WO2007050717A2 - Barge transportation system and refurbishing system and method of transporting and refurbishing barges - Google Patents

Barge transportation system and refurbishing system and method of transporting and refurbishing barges Download PDF

Info

Publication number
WO2007050717A2
WO2007050717A2 PCT/US2006/041710 US2006041710W WO2007050717A2 WO 2007050717 A2 WO2007050717 A2 WO 2007050717A2 US 2006041710 W US2006041710 W US 2006041710W WO 2007050717 A2 WO2007050717 A2 WO 2007050717A2
Authority
WO
WIPO (PCT)
Prior art keywords
barge
moving
refurbishing
blast
transport system
Prior art date
Application number
PCT/US2006/041710
Other languages
French (fr)
Other versions
WO2007050717A3 (en
Inventor
Jeffrey L. James Jr.
William E. Crabtree
Original Assignee
James Marine, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=37968539&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=WO2007050717(A2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by James Marine, Inc. filed Critical James Marine, Inc.
Publication of WO2007050717A2 publication Critical patent/WO2007050717A2/en
Publication of WO2007050717A3 publication Critical patent/WO2007050717A3/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways
    • B63C3/04Launching or hauling-out by landborne slipways; Slipways by sideways movement of vessel
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B59/00Hull protection specially adapted for vessels; Cleaning devices specially adapted for vessels
    • B63B59/06Cleaning devices for hulls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C13/00Equipment forming part of or attachable to vessels facilitating transport over land
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways
    • B63C3/08Tracks on slipways

