WO2007027119A1 - Procede de preparation du gaz naturel destine a etre fourni au consommateur, avec utilisation integree de l'energie du gaz naturel, systeme destine a sa mise en oeuvre, installation energetique de refroidissement et entrainement energetique muni d'une machine a aubes, refrigerateur a gaz et generateur de glace - Google Patents

Procede de preparation du gaz naturel destine a etre fourni au consommateur, avec utilisation integree de l'energie du gaz naturel, systeme destine a sa mise en oeuvre, installation energetique de refroidissement et entrainement energetique muni d'une machine a aubes, refrigerateur a gaz et generateur de glace Download PDF

Info

Publication number
WO2007027119A1
WO2007027119A1 PCT/RU2005/000440 RU2005000440W WO2007027119A1 WO 2007027119 A1 WO2007027119 A1 WO 2007027119A1 RU 2005000440 W RU2005000440 W RU 2005000440W WO 2007027119 A1 WO2007027119 A1 WO 2007027119A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas
ice
expander
chamber
refrigerator
Prior art date
Application number
PCT/RU2005/000440
Other languages
English (en)
Russian (ru)
Inventor
Dmitriy Timofeevich Aksyonov
Ekaterina Dmitrievna Lashkevich
Galina Petrovna Aksyonova
Original Assignee
Dmitriy Timofeevich Aksyonov
Lashkevich Ekaterina Dmitrievn
Galina Petrovna Aksyonova
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dmitriy Timofeevich Aksyonov, Lashkevich Ekaterina Dmitrievn, Galina Petrovna Aksyonova filed Critical Dmitriy Timofeevich Aksyonov
Priority to PCT/RU2005/000440 priority Critical patent/WO2007027119A1/fr
Publication of WO2007027119A1 publication Critical patent/WO2007027119A1/fr

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B27/00Machines, plants or systems, using particular sources of energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C1/00Producing ice

