WO2008006020A2 - Systems, methods and apparatuses for a wind turbine controller - Google Patents

Systems, methods and apparatuses for a wind turbine controller Download PDF

Info

Publication number
WO2008006020A2
WO2008006020A2 PCT/US2007/072852 US2007072852W WO2008006020A2 WO 2008006020 A2 WO2008006020 A2 WO 2008006020A2 US 2007072852 W US2007072852 W US 2007072852W WO 2008006020 A2 WO2008006020 A2 WO 2008006020A2
Authority
WO
WIPO (PCT)
Prior art keywords
turbine
power supply
blade
systems
control system
Prior art date
Application number
PCT/US2007/072852
Other languages
French (fr)
Other versions
WO2008006020A3 (en
Inventor
William Erdman
Michael Behnke
Ricardo Royo Garcia
Miguel Nunez Polo
Original Assignee
Acciona Windpower, S.A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Acciona Windpower, S.A filed Critical Acciona Windpower, S.A
Priority to EP07799320.2A priority Critical patent/EP2044326B1/en
Priority to DK07799320.2T priority patent/DK2044326T3/en
Priority to ES07799320.2T priority patent/ES2693433T3/en
Publication of WO2008006020A2 publication Critical patent/WO2008006020A2/en
Publication of WO2008006020A3 publication Critical patent/WO2008006020A3/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/04Automatic control; Regulation
    • F03D7/042Automatic control; Regulation by means of an electrical or electronic controller
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/022Adjusting aerodynamic properties of the blades
    • F03D7/0224Adjusting blade pitch
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/028Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power
    • F03D7/0284Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power in relation to the state of the electric grid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2270/00Control
    • F05B2270/10Purpose of the control system
    • F05B2270/107Purpose of the control system to cope with emergencies
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2270/00Control
    • F05B2270/30Control parameters, e.g. input parameters
    • F05B2270/32Wind speeds
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2270/00Control
    • F05B2270/60Control system actuates through
    • F05B2270/604Control system actuates through hydraulic actuators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Definitions

