WO2005071224A2 - Measuring device and drilling device for deep drillings - Google Patents

Measuring device and drilling device for deep drillings Download PDF

Info

Publication number
WO2005071224A2
WO2005071224A2 PCT/EP2004/014877 EP2004014877W WO2005071224A2 WO 2005071224 A2 WO2005071224 A2 WO 2005071224A2 EP 2004014877 W EP2004014877 W EP 2004014877W WO 2005071224 A2 WO2005071224 A2 WO 2005071224A2
Authority
WO
WIPO (PCT)
Prior art keywords
measuring device
measuring
packer
drill pipe
unit
Prior art date
Application number
PCT/EP2004/014877
Other languages
German (de)
French (fr)
Other versions
WO2005071224A3 (en
Inventor
Magdalena Rotthäuser
Original Assignee
Dtb Patente Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to AP2006003680A priority Critical patent/AP2006003680A0/en
Priority to MXPA06007946A priority patent/MXPA06007946A/en
Priority to US10/596,575 priority patent/US20070175663A1/en
Priority to JP2006549925A priority patent/JP2007518905A/en
Priority to BRPI0418436-0A priority patent/BRPI0418436A/en
Priority to AU2004314380A priority patent/AU2004314380A1/en
Priority to YUP-2006/0313A priority patent/RS20060313A/en
Priority to EA200601342A priority patent/EA200601342A1/en
Application filed by Dtb Patente Gmbh filed Critical Dtb Patente Gmbh
Priority to CA002544711A priority patent/CA2544711A1/en
Priority to EP04804461A priority patent/EP1706584A2/en
Publication of WO2005071224A2 publication Critical patent/WO2005071224A2/en
Publication of WO2005071224A3 publication Critical patent/WO2005071224A3/en
Priority to NO20061988A priority patent/NO20061988L/en
Priority to TNP2006000230A priority patent/TNSN06230A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/01Devices for supporting measuring instruments on drill bits, pipes, rods or wirelines; Protecting measuring instruments in boreholes against heat, shock, pressure or the like
    • E21B47/013Devices specially adapted for supporting measuring instruments on drill bits
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/003Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings with electrically conducting or insulating means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/028Electrical or electro-magnetic connections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells
    • E21B49/084Obtaining fluid samples or testing fluids, in boreholes or wells with means for conveying samples through pipe to surface

Definitions

  • the present invention relates to a measuring device according to the preamble of claim 1 and a drilling device according to claim 16.
  • EP 0 102 672 B1 discloses a measuring device for connection to a pipe string for deep drilling, with an electrically operated measuring unit for measuring relevant data, the measuring device being designed to supply electrical energy via the pipe string.
  • the measuring device converts soil properties into electrical signals and is driven into the soil for soil investigations. Due to the arrangement of the measuring device provided at the end of the drill pipe, only known measurement data can be recorded with the known measuring device which relate to the bottom area surrounding the measuring head at the end of the drill pipe. With the known measuring device it is not possible to record measurement data above the bottom of the borehole.
  • the object of the present invention is to further develop a measuring device according to the preamble of claim 1.
  • the measuring device can in principle be provided at any point in the drill string.
  • the measuring device can be arranged immediately after the chisel unit, so that measured values can be taken from the bottom of the borehole.
  • the arrangement of several measuring devices in a drill string is also readily possible.
  • the measuring device is supplied with electrical energy via the drill pipe. In the same way, the data or signal transfer from the measuring device to the surface takes place.
  • An evaluation device is then provided above ground, the measuring device being electrically coupled to the evaluation device. The electrical coupling serves on the one hand for data or signal transfer from the measuring device to Above ground and can also be used to transfer control commands.
  • the measuring device has a stable outer housing for receiving and thus for protecting the individual functional units.
  • the housing In order to be integrated into the drill string or the drill string or to be connected to parts of the drill string, the housing has screw connections at both ends.
  • the screw connections should preferably have an internal thread, so that the housing corresponds to a sleeve from the connection.
  • the functional units of the measuring device can include a converter, in particular a voltage converter, which converts the measuring signals received by the measuring unit, so that the converted signals, which may have a different frequency than the electrical energy supplied, are correctly recognized by the evaluation device.
  • the evaluation device can also be designed such that the measurement signals are derived from the energy consumption of the measurement unit.
  • the measuring unit can have a plurality of measuring devices for recording different data.
  • all known methods for measurement and / or analysis can be used here, it being understood that a correspondingly robust design is provided with regard to the conditions in the borehole.
  • the structure of the individual measuring devices can be modular, so that, if necessary, one type of measuring device can be exchanged for another type of measuring device if the measuring device is used for another application.
  • the sensor system of the measuring unit it is possible to provide the sensor system of the measuring unit on the outside of the housing, so that the measured values are taken from the medium flowing past the outside of the housing.
  • the sensor system it is advisable to provide the sensor system in a flow path within the housing.
  • at least one electrically operated, in flow connection with the measuring unit standing pump provided.
  • an electrically operated two-way valve in connection with the measuring unit, in order to discharge the examined medium either into the annular space or into the drill pipe if necessary.
  • An upstream filter can largely prevent damage to the pump and / or the sensor system.
  • the flow path to the pump can be closed by upstream valves, which is important if, for certain reasons, no measurement is to be carried out and no medium is to get into the measuring device.
  • the measuring device has an electrically, in particular electrohydraulically operated, packer.
  • the packer is intended for dividing the annular space into a section above the packer and a section below the packer. The two sections are effectively sealed.
  • the packer When the packer is retracted, it does not protrude beyond the housing, or only slightly. In the extended state, the packer lies against the borehole wall.
  • the packer In order to achieve a quasi-sealing function, the packer has a plurality of packer segments which at least partially overlap at least in the retracted state.
  • a particularly electrically operated lubricant supply device is provided above the packer, through which a layer of lubricant is applied to the top of the packer segments in the extended state or when the packer segments are extended.
  • the lubricant layer serves on the one hand as a protective layer and on the other hand as a sliding layer, which promotes the re-entry of the packer into the housing.
  • the pump is designed to lower the annular space level below the packer when the packer is in the extended state.
  • the inflow opening of the housing into the measuring device is provided below the packer, while the outflow opening in the housing is above the packer.
  • control unit for controlling the functional units as required. If necessary, the control unit is controlled from above ground via the evaluation device in which the measured values are displayed, evaluated and processed.
  • a generator provided above ground is usually used to supply energy to the measuring device.
  • the measuring device In order to ensure the functioning of the measuring device even in the event of malfunctions of the generator, the measuring device has an energy store for an emergency power supply. Ultimately, this is an accumulator provided in the housing.
  • 1 is a schematic view of a drill pipe placed in a borehole
  • FIG. 2 is a schematic view of the pipe end of a drill pipe
  • FIG. 3 is a schematic view of part of a sleeve
  • FIG. 6 is a detailed view of a sleeve
  • Fig. 7 is a schematic partial view of a drill pipe screwed into a sleeve
  • Fig. 8 is a schematic view of a measuring device according to the invention.
  • a drilling device 1 is shown schematically.
  • the drilling device 1 has a drilling head 2 arranged above ground and a drill pipe 3, which is located in a borehole 4 in the drilling state.
  • a chisel unit 5 At the lower end of the drill pipe 3 there is a chisel unit 5.
  • a measuring device 6 directly above the chisel unit 5, which is connected via a conductor 7 to an evaluation device 8 located above ground.
  • the measuring device 6 makes it possible to record measured values during drilling, which can then be evaluated directly via the evaluation device 8.
  • the drill pipe 3 itself is composed of a large number of alternately arranged drill pipes 10 and sleeves 11.
  • Drill pipes 10 of the type in question can have a length of up to 10 m and longer, while drill pipes 3 for deep drilling can have a length of several thousand meters.
  • FIG. 2 A part of a drill pipe 10 is shown in FIG. 2 and in a detailed representation according to FIG. 4.
  • the drill pipe 10 has a drill pipe body 12 made of electrically conductive material. It is now provided that at least one electrical pipe conductor 7a is passed through the drill pipe body 12 and is connected at the end, at both ends, to a pipe contact connection 13 provided on the drill pipe body 12, the pipe conductor 7a and the pipe contact connection 13 opposite the pipe pipe body 12 are electrically isolated.
  • the pipe conductor 7a is fixed on the inside 14 of the pipe.
  • a longitudinal groove 15 for the pipe conductor 7a is provided on the inside of the pipe 14. In the present case, the groove 15 is dovetailed tail-shaped.
  • the groove 15 runs parallel to the central axis of the drill pipe 10. In the present case, the depth of the groove 15 is greater than the outer diameter of the pipe 7a.
  • the pipe conductor 7a is held in the groove 15 via an insulation 16.
  • the insulation 16 also has an electrically insulating function.
  • the pipe conductor 7a has a conductor insulation 17 which extends over the entire length of the pipe conductor 7a.