Definitions

  • the method of preparing natural gas for supply to the consumer with the integrated use of natural gas energy a system for its implementation, an energy refrigerating unit and an electric drive with a shovel, a gas refrigerator and an ice maker
  • the group of inventions relates to the field of power engineering and is intended for the use of natural gas in the means of generating mechanical energy and cold due to the use of differential pressure of natural gas, mainly in the places of its production, at gas distribution and compressor stations.
  • the essence of the known technology lies in the fact that natural gas having a high pressure is sent to an expander, where the gas expands and does the work that is used to drive various mechanisms, for example, pumps, generators or transformers, into the energy stored, for example, in electric batteries.
  • This technology allows you to increase the efficiency of natural gas use, but its application raises a number of problems.
  • One of the main problems concerns the use in the known technology of technical means for using the differential pressure of natural gas, in particular, expander units.
  • a turboexpander made in the form of an electric drive with a blade machine, comprising a housing with a rotor installed in it, mounted on a shaft with bearings, a guiding apparatus with nozzles for supplying and discharging a working fluid (gas) and high and low pressure manifolds, a sealing system shaft, regulation, control and protection system (“Petroleum and Gas Transport Transport”, edited by V. A. Yufina, M., Nedra, 1982, pp. 123–126; A. A. Stepanets “Energy-saving turbine expander units)) , Nedra, 1999).
  • GAZ-oil at high shaft speeds leads to the need for a separate complex sealing system, including a sealing block, two pumps, GAZ-oil differential pressure controller, oil accumulator, heat exchanger, degasser, oil and gas return system, etc. .
  • the full bore turbo expanders used are very sensitive to deviations from the calculated volume of gas and pressure passing through them. When reducing the pressure and volume of the passing gas through the turboexpander, its power and efficiency first sharply decrease, and then it stops. In addition, high-speed blade machines require correspondingly high-precision production for their manufacture and special operating conditions.
  • the closest of them to the proposed method and system is a method of preparing natural gas for supply to the consumer with the integrated use of natural gas energy by expanding natural gas in the expanders, removing the mechanical energy of the expanders to drive the generator and transmitting the gas cooled in the expander before being supplied to the consumer through the heat exchanger of the refrigeration unit, as well as a system for implementing this method, comprising electro-refrigerating units (ECA), each of which includes the expander and an electric generator connected to its shaft, and a refrigeration unit, the heat exchanger of which is connected to the outlet, at least one of the ECA, and with which the pipeline for supplying gas to the consumer is connected (RF patent 2098713).
  • ECA electro-refrigerating units
  • the closest to the proposed energy-refrigerating unit is an ECA containing a sealed chamber with an outlet pipe, a turboexpander installed in it and an electric generator connected to its shaft, a sensor for the rotational speed of the turboexpander shaft, a throttle-metering device for supplying gas to the nozzles of the turbine expander, a regulator connected to it gas supply and an electronic unit associated with the indicated sensor and regulator (RF certificate JY220778).
  • the problem is that when the potential energy of the gas pressure in the turboexpander is released, the thermodynamic parameters of the gas change, which can go beyond the acceptable limits for normal operation both for the expander and gas transmission system, as well as for the gas consumer’s technical equipment.
  • the operation of the expander installation is carried out at high degrees of gas expansion (from 8 to 12 times), which leads to a deep decrease in the temperature of the gas stream at the outlet of the installation.
  • gas at the inlet to the installation will be supplied with a temperature of 0 C, then at the outlet of the installation it will reach minus 90-120 0 C, and this will require the use of special cold-resistant steels, which will sharply increase the cost of the installation, and gas with such a temperature cannot be transported through conventional gas pipelines and, moreover, cannot be used by consumers.
  • the known technical solutions provide for heating the gas at the inlet to the expander unit to approximately 100 0 C due to the use of useful thermal energy, for example, by the power plant, then the gas at the outlet of the unit has a temperature of minus 10-20 0 C and conventional high-quality steels are used in the construction.
  • the mechanical energy received from the expander and the usable useful thermal energy steam or hot water
  • the thermal energy exceeds the mechanical energy by the amount of energy, determined by the efficiency of the heat exchanger and the need to transport the heat carrier to the expander. installation and back.
  • such a system is energetically insolvent - unprofitable.
  • Famous refrigerators are complex, expensive during the construction and operation of facilities, which can be divided into two parts: 1) cold-flax compressor unit with infrastructure (systems for receiving, storing, supplying refrigerant; systems for receiving, storing, moving, circulating and regenerating lubricants oils, cooling water supply, cooling, circulation or drainage systems; power supply system; buildings with heating, lighting, ventilation, water supply, sewage systems, etc.); 2) the refrigerator itself, having food storage chambers equipped with heat exchangers with air circulation, doors, lighting, corridors for transporting goods, etc.
  • the known solutions do not use natural gas with a low temperature as a refrigerant for cooling the chambers of refrigerators designed to store food.
  • Natural gas is not a toxic substance and its use as a refrigerant in combination with expander units can make it possible to create highly efficient environmentally friendly, less expensive refrigerators with a simplified structure.
  • Known gas refrigerator containing a heat-shielding jacket, chambers with a closed opening and heat exchangers, air coolers (see [2] p.197, 198). However, it does not provide heating of the chilled gas to a temperature ensuring its normal use by the consumer.
  • the known ice machine has a complex cooling system, and this, in combination with spraying water in the lower part of the chamber, does not allow efficient use of the entire volume of the chamber to form ice.
  • the objective of the invention is to create a set of technical solutions that provide the greatest efficiency of the technology for using the energy of the process differential pressure (“waste” energy) of a natural gas source.
  • the method used in this technology should be carried out using standard equipment of mass production, and the devices used should be improved and unified elements of this equipment.
  • the technical result achieved using the proposed method, system and gas cooler is to increase the efficiency of the beneficial use of cold coming out of the ECA gas and providing the output system the temperature of the gas necessary for its normal use by the consumer without special heating.
  • the technical result in terms of the energy refrigeration unit and the power drive is to provide the ability to achieve rated power at various parameters of the gas stream.
  • the technical result achieved using the proposed ice machine is to simplify the design and increase the efficiency of using the volume of the chamber.
  • the technical result is achieved by the fact that in the method of preparing natural gas for supplying a consumer with the integrated use of natural gas energy by expanding natural gas in at least one expander of an electro-refrigerating unit (ECA), removing the mechanical energy of each expander to drive an electric generator of the corresponding ECA and transmitting leaving the ECA of the gas cooled in the expander before feeding it to the consumer through at least one heat exchanger of the refrigerator, according to the invention, I use t a refrigerator with chambers, in each of which a heat exchanger is placed, cold gas is passed sequentially through the heat exchangers of the refrigerator chambers, and part of the cold gas is passed into the ice generator heat exchanger connected to the output of the corresponding ECA or to a collector connected to the output of each ECA to obtain the output ice generator gas temperature, ensuring its use by the consumer.
  • the degree of expansion of the gas in each expander is
  • a system including at least one of the indicated expander, an electric generator, a refrigerator and an ice generator is connected to a natural gas source and to a gas supply pipe to a consumer in parallel with a gas reduction station (GDS) to reduce the load on it and maintain required parameters of gas supplied to the consumer.
  • GDS gas reduction station
  • ECA each of which includes an expander and its associated the shaft of the generator, at least one gas refrigerator, the heat exchanger of which is connected to the outlet of at least one ECA, and the pipeline for supplying gas to the consumer
  • the gas refrigerator contains chambers, in each of which there is a heat exchanger, heat exchangers are connected to each other another in series, and the output of the heat exchangers is connected to the pipeline for supplying gas to the consumer
  • the system is equipped with at least one ice generator, the heat exchanger of which is connected to the output of the corresponding ECA and whether with a collector connected to the output of each ECA, and with a pipeline for supplying gas to the consumer.
  • the technical result is also achieved by the fact that in an energy-refrigerating unit containing a sealed chamber with an outlet pipe, a turboexpander installed in it and an electric generator connected to its shaft, a turboexpander shaft speed sensor connected to a gas supply pipe, a throttle-dispenser for supplying gas to the nozzles of the turbine expander, the associated gas supply regulator and an electronic unit associated with the indicated sensor and the regulator, according to the invention, the turbo-expander nozzles are divided into two or more groups , one group of nozzles is connected to the gas supply pipeline through the specified metering throttle, and the other or others through the collector or through an additional metering throttle or metering throttle.
  • a shut-off element controlled by an automation system with a smooth opening operation when the electric generator is loaded and with quick closing by a signal from the system is installed on the gas supply line to the turbine expander automation formed by an external switch on or by a protection unit when the operating parameters of the unit and processes deviate beyond specified limits with the possibility of simultaneously removing the load from the generator and closing the shut-off element.
  • the turbo-expander has a strength calculated for the highest accepted level of gas pressure
  • the chamber has a strength calculated at a pressure less than the highest accepted by the magnitude of the degree of expansion of the gas in the turbo-expander.
  • a gas reducer can be installed on the gas supply line to the turbo-expander to maintain its pressure not higher than the required one
