WO2008000526A1 - Tool and method for erecting a tower segment - Google Patents

Tool and method for erecting a tower segment Download PDF

Info

Publication number
WO2008000526A1
WO2008000526A1 PCT/EP2007/051828 EP2007051828W WO2008000526A1 WO 2008000526 A1 WO2008000526 A1 WO 2008000526A1 EP 2007051828 W EP2007051828 W EP 2007051828W WO 2008000526 A1 WO2008000526 A1 WO 2008000526A1
Authority
WO
WIPO (PCT)
Prior art keywords
tower segment
frame
tower
bracket
guideway
Prior art date
Application number
PCT/EP2007/051828
Other languages
French (fr)
Inventor
Svend Erik Petersen
Original Assignee
Siemens Aktiengesellschaft
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Aktiengesellschaft filed Critical Siemens Aktiengesellschaft
Publication of WO2008000526A1 publication Critical patent/WO2008000526A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like

Definitions

  • the present invention relates to a tower segment erection tool and to a tower segment erection method.
  • tower segment either a whole tower or a part of a tower shall be understood.
  • the tower segment erection tool and the method can be used for erecting wind turbine towers or tower segments thereof.
  • An inventive tower segment erection tool includes a frame which is adapted to rest on the ground.
  • the frame comprises at least one upstanding stop portion and at least one guide portion including a guideway, which, when the frame rests on the ground, extends vertically and has the same height as a stop portion.
  • It further includes a bracket which is designed to be detachably fixed to the lower most section of the tower segment which is to be erected.
  • the brackets comprise an abutment face being adapted to abut on the stop portion and at least one guided element, e.g. a projection like a stud or bolt, which is adapted to be guided by the guideway of the frame .
  • the inventive tool can be advantageously used for erecting tower segments or whole towers, such as wind turbine towers.
  • a tower segment For erecting a tower segment the at least one guided element is inserted into the guideway of a frame resting on the ground.
  • the bracket is fixed to the tower segment which is to be erected when the tower segment is in a horizontal or near horizontal position.
  • the fixing of the bracket to the tower segment may take place before or after inserting the guide element into the guideway of the frame.
  • the bracket is first fixed to the tower segment then the whole tower segment needs to be moved in order to insert the guide element into the guideway. Therefore, it is advanta- geous first to insert the guide element into the guideway and then to fix the bracket to the tower segment.
  • the tower When the bracket is fixed to the tower segment and the guided element is inserted into the guideway of the frame, then the tower is tilted into a tilted position, in which the abutment face of the bracket abuts on the at least one stop portion of the frame. From then on a further tilting of the tower segment into a vertical position takes place with the abutment face resting on the stop portion and the guide elements being guided upwards by a guideway.
  • the tower segment As the guideway prevents the guided element (s) of the bracket from moving horizontally and due to the same dimension of the stop portion and the guideway in vertical direction the tower segment is prevented from swinging over during the erection process, i.e. until it is in a precise vertical position, where the gravitational force is acting only along the longi- tudinal axis of the power segments. Thus, no moment trying to tilt the tower segment out of its vertical position is pre ⁇ sent any more, when the guided elements leave the guideway. After the tower segment is in its upright position, the bracket is dismounted.
  • the frame of the tower segment erection tool may comprise at least two independent frame parts one of which carries the stop portion (s) while the other carries the guideway (s).
  • the point at which the abutment face of the bracket abuts on the stop por ⁇ tion i.e. the tilt angle of the tower segment at the moment of abutting on the stop portion, can be set to the actual need.
  • the frame can be adapted to brackets of dif ⁇ ferent size, i.e. brackets designed for tower segments having different profile width.
  • the frame could as well be implemented as a one part structure, which would be particu ⁇ larly useful, where very high stability of the frame is needed.
  • the guide portion (s) of the frame may be implemented by first and second beams which are fixed to the frame such as to leave a slit between them. The slit then forms the guideway.