  • the present disclosure is generally directed to controlling a wind turbine, and more particularly, to apparatuses, methods and systems for maintaining consistent turbine operational characteristics during voltage irregularities.
  • UPS Uninterruptible power supplies
  • simply incorporating a UPS device does not provide a one-size-fits-all solution for a variety of reasons.
  • the UPS devices are not able to run all of the systems of a wind turbine, if the primary power supply is interrupted. As such, it may be necessary to operate certain systems at a reduced capacity when the UPS attempts to power all of the subsystems.
  • the disclosure details implementations of apparatuses, methods, and systems for operating a wind turbine that may achieve consistent operational characteristics, despite the occurrence of voltages irregularities.
  • This disclosure presents solutions that assist in expediting the adoption and incorporation of wind turbine generators.
  • the system is configured to facilitate consistent operational control and address a variety of issues that may arise during the normal operation of a wind turbine connected with electrical power grid.
  • the disclosure discusses an implementation of the system, that is configured to maintain normal operation independent of repeated voltage events that may occur.
  • the wind turbine control system is configured with a turbine controller that may transition certain ancillary turbine systems to a UPS device, while maintaining independent normal operational power characteristics for primary turbine systems (e.g., a wind turbine blade pitch control system).
  • Fig. 1 is an overview of various wind turbine components
  • Fig. 2 A is a diagram of turbine system components utilized during an energy transmission process
  • Fig. 2B illustrates a turbine component system interconnection diagram
  • FIGs. 3A-3B illustrate a diagram of turbine system components associated with a wind pitch control system according to implementations of the system
  • Fig. 4 illustrates operational characteristics associated with a blade pitch control system according to an implementation of the system
  • FIGS. 5A-5B illustrate diagrams of hydraulic elements associated with a wind pitch control system associated with implementations of the system
  • Fig. 6 illustrates aspects of an operational flow diagram of a turbine control system according to an implementation of the system
  • Fig. 7 is a graph illustrating aspects of operational voltage characteristics with a turbine control system according to an implementation.
  • each reference numeral indicates the first drawing in which that reference numeral is introduced.
  • turbine 100 is first introduced in Figure 1.
  • Fig. 1 illustrates a variety of components associated with the control characteristics of a wind turbine generator.
  • a wind turbine generator 100 may be configured with a variety of sub-systems. These sub-systems may be controlled in coordination in order to improve the efficiency and quality of the power generated by turbine 100.
  • external sensors and/or systems such as a yaw control unit or a turbine blade pitch control system may be controlled in order to maximize the efficiency of generating power from a wind stream.
  • the yaw control system may be manipulated based on feedback from a wind direction detector and configured to rotate the turbine rotor in the direction of arrow 135.
  • the turbine rotor is able to achieve an optimal angle with regard to the direction of a wind stream 120.
  • Feedback from the wind direction detector may be used to assist in controlling the pitch of the turbine blade 130 with regard to the direction or speed of wind stream 120.
  • the turbine blade pitch control system may also utilize a sensor measurement of the rotor's revolutions per minute, in order to determine the tip speed of a turbine blade 125. Aspects of the blade pitch control system will be discussed in greater detail below.
  • the turbine controller, blade pitch controller or other system controllers may be implemented and configured in a variety of ways.
  • the turbine controller (as well as the other subsystem controllers, for example a wind blade pitch controller) may serve to aggregate, execute, generate, identify, instruct, match, process, search, store, select serve, and/or facilitate interactions with a computer through for managing and coordinating various aspects of the functionality associated with operating a wind turbine, some of which is described in greater detail below.
  • CPU central processing units
  • CPUs use communicative signals to enable various operations. Such communicative signals may be stored and/or transmitted in batches as program and/or data components facilitate desired operations.
  • a common type of program is a computer operating system, which, commonly, is executed by CPU on a computer or microcontroller; the operating system enables and facilitates users to access and operate computer information technology and resources.
  • Common resources employed in information technology systems include: input and output mechanisms through which data may pass into and out of a computer; memory storage into which data may be saved; and processors by which information may be processed.
  • the information technology systems may include interfaces for facilitating communication between the microcontroller with a variety of sensors or sub-systems. Often information technology systems are used to collect data for later retrieval, analysis, and manipulation, commonly, which may be facilitated through a database program. Information technology systems may provide similar interfaces that allow users to access and operate various system components.
  • the turbine controller may be connected to and/or communicate with entities such as, but not limited to: one or more users from user input devices; peripheral devices; one or mores sensors; a variety of control systems; and/or a communications network.
  • entities such as, but not limited to: one or more users from user input devices; peripheral devices; one or mores sensors; a variety of control systems; and/or a communications network.
  • Networks are commonly thought to comprise the interconnection and interoperation of clients, servers, and intermediary nodes in a graph topology.
  • server refers generally to a computer, other device, program, or combination thereof that processes and responds to the requests of remote users across a communications network. Servers serve their information to requesting "clients.”
  • client refers generally to a computer, other device, program, or combination thereof that is capable of processing and making requests and obtaining and processing any responses from servers across a communications network.
  • a computer, mircrocontroller, other device, program, or combination thereof that facilitates, processes information and requests, and/or furthers the passage of information from a source user to a destination user is commonly referred to as a "node.”
  • Networks are generally thought to facilitate the transfer of information from source points to destinations.
  • a node specifically tasked with furthering the passage of information from a source to a destination is commonly called a "router.”
  • There are many forms of networks such as Local Area Networks (LANs), Pico networks, Wide Area Networks (WANs), Wireless Networks (WLANs), etc.
  • LANs Local Area Networks
  • WANs Wide Area Networks
  • WLANs Wireless Networks
  • the Internet is generally accepted as being an interconnection of a multitude of networks whereby remote clients and servers may access and interoperate with one another.
  • the turbine controller may be based on common computer systems that may comprise, but are not limited to, components such as: a computer systemization connected to memory.
  • a computer systemization may comprise a clock, central processing unit (CPU), a read only memory (ROM), a random access memory (RAM), and/or an interface bus, and most frequently, although not necessarily, are all interconnected and/or communicating through a system bus.
  • the computer systemization may be connected to an internal power source.
  • a cryptographic processor may be connected to the system bus.
  • the system clock typically has a crystal oscillator and provides a base signal. The clock is typically coupled to the system bus and various clock multipliers that will increase or decrease the base operating frequency for other components interconnected in the computer systemization.
  • the clock and various components in a computer systemization drive signals embodying information throughout the system. Such transmission and reception of signals embodying information throughout a computer systemization may be commonly referred to as communications. These communicative signals may further be transmitted, received, and the cause of return and/or reply signal communications beyond the instant computer systemization to: communications networks, input devices, other computer systemizations or controllers, systems sensors, systems constrol sub-systems, peripheral devices, and/or the like. Of course, any of the above components may be connected directly to one another, connected to the CPU, and/or organized in numerous variations employed as exemplified by various computer systems.
  • the CPU comprises at least one processor or in some implementations a highspeed data processor adequate to execute program components for facilitating turbine control system functionality, executing user and/or system-generated requests.
  • the CPU may be a microprocessor such as AMD's Athlon, Duron and/or Opteron; IBM and/or Motorola's PowerPC; IBM's and Sony's Cell processor; Intel's Celeron, Itanium, Pentium, Xeon, and/or XScale; and/or the like processor(s).
  • the CPU interacts with memory through signal passing through conductive conduits to execute stored signal program code according to conventional data processing techniques. Such signal passing facilitates communication within the turbine controller, system primary and ancillary control systems, and beyond through various interfaces. Should processing requirements dictate a greater amount speed, parallel, mainframe and/or super-computer architectures may similarly be employed. Alternatively, should deployment requirements dictate greater portability or embedded control systems, smaller embedded microcontroller CPUs, and/or embedded control systems, may be employed.
  • FIG. 2A illustrates aspects of interaction between turbine components and the turbine control system and turbine controller 200 that includes turbine controller during the electricity generation/power transmission process.
  • Turbine blades/rotor are communicatively connected with a gearbox (turbine component power generation systems 205), which in turn drives a generator 210.
  • a gearbox turbine component power generation systems 205
  • generators may be used as part of the transmission system (e.g., induction/synchronous generators).
  • each turbine generator is connected with its own transformer 220 for stepping up the voltage characteristics from the generator for transmission to the utility grid 225.
  • FIG. 2B illustrates aspects of the turbine control system 200 (in Fig. 2A).
  • Power for the turbine control system and turbine controller 200 may be provided from input power sources 230 as input for a power supply 235.
  • the power supply may be connected with primary turbine systems, such as wind pitch control system 255.
  • the power supply 235 may also be connected with ancillary turbine systems such as a turbine yaw control system 245 or various turbine sensor control systems 240.
  • the turbine sensor control systems may include a thermostat control subsystem, an anemometer sub-system and a vibration sensor system, a hydraulic fluid level control sub-system, and/or any number of other turbine sub-systems.
  • these ancillary systems are connected with an uninterruptable power supply (UPS) 250.
  • UPS uninterruptable power supply
  • the primary turbine systems for example, a wind pitch control system 255 is connected only with the power supply. It is critical that these primary turbine systems are consistently driven when transitioning to a UPS at normal operating characteristics despite voltage irregularities that may occur.
  • the power supply 235 may lose its input power source.
  • the ancillary sensor systems would be transferred to the UPS device and may be selectively operated at some sort of reduced capacity during a voltage irregularity (e.g., a voltage event). This would effectively lower the load demands on the UPS during the voltage irregularity.
  • the primary control systems such as the wind pitch control system
  • the primary turbine systems may be isolated and driven by another power supply 237 (connected with turbine controller 200).
  • Power supply 235 and UPS 250 may drive ancillary systems and are not connected to primary turbine systems in this alternate implementation. Accordingly, power supply 237 would be solely responsible for providing power to the primary turbine systems like the wind pitch control system 255.
