WO2009048776A3 - Coarse wellsite analysis for field development planning - Google Patents

Coarse wellsite analysis for field development planning Download PDF

Info

Publication number
WO2009048776A3
WO2009048776A3 PCT/US2008/078446 US2008078446W WO2009048776A3 WO 2009048776 A3 WO2009048776 A3 WO 2009048776A3 US 2008078446 W US2008078446 W US 2008078446W WO 2009048776 A3 WO2009048776 A3 WO 2009048776A3
Authority
WO
WIPO (PCT)
Prior art keywords
coarse
wellsite
field development
development planning
analysis
Prior art date
Application number
PCT/US2008/078446
Other languages
French (fr)
Other versions
WO2009048776A2 (en
Inventor
George C. Dozier
Original Assignee
Schlumberger Canada Limited
Services Petroliers Schlumberger
Schlumberger Holdings Limited
Schlumberger Technology B.V.
Prad Research And Development Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Canada Limited, Services Petroliers Schlumberger, Schlumberger Holdings Limited, Schlumberger Technology B.V., Prad Research And Development Limited filed Critical Schlumberger Canada Limited
Priority to MX2010002527A priority Critical patent/MX2010002527A/en
Priority to CA2696820A priority patent/CA2696820C/en
Priority to RU2010119067/03A priority patent/RU2489571C2/en
Publication of WO2009048776A2 publication Critical patent/WO2009048776A2/en
Publication of WO2009048776A3 publication Critical patent/WO2009048776A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Abstract

A new method for assessing the probability of production at a wellsite. The process includes the four steps of: 1) Data Collection and Uncertainty Analysis (510); 2) Wellsite Preparation (520); 3) Treatment Selection/Job Execution (530); and 4) Evaluation and Upscaling to Field Level (540).
PCT/US2008/078446 2007-10-12 2008-10-01 Coarse wellsite analysis for field development planning WO2009048776A2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
MX2010002527A MX2010002527A (en) 2007-10-12 2008-10-01 Coarse wellsite analysis for field development planning.
CA2696820A CA2696820C (en) 2007-10-12 2008-10-01 Coarse wellsite analysis for field development planning
RU2010119067/03A RU2489571C2 (en) 2007-10-12 2008-10-01 Preliminary analysis of drilling site for planning of deposite mining

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US97957807P 2007-10-12 2007-10-12
US60/979,578 2007-10-12
US12/240,609 2008-09-29
US12/240,609 US7660673B2 (en) 2007-10-12 2008-09-29 Coarse wellsite analysis for field development planning

Publications (2)

Publication Number Publication Date
WO2009048776A2 WO2009048776A2 (en) 2009-04-16
WO2009048776A3 true WO2009048776A3 (en) 2010-12-16

Family

ID=40533058

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2008/078446 WO2009048776A2 (en) 2007-10-12 2008-10-01 Coarse wellsite analysis for field development planning

Country Status (5)

Country Link
US (1) US7660673B2 (en)
CA (1) CA2696820C (en)
MX (1) MX2010002527A (en)
RU (1) RU2489571C2 (en)
WO (1) WO2009048776A2 (en)