  • safety valves can be installed on the outlet pipe connected to the chamber, which can be activated when the gas pressure in the chamber rises above the specified level, for which the strength of the chamber was calculated, and their total flow area selected is greater than the cross section of the nozzles of the turbo expander.
  • the chamber has dimensions determined on the basis of the dimensions of the generator of the highest power in the used power range, and the turboexpander has the dimensions of the flow part and power calculated from the condition that the generator reaches its rated power at the lowest specified gas pressure at the inlet to the turbine expander.
  • the throttle-dispenser is connected to one group of nozzles and to a gas supply pipe to the turbo-expander equipped with the indicated shut-off element, and the unit is equipped with a collector, connected to the remaining groups of nozzles of the turbo-expander and with the specified pipeline for supplying gas to the turbo-expander for starting, putting the electric generator in synchronism with the external network and developing 5-10% of the rated power when gas is supplied through the throttle-dispenser to fully charge the electric generator with additional gas supply through the collector.
  • one or more metering throttles connected to one or more groups of nozzles are connected to a manifold connected to the gas supply line to the turbo-expander to provide gas supply through the throttle-metering or throttle-metering devices while regulating the gas supply to nozzles during start-up and commissioning of the generator in synchronism with the power grid, and at its rated load and other operating modes of the unit.
  • the flow part of the turboexpander has parameters, namely, the number and sizes of the groups of nozzles and pipelines included in it, connecting them to the manifold outputs or with the throttle-dispenser, calculated from the condition of ensuring optimal efficiency when changing the gas pressure at its inlet in 4-5 times, gas consumption by 4-6 times and turbine expander power by 3-4 times.
  • the generator is made with the possibility of using it when starting up the unit as an electric motor and spinning its own rotor and turbine expander shaft when voltage is applied to it from an external electric network to a frequency synchronous with the electric network and with the possibility of transition after that and after gas supply to the turbo expander nozzles from engine mode at generator mode with equality of the power consumed by the unit and the power generated by it and the output to the nominal mode.
  • nozzles are divided into several groups, one group of nozzles is connected to the gas supply pipe through the specified metering throttle, and the rest is through a manifold connected to the shut-off device anom.
  • the number of nozzles connected to the gas supply pipeline during operation of the power drive is determined on the basis of the conditions for achieving the rated power with maximum efficiency at the lowest pressure of the source gas.
  • the degree of expansion of the gas is selected based on the given temperature of the gas at the output of the power drive at the highest temperature of the gas entering the power drive from the source.
  • the technical result is also achieved by the fact that in a gas refrigerator containing heat-insulated chambers with a closed opening and heat exchangers, according to the invention, a heat exchanger and a fan are placed in each chamber, to ensure storage of products at different temperatures, the heat exchangers are connected in series and on pipelines for supplying cold gas to each heat exchanger locking and regulating bodies are installed with the possibility of maintaining the first along the cold gas chamber of the lowest air temperature and a successively increasing air temperature in subsequent chambers.
  • each chamber can be equipped with an air temperature control system associated with temperature sensors located in the chamber, with a shut-off regulating body and with a fan with the possibility of changing the supply of cold gas to the heat exchanger and / or the fan rotation speed depending on the set and actual air temperatures in the cameras.
  • At least one chamber can be connected to an autonomous refrigeration producer with the possibility of taking part of the air from the chamber, cooling it and returning it to the chamber to maintain the set temperature in it.
  • the outlet pipe of each heat exchanger can be connected through a shut-off element to the hot air blower connection unit, and a discharge candle can be connected to the heat exchanger inlet through the shut-off element to exit the gas exchanger first, and then hot air.
  • methane concentration sensors can be installed at the upper points of each chamber, which are connected through a signal converter-amplifier to an automation and protection system connected to a shut-off element installed on the gas supply pipe to the corresponding heat exchanger, as well as to an exhaust ventilation system. It is advisable that the heat exchangers and pipelines located inside the chambers are made without detachable connections, and the shut-off bodies are placed outside the chambers.
  • the technical result is also achieved by the fact that in an ice machine containing a thermally insulated chamber, in which a droplet-forming device with means for spraying water is placed, a fan, a heat exchanger and an ice receiving device in the lower part of the chamber, according to the invention, are placed in said thermally insulated channel and connected to pipelines for supplying and discharging cold gas with locking elements, the specified channel is connected by its inlet to the upper part of the chamber, and the output is openings in the side walls of the chamber to enter the cooling air chamber.
  • the droplet generator can be connected to another heat exchanger to supply water cooled with cold gas.
  • the device for receiving ice is an ice storage device in the form of a tank located at the bottom of the chamber with inclined walls and a balancer, mounted on an axis and connected with a fixing device with the possibility of unlocking and tipping the drive when filling it with ice due to the asymmetry of the drive and the return of the drive freed from ice in the starting position due to the moment from the balancer and fixing the drive.
  • the inner surfaces of the chamber of the ice maker and the storage tank are preferably coated with a water-wettable material, for example, Teflon.
  • the ice maker can also be equipped with a conveyor belt and an ice storage located under the drive, in which a transportable distributor is installed for feeding ice briquettes onto it from the drive using a conveyor belt, and other belt conveyors are attached to the distributor for laying ice briquettes on the ice storage floor one on another or on shelving.
  • the entrance to the ice storage can be combined with the exit for ice from the chamber, and an ice crushing unit can be installed at the exit from the ice storage to turn ice briquettes into marketable ice of a given structure.
  • the complex use of natural gas energy when it is supplied to the consumer is carried out through an expander connected to the high pressure pipeline, in which natural gas expands with decreasing temperature and mechanical energy is removed to drive the energy consumer, for example, an electric generator, and then the cooled gas passes through the heat exchangers of the refrigerator and the ice maker in which it is heated, its temperature rises, and then it enters the pipeline that discharges gas to consumers.
  • gas is supplied to consumers through one or more expanders connected in series, parallel or combined, the temperature difference of the gas stream passing through the expander is measured, and depending on the value of this difference, the gas stream is directed either to a heat exchanger where it is heated for due to cooling of the ambient air, or to the next series-connected expander.
  • an energy-refrigerating unit including an expander that generates mechanical energy, a consumer of mechanical energy, for example, an electric generator, a gas supply and exhaust system, a system for regulating the unit's operating mode, etc.
  • the degree of gas expansion in the expander of each energy-refrigerating unit should be such that the temperature of the gas after expansion should be in a predetermined interval suitable for direct beneficial use of the cold contained in the gas stream. For example, when using the arising cold in the refrigerator for storage food gas temperature should be in the range of minus 20-30 0 C.
  • the inputs of the expanders of energy-refrigerating units included in the unit it is possible to connect pipelines to one collector, which is connected to high-pressure gas source, and the outputs also to one low-pressure manifold (i.e.
  • a turboexpander is used as an energy drive in an energy-refrigerating unit, i.e. a blade machine comprising a housing with gas supply and exhaust pipelines, a rotor with blades mounted on a shaft connected to the electric motor shaft by means of a coupling, a nozzle apparatus divided into groups, gas jets after which interact with rotor blades, a gas flow meter, communicated pipelines with nozzles, a dispenser control system for regulating gas flow, which includes a modulator with a rotor shaft speed sensor connected via an electronic unit and a signal amplifier to an executive device stvom providing the desired change in the flow cross section of the dispenser at the start, output and maintaining the nominal idle speed and load change.
  • a blade machine comprising a housing with gas supply and exhaust pipelines, a rotor with blades mounted on a shaft connected to the electric motor shaft by means of a coupling, a nozzle apparatus divided into groups, gas jets after which interact with rotor blades, a gas flow
  • the gas flow meter can be made in the form of a rotary or spool throttle located in the housing with a drive from a lever or electromagnetic system.
  • a controlled gas meter At sufficiently high pressure of the gas source, it is desirable to supply the entire stream to the turboexpander through a controlled gas meter at all operating modes from start-up to full load, and at low gas source pressures it is advisable to supply only part of the gas stream through the meter, i.e. to one of the groups of nozzles to ensure the start-up of the unit, output to the rated idle speed and their maintenance, synchronization of the generator with the mains and reception of a partial load. Further increase the load by smoothly opening the controlled shut-off device and supplying gas to the other groups of nozzles of the turbo-expander. It is desirable that this controlled shut-off device was able to open slowly (30-40 s) and close quickly (0.3-0.5 s). In this case, it can be used in the protection system of the unit when its defining parameters deviate from the permis
  • the excess of cold formed during the full load of energy-refrigerating units is used for ice production and stored for intensive use in the trade of chilled products in the warm season.
  • the ice generator heat exchanger in which the process of continuous freezing of water droplets sprayed with nozzles in the air space of the heat-insulated chamber of the ice generator is organized.
  • drops of water are proposed to be thrown out of the nozzles towards or at an angle to the cold air stream, coming from the heat exchanger.
  • FIG. L shows a block diagram of the proposed system - energy refrigerating complex
  • figure 2 energy refrigerating complex
  • Fig.Z energy refrigeration unit
  • figure 4 gas refrigerator
  • figure 5 ice machine with ice storage, functional diagram.