  • This alternate implementation is illustrated by the dashed lines in Figure 2B.
  • FIG. 3A An embodiment of the power supply for providing power for primary turbine systems is illustrated in Figs. 3A-3B.
  • a blade wind pitch controller is provided where raw auxiliary input power 300 is available during normal operation of the turbine to provide power to the primary turbine systems, such as blade pitch control system 310 and other primary turbine systems loads 320 through a power supply 315.
  • the blade pitch controller 310 drives a proportional hydraulic valve 318 in order to adjust the turbine blade pitch.
  • power for the primary turbine systems 320 is supplied from the power supply 315 under normal operation (as well as during the possible occurrence of a voltage event).
  • the power supply 315 continues to provide the necessary power for continued operation of the blade pitch controller 310 and the proportional hydraulic valve 318. This may be achieved by designing the power supply 315 to include a particular amount and type of energy storage device in the DC link of the power supply 315. Depending on the particular needs of the particular implementation, the energy storage device may be configured as a DC battery or large capacity capacitor.
  • Fig. 3 B illustrates a circuit diagram according to an example implementation of the power supply. A determination of various circuit components associated with the power supply to achieve these operational characteristics is included below.
  • Vc(O) - Vc(3 sec) lie, (t) dt , 0
  • a 1.25 Farad, 6.3 or 10 V capacitor should be included as a component of the power supply. In an implementation this could be achieved through two aluminum electrolytics or one or more super-capacitors.
  • Fig. 4 illustrates aspects of the operational characteristics associated with four operating regions for turbine blade pitch control (425-440).
  • the four graphs show different turbine control characteristics associated with the generator (rotor) speed 405, torque 410, power 415, and pitch angle 420. respectively.
  • Each graph relates these characteristics 405- 420 with an increasing wind speed 465.
  • regions II and III are power transfer operational regions, with the cusp 470 between the two regions acting as an optimal power transmission 'sweet spot. 1
  • the turbine in operating region I, the wind speed is below a cut-in threshold and as such, the turbine does not operate.
  • the turbine rotor rotation speed varies in direct proportion to the wind speed. This maintains a constant, optimal blade tip speed ratio (TSR) for the turbine's rotor, which in turn optimizes energy capture in operating region II.
  • TSR blade tip speed ratio
  • the turbine controller also varies torque as the square of the wind speed and rotor rotational speed. Power is calculated as the product of torque and speed. Illustrated in graph 415, the generated power varies as the cube of wind speed (or rotor rotational speed).
  • the wind pitch control system drives/maintains the turbine blades in a zero degree pitch (full power pitch position). That is, the blades are disposed to transfer the full power of the wind stream, which is generally at or about zero degrees.
  • the cusp 470 between regions II 430 and III 435 marks the transition point where the turbine achieves its rated power output. Operation in region III 435 requires the turbine to operate at a constant rotor rotation speed 475 and at a constant torque 476, despite any increases in the wind speed.
  • the constant speed and torque operating characteristics are achieved by the turbine controller interacting with a primary turbine control system - the wind pitch control system. More specifically, as the speed of the wind increases, the pitch angle of the turbine blade is adjusted moving toward a full feather position (a ninety degree position that does not transfer any power).
  • Operating region IV 440 is considered a high wind speed cut-out region.
  • the pitch control drive mechanism may be configured with electro-mechanical devices or as illustrated in Figs. 5A or 5B - hydraulic drive devices.
  • Fig. 5 A illustrates aspects of a hydraulic turbine blade pitch drive system that interfaces with the wind blade pitch controller.
  • Fig. 5 A illustrates an implementation of a hydraulic blade pitch control subsystem for a single blade 501.
  • corresponding hydraulic blade pitch control sub-systems are also implemented for turbine blade 2 (502 in Fig. 5A), as well as blade 3 (503 in Fig. 5A).
  • the hydraulic system stores energy in a hydraulic energy storing unit 505 on the nacelle that is communitively coupled with hydraulic pump 510 and configured to provide hydraulic energy for each blade's hydraulic blade pitch drive system on blades 501, 502 and 503.
  • the hydraulic energy is distributed through a rotating junction 515.
  • the junction 515 is situated between the hydraulic circuit disposed in the nacelle and each hydraulic circuit situated in the hub.
  • the rotating junction effectively provides/withdraws hydraulic energy through the pressure line 511 (illustrated on the left side of the junction) and a returning line 512 (illustrated on the right side of the junction).
  • the hydraulic fluid provided by the junction 515 is supplemented by a hydraulic energy storage unit 530 associated with the blade circuit 501.
  • a non-retuming valve 531 is also incorporated into each hydraulic blade circuit in order to ensure the independence of each blade circuit.
  • Each blade circuit includes a hydraulic cylinder 520 that is manipulated in order to drive the blade between the full feather position (i.e., operating at ninety degrees, wherein the blade is configured to shed all power and not transmit any power from the wind stream) and a zero feather position (i.e., operating at zero degrees, wherein the blade fully transmits all power imparted from the wind stream).
  • the front chamber 521 maintains a constant pressure and is connected with the pressure line, whereas the rear chamber 522 has a variable pressure in order to actuate the cylinder and thereby adjust the blade pitch.
  • valves 545 and 550 vary the pressure in the rear chamber 522, in order to actuate the cylinder 520.
  • valve 545 is activated to connect the rear chamber 522 with the pressure line (and thereby increase the pressure in the rear chamber).
  • valve 550 is activated to connect the rear chamber with the return line (and thereby decrease the pressure inside the rear chamber 522).
  • emergency valves 535 and 540 are generally operated in an activated configuration, whereby the front chamber 521 is connected to the pressure line across 535 and the rear chamber 522 is disconnected across valve 540. If a system fault flag is generated, the wind pitch control system initiates the release of emergency valves 535 and 540, which results in the front chamber 521 being connected to the returning line across valve 535 and the rear chamber 522 connected to the pressure line across valve 540.
  • the cylinder 520 will extend in an emergency situation and force the blades to quickly transition to the full feather position.
  • An additional emergency safety measure included in some implementations of the system involves a blocking mechanism 525.
  • the blocking mechanism When pressure is applied to the front chamber 521, the blocking mechanism is held retracted in an inactive position. However, if a system fault flag is generated by the turbine control system, the wind pitch control system reduces the front chamber pressure.
  • a resort that normally retains the blocking cylinder, actuates the cylinder locking the blades into position once transitioned to full feather position.
  • the blade is blocked and secured in the full feathered position. Otherwise, the blades may be moved by the wind (especially in the event that the wind directions shifts to come from behind the nacelle).
  • Fig. 5B illustrates an alternate implementation of the hydraulic turbine blade pitch drive system.
  • valves 545 and 550 are implemented as separate valves.
  • block 545A could be configured as a single valve block or comprising two separate valves.
  • normal operation involves activating valve 545A, which thereby connects the line from proportional valve to rear chamber.
  • the emergency operation is based on connecting the pressure line to the rear chamber in order to force the cylinder to extend and transition the blade into a full feather position.
  • Fig. 6 illustrates aspects of an operational flow diagram associated with the turbine control system according to an implementation of the system.
  • the turbine control system queries 605 the anemometer to determine the current wind speed in order to determine which operating region the turbine should transition to 615. If there is no wind the turbine controller recycles the start-up process 610 and transitions back to 600. In contrast, if wind is detected, the turbine controller transitions to determining which operational region will provide efficient and effective power transfer 615.
  • the various operating regions are discussed above with regard to Fig. 4.
  • the turbine control system will determine whether it is necessary to remain in the same operating region or transition to one of the other operating regions 615. If the turbine controller determines that it is necessary to operate in region II, the controller sends a message to the wind blade pitch control system to indicate that the pitch of each of the turbine's blades should be driven to/maintained in a zero feather position 620 (i.e., a zero degree pitch). If the turbine controller determines that it is necessary to operate in region III, the wind speed is used to determine an optimal percentage pitch for the blade. A message is then transmitted to the wind blade pitch controller that will in turn drive/maintain the blade to/in an optimal pitch percentage for the corresponding wind speed. In the event that the turbine controller determines it is necessary to operate in region IV, a message is transmitted to the wind blade pitch controller to indicate that the blades should be driven to/maintained in a full feather position 635 (i.e., ninety degree pitch).
  • the process of determining the optimal operating region and transitioning to or maintaining the blades in the optimal region is executed periodically.
  • the actual periodic assessment may be executed over a range of periodic frequencies based on a variety of operational characteristics. For example, one implementation of the system may be based on a 20 hz periodic region determination 625.
  • the turbine controller determines whether there are any voltage irregularities 640 (e.g., a voltage event).
  • the turbine controller may (1) transition ancillary turbine systems (e.g., some turbine sensor systems) to an uninterruptible power supply 655.
  • the turbine controller also (2) checks the supply voltage level of the power supply configured to supply the turbine's primary systems 660 (e.g., the wind blade pitch control system). If the power supply has discharged and reaches a critical level, the turbine controller generates a system fault flag 662 and drives the blades to a full feather position 635 (e.g. examples of the emergency fault drive system are described above with regard to Figs. 5A-5B). If the power supply has not approached a critical level 665, despite any detected voltage irregularities, the turbine controller cycles back to A 650 and re-assesses the current operating characteristics.
  • the turbine primary systems are driven under normal operating conditions without being transitioned to and/or powered by a UPS device.
  • the ancillary turbine systems may operate at a reduced capacity to lower the draining effect on a UPS device.
  • Fig. 7 illustrates aspects of the turbine system coordinated by the turbine controller.
  • the system operates at an ordinary system voltage 700 until time T.
  • the system detects a voltage event 705, wherein the input voltage drops significantly.
  • the turbine controller may be configured to transition ancillary turbine systems to the UPS device (shown by the dashed line 710).
  • the system may then enter a reduced capacity operational state in order to lower the loading demand on the UPS.
  • the ancillary systems are transitioned to the UPS device, the system still expends additional resources and may encounter a brief delay in data processing.
  • the turbine controller operates the primary turbine systems under normal operational characteristics (bold dashed line 715).
  • the power supply connected to the wind blade pitch control system does not transition to either the UPS or enter a reduced operating capacity state. Instead, (as illustrated by the bold dashed line 715), the pitch system is provided with ordinary operating characteristics by the power supply. In the implementation discussed in Fig. 3B, this may be achieved by storing energy in capacitors within the power supply and then discharging to maintain ordinary voltage characteristics 715.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Wind Motors (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