  • the guided element (s) could be implemented e.g. as a stud extending from the bracket.
  • each stop portion comprises or is implemented as a sliding sur ⁇ face. Additionally or alternatively, each abutment face com ⁇ prises or is implemented as a sliding surface.
  • each devel ⁇ opment horizontal movement of the abutment face relative to the stop portion is less obstructed by friction.
  • Such a hori- zontal movement arises when the tower fixed to the bracket is tilted as the movement of the guided element is restricted to a strictly linear movement by a linear guideway. This re ⁇ striction is compensated by a horizontal movement of the bracket relative to the stop portion.
  • Figure 1 schematically shows a first embodiment of the inven ⁇ tive tower segment erection tool.
  • Figure 2 shows the frame of the first embodiment in a top view.
  • Figure 3 shows the bracket of the first embodiments in a top view .
  • Figure 4 shows a first step in erecting a tower segment with the top segment erection tool.
  • Figure 5 shows a second step of erecting a tower segment with the tower segment erection tool.
  • Figure 6 shows a third step of erecting a tower segment with the tower segment erection tool according to a third step.
  • Figure 7 shows the frame of the tower segment erection tool according to a second embodiment of the invention in a side view .
  • Figure 8 shows the frame according to the second embodiment in a top view.
  • the tower segment erection tool according to the first em- bodiment of the invention comprises a frame IA to IE and bracket 3 which can be fixed to the bottom side of a tower segment.
  • the tower segment is indicated in Figure 1 and Fig ⁇ ure 3 by dashed lines. It may in particular be a wind turbine tower .
  • the frame comprises four independent frame parts, IA to ID.
  • Each frame part IA - ID comprises a base steel beam 7A to 7D to which either a stop portion 9A, 9B or a guideway 9C, 9D is fixed.
  • the guideways 9C, 9D are formed by upstanding parallel steel beams 11 fixed to the base steel beams 7C and 7D, re- spectively, in a right angle.
  • Each base steel beam 7A to 7D forms a base portion one side of which is adapted to rest on the ground. When the base portions 7A to 7D rest on the ground the respective stop portions 9A, 9D and guideways 9C, 9D extend vertically.
  • the arrangement of the frame portions IA - ID on the ground for erecting, e.g., a wind turbine tower is shown in figure 2.
  • the frame parts IA, IB comprising the stop portions 9A, 9B are set on the ground with their beams 7A, 7B oriented in parallel and with their stop portions lying on the line L which extends perpendicular to the orientation of the beams 7A, 7B.
  • the frame parts 1C, ID comprising the guideways 9C, 9D are set on the ground with a distance to the frame parts IA, IB in the direction parallel to the base steel beams 7A, 7B.
  • the distance between the frame parts 1C, ID, the base steel beams 7C, 7D of which are oriented the same way as the base steel beams 7A, 7B, is slightly larger than the distance between the frame parts IA, IB.
  • base portions 7B to 7D of the frame parts IA to ID are formed by single base steel beams 7A to 7D in the first embodiment they could as well be formed differently, e.g. by steel plates, crossing steel beams, etc. Further, other materials than steel could, in principle, also be used as long as they provide sufficient strength to bare the loads which are imparted to the frame when the tower segment 5 is erected.
  • FIG. 3 A top view onto the bracket 3 of the tower segment erection tool according to the first embodiment is shown in figure 3. Like in figure 1, a wind turbine tower 5 fixed with its bot- torn side to the bracket 3 is indicated by a dashed circle.
  • the bracket 3 is formed by four steel beams 13A to 13B. Two parallel first beams 13A, 13B are connected to each other by cross beams 13C, 13D such that a more or less quadratic face is enclosed by the four beams 13A - 13D. At one end of each first steel beam 13A, 13B studs 15A, 15B extend perpendicu ⁇ larly outwards from the respective beam. The width of the stud's 15A, 15B cross sections are chosen such that they fit into the guideways 9C, 9D formed by the upstanding steel beams 11 of the frame parts 1C, ID. The studs 15A, 15B form guided elements which are guided by the guideways 9C, 9D when the tower 5 is erected. Each beam 17A to 17B may comprise a number of hols or openings (not shown) through which screws, bolts or other fixing means could be inserted in order to fix the bracket 3 to the bottom side of the tower 5.