  • Preferred Embodiment Figure l presents a block diagram of a system that implements the proposed method is an energy-refrigerating complex showing the relationship of its components with each other and GDS.
  • the energy-refrigerating complex includes a power unit 100 of energy-refrigerating units, a gas refrigerator 101 and an ice maker 102 with an ice storage 103. All these components are connected by gas pipelines to each other and to the gas pipelines of the GDS 104 (dashed lines).
  • Each object that makes up the energy-refrigerating complex produces its own positive effect:
  • the high-pressure natural gas enters the turboexpander of the energy-refrigerating unit, in the nozzle apparatus of which the potential energy of the gas is partially converted into kinetic energy with a decrease in its temperature.
  • the jets of gas at a high speed act on the blades of the rotor of the turbo expander, bringing it into rotation, which, in turn, performs work on external objects, for example, drives an electric generator.
  • the difference in gas temperature at the inlet and outlet of the turboexpander is determined by the degree of expansion of gas in it.
  • the gas as a refrigerant, is sent to the heat exchangers of the refrigerator or to the heat exchangers of the refrigerator and the ice maker at the same time. It depends on the amount of gas passing through the turbo expander.
  • the degree of gas expansion in each turboexpander take the same and sufficient in value for the required reduction in the temperature of the gas stream for the purpose of its use as a refrigerant for a refrigerator and an ice maker. This temperature difference is measured, and if necessary, for a deeper cooling of the gas stream, it is sent not to the heat exchanger of the refrigerator, but to the next series-connected turbo expander, in which the second stage of gas expansion is realized, and then sent to heat exchangers for useful use, etc.
  • air with a lower temperature is additionally supplied to the refrigerator chambers from a low-power independent compressor refrigeration unit so that after mixing the air cooled in the heat exchangers with gas refrigerant and air, fed additionally from this unit, the air temperature in the refrigerator has reached the required level.
  • the heat exchangers of the chamber with the lowest temperature of air circulating in it are connected first to the source of cold gas - a turbo-expander or low-pressure gas collector, for example, minus 18-20 0 C, then the heat exchangers of the chamber in which air with higher temperature should circulate are connected in series for example, minus 7-8 0 C and, finally, a chamber heat exchanger is connected in which air with a temperature of about O 0 C is to be circulated. This way, the controlled and most complete selection of the cold produced by turbo expanders is performed.
  • gas with the required pressure and temperature which is in the acceptable range based on ensuring normal operating conditions for equipment, technical means and equipment of the gas transmission system and gas consuming objects, is sent to the pipeline supplying gas to the consumer. It is known that the minimum gas consumption falls on the summer warmest period of the year, and it is at this time that refrigerators operate most intensively, and they need the maximum amount of cold. In this regard, the calculation of the supply of refrigerators with cold is carried out to minimize the passage of gas through the turbine expanders. During this period, the ice maker is turned off or turned on with minimal capacity.
  • the refrigerator With a decrease in the ambient temperature, the refrigerator’s need for cold somewhat decreases, and gas consumption increases, and consequently, the gas flow from the high pressure source to the consumer through the energy refrigeration complex also increases. This leads to an increase in electric power and cooling capacity, and, consequently, to an excess of cold.
  • an ice machine is used, which uses time-varying excess cold to produce ice, which is partially consumed, and is mainly sent to the ice storage for accumulation by the summer period - when the demand for it is especially high.
  • a gas flow regulator is included in the gas system along the bypass line between the low-pressure gas collector after the turbo-expanders and the gas outlet pipe to the consumer, which maintains a steady-state gas pressure in the specified manifold than in the gas outlet pipe to the consumer with a decrease in gas passage through the refrigerator and the ice maker.
  • a pressure reducing valve is installed at its inlet, with which the gas pressure at the inlet to the unit is reduced to the calculated value.
  • high-pressure gas in addition to transferring mechanical energy, performs a useful function of the refrigerant in refrigeration devices and only after such complex use of it energy potential is supplied to the consumer with the required reduced pressure and temperature acceptable for the transport and use process.
  • a temperature sensor with a limiter is installed at its inlet, the pulse from which enters the automation system, which sequentially shuts down energy-cooling units to setting the gas temperature above an acceptable level.
  • the system that implements the method is a power unit of energy-refrigerating units, a functional diagram of which is shown in figure 2.
  • the power unit is connected to a high-pressure gas source through a supply pipe containing a sequentially arranged shut-off element 1, a filter 2, a heat exchanger 3, a throttle valve block 4, and connected to a gas supply pipe to a consumer through a metering device 5 and a shut-off shut-off element 6.
  • To pipelines connecting these elements at points A, B, C are connected pipelines with locking elements 7.
  • two locking bodies 8 are installed in this connection system.
  • the pipeline connecting the locking elements 7 is connected to a gas reducer 9, behind which a locking and regulating body 10 is installed, located at the inlet of the first energy-refrigerating unit, consisting of an electric drive with a blade machine - a turboexpander and an electric generator.
  • the power drive includes a gas metering throttle 11, a turbo expander 12, a rotational speed controller 13 of the turbine expander rotor shaft, mechanically or electrically connected to the throttle batcher 11.
  • the shaft of the turboexpander 12 with the rotor mounted on it (a blade machine) is connected, for example, by means of a coupling, to the shaft of the electric generator 14.
  • the output of the next turboexpander 12 will retain the same temperature difference of gas 12-25 C, as at the output of the previous turboexpander 12 and in the next heat exchanger 16 of an external refrigeration device (gas refrigerator or ice maker ) the same conditions as for the previous heat exchanger 16 are realized for an effective coolant, i.e. minus 12-25 0 C.
  • the gas is sent to the next turboexpander 12, bypassing the heat exchanger 16. Otherwise, if the need for cold is less than the available refrigerating capacity, the gas after cleaning Before entering the turbo-expander system, the gas expansion in the turbo-expander is preheated or reduced.
  • an ice maker with an ice storage box is connected in parallel with the gas refrigerator, in which the ice reserve is formed in the autumn-winter-spring periods, when cold output exceeds cold demand.
  • This stock is mainly used in the summer.
  • high-pressure natural gas in addition to transferring mechanical energy to external devices, functions as a coolant for external refrigeration devices to ensure the required temperature regime of the refrigeration chambers, and enters the pipeline leading to the gas consumer under reduced pressure and at such a temperature that are allowed by the operating conditions of the relevant equipment used in gas production sites or at gas distribution stations.
  • the output of the turboexpander 12 through a check valve 15 is connected to the inlet to the heat exchanger 16 by a pipe 17, in which a controlled shut-off element 18 is installed in front of the heat exchangers 16.
  • the inlet pipe 17 and the outlet pipe 19 of the heat exchangers 16 are connected by controlled shut-off bodies 20. This arrangement of the shut-off bodies 18 and 20 allows the gas stream that has passed the expansion stage in the turboexpander 12, either enter the heat exchangers 16, or, bypassing them, to the next expansion stage.
  • a condensate collector 21 can be placed, made, for example, in the form of a tank with a float valve, from which the gas condensate flows through a separate pipeline into an inhabited storage tank.
  • the output pipe 19 of the heat exchanger 16 of the first gas expansion stage is in communication with the next turbine expander 12, which enters the second gas expansion stage, containing the same structural elements as the first stage of expansion, as described above.
  • the outlet pipe 19 of the heat exchanger 16 is communicated by a pipe 22 through a shut-off element 8, a metering device 5 and a shut-off element 6 with a gas line leading to the consumer.
  • a bypass pipe 23 can be introduced into the power unit structure, connected to the gas supply line to the first between the gearbox 9 and the first shutoff body 10, and communicated with the inlet 17 and outlet 19 pipelines of each of the heat exchangers 16.
  • pipelines 17 and 19 are installed shut-off bodies, respectively, 24 and 25, and shut-off bodies 26 and 27 are installed in the bypass pipe 23 so that in the event of a decrease in gas pressure at the inlet of the gas main or an emergency situation that causes one or more goholodilnyh aggregates, the gas flow could be directed to bypass any consumer turboexpander 12 and heat exchanger 16.
  • bypass pipe 23 allows you to use in all cases the optimal number of units, and in emergency In situations, allowable cooling regimes in cold rooms and the pressure at the inlet of the line leading to the consumer to be maintained by venting gas from the main line of the unit to the bypass pipe.
  • the proposed system - energy refrigeration complex works as follows.
  • the gas stream enters through the shutoff member 7 through any of the three pipelines connected to the supply pipe at points A, B and C.
  • gas to the reducer 9 comes from point "A" of the supply pipe.
  • the gas to the reducer 9 comes from point “B” of the supply pipe, passing through a heat exchanger where the gas is heated.
  • the gas having passed the gearbox 9 and the locking-regulating body 10, enters through the throttle-dispenser 11 the drive to the first turbo expander 12 of the energy refrigerating unit, where the gas expands and rotates the shaft of the electric generator 14.
  • the output of the turbo expander 12 measures, for example, a thermocouple lowering the temperature of the gas stream and, depending on its value, the gas through the check valve 15 and the condensate collector 21 sent either to the heat exchanger 16, or if the temperature decrease is not enough to implement the required operating mode of the refrigeration chambers, the gas stream is sent to the second turbine expander 12 To implement the next stage of gas expansion.
  • the closure member 20 is closed and the organ 18 is opened, and in the second case, vice versa, while the shutoff members 24 and 25 remain open.
  • the automation system closes the shut-off element 10 located in front of it, opens the organs 18 and 25, closes the organs 24, 26 and 27. In this case, the gas flow enters the first heat exchanger 16, and from it to the second stage of gas expansion through the open shut-off element 25. In order for the flow to be directed directly to the second stage of gas expansion, bypassing the first heat exchanger 16, the automation system additionally closes the shut-off element 18.
