WO2007065301A1 - A fast rerouting method for automatically exchanging optical network - Google Patents

A fast rerouting method for automatically exchanging optical network Download PDF

Info

Publication number
WO2007065301A1
WO2007065301A1 PCT/CN2005/002134 CN2005002134W WO2007065301A1 WO 2007065301 A1 WO2007065301 A1 WO 2007065301A1 CN 2005002134 W CN2005002134 W CN 2005002134W WO 2007065301 A1 WO2007065301 A1 WO 2007065301A1
Authority
WO
WIPO (PCT)
Prior art keywords
node
controller
requirement
failure
connection
Prior art date
Application number
PCT/CN2005/002134
Other languages
French (fr)
Chinese (zh)
Inventor
Ming Ke
Desheng Sun
Original Assignee
Zte Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zte Corporation filed Critical Zte Corporation
Priority to CNA2005800513798A priority Critical patent/CN101248630A/en
Priority to PCT/CN2005/002134 priority patent/WO2007065301A1/en
Publication of WO2007065301A1 publication Critical patent/WO2007065301A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/28Routing or path finding of packets in data switching networks using route fault recovery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/02Topology update or discovery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q2011/0073Provisions for forwarding or routing, e.g. lookup tables
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q2011/0079Operation or maintenance aspects
    • H04Q2011/0081Fault tolerance; Redundancy; Recovery; Reconfigurability

Definitions

  • OT p ca Ta smsso ewok A W WaVe e g-vso pex Sy cho o s g a eac synchronous digital system or SON T y c o o s Op ca ewo synchronous A A has been obtained in the field.
  • Self-healing ability is an important feature of Ah.
  • Solid T-TG.841 The scores and characteristics of Ah S SO T Ah is self-healing.
  • the recommended methods of protection include the guarantee to Pa and the guarantee to Yu.
  • the security For the path Pah, the security most often has channels and the sub-A security is most often shared or shared, 1 + 1/1 iron, etc. Passages have been very popular in Afghanistan, but the way of ah and ah occupies a lot of sources and no longer meet.
  • the re-routing process as shown in Figure 1 is based on the RB Ro g aa ase update, which is more reliable than the latest R method, but the fault information and RB update have a large delay. more. If the failure information does not arrive and the respective summer routes may still fail and cannot be successful.
  • the problem to be solved is to provide a fast method of exchanging self-robbery to exchange Ayou.
  • the same success rate is high, and the resources of Azerbaijan are quickly and quickly combined with each route.
  • This method provides a quick way to exchange self-robbery, including the following: 1) All the conditions in this country, all the conditions in this country, and phase failure. 2) Otherwise
  • step 2 A search for failure of the connection on the road if the connection is carried on the step 3 otherwise return to step 1
  • Each Arab League contains the resource manager, the connection controller, the controller and the controller.
  • the management function completed by the manager of the failed Arab League does not notify the controller of the failure information and the connected controller of the connected Arab League.
  • Xia Route returns to the connection controller of the connection controller.
  • the strategy can be to exclude the fault, or to exclude the two ends of the fault, or to exclude the fault, and have the same sharing risk.
  • this method reduces The requirement of resources avoids the blind routing of the summer routing channel and improves the success rate of each of them, shortening the same.
