WO2008035989A2 - Utility meter installation system and method - Google Patents

Utility meter installation system and method Download PDF

Info

Publication number
WO2008035989A2
WO2008035989A2 PCT/NZ2007/000249 NZ2007000249W WO2008035989A2 WO 2008035989 A2 WO2008035989 A2 WO 2008035989A2 NZ 2007000249 W NZ2007000249 W NZ 2007000249W WO 2008035989 A2 WO2008035989 A2 WO 2008035989A2
Authority
WO
WIPO (PCT)
Prior art keywords
job
records
wireless device
installer
central server
Prior art date
Application number
PCT/NZ2007/000249
Other languages
French (fr)
Other versions
WO2008035989A3 (en
Inventor
Stephen Gregory Hunt
Original Assignee
Arc Innovations Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Arc Innovations Limited filed Critical Arc Innovations Limited
Publication of WO2008035989A2 publication Critical patent/WO2008035989A2/en
Publication of WO2008035989A3 publication Critical patent/WO2008035989A3/en

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D4/00Tariff metering apparatus
    • G01D4/002Remote reading of utility meters
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/30Smart metering, e.g. specially adapted for remote reading

Definitions

  • the present invention relates to a method and system for installing electrical equipment. Mote particularly but not exclusively the invention relates to a method and system for effecting a change to one or more utility meters at one or more customer premises.
  • the installation, maintenance and repair of utility meters is a complex task.
  • the task is required to be carried out by a skilled human installer.
  • the installer requires a significant amount of data that is specific to an individual meter being removed, an individual meter being installed, and information about the customer for whom the operation has been performed and pricing information specific to that customer.
  • One method of providing such detailed information to an installer is by providing the installer with a handheld computing device that is in wireless communication with a central server.
  • a handheld computing device that is in wireless communication with a central server.
  • network coverage is not available in many of the customer premises in which an installer works.
  • the information required by an installer to conduct a job at a customer premises is often not able to be transmitted in real time from the central server to the handheld device of the installer.
  • a further problem is that the data recorded by the installer is not able to be transmitted to the central server resulting in a loss of accuracy and/or quality of data.
  • a further disadvantage of simple techniques involving handheld computing devices is that such prior art techniques do not facilitate the required tests and capture of the necessary data. In some cases it is necessary to obtain test results that are specific to the type of installation, site certification number, seal number and so on. Prior art techniques do not address the need to obtain specific test results. It is an object of the present invention to provide an improved or alternative method for installing utility meters at a customer premises, or to at least provide the public with a useful choice.
  • the invention in one form provides a method of effecting a change to one or more utility meters at one or more customer premises, the method comprising transmitting one or more job summary records from a central server to a wireless device operated by a utility meter installer; displaying at least part of the or at least one of the job summary records on the wireless device; accepting an installer selection of the or at least one of the displayed job summary records; transmitting one or more job detail records from the central server to the wireless device, the job detail records associated with respective selected job summary records; effecting the change specified in the job detail record(s); modifying one or more of the job detail records; and transmitting one or more of the modified job detail records to die central server.
  • FIG. 1 shows a preferred form system in which the techniques described below can be implemented
  • Figure 2 shows a preferred form method for transmitting summary records and job detail records over the network of figure 1;
  • Figure 3 shows a preferred form method for recording details of utility meter installations
  • Figure 4 shows a preferred form process for uploading job details to the central server.
  • FIG. 1 shows a preferred form system in which the techniques described below can be implemented.
  • the system 100 includes a plurality of utility meters 105, M .
  • Utility meters 105 are indicated generally as customer premises equipment or CPE.
  • the utility meters monitor usage of a utility such as electricity, gas or water to a customer premises.
  • Utility meters 105 are installed and maintained by a certified human installer. The installer is contracted or employed by a utility supplier to maintain the utility meters.
  • At least one of the human installers has control or at least access to wireless device 110.
  • This wireless device 110 includes for example a personal digital assistant (PDA) capable of both wireless and wireline communication with other entities.
  • PDA personal digital assistant
  • the wireless device typically has a display screen, a processing module or CPU and a storage component.
  • System 100 further includes a central server or similar that is operated by a utility sendee provider.
  • the central server 115 has stored on it or at least has access to data records representing utility meters 105 that are installed at customer premises. As will be described further below the central server transmits both summary records 120, x and job detail records 125j ⁇ .
  • Central server 115 manages summary records 120 and job detail records 125 through I/O component 128.
  • the central server 115 and wireless device 110 are configured to transmit summary records 120 and job detail records 125 over network or networks 130.
  • central server 115 and utility meters 105 are configured to transmit data between themselves also over network 130.
  • Figure 2 illustrates one preferred form method for transmitting both summary records and job detail records from the central server 115 to the wireless device 110.
  • the installer is optionally offered the capability of entering on the wireless device 110 one or more search criteria. It is envisaged that the search criteria will include street name, suburb, ICP number and/or job number. An ICP number identifies an electricity connection point and is a unique identifier across New Zealand for a particular utility meter installation.
  • the installer enters 205 one or more search criteria into the wireless device.
  • the search criteria are matched at the central server against a series of job records. Of those job records that match the search criteria entered at the wireless device, summary records of those job records are transmitted 210 from the central server 115 to the wireless device 110.
  • the search results are displayed 215 on the display associated with the wireless device 110. It is envisaged that up to 20 individual jobs will be shown at any one time on the wireless device. It will be appreciated that the number of jobs able to be shown at a particular time is a configurable number and depends at least partly on the size of the display associated with the wireless device. It is envisaged that at least the address, ICP number and job number will be displayed on the wireless device.