  • the automation system closes the shut-off element 25 and opens the shut-off element 27, as a result of which the gas, bypassing the turbo-expander 12 of the second expansion stage, is directed to the following heat exchangers 16 or, bypassing them, to turboexpander 12 of the next expansion stage, as was the case for the gas expansion stage, etc.
  • the rotor shaft speed controller 13 (independently or combined with the throttle batcher 11) of the turboexpander 12 through a mechanical connection acts on the gas throttle batcher 11 so that the gas flow rate can be adjusted to maintain the rotor rotor 12 rotor speed.
  • Energy refrigeration unit (Fig.Z) contains a camera body
  • capsule 28 in which an electric generator 30 and an expansion turbine (turboexpander) 31 are installed on the spars - foundation 29, the shaft of which is connected to the electric generator shaft using a coupling 32. Cables from the electric generator 30 are output through the capsule shell 28 using current leads 34, consisting of metal casing, boards made of insulating material and conductive rods embedded in them, as well as sealing elements.
  • High pressure gas is supplied to the turbine expander 31 from the manifold 35 via pipelines 36, and to the throttle-metering device 38 is supplied via a separate pipeline 37 with a controlled shut-off element 39, gas is supplied to the manifold 35 through a pipeline also equipped with a controlled shut-off element 40.
  • Pipeline 37 through which gas is supplied to the shut-off element 39, is connected to the gas supply pipe to a controlled shut-off element 40.
  • the control units of the shut-off bodies 39 and 40 are electrically connected to the electronic unit - automation system 49, cat compassion includes protection unit block, and selecting pneumo-electric embodiment the execution of the locking elements 39 and 40, they are still connected by impulse tubes to the gas supply pipe until they enter the locking body 40. Gas from the unit capsule 38 is discharged into the pipeline through the pipe 41.
  • the protection unit contained in the automation system 49 gives impulses for unloading generator 30 and simultaneous emergency (less than one second) closing of the locking elements 39 and 40.
  • Another version of the gas supply system of the unit which is used at higher gas pressures, provides for regulation e of the total amount of gas that is supplied to the turboexpander 31 using one or more throttle batchers 38, which are connected by their inlets via pipelines to the manifold 35 without installing a shut-off element 39.
  • the third embodiment of a system for supplying high pressure gas to a turboexpander 31 includes a voltage reduction unit 42, which is connected to the power grid on the one hand, and the generator exciter on the other, and also block 43 (contactor), which connects the generator to the power supply and a controlled locking device 40, through which high-pressure gas is supplied to the manifold 35 of the unit, pipelines that connect this manifold 35 to the turbine expander 31.
  • Power drive with a shovel machine - a turboexpander is an integral part of an energy refrigeration unit.
  • the power drive includes a housing 44, one of the above systems for supplying gas to the nozzle groups 47 of the blade machine 31, a rotor 45 with blades, which is mounted on the shaft 46, a bearing, a gas throttle batcher 38 (one or more), which is connected by a pipe with nozzles 47 regulation system and maintaining the rotor speed 45, which includes a gas supply controller 48 through the metering throttle 38 using mechanical or electromagnetic coupling, the automation system electronic unit 49 is a signal converter, an induction speed sensor 50, and a modulator 51.
  • Energy-refrigerating unit with an energy drive in the form of a spatula machine works as follows. High-pressure gas enters the controlled shut-off devices 39 and 40. When the unit is started on impulse from the automation system (“Pycc” button), the shut-off element 39 is opened, and the gas through the throttle batcher 38, controlled by the rotor speed controller 48, enters the group nozzles 47. Passing through nozzles 47, the gas expands, its pressure decreases, and the speed increases, jets of gas act at high speed on the blades of the rotor 45 and, thereby, rotate the shaft 46, and this shaft, in turn, leads to rotation driven shaft Rathore 30 through the coupler 32.
  • the throttle batcher 38 is controlled by a regulator 48, to which a signal converter is supplied from the electronic unit 49 the electronic current, the magnitude of which, and, consequently, its effect on the flow area in the throttle batcher 38, is changed by the “weak” current pulse from the induction sensor 50, which interacts with the modulator 51.
  • the sensor 50 When starting after the shaft 46 reaches a certain speed, the sensor 50 starts to supply electrical impulses to the electronic unit 49 of the automation system, which converts them and compares them with the setting to ensure the nominal speed of the shaft 46.
  • the presence of a mismatch between the actual and nominal speeds of the shaft 46 determines the amount of current supplied to the regulator 48, which accordingly increases or decreases the gas cross section in the throttle batcher 38 until the nominal speed of the shaft 46 is established, and After that, the control system (from the sensor 50 to the throttle metering device 38) maintains the nominal idle speed of the turbo expander with the electric generator 30.
  • an external impulse (manually or using an automation system) is applied to open the main valve 40 for supplying gas to the turbo-expander 12, which opens smoothly (within 30-50 s), gradually increasing the load on the electric generator 30 to a maximum value, and the electricity generated by the unit through cables through sealed current leads 34, through a contactor 43 and a disconnecting cell and other devices is transmitted to external power supply.
  • the unit stops (“Stop”), the load is removed from the electric generator 30, and at the same time the controlled locking elements 39, 40 are closed and the metering choke 38 is closed.
  • the voltage, frequency and current of the generator, as well as the temperature of the bearings, etc. are deviated.
  • pulses are sent to the protection unit 53, which, in turn, gives an impulse to the emergency stop of the unit according to the same algorithm as when the "Stop" button was pressed.
  • the protection unit 53 gives an impulse to the emergency stop of the unit according to the same algorithm as when the "Stop" button was pressed.
  • the second version of the gas supply system and regulation of the unit’s operating mode when higher pressure gas is supplied to it, and it is possible to pass the entire gas stream through, for example, two or three metering chokes 38, controlled shut-off bodies 39 are not installed in front of them, metering choke 38 by pipelines it connects directly to the manifold 35, to which gas is supplied through the shut-off element 40. Starting and loading with this design of the unit, its stopping and protection are carried out according to the same algorithm as described above.
  • the controlled shut-off element 40 When starting up the unit, the controlled shut-off element 40 is closed, the generator 30 is connected to the external power supply using the “Pyck” button 42, and the rotor of the electric generator 30 is powered by current rotation (the electric generator starts as an electric motor together with the turbine of the expander), accelerates to a sub-synchronous speed and then the electric generator (as a synchronous electric motor with a short-circuited rotor) enters into synchronism with an external power supply network. After that, the power supply of the electric generator 30 with the current from the network is switched to full voltage by turning off the unit 42, and a pulse is applied to open the controlled locking element 40, which opens smoothly (within 30-50 s).
  • the unit is stopped and protected by simultaneously removing the load from the electric generator 30 and stopping the gas from entering the turboexpander 12 by urgently (within 0.5 s) closing the controlled shut-off element 40, which has an additional device (unit) 54 to guarantee closing and when the system is de-energized, for example, a short circuit in the external network or a power failure to the automation system of the unit.
  • the gas refrigerator (figure 4) contains the actual refrigerating chambers 55, in which heat exchangers 56 are located with fans 64 that take in heated air, blow it through heat exchangers, and this ensures cooling and air circulation in the chamber.
  • the gas inlet into the internal cavity of the first in-line gas heat exchanger 56 (first chamber) is connected by a pipe equipped with a regulating-locking body 57 with a collector that receives cold gas from energy-refrigerating units, and the output of the heat exchanger 56 can be connected by a pipe to the input of a series-connected heat exchanger, which is located in the next (second) refrigerator, where a higher air temperature is required than in the first refrigerator.
  • the gas outlet from the heat exchangers of the refrigerator is connected by pipelines to the gas pipeline through which gas is supplied to the consumer.
  • FIG 4 shows only two refrigeration chambers 55 (first and second) of the refrigerator (separated by a transport corridor) in which heat exchangers 56 are located.
  • the inlet of the heat exchanger 56 which is placed in the first chamber 55, is connected by a pipeline with a regulating shut-off element 57 to a collector into which cold gas comes from energy-refrigerating units, and their outlet is connected by a pipe equipped with a shut-off element 58 to the inlet of the heat exchanger 56, which is located in the second chamber, and the outlet is connected by a pipe with a shut-off element 79 to the pipe gas supply wire to the consumer.
  • the gas pipeline to the entrance to the first chamber 55 is equipped with a “special candle” with a shutoff body 59, and in the transport corridor of the refrigerator (up to the shutoff body 58 along the gas path), a pipeline equipped with a shutoff body is connected to the gas exhaust pipe from heat exchangers 56 60 and the connection unit 61 of the hot air source for thawing heat exchangers 56 through certain time intervals.
  • the heat exchanger located in the second refrigerating chamber is equipped with the same pipeline and a discharge candle.
  • additional cold can be supplied to the first refrigerating chamber 55 from an autonomous refrigeration producer 62, for example, from one that is installed on refrigerated trucks.
  • Such an assembly is connected by air ducts 63, 72 to the chamber 55, through which it takes air from the refrigerating chamber 55 and after cooling returns air back to the chamber 55.
  • methane concentration sensors 68 are installed, which are connected through an electronic converter 69 to the system
  • the electric motors of the fans 64 of the heat exchangers 56 through the control unit 65 are connected to the automation system 66, which enables them to turn on, control the mode and stop.
  • the refrigeration chambers 55 are equipped with remote sensors 67, which are electrically connected to the automation system 66, which uses their pulses to act on the electric motor control unit 65 of the heat exchanger fans 64 to provide a predetermined average air temperature in each chamber.
  • sensors 67 which are electrically connected to the automation system 66, which uses their pulses to act on the electric motor control unit 65 of the heat exchanger fans 64 to provide a predetermined average air temperature in each chamber.