Families Citing this family (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9863240B2 (en) * 2004-03-11 2018-01-09 M-I L.L.C. Method and apparatus for drilling a probabilistic approach
US7731421B2 (en) * 2007-06-25 2010-06-08 Schlumberger Technology Corporation Fluid level indication system and technique
US8121790B2 (en) * 2007-11-27 2012-02-21 Schlumberger Technology Corporation Combining reservoir modeling with downhole sensors and inductive coupling
BRPI0820870A2 (en) 2007-12-13 2015-06-16 Exxonmobil Upstream Res Co Method for simulating a reservoir model.
CA2801386A1 (en) 2010-06-15 2011-12-22 Exxonmobil Upstream Research Company Method and system for stabilizing formulation methods
RU2449121C2 (en) * 2010-07-20 2012-04-27 Закрытое акционерное общество "КОНКОРД" Controlled upscaling method
US9134453B1 (en) * 2011-04-01 2015-09-15 Simpson Holdings, Inc. Forecasting hydrocarbon production
RU2475646C1 (en) * 2011-08-17 2013-02-20 Министерство образования и науки РФ Государственное образовательное учреждение высшего профессионального образования "Уральский государственный горный университет" Method of construction of geologic and hydrodynamic model of oil and gas deposits
CN104081000B (en) * 2011-12-08 2017-03-08 沙特阿拉伯石油公司 Using ultrasonic deep acidizing Enhancement Method and acidifying instrument
US9460403B2 (en) 2012-07-31 2016-10-04 Landmark Graphics Corporation Methods and systems related to hydrocarbon recovery strategy development
US20140156194A1 (en) * 2012-12-04 2014-06-05 Schlumberger Technology Corporation Deviated well log curve grids workflow
CA2895400C (en) * 2013-01-25 2017-12-05 Landmark Graphics Corporation Well integrity management using coupled engineering analysis
US9097097B2 (en) 2013-03-20 2015-08-04 Baker Hughes Incorporated Method of determination of fracture extent
AU2013395719A1 (en) * 2013-07-29 2015-12-10 Halliburton Energy Services, Inc. Tool casing detection
US20160186496A1 (en) * 2013-08-08 2016-06-30 Energy Holdings Limited Methods and apparatus for well productivity
US9085958B2 (en) 2013-09-19 2015-07-21 Sas Institute Inc. Control variable determination to maximize a drilling rate of penetration
US9163497B2 (en) 2013-10-22 2015-10-20 Sas Institute Inc. Fluid flow back prediction
RU2541348C1 (en) * 2014-01-09 2015-02-10 Екатерина Алексеевна Пономарева Method of construction of geologic model for oil and gas deposits
EP3072075A4 (en) * 2014-01-24 2017-01-11 Landmark Graphics Corporation Determining appraisal locations in a reservoir system
RU2556649C1 (en) * 2014-03-31 2015-07-10 Общество с ограниченной ответственностью "Реагент" Method of determining dynamics of extraction of hard to recover reserves of oil
MX2017002531A (en) * 2014-08-27 2017-06-08 Digital H2O Inc Oilfield water management.
CA2974893C (en) 2015-01-28 2021-12-28 Schlumberger Canada Limited Method of performing wellsite fracture operations with statistical uncertainties
US10401808B2 (en) * 2015-01-28 2019-09-03 Schlumberger Technology Corporation Methods and computing systems for processing and transforming collected data to improve drilling productivity
EP3265647B1 (en) * 2015-03-06 2021-02-24 Hartford Steam Boiler Inspection and Insurance Company Risk assessment for drilling and well completion operations
WO2016186627A1 (en) * 2015-05-15 2016-11-24 Halliburton Energy Services, Inc. Transforming historical well production data for predictive modeling
WO2017027068A1 (en) * 2015-08-07 2017-02-16 Schlumberger Technology Corporation Well management on cloud computing system
US10920538B2 (en) 2015-08-07 2021-02-16 Schlumberger Technology Corporation Method integrating fracture and reservoir operations into geomechanical operations of a wellsite
US10794154B2 (en) 2015-08-07 2020-10-06 Schlumberger Technology Corporation Method of performing complex fracture operations at a wellsite having ledged fractures
WO2017027433A1 (en) 2015-08-07 2017-02-16 Schlumberger Technology Corporation Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite
US10415358B2 (en) 2017-02-17 2019-09-17 Saudi Arabian Oil Company Conditioning a subterranean formation
JP6942239B2 (en) 2017-07-27 2021-09-29 ハートフォード スチーム ボイラー インスペクション アンド インシュアランス カンパニー Computer systems and computer implementations that utilize sensor-driven dynamically adjustable feedback loops to manage equipment-based risks to asset-specific levels of energy data use
CN109505591B (en) * 2017-09-13 2021-10-29 中国石油化工股份有限公司 Method and system for determining permeability limit of unfilled karst cave of fracture-cavity oil reservoir
US20200302293A1 (en) * 2019-03-20 2020-09-24 Exxonmobil Research And Engineering Company Methods and systems for field development decision optimization
CN110469319B (en) * 2019-08-13 2023-01-24 中海石油(中国)有限公司 Decision-making method for capacity test of ultra-deep water oil field in evaluation period
US11643924B2 (en) 2020-08-20 2023-05-09 Saudi Arabian Oil Company Determining matrix permeability of subsurface formations
US11326092B2 (en) 2020-08-24 2022-05-10 Saudi Arabian Oil Company High temperature cross-linked fracturing fluids with reduced friction
CN112983375B (en) * 2021-03-01 2022-12-02 中国石油天然气股份有限公司 Well site construction method and device
US11680887B1 (en) 2021-12-01 2023-06-20 Saudi Arabian Oil Company Determining rock properties

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4831530A (en) * 1987-06-26 1989-05-16 Amoco Corporation Method for determining in-situ formation properties
US20040260472A1 (en) * 2003-04-30 2004-12-23 Exxonmobil Upstream Research Company Method for predicting properties of a sedimentary deposit from a thickness contour of the deposit
US20050203723A1 (en) * 2004-03-11 2005-09-15 Thomas Geehan Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach
RU2005133037A (en) * 2005-10-26 2007-05-10 Викторин Евгеньевич Пешков (RU) METHOD FOR DEVELOPING OIL DEPOSIT
US20070179766A1 (en) * 2006-01-31 2007-08-02 Landmark Graphics Corporation Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7003439B2 (en) * 2001-01-30 2006-02-21 Schlumberger Technology Corporation Interactive method for real-time displaying, querying and forecasting drilling event and hazard information
CA2610300C (en) * 2005-04-29 2016-08-02 Landmark Graphics Corporation Optimization of decisions regarding multiple assets in the presence of various underlying uncertainties
RU2298817C2 (en) * 2005-05-20 2007-05-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for making local prognosis of oil content
US7467045B2 (en) * 2006-01-20 2008-12-16 Schlumberger Technology Corporation Method for assessment of uncertainty and risk
GB2457823B (en) * 2006-10-30 2012-03-21 Logined Bv System and method for performing oilfield simulation operations
US7577527B2 (en) * 2006-12-29 2009-08-18 Schlumberger Technology Corporation Bayesian production analysis technique for multistage fracture wells