The disclosure describes implementations of methods, systems and apparatuses that are configured to facilitate normal operating characteristics for a wind turbine during normal operation, as well as during voltage irregularities. In an implementation, a turbine controller coordinates operating primary turbine systems and ancillary turbine systems during normal operation and during voltage irregularities. During normal operation, the turbine controller coordinates powering both primary and ancillary turbine systems through a power supply. During a detected voltage event, ancillary turbine systems may be transitioned to a having an uninterruptible power supply power these systems. However, the turbine controller coordinates maintaining the power supply as the sole powering device for primary turbine systems despite a voltage irregularity. In some implementations, when the power supply reaches a critical level during a voltage irregularity, a system fault flag is generated and the turbine blades may be driven into a full feather operational position.

Description

SYSTEMS, METHODS AND APPARATUSES FOR A WIND TURBINE CONTROLLER
PRIORITY CLAIMS AND RELATED APPLICATIONS
[001 ] This disclosure claims priority to under 35 U. S. C. § 119 and incorporates by reference U.S. Provisional Patent Application titled "Systems and Methods for Pitch Control During Low Voltage Ride-Thru Event," filed July 6, 2006, as Serial No. 60/806,707.
FIELD
[002 ] The present disclosure is generally directed to controlling a wind turbine, and more particularly, to apparatuses, methods and systems for maintaining consistent turbine operational characteristics during voltage irregularities.
BACKGROUND
[003] As the use of wind turbines grows and the percentage of electricity wind turbines provide increases, solutions are necessary for controlling wind turbines during possible voltage irregularities (i.e., voltage events or fluctuations across a utility power grid). For example, Uninterruptible power supplies (UPS) have been incorporated into many wind tower assemblies in order to provide a backup power source. However, simply incorporating a UPS device does not provide a one-size-fits-all solution for a variety of reasons. For example, the UPS devices are not able to run all of the systems of a wind turbine, if the primary power supply is interrupted. As such, it may be necessary to operate certain systems at a reduced capacity when the UPS attempts to power all of the subsystems. Furthermore, maintenance of the UPS device may necessitate additional service requirements for the turbine generator, resulting in difficulties associated with accessibility of the UPS device for service technicians. Accordingly, there is a need to implement a robust power solution - one which can maintain consistent turbine operating characteristics despite the possibility of voltages irregularities, as well as facilitate low maintenance costs. It is also important to ensure consistent operational turbine speeds before, during and after voltage irregularities, otherwise the turbine speed may increase during a voltage irregularities.
SUMMARY
[004] The disclosure details implementations of apparatuses, methods, and systems for operating a wind turbine that may achieve consistent operational characteristics, despite the occurrence of voltages irregularities. This disclosure presents solutions that assist in expediting the adoption and incorporation of wind turbine generators. In an implementation, the system is configured to facilitate consistent operational control and address a variety of issues that may arise during the normal operation of a wind turbine connected with electrical power grid. For example, the disclosure discusses an implementation of the system, that is configured to maintain normal operation independent of repeated voltage events that may occur. In an implementation, the wind turbine control system is configured with a turbine controller that may transition certain ancillary turbine systems to a UPS device, while maintaining independent normal operational power characteristics for primary turbine systems (e.g., a wind turbine blade pitch control system).
BRIEF DESCRIPTION OF THE DRAWINGS
[005] The accompanying appendices and/or drawings illustrate various non-limiting, representative, inventive aspects in accordance with the present disclosure: [006] Fig. 1 is an overview of various wind turbine components;
[007] Fig. 2 A is a diagram of turbine system components utilized during an energy transmission process;
[008] Fig. 2B illustrates a turbine component system interconnection diagram;
[009] Figs. 3A-3B illustrate a diagram of turbine system components associated with a wind pitch control system according to implementations of the system;
[0010] Fig. 4 illustrates operational characteristics associated with a blade pitch control system according to an implementation of the system;
[0011 ] Figs. 5A-5B illustrate diagrams of hydraulic elements associated with a wind pitch control system associated with implementations of the system;
[0012] Fig. 6 illustrates aspects of an operational flow diagram of a turbine control system according to an implementation of the system;
[0013] Fig. 7 is a graph illustrating aspects of operational voltage characteristics with a turbine control system according to an implementation.
[0014] The leading number of each reference numeral indicates the first drawing in which that reference numeral is introduced. For example, turbine 100 is first introduced in Figure 1.
DETAILED DESCRIPTION
[0015] The disclosure details the implementation of apparatuses, methods, and systems for controlling a wind turbine generator. [0016] Fig. 1 illustrates a variety of components associated with the control characteristics of a wind turbine generator. According to an implementation, a wind turbine generator 100 may be configured with a variety of sub-systems. These sub-systems may be controlled in coordination in order to improve the efficiency and quality of the power generated by turbine 100. For example, external sensors and/or systems such as a yaw control unit or a turbine blade pitch control system may be controlled in order to maximize the efficiency of generating power from a wind stream.
[0017] For example, in an implementation of the system the yaw control system may be manipulated based on feedback from a wind direction detector and configured to rotate the turbine rotor in the direction of arrow 135. In this implementation, the turbine rotor is able to achieve an optimal angle with regard to the direction of a wind stream 120. Feedback from the wind direction detector may be used to assist in controlling the pitch of the turbine blade 130 with regard to the direction or speed of wind stream 120. The turbine blade pitch control system may also utilize a sensor measurement of the rotor's revolutions per minute, in order to determine the tip speed of a turbine blade 125. Aspects of the blade pitch control system will be discussed in greater detail below.
[0018] Further efficiency gains may be realized by a turbine controller managing a power converter control system 140 that prepares the electricity generated by the turbine's generator for transfer to the turbine's transformer 145 and subsequently to a utility's power grid 150.
[0019] Depending on the particular implementation, the turbine controller, blade pitch controller or other system controllers may be implemented and configured in a variety of ways. The turbine controller (as well as the other subsystem controllers, for example a wind blade pitch controller) may serve to aggregate, execute, generate, identify, instruct, match, process, search, store, select serve, and/or facilitate interactions with a computer through for managing and coordinating various aspects of the functionality associated with operating a wind turbine, some of which is described in greater detail below.
[0020] Typically, users, which may be people and/or other systems, engage information technology systems (e.g., commonly computers or microcontrollers) to facilitate information processing. In turn, computers employ processors and other system components to process information; such processors are often referred to as central processing units (CPU). A common form of processor is referred to as a microprocessor. CPUs use communicative signals to enable various operations. Such communicative signals may be stored and/or transmitted in batches as program and/or data components facilitate desired operations.
[0021 ] These stored instruction code signals may engage the CPU circuit components to perform desired operations. A common type of program is a computer operating system, which, commonly, is executed by CPU on a computer or microcontroller; the operating system enables and facilitates users to access and operate computer information technology and resources. Common resources employed in information technology systems include: input and output mechanisms through which data may pass into and out of a computer; memory storage into which data may be saved; and processors by which information may be processed. In some implementations, the information technology systems may include interfaces for facilitating communication between the microcontroller with a variety of sensors or sub-systems. Often information technology systems are used to collect data for later retrieval, analysis, and manipulation, commonly, which may be facilitated through a database program. Information technology systems may provide similar interfaces that allow users to access and operate various system components.
[0022] In one embodiment, the turbine controller may be connected to and/or communicate with entities such as, but not limited to: one or more users from user input devices; peripheral devices; one or mores sensors; a variety of control systems; and/or a communications network.
[0023] Networks are commonly thought to comprise the interconnection and interoperation of clients, servers, and intermediary nodes in a graph topology. It should be noted that the term "server" as used throughout this disclosure refers generally to a computer, other device, program, or combination thereof that processes and responds to the requests of remote users across a communications network. Servers serve their information to requesting "clients." The term "client" as used herein refers generally to a computer, other device, program, or combination thereof that is capable of processing and making requests and obtaining and processing any responses from servers across a communications network. A computer, mircrocontroller, other device, program, or combination thereof that facilitates, processes information and requests, and/or furthers the passage of information from a source user to a destination user is commonly referred to as a "node." Networks are generally thought to facilitate the transfer of information from source points to destinations. A node specifically tasked with furthering the passage of information from a source to a destination is commonly called a "router." There are many forms of networks such as Local Area Networks (LANs), Pico networks, Wide Area Networks (WANs), Wireless Networks (WLANs), etc. For example, the Internet is generally accepted as being an interconnection of a multitude of networks whereby remote clients and servers may access and interoperate with one another.
[0024] The turbine controller may be based on common computer systems that may comprise, but are not limited to, components such as: a computer systemization connected to memory. A computer systemization may comprise a clock, central processing unit (CPU), a read only memory (ROM), a random access memory (RAM), and/or an interface bus, and most frequently, although not necessarily, are all interconnected and/or communicating through a system bus. Optionally, the computer systemization may be connected to an internal power source. Optionally, a cryptographic processor may be connected to the system bus. The system clock typically has a crystal oscillator and provides a base signal. The clock is typically coupled to the system bus and various clock multipliers that will increase or decrease the base operating frequency for other components interconnected in the computer systemization. The clock and various components in a computer systemization drive signals embodying information throughout the system. Such transmission and reception of signals embodying information throughout a computer systemization may be commonly referred to as communications. These communicative signals may further be transmitted, received, and the cause of return and/or reply signal communications beyond the instant computer systemization to: communications networks, input devices, other computer systemizations or controllers, systems sensors, systems constrol sub-systems, peripheral devices, and/or the like. Of course, any of the above components may be connected directly to one another, connected to the CPU, and/or organized in numerous variations employed as exemplified by various computer systems.
[0025] The CPU comprises at least one processor or in some implementations a highspeed data processor adequate to execute program components for facilitating turbine control system functionality, executing user and/or system-generated requests. The CPU may be a microprocessor such as AMD's Athlon, Duron and/or Opteron; IBM and/or Motorola's PowerPC; IBM's and Sony's Cell processor; Intel's Celeron, Itanium, Pentium, Xeon, and/or XScale; and/or the like processor(s). The CPU interacts with memory through signal passing through conductive conduits to execute stored signal program code according to conventional data processing techniques. Such signal passing facilitates communication within the turbine controller, system primary and ancillary control systems, and beyond through various interfaces. Should processing requirements dictate a greater amount speed, parallel, mainframe and/or super-computer architectures may similarly be employed. Alternatively, should deployment requirements dictate greater portability or embedded control systems, smaller embedded microcontroller CPUs, and/or embedded control systems, may be employed.
[0026] Fig. 2A illustrates aspects of interaction between turbine components and the turbine control system and turbine controller 200 that includes turbine controller during the electricity generation/power transmission process. Turbine blades/rotor are communicatively connected with a gearbox (turbine component power generation systems 205), which in turn drives a generator 210. Depending on the operating parameters of a particular implementation, it is to be understood that a variety of generators may be used as part of the transmission system (e.g., induction/synchronous generators). In some implementations involving multiple wind turbines (or a wind farm), each turbine generator is connected with its own transformer 220 for stepping up the voltage characteristics from the generator for transmission to the utility grid 225.
[0027] Fig. 2B illustrates aspects of the turbine control system 200 (in Fig. 2A).
Power for the turbine control system and turbine controller 200 may be provided from input power sources 230 as input for a power supply 235. The power supply may be connected with primary turbine systems, such as wind pitch control system 255. Further, the power supply 235 may also be connected with ancillary turbine systems such as a turbine yaw control system 245 or various turbine sensor control systems 240. Depending on the implementation, the turbine sensor control systems may include a thermostat control subsystem, an anemometer sub-system and a vibration sensor system, a hydraulic fluid level control sub-system, and/or any number of other turbine sub-systems. As illustrated in Fig. 2B, these ancillary systems are connected with an uninterruptable power supply (UPS) 250. However, it is noted that the primary turbine systems, for example, a wind pitch control system 255 is connected only with the power supply. It is critical that these primary turbine systems are consistently driven when transitioning to a UPS at normal operating characteristics despite voltage irregularities that may occur.
[0028] According to one implementation, during a voltage irregularity the power supply 235 may lose its input power source. The ancillary sensor systems would be transferred to the UPS device and may be selectively operated at some sort of reduced capacity during a voltage irregularity (e.g., a voltage event). This would effectively lower the load demands on the UPS during the voltage irregularity. However, with regard to the primary control systems such as the wind pitch control system, it is critical to maintain continuous operating characteristics independent of whether a power supply temporarily loses its underlying power source without transitioning to a UPS device. Therefore, the wind pitch control system 255, as well as corresponding components including a hydraulic blade pitch drive device 260, and an accumulator 275, are driven solely by power supply 235 during normal operation and in the presence of voltage irregularities.
[0029] In some implementations, the primary turbine systems may be isolated and driven by another power supply 237 (connected with turbine controller 200). Power supply 235 and UPS 250 may drive ancillary systems and are not connected to primary turbine systems in this alternate implementation. Accordingly, power supply 237 would be solely responsible for providing power to the primary turbine systems like the wind pitch control system 255. This alternate implementation is illustrated by the dashed lines in Figure 2B.