  • the job type specifies the nature of the job to be performed by the installer. This could include installing a utility meter, upgrading a utility meter, attending to a fault, removing a meter, installing a prepay system and so on.
  • the controller type specifies the manner in which the utility meter is configured to communicate with wireless device 110 and central server 115. This could include for example RF mesh or GSM.
  • the user identifier specifies the first installer, if any, that has downloaded the job. It is envisaged that at least some of the job records 120 and/ or 125 include a job completion status indicator. This status indicator specifies whether a job has not yet been started, is in progress or is completed. It is envisaged that some filtering of summary records is performed at the central server so that the summary records transmitted to the wireless device include only jobs that have been assigned to the organisation to which the installer belongs and those jobs which have a status of in progress.
  • the installer selects 220 one or more jobs to download. It is envisaged that a maximum number of jobs able to be downloaded at one time is set to 20 although it will be appreciated that this number is a configurable number and able to be changed.
  • At least one pre download task is performed.
  • One such pre download task is to transmit 225 wireless device configuration information from the central server 115 to the wireless device 110.
  • This configuration data includes display locations, utility meter locations and other information.
  • a further possible pre download task is to delete 230 old jobs.
  • Wireless device 110 transmits a first set of one or more job numbers or job number identifiers. This first set of job number identifiers represents jobs that have not yet been started. As will be described below, as jobs are completed or partially completed, job detail records are changed to represent progress on individual jobs. Jobs that have not been started do not have modified job detail records.
  • the central server 115 transmits a second set of one or more job number identifiers from the central server 115 to the wireless device 110.
  • This second set of job number identifiers represents a subset of the first set of job number identifiers.
  • the job detail records associated with these job number identifiers have a job completion status of other than "in progress”. This includes job detail records that have the status "completed” or "not started”.
  • the job detail records represented by the second set of job number identifiers are then deleted from the "wireless device.
  • the job detail records for the job or jobs selected by the installer are then transmitted 235 from the central server to the wireless device. If this is the first time that a job has been transmitted to a wireless device, then die user identifier of die installer operating the wireless device is recorded in the job record stored in the central server. This means that diat job is not sent to other installers on the same or subsequent days.
  • Figure 3 illustrates one preferred form method for recording details of utility meter installations.
  • the installer has selected a job detail record and this job detail record is displayed 305 on the wireless device.
  • Typical details displayed include job number, installation type, job type, address, customer name, phone number and so on.
  • the installer decides whedier or not to accept the job 310. If the installer does not accept the selected job the installer selects 315 another job detail record.
  • the installer removes the existing or old equipment at the customer premises.
  • the installer records 320 details of this removed equipment, for example the owner and serial number of each meter, in the wireless device.
  • the wireless device then displays 325 metering configuration.
  • One way of displaying this information is a drop down list of rate prices for a particular utility.
  • the installer selects an appropriate rate from die drop down list.
  • the wireless device displays further metering configuration details, for example, die number of meters to install, the type of meters to install, die configuration of each meter and so on.
  • Details are tiien recorded 330 of the installed equipment in the wireless device.
  • die serial number of each new meter is scanned.
  • the serial number of each meter is compared with a list of serial numbers stored in the wireless device for validation. If the new serial number scanned matches a serial number in the list then validation fails. It is envisaged diat the wireless device includes a potge function to purge all se ⁇ ial numbers scanned earlier than a predetermined time period where necessary to save space.
  • the wireless device initialises 335 a controller within the meter. The initialisation data is linked to the rate product selected by die installer.
  • the wireless device checks 340 die controller to ensure tiiat it is functioning correcdy. If the controller is not functioning correcdy steps 325 to 340 are then repeated.
  • the installer updates 345 the job detail record with die job type, any site hazards, access notes, test data and certification data.
  • die updated job detail record or records is/are transmitted 350 back to the central server.
  • the transmission step is conducted at the customer premises site if network coverage is available. The benefit of doing die transmission at this point is that if there are any serial number validation issues at die central server side, then die installer will be alerted to these issues while still at die customer site and is able to take corrective action at diat time.
  • die installer chooses not to upload the job details at the end of die installation, or if there is no network coverage, dien die job detail records are uploaded once the wireless device is back within network coverage, or when specified by the installer.
  • Figure 4 shows a preferred form process for uploading job details to die central server.
  • An "upload job details to server" option is preferably made available to die installer on die wireless device. If selected by the installer, all jobs stored on the wireless device for which the meter has been installed but die data has not yet been uploaded is tiien transmitted 405 to die central server. The information transmitted includes die number of meters installed at a customer site, serial numbers and odier data.
  • an exception report is generated 420.
  • An exception report is a notification to die wireless device of die installer tiiat the job has not been closed together with a reason for the lack of closure.
  • a further example of an exception report is a daily report created by the central server that contains a list of all jobs not closed. This report can be transmitted to interested parties for action.
  • the job is marked as closed 430 in the central server.
  • the job detail records have already been transmitted to the central server. Closing the job involves the central server setting a flag indicating that the job is now closed.