  • an electrical insulation layer 18 is vapor-deposited on the entire inside of the pipe 14, which also covers the groove 15 and thus the pipe conductor 7a. The insulation layer 18 is applied to the entire inside of the pipe 14.
  • the pipe contact connection 13 is provided on the end face 19 of the pipe end of the drill pipe 10. It goes without saying that a corresponding pipe contact connection 13 is provided at both ends of the drill pipe body 12, even if this is not dealt with in more detail below.
  • the pipe contact connection 13 is circumferential and has the shape of a contact ring. Otherwise, the pipe contact connection 13 is arranged on an insulation ring 20 resting on the end face 19.
  • the insulation ring 20, which consists of an elastic material, has an annular groove 21 for receiving the pipe contact connection 13.
  • the annular groove 21 is deeper than the height of the pipe contact connection 13.
  • the pipe contact connection 13 is spring-loaded in the direction away from the end face 19, namely in the direction of the sleeve 11 to be connected to the drill pipe 10.
  • a pin 22 on which an external thread 23 is provided.
  • a step 24 which at its end merges into the tube outside 25.
  • a circumferential seal 26 which in the present case is an O-ring.
  • an annular seal can be arranged on the step 24.
  • a part of a sleeve 11 is shown in FIG. 4 and in the detailed representation according to FIG. 6.
  • the sleeve 11 has a sleeve body 27 made of electrically conductive material.
  • An electrical sleeve conductor 7b is passed through the sleeve body 27 and is connected at the end, at both ends of the sleeve body 27, to sleeve contact connections 28, even if this is not shown in detail.
  • the socket conductor 7b and the socket contact connections 28 are electrically insulated from the socket body 27.
  • the socket conductor 7b is fixed on the inside of the socket 29.
  • a longitudinal groove 30 is provided on the inside of the sleeve 29 of the sleeve body 27.
  • the groove 30 is formed in the same way as the groove 15. Otherwise, the groove 30 runs parallel to the central axis of the sleeve 11. It is not shown that the sleeve conductor 7b is cast into the groove 30 via insulation and is otherwise covered by a conductor insulation , Furthermore, an electrical insulation layer 31, which also covers the socket conductor 7b, is vapor-deposited on the inside of the socket 29 as well as on the inside of the pipe 14.
  • the socket contact connection 28 is provided on an end shoulder 32.
  • the shoulder 32 is located between the internal thread 33 and the inside of the socket 29.
  • the socket contact connection 28 is formed all the way round and is arranged on an insulation ring 20 resting on the shoulder 32.
  • the type and structure of the insulation ring 20 corresponds to the insulation ring 20 provided on the drill pipe 10, that is to say it has an annular groove 21 for receiving the socket contact connection 28, the annular groove 21 being deeper than the height of the socket contact connection 28. Otherwise, the socket contact connection 28 is in the direction of the shoulder 32 spring loaded away.
  • the spring loading can be designed with respect to the contact connections 13, 28 such that one or a plurality of springs, for example small helical compression springs, act on the respective underside of the contact connection.
  • spring tongues can be provided on the respective contact connection.
  • the spring tongues can in principle be directed inwards and / or outwards, spring tongues pointing outwards then projecting beyond the actual contact connection and being able to effect the electrical contact.
  • the outer end face 34 is located between the internal thread 33 and the sleeve outside 36.
  • the drill pipes 10 and sleeves 11 described in the previously formed manner in connection with the pipe conductors 7a and sleeve conductors 7b result in a two-pole energy and data transmission system via the drill pipe 3.
  • the one pole is formed by the drill pipe body, which consists of the drill pipe bodies 12 and the sleeve bodies 27, while the other pole is formed by the conductor 7, which is composed of the pipe conductors 7a and the sleeve conductors 7b and the contact connections 13 and 28.
  • the system according to the invention also has the advantage that the drill pipe 3 and thus the two poles can be extended as desired, since the electrical connection via the contact connections 13, 28 on the one hand and the material of the drill pipe body can be achieved by screwing a drill pipe 10 with a sleeve 11 12 and the sleeve body 27 on the other hand results.
  • the energy is fed in or data is taken from the conductor 7 via a slip ring collector (not shown), which is provided on the first drill pipe 10.
  • the slip ring collector is connected to the pipe conductor 7a and insulated from the drill pipe body 12.
  • the slip ring collector is in turn connected to the evaluation device 8, while the drill rod body forms the ground connection.
  • the measuring device 6 shows a schematic illustration of the measuring device 6.
  • the measuring device 6 is connected to the last drill pipe 10 of the drill pipe 3.
  • the measuring device 6 has an electrically operated measuring unit 40 with which it is possible to measure relevant data about the state of the rock, the drilling fluid or the raw material to be extracted.
  • the measuring device 6 is supplied with electrical energy via the conductor 7 described above. It goes without saying that the measuring device 6 has a contact connection corresponding to the contact connections 13, 28 and a continuation of the conductor 7, even if this is not shown in detail.
  • the measuring device 6 has an outer housing 41 in which the measuring unit 40 and further functional units, which will be discussed in more detail below, are accommodated.
  • the housing 41 has screw connections 42, 43 at both ends thereof.
  • the screw connections 42, 43 correspond to those of the sleeve 11.
  • the measuring device 6 can be integrated into the drill pipe 3.
  • the measuring device 6 has a converter 44 for converting measurement signals received via the measuring unit 40 for subsequent transfer to the evaluation device 8. It is not shown that the measuring unit 40 can have a plurality of different measuring devices for recording the most varied data of the medium in question.
  • the individual measuring devices should have a modular structure, so that it is possible to replace measuring devices if necessary.
  • the sensors or the measurement sensors are provided in the flow path 45 within the housing 41. In principle, however, it is also possible for the measured value recorders to be directed outward into the annular space via external openings in the housing 41.
  • an electrically operated pump 46 which supplies the medium to be examined via the flow path 45 to the measuring unit 40.
  • An electrically operated valve unit 47 with at least one two-way valve is provided above the measuring unit 40 in order to discharge the examined medium into the annular space or via the drill pipe 3, if necessary.
  • corresponding outflow openings 48 are provided in the housing 41.
  • at least one filter 49 and one valve unit 50 are connected upstream of the pump 46.
  • the valve unit 50 serves to close the inflow openings 51 provided in the housing 41.
  • An electrohydraulic packer 52 is also provided.
  • the packer 52 has a plurality of packer segments, not shown in detail. In the retracted state of the packer 52, which is shown in FIG. 8, the packer segments overlap at least partially.
  • the packer 52 as a whole is constructed in such a way that it separates the annular space in an upper and lower part in the extended state and at least essentially seals these sections.
  • a lubricant supply device 53 which serves to apply a layer of lubricant to the top of the packer segments in the extended state.
  • the lubricant supply device 53 can be operated electrically or else mechanically.
  • the mechanically operated lubricant supply is preferably mechanically coupled to the packer 52 in that the lubricant supply is actuated when the packer segments are extended.
  • the measuring device 6 in the present case has a control unit 54 for controlling the individual functional units as required and an energy store 55.
  • the aforementioned functional units do not necessarily have to be arranged in the order shown. If the function of the measuring device 6 is not called into question, other arrangements can also be selected. It should be noted, however, that the packer 52 is located between the lower inlet openings 51 and the upper outflow openings 48, so that it is possible to lower the annular space level below the extended packer 52 by means of the pump 46.
  • Measuring device 6 are electrically connected to the two poles described above, so that an electrical power supply and, insofar as Measuring unit 40 or the control unit 54 are affected, data exchange with the evaluation device 8 is possible.
  • the measuring device 6 in which the drill string in the housing 41 of the measuring device 6 is open, it is in principle also possible for the measuring device 6 to have a through-tube section which is either on both sides or at one end with the drill pipe and at the other end with the Chisel unit 5 is connected.
  • the medium is then led through corresponding flow paths through the housing and also past the measuring unit 40.
  • the medium that has already been measured is either released into a drill string or into the annular space.
  • a corresponding valve unit opening into the drill string is required in this case.
  • the invention makes it possible to continuously measure the state of the medium in the borehole before, during and after drilling.
  • the data can be evaluated in the evaluation device 8 immediately. For example, hydrological changes during drilling are recognized immediately and testing is also possible immediately.
  • the non-return flap 56 closes off the drill pipe while the packer 52 is being extended.
  • the pump 46 requests the medium after the outflow openings 48 have been closed by means of the valve unit 47 through the drill string to the surface.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Remote Sensing (AREA)
  • Geophysics (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention aims at providing fast and exact information from the drilling site during deep drillings. To this aim, a measuring device (6) having an electrically operated measuring unit is used to measure relevant data of the rock, the drilling fluid and/or the raw material to be extracted, wherein the measuring device (6) is configured to supply electric energy by means of the drill stems (3) and to transfer data to the surface equally by means of the drill stems (3).