[0030] An embodiment of the power supply for providing power for primary turbine systems is illustrated in Figs. 3A-3B. In Fig. 3A, a blade wind pitch controller is provided where raw auxiliary input power 300 is available during normal operation of the turbine to provide power to the primary turbine systems, such as blade pitch control system 310 and other primary turbine systems loads 320 through a power supply 315. As shown, the blade pitch controller 310 drives a proportional hydraulic valve 318 in order to adjust the turbine blade pitch. In this configuration, power for the primary turbine systems 320 is supplied from the power supply 315 under normal operation (as well as during the possible occurrence of a voltage event). During such an event, where the power 300 is absent, the power supply 315 continues to provide the necessary power for continued operation of the blade pitch controller 310 and the proportional hydraulic valve 318. This may be achieved by designing the power supply 315 to include a particular amount and type of energy storage device in the DC link of the power supply 315. Depending on the particular needs of the particular implementation, the energy storage device may be configured as a DC battery or large capacity capacitor.
[0031 ] One of the principal advantages of this approach to continued supply of power during voltage irregularities involves storing energy in an electrostatic field, for example in a capacitor rather in than in electrochemical system. For this reason, a very large number of charge/discharge cycles are viable - minimizing service requirements for the turbine system and reducing system component replacement costs. This is not true for a turbine system that uniformly transitions turbine systems to a UPS device upon detection of a voltage event.
Fig. 3 B illustrates a circuit diagram according to an example implementation of the power supply. A determination of various circuit components associated with the power supply to achieve these operational characteristics is included below.
[0032] Assuming the voltage is essentially constant over the utility disturbance of 3 sec, a constant current draw by the hydraulic proportional valve of 83 niA is assumed.
3
Vc(O) - Vc(3 sec)= lie, (t) dt , 0
0.2 V = (83mA) (3 sec),
C = (83mA)(3 sec) / 0.2V 1.245Farads ~ 1.25 Farads [0033] Accordingly, in an implementation of the system rated to maintain consistent operational characteristics beyond a 3 second voltage event, a 1.25 Farad, 6.3 or 10 V capacitor should be included as a component of the power supply. In an implementation this could be achieved through two aluminum electrolytics or one or more super-capacitors.
[0034] Fig. 4 illustrates aspects of the operational characteristics associated with four operating regions for turbine blade pitch control (425-440). The four graphs show different turbine control characteristics associated with the generator (rotor) speed 405, torque 410, power 415, and pitch angle 420. respectively. Each graph relates these characteristics 405- 420 with an increasing wind speed 465. As will be described in greater detail below, regions II and III are power transfer operational regions, with the cusp 470 between the two regions acting as an optimal power transmission 'sweet spot.1
[0035] As illustrated in Fig. 4, in operating region I, the wind speed is below a cut-in threshold and as such, the turbine does not operate. As the wind speed increases and enters region II, the turbine rotor rotation speed varies in direct proportion to the wind speed. This maintains a constant, optimal blade tip speed ratio (TSR) for the turbine's rotor, which in turn optimizes energy capture in operating region II. The turbine controller also varies torque as the square of the wind speed and rotor rotational speed. Power is calculated as the product of torque and speed. Illustrated in graph 415, the generated power varies as the cube of wind speed (or rotor rotational speed). In region II, the wind pitch control system drives/maintains the turbine blades in a zero degree pitch (full power pitch position). That is, the blades are disposed to transfer the full power of the wind stream, which is generally at or about zero degrees. [0036] The cusp 470 between regions II 430 and III 435 marks the transition point where the turbine achieves its rated power output. Operation in region III 435 requires the turbine to operate at a constant rotor rotation speed 475 and at a constant torque 476, despite any increases in the wind speed. The constant speed and torque operating characteristics are achieved by the turbine controller interacting with a primary turbine control system - the wind pitch control system. More specifically, as the speed of the wind increases, the pitch angle of the turbine blade is adjusted moving toward a full feather position (a ninety degree position that does not transfer any power).
[0037] Operating region IV 440 is considered a high wind speed cut-out region.
Operating the turbine in this region is dangerous and damage to the turbine may occur. Accordingly, if the wind speed is determined to reach these levels, the turbine may be taken off-line.
[0038] Depending on the actual system configuration, the pitch control drive mechanism may be configured with electro-mechanical devices or as illustrated in Figs. 5A or 5B - hydraulic drive devices. By way of non-limiting example only, Fig. 5 A illustrates aspects of a hydraulic turbine blade pitch drive system that interfaces with the wind blade pitch controller. Fig. 5 A illustrates an implementation of a hydraulic blade pitch control subsystem for a single blade 501. Although not illustrated, it is to be understood that corresponding hydraulic blade pitch control sub-systems are also implemented for turbine blade 2 (502 in Fig. 5A), as well as blade 3 (503 in Fig. 5A). The hydraulic system stores energy in a hydraulic energy storing unit 505 on the nacelle that is communitively coupled with hydraulic pump 510 and configured to provide hydraulic energy for each blade's hydraulic blade pitch drive system on blades 501, 502 and 503.
[0039] The hydraulic energy is distributed through a rotating junction 515. In the implementation illustrated in Fig. 5A, the junction 515 is situated between the hydraulic circuit disposed in the nacelle and each hydraulic circuit situated in the hub. The rotating junction effectively provides/withdraws hydraulic energy through the pressure line 511 (illustrated on the left side of the junction) and a returning line 512 (illustrated on the right side of the junction). The hydraulic fluid provided by the junction 515 is supplemented by a hydraulic energy storage unit 530 associated with the blade circuit 501. A non-retuming valve 531 is also incorporated into each hydraulic blade circuit in order to ensure the independence of each blade circuit.
[0040] Each blade circuit includes a hydraulic cylinder 520 that is manipulated in order to drive the blade between the full feather position (i.e., operating at ninety degrees, wherein the blade is configured to shed all power and not transmit any power from the wind stream) and a zero feather position (i.e., operating at zero degrees, wherein the blade fully transmits all power imparted from the wind stream). During normal operation, the front chamber 521 maintains a constant pressure and is connected with the pressure line, whereas the rear chamber 522 has a variable pressure in order to actuate the cylinder and thereby adjust the blade pitch.
[0041 ] During normal operation proportional valves 545 and 550 vary the pressure in the rear chamber 522, in order to actuate the cylinder 520. For example, in order to extend cylinder 520 valve 545 is activated to connect the rear chamber 522 with the pressure line (and thereby increase the pressure in the rear chamber). In contrast, to retract the cylinder, valve 550 is activated to connect the rear chamber with the return line (and thereby decrease the pressure inside the rear chamber 522).
[0042] In the implementation illustrated in Fig. 5A, emergency valves 535 and 540 are generally operated in an activated configuration, whereby the front chamber 521 is connected to the pressure line across 535 and the rear chamber 522 is disconnected across valve 540. If a system fault flag is generated, the wind pitch control system initiates the release of emergency valves 535 and 540, which results in the front chamber 521 being connected to the returning line across valve 535 and the rear chamber 522 connected to the pressure line across valve 540. Through this operational configuration, it is ensured that the cylinder 520 will extend in an emergency situation and force the blades to quickly transition to the full feather position.
[0043] An additional emergency safety measure included in some implementations of the system involves a blocking mechanism 525. When pressure is applied to the front chamber 521, the blocking mechanism is held retracted in an inactive position. However, if a system fault flag is generated by the turbine control system, the wind pitch control system reduces the front chamber pressure. In turn, a resort (spring) that normally retains the blocking cylinder, actuates the cylinder locking the blades into position once transitioned to full feather position. Advantageously, the blade is blocked and secured in the full feathered position. Otherwise, the blades may be moved by the wind (especially in the event that the wind directions shifts to come from behind the nacelle). [0044] Fig. 5B illustrates an alternate implementation of the hydraulic turbine blade pitch drive system. Instead of implementing valves 545 and 550 as separate valves, the functionality is achieved by implementing a single proportional valve 545A, communicatively coupled with emergency valve 540A. Depending on the implementation, block 545A could be configured as a single valve block or comprising two separate valves. In this implementation, normal operation involves activating valve 545A, which thereby connects the line from proportional valve to rear chamber. In the event of a turbine controller-issued system fault flag, the emergency operation is based on connecting the pressure line to the rear chamber in order to force the cylinder to extend and transition the blade into a full feather position.
[0045] Fig. 6 illustrates aspects of an operational flow diagram associated with the turbine control system according to an implementation of the system. As the turbine is brought online 600, the turbine control system queries 605 the anemometer to determine the current wind speed in order to determine which operating region the turbine should transition to 615. If there is no wind the turbine controller recycles the start-up process 610 and transitions back to 600. In contrast, if wind is detected, the turbine controller transitions to determining which operational region will provide efficient and effective power transfer 615. The various operating regions are discussed above with regard to Fig. 4.
[0046] In the event that the turbine is already operating in one of the operational regions (650), the turbine control system will determine whether it is necessary to remain in the same operating region or transition to one of the other operating regions 615. If the turbine controller determines that it is necessary to operate in region II, the controller sends a message to the wind blade pitch control system to indicate that the pitch of each of the turbine's blades should be driven to/maintained in a zero feather position 620 (i.e., a zero degree pitch). If the turbine controller determines that it is necessary to operate in region III, the wind speed is used to determine an optimal percentage pitch for the blade. A message is then transmitted to the wind blade pitch controller that will in turn drive/maintain the blade to/in an optimal pitch percentage for the corresponding wind speed. In the event that the turbine controller determines it is necessary to operate in region IV, a message is transmitted to the wind blade pitch controller to indicate that the blades should be driven to/maintained in a full feather position 635 (i.e., ninety degree pitch).
[0047] The process of determining the optimal operating region and transitioning to or maintaining the blades in the optimal region is executed periodically. The actual periodic assessment may be executed over a range of periodic frequencies based on a variety of operational characteristics. For example, one implementation of the system may be based on a 20 hz periodic region determination 625. As part of the transition back to the start of the operating region assessment process 625, the turbine controller determines whether there are any voltage irregularities 640 (e.g., a voltage event).
[0048] If there is no voltage event detected, the turbine controller returns to point A
650. If a voltage event is detected, the turbine controller may (1) transition ancillary turbine systems (e.g., some turbine sensor systems) to an uninterruptible power supply 655. The turbine controller also (2) checks the supply voltage level of the power supply configured to supply the turbine's primary systems 660 (e.g., the wind blade pitch control system). If the power supply has discharged and reaches a critical level, the turbine controller generates a system fault flag 662 and drives the blades to a full feather position 635 (e.g. examples of the emergency fault drive system are described above with regard to Figs. 5A-5B). If the power supply has not approached a critical level 665, despite any detected voltage irregularities, the turbine controller cycles back to A 650 and re-assesses the current operating characteristics. Effectively, despite voltage irregularities, the turbine primary systems are driven under normal operating conditions without being transitioned to and/or powered by a UPS device. However, it is noted that in some implementations, the ancillary turbine systems may operate at a reduced capacity to lower the draining effect on a UPS device.
[0049] Fig. 7 illustrates aspects of the turbine system coordinated by the turbine controller. In Fig. 7, the system operates at an ordinary system voltage 700 until time T. At time T, the system detects a voltage event 705, wherein the input voltage drops significantly. At this time the turbine controller may be configured to transition ancillary turbine systems to the UPS device (shown by the dashed line 710). As discussed above, in some implementations, the system may then enter a reduced capacity operational state in order to lower the loading demand on the UPS. Also, as the ancillary systems are transitioned to the UPS device, the system still expends additional resources and may encounter a brief delay in data processing.
[0050] In contrast, despite the drop in the input supply voltage 700, the turbine controller operates the primary turbine systems under normal operational characteristics (bold dashed line 715). For example, the power supply connected to the wind blade pitch control system does not transition to either the UPS or enter a reduced operating capacity state. Instead, (as illustrated by the bold dashed line 715), the pitch system is provided with ordinary operating characteristics by the power supply. In the implementation discussed in Fig. 3B, this may be achieved by storing energy in capacitors within the power supply and then discharging to maintain ordinary voltage characteristics 715.
[0051 ] As illustrated, there is a point in time T+2 when the power supply will no longer be able to sustain these operational levels. However, based on the parameters of the power supply, it may be possible to ensure that the time T+2 is significantly larger than the expected duration of any voltage irregularities.
[0052] The entirety of this disclosure (including the Cover Page, Title, Headings,
Field, Background, Summary, Brief Description of the Drawings, Detailed Description, Claims, Abstract, Figures, and otherwise) shows by way of illustration various embodiments in which the claimed inventions may be practiced. The advantages and features of the disclosure are of a representative sample of embodiments only, and are not exhaustive and/or exclusive. They are presented only to assist in understanding and teach the claimed principles. It should be understood that they are not representative of all claimed inventions. As such, certain aspects of the disclosure have not been discussed herein. That alternate embodiments may not have been presented for a specific portion of the invention or that further undescribed alternate embodiments may be available for a portion is not to be considered a disclaimer of those alternate embodiments. It will be appreciated that many of those undescribed embodiments incorporate the same principles of the invention and others are equivalent. Thus, it is to be understood that other embodiments may be utilized and functional, logical, organizational, structural and/or topological modifications may be made without departing from the scope and/or spirit of the disclosure. As such, all examples and/or embodiments are deemed to be non-limiting throughout this disclosure. Also, no inference should be drawn regarding those embodiments discussed herein relative to those not discussed herein other than it is as such for purposes of reducing space and repetition. For instance, it is to be understood that the logical and/or topological structure of any combination of any program components (a component collection), other components and/or any present feature sets as described in the figures and/or throughout are not limited to a fixed operating order and/or arrangement, but rather, any disclosed order is exemplary and all equivalents, regardless of order, are contemplated by the disclosure. Furthermore, it is to be understood that such features are not limited to serial execution, but rather, any number of threads, processes, services, servers, and/or the like that may execute asynchronously, concurrently, in parallel, simultaneously, synchronously, and/or the like are contemplated by the disclosure. As such, some of these features may be mutually contradictory, in that they cannot be simultaneously present in a single embodiment. Similarly, some features are applicable to one aspect of the invention, and inapplicable to others. In addition, the disclosure includes other inventions not presently claimed. Applicant reserves all rights in those presently unclaimed inventions including the right to claim such inventions, file additional applications, continuations, continuations in part, divisions, and/or the like thereof. As such, it should be understood that advantages, embodiments, examples, functional, features, logical, organizational, structural, topological, and/or other aspects of the disclosure are not to be considered limitations on the disclosure as defined by the claims or limitations on equivalents to the claims.