Abstract

The invention provides a method of effecting a change to one or more utility meters at one or more customer premises. The method includes transmitting one or more job summary records from a central server to a wireless device operated by a utility meter installer; displaying at least part of the or at least one of the job summary records on the wireless device; accepting an installer selection of the or at least one of the displayed job summary records; transmitting one or more job detail records from the central server to the wireless device; effecting the change specified in the job detail record(s); modifying one or more of the job detail records; and transmitting one or more of the modified job detail records to the central server.

Description

UTILITY METER INSTALLATION SYSTEM AND METHOD
FIELD OF INVENTION
The present invention relates to a method and system for installing electrical equipment. Mote particularly but not exclusively the invention relates to a method and system for effecting a change to one or more utility meters at one or more customer premises.
BACKGROUND OF INVENTION
The installation, maintenance and repair of utility meters is a complex task. The task is required to be carried out by a skilled human installer. The installer requires a significant amount of data that is specific to an individual meter being removed, an individual meter being installed, and information about the customer for whom the operation has been performed and pricing information specific to that customer.
The data required to be maintained is in most countries specified by regulatory requirements. Normal paper-based systems for capturing the required data are complicated, time-consuming and error prone.
One method of providing such detailed information to an installer is by providing the installer with a handheld computing device that is in wireless communication with a central server. One problem with such an arrangement is that network coverage is not available in many of the customer premises in which an installer works. The information required by an installer to conduct a job at a customer premises is often not able to be transmitted in real time from the central server to the handheld device of the installer. A further problem is that the data recorded by the installer is not able to be transmitted to the central server resulting in a loss of accuracy and/or quality of data.
A further disadvantage of simple techniques involving handheld computing devices is that such prior art techniques do not facilitate the required tests and capture of the necessary data. In some cases it is necessary to obtain test results that are specific to the type of installation, site certification number, seal number and so on. Prior art techniques do not address the need to obtain specific test results. It is an object of the present invention to provide an improved or alternative method for installing utility meters at a customer premises, or to at least provide the public with a useful choice.
SUMMARY OF THE INVENTION
The invention in one form provides a method of effecting a change to one or more utility meters at one or more customer premises, the method comprising transmitting one or more job summary records from a central server to a wireless device operated by a utility meter installer; displaying at least part of the or at least one of the job summary records on the wireless device; accepting an installer selection of the or at least one of the displayed job summary records; transmitting one or more job detail records from the central server to the wireless device, the job detail records associated with respective selected job summary records; effecting the change specified in the job detail record(s); modifying one or more of the job detail records; and transmitting one or more of the modified job detail records to die central server.
The term "comprising" as used in this specification and claims means "consisting at least in part of. That is to say, when interpreting statements in this specification and claims which include "comprising", the features prefaced by this term in each statement all need to be present but other features can also be present. Related terms such as "comprise" and "comprised" are to be interpreted in a similar manner.
To those skilled in the art to which die invention relates, many changes in construction and widely differing embodiments and applications of the invention will suggest themselves without departing from the scope of the invention as defined in the appended claims. The disclosures and the descriptions herein are purely illustrative and are not intended to be in any sense limiting.
BRIEF DESCRIPTION OF THE FIGURES
The invention will now be described by way of example only and with reference to the drawings in which:
Figure 1 shows a preferred form system in which the techniques described below can be implemented;
Figure 2 shows a preferred form method for transmitting summary records and job detail records over the network of figure 1;
Figure 3 shows a preferred form method for recording details of utility meter installations; and
Figure 4 shows a preferred form process for uploading job details to the central server.
DETAILED DESCRIPTION
Figure 1 shows a preferred form system in which the techniques described below can be implemented. The system 100 includes a plurality of utility meters 105, M. Utility meters 105 are indicated generally as customer premises equipment or CPE. The utility meters monitor usage of a utility such as electricity, gas or water to a customer premises. Utility meters 105 are installed and maintained by a certified human installer. The installer is contracted or employed by a utility supplier to maintain the utility meters.