Definitions

  • the present invention relates to a system for processing barges.
  • the present invention has particular utility with respect to transporting and refurbishing unpowered river barges.
  • river barge means a barge adapted for use on an inland waterway, including an intracoastal waterway.
  • River barges are large, having a length of about 100-450 feet (about 30 to about 135 meters), a width of about 30-75 feet (about 9 to about 23 meters), and a depth of about 8-30 feet (about 2.5 to about 9 meters).
  • Most river barges in the United States come in two sizes, standard or jumbo.
  • a standard river barge has a hull which is 195 feet (59 meters) long, 35 feet (10.7 meters) wide, and 10-14 feet (3 to 4.3 meters) deep.
  • the hull thickness for a standard barge is approximately 3/8 inch - Vz inch (about 0.95 to about 1.25 cm).
  • a jumbo river barge typically has a hull 297 feet (90.5 meters) long, 54 feet (16.5 meters) wide, and 12 feet (3.7 meters) deep.
  • the thickness of the sides and bottom varies according to construction specifications of a particular barge. Based on construction differences, all these sizes may vary by + 5%.
  • the standard river barge has a typical unfilled weight of 300 U.S. tons (272,000 kg).
  • the jumbo river barge has a typical unfilled weight of 1 ,000 U.S. tons (907,000 kg).
  • River barges are typically generally rectangular as viewed in plan, with a length greater than their width. Their hulls are generally flat- bottomed, and one or both ends may be square (box hull) or sloped (rake hull). They may have internal structures and superstructures adapted for carrying particular types of cargo, and may be classified, for example, as a hopper barge, a tank barge, or a deck barge. A hopper barge typically has a coaming of from eighteen inches to six feet in height. A cover, such as a fiberglass cover or steel cover may be provided to secure the cargo hopper from the elements, may be provided over the coaming.
  • the exterior surfaces of river barges are sometimes painted to protect them from corrosion. Over time, however, the exterior surface, and in particular the hull, of the barge begins to corrode because of contact with the water and the atmospheric environment.
  • a typical process comprises manual sand blasting and manual spray-painting the barge surfaces.
  • the current methods for blasting and painting are either performed on a dry-dock or on marine ways. In a dry-dock, water is drained, the barge is manually blasted with abrasive, as much abrasive is cleaned up as can easily be accomplished, the barge is painted manually, the barge is floated over sufficiently that when water is again drained the spots where it was supported can be recoated.
  • the barge is partially pulled from an inland waterway and the surface is processed (sand blasted and painted) on the landside surface and on as much as the stern and bow of the barge as accessible. As such, this current process may still position part of the barge within the waterway. After the paint has dried, the barge is lowered back into the waterway and shifted around by a boat so that the other side can be exposed when pulled from the waterway. This manipulation of the barge on a flowing river or in a confined bay is extremely difficult and labor intensive. Once pulled from the waterway, this exposed side is blasted and painted to match the other processed side of the barge.
  • the present invention provides methods for refurbishing barges efficiently and, in accordance with certain preferred embodiments, with little environmental contamination, and systems for carrying out the methods.
  • various novel features of the methods and systems will be apparent to those skilled in the art and are set out in the appended claims.
  • FIG. 1 is a schematic of systems, constructed in accordance with and embodying the present invention, illustrating a barge, a transportation system and a refurbishing system, the refurbishing system having a blast system and having a coating system;
  • FIG. 2 is a schematic of the refurbishing system of Fig. 1 , constructed in accordance with and embodying the present invention, illustrating a blast media discharge system, a manual coating discharge system, a reclamation system, a control system and a filter system;
  • Fig. 3 is a partial isometric view of a sheave block and rails of the transportation system
  • Fig. 4 is a side elevational view of an embodiment of a first transport system connected to a second transport system, the connected first transport system and the second transport system moving toward the barge which is positioned in a waterway;
  • Fig. 5 is a side elevation view of the second transport system and the connected first transport system in an underwater position illustrating the barge floating into contact with the first transport system;
  • Fig. 6 is a side elevational view of Fig. 4 illustrating the barge supported by the first transport system and the second transport system and the supported barge, the connected first transport system and the second transport system moving away from the waterway and toward a position away from the waterway;
  • Fig. 7 is a side elevational view of the first transport system disconnected from the second transport while moving the barge to another inland position with the transportation system;
  • Fig. 8a is a side elevational view of a lift system supporting the barge in a raised position
  • Fig. 8b is a side elevational view of a lift system contacting and raising the barge to provide clearance under the barge for contact with a third transport system
  • Fig. 9 is a side elevational view of the third transport system of Fig. 8 supporting the barge and the lift system in a retracted position and illustrating the first transport system reconnected with the second transport system moving toward the waterway;
  • Fig. 9a is an isometric view of the third transport system
  • Fig. 9b is an isometric view of a switch rail assembly
  • Fig. 10 is a side elevational view of the third transport system moving the barge away from the other position and toward the refurbishing system of Figs. 1 and 2;
  • Fig. 11 is a perspective view of the third transport system moving the barge within a first end of the refurbishing system
  • Fig. 12 is a partial schematic view of Fig. 2 of the blast media discharge system, the manual coating discharge system and associated components thereof;
  • Fig. 13 is another schematic view of the blast media discharge system of Fig. 12 showing a blast storage tank, abrasive media, a plurality of blast discharge nozzles, the reclamation system, an elevator, a separator, a blast media waste disposal means, a hopper and a control system;
  • Fig. 13a is a schematic view of the barge positioned in a drying area of a housing containing the blast media discharge system and manual coating discharge system;
  • Fig. 14 is a schematic view of the barge moving through the coating system;
  • Fig. 14a is another schematic view of the coating discharge system of Fig.
  • Fig. 15 is a side elevational view of the transportation system moving the processed barge out of the refurbishing system
  • Fig. 16 is a side elevational view of the transportation system moving the processed barge toward the waterway;
  • Fig. 17 is a schematic of another embodiment of the present invention illustrating a pass-through system for the transportation system and the refurbishing system;
  • Fig. 17a is a cross-sectional view of the third transport systems and supported barge positioned on transfer platforms;
  • Fig. 18 is a schematic of another embodiment of the present invention illustrating a pass through system for the transportation system and the refurbishing system.
  • the first illustrative embodiment of the present invention transports barges completely out of a waterway and into a covered refurbishing system that is positioned on land. Within the covered refurbishing system, the hull of the barge is abrasively blasted and then coated. Once the barge has been refurbished, the system transports the barge back into the waterway.
  • the system eliminates or greatly reduces contamination of the ground and/or of the waterway from discharged blast material and/or coating overspray since the refurbishing system collects the discharged blast material and/or coating overspray.
  • the system further permits much faster refurbishment of barges by treating more than one exterior surface at a time.
  • the following description relates to an unpowered river barge.
  • a barge 10 which is unpowered and floats free unless acted upon, is pushed by a towboat or tugboat (not shown) within a waterway 12.
  • the waterway 12 may comprise any water source such as, but not limited to, a river, a lake, a channel (natural or artificial) and a bay/cove (natural or artificial).
  • the waterway 12 may also comprise a lock system (not shown), the dimensions of which may determine the practical dimensions of the barge. Regardless of the type of waterway 12, the barge 10 reaches an access point for processing.
  • the barge 10 is a standard sized barge 10 that has a hull having a length of 195 feet (59 meters), a width of 35 feet (10.7 meters), a height of 10-14 feet (3-4.3 meters), all dimensions being ⁇ 5%.
  • the weight of such a barge is about 300 U.S. tons (about 250,000 kg to about 300,000 kg).
  • the barge 10 includes sides 14, a bow 16, a stern 18 and a bottom 20. These portions of the barge 10 are collectively known as the hull.
  • the exterior surface of the hull is designated by reference numeral 22.
  • the processing system 5 of the present invention comprises a transportation system generally shown as 24 and a refurbishing system generally shown as 26.
  • the transportation system 24 comprises a first transport system 28, a second transport system 30, a third transport system 32, a rail system generally shown as 34, a drive system generally shown as 36 and a lift system generally shown as 38.
  • Fig. 1 schematically illustrates the systems of the transportation system 24.
  • the refurbishing system 26 comprises a housing 44 having a first end 46 and a second end 48, a blast system 50, a transition system 52 and a coating system 54.
  • the housing 44 may be in the form of a building. In this illustrative embodiment, the housing 44 has a length of 325 feet (99 meters).
  • the housing 44 covers the blast system 50, the transition system 52 and the coating system 54 to substantially isolate these areas from the outdoor environment while the first end 46 allows access within the housing 44.
  • the second end 48 is preferably closed but may be open to allow access within the housing 48.
  • the refurbishing system 26 also comprises a control system 56, a reclamation system 58 and a filter system 60.
  • Fig. 1 schematically illustrates the systems of the refurbishing system 26.
  • the first transport system 28, the second transport system 30 and the third transport system 32 comprise dollies comprising frames connected to casters or wheels 62.
  • the illustrative first transport system 28 comprises a rectangular base assembly 64 connected to the wheels 62.
  • the second transport system 30 also includes a base assembly 65 connected to wheels 62.
  • the second transport system 30 further includes an angle assembly 66, a support assembly 68 in the form of a pair of rails, and a stabilizer 70 in the form of a docking pole.
  • the angle assembly 66 positions the support assembly 68 in a level orientation
  • the rail system 34 comprises rails 72 that support the wheels 62 of the second transport system 30, rails 72a that support the first transport system 28 when it rolls off the rails 72 of the second transport system 30, as described hereinafter, and rails 72b that support the wheels 62 of the third transport system 32 (Fig. 8b).
  • the drive system 36 moves the first transport system 28, the second transport system 30 and the third transport system 32 along the rails 72, 72a, and 72b as described hereinafter.
  • the drive system 36 comprises a plurality of motor-driven winches 74, sheave blocks and cables 76 that connect with the transport systems or the barge carried by them, and move them.
  • the rail system 34 and drive system 36 have sufficient parameters to move and transfer the barges 10.
  • the winches 74 may comprise a 60-ton wide body winch that is driven by a vector computer regenerative drive to produce variable speed.
  • the cables 76 are one-inch steel.
  • the motor horsepower on the winches 74 is 18 horsepower through a 16 to 1 gearbox.
  • the rails 72 support the second transport system 30 while cable 76 of the drive system 36 connects the motor-driven winch 74 with the second transport system 30 via sheave block 75.
  • the winch 74 is shown schematically connected to sheave block 75 in Figs. 4-6.
  • the winch 74 that drives the second transport system 30 is preferably positioned adjacent to the housing 44.
  • the first transport system 28 is carried by the second transport system 30 and connects with the second transport system 30 via fastening means such as linkages or pins.
  • the angle assembly 66 of the second transport system 30 positions the support assembly 68, hence the first transport system 28, horizontally. Turning to Fig.
  • the first transport system 28 and the second transport system 30 move underwater such that the barge 10 floats (or is pushed by a tugboat) onto the top of the first transport system 28.
  • the stabilizer 70 supports the barge 10 as the combined first and second transport systems 28, 30 are pulled toward shore.
  • the tow or tug boat may also move the barge 10 toward shore until the barge 10 rests on the base assembly 64 of the first transportation system 28.
  • the first transport system 28 and the second transport system 30 then move the barge 10 from the waterway 12 onto a berth, shelf, or island 78 (Fig. 6).
  • the berth 78 has a height that is taller than any predicted flood level such as a one hundred year level.
  • An embankment 80 (Fig.
  • the slope of the embankment 80 is 5 to 1 while rails 72 extend into the waterway 12 approximately 200 feet on a 5 to 1 slope.
  • the embankment 80 has a grade range of approximately 5 degrees to approximately 15 degrees.
  • the embankment 80 has a height range of approximately 20 feet to approximately 40 feet (approximately 6-12 meters) above a normal level of the waterway 12.
  • the angle assembly 66 of the second transport system 30 compensates for the grade of the embankment 80. While the first transport system 28 and the second transport system 30 move the barge 10 up the embankment 80, the configuration of the angle assembly 66 raises the barge 10 in a level orientation.
  • the wheels 62 of the first transport system 28 contact rails 72a of the rail system 34 positioned on the berth 78.
  • Cable 76 connects the first transport system 28 with another winch 74 that is positioned on an inland position.
  • cable 76 connects with an internal sheave block of the first transport system 28. Winch 74 then moves the first transport system 28 across the berth 78 and over the lift system 38.
  • the lift system 38 of the transportation system 24 comprises jacks 82 or pylons that reciprocate between a retracted position 84 (Fig. 7) and an extended position 86 (Figs. 8a and 8b).
  • the jacks 82 may be hydraulically driven by known means.
  • the lift system 38 raises the barge 10 off the first transport system 28.
  • Winch 74 then moves the first transport system 28 away from the barge 10 while another winch 74 (Fig. 1) moves the third transport system 32 along rails 72b under the barge 10 (Fig. 8b).
  • the lift system 38 In the retracted position 84, the lift system 38 lowers the barge 10 onto the third transport system 32 (Fig. 9).
  • Fig. 9 Fig.
  • FIG. 9 illustrates the intersection of rails 72a and rails 72b with a portion of rail 72a removed wherein rails 72a have a larger height than rails 72b.
  • Fig. 9c illustrates an embodiment of the third transport system 32. Once the third transport system 32 supports the barge 10, a winch moves the third transport system 32 and supported barge 10 into the housing 44 of the refurbishing system 26 (Figs. 10 and 11).
  • the refurbishing system 26 positions the covered blast system 50, the covered transition system 52 and the covered coating system 54 within the housing 44 such that the covered blast system 50, the covered transition system 52 and the covered coating system 54 are in operative communication with each other.
  • Fig. 2 further schematically illustrates the winches 74, cables 76, rails 72, 72a and 72b, and jacks 82 of the transportation system 24 positioned near the first end 46 of the housing 44.
  • the transportation system 24 is in communication with the covered blast system 50, the covered transition system 52 and the covered coating system 54.
  • the covered blast system 50 comprises a blast storage tank 88, a blast media discharge system 90, and the reclamation system 58.
  • the control system 56 operatively controls at least the blast storage tank 88, the blast media discharge system 90, and the transportation system 26.
  • the covered blast system 50 has a height of 24 feet (7.3 meters), a width of 50 feet (15.2 meters) and a length of 50 feet (15.2 meters).
  • the covered blast system 50 may include other dimensions to accommodate a variety of sizes and configurations for barges 10.
  • the blast storage tank 88 holds an amount of abrasive media 96.
  • the abrasive media 96 comprises steel grit.
  • the blast media discharge system 90 communicates with the blast storage tank 88 via piping.
  • the blast media discharge system 90 comprises an air compressor system 98 and a plurality of discharge nozzles 100 positioned on both sides of the rail system 34 and underneath the portions of the rail system 34 positioned within the blast system 50.
  • the blast system 50 includes a basement in the form of a trough or pit 106 that is positioned under the rails 72b.
  • the rails 72b are suspended via I-beam supports across the pit 106.
  • the side discharge nozzles 100 are positioned within the covered blast system 50 at a height to face the barge 10.
  • the side discharge nozzles 100 may be adjustably positioned with respect to the height within the covered blast system 50 to process a variety of sizes and configurations for barges 10.
  • the system comprises eleven discharge nozzles 100.
  • the compressor system 98 transfers the abrasive media 96 from the blast storage tank 88 through the piping and out of the discharge nozzles 100.
  • the discharge nozzles 100 propel the abrasive media 96 against both sides and the underside of the exterior surface 22 of the barge 10.
  • the discharge nozzles 100 automatically reciprocate back and forth at 45° angles.
  • the distribution pattern of the abrasive media 96 overlaps so as to spray the exterior surface 22 of the barge 10.
  • the plurality of discharge nozzles 100 is configured to uniformly distribute the abrasive media 96 against the exterior surface 22 of the barge 10 as the barge is pulled through the blast system 50 at a rate of about 200 feet per hour as controlled by the control system 56.
  • the control system 56 controls the rate of movement of the barge 10.
  • the blast media discharge system 90 simultaneously processes both sides of the barge 10 while processing the bottom 20.
  • the bow 16 and the stern 18 are processed as the barge 10 enters and exits the blast system 50, respectively.
  • the blast media discharge system 90 may supply 6,000 cfm (170 cubic meters per minute), via air compressors, during the blasting process.
  • the components of the blast media discharge system 90 such as the piping, fittings, valves and discharge nozzles 100 are all designed to withstand the flow rate of the abrasive media 96.
  • the reclamation system 58 is positioned underneath the portion of the rails 72b positioned within the covered blast system 50.
  • the reclamation system 59 collects the applied abrasive media 96 and any blasted portions of the exterior surface 22 of the barge 10.
  • a grated floor covers the reclamation system 58 such that the grated floor allows the discharged abrasive media 96 and blasted surface components 104 of the barge 10 to pass through and into the reclamation system 58.
  • the grated floor allows personnel access to walk over pit 106.
  • the blasted surface components 104 comprise debris, rust, corrosion, etc., removed from the exterior surface 22 by the discharged abrasive media 96.
  • the reclamation system 58 comprises a means to collect the discharged abrasive media 96 and blasted surface components 104 of the exterior surface 22 of the barge 10.
  • the reclamation system 58 includes the pit 106, which channels the discharged abrasive media 96 and blasted surface components 104 to augers 108.
  • the augers 108 of the reclamation system 58 move the discharged abrasive media 96 to a cross augur 109 that in turn moves the discharged abrasive media 96 to an elevator 110.
  • the elevator 110 lifts the discharged abrasive media 96 and blasted surface components 104 for recycling.
  • the reclamation system 58 also includes a separator 112 that reclaims re-useable abrasive media 96 while discarding unusable abrasive media 96 from the transported media from the elevator 110.
  • the separator 112 also discards blasted surface components 104.
  • the separator 112 discards the waste abrasive media 96 and blasted surface components 104 to the media disposal means 114 such as a waste drum.
  • the separator 112 then moves the reusable abrasive media 96 into a hopper 116 that feeds the blast discharge system 90 to repeat the blasting process.
  • the control system 56 operatively controls at least the blast storage tank 88, the blast media discharge system 90, the discharge nozzles 100, and the transportation system 26.