Claims

CLAIMSWhat is claimed is:
1. A wind turbine generator system comprising: a power supply operatively coupled to primary and ancillary turbine systems; an uninterruptible power supply device operatively coupled to ancillary turbine systems; a nacelle supporting one or more turbine blades and having a turbine blade pitch controller controlling a hydraulic turbine pitch drive circuit for each of the turbine blades and configured to actuate the blade between a zero feather position and a full feather position; a turbine controller configured to control ancillary turbine systems that are driven by the power supply during ordinary operation and in coordination with the uninterruptible power supply during a voltage irregularity; the turbine controller is also configured to control primary turbine systems including a turbine blade pitch control system, wherein the turbine controller maintains consistent operating characteristics through the power supply powering the primary turbine systems independent of the uninterruptible power supply device during both normal operation and voltage irregularities.
2. The system of claim 1, further comprising: driving all of the turbine blades into a full feather position upon detection of a critical level of the power supply responsible for powering primary turbine control systems.
3. The system of claim 2, further comprising: issuing a system fault flag if the turbine controller detects a critical level in the power supply responsible for the primary turbine control systems.
4. The system of claim 3, wherein the turbine controller requires a manual override to transition back to ordinary operating characteristics after issuing the system fault flag.
5. The system of claim 2, wherein each of the one or more turbine blades have an independent hydraulic blade pitch actuation servo motor.
6. The system of claim 2, wherein each of the independent hydraulic circuits are communitively coupled with a hydraulic cylinder and configured to drive the hydraulic cylinder that changes the pitch of each turbine blade between a zero feather and a full feather position.
7. The system of claim 3, further comprising: the turbine blade pitch controller is operatively connected with a hydraulic pitch drive circuit configured for driving each turbine blade with emergency actuation valves.
8. The system of claim 7, wherein each turbine blade includes a blocking mechanism that is configured to lock the blades in a full feather position after a system fault flag has been generated.
9. The system of claim 8, wherein each blade hydraulic pitch drive circuit is configured to be driven independently by the turbine blade pitch controller.
10. A wind turbine generator comprising: a blade pitch control system configured to vary a pitch associated with one or more turbine blades; a power supply coupled to the blade pitch control system, wherein the power supply is configured to provide power to the blade pitch control system during a low voltage even without transfer to an uninterruptible power supply; and an uninterruptible power supply configured to provide power to non- pitch control turbine components during a low voltage event.
1 1. A wind turbine control system comprising: a microcontroller operatively connected with system memory, configured to store turbine operational instructions; the microcontroller is configured with instructions to coordinate powering ancillary turbine systems with a power supply and an uninterruptible power supply, wherein the microcontroller is configured to transition the ancillary systems to the uninterruptible power supply during a voltage irregularity; the microcontroller is configured with instructions to facilitate powering the primary turbine systems with the power supply independent of whether a voltage irregularities is detected, wherein the primary turbine systems include a blade pitch control system.
12. The wind turbine control system of claim 11 wherein the blade pitch control system further comprises: an independent hydraulic blade actuation system for each blade associated a wind turbine operatively connected with the microcontroller, wherein the microcontroller is configured to issue instructions to drive a turbine blade into a zero feather position, a full feather position, or a position between the zero feather and full feather position.
13. The wind turbine control systems of claim 12, wherein the turbine controller determines the position for a blade pitch based on wind speed characteristics.
14. The wind turbine control system of claim 12, further comprising: a power supply configured with an additional energy storage component configured to drive each independent hydraulic blade actuation system during both normal operation and during the occurrence of any voltage irregularities.
15. The wind turbine control system of claims 14, wherein the microcontroller is configured to monitor the voltage output level of the power supply.
16. The wind turbine control system of claim 15, wherein the microcontroller is configured to issue a system fault flag if the power supply reaches a critical operating voltage level.
17. The independent hydraulic blade actuation system of claim of claim 14 further comprising: a blade blocking mechanism configured to lock the blade associated with the independent hydraulic blade actuation system into a full feathered position.
18. The wind turbine control system of 17, wherein the microcontroller is configured to issue a control instruction to the wind blade pitch control system for each turbine blade to activate the blade blocking mechanism.
19. The wind turbine control system of claim 18, wherein the control instruction involves actuating a series of hydraulic valves configured to transition each turbine blade into the full feather position and activate the blocking mechanism.
20. The wind turbine control system of claim 19, wherein the turbine control transitions the turbine to an offline operational state and is configured to restart the system only in the event of a manual re-start or system override.
PCT/US2007/072852 2006-07-06 2007-07-05 Systems, methods and apparatuses for a wind turbine controller WO2008006020A2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP07799320.2A EP2044326B1 (en) 2006-07-06 2007-07-05 Systems, methods and apparatuses for a wind turbine controller
DK07799320.2T DK2044326T3 (en) 2006-07-06 2007-07-05 Systems, methods and devices for a wind turbine controller
ES07799320.2T ES2693433T3 (en) 2006-07-06 2007-07-05 Systems, procedures and devices for a wind turbine controller

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US80670706P 2006-07-06 2006-07-06
US60/806,707 2006-07-06

Publications (2)

Publication Number Publication Date
WO2008006020A2 true WO2008006020A2 (en) 2008-01-10
WO2008006020A3 WO2008006020A3 (en) 2008-12-04

Family

ID=38895466

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2007/072852 WO2008006020A2 (en) 2006-07-06 2007-07-05 Systems, methods and apparatuses for a wind turbine controller

Country Status (5)

Country Link
US (1) US7602075B2 (en)
EP (1) EP2044326B1 (en)
DK (1) DK2044326T3 (en)
ES (1) ES2693433T3 (en)
WO (1) WO2008006020A2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010005393A3 (en) * 2008-07-11 2010-05-06 Vestas Wind Systems A/S System for monitoring a restoration factor of a wind turbine population
US7999418B2 (en) 2008-12-22 2011-08-16 General Electric Company Electrical system and control method
EP2458203A1 (en) * 2010-11-26 2012-05-30 Vestas Wind Systems A/S A wind turbine having a hydraulic blade pitch system
CN102477944A (en) * 2010-11-26 2012-05-30 维斯塔斯风力系统有限公司 Pilot circuitry for controlling the emergency feathering of wind turbine
EP2565443A1 (en) * 2011-09-05 2013-03-06 XEMC Darwind B.V. Generating auxiliary power for a wind turbine
EP2698533A1 (en) * 2012-08-17 2014-02-19 Moog Unna GmbH Electric hydraulic pitch drive, wind or water turbine and method for operating an electric hydraulic pitch drive
EP2703644A1 (en) * 2012-08-27 2014-03-05 Alstom Wind, S.L.U. Angular positioning system for a wind turbine
CN103887789A (en) * 2014-04-10 2014-06-25 曲阜师范大学 Double-fed wind generation set converter topological structure for flexible direct-current electricity transmission system
EP2757252A1 (en) * 2013-01-17 2014-07-23 Alstom Wind, S.L.U. Method of operating a wind turbine
EP2757253A1 (en) * 2013-01-17 2014-07-23 Alstom Wind, S.L.U. Method of starting a wind turbine