  • Figure 4 shows the method after the bracket 3 has been fixed to the bottom side of a wind turbine tower 5.
  • the fixing of the bracket 3 to the bottom side 17 usually takes place when the tower 5 is in a horizontal position.
  • ID are suitably set on the ground and bracket 3 is inserted with its studs 15a, 15b into the guideways 9C, 9D .
  • the bracket 3 is brought into an upright position and the bottom side 17 of the wind turbine tower 5 which is, at that moment, in a horizontal position is fixed thereto.
  • the erection of the wind turbine tower 5 begins.
  • a single crane (not shown) is used for erecting the wind turbine tower 5. Al ⁇ though only a single crane is used, more than one crane could be used, as well. However, with the inventive tower segment erection tool, a single crane is enough for safely erecting the tower.
  • the tower 5 While being erected, the tower 5 is initially tilted around a tilt axis which extends through the studs 15A, 15B of the frame 3.
  • the tilt axis is horizontally held in position by the guideway 9C, 9D .
  • this axis is allowed to move vertically guided by the guideways 9C and 9D .
  • the abut ⁇ ment face of the bracket abuts on the top of the stop por ⁇ tions 9A and 9B .
  • the axis about which the tower 5 will be tilted while being further erected moves out of the axis extending through the studs 15A, 15B to point 20 where the abutment face 19 of the bracket 3 abuts on the top 21 of the stop portions 9A, 9B .
  • the tilting of the tower takes place about the axis defined by the points 20.
  • the studs 15A, 15B move upwards guided by the guideways 9C, 9D during the further erection of the tower.
  • a horizontal movement of the studs 15A, 15B is pre ⁇ vented by the upstanding steel beams 11.
  • the upstanding beams 11 can be stabilised by traverses 23 as it can be best seen in figure 1.
  • the studs 15A, 15B When the tower 5 is erected to a nearly vertical position, as it is depicted in figure 6, the studs 15A, 15B have reached the uppermost part of the guideway 9C, 9D . In this position, the tower 5 is still secured against overshooting, i.e. against a horizontal movement of the bottom part of the tower 5, by the guideways 9C, 9D . The studs 15A, 15B only move fully out of the guideway when the tower is oriented fully vertical. Thus, overshooting of the tower is prevented until it is exactly vertical. A second crane for preventing over ⁇ shooting is therefore not necessary.
  • bracket 3 will be dismounted from the bottom of the tower 5.
  • FIG. 7 A second embodiment of the inventive tower segment erection tool is shown in figures 7 and 8. These figures only show the frame 101 of the tool as the bracket of the second embodiment does not differ from the bracket 3 of the first embodiment.
  • the frame 101 of the second em ⁇ bodiment is implemented as a single part. It is built up from two beams 103A, 103B and two cross beams 105 and 107. All beams 103A, 103B, 105, 107 are made from steel. The beams 103A, 103B extend substantially parallel to each other, and the cross beams 105, 107 extend perpendicular to these beams 103A, 103B.
  • the cross beams 105, 107 connect the beams 103A, 103B in their outermost sections.
  • chamfered sections 104A, 104B are pre ⁇ sent, so that the distance between the beams 103A, 103B is slightly larger in the section 109, which will be referred to as the wide section hereinafter, than in the section 111, which will be referred to as the narrow section hereinafter.
  • the cross beam 107 in the wide section 109 is slightly longer than the cross beam 105 in the narrow sec ⁇ tion 111.
  • the guideways 9C, 9D are located, and in the narrow section 111 of the frame 101, the stop por ⁇ tions 9A, 9B are located.
  • the stop portions 9A, 9B and the guideways 9C, 9D do not differ from the stop portions and guideways described with respect to the first embodiment and will therefore not be described again.
  • the frame has been a four-part-frame in the first embodiment and a one-part-frame in the second embodiment, it could as well be a three-part-frame formed by connecting ei ⁇ ther the beams 7A and 7B or the beams 7C and 7D by a trav- erse.
  • a two-part-frame could be realized if beams 7A and 7B and beams 7C and 7D, are respectively connected to each other by traverses.
  • a two-part-frame could also be realized by omitting the beams 105, 107 in figure 8.
  • the inventive tool and the inventive method allow for erect- ing a tower segment, like e.g. a wind turbine tower, with the aid of only one crane. As no second crane is necessary the costs related with the erection of a tower segment can be re ⁇ cuted.