  • the covered blast system 50 (Fig. 1 and 12) is covered to prohibit rain/snow/moisture from contacting the now prepared (i.e. blasted) exterior surface 22 of the barge 10. As such, the prepared barge 10 is not exposed to any outside environment that may oxidize the prepared exterior of the barge 10. Furthermore, the covered blast system 50 prohibits any rain/snow/moisture from contacting the discharged steel grit. Since the reclamation system 58 recycles the discharged steel grit of the abrasive media 96, the covered blast system 50 reduces oxidation of the steel grit.
  • the covered transition system 52 is positioned in between and in communication with the covered blast system 50 and the covered coating system 54. Since the transition system 52 is in communication with the blast system 50, the rail system 34 moves the now prepared barge 10 to the covered transition system 52. As such, the prepared barge 10 is not exposed to any outside environment while transferring to the transition system 52.
  • the covered transition system 52 of this embodiment is much shorter than the length of the barge 10.
  • the covered transition system 52 comprises the manual processing system that includes hand held discharge nozzles 100. These discharge nozzles 100 may be controlled and supplied by the blast media discharge system 90 of the covered blast system 50. Personnel handle these discharge nozzles 100 to abrasively blast the barge 10 in areas that the covered blast system 50 may have missed as the barge 10 continues moving through the covered transition system 52.
  • the discharge nozzles 100 may be positioned on both sides of the rail system 34 and underneath the portion of the rails 72b that is positioned within the covered transition system 52.
  • the manual transition system 52 includes augers 108 also in communication with the reclamation system 58 such that the reclamation system 58 can collect applied abrasive media 96 that has fallen through the grated floor of the manual transition system 52.
  • the covered transition system 52 also includes an air discharge system 118.
  • the air discharge system 118 includes an air source, an air pump, nozzles and associated piping which connects the air source, the pump and the nozzles.
  • the air discharge system 118 is configured to apply high pressure air to the prepared exterior surface 22 of the barge 10 in order to remove any abrasive media 96 adhered to the exterior surface 22 of the barge 10.
  • workers further process the barge 10 as the barge 10 continuously moves through by spraying the exterior surface 22 with compressed air to remove abrasive media 96 adhered to the exterior surface 22 during the abrasive blasting of the exterior surface 22, and make whatever other repairs and preparation may be required.
  • the third transport system 32 then moves the prepared portion of barge 10 through the covered coating system 54.
  • the drive system 36 pulls the barge 10 completely through the blast system 50 and the transition system 52.
  • the drive system 36 then continues to pull the barge 10 past the unactivated coating system 54.
  • the drive system 36 pulls the blasted barge 10 into the drying area- of the housing 44 (Fig. 13a). Accordingly, the drive system 36 moves the prepared barge 10 from the transition system 52 and through the coating system 54 without exposing the barge 10 to any outside environments.
  • Figs. 14 and 14a and referring to Fig. 2 the drive system 36 moves the barge 10 back through the covered coating system 54.
  • the coating system 54 comprises a coating storage tank 120, a coating discharge system 122, and a ventilation system 126.
  • the coating system 54 may include automatic discharge of the coating and may include a coating reclamation system.
  • the dimensions of the coating system 54 include a height of 25 feet (7.6 meters), a width of 50 feet (15.2 meters) and a length 45 feet (13.7 meters).
  • the covered blast system 50 may include other dimensions to accommodate a variety of sizes and configurations for barges 10.
  • a pit 106 below the rails 72b and grated floor catwalks 1 alongside the barge 10 give access to all parts of the barge hull.
  • the coating storage tank 120 holds an amount of the coating 128.
  • the coating 128 comprises a solvent-based paint or a two-component epoxy coating.
  • the coating discharge system 122 communicates with the coating storage tank 120 via piping.
  • the coating discharge system 122 comprises a compressor 130 and a plurality of coating nozzles 132 positioned on both sides of the rails 72b and underneath the portion of the rails 72b that is positioned within the covered coating system 54.
  • the rails 72b suspend over pit 106 by I- beam support.
  • the coating nozzles 132 are standard, manually operated airless paint guns that are connected by appropriate hoses to the coating discharge system 122 for use by painters.
  • the compressor 130 transfers the coating 128 from the coating storage tank 120 through the piping and out of the coating nozzles 132.
  • the painters spray the coating 128 against both sides of the exterior surface 22 of the barge 10 and the underside of the exterior surface 22 of the barge 10 as the barge 10 rolls through the coating system 54 at a speed of approximately 200 feet per hour (60 meters per hour). Accordingly, the control system 56 controls the speed of the barge 10 through the coating system 54. Additionally, the ventilation and filter system 60 properly handles any fumes created by the coating discharge system 122. The coating system 54 is also covered to prohibit rain/snow/moisture from contacting the now coated exterior surface 22 of the barge 10. As such, the coated barge 10 is not exposed to the outside environment that may interfere with the drying or curing of the coating 128.
  • the transportation system 24 lifts the unpowered river barge 10 from the inland waterway 12 and deposits the river barge 10 onto an inland position.
  • the transportation system 24 then moves the barge 10 into the refurbishing system 26 for processing.
  • the blast system 50, transition system 52 and coating system 54 are in communication with each other to allow the transportation system 24 to move the barge 10 within the refurbishing system 26 under control of the control system 56.
  • a curtain C is provided at the front end 46 of the housing 44 (Fig. 11) to block the covered blast system 52 from the outside environment.
  • the curtain is illustratively a physical curtain in the form of a shroud and provides a physical barrier, although an air curtain that creates a forced air barrier may also be used. Additionally, curtains C may be positioned to separate the blast system 50, the transition system 52, and the coating system 54.
  • the transportation system 24 moves the barge 10 out of and away from the waterway 12 (Figs. 1-6).
  • Figs. 3-6 illustrate that moving the barge 10 out of and away from the waterway 12 comprises laterally moving the barge 10 with respect to the waterway 12. As shown, laterally moving the barge 10 with respect to the waterway 12 comprises moving the bow 16 and the stern 18 of the barge 10 substantially parallel to the waterway 12.
  • the transportation system 24 then moves the barge 10 within the refurbishing system 26.
  • Moving the barge 10 within the refurbishing system 26 comprises longitudinally moving the barge 10 with respect to the refurbishing system 26.
  • longitudinally moving the barge 10 within the refurbishing system 26 comprises moving the barge 10 lengthwise within the refurbishing system 26.
  • the bow 16 and the stern 18 of the barge 10 are substantially perpendicular with respect to the first end 46 of the refurbishing system 26.
  • the transportation system 24 moves the barge 10 away from the refurbishing system 26.
  • the transportation system 24 longitudinally moves the barge 10 away from the first end 46 of the refurbishing system 26.
  • Longitudinally moving the barge location away from the refurbishing system 26 comprises moving the barge 10 lengthwise from the first end 46.
  • the bow 16 and the stern 18 are substantially perpendicular with the first end 46 of the refurbishing system 26.
  • the lift system 38 transfers the barge 10 so that the transportation system 24 can move the barge 10 toward the waterway 12 (Fig. 16).
  • moving the barge 10 out of and away from the waterway 12 system comprises moving the barge 10 up the embankment 80 (Figs. 3-6). As shown, the barge 10 is raised in a level orientation up the embankment 80 at a rate of about 200 feet per hour. Furthermore, moving the barge 10 away from the refurbishing system 26 comprises lowering, in a level orientation, the barge 10 down the embankment 80 (Fig. 16). Since the barge 10 laterally moves away from the waterway 12, longitudinally moves within the refurbishing system 26 and laterally moves back toward the waterway 12, the barge 10 is raised, moved and lowered in the same axial direction, i.e. in the same orientation.
  • the method comprises connecting the first transport system 28 to the top of the second transport system 30 (Figs. 3 and 4). Once connected, the drive system 36 moves the first transport system 28 and the second transport system 30 to descend along the rails 72 into the inland waterway 12.
  • the rails 72 extend into waterway 12 deep enough to allow stabilizer 70 to pass under the river barge 10.
  • the unpowered river barge 10 floats (under control of a tow boat) onto the first transport system 28, wherein the first transport system 28(s) contacts and supports the unpowered river barge 10 (Fig. 4a).
  • the drive system 36 moves the second transport system 30, the connected first transport system 28 and river barge 10, in a transverse or lateral direction out of the waterway 12 along rails 72 up the embankment 80. (Figs. 3-6). Accordingly, the river barge 10 moves laterally away from the inland waterway 12. As shown in Fig. 4, the drive system 36 raises the second transport system 30, the connected first transport system 28 and river barge 10 up from the waterway 12, across the embankment 80 and toward the inland position. The configuration of the first transport system 28 and the second transport system 30 raises the river barge 10 in a level orientation across the embankment 80. The stabilizer 70 assists in maintaining the barge 10 on the first transport system 28 in the level orientation.
  • the first transport system 28 and the second transport system 30 raise the river barge 10 in this level orientation.
  • rails 72a align with the wheels 62 of the first transport system 28.
  • the first transport system 28 is then disconnected from the second transport system 30.
  • the drive system 36 then moves the first transport system 28 and supported river barge 10 away from the disconnected second transport system 30 and toward another inland position on the rails 72a.
  • the lift system Near the intersections of rails 72a and rails 72b, the lift system
  • the lift system 38 via the jacks 82, lifts the river barge 10 off of the first transport system 28 to allow the third transport system 32 to travel underneath the raised barge 10 (Figs. 7-9). As shown in Fig. 9c, a small portion of rail 72a is removed to allow access to the other rail 72b. Once the river barge 10 is properly suspended (Fig. 8b), the first transport system 28 moves away from the suspended river barge 10. The lift system 38 then lowers the river barge 10 onto the third transport system 32 so that the third transport system 32, mounted on rails 72b perpendicular to the rails 72a, supports the river barge 10 (Fig. 9). The third transport system 32 supports the river barge 10 while the first transport system 28 moves away from the river barge 10.
  • the first transport system 28 then moves toward and connects with the second transport system 30 after disconnecting from the river barge 10, wherein the connected second transport system 30 and first transport system 28 move back toward the inland waterway 12 to pick up another river barge 10.
  • the third transport system 32 and the now supported river barge 10 move in a longitudinal direction with respect to the inland waterway 12, toward the refurbishing system 26.
  • the third transport system 32 continues to move the river barge 10, in the level orientation, within the refurbishing system 26 (Fig. 11).
  • the refurbishing system 26 then processes the river barge 10.
  • the third transport system 32 retracts the river barge 10, in a longitudinal direction with respect to the inland waterway 12, out of the refurbishing system 26 and toward post processing area 138 (Figs. 1 and 2).
  • the post processing area 138 may be optionally covered.
  • the post processing area 138 includes a work area (not shown) such as elevated decks to allow workers to further refurbish and coat surfaces of the river barge 10 such as the superstructure or coaming. For example, the workers may coat the coaming or may weld the exterior surface 22 while the workers are positioned in the work areas.
  • the rail system 34 connects with multiple post processing areas 138 to allow multiple river barges 10 to dry and to allow workers to post process the multiple river barges 10.
  • the rail system 34 is configured to move the river barges 10 without having to rotate the barges 10.
  • the rail system 34 may include switch tracks (not shown) to allow interchangeability of unprocessed barges 10 and processed barges 10 to move along the rail system 34.
  • the transportation system 24 handles multiple barges 10 to allow simultaneous refurbishing of one barge 10 and post processing of other barges 10.
  • the transportation system 24 handles barges 10 to allow other barges 10 to move to respective locations within the transportation system 24. For example, one refurbished barge 10 is moved to the post processing area 138 to allow an un-refurbished barge 10 access to the refurbishing system 26.
  • the processing areas 138 provide a matrix of spaces to move multiple barges 10 on the transportation system 24.
  • the third transport system 32 moves the barge 10 back over the jacks 82 of the lift system 38.
  • the jacks 82 move from the retracted position 84 to the extended position 86.
  • the jacks 82 lift the river barge 10 off the third transport system 32.
  • the drive system 36 then moves the third transport system 32 away from the suspended river barge 10 and moves the first transport system 28 underneath the suspended river barge 10 via the switch track assembly (Fig. 9c).
  • the lift system 38 lowers the jacks 82 to the retracted position 84.
  • the jacks 82 lower the barge 10 onto the first transport system 28.
  • the drive system 36 then moves the first transport system 28 and supported barge 10 toward the second transport system 30 that is positioned on the embankment 80.
  • the first transport system 28 then connects with the second transport system 30.
  • the drive system 36 then lowers the second transport system 30, the connected first transport system 28 and supported river barge 10 from the embankment 80 and back into the inland waterway 12 (Fig. 16).
  • the second transport system 30 laterally moves the barge 10 down the embankment 80 and into the inland waterway 12.
  • the angle assembly 66 of the second transport system 30 allows the second transport system 30 to lower the barge 10 in the level orientation.
  • FIG. 17 another embodiment of the present invention includes a pass through system generally shown as 140.
  • the barge 10 is transported and processed within a refurbishing system 142 that comprises a housing 144 which covers a blast system 146, a transition system 148, a transfer system generally shown as 150 and a coating system 152.
  • the housing 144 has an entry end 154 and an exit end 156 as shown.
  • the blast system 146 and coating system 152 are positioned offset from each other by the transfer system 150.
  • the refurbishing system 142 comprises a U-shaped configuration.
  • the blast system 146, the transition system 148 and coating system 152 perform the same operation as blast system 50, transition system 52 and coating system 54 respectively.
  • the barge 10 is moved in a first direction out of the waterway 12 by a first transport system 158 and a second transport system 160 toward an inland position as previously described.
  • the barge 10 is then moved by the first transport system 158 to lift system 162.
  • the lift system 162 raises the barge 10 to allow third transport system 164 to move under the suspended barge 10.
  • the third transport system 164 moves along rails 166 as shown.
  • the third transport system 164 moves the supported barge 10 in a second direction into the refurbishing system 142.
  • the second direction is perpendicular to the first direction.
  • the third transport system 164 longitudinally moves the barge 10 within the covered blast system 146.
  • the covered blast system 146 abrasively processes the barge 10 as previously discussed.
  • the third transport system 164 moves the barge 10 through the transition system 148 wherein workers can process the barge 10 as previously described.
  • the third transport system 164 then moves the barge 10 into the transfer system 150.
  • the transfer system 150 comprises a fourth transport system 168 in the form of wheeled platforms positioned within channels 170.
  • the rails 166 do not extend over the channels 170. Instead, the tops of the platforms 168 are positioned in the same plane as the rails 166.
  • the third transport system 164 moves the barge 10 within the transfer system 150such that the third transport system 164 moves on top of the platforms 168.
  • the platforms 168 move the third transport system 164 and supported barge 10 in a third direction opposite to the second direction.
  • the platforms 168 move the barge 10 in its same orientation toward rails 167.
  • Rails 167 do not extend over the channels 170 at the opposite ends of the channels 170.
  • the platforms 168 move the third transport system 164in alignment with the rails 167.
  • the drive system then drives the third transport system 164 in the direction opposite of the second direction.
  • the third transport system 164 longitudinally moves the barge through the covered coating system 148.
  • the covered coating system processes the barge 10 as previously discussed.
  • the third transport system moves 168 the barge 10 into the drying area 172.
  • the third transport system 164 moves the barge 10 to another lift system 174 that is positioned beyond the drying area 172 along rails 176.
  • the other lift system 174 unloads the barge off the third transport system 164 and loads the barge 10 on the first transport system 158 positioned on rails 176.
  • the first transport system 158 reconnects with the second transport system 160 to lower the barge back into the waterwayi 2 previously described.
  • another embodiment of the present invention includes another pass through system generally shown as 176.
  • the barge 10 is transported and processed within the refurbishing system 26 as previously described.
  • the drive system 36 does not retract the third transport system 32 and supported barge 10 out of the first end 44 of the refurbishing system 26. Instead, the drive system 36 moves the barge 10 out of the second end 48 of the housing 44.
  • the third transport system 32 moves the barge 10 longitudinally away from the refurbishing system 26.
  • the barge 10 enters the first end 46 of the housing 44 and exits the second and 48 of the housing 44. Upon exiting the second end 48, other jacks 82 (Fig.
  • the lift system 38 moves to the extended position 86 to lift the barge 10 off the third transport system 32.
  • the other jacks 82 are positioned beyond the second end 48 of the housing 44. While the jacks 82 suspend the barge 10, the drive system 36 moves the third transport system 32 away from the barge 10. Once the third transport system 32 is cleared from the barge 10, the drive system 36 moves the fourth transport system 40 underneath the barge 10.
  • the lift system 38 lowers the jacks 82 to the retracted position 84.
  • the jacks 82 lower the barge 10 onto the transport system 178 so that the transport system 178 supports the barge 10.
  • the drive system 36 then moves the transport system 178 and the supported barge 10 toward the fifth transport system 180.
  • the transport system 178 connects with the fifth transport system 180.
  • the drive system 36 then lowers the fifth transport system 180, the connected transport system 178 and supported barge 10 down the embankment 80 and back into the waterway 12 as previously discussed.
  • the barge 10 releases from the transport system 178 and floats free within the inland waterway 12.
  • the transport systems and platforms may be driven by the motor driven winches 74 and cables 76 as previously discussed.
  • the platforms may also travel along rails. Numerous other variations in the present invention, within the scope of the appended claims, will occur to those skilled in the art in light of the foregoing invention.
  • the transportation system may be utilized in other ways, for example with other types of refurbishment systems, including different surface preparation systems and different coating systems, and further including refurbishment systems for the interior of the hull of the barge, refurbishment systems for the superstructure, and systems for more major refurbishment, such as replating some or all of the barge hull to repair more major damage or to re-outfit the hull for different uses.
  • the abrasive blasting process or the coating process of the invention may be carried out individually without the other process. Either or both of the processes may be carried out in a suitable enclosure using different types of transport systems.
  • Some aspects of the invention may be carried out with a modified dry-dock system, and some may be carried out with a movable abrasive system or a movable coating system for blasting or coating a stationary barge.
  • the control system is configured to time the movement of any particular barge and time the activation of the blast system, the transition system and the coating system, including automated coating systems.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Transportation (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)
  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

