WO2009048776A3 - Coarse wellsite analysis for field development planning - Google Patents
Coarse wellsite analysis for field development planning Download PDFInfo
- Publication number
- WO2009048776A3 WO2009048776A3 PCT/US2008/078446 US2008078446W WO2009048776A3 WO 2009048776 A3 WO2009048776 A3 WO 2009048776A3 US 2008078446 W US2008078446 W US 2008078446W WO 2009048776 A3 WO2009048776 A3 WO 2009048776A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- coarse
- wellsite
- field development
- development planning
- analysis
- Prior art date
Links
- 238000000034 method Methods 0.000 abstract 2
- 238000013480 data collection Methods 0.000 abstract 1
- 238000011156 evaluation Methods 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000013076 uncertainty analysis Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Abstract
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MX2010002527A MX2010002527A (en) | 2007-10-12 | 2008-10-01 | Coarse wellsite analysis for field development planning. |
CA2696820A CA2696820C (en) | 2007-10-12 | 2008-10-01 | Coarse wellsite analysis for field development planning |
RU2010119067/03A RU2489571C2 (en) | 2007-10-12 | 2008-10-01 | Preliminary analysis of drilling site for planning of deposite mining |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US97957807P | 2007-10-12 | 2007-10-12 | |
US60/979,578 | 2007-10-12 | ||
US12/240,609 | 2008-09-29 | ||
US12/240,609 US7660673B2 (en) | 2007-10-12 | 2008-09-29 | Coarse wellsite analysis for field development planning |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2009048776A2 WO2009048776A2 (en) | 2009-04-16 |
WO2009048776A3 true WO2009048776A3 (en) | 2010-12-16 |
Family
ID=40533058
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2008/078446 WO2009048776A2 (en) | 2007-10-12 | 2008-10-01 | Coarse wellsite analysis for field development planning |
Country Status (5)
Country | Link |
---|---|
US (1) | US7660673B2 (en) |
CA (1) | CA2696820C (en) |
MX (1) | MX2010002527A (en) |
RU (1) | RU2489571C2 (en) |
WO (1) | WO2009048776A2 (en) |
Families Citing this family (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9863240B2 (en) * | 2004-03-11 | 2018-01-09 | M-I L.L.C. | Method and apparatus for drilling a probabilistic approach |
US7731421B2 (en) * | 2007-06-25 | 2010-06-08 | Schlumberger Technology Corporation | Fluid level indication system and technique |
US8121790B2 (en) * | 2007-11-27 | 2012-02-21 | Schlumberger Technology Corporation | Combining reservoir modeling with downhole sensors and inductive coupling |
BRPI0820870A2 (en) | 2007-12-13 | 2015-06-16 | Exxonmobil Upstream Res Co | Method for simulating a reservoir model. |
CA2801386A1 (en) | 2010-06-15 | 2011-12-22 | Exxonmobil Upstream Research Company | Method and system for stabilizing formulation methods |
RU2449121C2 (en) * | 2010-07-20 | 2012-04-27 | Закрытое акционерное общество "КОНКОРД" | Controlled upscaling method |
US9134453B1 (en) * | 2011-04-01 | 2015-09-15 | Simpson Holdings, Inc. | Forecasting hydrocarbon production |
RU2475646C1 (en) * | 2011-08-17 | 2013-02-20 | Министерство образования и науки РФ Государственное образовательное учреждение высшего профессионального образования "Уральский государственный горный университет" | Method of construction of geologic and hydrodynamic model of oil and gas deposits |
CN104081000B (en) * | 2011-12-08 | 2017-03-08 | 沙特阿拉伯石油公司 | Using ultrasonic deep acidizing Enhancement Method and acidifying instrument |
US9460403B2 (en) | 2012-07-31 | 2016-10-04 | Landmark Graphics Corporation | Methods and systems related to hydrocarbon recovery strategy development |
US20140156194A1 (en) * | 2012-12-04 | 2014-06-05 | Schlumberger Technology Corporation | Deviated well log curve grids workflow |
CA2895400C (en) * | 2013-01-25 | 2017-12-05 | Landmark Graphics Corporation | Well integrity management using coupled engineering analysis |
US9097097B2 (en) | 2013-03-20 | 2015-08-04 | Baker Hughes Incorporated | Method of determination of fracture extent |
AU2013395719A1 (en) * | 2013-07-29 | 2015-12-10 | Halliburton Energy Services, Inc. | Tool casing detection |
US20160186496A1 (en) * | 2013-08-08 | 2016-06-30 | Energy Holdings Limited | Methods and apparatus for well productivity |
US9085958B2 (en) | 2013-09-19 | 2015-07-21 | Sas Institute Inc. | Control variable determination to maximize a drilling rate of penetration |
US9163497B2 (en) | 2013-10-22 | 2015-10-20 | Sas Institute Inc. | Fluid flow back prediction |
RU2541348C1 (en) * | 2014-01-09 | 2015-02-10 | Екатерина Алексеевна Пономарева | Method of construction of geologic model for oil and gas deposits |
EP3072075A4 (en) * | 2014-01-24 | 2017-01-11 | Landmark Graphics Corporation | Determining appraisal locations in a reservoir system |