Families Citing this family (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ299154B6 (en) * 2001-04-20 2008-05-07 Method for operating a windmill generating station system and windmill generating station system per se
DE10119624A1 (en) 2001-04-20 2002-11-21 Aloys Wobben Operating wind energy plant involves regulating power delivered from generator to electrical load, especially of electrical network, depending on current delivered to the load
JP3918837B2 (en) * 2004-08-06 2007-05-23 株式会社日立製作所 Wind power generator
EP2069637A2 (en) * 2006-09-14 2009-06-17 Vestas Wind Systems A/S Method for controlling a wind turbine connected to the utility grid, wind turbine and wind park
WO2008031433A1 (en) * 2006-09-14 2008-03-20 Vestas Wind Systems A/S Methods for controlling a wind turbine connected to the utility grid, wind turbine and wind park
WO2008131778A2 (en) * 2007-04-30 2008-11-06 Vestas Wind System A/S A method of operating a wind turbine with pitch control, a wind turbine and a cluster of wind turbines
WO2008150907A1 (en) * 2007-05-30 2008-12-11 Acciona Windpower, S.A. Systems and methods for synchronous speed avoidance in doubly-fed induction generators
EP2176545B1 (en) 2007-07-12 2014-09-03 Windurance LLC Method and apparatus for grid loss ride-through for wind turbine pitch control system
CN101784791A (en) * 2007-08-31 2010-07-21 维斯塔斯风力系统集团公司 Method for controlling at least one adjustment mechanism of a wind turbine, a wind turbine and a wind park
CN101918709B (en) * 2007-11-09 2013-01-02 莫戈公司 Electro-hydraulic actuator for controlling the pitch of a blade of a wind turbine
WO2009068036A2 (en) * 2007-11-30 2009-06-04 Vestas Wind Systems A/S A wind turbine, a method for controlling a wind turbine and use thereof
DE102008010543A1 (en) 2008-02-22 2009-08-27 Nordex Energy Gmbh Method for operating a wind turbine and wind turbine
WO2009107132A2 (en) * 2008-02-26 2009-09-03 Avi Efraty Hydraulic wind farms for grid electricity and desalination
ES2345645B1 (en) * 2008-06-09 2011-07-13 GAMESA INNOVATION & TECHNOLOGY, S.L. INSTALLATION OF WIND ENERGY AND PROCEDURE OF MODIFICATION OF THE SHOVEL PASSAGE IN A WIND ENERGY INSTALLATION.
DE102008028568A1 (en) * 2008-06-16 2009-12-31 Nordex Energy Gmbh Method for controlling a wind energy plant
EP2166225B1 (en) * 2008-09-19 2016-08-10 Vestas Wind Systems A/S A wind park having an auxiliary power supply
DE102008049530A1 (en) * 2008-09-29 2010-04-01 Prüftechnik Dieter Busch AG A method of monitoring a powertrain component of a wind turbine
ES2382631B1 (en) * 2009-09-03 2013-05-03 Gamesa Innovation & Technology, S.L. METHODS AND SYSTEMS OF AIRCRAFT CONTROL
US20110084492A1 (en) * 2009-09-11 2011-04-14 Just the 4 of Us, LLC Vertical Propeller Fluid Energy Capture with Coordinated Dynamic-Orientation Blades
US8410638B2 (en) 2010-05-13 2013-04-02 Eaton Corporation Uninterruptible power supply systems and methods supporting load balancing
US8362647B2 (en) 2010-05-13 2013-01-29 Eaton Corporation Uninterruptible power supply systems and methods supporting high-efficiency bypassed operation with a variably available power source
US20120074786A1 (en) 2010-05-13 2012-03-29 Eaton Corporation Uninterruptible power supply systems and methods using isolated interface for variably available power source
ES2410431B1 (en) * 2010-06-04 2014-06-17 Acciona Windpower, S.A. PROCEDURE FOR CONTROLLING THE ACTIVE POWER GENERATED BY A DISTRIBUTED GENERATION CENTER; AEROGENERATOR TO CARRY OUT THIS PROCEDURE; AND WIND PARK THAT UNDERSTANDS THAT AEROGENERATOR
DK2638281T3 (en) 2010-11-10 2021-04-19 Gen Electric METHOD AND SYSTEM FOR WIND TURBIN OPERATION IN THE EVENT OF ERROR
WO2012118549A1 (en) 2010-12-09 2012-09-07 Northern Power Systems, Inc. Systems for load reduction in a tower of an idled wind-power unit and methods thereof
US8858174B2 (en) 2011-05-12 2014-10-14 General Electric Company Wind turbine torque-speed control
DE102011081795A1 (en) * 2011-08-30 2013-02-28 Wobben Properties Gmbh Method for operating a wind energy plant
EP2786015B1 (en) * 2011-11-30 2018-02-21 Vestas Wind Systems A/S A hydraulic pitch system for a wind turbine
US8890349B1 (en) * 2012-01-19 2014-11-18 Northern Power Systems, Inc. Load reduction system and method for a wind power unit
US8704393B2 (en) * 2012-08-09 2014-04-22 General Electric Company System and method for controlling speed and torque of a wind turbine during post-rated wind speed conditions
ES2528065B1 (en) * 2013-07-31 2015-11-13 Acciona Windpower, S.A. Power control system of an electric generation unit
ES2538739B1 (en) * 2013-12-23 2016-04-14 Acciona Windpower, S.A. Wind Turbine Control Method
EP2919354A1 (en) * 2014-03-14 2015-09-16 Siemens Aktiengesellschaft Power supply arrangement of a wind farm
EP3051124B1 (en) * 2015-01-30 2018-06-27 Adwen GmbH Method of operating a wind turbine without grid connection and wind turbine
US10473088B2 (en) 2015-03-13 2019-11-12 General Electric Company System and method for variable tip-speed-ratio control of a wind turbine
US10634121B2 (en) 2017-06-15 2020-04-28 General Electric Company Variable rated speed control in partial load operation of a wind turbine
US11509141B2 (en) * 2018-07-10 2022-11-22 Vestas Wind Sysiems A/S Wind turbine power consumption control
US10998760B2 (en) 2018-09-27 2021-05-04 General Electric Company System and method for controlling uninterruptible power supply of electrical power systems
EP3754179B1 (en) * 2019-06-19 2023-07-19 Wobben Properties GmbH Method for operating a wind turbine
EP4102057A1 (en) * 2021-06-11 2022-12-14 Wobben Properties GmbH Method for controlling the rotor speed of a wind turbine

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6921985B2 (en) 2003-01-24 2005-07-26 General Electric Company Low voltage ride through for wind turbine generators