  • the control plane of the Benji wood plan includes the resource manager Reso ce a age R connected to the controller Co ec o Co oe, the controller Ro gCo oe you RC , Controller PoocoCo oe you C.
  • the detection and management functions completed by R shown in 4 of the same composition will notify the fault information controller C and connect each C. Route C to RC Xia. RC receives C's previous R B summer route returns
  • C RC returns the signalling of the summer route establishment.
  • Step 502 Determine whether each Arab League has detected a failure? If the failure is detected, otherwise return to Step 501
  • Step 03 When a fault is detected, search for this failure and carry it on the road and connect each
  • Step 504 Determine whether the connection is carried on the road if it fails. If yes, otherwise return to step 501
  • Step 505 According to the signaling message containing the failure information of the connection carried on the failure road
  • Step 506 This connected A received a letter containing invalid information
  • the strategy is based on the integration of the Arab League with the goal of Ali Su Resuming the Summer Route
  • Step 7 Is the summer routing successful? If yes, otherwise return to step 501
  • step 508 the signaling of each connected Axia route establishment may return to step 501.
  • F-G F-E is shared by SR G 1-
  • F-E is shared by SR G2 2 -z is shared by R G3 3
  • Step 2 The R of A F searches for the connections carried on the F-E road.
  • the F-E road carries the connections of the A-FE-Z.
  • Step 3 The R of A F receives the A-F-E-A failure message from A-F-E-Z
  • Step 1 The A-C C-F failure message uses A to Z as the purpose to force the repulsion failure FE to the local RC RC summer route.
  • Step 1 A local RC returns the route. The signaling established by the summer route. The connections of A-F 1 # channel, F-G 1 channel, G 1 # channel, and z channel are most established. Scenario 2 is a strategic solution to exclude faults.
  • the Axiu program at both ends includes the following steps
  • Step 1 A, B, C, D, E, F, G, and Z. The status of each A. The failure of the R of the F to the local F F direction
  • Step 2 The R of F searches for each connection carried on the FE road.
  • the search pig carries the A-F-Ez connections on the F-E road.
  • Step 3 A-F R-direction and A-F-E-Z A-F-E failure message
  • Step A Signaling of the establishment of a summer route returned by the local RC. Eventually establish the 1 # channel of AB and the communication of BC , CG's 1 # channel, G-'s 1 # channel, and -Z's 1 # channel connection scheme 3 is a strategic solution to exclude faults.
  • the Hugh scheme with the same SR G includes the following steps
  • Step 1 The status of each of A, B, C, E, F, G, and Z. The failure of A to the local F F direction
  • Step 2 The R of A F searches for each connection on the FE road and searches for the connection carrying the A-F-E-Z connection on the F-E road.
  • Step 3 A-F R-direction and A-F-E-Z A-F-E failure message
  • Step A C-e failure message of A A, A, Z, A Purpose Non-excitation C-G F-G to the local RC Xia route.
  • Step 1 A local RC returns the route. The signaling established by the summer route. Finally, the connection of A-B 1 channel, -C 1 channel, C- 1 channel, -E 1 channel, E-Z 1 # channel is established.
  • the above and the comparison can be one step.
  • the requirement of the source avoids the blindness of the summer routing channel, improves the success rate of each, and shortens and varies.
  • the special feature is that the faulty routing in summer does not need to wait for the update to be efficient and the non-faulty success rate is high. This method is used in any country that meets the rapid requirements.