At least one of the human installers has control or at least access to wireless device 110. This wireless device 110 includes for example a personal digital assistant (PDA) capable of both wireless and wireline communication with other entities. The wireless device typically has a display screen, a processing module or CPU and a storage component.
System 100 further includes a central server or similar that is operated by a utility sendee provider. The central server 115 has stored on it or at least has access to data records representing utility meters 105 that are installed at customer premises. As will be described further below the central server transmits both summary records 120, x and job detail records 125j γ. Central server 115 manages summary records 120 and job detail records 125 through I/O component 128. The central server 115 and wireless device 110 are configured to transmit summary records 120 and job detail records 125 over network or networks 130. As shown in Figure 1, central server 115 and utility meters 105 are configured to transmit data between themselves also over network 130.
Figure 2 illustrates one preferred form method for transmitting both summary records and job detail records from the central server 115 to the wireless device 110.
The installer is optionally offered the capability of entering on the wireless device 110 one or more search criteria. It is envisaged that the search criteria will include street name, suburb, ICP number and/or job number. An ICP number identifies an electricity connection point and is a unique identifier across New Zealand for a particular utility meter installation. The installer enters 205 one or more search criteria into the wireless device.
The search criteria are matched at the central server against a series of job records. Of those job records that match the search criteria entered at the wireless device, summary records of those job records are transmitted 210 from the central server 115 to the wireless device 110.
The search results are displayed 215 on the display associated with the wireless device 110. It is envisaged that up to 20 individual jobs will be shown at any one time on the wireless device. It will be appreciated that the number of jobs able to be shown at a particular time is a configurable number and depends at least partly on the size of the display associated with the wireless device. It is envisaged that at least the address, ICP number and job number will be displayed on the wireless device.
Also displayed could be the customer name, a job type, a controller type, and a user identifier. The job type specifies the nature of the job to be performed by the installer. This could include installing a utility meter, upgrading a utility meter, attending to a fault, removing a meter, installing a prepay system and so on. The controller type specifies the manner in which the utility meter is configured to communicate with wireless device 110 and central server 115. This could include for example RF mesh or GSM. The user identifier specifies the first installer, if any, that has downloaded the job. It is envisaged that at least some of the job records 120 and/ or 125 include a job completion status indicator. This status indicator specifies whether a job has not yet been started, is in progress or is completed. It is envisaged that some filtering of summary records is performed at the central server so that the summary records transmitted to the wireless device include only jobs that have been assigned to the organisation to which the installer belongs and those jobs which have a status of in progress.
From the list of summary records displayed on the wireless device 110, the installer selects 220 one or more jobs to download. It is envisaged that a maximum number of jobs able to be downloaded at one time is set to 20 although it will be appreciated that this number is a configurable number and able to be changed.
Before job details records are transmitted to the wireless device, at least one pre download task is performed. One such pre download task is to transmit 225 wireless device configuration information from the central server 115 to the wireless device 110. This configuration data includes display locations, utility meter locations and other information.
It is expected that the wireless device configuration information only changes occasionally. For this reason it is only necessary to transmit this data from the central server to the wireless device once per day. The installer will generally download the configuration data prior to jobs being downloaded for the first time on any given day.
A further possible pre download task is to delete 230 old jobs. Wireless device 110 transmits a first set of one or more job numbers or job number identifiers. This first set of job number identifiers represents jobs that have not yet been started. As will be described below, as jobs are completed or partially completed, job detail records are changed to represent progress on individual jobs. Jobs that have not been started do not have modified job detail records.
The central server 115 transmits a second set of one or more job number identifiers from the central server 115 to the wireless device 110. This second set of job number identifiers represents a subset of the first set of job number identifiers. The job detail records associated with these job number identifiers have a job completion status of other than "in progress". This includes job detail records that have the status "completed" or "not started". The job detail records represented by the second set of job number identifiers are then deleted from the "wireless device.