Description

Meßeinrichtung und Bohrvorrichtung für Tiefbohrungen Measuring device and drilling device for deep drilling
Die vorliegende Erfindung betrifft eine Meßeinrichtung nach dem Oberbegriff des Anspruchs 1 und eine Bohrvorrichtung nach Anspruch 16.The present invention relates to a measuring device according to the preamble of claim 1 and a drilling device according to claim 16.
Aus der EP 0 102 672 Bl ist eine Meßeinrichtung zur Verbindung mit einem Rohrgestänge für Tiefbohrungen bekannt, mit einer elektrisch betriebenen Meßeinheit zur Messung relevanter Daten, wobei die Meßeinrichtung zur Versorgung mit elektrischer Energie über das Rohrgestänge ausgebildet ist. Die Meßeinrichtung wandelt Bodeneigenschaften in elektrische Signale um und wird für Bodenuntersuchungen in den Boden getrieben. Aufgrund der am Ende des Bohrgestänges vorgesehenen Anordnung der Meßeinrichtung können mit der bekannten Meßeinrichtung ausschließlich Meßdaten aufgenommen werden, die den den Meßkopf umgebenden Bodenbereich am Ende des Bohrgestänges betreffen. Mit der bekannten Meßeinrichtung ist es nicht möglich, Meßdaten oberhalb der Bohrlochsohle aufzunehmen.EP 0 102 672 B1 discloses a measuring device for connection to a pipe string for deep drilling, with an electrically operated measuring unit for measuring relevant data, the measuring device being designed to supply electrical energy via the pipe string. The measuring device converts soil properties into electrical signals and is driven into the soil for soil investigations. Due to the arrangement of the measuring device provided at the end of the drill pipe, only known measurement data can be recorded with the known measuring device which relate to the bottom area surrounding the measuring head at the end of the drill pipe. With the known measuring device it is not possible to record measurement data above the bottom of the borehole.
Aufgabe der vorliegenden Erfindung ist es, eine Meßeinrichtung nach dem Oberbegriff des Anspruchs 1 weiter zu bilden.The object of the present invention is to further develop a measuring device according to the preamble of claim 1.
Die vorgenannte Aufgabe wird durch die kennzeichnenden Merkmale des Anspruchs 1 gelöst.The above object is achieved by the characterizing features of claim 1.
Die Meßeinrichtung kann grundsätzlich an jeder beliebigen Stelle im Bohr- sträng vorgesehen werden. Die Meßeinrichtung kann unmittelbar im Anschluß an die Meißeleinheit angeordnet werden, so daß Meßwerte von der Bohrlochsohle genommen werden können. Auch ist die Anordnung mehrerer Meßeinrichtungen in einem Bohrstrang ohne weiteres möglich. Zur Messung relevanter Daten erfolgt die Versorgung der Meßeimichtung mit elektrischer Energie über das Bohrgestänge. In gleicher Weise erfolgt der Daten- bzw. Signaltransfer von der Meßeinrichtung nach Übertage. Übertägig ist dann eine Auswerteeinrichtung vorgesehen, wobei die Meßeinrichtung mit der Auswerteeinrichtung elektrisch gekoppelt ist. Die elektrische Kopplung dient dabei zum einen zum Daten- bzw. Signaltransfer von der Meßeinrichtung nach Übertage und kann zum anderen auch zum Transfer von Steuerbefehlen dienen.The measuring device can in principle be provided at any point in the drill string. The measuring device can be arranged immediately after the chisel unit, so that measured values can be taken from the bottom of the borehole. The arrangement of several measuring devices in a drill string is also readily possible. To measure relevant data, the measuring device is supplied with electrical energy via the drill pipe. In the same way, the data or signal transfer from the measuring device to the surface takes place. An evaluation device is then provided above ground, the measuring device being electrically coupled to the evaluation device. The electrical coupling serves on the one hand for data or signal transfer from the measuring device to Above ground and can also be used to transfer control commands.
Die Meßeinrichtung weist ein stabiles äußeres Gehäuse zur Aufnahme und damit zum Schutz der einzelnen Funktionseinheiten auf. Um in das Bohrgestänge bzw. den Bohrstrang integriert bzw. an Teile des Bohrstrangs angeschlossen werden zu können, weist das Gehäuse an seinen beiden Enden Schraubanschlüsse auf. Vorzugsweise sollten die Schraubanschlüsse ein Innengewinde aufweisen, so daß das Gehäuse vom Anschluß her einer Muffe entspricht.The measuring device has a stable outer housing for receiving and thus for protecting the individual functional units. In order to be integrated into the drill string or the drill string or to be connected to parts of the drill string, the housing has screw connections at both ends. The screw connections should preferably have an internal thread, so that the housing corresponds to a sleeve from the connection.
Zu den Funktionseinheiten der Meßeinrichtung kann ein Wandler, insbesondere ein Spannungswandler gehören, der die von der Meßeinheit aufgenommenen Meßsignale umwandelt, so daß die umgewandelten, ggf. eine andere Frequenz als die zugeführte elektrische Energie aufweisenden Signale von der Auswerteeinrichtung korrekt erkannt werden. Im übrigen kann die Auswerteeinrichtung auch derart ausgebildet sein, daß die Meßsignale aus der Energie- aufhahme der Meßeinheit abgeleitet werden.The functional units of the measuring device can include a converter, in particular a voltage converter, which converts the measuring signals received by the measuring unit, so that the converted signals, which may have a different frequency than the electrical energy supplied, are correctly recognized by the evaluation device. In addition, the evaluation device can also be designed such that the measurement signals are derived from the energy consumption of the measurement unit.
Die Meßeinheit kann, je nach Anwendungsfall, eine Mehrzahl von Meßgeräten zur Aufnahme unterschiedlicher Daten aufweisen. Hierbei können grundsätzlich alle bekannten Verfahren zur Messung und/oder Analytik eingesetzt werden, wobei es sich versteht, daß eine entsprechend robuste Ausführung im Hinblick auf die Verhältnisse im Bohrloch vorgesehen ist. Im übrigen können die einzelnen Meßgeräte von ihrem Aufbau her modulartig aufgebaut sein, so daß bedarfsweise ein Meßgerätetyp gegen einen anderen Meßgerätetypen ausgetauscht werden kann, wenn die Meßeinrichtung für einen anderen Einsatzfall eingesetzt wird.Depending on the application, the measuring unit can have a plurality of measuring devices for recording different data. In principle, all known methods for measurement and / or analysis can be used here, it being understood that a correspondingly robust design is provided with regard to the conditions in the borehole. In addition, the structure of the individual measuring devices can be modular, so that, if necessary, one type of measuring device can be exchanged for another type of measuring device if the measuring device is used for another application.
Grundsätzlich ist es möglich, die Sensorik der Meßeinheit außen am Gehäuse vorzusehen, so daß die Meßwerte von dem Medium genommen werden, das am Gehäuse außen vorbeiströmt. Zum Schutz der Meßeinheit und insbesondere der Sensorik bzw. Meßwertaufnehmer bietet es sich jedoch an, die Sensorik in einem Strömungsweg innerhalb des Gehäuses vorzusehen. Um das zu un- tersuchende Medium an der Sensorik der Meßeinheit vorbeizuführen, ist wenigstens eine elektrisch betriebene, in Strömungsverbindung mit der Meßein- heit stehende Pumpe vorgesehen. Günstig ist es in diesem Zusammenhang dann, im Anschluß an die Meßeinheit ein elektrisch betriebenes Zwei- Wege- Ventil vorzusehen, um das untersuchte Medium bedarfsweise entweder in den Ringraum oder aber in das Bohrgestänge abzuführen.In principle, it is possible to provide the sensor system of the measuring unit on the outside of the housing, so that the measured values are taken from the medium flowing past the outside of the housing. However, to protect the measuring unit and in particular the sensor system or sensor, it is advisable to provide the sensor system in a flow path within the housing. In order to guide the medium to be examined past the sensor system of the measuring unit, at least one electrically operated, in flow connection with the measuring unit standing pump provided. In this context, it is then advantageous to provide an electrically operated two-way valve in connection with the measuring unit, in order to discharge the examined medium either into the annular space or into the drill pipe if necessary.
Im Zusammenhang mit der zuvor beschriebenen Pumpe bietet es sich an, wenigstens einen Filter und/oder Ventile vorzusehen. Durch einen vorgeschalteten Filter kann eine Beeinträchtigung der Pumpe und/oder der Sensorik wei- testgehend vermieden werden. Durch vorgeschaltete Ventile kann der Strö- mungsweg zur Pumpe verschlossen werden, was wichtig ist, wenn aus bestimmten Gründen keine Messung durchgeführt werden und kein Medium in die Meßeinrichtung gelangen soll.In connection with the pump described above, it makes sense to provide at least one filter and / or valves. An upstream filter can largely prevent damage to the pump and / or the sensor system. The flow path to the pump can be closed by upstream valves, which is important if, for certain reasons, no measurement is to be carried out and no medium is to get into the measuring device.
Während es die Erfindung ermöglicht, während des Bohrens Meßwerte zu nehmen, ist es grundsätzlich auch möglich, den Bohrvorgang kurzzeitig zu unterbrechen und eine Verprobung des Mediums im Bereich der Bohrlochsohle d Ohzuführen. Hierzu weist die Meßeinrichtung einen elektrisch, insbesondere elektrohydraulisch betriebenen Packer auf. Der Packer ist zur Unterteilung des Ringraums in einen Abschnitt oberhalb des Packers und einen Ab- schnitt unterhalb des Packers vorgesehen. Dabei findet quasi eine Abdichtung der beiden Abschnitte statt. Im eingefahrenen Zustand ragt der Packer nicht oder nur unwesentlich über das Gehäuse hinaus. Im ausgefahrenen Zustand liegt der Packer an der Bohrlochwandung an. Um eine quasi abdichtende Funktion zu erzielen, weist der Packer eine Mehrzahl von Packersegmenten auf, die sich zumindest im eingefahrenen Zustand zumindest teilweise überdecken.While the invention makes it possible to take measured values during drilling, it is also possible in principle to interrupt the drilling process briefly and to test the medium in the area of the bottom of the borehole d oh. For this purpose, the measuring device has an electrically, in particular electrohydraulically operated, packer. The packer is intended for dividing the annular space into a section above the packer and a section below the packer. The two sections are effectively sealed. When the packer is retracted, it does not protrude beyond the housing, or only slightly. In the extended state, the packer lies against the borehole wall. In order to achieve a quasi-sealing function, the packer has a plurality of packer segments which at least partially overlap at least in the retracted state.