Abstract

A fast rerouting method for automatically exchanging optical network, each node detectes several alarm conditions in all links of the node in time. When a fault of link be detected, the node searches a traffic beared at the failed link with fault, if the traffic exists, the node sends a signaling information including failed link information to a source node of the traffic sequentially. After detecting the failed traffic and receiving the signaling information, according to the restoration policy, the current node acts as the resource, the service destination node acts as the destination, the source node caculates the restoration route newly, the resource node connected with service begins to restore the signaling course of routing establishment. According to the described method in the present invention, it reduces the need of the link resource of network topology, avoids the blindness of selecting the restoration route channel, improves the success rate of service restoration , and shortens the service restoration time.

Description

劫交換 阿 由的 方法  Robbery exchange Ayou's method
領域 Field
本 涉及 阿領域尤其涉及 自 交換 阿 快速 由的 方法。 背景 木  This relates to the field of Afghanistan, and in particular to the self-exchange method of fast routing. Background wood
阿 例如OT p ca Ta smsso ewok 阿 、W WaVe e g - vso pex Sy cho o s g a eac 同步數字系 或 SON T y c o o s Op ca ewo 同步 阿 阿 在 領域已 得到了 。  For example, OT p ca Ta smsso ewok A, W WaVe e g-vso pex Sy cho o s g a eac synchronous digital system or SON T y c o o s Op ca ewo synchronous A A has been obtained in the field.
自 交換 阿 A o cSw chedOp ca ewok ASO 是近年 阿 領域的研究 。 T -T .8080 及G771X系列  Self-exchanging Ao cSw chedOp ca ewok ASO is a recent research in the field of Afghanistan. T -T .8080 and G771X series
了ASO 的概念 通 門的控制乎 o o Pa e, P 完成此 連接的自劫建立、 連接的自劫 等功能。  In view of the concept of ASO, the overall control of the door is o o Pa e, P completes the functions of self-hijacking of this connection and self-hijacking of the connection.
自愈能力是 阿 的一介重要特 。 固 T -TG.841 《 阿 的分 和特性》 S SO T 阿自愈功能 了 的 。其推荐的保 方法包括 于 往 Pa 的保 和 于 的保 。 于路徑 Pah 的保 最常 的有通道 和子阿連接 于 的保 最常 有 或 向 共享 、 1+1/1 鐵 等。通道 、 在 阿 中得到了非常 的 但 于阿 阿等 阿 上 方式 占用大量各 源而不再道合。  Self-healing ability is an important feature of Ah. Solid T-TG.841 "The scores and characteristics of Ah" S SO T Ah is self-healing. The recommended methods of protection include the guarantee to Pa and the guarantee to Yu. For the path Pah, the security most often has channels and the sub-A security is most often shared or shared, 1 + 1/1 iron, etc. Passages have been very popular in Afghanistan, but the way of ah and ah occupies a lot of sources and no longer meet.
于阿 阿 一般 " 方式 自愈功能。 目前自劫交換 主要 由方法未 此各的自劫 其基本原理 此各連接 故障 由 內的阿 于 控制平面 由、 由或分級 由等方法力用戶並各重新尋找 接 完成 各的自 。 The self-healing function in the general way of "Ahhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh with with with with self-healing, the main principle of the self-hijacking is not the method itself, the basic principle of this connection failure is to control the user by the control plane, by or by the classification method, etc. Find the self .
如 1 所示的重 由 流程 其特 是在 由 R B Ro g aa ase 更新完成之 此 于最新 R 的 方法 然可靠性高 但 故障信息 和R B更新 此各 有較大延退 于大型阿 延退則更加 。 如果在故障 信 息 沒有 到並各 並各 此各 的 夏 路由可能仍然 故障 並 不能 成功 。  The re-routing process as shown in Figure 1 is based on the RB Ro g aa ase update, which is more reliable than the latest R method, but the fault information and RB update have a large delay. more. If the failure information does not arrive and the respective summer routes may still fail and cannot be successful.