  • the temperatures of the first chamber 55 also act through an automation system on an autonomous refrigeration producer 62.
  • Gas refrigerator operates as follows. When a power unit operates with energy-refrigerating units, electricity is generated due to the expansion of gas, which is cooled, the cooling temperature is determined by the degree of gas pressure decrease and turboexpander efficiency. This Cooled gas through a controlled regulating shut-off element 57 enters heat exchangers 56 located in refrigeration chambers 55, in which air is circulated, driven by fans 64 through heat-exchanging surfaces of apparatus 56, and thus, cold is removed from them to cool chambers 55, and the gas temperature the output of the heat exchangers 56 is accordingly increased. In a gas refrigerator, one-, two-stage and three-stage selection of cold from incoming cold gas can be carried out.
  • the system maintains the average air temperature in the range of minus 18-20 0 C, and in the second chamber, where the second stage of taking cold from the gas takes place, the system maintains the average air temperature in the range of minus 7-9 0 C, and in the third stage, within minus 3 - plus 2 0 C.
  • heat exchangers 56 are designed for maximum cold volume, i.e. their heat-exchange surface must be such as to ensure that the specified temperature of the air in the chamber is maintained at the highest temperature of the gas coming from energy-refrigerating units.
  • the regulation of the volume of gas entering the heat exchanger 56 of the first chamber is carried out by means of a regulating-locking body 57, the opening mode of which is controlled by the automation system 66 according to a given level of air temperature in the chamber, by the pulse received from temperature sensors 67.
  • the same heat exchanger is installed as in the first chamber 55.
  • the lowest air temperature in the second chamber should be ensured at the highest temperature of the gas entering its heat exchanger, and the highest air temperature in the second chamber should be achieved by changing the operating modes of the fans 64 of the heat exchanger 56, driving air through them from the chamber the purpose of cooling it.
  • Regulation can be carried out, for example, by changing the speed of the fans 64 and turning off the fans.
  • the operation mode of the fans 64 is changed in order to maintain a predetermined air temperature in the chamber using an automation system 66, which receives a pulse from the air temperature sensors 67 in the chamber.
  • gas from the heat exchangers After the cold gas returns to the air of the second chamber, gas from the heat exchangers enters through the open shut-off element 70 into the gas supply line to the consumer. At the same time, its temperature is acceptable for normal and safe operation of technical means of transport and gas use by the consumer. Based on these conditions and ensuring maximum use of the generated cold in the gas refrigerator, it is planned to pass cold gas first through the heat exchangers of the chambers, in which the gas temperature should be maintained within minus 18-20 0 C, and then through the heat exchangers of the chambers connected to them in series where maintenance is required to ensure more high air temperature, for example, minus 7-9 0 C and D. With significant volumes of the refrigerator, in the presence of chambers with different adjustable air temperatures, it allows you to increase the range of products that can be taken into storage, and, therefore, provide the most complete load of the refrigerator and efficient use of the generated cold.
  • the design of heat exchangers and their pipelines is envisaged to be performed without detachable connections within the premises of refrigerators, i.e. cold rooms and transport corridor.
  • This ensures the safety of using cold natural gas as a refrigerant.
  • methane concentration sensors 68 at the upper points of the chambers 55 and in the corridor (inside), which transmit their pulses through block 69 at a concentration of up to 1% methane in air (explosive mixture of methane with air from 5 to 15 %) to the automation system 66, which, in turn, generates and sends pulses to close the regulating and locking element 57.
  • the locking elements 58 and 70 are closed and the hatch 71 and the locking elements 59 on the vent gas candles are opened. After the gas is discharged from the system, a gas leak is searched for and eliminated.
  • the locking elements 57, 58, 70 are opened, and the locking body 59 and the hatch 71 are closed. According to the operating conditions of the refrigerating chambers 55, the snow freezes on the heat transfer surfaces of the apparatus 56 and it is necessary to “heat” them - to defrost them at some time intervals. This operation, for example, for the first camera 55 performed in the following order.
  • the heat exchanger 56 is disconnected from the gas system by shutting off the shutoff members 57 and 58, and the gas is discharged onto the candle through the open shutoff member 59. Then, the shutoff member 60 is opened in the pipeline, and a hot air source that passes through the pipelines is connected to the assembly 61 through internal cavity of the heat exchanger 56 and through the candle with the open shut-off body 59 goes into the atmosphere. This continues until the heat transfer surfaces of the heat exchanger 56 are cleared of frozen snow. After that, the locking bodies 59 and 72 are closed, the locking bodies 57 and 58 are opened and the camera is thus turned on. The same operations are performed when defrosting the heat exchanger of the second chamber and other subsequent chambers. The chambers provide the necessary conditions for the flow of water generated during the defrosting of heat exchangers.
  • the ice generator (Fig. 5) contains a heat-insulated chamber 73, a device 74 for supplying water into the chamber in the form of droplets of adjustable size, a heat exchanger 75 with a fan 76, the internal cavity of the apparatus is connected by a pipeline equipped with a regulating and shut-off element 77 with a source of cold gas, and the output is with a gas supply pipe to the consumer through the shut-off element 94.
  • the heat exchanger 75 is placed in a heat-insulated channel 78, through which air from the freezer chamber 73 enters the fan 76, which blows it through the outer surface s and the heat exchanger 75, after the air has cooled after passing through this apparatus, it returns to the chamber 73 through inlet channel 79 devices 80 that can adjust the direction of air movement.
  • a device 83 for example, spring, electromagnetic or other type.
  • the inner surfaces of the chamber of the ice maker 73 and the ice storage are covered with a water-non-wettable material, for example, Teflon, etc.
  • a conveyor 84 is placed, which partially goes into the ice storage room (not shown).
  • a conveyor system is placed in the ice storage, the number and dimensions of which are determined based on the area and configuration of the ice storage.
  • the ice storage facility can also be equipped with shelves for storing ice briquettes and a block for preparing commercial ice (ice crusher).
  • the walls and roof of the ice storage are made of insulating materials.
  • a device 74 for supplying droplet water to the chamber is connected by a pipe equipped with a regulating-shutoff body 89 to a water-gas heat exchanger 87, the inlet of which is connected to a cold gas source by a pipe equipped with a regulating-shutter 88.
  • the gas outlet from the heat exchanger 87 by a pipe equipped with a shutoff body 90 is connected to a gas supply line to a consumer.
  • a temperature sensor 91 is installed in the chamber 73, which is electrically connected to the automation system 92, which provides control of the regulating-locking member 77 and the operation mode of the fan 76.
  • a temperature sensor 93 is installed in the droplet forming device 74, which is electrically connected to the automation system 92, which controls the shut-off and regulating organs 88 and 89.
  • Ice machine with ice storage work as follows.
  • the essence of the method of ice formation is that drops of water pre-cooled to a temperature of 0-2 0 C in the heat exchanger 87, which fall out of the nozzles of the device 74, fall into the oncoming flow of cold (temperature to minus 30 0 C) air, which is pumped into the chamber by a fan 76 of the heat exchanger 75 through the channel 79 and the guide pipes 80, which inhibits the drop of droplets inside the chamber and this increases the residence time of the droplets in the cooled air, which is sufficient to freeze them, and in the lower tapering st chamber 73 and tank 81 falls ice ice balls.
  • the operation of the ice maker begins with cooling the air, "which is in the chamber 73. To do this, open the shut-off bodies 90 and 94, then using the" Pyc "button, using the automation system 92, the fan 76 and the control-shut-off element 77 are turned on simultaneously, through which the cold gas from the source it is supplied to heat exchangers 75 and 87, while a temperature sensor 91 monitors a decrease in air temperature inside the chamber 73.
  • a pulse is received in the automation system 99, opening the shut-off bodies 88 and 89
  • cold gas and water enter the heat exchanger 87, in which the water is cooled to a temperature of 0-minyc 2 0 C, and then the water enters through a pipeline, droplet formation device 74, at the exit of the nozzles of which droplets are formed which fall into the cold upward air flow. While there is sufficient time in this stream, water droplets turn (as the chambers 73 move downward) into ice balls that fall into the accumulator 81 mounted on axis 82.
  • the ice accumulator 81 has an asymmetric profile with respect to axis 83 and when it is filled with ice balls a vertical force A arises to the upper level, the tilting moment from which is greater than the counterbalancing moment of the counterweight 85, which leads to a certain inclination of the drive 81 in the tilting direction, and the device 83, which releases ice accumulator 81, it capsizes around the axis 82, and the ice briquette hits the conveyor 84, and the ice accumulator 81 returns to its original position under the influence of the moment, which creates a counterweight 85 and is fixed by the device 83. Then this process is repeated.
  • Conveyor 84 moves the ice briquette to the ice storage distributor, from which, using conveyors and elevators, the ice briquettes are transported to the places of their storage.
  • it is cut into pieces and then passed through an appropriately configured ice crusher, after which marketable ice is loaded onto a vehicle using a conveyor and sent to its intended destination.
  • it is reduced by connecting to the ice machine an autonomous traditional low-power refrigeration producer, similarly to the chambers of a gas refrigerator.
  • the requirements for the design of the heat exchanger, pipelines and the placement of shut-off bodies with regard to the exclusion of detachable joints remain the same as for a gas refrigerator.
  • the process of thawing the heat exchange surface of the apparatus is carried out in the same way and by the same means as described in relation to a gas refrigerator.
  • the present invention can be applied in power generation facilities and in cooling systems through the use of technological pressure differences of natural gas, primarily in gas distribution systems, as well as in gas production sites and at compressor stations.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Separation By Low-Temperature Treatments (AREA)