Family Cites Families (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4180367A (en) * 1975-02-10 1979-12-25 Drees Herman M Self-starting windmill energy conversion system
DE2655026C2 (en) * 1976-12-04 1979-01-18 Ulrich Prof. Dr.-Ing. 7312 Kirchheim Huetter Wind energy converter
US4168439A (en) * 1977-11-28 1979-09-18 Palma F Neto Wind turbine
US4160170A (en) * 1978-06-15 1979-07-03 United Technologies Corporation Wind turbine generator pitch control system
US4161658A (en) * 1978-06-15 1979-07-17 United Technologies Corporation Wind turbine generator having integrator tracking
US4189648A (en) * 1978-06-15 1980-02-19 United Technologies Corporation Wind turbine generator acceleration control
US4297076A (en) * 1979-06-08 1981-10-27 Lockheed Corporation Wind turbine
US4348156A (en) * 1980-03-17 1982-09-07 United Technologies Corporation Blade pitch actuation system
US4348155A (en) * 1980-03-17 1982-09-07 United Technologies Corporation Wind turbine blade pitch control system
US4352634A (en) * 1980-03-17 1982-10-05 United Technologies Corporation Wind turbine blade pitch control system
US4400659A (en) * 1980-05-30 1983-08-23 Benjamin Barron Methods and apparatus for maximizing and stabilizing electric power derived from wind driven source
US4280060A (en) * 1980-06-09 1981-07-21 General Electric Company Dedicated microcomputer-based control system for steam turbine-generators
US4355955A (en) * 1981-04-06 1982-10-26 The Boeing Company Wind turbine rotor speed control system
US4423333A (en) * 1982-02-02 1983-12-27 Rossman Wendell E Horizontal axis wind energy conversion system with aerodynamic blade pitch control
US4462753A (en) * 1982-06-22 1984-07-31 United Technologies Corporation Blade feathering system for wind turbines
US4656362A (en) * 1982-11-08 1987-04-07 United Technologies Corporation Blade pitch angle control for large wind turbines
US4703189A (en) * 1985-11-18 1987-10-27 United Technologies Corporation Torque control for a variable speed wind turbine
US4700081A (en) * 1986-04-28 1987-10-13 United Technologies Corporation Speed avoidance logic for a variable speed wind turbine
US4792281A (en) * 1986-11-03 1988-12-20 Northern Power Systems, Inc. Wind turbine pitch control hub
US5083039B1 (en) * 1991-02-01 1999-11-16 Zond Energy Systems Inc Variable speed wind turbine
US5213470A (en) * 1991-08-16 1993-05-25 Robert E. Lundquist Wind turbine
US5155375A (en) * 1991-09-19 1992-10-13 U.S. Windpower, Inc. Speed control system for a variable speed wind turbine
EP1029176B1 (en) * 1997-11-04 2004-03-03 WINDTEC Anlagenerrichtungs- und Consulting GmbH Windpowerplant
ATE257218T1 (en) * 1998-08-13 2004-01-15 Neg Micon As CONTROL DEVICE FOR ADJUSTING AND STOPPING THE BLADES OF A WIND TURBINE
US6441507B1 (en) * 2000-03-22 2002-08-27 The Wind Turbine Company Rotor pitch control method and apparatus for parking wind turbine
ATE367522T1 (en) * 2002-02-25 2007-08-15 Iskra Wind Turbines Ltd PASSIVE SPEED AND POWER CONTROL SYSTEM FOR A WIND TURBINE
US7004724B2 (en) * 2003-02-03 2006-02-28 General Electric Company Method and apparatus for wind turbine rotor load control based on shaft radial displacement
US6888262B2 (en) * 2003-02-03 2005-05-03 General Electric Company Method and apparatus for wind turbine rotor load control
US7322794B2 (en) * 2003-02-03 2008-01-29 General Electric Company Method and apparatus for condition-based monitoring of wind turbine components
US7160083B2 (en) * 2003-02-03 2007-01-09 General Electric Company Method and apparatus for wind turbine rotor load control
AU2003203152B2 (en) * 2003-02-07 2006-11-09 Vestas Wind Systems A/S Method for controlling a power-grid connected wind turbine generator during grid faults and apparatus for implementing said method
DE10338127C5 (en) * 2003-08-15 2015-08-06 Senvion Se Wind turbine with a rotor
US7265456B2 (en) * 2004-01-15 2007-09-04 Vrb Bower Systems Inc. Power generation system incorporating a vanadium redox battery and a direct current wind turbine generator
US7353083B2 (en) * 2004-01-15 2008-04-01 Vrb Power Systems Inc. Vanadium redox battery energy storage and power generation system incorporating and optimizing diesel engine generators
JP4599350B2 (en) * 2004-02-27 2010-12-15 三菱重工業株式会社 Wind power generator, active vibration control method thereof, and windmill tower
US7121795B2 (en) * 2004-06-30 2006-10-17 General Electric Company Method and apparatus for reducing rotor blade deflections, loads, and/or peak rotational speed
US7175389B2 (en) * 2004-06-30 2007-02-13 General Electric Company Methods and apparatus for reducing peak wind turbine loads
US7095129B2 (en) * 2004-06-30 2006-08-22 General Electric Company Methods and apparatus for rotor load control in wind turbines
US7822560B2 (en) * 2004-12-23 2010-10-26 General Electric Company Methods and apparatuses for wind turbine fatigue load measurement and assessment
CA2592298C (en) * 2004-12-30 2014-05-13 Vestas Wind Systems A/S Wind turbine comprising a multiplied redundancy control system and method of controlling a wind turbine
US7227275B2 (en) * 2005-02-01 2007-06-05 Vrb Power Systems Inc. Method for retrofitting wind turbine farms
US7126236B2 (en) * 2005-03-15 2006-10-24 General Electric Company Methods and apparatus for pitch control power conversion
US7239036B2 (en) * 2005-07-29 2007-07-03 General Electric Company System and method for power control in wind turbines
US7355294B2 (en) * 2006-05-22 2008-04-08 General Electric Company Method and system for wind turbine blade movement
US7218012B1 (en) * 2006-05-31 2007-05-15 General Electric Company Emergency pitch drive power supply
JP4501958B2 (en) * 2007-05-09 2010-07-14 株式会社日立製作所 Wind power generation system and control method thereof
US7709972B2 (en) * 2007-08-30 2010-05-04 Mitsubishi Heavy Industries, Ltd. Wind turbine system for satisfying low-voltage ride through requirement

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6921985B2 (en) 2003-01-24 2005-07-26 General Electric Company Low voltage ride through for wind turbine generators

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2044326A4

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8108155B2 (en) 2008-07-11 2012-01-31 Vestas Wind Systems A/S System for monitoring a restoration factor of a wind turbine population
CN102119270A (en) * 2008-07-11 2011-07-06 维斯塔斯风力系统集团公司 System for monitoring a restoration factor of a wind turbine population
WO2010005393A3 (en) * 2008-07-11 2010-05-06 Vestas Wind Systems A/S System for monitoring a restoration factor of a wind turbine population
US8319374B2 (en) 2008-12-22 2012-11-27 General Electric Company Electrical system and control method
US7999418B2 (en) 2008-12-22 2011-08-16 General Electric Company Electrical system and control method
EP2458203A1 (en) * 2010-11-26 2012-05-30 Vestas Wind Systems A/S A wind turbine having a hydraulic blade pitch system
CN102477944A (en) * 2010-11-26 2012-05-30 维斯塔斯风力系统有限公司 Pilot circuitry for controlling the emergency feathering of wind turbine
US9698715B2 (en) 2011-09-05 2017-07-04 Xemc Darwind B.V. Generating auxiliary power for a wind turbine
EP2565443A1 (en) * 2011-09-05 2013-03-06 XEMC Darwind B.V. Generating auxiliary power for a wind turbine
WO2013034610A3 (en) * 2011-09-05 2013-05-30 Xemc Darwind B.V. Generating auxiliary power for a wind turbine
CN103890385B (en) * 2011-09-05 2018-01-16 湘电达尔文有限责任公司 Auxiliary power is produced for wind turbine
CN103890385A (en) * 2011-09-05 2014-06-25 湘电达尔文有限责任公司 Generating auxiliary power for a wind turbine
EP2698533A1 (en) * 2012-08-17 2014-02-19 Moog Unna GmbH Electric hydraulic pitch drive, wind or water turbine and method for operating an electric hydraulic pitch drive
EP2703644A1 (en) * 2012-08-27 2014-03-05 Alstom Wind, S.L.U. Angular positioning system for a wind turbine
CN104769278A (en) * 2012-08-27 2015-07-08 阿尔斯通再生能源技术公司 Angular positioning system for a wind turbine
WO2014033084A1 (en) * 2012-08-27 2014-03-06 Alstom Renovables España, S.L. Angular positioning system for a wind turbine
EP2757252A1 (en) * 2013-01-17 2014-07-23 Alstom Wind, S.L.U. Method of operating a wind turbine
EP2757253A1 (en) * 2013-01-17 2014-07-23 Alstom Wind, S.L.U. Method of starting a wind turbine
WO2014111504A1 (en) * 2013-01-17 2014-07-24 Alstom Renovables España, S.L. Method of starting a wind turbine
US10006440B2 (en) 2013-01-17 2018-06-26 GE Renewable Technologies Win B.V. Method of operating a wind turbine
US10215159B2 (en) 2013-01-17 2019-02-26 Ge Renewable Technologies Wind B.V. Method of starting a wind turbine
CN103887789A (en) * 2014-04-10 2014-06-25 曲阜师范大学 Double-fed wind generation set converter topological structure for flexible direct-current electricity transmission system

Also Published As

Publication number Publication date
ES2693433T3 (en) 2018-12-11
US20080030027A1 (en) 2008-02-07
EP2044326B1 (en) 2018-08-22
EP2044326A4 (en) 2017-11-15
EP2044326A2 (en) 2009-04-08
DK2044326T3 (en) 2018-12-03
US7602075B2 (en) 2009-10-13
WO2008006020A3 (en) 2008-12-04

Similar Documents

Publication Publication Date Title
US7602075B2 (en) Systems, methods and apparatuses for a wind turbine controller
US10418925B2 (en) Wind turbine providing grid support
JP6882452B2 (en) Wind turbine control method
US10243352B2 (en) Battery-supported braking system for a wind turbine
CN107810322B (en) Increase active power by wind turbine
US8866323B2 (en) Method and arrangement for responding to a grid event, such as fast under frequency combining demand response, inertial response and spinning reserve
WO2021023356A1 (en) Providing auxiliary power using offshore wind turbines
JP2009531012A (en) Dynamic brake of a variable speed wind turbine having an exciter and a power converter not connected to the grid
US20170298904A1 (en) Method for responding to a grid event
EP2492504B1 (en) Wind turbine
JP2015139343A (en) Wind farm and operation method for the same
CN113272547A (en) Pitch control of wind turbine blades in standby mode
WO2014125592A1 (en) Wind farm and method for operating and device for controlling same
CN115693724A (en) Control method for double-grid-connected mode variable-speed constant-frequency pumped storage power station
CN115842355A (en) Wind-storage combined system power generation control method and device, electronic equipment and storage medium
EP4090846B1 (en) Pitch control of wind turbine blades in a standby mode
Tsioumas et al. Energy management and power control strategy at the low wind speed region of a wind generation microgrid
EP4094340A1 (en) Control of a renewable power plant in response to zero power demand signal
EP4391275A1 (en) Operating a wind turbine to provide reactive power
Ahmed et al. Pitch angle control of a grid connected wind turbine
EP2649308A1 (en) Method of managing computing tasks in a wind farm
EP4141256A1 (en) Operation of a disconnected wind turbine
CN115459305A (en) Primary frequency modulation control method and device for variable-pitch, load-shedding and frequency modulation of fan
BG110743A (en) A system for output power control of a wind energy conversion system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07799320

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2007799320

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: RU