了解決此 T -T G7 提出了使用 由多 包括 萬、 萬和共享風險 SR aedRsk kGo p 萬等 由 夏路由的通道 其目的是 了在 R B不需要更新的前提下 即不需要 定位故障 的情況下 縮短 並各 同 提高此各成功 的可能性 其她 流程 2所示。 但 方式 阿 資源有較高要求 阿 不 定 支持 由多 在 神情況下 並各是否能 仍然是依 于 故障 信息的 和R 更新 並 需要花費 阿 不 能 足並各快速 的要求。 另外 即使 阿 支持 由多 但可能由于尋找到的 夏路由 的阿 多 夏路由 如 3所示 阿 A和阿 Z之同有一 並 的工作 由 A-F- Z 若 F- 失效 按照 由多 的路由 A-B-C-D-E-Z 但 上存在 更好的 夏路由A-F-G-Z  In order to solve this T-T G7, it is proposed to use the channels that are routed by Xia, including 10,000, 10,000, and shared risks SR aedRsk kGo p 10,000. And each improves the probability of this success. But the way is that the resource has higher requirements, and it may not be supported by the multi-individual situation, and whether it can still be based on the fault information and R update and it needs to cost. It can not meet the rapid requirements of each. In addition, even if Ahdo supports Youduo, it may be due to the found Axia route as shown in 3. Both Ah A and Ah Z work together. AF- Z If F- fails, follow the Yuduo route ABCDEZ There is a better summer route AFGZ
因此 需要有一 自 交換 阿 快速 由的 方法 在並各連 接 故障 快速、 的 並各路由。 內容  Therefore, there is a need for a self-exchange method and a fast routing method to connect faults quickly and to each route. Content
本 所要解決的 木 在于提供 自劫交換 阿 快速 由的 方法 用 克服 前自劫交換 阿 由 成功率不高 同 的 現成功率高、 阿 資源的快速 由 快速、 的 並各路由。 The problem to be solved is to provide a fast method of exchanging self-robbery to exchange Ayou. The same success rate is high, and the resources of Azerbaijan are quickly and quickly combined with each route.
本 提供 自劫交換 阿 快速 由的 方法包括如下 1 阿 內各阿 本阿 所有 的 狀況 阿 到相 故障 步驟 2 否則 This method provides a quick way to exchange self-robbery, including the following: 1) All the conditions in this country, all the conditions in this country, and phase failure. 2) Otherwise
2 阿 搜索 故障的失效 路上承載的此各連接 如果承載 有此各連接 步驟 3 否則返回步驟 1 2 A search for failure of the connection on the road if the connection is carried on the step 3 otherwise return to step 1
3 阿 依 向並各 接的 阿 包含失效 信息的 令消息 3 Ah Yi and the incoming Ah message containing invalid information
4 並各 接的 阿 到此各失效 接收到包含失效 信息的信令消息 策略 本阿 以此 目的阿 力 宿 重新 夏路由 若成功 步驟 5 否則返回步驟 1 5 並各 接的 阿 夏路由建立的信令 。  4 The connected Axia routers fail to receive the signaling message policy that contains the failure information. This Alibaba resumes the summer route for this purpose. If it succeeds in step 5, otherwise it returns to step 1 5. make.
各阿 都包含有 資源管理器、連接控制器、 由控制器及 控制器 其  Each Arab League contains the resource manager, the connection controller, the controller and the controller.
到 故障的阿 的 管理器完成 的 和管 理功能 非 將 故障信息 本阿 的 控制器通知並各連接 的 阿 的連接控制器 夏路由 阿 的路由控制器接收連接控制器的  The management function completed by the manager of the failed Arab League does not notify the controller of the failure information and the connected controller of the connected Arab League.
夏路由 返回 到連接控制器 阿 的連接控制器 步驟 4 策略可以是排斥故障 由、 或是排斥故障 兩端的阿 、 或是排斥 故障 具有相同共享風險 的相夫 鏈 。  Xia Route returns to the connection controller of the connection controller. Step 4 The strategy can be to exclude the fault, or to exclude the two ends of the fault, or to exclude the fault, and have the same sharing risk.
用本 方法 現有 由 木相比,減少了 阿 資源的要求 避免了 夏路由通道 的盲目 提高了此各 的 成功率 縮短了此 同。 Compared with the existing Yuki, this method reduces The requirement of resources avoids the blind routing of the summer routing channel and improves the success rate of each of them, shortening the same.