A refurbishing system (5) for refurbishing a barge (10) includes transport systems (28, 30, 32, 158, 160, 166, 178 and 180) that pull the barge out of a waterway (12) and onto a shelf above water level, then pull the barge into a covered blast system (50) and a covered coating system (54). A reclamation system (58) receives spent abrasive media. The transport systems (28, 30, 32, 158, 160, 166, 178 and 180) then move the refurbished barge (10) back into the water (12). The transport systems (28, 30, 32, 158, 160, 166, 178 and 180) move the barge (10) without substantially tilting it or changing its orientation.

Description

BARGE TRANSPORTATION SYSTEM AND REFURBISHING
SYSTEM AND METHOD OF TRANSPORATING
AND REFURBISHING BARGES CROSS-REFERENCE TO RELATED APPLICATIONS
This application claims priority under 35 U. S. C. § 119(e) of United States Provisional Patent Application No. 60/730,788 filed October 27, 2005, in the name of the present inventors and entitled "River Barge Refurbishment System And Method Of Refurbishing River Barges", this provisional application being incorporated herein by reference. TECHNICAL FIELD
The present invention relates to a system for processing barges. The present invention has particular utility with respect to transporting and refurbishing unpowered river barges. As used herein, the term "river barge" means a barge adapted for use on an inland waterway, including an intracoastal waterway.
River barges are large, having a length of about 100-450 feet (about 30 to about 135 meters), a width of about 30-75 feet (about 9 to about 23 meters), and a depth of about 8-30 feet (about 2.5 to about 9 meters). Most river barges in the United States come in two sizes, standard or jumbo. A standard river barge has a hull which is 195 feet (59 meters) long, 35 feet (10.7 meters) wide, and 10-14 feet (3 to 4.3 meters) deep. The hull thickness for a standard barge is approximately 3/8 inch - Vz inch (about 0.95 to about 1.25 cm). A jumbo river barge typically has a hull 297 feet (90.5 meters) long, 54 feet (16.5 meters) wide, and 12 feet (3.7 meters) deep. The thickness of the sides and bottom varies according to construction specifications of a particular barge. Based on construction differences, all these sizes may vary by + 5%. The standard river barge has a typical unfilled weight of 300 U.S. tons (272,000 kg). The jumbo river barge has a typical unfilled weight of 1 ,000 U.S. tons (907,000 kg).
River barges are typically generally rectangular as viewed in plan, with a length greater than their width. Their hulls are generally flat- bottomed, and one or both ends may be square (box hull) or sloped (rake hull). They may have internal structures and superstructures adapted for carrying particular types of cargo, and may be classified, for example, as a hopper barge, a tank barge, or a deck barge. A hopper barge typically has a coaming of from eighteen inches to six feet in height. A cover, such as a fiberglass cover or steel cover may be provided to secure the cargo hopper from the elements, may be provided over the coaming.
The exterior surfaces of river barges are sometimes painted to protect them from corrosion. Over time, however, the exterior surface, and in particular the hull, of the barge begins to corrode because of contact with the water and the atmospheric environment. To refurbish these barges, a typical process comprises manual sand blasting and manual spray-painting the barge surfaces. The current methods for blasting and painting are either performed on a dry-dock or on marine ways. In a dry-dock, water is drained, the barge is manually blasted with abrasive, as much abrasive is cleaned up as can easily be accomplished, the barge is painted manually, the barge is floated over sufficiently that when water is again drained the spots where it was supported can be recoated.
In one marine ways process, the barge is partially pulled from an inland waterway and the surface is processed (sand blasted and painted) on the landside surface and on as much as the stern and bow of the barge as accessible. As such, this current process may still position part of the barge within the waterway. After the paint has dried, the barge is lowered back into the waterway and shifted around by a boat so that the other side can be exposed when pulled from the waterway. This manipulation of the barge on a flowing river or in a confined bay is extremely difficult and labor intensive. Once pulled from the waterway, this exposed side is blasted and painted to match the other processed side of the barge. Besides being inefficient with respect to processing only one side of the exterior surface of the barge at a time, these sandblasting and painting processes result in spent materials falling on the ground and being exposed to the waterway. An alternative marine ways process is to pull the barge up level, sufficiently far from the waterway to erect scaffolding, and the barge is processed from the embankment and from the scaffolding. Again, spent materials are largely exposed to the ground and to the waterway. The inefficiencies and hazardous environmental conditions produced by all these methods are further exacerbated by the size of the jumbo barges. The current methods are extremely expensive and very few environmental controls can be incorporated into the processes.
BRIEF SUMMARY OF THE DISCLOSURE
The present invention provides methods for refurbishing barges efficiently and, in accordance with certain preferred embodiments, with little environmental contamination, and systems for carrying out the methods. In view of the following invention, various novel features of the methods and systems will be apparent to those skilled in the art and are set out in the appended claims.
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS In the accompanying drawings which form part of the specification: Fig. 1 is a schematic of systems, constructed in accordance with and embodying the present invention, illustrating a barge, a transportation system and a refurbishing system, the refurbishing system having a blast system and having a coating system;
Fig. 2 is a schematic of the refurbishing system of Fig. 1 , constructed in accordance with and embodying the present invention, illustrating a blast media discharge system, a manual coating discharge system, a reclamation system, a control system and a filter system;
Fig. 3 is a partial isometric view of a sheave block and rails of the transportation system; Fig. 4 is a side elevational view of an embodiment of a first transport system connected to a second transport system, the connected first transport system and the second transport system moving toward the barge which is positioned in a waterway;
Fig. 5 is a side elevation view of the second transport system and the connected first transport system in an underwater position illustrating the barge floating into contact with the first transport system;
Fig. 6 is a side elevational view of Fig. 4 illustrating the barge supported by the first transport system and the second transport system and the supported barge, the connected first transport system and the second transport system moving away from the waterway and toward a position away from the waterway; Fig. 7 is a side elevational view of the first transport system disconnected from the second transport while moving the barge to another inland position with the transportation system;
Fig. 8a is a side elevational view of a lift system supporting the barge in a raised position; Fig. 8b is a side elevational view of a lift system contacting and raising the barge to provide clearance under the barge for contact with a third transport system;
Fig. 9 is a side elevational view of the third transport system of Fig. 8 supporting the barge and the lift system in a retracted position and illustrating the first transport system reconnected with the second transport system moving toward the waterway;
Fig. 9a is an isometric view of the third transport system;
Fig. 9b is an isometric view of a switch rail assembly;
Fig. 10 is a side elevational view of the third transport system moving the barge away from the other position and toward the refurbishing system of Figs. 1 and 2;
Fig. 11 is a perspective view of the third transport system moving the barge within a first end of the refurbishing system;
Fig. 12 is a partial schematic view of Fig. 2 of the blast media discharge system, the manual coating discharge system and associated components thereof; Fig. 13 is another schematic view of the blast media discharge system of Fig. 12 showing a blast storage tank, abrasive media, a plurality of blast discharge nozzles, the reclamation system, an elevator, a separator, a blast media waste disposal means, a hopper and a control system; Fig. 13a is a schematic view of the barge positioned in a drying area of a housing containing the blast media discharge system and manual coating discharge system;
Fig. 14 is a schematic view of the barge moving through the coating system; Fig. 14a is another schematic view of the coating discharge system of Fig.
12 showing a coating storage tank, a plurality of coating discharge nozzles, and painters applying a coating;
Fig. 15 is a side elevational view of the transportation system moving the processed barge out of the refurbishing system; Fig. 16 is a side elevational view of the transportation system moving the processed barge toward the waterway;
Fig. 17 is a schematic of another embodiment of the present invention illustrating a pass-through system for the transportation system and the refurbishing system; Fig. 17a is a cross-sectional view of the third transport systems and supported barge positioned on transfer platforms; and
Fig. 18 is a schematic of another embodiment of the present invention illustrating a pass through system for the transportation system and the refurbishing system.
Corresponding reference characters indicate corresponding parts throughout the several views of the drawings.
DESCRIPTION OF THE PREFERRED EMBODIMENT
The following detailed description illustrates the invention by way of example and not by way of limitation. The description clearly enables one skilled in the art to make and use the invention, and describes several embodiments, adaptations, variations, alternatives, and uses of the invention, including what is presently believed to be the best mode of carrying out the invention. The first illustrative embodiment of the present invention transports barges completely out of a waterway and into a covered refurbishing system that is positioned on land. Within the covered refurbishing system, the hull of the barge is abrasively blasted and then coated. Once the barge has been refurbished, the system transports the barge back into the waterway. The system eliminates or greatly reduces contamination of the ground and/or of the waterway from discharged blast material and/or coating overspray since the refurbishing system collects the discharged blast material and/or coating overspray. The system further permits much faster refurbishment of barges by treating more than one exterior surface at a time. For illustrative purposes, the following description relates to an unpowered river barge.
Referring to the drawings, the processing system 5 (Fig. 1) is schematically shown. A barge 10, which is unpowered and floats free unless acted upon, is pushed by a towboat or tugboat (not shown) within a waterway 12. The waterway 12 may comprise any water source such as, but not limited to, a river, a lake, a channel (natural or artificial) and a bay/cove (natural or artificial). The waterway 12 may also comprise a lock system (not shown), the dimensions of which may determine the practical dimensions of the barge. Regardless of the type of waterway 12, the barge 10 reaches an access point for processing. In an illustrative embodiment of the present invention, the barge 10 is a standard sized barge 10 that has a hull having a length of 195 feet (59 meters), a width of 35 feet (10.7 meters), a height of 10-14 feet (3-4.3 meters), all dimensions being ± 5%. The weight of such a barge is about 300 U.S. tons (about 250,000 kg to about 300,000 kg). As known, the barge 10 includes sides 14, a bow 16, a stern 18 and a bottom 20. These portions of the barge 10 are collectively known as the hull. The exterior surface of the hull is designated by reference numeral 22.
Turning to Figs. 1-16, the processing system 5 of the present invention comprises a transportation system generally shown as 24 and a refurbishing system generally shown as 26. The transportation system 24 comprises a first transport system 28, a second transport system 30, a third transport system 32, a rail system generally shown as 34, a drive system generally shown as 36 and a lift system generally shown as 38. Fig. 1 schematically illustrates the systems of the transportation system 24.
The refurbishing system 26 comprises a housing 44 having a first end 46 and a second end 48, a blast system 50, a transition system 52 and a coating system 54. The housing 44 may be in the form of a building. In this illustrative embodiment, the housing 44 has a length of 325 feet (99 meters). The housing 44 covers the blast system 50, the transition system 52 and the coating system 54 to substantially isolate these areas from the outdoor environment while the first end 46 allows access within the housing 44. The second end 48 is preferably closed but may be open to allow access within the housing 48. The refurbishing system 26 also comprises a control system 56, a reclamation system 58 and a filter system 60. Fig. 1 schematically illustrates the systems of the refurbishing system 26.
Turning to Figs. 3-9, the first transport system 28, the second transport system 30 and the third transport system 32 comprise dollies comprising frames connected to casters or wheels 62. As shown in Fig. 4, the illustrative first transport system 28 comprises a rectangular base assembly 64 connected to the wheels 62. The second transport system 30 also includes a base assembly 65 connected to wheels 62. The second transport system 30 further includes an angle assembly 66, a support assembly 68 in the form of a pair of rails, and a stabilizer 70 in the form of a docking pole. The angle assembly 66 positions the support assembly 68 in a level orientation
Still referring to Fig. 4, the rail system 34 comprises rails 72 that support the wheels 62 of the second transport system 30, rails 72a that support the first transport system 28 when it rolls off the rails 72 of the second transport system 30, as described hereinafter, and rails 72b that support the wheels 62 of the third transport system 32 (Fig. 8b). The drive system 36, in turn, moves the first transport system 28, the second transport system 30 and the third transport system 32 along the rails 72, 72a, and 72b as described hereinafter. The drive system 36 comprises a plurality of motor-driven winches 74, sheave blocks and cables 76 that connect with the transport systems or the barge carried by them, and move them. The rail system 34 and drive system 36 have sufficient parameters to move and transfer the barges 10. For example, the winches 74 may comprise a 60-ton wide body winch that is driven by a vector computer regenerative drive to produce variable speed. The cables 76 are one-inch steel. The motor horsepower on the winches 74 is 18 horsepower through a 16 to 1 gearbox.
As shown, for example, in Fig. 4, the rails 72 support the second transport system 30 while cable 76 of the drive system 36 connects the motor-driven winch 74 with the second transport system 30 via sheave block 75. The winch 74 is shown schematically connected to sheave block 75 in Figs. 4-6. As shown in Fig. 1 , the winch 74 that drives the second transport system 30 is preferably positioned adjacent to the housing 44. Additionally, as shown in Fig. 4, the first transport system 28 is carried by the second transport system 30 and connects with the second transport system 30 via fastening means such as linkages or pins. The angle assembly 66 of the second transport system 30 positions the support assembly 68, hence the first transport system 28, horizontally. Turning to Fig. 5a, the first transport system 28 and the second transport system 30 move underwater such that the barge 10 floats (or is pushed by a tugboat) onto the top of the first transport system 28. The stabilizer 70 supports the barge 10 as the combined first and second transport systems 28, 30 are pulled toward shore. The tow or tug boat may also move the barge 10 toward shore until the barge 10 rests on the base assembly 64 of the first transportation system 28. The first transport system 28 and the second transport system 30 then move the barge 10 from the waterway 12 onto a berth, shelf, or island 78 (Fig. 6). The berth 78 has a height that is taller than any predicted flood level such as a one hundred year level. An embankment 80 (Fig. 6) exists between the inland waterway 12 and the berth 78. The slope of the embankment 80 is 5 to 1 while rails 72 extend into the waterway 12 approximately 200 feet on a 5 to 1 slope. In one embodiment, the embankment 80 has a grade range of approximately 5 degrees to approximately 15 degrees. Further, in one embodiment, the embankment 80 has a height range of approximately 20 feet to approximately 40 feet (approximately 6-12 meters) above a normal level of the waterway 12. The angle assembly 66 of the second transport system 30 compensates for the grade of the embankment 80. While the first transport system 28 and the second transport system 30 move the barge 10 up the embankment 80, the configuration of the angle assembly 66 raises the barge 10 in a level orientation.