Once the above pre download tasks have been performed, the job detail records for the job or jobs selected by the installer are then transmitted 235 from the central server to the wireless device. If this is the first time that a job has been transmitted to a wireless device, then die user identifier of die installer operating the wireless device is recorded in the job record stored in the central server. This means that diat job is not sent to other installers on the same or subsequent days.
Figure 3 illustrates one preferred form method for recording details of utility meter installations.
The installer has selected a job detail record and this job detail record is displayed 305 on the wireless device. Typical details displayed include job number, installation type, job type, address, customer name, phone number and so on.
The installer decides whedier or not to accept the job 310. If the installer does not accept the selected job the installer selects 315 another job detail record.
If the installer accepts the job the installer removes the existing or old equipment at the customer premises. The installer records 320 details of this removed equipment, for example the owner and serial number of each meter, in the wireless device.
The wireless device then displays 325 metering configuration. One way of displaying this information is a drop down list of rate prices for a particular utility. The installer selects an appropriate rate from die drop down list. Once the installer has selected a rate price, the wireless device displays further metering configuration details, for example, die number of meters to install, the type of meters to install, die configuration of each meter and so on.
Details are tiien recorded 330 of the installed equipment in the wireless device. In one embodiment die serial number of each new meter is scanned. The serial number of each meter is compared with a list of serial numbers stored in the wireless device for validation. If the new serial number scanned matches a serial number in the list then validation fails. It is envisaged diat the wireless device includes a puige function to purge all seϊial numbers scanned earlier than a predetermined time period where necessary to save space. Using a wired or wireless connection to the utility meter, the wireless device initialises 335 a controller within the meter. The initialisation data is linked to the rate product selected by die installer.
The wireless device checks 340 die controller to ensure tiiat it is functioning correcdy. If the controller is not functioning correcdy steps 325 to 340 are then repeated.
If the controller is functioning correctly the installer updates 345 the job detail record with die job type, any site hazards, access notes, test data and certification data.
If network coverage is available, die updated job detail record or records is/are transmitted 350 back to the central server. The transmission step is conducted at the customer premises site if network coverage is available. The benefit of doing die transmission at this point is that if there are any serial number validation issues at die central server side, then die installer will be alerted to these issues while still at die customer site and is able to take corrective action at diat time.
If die installer chooses not to upload the job details at the end of die installation, or if there is no network coverage, dien die job detail records are uploaded once the wireless device is back within network coverage, or when specified by the installer.
Figure 4 shows a preferred form process for uploading job details to die central server. An "upload job details to server" option is preferably made available to die installer on die wireless device. If selected by the installer, all jobs stored on the wireless device for which the meter has been installed but die data has not yet been uploaded is tiien transmitted 405 to die central server. The information transmitted includes die number of meters installed at a customer site, serial numbers and odier data.
As each job detail record is transmitted to die central server, validation is performed 410 against the serial numbers in die job detail records. If any of die serial numbers provided or transmitted to die central server do not match die serial numbers stored in die central server, tiien validation will fail. If any of the serial numbers have been used for previous jobs tiien validation will also fail.
If validation fails 415, an exception report is generated 420. One example of an exception report is a notification to die wireless device of die installer tiiat the job has not been closed together with a reason for the lack of closure. A further example of an exception report is a daily report created by the central server that contains a list of all jobs not closed. This report can be transmitted to interested parties for action.
If validation fails for a job detail record, that job is suspended 425. The job can be resumed at a later date.
If validation performs successfully, the job is marked as closed 430 in the central server. The job detail records have already been transmitted to the central server. Closing the job involves the central server setting a flag indicating that the job is now closed.
The foregoing describes the invention including preferred forms thereof. Modifications and improvements as would be obvious to those skilled in the art are intended to be incorporated in the scope hereof, as defined by the accompanying claims.