Figure imgf000006_0001
本投明的最佳 方式
Figure imgf000006_0001
The best way
一步的 。 Step by step.
4所示 是本 明技木方案功能 本 明技木方案 T -TG.8 80 的控制平面 包括 資源管理器 Reso ce a age R 連接控制器 Co ec o Co o e 、 由控制器 Ro gCo o e 你RC 、 控制器 PoocoCo o e 你 C 。 各組成 之同的 4所示 R 完成 的檢測和管理功能 將 故障信息 控制器 C 通知並各 接的 C。 C 策略向RC 夏路 由。 RC接收 C的 于 前R B 夏路由 返回  4 shows the function of the Benji wood plan T-TG.8 80 The control plane of the Benji wood plan includes the resource manager Reso ce a age R connected to the controller Co ec o Co oe, the controller Ro gCo oe you RC , Controller PoocoCo oe you C. The detection and management functions completed by R shown in 4 of the same composition will notify the fault information controller C and connect each C. Route C to RC Xia. RC receives C's previous R B summer route returns
。 C RC返回的路由 夏路由建立的信令 。 . C RC returns the signalling of the summer route establishment.
5是本 明技木方案的流程 包括如下步驟  5 is the flow of this Mingji wood plan, including the following steps
步驟501 內各 本 所有 的 狀況 步驟502 判斷各阿 是否檢測到 故障?如果粒 到 故障 則 否則返回步驟501 All the conditions in step 501 Step 502 Determine whether each Arab League has detected a failure? If the failure is detected, otherwise return to Step 501
步驟 03 檢測到 故障的阿 搜索此失效 路上承載的並各連 接  Step 03 When a fault is detected, search for this failure and carry it on the road and connect each
步驟504 判斷失效 路上是否承載有此 接 如果是 則 否則 返回步驟501  Step 504: Determine whether the connection is carried on the road if it fails. If yes, otherwise return to step 501
步驟505 依 失效 路上承載的此 連接的 阿 包含 失效 信息的信令消息  Step 505 According to the signaling message containing the failure information of the connection carried on the failure road
步驟506 此各 接的 阿 接收到包含失效 信息的信  Step 506: This connected A received a letter containing invalid information
策略 以本阿 以並 目的阿 力宿 重新 夏路由  The strategy is based on the integration of the Arab League with the goal of Ali Su Resuming the Summer Route
步驟 7 夏路由是否 成功?如果是 則 否則 返 回步驟501  Step 7 Is the summer routing successful? If yes, otherwise return to step 501
步驟508 並各連接的 阿 夏路由建立的信令 可 以 返回步驟501 。 In step 508, the signaling of each connected Axia route establishment may return to step 501.
6是用于 休 方案的阿 阿 其 F-G F-E 于 SR G 共享凡 1 - 、 F-E 于 SR G2 共享 凡 2 -z 于 R G3 共享凡 3  6 is used for the Hou program. The F-G F-E is shared by SR G 1-, F-E is shared by SR G2 2 -z is shared by R G3 3
合 4、 、 6 明本 不同 策略的 休 方案。  Combine the rest plans of 4, 6, and 6 with different strategies.
首先做如下 阿 A到阿 Z有一 並 的工作 由 最短路徑A-F -Z A-F 的 1#通道、 F-E 的 1#通道、 EZ 的 1#通道 。 FE F方向的 故障 本 將 下面
Figure imgf000007_0001
包括 如下步驟
First, do the following A-A to A-Z work from the shortest path AF-Z AF 1 # channel, FE 1 # channel, EZ 1 # channel. The fault in the FE F direction will be the following
Figure imgf000007_0001
Including the following steps
步驟 、 A、 。 C、 、 E、 F、 G、 和Z的 R 本 各 的 狀況 阿 F的 R 到本地FE F方向的 故障 Steps, A,. R, C, E, F, G, and Z In each situation, there is a fault in the direction of R from the F to the local F
步驟二、 阿 F的 R 搜索F-E 路上承載的 各連接 搜索 F- 路上承載了A-FE-Z 各 接  Step 2: The R of A F searches for the connections carried on the F-E road. The F-E road carries the connections of the A-FE-Z.
步驟三、 阿 F的 R 向此各 接A-F-E-Z的 阿 A F-E 失效消息  Step 3: The R of A F receives the A-F-E-A failure message from A-F-E-Z
步驟 、阿 A的 C F-E 失效消息 以A 以Z 阿 目的 把排斥失效 FE作力 由 向本阿 的 RC 夏路由。 RC返回路由 A-F-G- -Z  Step 1. The A-C C-F failure message uses A to Z as the purpose to force the repulsion failure FE to the local RC RC summer route. RC return route A-F-G- -Z