Turning to Figs. 7-9, at the top of the embankment 80, the wheels 62 of the first transport system 28 contact rails 72a of the rail system 34 positioned on the berth 78. Cable 76 connects the first transport system 28 with another winch 74 that is positioned on an inland position. In one embodiment, cable 76 connects with an internal sheave block of the first transport system 28. Winch 74 then moves the first transport system 28 across the berth 78 and over the lift system 38.
The lift system 38 of the transportation system 24 comprises jacks 82 or pylons that reciprocate between a retracted position 84 (Fig. 7) and an extended position 86 (Figs. 8a and 8b). The jacks 82 may be hydraulically driven by known means. As will be discussed, in the extended position 86, the lift system 38 raises the barge 10 off the first transport system 28. Winch 74 then moves the first transport system 28 away from the barge 10 while another winch 74 (Fig. 1) moves the third transport system 32 along rails 72b under the barge 10 (Fig. 8b). In the retracted position 84, the lift system 38 lowers the barge 10 onto the third transport system 32 (Fig. 9). Fig. 9 illustrates the intersection of rails 72a and rails 72b with a portion of rail 72a removed wherein rails 72a have a larger height than rails 72b. Fig. 9c illustrates an embodiment of the third transport system 32. Once the third transport system 32 supports the barge 10, a winch moves the third transport system 32 and supported barge 10 into the housing 44 of the refurbishing system 26 (Figs. 10 and 11).
Returning to Figs. 1 and 2, the refurbishing system 26 positions the covered blast system 50, the covered transition system 52 and the covered coating system 54 within the housing 44 such that the covered blast system 50, the covered transition system 52 and the covered coating system 54 are in operative communication with each other. Fig. 2 further schematically illustrates the winches 74, cables 76, rails 72, 72a and 72b, and jacks 82 of the transportation system 24 positioned near the first end 46 of the housing 44. As shown in Fig. 1 , the transportation system 24 is in communication with the covered blast system 50, the covered transition system 52 and the covered coating system 54.
Referring to Fig. 2, the covered blast system 50 comprises a blast storage tank 88, a blast media discharge system 90, and the reclamation system 58. The control system 56 operatively controls at least the blast storage tank 88, the blast media discharge system 90, and the transportation system 26. In the illustrative embodiment, the covered blast system 50 has a height of 24 feet (7.3 meters), a width of 50 feet (15.2 meters) and a length of 50 feet (15.2 meters). The covered blast system 50 may include other dimensions to accommodate a variety of sizes and configurations for barges 10.
Turning to Figs. 12 and 13 and referring to Fig. 2, the blast storage tank 88 holds an amount of abrasive media 96. In one embodiment, the abrasive media 96 comprises steel grit. The blast media discharge system 90 communicates with the blast storage tank 88 via piping. The blast media discharge system 90 comprises an air compressor system 98 and a plurality of discharge nozzles 100 positioned on both sides of the rail system 34 and underneath the portions of the rail system 34 positioned within the blast system 50. Accordingly, the blast system 50 includes a basement in the form of a trough or pit 106 that is positioned under the rails 72b. The rails 72b are suspended via I-beam supports across the pit 106. The side discharge nozzles 100 are positioned within the covered blast system 50 at a height to face the barge 10. The side discharge nozzles 100 may be adjustably positioned with respect to the height within the covered blast system 50 to process a variety of sizes and configurations for barges 10. In one embodiment, the system comprises eleven discharge nozzles 100.
The compressor system 98 transfers the abrasive media 96 from the blast storage tank 88 through the piping and out of the discharge nozzles 100. The discharge nozzles 100 propel the abrasive media 96 against both sides and the underside of the exterior surface 22 of the barge 10. The discharge nozzles 100 automatically reciprocate back and forth at 45° angles. The distribution pattern of the abrasive media 96 overlaps so as to spray the exterior surface 22 of the barge 10. The plurality of discharge nozzles 100 is configured to uniformly distribute the abrasive media 96 against the exterior surface 22 of the barge 10 as the barge is pulled through the blast system 50 at a rate of about 200 feet per hour as controlled by the control system 56. Accordingly, the control system 56 controls the rate of movement of the barge 10. As shown, the blast media discharge system 90 simultaneously processes both sides of the barge 10 while processing the bottom 20. The bow 16 and the stern 18 are processed as the barge 10 enters and exits the blast system 50, respectively. The blast media discharge system 90 may supply 6,000 cfm (170 cubic meters per minute), via air compressors, during the blasting process. The components of the blast media discharge system 90 such as the piping, fittings, valves and discharge nozzles 100 are all designed to withstand the flow rate of the abrasive media 96.
The reclamation system 58 is positioned underneath the portion of the rails 72b positioned within the covered blast system 50. The reclamation system 59 collects the applied abrasive media 96 and any blasted portions of the exterior surface 22 of the barge 10. Accordingly, a grated floor covers the reclamation system 58 such that the grated floor allows the discharged abrasive media 96 and blasted surface components 104 of the barge 10 to pass through and into the reclamation system 58. The grated floor allows personnel access to walk over pit 106. The blasted surface components 104 comprise debris, rust, corrosion, etc., removed from the exterior surface 22 by the discharged abrasive media 96. The reclamation system 58 comprises a means to collect the discharged abrasive media 96 and blasted surface components 104 of the exterior surface 22 of the barge 10. In one embodiment, the reclamation system 58 includes the pit 106, which channels the discharged abrasive media 96 and blasted surface components 104 to augers 108. The augers 108 of the reclamation system 58 move the discharged abrasive media 96 to a cross augur 109 that in turn moves the discharged abrasive media 96 to an elevator 110. The elevator 110, in turn, lifts the discharged abrasive media 96 and blasted surface components 104 for recycling.
The reclamation system 58 also includes a separator 112 that reclaims re-useable abrasive media 96 while discarding unusable abrasive media 96 from the transported media from the elevator 110. The separator 112 also discards blasted surface components 104. The separator 112 discards the waste abrasive media 96 and blasted surface components 104 to the media disposal means 114 such as a waste drum. The separator 112 then moves the reusable abrasive media 96 into a hopper 116 that feeds the blast discharge system 90 to repeat the blasting process. As shown, the control system 56 operatively controls at least the blast storage tank 88, the blast media discharge system 90, the discharge nozzles 100, and the transportation system 26.
The covered blast system 50 (Fig. 1 and 12) is covered to prohibit rain/snow/moisture from contacting the now prepared (i.e. blasted) exterior surface 22 of the barge 10. As such, the prepared barge 10 is not exposed to any outside environment that may oxidize the prepared exterior of the barge 10. Furthermore, the covered blast system 50 prohibits any rain/snow/moisture from contacting the discharged steel grit. Since the reclamation system 58 recycles the discharged steel grit of the abrasive media 96, the covered blast system 50 reduces oxidation of the steel grit.
Turning to Fig. 12 and referring to Fig. 2, the covered transition system 52 is positioned in between and in communication with the covered blast system 50 and the covered coating system 54. Since the transition system 52 is in communication with the blast system 50, the rail system 34 moves the now prepared barge 10 to the covered transition system 52. As such, the prepared barge 10 is not exposed to any outside environment while transferring to the transition system 52. The covered transition system 52 of this embodiment is much shorter than the length of the barge 10. Once a part of the exterior surface 22 has been abrasive blasted by the discharge nozzles 100, the rail system 34 moves the prepared portion of the barge 10 into the covered transition system 52 (Figs. 2 and 12). Any abrasive blasting which did not adequately process the exterior surface 22 of the barge 10 is touched up in a manual processing system of the covered transition system 52.
The covered transition system 52 comprises the manual processing system that includes hand held discharge nozzles 100. These discharge nozzles 100 may be controlled and supplied by the blast media discharge system 90 of the covered blast system 50. Personnel handle these discharge nozzles 100 to abrasively blast the barge 10 in areas that the covered blast system 50 may have missed as the barge 10 continues moving through the covered transition system 52. The discharge nozzles 100 may be positioned on both sides of the rail system 34 and underneath the portion of the rails 72b that is positioned within the covered transition system 52. The manual transition system 52 includes augers 108 also in communication with the reclamation system 58 such that the reclamation system 58 can collect applied abrasive media 96 that has fallen through the grated floor of the manual transition system 52.
The covered transition system 52 also includes an air discharge system 118. The air discharge system 118 includes an air source, an air pump, nozzles and associated piping which connects the air source, the pump and the nozzles. The air discharge system 118 is configured to apply high pressure air to the prepared exterior surface 22 of the barge 10 in order to remove any abrasive media 96 adhered to the exterior surface 22 of the barge 10. In the covered transition system 52, workers further process the barge 10 as the barge 10 continuously moves through by spraying the exterior surface 22 with compressed air to remove abrasive media 96 adhered to the exterior surface 22 during the abrasive blasting of the exterior surface 22, and make whatever other repairs and preparation may be required.
After air blowing the barge 10, the third transport system 32 then moves the prepared portion of barge 10 through the covered coating system 54. The drive system 36 pulls the barge 10 completely through the blast system 50 and the transition system 52. The drive system 36 then continues to pull the barge 10 past the unactivated coating system 54. The drive system 36 pulls the blasted barge 10 into the drying area- of the housing 44 (Fig. 13a). Accordingly, the drive system 36 moves the prepared barge 10 from the transition system 52 and through the coating system 54 without exposing the barge 10 to any outside environments. Turning to Figs. 14 and 14a and referring to Fig. 2, the drive system 36 moves the barge 10 back through the covered coating system 54. The coating system 54 comprises a coating storage tank 120, a coating discharge system 122, and a ventilation system 126. The coating system 54 may include automatic discharge of the coating and may include a coating reclamation system. In this illustrative embodiment, the dimensions of the coating system 54 include a height of 25 feet (7.6 meters), a width of 50 feet (15.2 meters) and a length 45 feet (13.7 meters). The covered blast system 50 may include other dimensions to accommodate a variety of sizes and configurations for barges 10. A pit 106 below the rails 72b and grated floor catwalks 1 alongside the barge 10 give access to all parts of the barge hull. The coating storage tank 120 holds an amount of the coating 128.
In one embodiment, the coating 128 comprises a solvent-based paint or a two-component epoxy coating. The coating discharge system 122 communicates with the coating storage tank 120 via piping. The coating discharge system 122 comprises a compressor 130 and a plurality of coating nozzles 132 positioned on both sides of the rails 72b and underneath the portion of the rails 72b that is positioned within the covered coating system 54. The rails 72b suspend over pit 106 by I- beam support. The coating nozzles 132 are standard, manually operated airless paint guns that are connected by appropriate hoses to the coating discharge system 122 for use by painters. The compressor 130 transfers the coating 128 from the coating storage tank 120 through the piping and out of the coating nozzles 132. The painters spray the coating 128 against both sides of the exterior surface 22 of the barge 10 and the underside of the exterior surface 22 of the barge 10 as the barge 10 rolls through the coating system 54 at a speed of approximately 200 feet per hour (60 meters per hour). Accordingly, the control system 56 controls the speed of the barge 10 through the coating system 54. Additionally, the ventilation and filter system 60 properly handles any fumes created by the coating discharge system 122. The coating system 54 is also covered to prohibit rain/snow/moisture from contacting the now coated exterior surface 22 of the barge 10. As such, the coated barge 10 is not exposed to the outside environment that may interfere with the drying or curing of the coating 128.
Referring still to Figs. 1-16, the following descriptions will further detail the transporting steps and the processing steps applied to a river barge. During operation, the transportation system 24 lifts the unpowered river barge 10 from the inland waterway 12 and deposits the river barge 10 onto an inland position. The transportation system 24 then moves the barge 10 into the refurbishing system 26 for processing. The blast system 50, transition system 52 and coating system 54 are in communication with each other to allow the transportation system 24 to move the barge 10 within the refurbishing system 26 under control of the control system 56. In this illustrative embodiment, a curtain C is provided at the front end 46 of the housing 44 (Fig. 11) to block the covered blast system 52 from the outside environment. The curtain is illustratively a physical curtain in the form of a shroud and provides a physical barrier, although an air curtain that creates a forced air barrier may also be used. Additionally, curtains C may be positioned to separate the blast system 50, the transition system 52, and the coating system 54. In particular, the transportation system 24 moves the barge 10 out of and away from the waterway 12 (Figs. 1-6). Figs. 3-6 illustrate that moving the barge 10 out of and away from the waterway 12 comprises laterally moving the barge 10 with respect to the waterway 12. As shown, laterally moving the barge 10 with respect to the waterway 12 comprises moving the bow 16 and the stern 18 of the barge 10 substantially parallel to the waterway 12.
As shown in Figs. 10 -12, the transportation system 24 then moves the barge 10 within the refurbishing system 26. Moving the barge 10 within the refurbishing system 26 comprises longitudinally moving the barge 10 with respect to the refurbishing system 26. As shown in Figs. 10 and 11 , longitudinally moving the barge 10 within the refurbishing system 26 comprises moving the barge 10 lengthwise within the refurbishing system 26. In other words, the bow 16 and the stern 18 of the barge 10 are substantially perpendicular with respect to the first end 46 of the refurbishing system 26.