Claims

WHAT WE CLAIM IS:
1. A method of effecting a change to one or more utility meters at one or more customer premises, the method comprising:
transmitting one or more job summary records from a central server to a wireless device operated by a utility meter installer;
displaying at least part of the or at least one of the job summary records on the wireless device;
accepting an installer selection of the or at least one of the displayed job summary records;
transmitting one or more job detail records from the central server to the wireless device, the job detail records associated widi respective selected job summary records;
effecting the change specified in die job detail record(s);
modifying one or more of the job detail records; and
transmitting one or more of the modified job detail records to the central server.
2. The mediod of claim 1 where the job summary records and the job detail records include a job number identifier, and where job detail records diat are associated with job summary records include the same job number identifier.
3. The method of claim 2 where the job detail records include a job completion status indicator.
4. The method of claim 3 where the list of possible values for the indicator include "not started", "in progress" and "completed".
5. The method of claim 4 wherein the transmitted job summary records each have an associated job detail record having a job completion status of "in progress".
6. The method of claim 5 further comprising:
transmitting a first set of one or more job number identifiers from the wireless device to the central server, the first set of job number identifiers representing job detail records for which changes have not been effected;
transmitting a second set of one or more job number identifiers from the central server to the wireless device, the second set of job number identifiers representing a subset of the first set of job number identifiers having an associated job detail record having a job completion status other than "in progress"; and
deleting the job detail records represented by the second set of job number identifiers from the wireless device.
7. The method of any one of the preceding claims where the job detail records include an installer identifier, the method further comprising the step of modifying the installer identifier of the job detail records on the central server for each job detail record transmitted to the wireless device.
8. The mediod of any one of the preceding claims where transmitting the job summary record(s) is performed following a query by the installer.
9. A system for effecting a change to one or more utility meters at one or more customer premises, the system comprising:
one or more job summary records maintained in computer memory;
one or more job detail records maintained in computer memory, the job detail records associated with respective selected job summary records;
a server configured to retrieve one or more job summary records from computer memory; a wireless device configured to receive the or at least one of the retrieved job summary records over a network and to display at least part of the or at least one of the retrieved job summary records; and
a user input component configured to receive an installer selection of the or at least one of the displayed job summary records;
the server configured to receive the installer selection and to retrieve at least one job detail record from computer memory that corresponds to the installer selection; and
the wireless device configured to receive the or at least one of the retrieved job detail records, to receive modifications to the job detail record(s) from the user input component and to transmit the modifications to the server.
PCT/NZ2007/000249 2006-09-18 2007-09-06 Utility meter installation system and method WO2008035989A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NZ549934 2006-09-18
NZ54993406 2006-09-18

Publications (2)

Publication Number Publication Date
WO2008035989A2 true WO2008035989A2 (en) 2008-03-27
WO2008035989A3 WO2008035989A3 (en) 2008-06-26

Family

ID=39200990

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NZ2007/000249 WO2008035989A2 (en) 2006-09-18 2007-09-06 Utility meter installation system and method

Country Status (1)

Country Link
WO (1) WO2008035989A2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2503295A1 (en) * 2011-03-25 2012-09-26 Cinterion Wireless Modules GmbH Communication module, point of entry electricity metering device, metering system of a metered user area and method for self organized regulating a power consumption via a point of entry electricity metereing device in a metered user area of an electricity grid
US9955239B2 (en) 2016-07-15 2018-04-24 Honeywell International Inc. Configurable secure mobile tool for AMI and AMR metering systems