步驟 、 阿 A 本地RC返回的路由 夏路由建 立的信令 。 最 建立 A-F 的 1#通道、 F-G 的 1 通 道、 G 的1#通道、 z 的 通道的 連接。 方案2 是 策略力排斥故障 兩端的阿 的 休 方案 包括如下步驟  Step 1. A. A local RC returns the route. The signaling established by the summer route. The connections of A-F 1 # channel, F-G 1 channel, G 1 # channel, and z channel are most established. Scenario 2 is a strategic solution to exclude faults. The Axiu program at both ends includes the following steps
步驟一、 阿 A、 B、 C、 D、 E、 F、 G、 和Z的 R 本 阿 各 的 狀況 阿 F的 R 到本地FE F方向的 故障  Step 1. A, B, C, D, E, F, G, and Z. The status of each A. The failure of the R of the F to the local F F direction
步驟二、 F的 R 搜索FE 路上承載的此各連接 搜索豬 F-E 路上承載了A-F-Ez 各連接  Step 2: The R of F searches for each connection carried on the FE road. The search pig carries the A-F-Ez connections on the F-E road.
步驟三、 阿 F的 R 向並 連接A-F-E-Z的 阿 A F-E 失效消息  Step 3: A-F R-direction and A-F-E-Z A-F-E failure message
步驟 、阿 A的 C收到FE 失效消息 以A阿 以Z 阿 目的 把排斥 F和阿 E作力 由 向本阿 的RC 夏路由。 RC返回路由 A-B-C-G- -Z  Step A, C of A, A received FE failure message, A, Z, A, purpose, to exclude F and A, E, to the local RC Xia routing. RC return route A-B-C-G- -Z
步驟 、 阿 A 本地RC返回的路由 夏路由建 立的信令 。 最終建立 A-B 的 1#通道、 B-C 的用通 、 C-G 的 1#通道、 G- 的 1#通道、 -Z 的 1#通道的 連接 方案3 是 策略力排斥 故障 具有相同SR G的相夫 的 休 方案 包括如下步驟 Step A: Signaling of the establishment of a summer route returned by the local RC. Eventually establish the 1 # channel of AB and the communication of BC , CG's 1 # channel, G-'s 1 # channel, and -Z's 1 # channel connection scheme 3 is a strategic solution to exclude faults. The Hugh scheme with the same SR G includes the following steps
步驟一、 阿 A、 B、 C、 、 E、 F、 G、 和Z的 本 阿 各 的 狀況 阿 F的 到本地FE F方向的 故障  Step 1. The status of each of A, B, C, E, F, G, and Z. The failure of A to the local F F direction
步驟二、 阿 F的 R 搜索FE 路上 的並各連接 搜索 F-E 路上承載了A-F-E-Z此 連接  Step 2: The R of A F searches for each connection on the FE road and searches for the connection carrying the A-F-E-Z connection on the F-E road.
步驟三、 阿 F的 R 向並各連接A-F-E-Z的 阿 A F-E 失效消息  Step 3: A-F R-direction and A-F-E-Z A-F-E failure message
步驟 、阿 A的 C -e 失效消息 以A阿 以Z 阿 目的 非把排斥 C-G F-G作力 由 向本 阿 的RC 夏路由。 RC返回路由 豬 A-B-C- -E-z  Step A, C-e failure message of A A, A, Z, A Purpose Non-excitation C-G F-G to the local RC Xia route. RC return route pig A-B-C- -E-z
步驟 、 阿 A 本地RC返回的路由 夏路由建 立的信令 。 最終建立 A-B 的 1 通道、 -C 的1 通 道、 C- 的 1 通道、 -E 的 1 通道、 E-Z 的 1#通道的 連接。  Step 1. A. A local RC returns the route. The signaling established by the summer route. Finally, the connection of A-B 1 channel, -C 1 channel, C- 1 channel, -E 1 channel, E-Z 1 # channel is established.
上 和 比 可 一步 本 明技木方案具有如 下  The above and the comparison can be one step.
在 夏路由 不需要等待 由 更新 的 同效率高  In the summer routing, there is no need to wait for updates by the same high efficiency
在 夏路由通道 知道故障 信息 故 的成功率高  In the summer routing channel, the failure rate is known, so the success rate is high
本 方法造用于任何 阿 在滿足快速 要求的同  This method is used for any
阿 。 並 Ah. and
用本 方法 有 由 木相比 減少了  Compared with Yuki, this method reduces
源的要求 避免了 夏路由通道 的盲目 提高了此各 的 成功率 縮短了並各 同。 其特別的 在于 故障 的 在 夏路由 不需要等待 由 更新 的 同效率 非 故障 的成功率高。 本 的方法造用于任何 阿 在滿足快速 要求的同 阿 。  The requirement of the source avoids the blindness of the summer routing channel, improves the success rate of each, and shortens and varies. The special feature is that the faulty routing in summer does not need to wait for the update to be efficient and the non-faulty success rate is high. This method is used in any country that meets the rapid requirements.