After the refurbishing system 26 processes the barge 10, the transportation system 24 moves the barge 10 away from the refurbishing system 26. As shown in Fig. 15, the transportation system 24 longitudinally moves the barge 10 away from the first end 46 of the refurbishing system 26. Longitudinally moving the barge location away from the refurbishing system 26 comprises moving the barge 10 lengthwise from the first end 46. In other words, the bow 16 and the stern 18 are substantially perpendicular with the first end 46 of the refurbishing system 26. The lift system 38 transfers the barge 10 so that the transportation system 24 can move the barge 10 toward the waterway 12 (Fig. 16). Since the embankment 80 positions the refurbishing system 26 inland from the waterway 12, moving the barge 10 out of and away from the waterway 12 system comprises moving the barge 10 up the embankment 80 (Figs. 3-6). As shown, the barge 10 is raised in a level orientation up the embankment 80 at a rate of about 200 feet per hour. Furthermore, moving the barge 10 away from the refurbishing system 26 comprises lowering, in a level orientation, the barge 10 down the embankment 80 (Fig. 16). Since the barge 10 laterally moves away from the waterway 12, longitudinally moves within the refurbishing system 26 and laterally moves back toward the waterway 12, the barge 10 is raised, moved and lowered in the same axial direction, i.e. in the same orientation. This consistent orientation results in stable movement for the barge 10. In other words, in this embodiment, the barge 10 does not rotate on the rails 72, 72a, and 72b during handling by the transportation system 24. The following description will describe in detail the transporting by the first transport system 28, the second transport system 30 and the third transport system 32. The method comprises connecting the first transport system 28 to the top of the second transport system 30 (Figs. 3 and 4). Once connected, the drive system 36 moves the first transport system 28 and the second transport system 30 to descend along the rails 72 into the inland waterway 12. The rails 72 extend into waterway 12 deep enough to allow stabilizer 70 to pass under the river barge 10. The unpowered river barge 10 floats (under control of a tow boat) onto the first transport system 28, wherein the first transport system 28(s) contacts and supports the unpowered river barge 10 (Fig. 4a).
The drive system 36 moves the second transport system 30, the connected first transport system 28 and river barge 10, in a transverse or lateral direction out of the waterway 12 along rails 72 up the embankment 80. (Figs. 3-6). Accordingly, the river barge 10 moves laterally away from the inland waterway 12. As shown in Fig. 4, the drive system 36 raises the second transport system 30, the connected first transport system 28 and river barge 10 up from the waterway 12, across the embankment 80 and toward the inland position. The configuration of the first transport system 28 and the second transport system 30 raises the river barge 10 in a level orientation across the embankment 80. The stabilizer 70 assists in maintaining the barge 10 on the first transport system 28 in the level orientation. Although the embankment 80 angles between the inland waterway 12 and the inland position, the first transport system 28 and the second transport system 30 raise the river barge 10 in this level orientation. At the inland position at the top of the embankment 80, rails 72a align with the wheels 62 of the first transport system 28. The first transport system 28 is then disconnected from the second transport system 30. The drive system 36 then moves the first transport system 28 and supported river barge 10 away from the disconnected second transport system 30 and toward another inland position on the rails 72a. Near the intersections of rails 72a and rails 72b, the lift system
38, via the jacks 82, lifts the river barge 10 off of the first transport system 28 to allow the third transport system 32 to travel underneath the raised barge 10 (Figs. 7-9). As shown in Fig. 9c, a small portion of rail 72a is removed to allow access to the other rail 72b. Once the river barge 10 is properly suspended (Fig. 8b), the first transport system 28 moves away from the suspended river barge 10. The lift system 38 then lowers the river barge 10 onto the third transport system 32 so that the third transport system 32, mounted on rails 72b perpendicular to the rails 72a, supports the river barge 10 (Fig. 9). The third transport system 32 supports the river barge 10 while the first transport system 28 moves away from the river barge 10. If desired, the first transport system 28 then moves toward and connects with the second transport system 30 after disconnecting from the river barge 10, wherein the connected second transport system 30 and first transport system 28 move back toward the inland waterway 12 to pick up another river barge 10. As shown in Fig. 10, the third transport system 32 and the now supported river barge 10 move in a longitudinal direction with respect to the inland waterway 12, toward the refurbishing system 26.
The third transport system 32 continues to move the river barge 10, in the level orientation, within the refurbishing system 26 (Fig. 11). The refurbishing system 26 then processes the river barge 10. After the refurbishing system 26 processes the river barge 10, the third transport system 32 retracts the river barge 10, in a longitudinal direction with respect to the inland waterway 12, out of the refurbishing system 26 and toward post processing area 138 (Figs. 1 and 2).
The post processing area 138 may be optionally covered. The post processing area 138 includes a work area (not shown) such as elevated decks to allow workers to further refurbish and coat surfaces of the river barge 10 such as the superstructure or coaming. For example, the workers may coat the coaming or may weld the exterior surface 22 while the workers are positioned in the work areas. If so desired, the rail system 34 connects with multiple post processing areas 138 to allow multiple river barges 10 to dry and to allow workers to post process the multiple river barges 10. In this embodiment, the rail system 34 is configured to move the river barges 10 without having to rotate the barges 10. Additionally, the rail system 34 may include switch tracks (not shown) to allow interchangeability of unprocessed barges 10 and processed barges 10 to move along the rail system 34. The transportation system 24 handles multiple barges 10 to allow simultaneous refurbishing of one barge 10 and post processing of other barges 10. The transportation system 24 handles barges 10 to allow other barges 10 to move to respective locations within the transportation system 24. For example, one refurbished barge 10 is moved to the post processing area 138 to allow an un-refurbished barge 10 access to the refurbishing system 26. As such, the processing areas 138 provide a matrix of spaces to move multiple barges 10 on the transportation system 24.
After drying and any post processing, the third transport system 32 moves the barge 10 back over the jacks 82 of the lift system 38. The jacks 82 move from the retracted position 84 to the extended position 86. In the extended position 86, the jacks 82 lift the river barge 10 off the third transport system 32. The drive system 36 then moves the third transport system 32 away from the suspended river barge 10 and moves the first transport system 28 underneath the suspended river barge 10 via the switch track assembly (Fig. 9c). When the drive system 36 properly positions the first transport system 28 underneath the river barge 10, the lift system 38 lowers the jacks 82 to the retracted position 84. In the retracted position 84, the jacks 82 lower the barge 10 onto the first transport system 28. The drive system 36 then moves the first transport system 28 and supported barge 10 toward the second transport system 30 that is positioned on the embankment 80. The first transport system 28 then connects with the second transport system 30. The drive system 36 then lowers the second transport system 30, the connected first transport system 28 and supported river barge 10 from the embankment 80 and back into the inland waterway 12 (Fig. 16). As shown in Fig. 16, the second transport system 30 laterally moves the barge 10 down the embankment 80 and into the inland waterway 12. Although the embankment 80 angles toward the inland waterway 12, the angle assembly 66 of the second transport system 30 allows the second transport system 30 to lower the barge 10 in the level orientation.
Referring to Fig. 17, another embodiment of the present invention includes a pass through system generally shown as 140. In this embodiment, the barge 10 is transported and processed within a refurbishing system 142 that comprises a housing 144 which covers a blast system 146, a transition system 148, a transfer system generally shown as 150 and a coating system 152. The housing 144 has an entry end 154 and an exit end 156 as shown. In this embodiment, the blast system 146 and coating system 152 are positioned offset from each other by the transfer system 150. As shown, the refurbishing system 142 comprises a U-shaped configuration. The blast system 146, the transition system 148 and coating system 152 perform the same operation as blast system 50, transition system 52 and coating system 54 respectively. In this embodiment, the barge 10 is moved in a first direction out of the waterway 12 by a first transport system 158 and a second transport system 160 toward an inland position as previously described. The barge 10 is then moved by the first transport system 158 to lift system 162. The lift system 162 raises the barge 10 to allow third transport system 164 to move under the suspended barge 10. The third transport system 164 moves along rails 166 as shown. The third transport system 164 moves the supported barge 10 in a second direction into the refurbishing system 142. The second direction is perpendicular to the first direction. As shown, the third transport system 164 longitudinally moves the barge 10 within the covered blast system 146. The covered blast system 146 abrasively processes the barge 10 as previously discussed. Subsequent to abrasive blasting, the third transport system 164 moves the barge 10 through the transition system 148 wherein workers can process the barge 10 as previously described. The third transport system 164 then moves the barge 10 into the transfer system 150. As shown in Fig. 17a, the transfer system 150 comprises a fourth transport system 168 in the form of wheeled platforms positioned within channels 170. The rails 166 do not extend over the channels 170. Instead, the tops of the platforms 168 are positioned in the same plane as the rails 166. The third transport system 164 moves the barge 10 within the transfer system 150such that the third transport system 164 moves on top of the platforms 168. Once the third transport systems 164 are properly positioned on top of the platforms 168, the platforms 168 move the third transport system 164 and supported barge 10 in a third direction opposite to the second direction. The platforms 168 move the barge 10 in its same orientation toward rails 167. Rails 167 do not extend over the channels 170 at the opposite ends of the channels 170.
The platforms 168 move the third transport system 164in alignment with the rails 167. The drive system then drives the third transport system 164 in the direction opposite of the second direction.
The third transport system 164 longitudinally moves the barge through the covered coating system 148. The covered coating system processes the barge 10 as previously discussed. After the coating process, the third transport system moves 168 the barge 10 into the drying area 172.
After drying, the third transport system 164 moves the barge 10 to another lift system 174 that is positioned beyond the drying area 172 along rails 176. The other lift system 174 unloads the barge off the third transport system 164 and loads the barge 10 on the first transport system 158 positioned on rails 176. The first transport system 158 then reconnects with the second transport system 160 to lower the barge back into the waterwayi 2 previously described.
Referring to Fig. 18, another embodiment of the present invention includes another pass through system generally shown as 176. In this embodiment, the barge 10 is transported and processed within the refurbishing system 26 as previously described. After coating the barge 10, the drive system 36 does not retract the third transport system 32 and supported barge 10 out of the first end 44 of the refurbishing system 26. Instead, the drive system 36 moves the barge 10 out of the second end 48 of the housing 44. The third transport system 32 moves the barge 10 longitudinally away from the refurbishing system 26. As such, in this embodiment, the barge 10 enters the first end 46 of the housing 44 and exits the second and 48 of the housing 44. Upon exiting the second end 48, other jacks 82 (Fig. 18) of the lift system 38 move to the extended position 86 to lift the barge 10 off the third transport system 32. As shown, the other jacks 82 are positioned beyond the second end 48 of the housing 44. While the jacks 82 suspend the barge 10, the drive system 36 moves the third transport system 32 away from the barge 10. Once the third transport system 32 is cleared from the barge 10, the drive system 36 moves the fourth transport system 40 underneath the barge 10.
When the drive system 36 properly positions the fourth transport system 40 underneath the barge 10, the lift system 38 lowers the jacks 82 to the retracted position 84. In the retracted position 84, the jacks 82 lower the barge 10 onto the transport system 178 so that the transport system 178 supports the barge 10.
The drive system 36 then moves the transport system 178 and the supported barge 10 toward the fifth transport system 180. The transport system 178 connects with the fifth transport system 180. The drive system 36 then lowers the fifth transport system 180, the connected transport system 178 and supported barge 10 down the embankment 80 and back into the waterway 12 as previously discussed. At the waterway 12, the barge 10 releases from the transport system 178 and floats free within the inland waterway 12. In the embodiments of Figs. 17 and 18, the transport systems and platforms may be driven by the motor driven winches 74 and cables 76 as previously discussed. The platforms may also travel along rails. Numerous other variations in the present invention, within the scope of the appended claims, will occur to those skilled in the art in light of the foregoing invention. Merely by way of example, the transportation system may be utilized in other ways, for example with other types of refurbishment systems, including different surface preparation systems and different coating systems, and further including refurbishment systems for the interior of the hull of the barge, refurbishment systems for the superstructure, and systems for more major refurbishment, such as replating some or all of the barge hull to repair more major damage or to re-outfit the hull for different uses. Likewise, the abrasive blasting process or the coating process of the invention may be carried out individually without the other process. Either or both of the processes may be carried out in a suitable enclosure using different types of transport systems. Some aspects of the invention may be carried out with a modified dry-dock system, and some may be carried out with a movable abrasive system or a movable coating system for blasting or coating a stationary barge. Furthermore, the control system is configured to time the movement of any particular barge and time the activation of the blast system, the transition system and the coating system, including automated coating systems. Some of the advantages of the present invention may be obtained without the use of an enclosure for the surface preparation and/or the coating processes. These variations are merely illustrative.
In view of the above, it will be seen that the several objects of the invention are achieved and other advantageous results are obtained. As various changes could be made in the above constructions without departing from the scope of the invention, it is intended that all matter contained in the above description or shown in the accompanying drawings shall be interpreted as illustrative and not in a limiting sense.