Zum Ziehen einer Probe nach Ausfahren des Packers ist es erforderlich, den Umlauf der Bohrlochspülung zu unterbrechen. Durch den Stillstand der Spü- lung können Schwebeteilchen, die Bestandteile der Spülung sind, absinken und sich auf die Packeroberseite legen. Dies kann zu Schwierigkeiten beim Wiedereinfahren des Packers führen. Zur Beseitigung dieses Problems ist eine insbesondere elektrisch betriebene Schmiermittelversorgungseinrichtung oberhalb des Packers vorgesehen, durch die eine Schmiermittelschicht auf die Oberseite der Packersegmente im ausgefahrenen Zustand oder beim Ausfahren der Packersegmente aufgebracht wird. Die Schmiermittelschicht dient da- bei zum einen als Schutzschicht und zum anderen als Gleitschicht, die das Wiedereinfahren des Packers in das Gehäuse begünstigt.In order to take a sample after the packer has been extended, it is necessary to interrupt the circulation of the drilling fluid. When the rinsing stops, floating particles that are part of the rinsing can sink and lie on the top of the packer. This can cause difficulties when the packer is retracted. To eliminate this problem, a particularly electrically operated lubricant supply device is provided above the packer, through which a layer of lubricant is applied to the top of the packer segments in the extended state or when the packer segments are extended. The lubricant layer serves on the one hand as a protective layer and on the other hand as a sliding layer, which promotes the re-entry of the packer into the housing.
Wird im ausgefahrenen Zustand des Packers die Bohrlochspülung im oberen Teil abgesenkt, kann es zu erheblichen Beanspruchungen des Packers kommen. Aus diesem Grunde ist erfindungsgemäß vorgesehen, daß die Pumpe zur Absenkung des Ringraumpegels unterhalb des Packers im ausgefahrenen Zustand des Packers ausgebildet ist. In diesem Zusammenhang ist dabei die Zu- strömöffhung des Gehäuses in die Meßeinrichtung unterhalb des Packers vor- gesehen, während sich die Ausströmöffnung im Gehäuse oberhalb des Packers befindet.If the drill hole flushing is lowered in the upper part when the packer is extended, the packer can be subjected to considerable stress. For this reason, it is provided according to the invention that the pump is designed to lower the annular space level below the packer when the packer is in the extended state. In this context, the inflow opening of the housing into the measuring device is provided below the packer, while the outflow opening in the housing is above the packer.
Aufgrund der verschiedenen Ansteuerungsmöglichkeiten bietet es sich an, daß eine elektrisch betriebene Steuereinheit zur bedarfsweisen Ansteuerung der Funktionseinheiten vorgesehen ist. Die Steuereinheit wird bedarfsweise von Übertage über die Auswerteeinrichtung, in der die gemessenen Werte angezeigt, ausgewertet und verarbeitet werden, angesteuert.Because of the various control options, it is advisable to provide an electrically operated control unit for controlling the functional units as required. If necessary, the control unit is controlled from above ground via the evaluation device in which the measured values are displayed, evaluated and processed.
Zur Energieversorgung der Meßeinrichtung dient üblicherweise ein Übertage vorgesehener Generator. Um auch bei Funktionsstörungen des Generators ein Funktionieren der Meßeimichtung sicherzustellen, weist die Meßeinrichtung einen Energiespeicher für eine Notstromversorgung auf. Hierbei handelt es sich letztlich um einen im Gehäuse vorgesehenen Akkumulator.A generator provided above ground is usually used to supply energy to the measuring device. In order to ensure the functioning of the measuring device even in the event of malfunctions of the generator, the measuring device has an energy store for an emergency power supply. Ultimately, this is an accumulator provided in the housing.
Nachfolgend werden Ausführungsbeispiele der Erfindung anhand der Zeichnung beschrieben. Dabei zeigtExemplary embodiments of the invention are described below with reference to the drawing. It shows
Fig. 1 eine schematische Ansicht eines in ein Bohrloch eingebrachten Bohrgestänges,1 is a schematic view of a drill pipe placed in a borehole,
Fig. 2 eine schematische Ansicht des Rohrendes eines Bohrrohres,2 is a schematic view of the pipe end of a drill pipe,
Fig. 3 eine schematische Ansicht eines Teils einer Muffe,3 is a schematic view of part of a sleeve,
Fig. 4 eine Querschnittsansicht eines Teils eine Bohrrohres, Fig. 5 eine Detailansicht eines Teils eines Bohrrohres,4 is a cross-sectional view of part of a drill pipe; 5 is a detailed view of part of a drill pipe,
Fig. 6 eine Detailansicht einer Muffe,6 is a detailed view of a sleeve,
Fig. 7 eine schematische Teilansicht eines in eine Muffe eingeschraubten Bohrrohres undFig. 7 is a schematic partial view of a drill pipe screwed into a sleeve and
Fig. 8 eine schematische Ansicht einer erfindungsgemäßen Meßeinrichtung.Fig. 8 is a schematic view of a measuring device according to the invention.
In Fig. 1 ist schematisch eine Bohrvorrichtung 1 dargestellt. Die Bohrvorrichtung 1 weist einen über Tage angeordneten Bohrkopf 2 und ein Bohrgestänge 3 auf, das sich im Bohrzustand in einem Bohrloch 4 befindet. Am unteren Ende des Bohrgestänges 3 befindet sich eine Meißeleinheit 5. Im dargestellten Ausführungsbeispiels befindet sich unmittelbar oberhalb der Meißeleinheit 5 eine Meßeinrichtung 6, die über einen Leiter 7 mit einer über Tage befindlichen Auswerteeinrichtung 8 verbunden ist. Die Meßeinrichtung 6 ermöglicht es, während des Bohrens Meßwerte aufzunehmen, die dann unmittelbar über die Auswerteeinrichtung 8 ausgewertet werden können.In Fig. 1, a drilling device 1 is shown schematically. The drilling device 1 has a drilling head 2 arranged above ground and a drill pipe 3, which is located in a borehole 4 in the drilling state. At the lower end of the drill pipe 3 there is a chisel unit 5. In the exemplary embodiment shown, there is a measuring device 6 directly above the chisel unit 5, which is connected via a conductor 7 to an evaluation device 8 located above ground. The measuring device 6 makes it possible to record measured values during drilling, which can then be evaluated directly via the evaluation device 8.
Das Bohrgestänge 3 selbst setzt sich vorliegend aus einer Vielzahl von alternierend angeordneten Bohrrohren 10 und Muffen 11 zusammen. Bohrrohre 10 der in Rede stehenden Art können eine Länge bis zu 10 m und länger haben, während Bohrgestänge 3 für Tiefbohrungen eine Länge von mehreren tausend Metern haben können.In the present case, the drill pipe 3 itself is composed of a large number of alternately arranged drill pipes 10 and sleeves 11. Drill pipes 10 of the type in question can have a length of up to 10 m and longer, while drill pipes 3 for deep drilling can have a length of several thousand meters.
In Fig. 2 und in Detaildarstellung gemäß Fig. 4 ist ein Teil eines Bohrrohres 10 dargestellt. Das Bohrrohr 10 weist einen Bohrrohrkörper 12 aus elektrisch leitendem Material auf. Vorgesehen ist nun, daß durch den Bohrrohrkörper 12 wenigstens ein elektrischer Rohrleiter 7a hmdurchgefuhrt ist, der endseitig, und zwar an beiden Enden, mit einem am Bohrrohrkörper 12 vorgesehenen Rohrkontaktanschluß 13 verbunden ist, wobei der Rohrleiter 7a und der Rohr- kontaktanschluß 13 gegenüber dem Rohrrohrkörper 12 elektrisch isoliert sind. Wie sich insbesondere aus Fig. 4 ergibt, ist der Rohrleiter 7a an der Rohrin- nenseite 14 fixiert. Hierzu ist an der Rohrinnenseite 14 eine längslaufende Nut 15 für den Rohrleiter 7a vorgesehen. Vorliegend ist die Nut 15 schwalben- schwanzförmig ausgebildet. Grundsätzlich ist aber auch jede andere Nutform möglich. Die Nut 15 verläuft parallel zur Mittelachse des Bohrrohres 10. Die Tiefe der Nut 15 ist vorliegend größer als der äußere Durchmesser des Rohrleiters 7a. In der Nut 15 ist der Rohrleiter 7a über eine Isolierung 16 gehalten. Die Isolierung 16 hat neben ihrer Befestigungsfunktion zusätzlich eine elektrisch isolierende Funktion. Neben der Isolierung 16 weist der Rohrleiter 7a eine Leiterisolierung 17 auf, die sich über die gesamte Länge des Rohrleiters 7a erstreckt. Wie sich weiter aus Fig. 4 ergibt, ist auf die Rohrinnenseite 14 vollflächig eine elektrische Isolationsschicht 18 aufgedampft, die auch die Nut 15 und damit den Rohrleiter 7a überdeckt. Die Isolationsschicht 18 ist vollflächig auf die Rohrinnenseite 14 aufgebracht.A part of a drill pipe 10 is shown in FIG. 2 and in a detailed representation according to FIG. 4. The drill pipe 10 has a drill pipe body 12 made of electrically conductive material. It is now provided that at least one electrical pipe conductor 7a is passed through the drill pipe body 12 and is connected at the end, at both ends, to a pipe contact connection 13 provided on the drill pipe body 12, the pipe conductor 7a and the pipe contact connection 13 opposite the pipe pipe body 12 are electrically isolated. As can be seen in particular from FIG. 4, the pipe conductor 7a is fixed on the inside 14 of the pipe. For this purpose, a longitudinal groove 15 for the pipe conductor 7a is provided on the inside of the pipe 14. In the present case, the groove 15 is dovetailed tail-shaped. In principle, however, any other groove shape is also possible. The groove 15 runs parallel to the central axis of the drill pipe 10. In the present case, the depth of the groove 15 is greater than the outer diameter of the pipe 7a. The pipe conductor 7a is held in the groove 15 via an insulation 16. In addition to its fastening function, the insulation 16 also has an electrically insulating function. In addition to the insulation 16, the pipe conductor 7a has a conductor insulation 17 which extends over the entire length of the pipe conductor 7a. As can further be seen from FIG. 4, an electrical insulation layer 18 is vapor-deposited on the entire inside of the pipe 14, which also covers the groove 15 and thus the pipe conductor 7a. The insulation layer 18 is applied to the entire inside of the pipe 14.
Der Rohrkontaktanschluß 13 ist an der endseitigen Stirnfläche 19 des Rohrendes des Bohrrohres 10 vorgesehen. Dabei versteht es sich, daß an beiden En- den des Bohrrohrkörpers 12 jeweils ein entsprechender Rohrkontaktanschluß 13 vorgesehen ist, auch wenn hierauf nachfolgend nicht näher eingegangen wird. Der Rohrkontaktanschluß 13 ist umlaufend ausgebildet und hat die Form eines Kontaktringes. Im übrigen ist der Rohrkontaktanschluß 13 auf einem auf der Stirnfläche 19 aufliegenden Isolationsring 20 angeordnet. Der Isolationsring 20, der aus einem elastischen Material besteht, weist eine Ringnut 21 zur Aufnahme des Rohrkontaktanschlusses 13 auf. Dabei ist die Ringnut 21 tiefer als die Höhe des Rohrkontaktanschlusses 13.The pipe contact connection 13 is provided on the end face 19 of the pipe end of the drill pipe 10. It goes without saying that a corresponding pipe contact connection 13 is provided at both ends of the drill pipe body 12, even if this is not dealt with in more detail below. The pipe contact connection 13 is circumferential and has the shape of a contact ring. Otherwise, the pipe contact connection 13 is arranged on an insulation ring 20 resting on the end face 19. The insulation ring 20, which consists of an elastic material, has an annular groove 21 for receiving the pipe contact connection 13. The annular groove 21 is deeper than the height of the pipe contact connection 13.