RU2556649C1 (en) * | 2014-03-31 | 2015-07-10 | Общество с ограниченной ответственностью "Реагент" | Method of determining dynamics of extraction of hard to recover reserves of oil |
MX2017002531A (en) * | 2014-08-27 | 2017-06-08 | Digital H2O Inc | Oilfield water management. |
CA2974893C (en) | 2015-01-28 | 2021-12-28 | Schlumberger Canada Limited | Method of performing wellsite fracture operations with statistical uncertainties |
US10401808B2 (en) * | 2015-01-28 | 2019-09-03 | Schlumberger Technology Corporation | Methods and computing systems for processing and transforming collected data to improve drilling productivity |
EP3265647B1 (en) * | 2015-03-06 | 2021-02-24 | Hartford Steam Boiler Inspection and Insurance Company | Risk assessment for drilling and well completion operations |
WO2016186627A1 (en) * | 2015-05-15 | 2016-11-24 | Halliburton Energy Services, Inc. | Transforming historical well production data for predictive modeling |
WO2017027068A1 (en) * | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Well management on cloud computing system |
US10920538B2 (en) | 2015-08-07 | 2021-02-16 | Schlumberger Technology Corporation | Method integrating fracture and reservoir operations into geomechanical operations of a wellsite |
US10794154B2 (en) | 2015-08-07 | 2020-10-06 | Schlumberger Technology Corporation | Method of performing complex fracture operations at a wellsite having ledged fractures |
WO2017027433A1 (en) | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite |
US10415358B2 (en) | 2017-02-17 | 2019-09-17 | Saudi Arabian Oil Company | Conditioning a subterranean formation |
JP6942239B2 (en) | 2017-07-27 | 2021-09-29 | ハートフォード スチーム ボイラー インスペクション アンド インシュアランス カンパニー | Computer systems and computer implementations that utilize sensor-driven dynamically adjustable feedback loops to manage equipment-based risks to asset-specific levels of energy data use |
CN109505591B (en) * | 2017-09-13 | 2021-10-29 | 中国石油化工股份有限公司 | Method and system for determining permeability limit of unfilled karst cave of fracture-cavity oil reservoir |
US20200302293A1 (en) * | 2019-03-20 | 2020-09-24 | Exxonmobil Research And Engineering Company | Methods and systems for field development decision optimization |
CN110469319B (en) * | 2019-08-13 | 2023-01-24 | 中海石油(中国)有限公司 | Decision-making method for capacity test of ultra-deep water oil field in evaluation period |
US11643924B2 (en) | 2020-08-20 | 2023-05-09 | Saudi Arabian Oil Company | Determining matrix permeability of subsurface formations |
US11326092B2 (en) | 2020-08-24 | 2022-05-10 | Saudi Arabian Oil Company | High temperature cross-linked fracturing fluids with reduced friction |
CN112983375B (en) * | 2021-03-01 | 2022-12-02 | 中国石油天然气股份有限公司 | Well site construction method and device |
US11680887B1 (en) | 2021-12-01 | 2023-06-20 | Saudi Arabian Oil Company | Determining rock properties |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4831530A (en) * | 1987-06-26 | 1989-05-16 | Amoco Corporation | Method for determining in-situ formation properties |
US20040260472A1 (en) * | 2003-04-30 | 2004-12-23 | Exxonmobil Upstream Research Company | Method for predicting properties of a sedimentary deposit from a thickness contour of the deposit |
US20050203723A1 (en) * | 2004-03-11 | 2005-09-15 | Thomas Geehan | Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach |
RU2005133037A (en) * | 2005-10-26 | 2007-05-10 | Викторин Евгеньевич Пешков (RU) | METHOD FOR DEVELOPING OIL DEPOSIT |
US20070179766A1 (en) * | 2006-01-31 | 2007-08-02 | Landmark Graphics Corporation | Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7003439B2 (en) * | 2001-01-30 | 2006-02-21 | Schlumberger Technology Corporation | Interactive method for real-time displaying, querying and forecasting drilling event and hazard information |
CA2610300C (en) * | 2005-04-29 | 2016-08-02 | Landmark Graphics Corporation | Optimization of decisions regarding multiple assets in the presence of various underlying uncertainties |
RU2298817C2 (en) * | 2005-05-20 | 2007-05-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method for making local prognosis of oil content |
US7467045B2 (en) * | 2006-01-20 | 2008-12-16 | Schlumberger Technology Corporation | Method for assessment of uncertainty and risk |
GB2457823B (en) * | 2006-10-30 | 2012-03-21 | Logined Bv | System and method for performing oilfield simulation operations |
US7577527B2 (en) * | 2006-12-29 | 2009-08-18 | Schlumberger Technology Corporation | Bayesian production analysis technique for multistage fracture wells |
-
2008
- 2008-09-29 US US12/240,609 patent/US7660673B2/en not_active Expired - Fee Related
- 2008-10-01 RU RU2010119067/03A patent/RU2489571C2/en not_active IP Right Cessation