Claims

CLAIMS:
1. A method of transferring a barge from a waterway and within a refurbishing system, comprising: moving the barge out of and away from the waterway; moving the barge within the refurbishing system; and moving the barge away from the refurbishing system and into the waterway.
2. The method of claim 1 wherein moving the barge out of and away from the waterway comprises laterally moving the barge with respect to the waterway.
3. The method of claim 1 wherein moving the barge within the refurbishment system comprises longitudinally moving the barge with respect to the waterway.
4. The method of claim 3 wherein moving the barge within the refurbishing system comprises longitudinally moving the barge with respect to the refurbishing system.
5. The method of claim 1 wherein moving the barge away from the refurbishing system comprises longitudinally moving the barge away from the refurbishing system.
6. The method of claim 1 wherein moving the barge away from the refurbishing system and into the waterway comprises laterally moving the barge.
7. The method of claim 1 wherein moving the barge out of and away from the waterway comprises moving the barge in a level orientation up a marine way and onto a rail system, the rail system including at least one perpendicular transfer station.
8. The method of claim 7 wherein moving the barge away from the refurbishing system comprises changing the direction of movement of the barge at a transfer station without changing the orientation of the barge, and further comprises lowering, in a level orientation, the barge down the marine way.
9. The method of claim 1 wherein the barge is raised, moved and lowered without changing its orientation.
10. The method of claim 1 wherein the barge comprises an unpowered barge having a length of about 100-450 feet (about 30 to about 135 meters), a width of about 30-75 feet (about 9 to about 23 meters), and a depth of about 8-30 feet (about 2.5 to about 9 meters).
11. The method of claim 1 wherein the barge is 195 feet (59 meters) long and 35 feet (10.7 meters) wide, both dimensions ±5%.
12. The method of claim 1 wherein the barge has a weight of between about 200 U.S. tons and about 1 ,000 U.S. tons (about 180,000 kg to about 907,000 kg).
13. A method of transferring a barge from an inland waterway and within an inland refurbishing system, the method comprising: connecting a first transport system to a second transport system; positioning the connected first transport system and the second transport system at least partially into the inland waterway; floating the barge from the inland waterway onto the first transport system; supporting the barge on the first transport system; moving the second transport system, the connected first transport system and supported barge, in a first direction out of the waterway and toward an inland position; disconnecting the first transport system from the second transport system at the inland position and moving the first transport system and supported barge away from the disconnected second transport system and toward another inland position; removing the barge from the first transport system and supporting the barge on a third transport system at the other inland position; moving the third transport system and the supported barge in a second direction into the refurbishing system, the second direction being perpendicular to the first direction; and moving the third transport system and the barge out of the refurbishing system.
14. The method of claim 13 further comprising moving the barge in the refurbishing system in a third direction opposite the second direction.
15. The method of claim 14 further comprising moving the barge in a fourth direction perpendicular to the second direction, before moving the barge in the third direction.
16. The method of claim 13 wherein moving the second transport system, the connected first transport system and the supported barge toward the inland position comprises moving the second transport system, the connected first transport system and the supported barge up a marine way, and wherein the method further comprises moving the barge down the marine way after it is moved out of the refurbishing system.
17. The method of claim 14 wherein the barge comprises an unpowered barge having a length of about 100-450 feet (about 30 to about 135 meters), a width of about 30-75 feet (about 9 to about 23 meters), and a depth of about 8-30 feet (about 2.5 to about 9 meters).
18. A method of refurbishing a barge having a length of about 100-450 feet (about 30 to about 135 meters), a width of about 30-75 feet (about 9 to about 23 meters), and a depth of about 8-30 feet (about 2.5 to about 9 meters), the method comprising: moving the barge from an inland waterway to an inland position; moving the barge from the inland position into a covered blast area; abrasive blasting the exterior surface of the barge with an abrasive media while the barge is positioned within the covered blast area; moving the barge to a covered coating area; and applying a coating to the exterior surface of the barge while the barge is positioned within the covered coating area.
19. The method of claim 18 further comprising collecting in a pit the abrasive media that has been blasted against the exterior surface of the barge, the pit comprising augers which move the abrasive media, and recycling the collected abrasive media.
20. The method of claim 18 further comprising spraying the exterior surface with compressed air to remove abrasive media that is adhered to the exterior surface during the abrasive blasting of the exterior surface.
21. The method of claim 18 wherein moving the barge from the inland waterway comprises laterally moving the barge with respect to the inland waterway, and moving the barge from the inland position into a covered blast area comprises moving the barge longitudinally.
22. An inland refurbishing system for refurbishing a barge, the system, comprising: a covered blast system having a blast media storage tank which stores abrasive media, the covered blast system further having a blast media discharge system in communication with the blast media storage tank, the blast media discharge system being configured to discharge the abrasive media against an exterior surface of the barge; and a reclamation system in communication the blast media discharge system, the reclamation system having a collector and a recycler, wherein the collector receives the abrasive media after the abrasive media has been discharged against the exterior surface of the barge and wherein the recycler accepts the collected abrasive media from the collector and moves the collected abrasive media to the blast media storage tank for reuse of the collected abrasive media.
23. The refurbishing system of claim 22 further comprising a transportation system that is positioned within the covered blast system and moves the barge, and a control system which automatically controls at least one of the transportation system and the blast system.
24. The refurbishing system of claim 22 wherein the blast media discharge system comprises a plurality of blast discharge nozzles which are positioned on both sides and underneath of a portion of the transportation systemithat is positioned within the covered blast system.
25. The refurbishing system of claim 22 further comprising a covered coating system in communication with the covered blast system, the covered coating system having a coating storage tank which stores an amount of coating and having a coating discharge system in communication with the coating storage tank.
26. The refurbishing system of claim 22 further comprising a covered transition system, the covered transition system having an air discharge system that discharges compressed air to remove abrasive media that is adhered to the exterior surface of the barge.
27. An inland refurbishing system for refurbishing a barge having a length of about 100-450 feet (about 30 to about 135 meters), a width of about 30-75 feet (about 9 to about 23 meters), and a depth of about 8-30 feet (about 2.5 to about 9 meters), the system, comprising: a covered blast area having a blast media storage tank which stores abrasive media, the covered blast area further having a blast media discharge system in communication with the blast media storage tank, the blast media discharge system being configured to discharge the abrasive media against an exterior surface of the barge; a covered coating area in communication with the covered blast area, the covered coating area having a coating storage tank which stores an amount of coating and having a coating discharge system in communication with the coating storage tank, the coating discharge system being configured to permit discharge of the coating onto the blasted exterior surface of the barge; and a transportation system operatively connected with the covered blast area and operatively connected with the covered coating area wherein the transportation system transports the barge from an inland waterway, within the covered blast area and within the covered coating area in a level orientation while the blast media discharge system and the coating discharge system respectively process the exterior surface of the barge.
28. The refurbishing system of claim 27 wherein the transportation system comprises a first transport system, a second transport system and a third transport system, each of the first transport system, the second transport system and the third transport system comprising wheeled platforms capable of supporting the weight of the barge.
29. The refurbishing system of claim 27 wherein the transportation system further comprises a drive system that operatively moves the first transport system, the second transport system and the third transport system.
30. The refurbishing system of claim 29 wherein the drive system comprises a plurality of motors and cables wherein the cables connect the plurality of motors to the first transport system, the second transport system and the third transport system.
31. The system of claim 30 further comprising a control system which controls the drive system and the blast media discharge system
32. A method of refurbishing a barge, the method comprising moving the barge through an enclosed abrasive blast area having a length less than the length of the barge, blasting the barge with abrasive while it is moved through the blast area, and recovering at least a part of the abrasive for reuse.
33. A method of refurbishing a barge, the method comprising moving the barge into an enclosed abrasive blast area, the blast area comprising a pit below the barge, blasting the barge with abrasive while the barge is in the blast area, and recovering at least a part of the abrasive from the pit for reuse.
34. A method of refurbishing a barge, the method comprising moving the barge into an enclosed abrasive blast area, the blast area comprising a blast media discharge system, producing relative movement between the barge and the blast media discharge system while causing the blast media discharge system to discharge blast media in a predetermined pattern into contact with the barge, and automatically controlling at least one of the producing relative movement and the causing the blast media discharge system to discharge blast media in a predetermined pattern.
35. A method of refurbishing a barge comprising moving the barge through a curtain into an enclosed refurbishment area.
36. A method of refurbishing a barge comprising moving the barge into a covered building and performing at least one refurbishment process on the barge while the barge is in the covered building.
37. The method of claim 36 wherein the refurbishment processes comprise blasting the barge with abrasive.
38. The method of claim 36 wherein the barge is blasted with abrasive while it is moving through the building.
39. The method of claim 36 wherein the barge is moved through an abrasive blasting area in a first direction and wherein the barge is moved through a coating area in an opposite direction.
40. A method of refurbishing a barge comprising moving the barge laterally from a waterway up a marine way to a level area, and thereafter moving the barge longitudinally through a cleaning area.
41. The method of claim 40 comprising a further step of moving the barge longitudinally through a coating area in a direction opposite the direction the barge moves through the cleaning area.
PCT/US2006/041710 2005-10-27 2006-10-27 Barge transportation system and refurbishing system and method of transporting and refurbishing barges WO2007050717A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US73078805P 2005-10-27 2005-10-27
US60/730,788 2005-10-27