Im übrigen ist der Rohrkontaktanschluß 13 vorliegend in Richtung von der Stirnfläche 19 weg federbelastet, nämlich in Richtung auf die mit dem Bohrrohr 10 zu verbindende Muffe 11.Otherwise, the pipe contact connection 13 is spring-loaded in the direction away from the end face 19, namely in the direction of the sleeve 11 to be connected to the drill pipe 10.
An beiden Rohrenden des Bohrrohres 10 befindet sich ein Zapfen 22, an dem ein Außengewinde 23 vorgesehen ist. Zwischen dem Zapfen 22 mit Außen- gewinde 23 befindet sich eine Stufe 24, die an ihrem Ende in die Rohraußenseite 25 übergeht. Am Übergang von der Stufe 24 zum Außengewinde 23 befindet sich eine umlaufende Dichtung 26, bei der es sich vorliegend um einen O-Ring handelt. Statt der Dichtung 26 oder zusätzlich zu dieser kann im übrigen eine Ringdichtung auf der Stufe 24 angeordnet sein. In Fig. 4 und in der Detaildarstellung gemäß Fig. 6 ist ein Teil einer Muffe 11 dargestellt. Die Muffe 11 weist einen Muffenkörper 27 aus elektrisch leitendem Material auf. Durch den Muffenkörper 27 ist ein elektrischer Muffenleiter 7b hmdurchgeführt, der endseitig, und zwar an beiden Enden des Muffen- körpers 27, mit Muffenkontaktanschlüssen 28 verbunden ist, auch wenn dies im einzelnen nicht dargestellt ist. Der Muffenleiter 7b und die Muffenkontakt- anschlüsse 28 sind gegenüber dem Muffenkörper 27 elektrisch isoliert.At both pipe ends of the drill pipe 10 there is a pin 22 on which an external thread 23 is provided. Between the pin 22 with the external thread 23 there is a step 24, which at its end merges into the tube outside 25. At the transition from step 24 to external thread 23 there is a circumferential seal 26, which in the present case is an O-ring. Instead of the seal 26 or in addition to this, an annular seal can be arranged on the step 24. A part of a sleeve 11 is shown in FIG. 4 and in the detailed representation according to FIG. 6. The sleeve 11 has a sleeve body 27 made of electrically conductive material. An electrical sleeve conductor 7b is passed through the sleeve body 27 and is connected at the end, at both ends of the sleeve body 27, to sleeve contact connections 28, even if this is not shown in detail. The socket conductor 7b and the socket contact connections 28 are electrically insulated from the socket body 27.
Der Muffenleiter 7b ist an der Muffeninnenseite 29 fixiert. Hierzu ist an der Muffeninnenseite 29 des Muffenkörpers 27 eine längslaufende Nut 30 vorgesehen. Die Nut 30 ist in gleicher Weise ausgebildet wie die Nut 15. Im übrigen verläuft die Nut 30 parallel zur Mittelachse der Muffe 11. Nicht dargestellt ist, daß der Muffenleiter 7b in die Nut 30 über eine Isolierung eingegossen und im übrigen von einer Leiterisolierung ummantelt ist. Des weiteren ist auf die Muffeninnenseite 29 wie auch auf die Rohrinnenseite 14 eine elektrische Isolationsschicht 31 aufgedampft, die auch den Muffenleiter 7b überdeckt.The socket conductor 7b is fixed on the inside of the socket 29. For this purpose, a longitudinal groove 30 is provided on the inside of the sleeve 29 of the sleeve body 27. The groove 30 is formed in the same way as the groove 15. Otherwise, the groove 30 runs parallel to the central axis of the sleeve 11. It is not shown that the sleeve conductor 7b is cast into the groove 30 via insulation and is otherwise covered by a conductor insulation , Furthermore, an electrical insulation layer 31, which also covers the socket conductor 7b, is vapor-deposited on the inside of the socket 29 as well as on the inside of the pipe 14.
Wie sich insbesondere aus Fig. 6 ergibt, ist der Muffenkontaktanschluß 28 an einer stirnseitigen Schulter 32 vorgesehen. Die Schulter 32 befindet sich zwischen dem Innengewinde 33 und der Muffeninnenseite 29. Der Muffenkontaktanschluß 28 ist umlaufend ausgebildet und auf einem auf der Schulter 32 aufliegenden Isolationsring 20 angeordnet. Der Isolationsring 20 entspricht von Art und Aufbau dem am Bohrrohr 10 vorgesehenen Isolationsring 20, weist also eine Ringnut 21 zur Aufnahme des Muffenkontaktanschlusses 28 auf, wobei die Ringnut 21 tiefer ist als die Höhe des Muffenkontaktanschlusses 28. Im übrigen ist der Muffenkontaktanschluß 28 in Richtung von der Schulter 32 weg federbelastet. Die Federbelastung kann bezüglich der Kontaktanschlüsse 13, 28 derart ausgebildet sein, daß auf die jeweilige Unterseite des Kontaktanschlusses ein oder eine Mehrzahl von Federn, beispielsweise von kleinen Schraubendruckfedern wirken. Des weiteren können an dem jeweiligen Kontaktanschluß Federzungen vorgesehen sein. Die Federzungen können grundsätzlich nach innen und/oder nach außen gerichtet sein, wobei nach außen gerichtete Federzungen dann über den eigentlichen Kontaktan- schluß überstehen und die elektrische Kontaktierung bewirken können. Auf der äußeren Stirnfläche 34 des Muffenkörpers 27 befindet sich vorliegend eine umlaufende Dichtung 35. Die äußere Stirnfläche 34 befindet sich zwischen dem Innengewinde 33 und der Muffenaußenseite 36.As can be seen in particular from FIG. 6, the socket contact connection 28 is provided on an end shoulder 32. The shoulder 32 is located between the internal thread 33 and the inside of the socket 29. The socket contact connection 28 is formed all the way round and is arranged on an insulation ring 20 resting on the shoulder 32. The type and structure of the insulation ring 20 corresponds to the insulation ring 20 provided on the drill pipe 10, that is to say it has an annular groove 21 for receiving the socket contact connection 28, the annular groove 21 being deeper than the height of the socket contact connection 28. Otherwise, the socket contact connection 28 is in the direction of the shoulder 32 spring loaded away. The spring loading can be designed with respect to the contact connections 13, 28 such that one or a plurality of springs, for example small helical compression springs, act on the respective underside of the contact connection. Furthermore, spring tongues can be provided on the respective contact connection. The spring tongues can in principle be directed inwards and / or outwards, spring tongues pointing outwards then projecting beyond the actual contact connection and being able to effect the electrical contact. In the present case, there is a circumferential seal 35 on the outer end face 34 of the sleeve body 27. The outer end face 34 is located between the internal thread 33 and the sleeve outside 36.
Durch die in der zuvor ausgebildeten Art und Weise beschriebenen Bohrrohre 10 und Muffen 11 in Verbindung mit den Rohrleitern 7a und Muffenleitern 7b ergibt sich ein zweipoliges Energie- und Datenübertragungssystem über das Bohrgestänge 3. Dabei wird der eine Pol durch den Bohrgestängekörper gebildet, der sich aus den Bohrrohrkörpern 12 und den Muffenkörpern 27 zu- sammensetzt, während der andere Pol durch den Leiter 7, der sich aus den Rohrleitern 7a und den Muffenleitern 7b sowie den Kontaktanschlüssen 13 und 28 zusammensetzt gebildet wird. Das erfindungsgemäße System bietet im übrigen den Vorteil, daß das Bohrgestänge 3 und damit die beiden Pole beliebig verlängert werden können, da sich durch Verschrauben eines Bohrrohres 10 mit einer Muffe 11 die elektrische Verbindung über die Kontaktanschlüsse 13, 28 einerseits und über das Material des Bohrrohrkörpers 12 und des Muffenkörpers 27 andererseits ergibt.The drill pipes 10 and sleeves 11 described in the previously formed manner in connection with the pipe conductors 7a and sleeve conductors 7b result in a two-pole energy and data transmission system via the drill pipe 3. The one pole is formed by the drill pipe body, which consists of the drill pipe bodies 12 and the sleeve bodies 27, while the other pole is formed by the conductor 7, which is composed of the pipe conductors 7a and the sleeve conductors 7b and the contact connections 13 and 28. The system according to the invention also has the advantage that the drill pipe 3 and thus the two poles can be extended as desired, since the electrical connection via the contact connections 13, 28 on the one hand and the material of the drill pipe body can be achieved by screwing a drill pipe 10 with a sleeve 11 12 and the sleeve body 27 on the other hand results.
Die Energieeinspeisung bzw. Datenabnahme vom Leiter 7 erfolgt über einen nicht dargestellten Schleifringabnehmer, der am ersten Bohrrohr 10 vorgesehen ist. Der Schleifringabnehmer ist mit dem Rohrleiter 7a verbunden und gegenüber dem Bohrrohrkörper 12 isoliert. Der Schleifringabnehmer wiederum ist mit der Aus Werteeinrichtung 8 verbunden, während der Bohrgestängekörper den Masseanschluß bildet.The energy is fed in or data is taken from the conductor 7 via a slip ring collector (not shown), which is provided on the first drill pipe 10. The slip ring collector is connected to the pipe conductor 7a and insulated from the drill pipe body 12. The slip ring collector is in turn connected to the evaluation device 8, while the drill rod body forms the ground connection.
In Fig. 8 ist eine schematische Darstellung der Meßeinrichtung 6 gezeigt. Die Meßeinrichtung 6 ist vorliegend mit dem letzten Bohrrohr 10 des Bohrgestänges 3 verbunden. Die Meßeinrichtung 6 weist vorliegend eine elektrisch betriebene Meßeinheit 40 auf, mit der es möglich ist, relevante Daten über den Zustand des Gebirges, der Bohrspülung oder des zu gewinnenden Rohstoffes zu messen. Die Meßeinrichtung 6 wird dabei über den zuvor beschriebenen Leiter 7 mit elektrischer Energie versorgt. Dabei versteht es sich, daß die Meßeinrichtung 6 einen Kontaktanschluß entsprechend den Kontaktanschlüssen 13, 28 und eine Fortführung des Leiters 7 aufweist, auch wenn dies im einzelnen nicht dargestellt ist. Die Meßeinrichtung 6 weist ein äußeres Gehäuse 41 auf, in dem die Meßeinheit 40 und weitere Funktionseinheiten, auf die nachfolgend noch näher eingegangen wird, aufgenommen sind. Zum Anschluß an den Bohrstrang und die Meißeleinheit 5 weist das Gehäuse 41 an seinen beiden Enden jeweils Schraubanschlüsse 42, 43 auf. Die Schraubanschlüsse 42, 43 entsprechen denen der Muffe 11. Allerdings ist darauf hinzuweisen, daß es grundsätzlich auch möglich ist, andere Schraubanschlüsse, insbesondere auch solche mit Außengewinde vorzusehen. Letztlich ist lediglich entscheidend, daß die Meßeinrichtung 6 in das Bohrgestänge 3 integriert werden kann.8 shows a schematic illustration of the measuring device 6. In the present case, the measuring device 6 is connected to the last drill pipe 10 of the drill pipe 3. In the present case, the measuring device 6 has an electrically operated measuring unit 40 with which it is possible to measure relevant data about the state of the rock, the drilling fluid or the raw material to be extracted. The measuring device 6 is supplied with electrical energy via the conductor 7 described above. It goes without saying that the measuring device 6 has a contact connection corresponding to the contact connections 13, 28 and a continuation of the conductor 7, even if this is not shown in detail. The measuring device 6 has an outer housing 41 in which the measuring unit 40 and further functional units, which will be discussed in more detail below, are accommodated. For connection to the drill string and the chisel unit 5, the housing 41 has screw connections 42, 43 at both ends thereof. The screw connections 42, 43 correspond to those of the sleeve 11. However, it should be pointed out that it is in principle also possible to provide other screw connections, in particular also those with an external thread. Ultimately, it is only crucial that the measuring device 6 can be integrated into the drill pipe 3.