Abstract

A tower segment (5) erection tool is provided. The tool comprises a frame (IA - ID, 101) which is adapted to rest on the ground and which comprises at least one upstanding stop portion (9A, 9B) and at least one guide portion including at least one guideway (9C, 9D) which has the same height as the stop portion (9A, 9B) and is adapted to restrict the movement of a guide element (15A, 15B) to a vertical movement. It further comprises a bracket (3) which is designed to be detachably fixed to the lowermost section of the tower segment (5) and which comprises an abutment face (19) being adapted to abut on the stop portion (9A, 9B) and at least one guide element (15A, 15B) which is adapted to be guided by the at least one guideway (9C, 9D) of the frame (IA, IB, 101).

Description

Description
TOOL AND METHOD FOR ERECTING A TOWER SEGMENT
The present invention relates to a tower segment erection tool and to a tower segment erection method. Under the ex¬ pression "tower segment" either a whole tower or a part of a tower shall be understood. In particular, the tower segment erection tool and the method can be used for erecting wind turbine towers or tower segments thereof.
For erecting a wind turbine tower usually two cranes are needed to keep the moment of tilt under control when the tower reaches the vertical position. Just before reaching the vertical position the moment acting on the tower induced by gravitational force acts on a side of the tower and tends to tilt it in a more horizontal position. When reaching the vertical position, the tower may swing over. Such a swing over would then lead to a sudden change in the direction the gravitational force tends to tilt the tower, i.e. the tower now tends to be tilt to the opposite direction than before. Usually therefore a second crane is used to keep the tower under control and to prevent it from falling over due to the tilt moment. However, it would be desirable using only one crane for erecting the tower and thereby save the direct and indirect costs for the second crane.
US 6,408,575 Wl and US 6,782,667 W2 describe methods for erecting wind turbine towers which are pivotably connected to a base foundation. These towers could, in principle, be erected with one crane only. However, the hinge at which a tower is pivotably connected to the foundation and the foun¬ dation itself would experience considerable loads during the erection of the tower. In particular, the load at the moment of swing over would lead to rather high forces on the hinge entailing the risk of damaging the hinge. It is therefore an objective of the present invention to pro¬ vide a tool and an improved method by which a tower or tower segment can be erected without the need of a second crane.
This objective is solved by a tower segment erection tool, as claimed in claim 1, and by a method of erecting a tower seg¬ ment as claimed in claim 7. The depending claims define fur¬ ther developments of the invention.
An inventive tower segment erection tool includes a frame which is adapted to rest on the ground. The frame comprises at least one upstanding stop portion and at least one guide portion including a guideway, which, when the frame rests on the ground, extends vertically and has the same height as a stop portion. It further includes a bracket which is designed to be detachably fixed to the lower most section of the tower segment which is to be erected. The brackets comprise an abutment face being adapted to abut on the stop portion and at least one guided element, e.g. a projection like a stud or bolt, which is adapted to be guided by the guideway of the frame .
The inventive tool can be advantageously used for erecting tower segments or whole towers, such as wind turbine towers. For erecting a tower segment the at least one guided element is inserted into the guideway of a frame resting on the ground. The bracket is fixed to the tower segment which is to be erected when the tower segment is in a horizontal or near horizontal position. In general, the fixing of the bracket to the tower segment may take place before or after inserting the guide element into the guideway of the frame. However, when the bracket is first fixed to the tower segment then the whole tower segment needs to be moved in order to insert the guide element into the guideway. Therefore, it is advanta- geous first to insert the guide element into the guideway and then to fix the bracket to the tower segment. When the bracket is fixed to the tower segment and the guided element is inserted into the guideway of the frame, then the tower is tilted into a tilted position, in which the abutment face of the bracket abuts on the at least one stop portion of the frame. From then on a further tilting of the tower segment into a vertical position takes place with the abutment face resting on the stop portion and the guide elements being guided upwards by a guideway.
As the guideway prevents the guided element (s) of the bracket from moving horizontally and due to the same dimension of the stop portion and the guideway in vertical direction the tower segment is prevented from swinging over during the erection process, i.e. until it is in a precise vertical position, where the gravitational force is acting only along the longi- tudinal axis of the power segments. Thus, no moment trying to tilt the tower segment out of its vertical position is pre¬ sent any more, when the guided elements leave the guideway. After the tower segment is in its upright position, the bracket is dismounted.