Abstract

L'invention concerne un procédé d'utilisation intégrée et optimisée de la pression excessive d'un gaz subissant une réduction dans les stations de distribution de gaz à des fins de production d'énergie électrique, de froid et de glace d'eau sans brûlage de combustible et, partant, sans effets adverses sur l'environnement. L'invention concerne également les dispositifs nécessaires à la mise en oeuvre de ce procédé. Selon l'invention, l'énergie de pression excessive du gaz dans les stations de distribution de gaz est transformée en énergie mécanique au moyen d'une machine de dilatation (un détendeur) d'une installation de réfrigération électrique, ladite énergie mécanique étant également utilisée pour entraîner la génératrice électrique de cette même installation de réfrigération électrique; le gaz refroidi grâce à sa dilatation dans le détendeur et grâce au travail externe est utilisé en tant que fluide de refroidissement pour refroidir l'air dans les chambres du réfrigérateur et du générateur de glace au moyen d'échangeurs de chaleur reliés aux sorties des installations de réfrigération électrique correspondantes ou au collecteur relié aux sorties des installations de réfrigération électrique. Le système de mise en oeuvre de ce procédé comprend les unités mentionnées ici. L'invention concerne également les structures d'une installation de réfrigération électrique comprenant un détendeur turbo et une génératrice électrique, un entraînement énergétique muni d'une machine à aubes, un réfrigérateur à gaz et un générateur de glace avec un dépôt de glace utilisé dans le système.
PCT/RU2005/000440 2005-08-30 2005-08-30 Procede de preparation du gaz naturel destine a etre fourni au consommateur, avec utilisation integree de l'energie du gaz naturel, systeme destine a sa mise en oeuvre, installation energetique de refroidissement et entrainement energetique muni d'une machine a aubes, refrigerateur a gaz et generateur de glace WO2007027119A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/RU2005/000440 WO2007027119A1 (fr) 2005-08-30 2005-08-30 Procede de preparation du gaz naturel destine a etre fourni au consommateur, avec utilisation integree de l'energie du gaz naturel, systeme destine a sa mise en oeuvre, installation energetique de refroidissement et entrainement energetique muni d'une machine a aubes, refrigerateur a gaz et generateur de glace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/RU2005/000440 WO2007027119A1 (fr) 2005-08-30 2005-08-30 Procede de preparation du gaz naturel destine a etre fourni au consommateur, avec utilisation integree de l'energie du gaz naturel, systeme destine a sa mise en oeuvre, installation energetique de refroidissement et entrainement energetique muni d'une machine a aubes, refrigerateur a gaz et generateur de glace