Die Meßeinrichtung 6 weist einen Wandler 44 zur Wandlung von über die Meßeinheit 40 aufgenommenen Meßsignalen zum anschließenden Transfer zur Auswerteeinrichtung 8 auf. Nicht dargestellt ist, daß die Meßeinheit 40 eine Mehrzahl von unterschiedlichen Meßgeräten zur Aufnahme unterschied- lichster Daten des betreffenden Mediums aufweisen kann. Die einzelnen Meßgeräte sollten modulartig aufgebaut sein, so daß es bedarfsweise möglich ist, Meßgeräte auszutauschen. Im dargestellten Ausführungsbeispiel ist die Sensorik bzw. sind die Meßwertaufnehmer im Strömungsweg 45 innerhalb des Gehäuses 41 vorgesehen. Grundsätzlich ist es aber auch möglich, daß die Meßwertaufhehmer über äußere Öffnungen im Gehäuse 41 nach außen in den Ringraum gerichtet sind.The measuring device 6 has a converter 44 for converting measurement signals received via the measuring unit 40 for subsequent transfer to the evaluation device 8. It is not shown that the measuring unit 40 can have a plurality of different measuring devices for recording the most varied data of the medium in question. The individual measuring devices should have a modular structure, so that it is possible to replace measuring devices if necessary. In the exemplary embodiment shown, the sensors or the measurement sensors are provided in the flow path 45 within the housing 41. In principle, however, it is also possible for the measured value recorders to be directed outward into the annular space via external openings in the housing 41.
Weiterhin ist eine elektrisch betriebene Pumpe 46 vorgesehen, die das zu untersuchende Medium über den Strömungsweg 45 der Meßeinheit 40 zuführt. Oberhalb der Meßeinheit 40 ist eine elektrisch betriebene Ventileinheit 47 mit wenigstens einem Zwei- Wege- Ventil vorgesehen, um das untersuchte Medium bedarfsweise in den Ringraum oder aber über das Bohrgestänge 3 abzuführen. Hierzu sind im Gehäuse 41 entsprechende Ausströmöffnungen 48 vorgesehen. Der Pumpe 46 vorgeschaltet ist vorliegend wenigstens ein Filter 49 und eine Ventileinheit 50. Die Ventileinheit 50 dient zum Verschluß von im Gehäuse 41 vorgesehenen Zuströmöffhungen 51.Furthermore, an electrically operated pump 46 is provided, which supplies the medium to be examined via the flow path 45 to the measuring unit 40. An electrically operated valve unit 47 with at least one two-way valve is provided above the measuring unit 40 in order to discharge the examined medium into the annular space or via the drill pipe 3, if necessary. For this purpose, corresponding outflow openings 48 are provided in the housing 41. In the present case, at least one filter 49 and one valve unit 50 are connected upstream of the pump 46. The valve unit 50 serves to close the inflow openings 51 provided in the housing 41.
Des weiteren ist ein elektrohydraulischer Packer 52 vorgesehen. Der Packer 52 weist eine Mehrzahl von im einzelnen nicht näher dargestellten Packer- Segmenten auf. Im eingefahrenen Zustand des Packers 52, der in Fig. 8 dargestellt ist, überdecken sich die Packersegmente zumindest teilweise. Der Packer 52 insgesamt ist derart aufgebaut, daß er im ausgefahrenen Zustand den Ringraum in einem oberen und unteren Teil trennt und diese Abschnitte dabei zumindest im wesentlichen abdichtet. Unmittelbar oberhalb des Packers 52 befindet sich eine Schmiermittelversorgungseinrichtung 53, die zum Aufbringen einer Schmiermittelschicht auf die Oberseite der Packersegmente im ausgefahrenen Zustand dient. Die Schmiermittelversorgungseimichtung 53 kann elektrisch oder aber auch mechanisch betrieben sein. Die mechanisch betriebene Schmiermittelversorgung ist vorzugsweise mit dem Packer 52 insofern mechanisch gekoppelt, daß beim Ausfahren der Packersegmente die Schmiermittelversorgung betätigt wird.An electrohydraulic packer 52 is also provided. The packer 52 has a plurality of packer segments, not shown in detail. In the retracted state of the packer 52, which is shown in FIG. 8, the packer segments overlap at least partially. The packer 52 as a whole is constructed in such a way that it separates the annular space in an upper and lower part in the extended state and at least essentially seals these sections. Immediately above the packer 52 is a lubricant supply device 53 which serves to apply a layer of lubricant to the top of the packer segments in the extended state. The lubricant supply device 53 can be operated electrically or else mechanically. The mechanically operated lubricant supply is preferably mechanically coupled to the packer 52 in that the lubricant supply is actuated when the packer segments are extended.
Des weiteren weist die Meßeinrichtung 6 vorliegend eine Steuereinheit 54 zur bedarfsweisen Ansteuerung der einzelnen Funktionseinheiten sowie einen Energiespeicher 55 auf.Furthermore, the measuring device 6 in the present case has a control unit 54 for controlling the individual functional units as required and an energy store 55.
Im übrigen versteht es sich, daß die vorgenannten Funktionseinheiten nicht notwendigerweise in der dargestellten Reihenfolge angeordnet sein müssen. Soweit die Funktion der Meßeinrichtung 6 nicht in Frage gestellt wird, lassen sich auch andere Anordnungen wählen. Beachtet werden sollte allerdings, daß sich der Packer 52 zwischen den unteren Zusttömöffhungen 51 und den oberen Ausströmöffnungen 48 befindet, so daß es möglich ist, über die Pumpe 46 den Ringraumpegel unterhalb des ausgefahrenen Packers 52 abzusenken.Moreover, it goes without saying that the aforementioned functional units do not necessarily have to be arranged in the order shown. If the function of the measuring device 6 is not called into question, other arrangements can also be selected. It should be noted, however, that the packer 52 is located between the lower inlet openings 51 and the upper outflow openings 48, so that it is possible to lower the annular space level below the extended packer 52 by means of the pump 46.
Im übrigen befindet sich im Gehäuse 41 ein den Strömungsweg 45 bildender Strangabschnitt, der eine Durchgangsöffhung aufweist, die mit dem Bohrgestänge 3 bzw. der Öffnung darin und der Meißeleinheit 5 kommuniziert. Mit dem den Strömungsweg 45 bildenden Strangabschnitt kommunizieren im übrigen die Ausströmöffnungen 48 und die Zuströmöffhungen 51. Am Ende des Strangabschnitts befindet sich vorliegend eine die Durchgangsöffhung ver- schließende Rückschlagklappe 56. Diese weist einen nicht dargestellten elektrischen Antrieb auf.Otherwise, there is a strand section forming the flow path 45 in the housing 41, which has a passage opening which communicates with the drill pipe 3 or the opening therein and the chisel unit 5. The outflow openings 48 and the inflow openings 51 also communicate with the line section forming the flow path 45. At the end of the line section there is a non-return flap 56 closing the through opening. This has an electric drive (not shown).
Im einzelnen nicht dargestellt ist, daß die einzelnen Funktionseinheiten derIt is not shown in detail that the individual functional units of the
Meßeinrichtung 6 elektrisch an die beiden zuvor beschriebenen Pole ange- schlössen sind, so daß eine elektrische Energieversorgung und, soweit die Meßeihheit 40 bzw. die Steuereinheit 54 betroffen sind, ein Datenaustausch mit der Auswerteeinrichtung 8 möglich ist.Measuring device 6 are electrically connected to the two poles described above, so that an electrical power supply and, insofar as Measuring unit 40 or the control unit 54 are affected, data exchange with the evaluation device 8 is possible.
Statt der zuvor beschriebenen Ausführungsform, bei der der Bohrstrang im Gehäuse 41 der Meßeinrichtung 6 geöffnet ist, ist es grundsätzlich auch möglich, daß die Meßeinrichtung 6 einen Durchgangsrohrabschnitt aufweist, der entweder beidseitig oder aber an einem Ende mit dem Bohrgestänge und am anderen Ende mit der Meißeleinheit 5 verbunden ist. Zur Analyse wird dann das Medium durch entsprechende Strömungswege durch das Gehäuse und da- bei auch an der Meßeinheit 40 vorbeigeführt. Auch in diesem Fall kann vorgesehen sein, daß das bereits vermessene Medium entweder einen Bohrstrang oder aber in den Ringraum abgegeben wird. Eine entsprechende in den Bohrstrang hinein öffnende Ventileinheit ist in diesem Fall erforderlich.Instead of the previously described embodiment, in which the drill string in the housing 41 of the measuring device 6 is open, it is in principle also possible for the measuring device 6 to have a through-tube section which is either on both sides or at one end with the drill pipe and at the other end with the Chisel unit 5 is connected. For the analysis, the medium is then led through corresponding flow paths through the housing and also past the measuring unit 40. In this case too, it can be provided that the medium that has already been measured is either released into a drill string or into the annular space. A corresponding valve unit opening into the drill string is required in this case.
Die Erfindung ermöglicht es, vor, während und nach dem Bohren ständig den Zustand des Mediums im Bohrloch zu messen. Die Daten können in der Auswerteeinrichtung 8 sofort ausgewertet werden. So werden beispielsweise hydrologische Veränderungen während des Bohrens unverzüglich erkannt und es ist auch eine Verprobung sofort möglich. Hierzu schließt bei der dargestellten Ausführungsform die Rückschlagklappe 56 das Bohrrohr nach unten ab, während der Packer 52 ausgefahren wird. Die Pumpe 46 fordert dann das Medium nach Verschluß der Ausströmöffnungen 48 mittels der Ventileinheit 47 durch den Bohrstrang nach Übertage. The invention makes it possible to continuously measure the state of the medium in the borehole before, during and after drilling. The data can be evaluated in the evaluation device 8 immediately. For example, hydrological changes during drilling are recognized immediately and testing is also possible immediately. For this purpose, in the embodiment shown, the non-return flap 56 closes off the drill pipe while the packer 52 is being extended. The pump 46 then requests the medium after the outflow openings 48 have been closed by means of the valve unit 47 through the drill string to the surface.