The frame of the tower segment erection tool may comprise at least two independent frame parts one of which carries the stop portion (s) while the other carries the guideway (s). By varying the distance between the two frame parts the point at which the abutment face of the bracket abuts on the stop por¬ tion, i.e. the tilt angle of the tower segment at the moment of abutting on the stop portion, can be set to the actual need. Further, the frame can be adapted to brackets of dif¬ ferent size, i.e. brackets designed for tower segments having different profile width. However, the frame could as well be implemented as a one part structure, which would be particu¬ larly useful, where very high stability of the frame is needed.
The guide portion (s) of the frame may be implemented by first and second beams which are fixed to the frame such as to leave a slit between them. The slit then forms the guideway. In such a case, the guided element (s) could be implemented e.g. as a stud extending from the bracket.
In an advantageous development of the inventive tool each stop portion comprises or is implemented as a sliding sur¬ face. Additionally or alternatively, each abutment face com¬ prises or is implemented as a sliding surface. By this devel¬ opment, horizontal movement of the abutment face relative to the stop portion is less obstructed by friction. Such a hori- zontal movement arises when the tower fixed to the bracket is tilted as the movement of the guided element is restricted to a strictly linear movement by a linear guideway. This re¬ striction is compensated by a horizontal movement of the bracket relative to the stop portion.
Further features, properties and advantages of the present invention will become clear by the following description of embodiments of the invention with reference to the accompany¬ ing drawings .
Figure 1 schematically shows a first embodiment of the inven¬ tive tower segment erection tool.
Figure 2 shows the frame of the first embodiment in a top view.
Figure 3 shows the bracket of the first embodiments in a top view .
Figure 4 shows a first step in erecting a tower segment with the top segment erection tool.
Figure 5 shows a second step of erecting a tower segment with the tower segment erection tool.
Figure 6 shows a third step of erecting a tower segment with the tower segment erection tool according to a third step. Figure 7 shows the frame of the tower segment erection tool according to a second embodiment of the invention in a side view .
Figure 8 shows the frame according to the second embodiment in a top view.
Throughout the figures, like reference numerals designate like or similar elements.
A first embodiment of the inventive tower segment erection tool will now be described with reference to figures 1, 2 and 3. The tower segment erection tool according to the first em- bodiment of the invention comprises a frame IA to IE and bracket 3 which can be fixed to the bottom side of a tower segment. The tower segment is indicated in Figure 1 and Fig¬ ure 3 by dashed lines. It may in particular be a wind turbine tower .
While figure 1 shows the frame IA to ID and the bracket 3 with the wind turbine tower 5 attached thereto in a side view, figures 2 and 3 show the frame IA to ID and the bracket 3, respectively, in a top view. In the first embodiment, the frame comprises four independent frame parts, IA to ID. Each frame part IA - ID comprises a base steel beam 7A to 7D to which either a stop portion 9A, 9B or a guideway 9C, 9D is fixed. The guideways 9C, 9D are formed by upstanding parallel steel beams 11 fixed to the base steel beams 7C and 7D, re- spectively, in a right angle. Each base steel beam 7A to 7D forms a base portion one side of which is adapted to rest on the ground. When the base portions 7A to 7D rest on the ground the respective stop portions 9A, 9D and guideways 9C, 9D extend vertically.
The arrangement of the frame portions IA - ID on the ground for erecting, e.g., a wind turbine tower is shown in figure 2. The frame parts IA, IB comprising the stop portions 9A, 9B are set on the ground with their beams 7A, 7B oriented in parallel and with their stop portions lying on the line L which extends perpendicular to the orientation of the beams 7A, 7B. The frame parts 1C, ID comprising the guideways 9C, 9D are set on the ground with a distance to the frame parts IA, IB in the direction parallel to the base steel beams 7A, 7B. The distance between the frame parts 1C, ID, the base steel beams 7C, 7D of which are oriented the same way as the base steel beams 7A, 7B, is slightly larger than the distance between the frame parts IA, IB.
Although the base portions 7B to 7D of the frame parts IA to ID are formed by single base steel beams 7A to 7D in the first embodiment they could as well be formed differently, e.g. by steel plates, crossing steel beams, etc. Further, other materials than steel could, in principle, also be used as long as they provide sufficient strength to bare the loads which are imparted to the frame when the tower segment 5 is erected.
A top view onto the bracket 3 of the tower segment erection tool according to the first embodiment is shown in figure 3. Like in figure 1, a wind turbine tower 5 fixed with its bot- torn side to the bracket 3 is indicated by a dashed circle.
The bracket 3 is formed by four steel beams 13A to 13B. Two parallel first beams 13A, 13B are connected to each other by cross beams 13C, 13D such that a more or less quadratic face is enclosed by the four beams 13A - 13D. At one end of each first steel beam 13A, 13B studs 15A, 15B extend perpendicu¬ larly outwards from the respective beam. The width of the stud's 15A, 15B cross sections are chosen such that they fit into the guideways 9C, 9D formed by the upstanding steel beams 11 of the frame parts 1C, ID. The studs 15A, 15B form guided elements which are guided by the guideways 9C, 9D when the tower 5 is erected. Each beam 17A to 17B may comprise a number of hols or openings (not shown) through which screws, bolts or other fixing means could be inserted in order to fix the bracket 3 to the bottom side of the tower 5.
Erecting a tower segment by use of the inventive tool will now be explained with respect to figures 4 to 6. The figures show three stages of erecting a wind turbine tower, as an ex- ample for the inventive tower segment erection method.