Publications (1)

Publication Number Publication Date
WO2007027119A1 true WO2007027119A1 (fr) 2007-03-08

Family

ID=37809129

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/RU2005/000440 WO2007027119A1 (fr) 2005-08-30 2005-08-30 Procede de preparation du gaz naturel destine a etre fourni au consommateur, avec utilisation integree de l'energie du gaz naturel, systeme destine a sa mise en oeuvre, installation energetique de refroidissement et entrainement energetique muni d'une machine a aubes, refrigerateur a gaz et generateur de glace

Country Status (1)

Country Link
WO (1) WO2007027119A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2478811A (en) * 2009-12-23 2011-09-21 2Oc Power and cooling system for a data centre

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU411277A1 (fr) * 1969-09-29 1974-01-15
GB2103354A (en) * 1981-08-03 1983-02-16 Olajipari Foevallal Tervezoe Gas transfer station
RU2098713C1 (ru) * 1996-08-13 1997-12-10 Дмитрий Тимофеевич Аксенов Способ использования энергии перепада давления источника природного газа, энергохолодильный агрегат и турбодетандер в виде энергопривода с лопаточной машиной
RU2119133C1 (ru) * 1996-09-20 1998-09-20 Закрытое акционерное общество "Криогенная технология" Холодильная установка
RU20778U1 (ru) * 2001-04-09 2001-11-27 Аксенов Дмитрий Тимофеевич Пневмоэлектрогенераторный агрегат
RU2196238C2 (ru) * 2000-08-16 2003-01-10 ТУЗОВА Алла Павловна Способ утилизации энергии расширения природного газа
RU2264581C1 (ru) * 2004-04-05 2005-11-20 Аксенов Дмитрий Тимофеевич Способ подготовки природного газа к подаче потребителю с комплексным использованием энергии природного газа, система для его реализации, энергохолодильный агрегат и энергопривод с лопаточной машиной, газовый холодильник и льдогенератор

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU411277A1 (fr) * 1969-09-29 1974-01-15
GB2103354A (en) * 1981-08-03 1983-02-16 Olajipari Foevallal Tervezoe Gas transfer station
RU2098713C1 (ru) * 1996-08-13 1997-12-10 Дмитрий Тимофеевич Аксенов Способ использования энергии перепада давления источника природного газа, энергохолодильный агрегат и турбодетандер в виде энергопривода с лопаточной машиной
RU2119133C1 (ru) * 1996-09-20 1998-09-20 Закрытое акционерное общество "Криогенная технология" Холодильная установка
RU2196238C2 (ru) * 2000-08-16 2003-01-10 ТУЗОВА Алла Павловна Способ утилизации энергии расширения природного газа
RU20778U1 (ru) * 2001-04-09 2001-11-27 Аксенов Дмитрий Тимофеевич Пневмоэлектрогенераторный агрегат
RU2264581C1 (ru) * 2004-04-05 2005-11-20 Аксенов Дмитрий Тимофеевич Способ подготовки природного газа к подаче потребителю с комплексным использованием энергии природного газа, система для его реализации, энергохолодильный агрегат и энергопривод с лопаточной машиной, газовый холодильник и льдогенератор

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ZARNITSKII G.E.: "Teoreticheskie osnovy ispolzovaniya energii davleniya prirodnogo gaza", MOSCOW, NEDRA, 1968, pages 195 - 198, XP008078379 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2478811A (en) * 2009-12-23 2011-09-21 2Oc Power and cooling system for a data centre
GB2478811B (en) * 2009-12-23 2012-03-07 2Oc Data centre, and power and cooling system therefor

Similar Documents

Publication Publication Date Title
USRE44815E1 (en) System and method for chilling inlet air for gas turbines
US7856843B2 (en) Thermal energy storage system using compressed air energy and/or chilled water from desalination processes
CN101405547B (zh) 闪蒸罐、热泵、热泵系统、蒸汽喷射系统以及运行压缩机的方法
US9488102B2 (en) Gas turbines in mechanical drive applications and operating methods
EP3444448A1 (fr) Système et procédé pour convertir de le énergie électrique en énergie thermique et de stockage d'énergie thermique
US20160177822A1 (en) Hybrid Power Generation System
CN104797893A (zh) 空气调节装置
US11624318B2 (en) Thermal energy storage system comprising a packed-bed heat storage unit and a packed-bed cold storage unit, and method for operating a thermal energy storage system
WO2013025582A1 (fr) Système de stockage d'énergie à air comprimé modulaire de haute puissance (homc)
CN104813117A (zh) 空气调节装置
CA2667354A1 (fr) Systeme de stockage d'energie thermique utilisant l'energie de l'air comprime et/ou de l'eau refroidi provenant de processus de desalinisation
CN212057909U (zh) 一种多位连接的制冷蓄冷系统
AU2009302875A1 (en) Method and apparatus for using compressed air to increase the efficiency of a fuel driven turbine generator
RU2264581C1 (ru) Способ подготовки природного газа к подаче потребителю с комплексным использованием энергии природного газа, система для его реализации, энергохолодильный агрегат и энергопривод с лопаточной машиной, газовый холодильник и льдогенератор
US20120247114A1 (en) Water Cooling System For Intercooled Turbines
KR20150117635A (ko) 주변 공기 기화기와 냉각 활용을 위한 구성 및 방법
WO2007027119A1 (fr) Procede de preparation du gaz naturel destine a etre fourni au consommateur, avec utilisation integree de l'energie du gaz naturel, systeme destine a sa mise en oeuvre, installation energetique de refroidissement et entrainement energetique muni d'une machine a aubes, refrigerateur a gaz et generateur de glace
JP2005090636A (ja) 液体水素の輸送システム
US11092075B2 (en) High-capacity electric energy storage system for gas turbine based power plants
RU2365827C2 (ru) Устройство для изменения температуры воздуха помещения
RU2283462C1 (ru) Способ экологически безопасного использования холода, образующегося при расширении природного газа в детандере с отводом механической энергии, и система для реализации способа
RU55928U1 (ru) Система для экологически безопасного использования холода, образующегося при расширении природного газа в детандере с отводом механической энергии
JPH03185224A (ja) ガスタービン設備及びその運転方法
RU2783081C1 (ru) Система газификации сжиженного природного газа (СПГ) котельной
JP4006545B2 (ja) 高効率発電と昼夜電力需要負荷の平準化法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 05802940

Country of ref document: EP

Kind code of ref document: A1