Claims

要 求 1、 自劫交換 阿 快速 由的 方法 其特 在于 包括 如下步驟Requirement 1. The method of exchanging self-robbing and fast-moving method is characterized by the following steps
1 阿 內各阿 本 所有 的 狀況 阿 到相夫鏈 故障 步驟 2 1 All the conditions of Neben Aben to the failure of Sangfu Chain Step 2
2 阿 搜索 故障的失效 路上承載的此 接 如果承載 有此 連接 步驟 3 2 A search for failure of the connection on the road if the bearer has this connection Step 3
3 阿 依吹向此各 接的 阿 包含失效 信息的 令消息 3 Ah Yi blows to this connected Ah message containing invalid information
4 此各連接的 阿 到 各失效 接收到包含失效 信息的信令消息 策略 以本阿 以此 目的阿 力宿 重新 夏路由 若成功 步驟 5 4 This connection to each failure to receive a signaling message strategy that contains failure information to use this as the purpose of this destination to re-summer routing if successful Step 5
5 此各 接的 阿 夏路由建立的信令 。 5 The signaling of the establishment of this connected Axia route.
2、 要求1 的方法 其特 在于 步驟 1 一步包 括 如果各阿 到本阿 相夫 故障 則 檢測本阿 所有 的 狀況。  2. The method of Requirement 1 is characterized in that step 1 includes the detection of all the conditions of Ben-Ah if each Arab-Afghan failure occurs.
3、 要求1 的方法 其特 在于 步驟 2 一步包 括 如果 失效 路上 承載有此 連接 則返回步驟 1 。 3. The method of requirement 1 is characterized in that step 2 includes the step 1 step including returning to step 1 if the connection is carried on the failed road.
4、 要求1 的方法 其特 在于 步驟 4 一步包 括 如果重新 夏路由不成功 則返回步驟 1  4. The method of requirement 1 is characterized in that step 4 includes one step. If the resuming of the summer route is unsuccessful, return to step 1
5、 要求 1 的方法 其特 在于 各阿 都包含有 資源管理器、 接控制器、 由控制器及 控制器 功能 將 故障信息 本阿 的 控制器通知此各連接的 阿 的連接控制器 阿 的路由控制器接收連接控制器的 5. The method of requirement 1 is characterized in that each Arab League contains a resource manager, a controller, and the controller and controller function will notify the controller of the failure of the Arab League to the connected controller A routing controller receives the connection of the controller
夏路由 返回 到 接控制器 阿 的連接控制器  Xia Routing returns to the connected controller
6、 要求1 的方法 其特 在于 步驟 4 中 6. The method of requirement 1 is characterized in step 4
略是排斥故障 由。 Slightly exclude faults.
7、 要求1 的方法 其特 在于 步驟 4 中 策 略是排斥故障 端的阿 。  7. The method of requirement 1 is characterized in that the strategy in step 4 is to exclude the faulty side.
8、 要求1 的方法 其特 在于 步驟 4 中  8. The method of requirement 1 is characterized in step 4
PCT/CN2005/002134 2005-12-09 2005-12-09 A fast rerouting method for automatically exchanging optical network WO2007065301A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CNA2005800513798A CN101248630A (en) 2005-12-09 2005-12-09 Method for implementing automatic exchange optical network fast heavy route
PCT/CN2005/002134 WO2007065301A1 (en) 2005-12-09 2005-12-09 A fast rerouting method for automatically exchanging optical network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2005/002134 WO2007065301A1 (en) 2005-12-09 2005-12-09 A fast rerouting method for automatically exchanging optical network

Publications (1)

Publication Number Publication Date
WO2007065301A1 true WO2007065301A1 (en) 2007-06-14

Family

ID=38122459

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2005/002134 WO2007065301A1 (en) 2005-12-09 2005-12-09 A fast rerouting method for automatically exchanging optical network

Country Status (2)

Country Link
CN (1) CN101248630A (en)
WO (1) WO2007065301A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011022982A1 (en) * 2009-08-25 2011-03-03 中兴通讯股份有限公司 Method and path computation element for improving service restoration speed in transmission network
CN107579868A (en) * 2016-07-04 2018-01-12 中兴通讯股份有限公司 A kind of method and apparatus of network element failure effect business detection
CN113727221A (en) * 2021-08-13 2021-11-30 烽火通信科技股份有限公司 Intelligent optical network control method, device and system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101616344B (en) * 2009-06-17 2012-06-06 中兴通讯股份有限公司 Method and device for protecting service based on automatic exchange optical network
CN113365165B (en) * 2021-06-22 2022-07-08 烽火通信科技股份有限公司 Method and equipment for dynamically switching transport network rerouting service