Figure 4 shows the method after the bracket 3 has been fixed to the bottom side of a wind turbine tower 5. The fixing of the bracket 3 to the bottom side 17 usually takes place when the tower 5 is in a horizontal position. However before fix¬ ing the brackets to the bottom side 17 at least the frame parts 1C, ID are suitably set on the ground and bracket 3 is inserted with its studs 15a, 15b into the guideways 9C, 9D . Then the bracket 3 is brought into an upright position and the bottom side 17 of the wind turbine tower 5 which is, at that moment, in a horizontal position is fixed thereto.
After the bracket 3 has been fixed to the bottom side 17, the erection of the wind turbine tower 5 begins. For erecting the wind turbine tower 5, a single crane (not shown) is used. Al¬ though only a single crane is used, more than one crane could be used, as well. However, with the inventive tower segment erection tool, a single crane is enough for safely erecting the tower.
While being erected, the tower 5 is initially tilted around a tilt axis which extends through the studs 15A, 15B of the frame 3. The tilt axis is horizontally held in position by the guideway 9C, 9D . However, this axis is allowed to move vertically guided by the guideways 9C and 9D . When the tilt angle depicted in figure 5 is reached the abut¬ ment face of the bracket abuts on the top of the stop por¬ tions 9A and 9B . From this moment on, the axis about which the tower 5 will be tilted while being further erected moves out of the axis extending through the studs 15A, 15B to point 20 where the abutment face 19 of the bracket 3 abuts on the top 21 of the stop portions 9A, 9B . Thus, when the tower 5 is further erected from the stage shown in figure 5, the tilting of the tower takes place about the axis defined by the points 20. As a consequence the studs 15A, 15B move upwards guided by the guideways 9C, 9D during the further erection of the tower. A horizontal movement of the studs 15A, 15B is pre¬ vented by the upstanding steel beams 11. To increase the re¬ sistance of the upstanding beams 11 to forces acting in hori- zontal direction during the erection of the tower 5 the upstanding beams 11 can be stabilised by traverses 23 as it can be best seen in figure 1.
When the tower 5 is erected to a nearly vertical position, as it is depicted in figure 6, the studs 15A, 15B have reached the uppermost part of the guideway 9C, 9D . In this position, the tower 5 is still secured against overshooting, i.e. against a horizontal movement of the bottom part of the tower 5, by the guideways 9C, 9D . The studs 15A, 15B only move fully out of the guideway when the tower is oriented fully vertical. Thus, overshooting of the tower is prevented until it is exactly vertical. A second crane for preventing over¬ shooting is therefore not necessary.
After the tower 5 has been fully erected, the bracket 3 will be dismounted from the bottom of the tower 5.
A second embodiment of the inventive tower segment erection tool is shown in figures 7 and 8. These figures only show the frame 101 of the tool as the bracket of the second embodiment does not differ from the bracket 3 of the first embodiment. In contrast to the first embodiment, where the frame com¬ prises four parts IA - ID, the frame 101 of the second em¬ bodiment is implemented as a single part. It is built up from two beams 103A, 103B and two cross beams 105 and 107. All beams 103A, 103B, 105, 107 are made from steel. The beams 103A, 103B extend substantially parallel to each other, and the cross beams 105, 107 extend perpendicular to these beams 103A, 103B. The cross beams 105, 107 connect the beams 103A, 103B in their outermost sections. In the middle section of the beams 103A, 103B, chamfered sections 104A, 104B are pre¬ sent, so that the distance between the beams 103A, 103B is slightly larger in the section 109, which will be referred to as the wide section hereinafter, than in the section 111, which will be referred to as the narrow section hereinafter. Correspondingly, the cross beam 107 in the wide section 109 is slightly longer than the cross beam 105 in the narrow sec¬ tion 111.
In the wide section 109, the guideways 9C, 9D are located, and in the narrow section 111 of the frame 101, the stop por¬ tions 9A, 9B are located. The stop portions 9A, 9B and the guideways 9C, 9D do not differ from the stop portions and guideways described with respect to the first embodiment and will therefore not be described again.
Although the frame has been a four-part-frame in the first embodiment and a one-part-frame in the second embodiment, it could as well be a three-part-frame formed by connecting ei¬ ther the beams 7A and 7B or the beams 7C and 7D by a trav- erse. A two-part-frame could be realized if beams 7A and 7B and beams 7C and 7D, are respectively connected to each other by traverses. Alternatively, a two-part-frame could also be realized by omitting the beams 105, 107 in figure 8.
In order to reduce friction between the abutment faces 19, and the top 21 of the stop portions 9A, 9B either of each could be provided with a friction reducing coating so as to form sliding surfaces. By such a coating, the movement of the abutment face around the arcuate top 21 of the stop portions 19A, 19B could be assisted. Such a movement takes place as the studs 15A, 15B are prevented from moving on a circle through the guideways 9C, 9D after the step of the erection method depicted in figure 5 has been reached, in which the tilt axis extends through or near to the points 20.
The inventive tool and the inventive method allow for erect- ing a tower segment, like e.g. a wind turbine tower, with the aid of only one crane. As no second crane is necessary the costs related with the erection of a tower segment can be re¬ duced.