Claims

Patentansprüche: claims:
1. Meßeinrichtung (6) zur Verbindung mit einem Bohrgestänge (3) für Tiefbohrungen, mit einer elektrisch betriebenen Meßeinheit (40) zur Messung re- levanter Daten das Gebirge, die Bohrspülung und oder den zu gewinnenden Rohstoff betreffend, wobei die Meßeinrichtung (6) zur Versorgung mit elektrischer Energie über das Bohrgestänge (3) und zum Datentransfer nach Übertage ebenfalls über das Bohrgestänge (3) ausgebildet ist, dadurch gekennzeichnet, daß ein äußeres Gehäuse (41) der Meßeinrichtung (6) mit we- nigstens einer Zuströmöffnung (51) und wenigstens einer Ausströmöffnung (48) vorgesehen ist und daß das Gehäuse (41) an seinen beiden Enden Schraubanschlüsse zum Anschluß an das Bohrgestänge (3) und/oder die Meißeleinrichtung (5) aufweist.1. Measuring device (6) for connection to a drill pipe (3) for deep drilling, with an electrically operated measuring unit (40) for measuring relevant data relating to the mountains, the drilling fluid and or the raw material to be extracted, the measuring device (6) for supplying electrical energy via the drill pipe (3) and for data transfer to the surface also via the drill pipe (3), characterized in that an outer housing (41) of the measuring device (6) with at least one inflow opening (51) and at least one outflow opening (48) is provided and that the housing (41) has screw connections at both ends for connection to the drill pipe (3) and / or the chisel device (5).
2. Meßeinrichtung nach Anspruch 1, dadurch gekennzeichnet, daß der Meßeinrichtung (6) eine übertägig angeordnete Auswerteeinrichtung (8) zugeordnet ist und daß die Meßeinrichtung (6) mit der Auswerteeinrichtung (8) elektrisch gekoppelt ist.2. Measuring device according to claim 1, characterized in that the measuring device (6) is assigned a surface-mounted evaluation device (8) and that the measuring device (6) with the evaluation device (8) is electrically coupled.
3. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß ein Wandler (44), insbesondere ein Spannungswandler, zur Wandlung von Meßsignalen zur anschließenden Übertragung zur Auswerteeinrichtung (8) vorgesehen ist und/oder daß die Auswerteeinrichtung (8) derart ausgebildet ist, daß die Meßsignale aus der Energieaufnahme der Meßein- heit (40) abgeleitet werden.3. Measuring device according to one of the preceding claims, characterized in that a converter (44), in particular a voltage converter, is provided for converting measurement signals for subsequent transmission to the evaluation device (8) and / or that the evaluation device (8) is designed in such a way that the measurement signals are derived from the energy consumption of the measuring unit (40).
4. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß die Meßeinheit (40) bedarfsweise eine Mehrzahl von insbesondere modular ausgebildeten Meßgeräten zur Aufnahme unterschiedlicher Daten aufweist.4. Measuring device according to one of the preceding claims, characterized in that the measuring unit (40) if necessary has a plurality of in particular modular measuring devices for recording different data.
5. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß die Meßwertaufhehmer der Meßeinheit (40) in einen Strömungsweg (45) innerhalb des Gehäuses (41) gerichtet sind. 5. Measuring device according to one of the preceding claims, characterized in that the transducers of the measuring unit (40) are directed into a flow path (45) within the housing (41).
6. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß wenigstens eine elektrisch betriebene, in Strömungsverbindung mit der Meßeinheit (40) stehende Pumpe (46) vorgesehen ist, um das zu untersuchende Medium der Meßeinheit (40) zuzuführen.6. Measuring device according to one of the preceding claims, characterized in that at least one electrically operated, in flow connection with the measuring unit (40) standing pump (46) is provided to supply the medium to be examined to the measuring unit (40).
7. Meßeinrichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß eine elektrisch betriebene Ventileinheit vorgesehen ist, um das untersuchte Medium bedarfsweise in den Ringraum oder das Bohrgestänge abzuführen.7. Measuring device according to one of the preceding claims, characterized in that an electrically operated valve unit is provided in order to discharge the examined medium, if necessary, into the annular space or the drill pipe.
8. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß der Pumpe (46) wenigstens ein Filter (49) und/oder Ventile (50) vorgeschaltet sind.8. Measuring device according to one of the preceding claims, characterized in that the pump (46) at least one filter (49) and / or valves (50) are connected upstream.
9. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß eine elektrisch betriebener, insbesondere elektrohydraulischer Packer (52) vorgesehen ist.9. Measuring device according to one of the preceding claims, characterized in that an electrically operated, in particular electrohydraulic packer (52) is provided.
10. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch ge- kennzeichnet, daß der Packer (52) eine Mehrzahl von Packersegmenten aufweist, die sich zumindest im eingefahrenen Zustand zumindest teilweise überdecken.10. Measuring device according to one of the preceding claims, characterized in that the packer (52) has a plurality of packer segments which at least partially overlap at least in the retracted state.
11. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch ge- kennzeichnet, daß eine insbesondere elektrisch betriebene Schmiermittelversorgungseinrichtung (53) zum Aufbringen einer Schmiermittelschicht auf die Oberseite des Packers im ausgefahrenen Zustand oder beim Ausfahren des Packers vorgesehen ist.11. Measuring device according to one of the preceding claims, characterized in that an in particular electrically operated lubricant supply device (53) is provided for applying a lubricant layer to the top of the packer in the extended state or when the packer is extended.
12. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß eine elektrisch betriebene Steuereinheit (44) zur bedarfsweisen Ansteuerung der Funktionseinheiten vorgesehen ist.12. Measuring device according to one of the preceding claims, characterized in that an electrically operated control unit (44) is provided for controlling the functional units as required.
13. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch ge- kennzeichnet, daß ein Energiespeicher (55) im Gehäuse (41) vorgesehen ist. 13. Measuring device according to one of the preceding claims, characterized in that an energy store (55) is provided in the housing (41).
14. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß die Zuströmöffiiung (51) des Gehäuses (41) unterhalb des Packers (52) und die Ausströmöffnung (48) oberhalb des Packers (52) vorgesehen ist.14. Measuring device according to one of the preceding claims, characterized in that the inflow opening (51) of the housing (41) below the packer (52) and the outflow opening (48) above the packer (52) is provided.
15. Meßeimichtung nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, daß im Gehäuse (41) ein mit dem Bohrgestänge (3) kommunizierender Strangabschnitt mit Durchgangsöffhung vorgesehen ist und daß, vorzugsweise, dem Strangabschnitt eine die Durchgangsöffnung verschlie- ßende Rückschlagklappe (56) zugeordnet ist.15. Measuring device according to one of the preceding claims, characterized in that in the housing (41) with the drill pipe (3) communicating strand section with through opening is provided and that, preferably, the strand section is assigned a check valve (56) closing the through opening ,
16. Bohrvorrichtung (1) für Tiefbohrungen, mit einem Bohrgestänge (3), mit wenigstens einer Meßeinrichtung (6) nach einem der vorhergehenden Ansprüche und mit einer mit der Meßeinrichtung (6) elektrisch gekoppelten, übertä- gig angeordneten Auswerteeinrichtung (8).16. Drilling device (1) for deep drilling, with a drill pipe (3), with at least one measuring device (6) according to one of the preceding claims and with an evaluation device (8) which is electrically coupled to the measuring device (6) and is arranged above the surface.
17. Bohrvorrichtung nach Anspruch 16, dadurch gekennzeichnet, daß eine Meißeleinheit (5) vorgesehen ist und daß die Meßeinrichtung (6) mit ihrem unteren Ende mit der Meißeleinheit (5) verbunden ist. 17. Drilling device according to claim 16, characterized in that a chisel unit (5) is provided and that the measuring device (6) is connected at its lower end to the chisel unit (5).
PCT/EP2004/014877 2004-01-22 2004-12-31 Measuring device and drilling device for deep drillings WO2005071224A2 (en)

Priority Applications (12)

Application Number Priority Date Filing Date Title
YUP-2006/0313A RS20060313A (en) 2004-01-22 2004-12-31 Measuring device and drilling device for deep drillings
US10/596,575 US20070175663A1 (en) 2004-01-22 2004-12-31 Measuring device and drilling device for deep drillings
JP2006549925A JP2007518905A (en) 2004-01-22 2004-12-31 Measuring device and deep well drilling device
BRPI0418436-0A BRPI0418436A (en) 2004-01-22 2004-12-31 deep well measuring device and drilling rig
AU2004314380A AU2004314380A1 (en) 2004-01-22 2004-12-31 Measuring device and drilling device for deep drillings
AP2006003680A AP2006003680A0 (en) 2004-01-22 2004-12-31 Measuring device and drilling device for deep drilling
EA200601342A EA200601342A1 (en) 2004-01-22 2004-12-31 MEASURING DEVICE AND BORING UNIT FOR DEEP WELLS
MXPA06007946A MXPA06007946A (en) 2004-01-22 2004-12-31 Measuring device and drilling device for deep drillings.
CA002544711A CA2544711A1 (en) 2004-01-22 2004-12-31 Measuring device and drilling device for deep drillings
EP04804461A EP1706584A2 (en) 2004-01-22 2004-12-31 Measuring device and drilling device for deep drillings
NO20061988A NO20061988L (en) 2004-01-22 2006-05-04 Painting and drilling equipment for deep boreholes
TNP2006000230A TNSN06230A1 (en) 2004-01-22 2006-07-21 Measuring device and drilling device for deep drillings