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4831530A (en) * 1987-06-26 1989-05-16 Amoco Corporation Method for determining in-situ formation properties
US20040260472A1 (en) * 2003-04-30 2004-12-23 Exxonmobil Upstream Research Company Method for predicting properties of a sedimentary deposit from a thickness contour of the deposit
US20050203723A1 (en) * 2004-03-11 2005-09-15 Thomas Geehan Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach
RU2005133037A (en) * 2005-10-26 2007-05-10 Викторин Евгеньевич Пешков (RU) METHOD FOR DEVELOPING OIL DEPOSIT
US20070179766A1 (en) * 2006-01-31 2007-08-02 Landmark Graphics Corporation Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
DABOUL B ET AL: "VERBESSERUNG DER PRODUKTIONSVORHERSAGE VON GEFRACTEN GASBOHRUNGEN DURCH SIMULATION. ÖIMPROVED PRODUCTION FORECAST OF FRACTURED GAS WELLS BY 3D-RESERVOIR SIMULATION", ERDOEL ERDGAS KOHLE, URBAN VERLAG, HAMBURG, DE, vol. 112, no. 2, 1 February 1996 (1996-02-01), pages 66 - 69, XP000555639, ISSN: 0179-3187 *
ROSS J G: "Risk and uncertainty in portfolio characterisation", JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, ELSEVIER, AMSTERDAM, NL LNKD- DOI:10.1016/J.PETROL.2004.02.004, vol. 44, no. 1-2, 31 October 2004 (2004-10-31), pages 41 - 53, XP004613308, ISSN: 0920-4105 *

Also Published As

Publication number Publication date
MX2010002527A (en) 2010-03-25
RU2489571C2 (en) 2013-08-10
CA2696820C (en) 2014-12-23
US7660673B2 (en) 2010-02-09
WO2009048776A2 (en) 2009-04-16
CA2696820A1 (en) 2009-04-16
US20090095469A1 (en) 2009-04-16
RU2010119067A (en) 2011-11-20

Similar Documents

Publication Publication Date Title
WO2009048776A3 (en) Coarse wellsite analysis for field development planning
WO2007018860A8 (en) Well modeling associated with extraction of hydrocarbons from subsurface formations
EP1952280A4 (en) System, method&computer program product for concept based searching&analysis
WO2012177791A3 (en) System and method for building and managing user experience for computer software interfaces
WO2006014479A3 (en) Data collection and analysis system
WO2013066953A3 (en) Statistical analysis of combined log data
WO2007053630A3 (en) System and method for providing a fraud risk score
WO2005066660A3 (en) Processing seismic data representing a physical system
WO2008085424A3 (en) Method and apparatus for multi-dimensional data analysis to identify rock heterogeneity
WO2007047868A3 (en) System, method, and computer program for early event detection
WO2009089150A3 (en) A system and method for real-time quality control for downhole logging devices
WO2011073861A3 (en) Method for modeling a reservoir basin
WO2007015200A3 (en) Apparatus for monitoring a person having an interest to an object, and method thereof
NO20065931L (en) Method and apparatus for painting formation properties
WO2012167073A8 (en) Methods, apparatuses, and computer program products for database record recovery
WO2007085875A3 (en) A method of terrain correction for a geophysical survey
WO2008048357A3 (en) Method and appartus for characterizing heavy oil components in petroleum reservoirs
WO2009117305A3 (en) Analysis refracted acoustic waves measured in a borehole
WO2007006661A3 (en) System and method for characterizing a chemical sample
WO2007084974A3 (en) Systems and methods for acquiring analyzing mining data and information
WO2007124178A3 (en) Methods for processing formatted data
WO2007133755A3 (en) Structure model description and use for scatterometry-based semiconductor manufacturing process metrology
WO2008154325A3 (en) Updating floor-specific information
WO2005048108A3 (en) System, method, and computer program product for testing program code
WO2008008118A3 (en) System and method for service oriented design process

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08837489

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 2696820

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: MX/A/2010/002527

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2010119067

Country of ref document: RU

122 Ep: pct application non-entry in european phase

Ref document number: 08837489

Country of ref document: EP

Kind code of ref document: A2