Claims

Claims
1. A tower segment (5) erection tool with
- a frame (IA - ID, 101) which is adapted to rest on the ground and which comprises at least one upstanding stop por¬ tion (9A, 9B) and at least one guide portion including at least one guideway (9C, 9D) which has the same height as the stop portion (9A, 9B) and is adapted to restrict the movement of a guided element (15A, 15B) to a vertical movement; and - a bracket (3) which is designed to be detachably fixed to the lowermost section of the tower segment (5) and which com¬ prises an abutment face (19) being adapted to abut on the stop portion (9A, 9B) and at least one guided element (15A, 15B) which is adapted to be guided by the at least one guide- way (9C, 9D) of the frame (IA, IB, 101) .
2. The tower segment (5) erection tool as claimed in claim 1, in which the frame comprises at least two independent frame parts (IA - ID) carrying the stop portion (s) (9A, 9B) and the guideway(s) (9C, 9D).
3. The tower segment (5) erection tool as claimed in claim 1, in which the frame (101) is implemented as a one part struc¬ ture .
4. The tower segment (5) erection tool as claimed in any of the preceding claims, in which each guide portion comprises first and second beams (11) which are fixed to a base portion (7C, 7D) of the frame (1C, ID) with a slit between them, the slit forming the guideway (9C, 9D) .
5. The tower segment (5) erection tool as claimed in claim 4, in which each guided element (15A, 15B) is a stud extending from the bracket (3) .
6. The tower segment (5) erection tool as claimed in any of the preceding claims, in which each stop portion (9A, 9B) and/or each abutment face (19) comprises a or is implemented as a sliding surface.
7. A method of erecting a tower segment (5) using a tower segment (5) erection tool as claimed in any of the preceding claims, comprising the steps of:
- inserting the at least one guided element (15A, 15B) into the guideway (9C, 9D) of a frame (IA, ID) resting on the ground; - fixing the bracket (3) to the tower segment (5) which is to be erected when it is in a horizontal or near horizontal po¬ sition;
- tilting the tower segment (5) into a tilted position in which the abutment face (19) of the bracket (3) abuts on the at least one stop portion (9A, 9B) of the frame (IA, ID);
- further tilting the tower (5) into a vertical position with the abutment face (19) resting on the stop portion (9A, 9B) and the guided element (15A, 15B) being guided upwards by the guideway (9c, 9D) .
8. The method as claimed in claim 7 in which the bracket (3) is dismounted from the tower segment (5) after it is in the upright position.
PCT/EP2007/051828 2006-06-27 2007-02-27 Tool and method for erecting a tower segment WO2008000526A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP20060013265 EP1873332B1 (en) 2006-06-27 2006-06-27 Tool and method for erecting a tower segment
EP06013265.1 2006-06-27

Publications (1)

Publication Number Publication Date
WO2008000526A1 true WO2008000526A1 (en) 2008-01-03

Family

ID=37441099

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2007/051828 WO2008000526A1 (en) 2006-06-27 2007-02-27 Tool and method for erecting a tower segment

Country Status (5)