Publications (2)

Publication Number Publication Date
WO2007050717A2 true WO2007050717A2 (en) 2007-05-03
WO2007050717A3 WO2007050717A3 (en) 2007-10-04

Family

ID=37968539

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2006/041710 WO2007050717A2 (en) 2005-10-27 2006-10-27 Barge transportation system and refurbishing system and method of transporting and refurbishing barges

Country Status (2)

Country Link
US (3) US7837410B2 (en)
WO (1) WO2007050717A2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2945475B1 (en) * 2009-05-13 2012-06-08 Daniel Chalamet BOAT MULTICOQUE.
CN102514686A (en) * 2011-12-15 2012-06-27 吴平平 Simulation sliding testing machine for multifunctional wind turbine installation vessel
US9139270B2 (en) * 2013-10-03 2015-09-22 James Pirtle System for refloating grounded vessels
FR3047229A1 (en) * 2016-02-02 2017-08-04 Gilles Barboteau DEVICE FOR MOVING AND EARTHING A VESSEL
CN114889753B (en) * 2022-05-10 2023-03-28 中国船舶科学研究中心 Efficient mooring transportation device and transportation method for island-reef sea area
CN115771598A (en) * 2022-12-14 2023-03-10 中交四航局江门航通船业有限公司 Upper row structure of ship

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3390657A (en) * 1966-08-12 1968-07-02 Morgan Engineering Co Gantry crane for loading barges on ships
US4003329A (en) * 1973-07-26 1977-01-18 Fmc Corporation Combination positioning and propelling apparatus for barges
US4615641A (en) * 1984-08-03 1986-10-07 Novay Paul L Barge repair device
US5695388A (en) * 1994-12-01 1997-12-09 Corcon Industrial Painting Mobile platform recovery system for bridge maintenance

Family Cites Families (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US236563A (en) * 1881-01-11 James b
US126240A (en) * 1872-04-30 Improvement in building-yards
US130768A (en) * 1872-08-20 Improvement in launching, hauling, and building ways for vessels
US1263651A (en) * 1916-07-26 1918-04-23 Pietro D Amico Rail armament and cars for loading and unloading ships direct to and from a railway-station.
US1298499A (en) * 1918-08-26 1919-03-25 Gustave A Hansen Steamboat and barge loading and unloading system.
US1433706A (en) * 1922-05-12 1922-10-31 Maschf Augsburg Nuernberg Ag Hauling-up plant for ships
US1860177A (en) * 1931-03-10 1932-05-24 Dravo Contracting Company Marine railway
US2347396A (en) * 1941-05-31 1944-04-25 Crandall Dry Dock Engineers In Boat storage system and apparatus
US2357494A (en) * 1942-06-11 1944-09-05 Basile Salvatore System and means for transporting ships
US2372390A (en) * 1942-11-09 1945-03-27 Albert O Petersen Launching device for ships
US2415805A (en) * 1944-12-19 1947-02-18 Dravo Corp Marine railway
US2543348A (en) * 1948-12-21 1951-02-27 Todd Shipyards Corp Scaling machine for cleaning the sides of a ship
FR1557648A (en) * 1966-07-16 1969-01-13
US3478526A (en) * 1968-05-01 1969-11-18 Christopher J Foster Ship launching apparatus and method
US3681926A (en) * 1971-03-03 1972-08-08 Kelso Marine Inc Solid lubricant launching arrangement for a vessel
US3752109A (en) * 1971-10-22 1973-08-14 R Seiple Ecologically controlled ship's hull reconditioner
US3817041A (en) * 1973-05-10 1974-06-18 F Pownall Ship slipping system
GB1472831A (en) * 1975-06-04 1977-05-11 Shell Int Research Apparatus and a method for treating a surface
US4027433A (en) * 1975-09-17 1977-06-07 Wayne Hockett Sand blasting apparatus
US4473321A (en) * 1983-05-02 1984-09-25 Chicago Bridge & Iron Company Method of launching a large floatable object from a dock to water and delaunching it
US4641996A (en) * 1984-09-20 1987-02-10 Morton Seal Side loading boat lifts
US4714375A (en) * 1984-11-13 1987-12-22 Levitator, Inc. Seaplane and dock lift
US4808931A (en) * 1987-04-13 1989-02-28 General Technology, Inc. Conductivity probe
GB9108518D0 (en) * 1991-04-19 1991-06-05 Beausoleil Normand Sand blasting apparatus
US5355823A (en) * 1991-10-24 1994-10-18 Mmc Compliance Engineering, Inc. Apparatus and method for performing external surface work on ships' hulls
US5185183A (en) * 1992-01-10 1993-02-09 Westinghouse Electric Corp. Apparatus and method for blasting and metal spraying a cylindrical surface
US5398632A (en) * 1993-03-08 1995-03-21 Mmc Compliance Engineering, Inc. Apparatus and method for performing external surface work on ship hulls
US5353729A (en) * 1993-07-30 1994-10-11 Mmc Compliance Engineering, Inc. Apparatus and method for performing external surface work on ship hulls
US5716261A (en) * 1994-01-14 1998-02-10 The Wheelabrator Corporation, Oscillating blast cleaner
US5445101A (en) * 1994-05-16 1995-08-29 Koch; Leonard System for spray washing boat hulls
US5988093A (en) * 1995-07-13 1999-11-23 Orca Marine Company Limited Floating dock
US6102157A (en) * 1997-02-19 2000-08-15 Metro Machine Corporation Self-contained staging system for cleaning and painting bulk cargo holds
US5807168A (en) * 1997-02-19 1998-09-15 Mmc Compliance Engineering, Inc. Self-contained device for cleaning and coating hold surfaces in a bulk carrier
US6186273B1 (en) * 1997-02-19 2001-02-13 Metro Machine Corporation Self-contained staging system for cleaning and painting bulk cargo holds
US5823291A (en) * 1997-02-19 1998-10-20 Metro Machine Corporation Self-contained device for cleaning and coating hold surfaces in a bulk carrier
US6276292B1 (en) * 1997-11-14 2001-08-21 Alice B. Soulek Foulant control system such as for use with large ships
NO309544B1 (en) * 1998-09-03 2001-02-12 Oeystein Baltzersen Method and apparatus for examining liquid objects
GB9915148D0 (en) * 1999-06-30 1999-09-01 Hudd Adrian G Improvements relating to boat maintenance
US6260499B1 (en) * 1999-08-17 2001-07-17 Richard Ernest Steel Enclosure for partially submerged boat keels, rudders and outdrives
US6173669B1 (en) * 1999-10-14 2001-01-16 Brunswick Corporation Apparatus and method for inhibiting fouling of an underwater surface
US6327991B1 (en) * 2000-04-07 2001-12-11 John E. Eichert Boat maintenance
US20040121181A1 (en) * 2001-05-01 2004-06-24 Call Edwin Young System for protection of submerged marine surfaces
US7013821B2 (en) * 2001-11-09 2006-03-21 Jiro Sakurai Apparatus and method for cleaning object floating at the surface of water
USH2159H1 (en) * 2004-01-16 2006-07-04 The United States Of America As Represented By The Secretary Of The Navy Guidance of treatment devices on target surfaces
US7444952B1 (en) * 2007-10-29 2008-11-04 Mcgann Leo Boat hull rinsing device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3390657A (en) * 1966-08-12 1968-07-02 Morgan Engineering Co Gantry crane for loading barges on ships
US4003329A (en) * 1973-07-26 1977-01-18 Fmc Corporation Combination positioning and propelling apparatus for barges
US4615641A (en) * 1984-08-03 1986-10-07 Novay Paul L Barge repair device
US5695388A (en) * 1994-12-01 1997-12-09 Corcon Industrial Painting Mobile platform recovery system for bridge maintenance

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
BEASLEY B: 'Engineer Update: Bottoms Up! Innovative Workers Replate Old Barge, Saving Time and Money' October 2000, *

Also Published As

Publication number Publication date
US20110188932A1 (en) 2011-08-04
WO2007050717A3 (en) 2007-10-04
US20070098499A1 (en) 2007-05-03
US20110177759A1 (en) 2011-07-21
US7837410B2 (en) 2010-11-23

Similar Documents

Publication Publication Date Title
US5540172A (en) Apparatus for performing external surface work on underside of ship hull
AU648732B2 (en) Apparatus and method for performing external surface work on ships' hulls
EP0597643B1 (en) Method and apparatus for performing external surface work
EP0614802B1 (en) Apparatus and method for performing external surface work on ship hulls and the like
US20110177759A1 (en) Barge transportation system and refurbishing system and method of transporting and refurbishing barges
FI111700B (en) A method and apparatus for blasting a substantially vertical outer surface of a ship's hull
US20190210700A1 (en) System for conveying a barge over a levee in a level attitude
WO2002068261A1 (en) Environmentally enclosed ship coating depot

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 06817383

Country of ref document: EP

Kind code of ref document: A2