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1437356A (en) * 2002-02-06 2003-08-20 日本电气株式会社 Method for establishing recovery type path of different faults in one communication network
WO2004006514A1 (en) * 2002-07-05 2004-01-15 Nortel Networks Limited Method, device and corresponding computer readable medium for establishing protection paths on demand and retrieve protection switching in a communications network
US20040109687A1 (en) * 2002-12-10 2004-06-10 Hyeon Park Fast rerouting method through generalized multi-protocol label switching
CN1505409A (en) * 2002-11-27 2004-06-16 华为技术有限公司 Rerouting method based on network entrance node

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1437356A (en) * 2002-02-06 2003-08-20 日本电气株式会社 Method for establishing recovery type path of different faults in one communication network
WO2004006514A1 (en) * 2002-07-05 2004-01-15 Nortel Networks Limited Method, device and corresponding computer readable medium for establishing protection paths on demand and retrieve protection switching in a communications network
CN1505409A (en) * 2002-11-27 2004-06-16 华为技术有限公司 Rerouting method based on network entrance node
US20040109687A1 (en) * 2002-12-10 2004-06-10 Hyeon Park Fast rerouting method through generalized multi-protocol label switching

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011022982A1 (en) * 2009-08-25 2011-03-03 中兴通讯股份有限公司 Method and path computation element for improving service restoration speed in transmission network
KR101342787B1 (en) * 2009-08-25 2013-12-19 지티이 코포레이션 Method and path computation element for improving service restoration speed in transmission network
US8767550B2 (en) 2009-08-25 2014-07-01 Zte Corporation Method and path computation element for improving service restoration speed in transmission network
CN107579868A (en) * 2016-07-04 2018-01-12 中兴通讯股份有限公司 A kind of method and apparatus of network element failure effect business detection
CN107579868B (en) * 2016-07-04 2023-05-23 中兴通讯股份有限公司 Method and device for detecting service affected by network element failure
CN113727221A (en) * 2021-08-13 2021-11-30 烽火通信科技股份有限公司 Intelligent optical network control method, device and system

Also Published As

Publication number Publication date
CN101248630A (en) 2008-08-20

Similar Documents

Publication Publication Date Title
US10432514B2 (en) Multiprotocol label switching traffic engineering tunnel establishing method and device
US7471669B1 (en) Routing of protocol data units within a communication network
US9264302B2 (en) Methods and systems with enhanced robustness for multi-chassis link aggregation group
JP3963728B2 (en) Spanning tree bypass method and apparatus
CN102598599B (en) RSVP-TE graceful restart under fast re-route conditions
US10439880B2 (en) Loop-free convergence in communication networks
EP2911348A1 (en) Control device discovery in networks having separate control and forwarding devices
US20160087873A1 (en) Network Topology Discovery Method and System
JP4509885B2 (en) Signaling device
US20140140210A1 (en) Network system and load balancing method
EP2686988A1 (en) Method and apparatus for rapid rerouting of ldp packets
JP2002190825A (en) Traffic engineering method and node equipment using it
TW201218687A (en) Network device with creating path data and method thereof
WO2012062069A1 (en) Method and device for sending bidirectional forwarding detection message
CN109672619A (en) A kind of method, equipment and system handling message
CN102404189B (en) Main and standby switching method of device supporting multi-topology routing as well as master control board
WO2011157130A2 (en) Path establishment method and apparatus
WO2011110110A1 (en) Method, system and node device for establishing label switch path
WO2013179163A1 (en) Increasing failure coverage in hierarchical, redundant, multicast routing
WO2007065301A1 (en) A fast rerouting method for automatically exchanging optical network
EP2658177B1 (en) Method for detecting tunnel faults and traffic engineering node
WO2014090083A1 (en) Service bearing method and apparatus during distributed resilient network interconnect
US20080247393A1 (en) Methods and systems for using a link management interface to distribute information in a communications network
WO2011140890A1 (en) Method and device for realizing fast reroute
WO2014029287A1 (en) Method and device for sharing tunnel load

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 200580051379.8

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 05818644

Country of ref document: EP

Kind code of ref document: A1