Country Link
EP (1) EP1873332B1 (en)
DE (1) DE602006004442D1 (en)
DK (1) DK1873332T3 (en)
ES (1) ES2317367T3 (en)
WO (1) WO2008000526A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5655777B2 (en) * 2009-03-19 2015-01-21 パナソニックIpマネジメント株式会社 Induction heating cooker
CN113748266A (en) * 2019-05-06 2021-12-03 西门子歌美飒可再生能源公司 Tool device for unloading a tower or a tower segment from a transport vehicle and/or for storing a tower or a tower segment

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3736396A1 (en) * 2019-05-06 2020-11-11 Siemens Gamesa Renewable Energy A/S Tool arrangement for pivoting a tower or a tower segment from a non-erected position to an erected position

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4127199A (en) * 1977-01-25 1978-11-28 Sparrows Contract Services Limited Lifting apparatus
GB2206138A (en) * 1987-06-20 1988-12-29 Towermaster Steelwork Limited Tiltable column with pedestal
US6408575B1 (en) * 1999-03-30 2002-06-25 Fuji Jukogyo Kabushiki Kaisha Horizontal axis type wind turbine and method of construction thereof
US6709215B1 (en) * 2002-03-12 2004-03-23 J-Jack Corporation One-man, light-pole erecting and lowering apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4127199A (en) * 1977-01-25 1978-11-28 Sparrows Contract Services Limited Lifting apparatus
GB2206138A (en) * 1987-06-20 1988-12-29 Towermaster Steelwork Limited Tiltable column with pedestal
US6408575B1 (en) * 1999-03-30 2002-06-25 Fuji Jukogyo Kabushiki Kaisha Horizontal axis type wind turbine and method of construction thereof
US6709215B1 (en) * 2002-03-12 2004-03-23 J-Jack Corporation One-man, light-pole erecting and lowering apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5655777B2 (en) * 2009-03-19 2015-01-21 パナソニックIpマネジメント株式会社 Induction heating cooker
US9769883B2 (en) 2009-03-19 2017-09-19 Panasonic Intellectual Property Management Co., Ltd. Induction heating cooker
CN113748266A (en) * 2019-05-06 2021-12-03 西门子歌美飒可再生能源公司 Tool device for unloading a tower or a tower segment from a transport vehicle and/or for storing a tower or a tower segment

Also Published As

Publication number Publication date
DK1873332T3 (en) 2009-03-30
DE602006004442D1 (en) 2009-02-05
ES2317367T3 (en) 2009-04-16
EP1873332B1 (en) 2008-12-24
EP1873332A1 (en) 2008-01-02

Similar Documents

Publication Publication Date Title
US9181719B2 (en) Adjustable formwork climber for casting a protruding region of a structure
CN110541556B (en) Attached lifting scaffold and climbing method
US20130160224A1 (en) Partially and fully earth-anchored cable-stayed bridges using main-span prestressing unit and method of constructing the same
KR101239621B1 (en) Beam launching method using beam launcher with end strut having roller guide
CA2998120C (en) Ladder installation for equipment tower
KR101118526B1 (en) Construction method of steel tower of bridge and dismantling method of lifting frame
CN211772901U (en) Space abnormal shape steel case arch rib installation device
CN206736864U (en) Hydraulic self-lifting cantilever heavy type arch dam shuttering work platform
WO2008000526A1 (en) Tool and method for erecting a tower segment
US20140173898A1 (en) Method of mounting a wind turbine
JP4279189B2 (en) Temporary strut and its construction method
CN102574566A (en) Method for installing a wind turbine
GB2563464B (en) Pile guide frame coupled with rotatable arm
CN109610346B (en) Cantilever beam adjusting method
CN217000940U (en) High-precision mounting system for rear-mounted inclined steel column
US4260345A (en) Arrangement for casting concrete walls
CN110900820B (en) Construction device and construction method for self-adaptive post-tensioning prefabricated box girder
CN113136803A (en) River-crossing steel truss bridge closure method
JP4217203B2 (en) Structure construction method and lifting device
CN104279130B (en) Tower section storage
JP2022537058A (en) System and method for leveling and fastening jacketed pedestals to hollow foundation piles
CN110552542A (en) Construction method of conical building structure
CN110606430B (en) Cofferdam hanging system and method
JP7473097B1 (en) Rotating body installation method
CN215759150U (en) Construction elevator foundation device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07726527

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: RU

122 Ep: pct application non-entry in european phase

Ref document number: 07726527

Country of ref document: EP

Kind code of ref document: A1