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020010615A1 (en) * 2000-03-31 2002-01-24 Simon Jacobs Methods and systems for scheduling complex work orders for a workforce of mobile service technicians
US6430562B1 (en) * 1999-03-01 2002-08-06 Electronic Data Systems Corporation Integrated resource management system and method
US6484036B1 (en) * 1999-11-19 2002-11-19 International Business Machines Corporation Method and apparatus for scheduling mobile agents utilizing rapid two-way communication
US20030028410A1 (en) * 2001-08-01 2003-02-06 House Michael Brynn Method and apparatus for wireless workforce mobilization and management
US20050015292A1 (en) * 2003-07-15 2005-01-20 Sbc Knowledge Ventures Lp Dispatch and service support system
US6900738B2 (en) * 2000-06-21 2005-05-31 Henry Crichlow Method and apparatus for reading a meter and providing customer service via the internet
US20060071812A1 (en) * 2002-06-28 2006-04-06 Elster Electricity Llc Data collector for an automated meter reading system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6430562B1 (en) * 1999-03-01 2002-08-06 Electronic Data Systems Corporation Integrated resource management system and method
US6484036B1 (en) * 1999-11-19 2002-11-19 International Business Machines Corporation Method and apparatus for scheduling mobile agents utilizing rapid two-way communication
US20020010615A1 (en) * 2000-03-31 2002-01-24 Simon Jacobs Methods and systems for scheduling complex work orders for a workforce of mobile service technicians
US6900738B2 (en) * 2000-06-21 2005-05-31 Henry Crichlow Method and apparatus for reading a meter and providing customer service via the internet
US20030028410A1 (en) * 2001-08-01 2003-02-06 House Michael Brynn Method and apparatus for wireless workforce mobilization and management
US20060071812A1 (en) * 2002-06-28 2006-04-06 Elster Electricity Llc Data collector for an automated meter reading system
US20050015292A1 (en) * 2003-07-15 2005-01-20 Sbc Knowledge Ventures Lp Dispatch and service support system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2503295A1 (en) * 2011-03-25 2012-09-26 Cinterion Wireless Modules GmbH Communication module, point of entry electricity metering device, metering system of a metered user area and method for self organized regulating a power consumption via a point of entry electricity metereing device in a metered user area of an electricity grid
US9955239B2 (en) 2016-07-15 2018-04-24 Honeywell International Inc. Configurable secure mobile tool for AMI and AMR metering systems

Also Published As

Publication number Publication date
WO2008035989A3 (en) 2008-06-26

Similar Documents

Publication Publication Date Title
CA2516307C (en) A user interface for monitoring remote devices
US9721027B2 (en) Collection, monitoring, analyzing and reporting decay rate of traffic speed data via vehicle sensor devices placed at multiple remote locations
US20050225441A1 (en) System and method for monitoring management
US10282683B2 (en) Technician control system
US8135611B2 (en) System and method for managing asset installation and evaluation
US20160232617A1 (en) Object based energy usage and tracking
US20050283414A1 (en) Remote system management
KR101047899B1 (en) User interface automatic generation and industrial facility controlling system using portable terminal
US20030222792A1 (en) Method, system and storage medium for monitoring parking meters
US20040220778A1 (en) Remote maintenance system and stock management system
US7711522B2 (en) Systems and methods for monitoring a machine
CN109872809A (en) The long-range monitoring of medical apparatus
CN103038752A (en) Bug clearing house
EP1918842A2 (en) Upgrade service system
US10088335B2 (en) Anomaly detection using usage data for metering system
CN102739838A (en) User behavior analysis method of smart mobile phone application
CN101470445A (en) Remote monitoring system, terminal management server and terminal management server control program
US20150227992A1 (en) Building Optimization Platform And Web-Based Invoicing System
Klugman et al. Hardware, apps, and surveys at scale: insights from measuring grid reliability in Accra, Ghana
US20150262133A1 (en) Method and system for providing an assessment of equipment in an equipment fleet
WO2008035989A2 (en) Utility meter installation system and method
US20040243525A1 (en) System and method for disconnecting utility services
CN108108175A (en) A kind of method and apparatus for gray scale issue
US20110282824A1 (en) Technologies for mapping a set of criteria
US10387135B2 (en) System and method for remotely flashing a wireless device

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07834853

Country of ref document: EP

Kind code of ref document: A2

122 Ep: pct application non-entry in european phase

Ref document number: 07834853

Country of ref document: EP

Kind code of ref document: A2