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102004003481.8 2004-01-22
DE102004003481A DE102004003481B4 (en) 2004-01-22 2004-01-22 Measuring device and drilling device for deep drilling and method for measuring relevant data in deep wells

Publications (2)

Publication Number Publication Date
WO2005071224A2 true WO2005071224A2 (en) 2005-08-04
WO2005071224A3 WO2005071224A3 (en) 2005-11-03

Family

ID=34800946

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2004/014877 WO2005071224A2 (en) 2004-01-22 2004-12-31 Measuring device and drilling device for deep drillings

Country Status (18)

Country Link
US (1) US20070175663A1 (en)
EP (1) EP1706584A2 (en)
JP (1) JP2007518905A (en)
CN (1) CN1906379A (en)
AP (1) AP2006003680A0 (en)
AU (1) AU2004314380A1 (en)
BR (1) BRPI0418436A (en)
CA (1) CA2544711A1 (en)
DE (1) DE102004003481B4 (en)
EA (1) EA200601342A1 (en)
EC (1) ECSP066719A (en)
MA (1) MA28297A1 (en)
MX (1) MXPA06007946A (en)
NO (1) NO20061988L (en)
RS (1) RS20060313A (en)
TN (1) TNSN06230A1 (en)
WO (1) WO2005071224A2 (en)
ZA (1) ZA200605652B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7913774B2 (en) * 2005-06-15 2011-03-29 Schlumberger Technology Corporation Modular connector and method
GB2454699B (en) * 2007-11-15 2012-08-15 Schlumberger Holdings Measurements while drilling or coring using a wireline drilling machine
US20130026978A1 (en) * 2011-07-27 2013-01-31 Fastcap Systems Corporation Power supply for downhole instruments
CN104221110B (en) 2011-07-08 2019-04-05 快帽系统公司 High temperature energy storage device
US9558894B2 (en) 2011-07-08 2017-01-31 Fastcap Systems Corporation Advanced electrolyte systems and their use in energy storage devices
CA2854404C (en) 2011-11-03 2021-05-25 Fastcap Systems Corporation Production logging instrument
US9366094B2 (en) * 2012-11-30 2016-06-14 Intelliserv, Llc Pipe joint having coupled adapter
US10872737B2 (en) 2013-10-09 2020-12-22 Fastcap Systems Corporation Advanced electrolytes for high temperature energy storage device
WO2015095858A2 (en) 2013-12-20 2015-06-25 Fastcap Systems Corporation Electromagnetic telemetry device
CN107533919A (en) 2015-01-27 2018-01-02 快帽系统公司 Wide temperature range ultracapacitor
CN105482996B (en) * 2016-01-06 2018-01-30 西北工业大学 Three-dimensional cell culture support mechanical stimulation loading device
WO2018224703A1 (en) * 2017-06-09 2018-12-13 Consejo Superior De Investigaciones Cientificas (Csic) Multiparametric probe for monitoring subterranean environments

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4570481A (en) * 1984-09-10 1986-02-18 V.E. Kuster Company Instrument locking and port bundle carrier
US5404946A (en) * 1993-08-02 1995-04-11 The United States Of America As Represented By The Secretary Of The Interior Wireline-powered inflatable-packer system for deep wells
US6581455B1 (en) * 1995-03-31 2003-06-24 Baker Hughes Incorporated Modified formation testing apparatus with borehole grippers and method of formation testing

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8203399A (en) * 1982-08-31 1984-03-16 Ijsselmeer Beton Fundatietechn TRANSMISSION SYSTEM FOR SOIL RESEARCH.
GB8714754D0 (en) * 1987-06-24 1987-07-29 Framo Dev Ltd Electrical conductor arrangements
DE69629901T2 (en) * 1995-03-31 2004-07-22 Baker-Hughes Inc., Houston DEVICE AND METHOD FOR INSULATING AND TESTING A FORMATION
US6820702B2 (en) * 2002-08-27 2004-11-23 Noble Drilling Services Inc. Automated method and system for recognizing well control events

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4570481A (en) * 1984-09-10 1986-02-18 V.E. Kuster Company Instrument locking and port bundle carrier
US5404946A (en) * 1993-08-02 1995-04-11 The United States Of America As Represented By The Secretary Of The Interior Wireline-powered inflatable-packer system for deep wells
US6581455B1 (en) * 1995-03-31 2003-06-24 Baker Hughes Incorporated Modified formation testing apparatus with borehole grippers and method of formation testing

Also Published As

Publication number Publication date
TNSN06230A1 (en) 2007-12-03
BRPI0418436A (en) 2007-05-22
RS20060313A (en) 2007-12-31
DE102004003481A1 (en) 2005-08-25
JP2007518905A (en) 2007-07-12
CA2544711A1 (en) 2005-08-04
MA28297A1 (en) 2006-11-01
EP1706584A2 (en) 2006-10-04
DE102004003481B4 (en) 2007-01-25
WO2005071224A3 (en) 2005-11-03
ECSP066719A (en) 2006-10-31
EA200601342A1 (en) 2007-06-29
US20070175663A1 (en) 2007-08-02
ZA200605652B (en) 2007-11-28
NO20061988L (en) 2006-08-21
CN1906379A (en) 2007-01-31
AU2004314380A1 (en) 2005-08-04
AP2006003680A0 (en) 2006-08-31
MXPA06007946A (en) 2007-01-31

Similar Documents

Publication Publication Date Title
DE69012717T2 (en) Shock absorber for a downhole tool.
DE2840014C2 (en)
DE68927569T2 (en) Downhole device and method for determining the properties of a formation
DE60132115T2 (en) SUCTION DEVICE AND METHOD FOR IN-SITU ANALYSIS OF FORMATION FLUIDS
DE60305733T2 (en) DRILLING A DRILL
DE60320101T2 (en) METHOD FOR REGRESSIONAL ANALYSIS OF FORMATION PARAMETERS
DE4429136C2 (en) Multi-level packer system for sampling, in particular groundwater sampling, and / or recording of measured values of physical, chemical and / or geophysical parameters at different depths in a borehole
WO2005071224A2 (en) Measuring device and drilling device for deep drillings
DE69721909T2 (en) Formation testing device
DE2747748A1 (en) METHOD FOR DETERMINING MEASURED VALUES OF THE FORMATIONS SURROUNDING A DEEP HOLE
DE3328751A1 (en) DEVICE FOR TAKING MEASURES DURING DRILLING AND SLUDGE PRESSURE VALVE
DE4126249A1 (en) TELEMETRY DEVICE, IN PARTICULAR FOR TRANSMITTING MEASURED DATA WHILE DRILLING
DE2600252A1 (en) METHOD AND DEVICE FOR MANIPULATING CIRCULATION AND / OR TEST VALVES IN A DRILL HOLE
DE102005029349A1 (en) Wireline-bound arrangement, method of assessing a subsurface formation, downhole tool, and method of sampling in a wellbore
DE3035905A1 (en) DEVICE FOR REMOTELY TRANSMITTING INFORMATION FROM A DRILL HOLE TO THE GROUND SURFACE DURING THE OPERATION OF A DRILLING DEVICE
DE112016006159T5 (en) ELECTRIC UNDERFLOOR SAFETY VALVE (ESSSV)
DE2742591C2 (en) Method for determining the clamping point of a pipe string stuck in a borehole and device for carrying out the method
DE3113749C2 (en) Device for the remote transmission of information from a borehole to the surface of the earth during the operation of a drilling rig
DE3686635T2 (en) PRESSURE-DRILLED HOLE TOOL WITH SAFETY RELEASE DEVICE.
DE112011105668T5 (en) Formation fluid sample container device
DE102004003479B4 (en) Drill pipe for deep drilling
DE3242905A1 (en) DEVICE FOR MEASURING PRESSURE IN A HOLE
DE3229151C2 (en)
DE68906043T2 (en) HYDRAULIC SETTING DEVICE.
DE19819258C2 (en) Method and measuring probe for carrying out measurements in water supply systems

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: P-2006/0313

Country of ref document: YU

AK Designated states

Kind code of ref document: A2

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2004804461

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2544711

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 1189/KOLNP/2006

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 175825

Country of ref document: IL

WWE Wipo information: entry into national phase

Ref document number: 2004314380

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 547654

Country of ref document: NZ

ENP Entry into the national phase

Ref document number: 2004314380

Country of ref document: AU

Date of ref document: 20041231

Kind code of ref document: A

WWP Wipo information: published in national office

Ref document number: 2004314380

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 10596575

Country of ref document: US

Ref document number: 2007175663

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2006/05652

Country of ref document: ZA

Ref document number: 200605652

Country of ref document: ZA

WWE Wipo information: entry into national phase

Ref document number: PA/a/2006/007946

Country of ref document: MX

WWE Wipo information: entry into national phase

Ref document number: 12006501372

Country of ref document: PH

Ref document number: 200480040605.8

Country of ref document: CN

Ref document number: 2006549925

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: CR2006-008523

Country of ref document: CR

WWE Wipo information: entry into national phase

Ref document number: 200601342

Country of ref document: EA

WWE Wipo information: entry into national phase

Ref document number: 9589/1

Country of ref document: GE

WWP Wipo information: published in national office

Ref document number: 2004804461

Country of ref document: EP

ENP Entry into the national phase

Ref document number: PI0418436

Country of ref document: BR

WWP Wipo information: published in national office

Ref document number: 10596575

Country of ref document: US