- 2008-10-01 CA CA2696820A patent/CA2696820C/en not_active Expired - Fee Related
- 2008-10-01 WO PCT/US2008/078446 patent/WO2009048776A2/en active Application Filing
- 2008-10-01 MX MX2010002527A patent/MX2010002527A/en active IP Right Grant
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4831530A (en) * | 1987-06-26 | 1989-05-16 | Amoco Corporation | Method for determining in-situ formation properties |
US20040260472A1 (en) * | 2003-04-30 | 2004-12-23 | Exxonmobil Upstream Research Company | Method for predicting properties of a sedimentary deposit from a thickness contour of the deposit |
US20050203723A1 (en) * | 2004-03-11 | 2005-09-15 | Thomas Geehan | Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach |
RU2005133037A (en) * | 2005-10-26 | 2007-05-10 | Викторин Евгеньевич Пешков (RU) | METHOD FOR DEVELOPING OIL DEPOSIT |
US20070179766A1 (en) * | 2006-01-31 | 2007-08-02 | Landmark Graphics Corporation | Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator |
Non-Patent Citations (2)
Title |
---|
DABOUL B ET AL: "VERBESSERUNG DER PRODUKTIONSVORHERSAGE VON GEFRACTEN GASBOHRUNGEN DURCH SIMULATION. ÖIMPROVED PRODUCTION FORECAST OF FRACTURED GAS WELLS BY 3D-RESERVOIR SIMULATION", ERDOEL ERDGAS KOHLE, URBAN VERLAG, HAMBURG, DE, vol. 112, no. 2, 1 February 1996 (1996-02-01), pages 66 - 69, XP000555639, ISSN: 0179-3187 * |
ROSS J G: "Risk and uncertainty in portfolio characterisation", JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, ELSEVIER, AMSTERDAM, NL LNKD- DOI:10.1016/J.PETROL.2004.02.004, vol. 44, no. 1-2, 31 October 2004 (2004-10-31), pages 41 - 53, XP004613308, ISSN: 0920-4105 * |
Also Published As
Publication number | Publication date |
---|---|
MX2010002527A (en) | 2010-03-25 |
RU2489571C2 (en) | 2013-08-10 |
CA2696820C (en) | 2014-12-23 |
US7660673B2 (en) | 2010-02-09 |
WO2009048776A2 (en) | 2009-04-16 |
CA2696820A1 (en) | 2009-04-16 |
US20090095469A1 (en) | 2009-04-16 |
RU2010119067A (en) | 2011-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2009048776A3 (en) | Coarse wellsite analysis for field development planning | |
WO2007018860A8 (en) | Well modeling associated with extraction of hydrocarbons from subsurface formations | |
EP1952280A4 (en) | System, method&computer program product for concept based searching&analysis | |
WO2012177791A3 (en) | System and method for building and managing user experience for computer software interfaces | |
WO2006014479A3 (en) | Data collection and analysis system | |
WO2013066953A3 (en) | Statistical analysis of combined log data | |
WO2007053630A3 (en) | System and method for providing a fraud risk score | |
WO2005066660A3 (en) | Processing seismic data representing a physical system | |
WO2008085424A3 (en) | Method and apparatus for multi-dimensional data analysis to identify rock heterogeneity | |
WO2007047868A3 (en) | System, method, and computer program for early event detection | |
WO2009089150A3 (en) | A system and method for real-time quality control for downhole logging devices | |
WO2011073861A3 (en) | Method for modeling a reservoir basin | |
WO2007015200A3 (en) | Apparatus for monitoring a person having an interest to an object, and method thereof | |
NO20065931L (en) | Method and apparatus for painting formation properties | |
WO2012167073A8 (en) | Methods, apparatuses, and computer program products for database record recovery | |
WO2007085875A3 (en) | A method of terrain correction for a geophysical survey | |
WO2008048357A3 (en) | Method and appartus for characterizing heavy oil components in petroleum reservoirs | |
WO2009117305A3 (en) | Analysis refracted acoustic waves measured in a borehole | |
WO2007006661A3 (en) | System and method for characterizing a chemical sample | |
WO2007084974A3 (en) | Systems and methods for acquiring analyzing mining data and information | |
WO2007124178A3 (en) | Methods for processing formatted data | |
WO2007133755A3 (en) | Structure model description and use for scatterometry-based semiconductor manufacturing process metrology | |
WO2008154325A3 (en) | Updating floor-specific information | |
WO2005048108A3 (en) | System, method, and computer program product for testing program code | |
WO2008008118A3 (en) | System and method for service oriented design process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08837489 Country of ref document: EP Kind code of ref document: A2 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2696820 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2010/002527 Country of ref document: MX |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2010119067 Country of ref document: RU |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 08837489 Country of ref document: EP Kind code of ref document: A2 |