WO2005054585A1 - Method of constructing an offshore platform comprising at least one pile - Google Patents

Method of constructing an offshore platform comprising at least one pile Download PDF

Info

Publication number
WO2005054585A1
WO2005054585A1 PCT/GB2004/005034 GB2004005034W WO2005054585A1 WO 2005054585 A1 WO2005054585 A1 WO 2005054585A1 GB 2004005034 W GB2004005034 W GB 2004005034W WO 2005054585 A1 WO2005054585 A1 WO 2005054585A1
Authority
WO
WIPO (PCT)
Prior art keywords
pile
platform
topside
section
conduit
Prior art date
Application number
PCT/GB2004/005034
Other languages
French (fr)
Inventor
Brian Leonard Smith
Paul David Thomson
Original Assignee
Slp Engineering Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Slp Engineering Limited filed Critical Slp Engineering Limited
Priority to EP04801249A priority Critical patent/EP1699980B1/en
Priority to DE602004023230T priority patent/DE602004023230D1/en
Priority to AT04801249T priority patent/ATE443185T1/en
Publication of WO2005054585A1 publication Critical patent/WO2005054585A1/en
Priority to TNP2006000163A priority patent/TNSN06163A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0008Methods for grouting offshore structures; apparatus therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0095Connections of subsea risers, piping or wiring with the offshore structure

Definitions

  • the present invention relates to a method of constructing an offshore platform and to an offshore platform which may be constructed by said method.
  • Offshore platforms are used to exploit oil and gas reserves that exist below a seabed.
  • a well is drilled into the seabed in a potential oil or gas field and, if sufficient oil or gas is found, exploitation of the well may commence.
  • a tree is coupled to the wellhead, the tree comprising safety valves and distribution connections. The tree may be located on the seabed, or on a platform above sea level installed above the wellhead. Oil and gas extracted from the well pass up to the platform and may be processed before being piped to storage on or offshore.
  • Installing a platform is a complex and expensive operation usually requiring the hiring of specialist installation vessels that have cranes or hoists with the required reach and. lift capacity.
  • platforms are only installed over wells that have a comparatively high expected output as this helps to justify the high capital cost of installation.
  • For wells that have a low expected output the tree is often installed on the seabed and the oil or gas pumped to a nearby platform for distribution. This can increase the useful life of a platform and therefore further help to justify the capital cost of platform installation.
  • sub-sea trees suffer from comparatively high intervention costs in the event of a malfunction as divers and sub-sea vessels are usually required to perform the required intervention. It is an obj ect of the present invention to provide a method of constructing an offshore platform and an offshore platform that address some of the above issues.
  • a method of constructing an offshore platform comprising at least one pile and a topside, the pile comprising at least two pile sections, one of the pile sections having a sleeve portion attached thereto and the other pile section including a joining portion, the method comprising the steps of; a. driving a first pile section into a seabed in the desired location for the platform such that a root portion of the first pile section extends into the seabed and a stem portion of first pile section extends substantially vertically upwards from the seabed to a level below a Lowest Astronomical Tide level; b.
  • the section that is driven into the seabed can be free of non-essential attached apparatus. Any apparatus required can be attached to the second or other section of the pile. This reduces the likelihood of damage to the attached apparatus during the driving operation.
  • LAT Lowest Astronomical Tide
  • a grouted connection is a rapid and reliable way to secure two sections of pile to one another and does not require sub-sea operations to be carried out.
  • the grout is preferably pumped from above sea level through a pipe into the space between the sleeve portion and the joining portion and allowed to cure to secure the two sections together. It should be understood that other methods of inserting the grout between the two sections could be employed.
  • grout is used herein to refer to an adhesive that may be pumped into the gap between the sleeve portion and the j oining portion and allowed to set to secure the two portions to one another .
  • the sleeve portion is attached to the second pile section as this allows a feed pipe for the grout to be attached to the second pile section which reduces the likelihood of damage to the feed pipe during positioning and also during driving of the first pile section.
  • the second pile section may also comprise an integral conduit means for guiding grout between the joining portion and the sleeve
  • the topside may be attached to the second pile section before the second pile section is installed, or it may be installed afterwards. If the topside is installed after the installation of the second pile section then it is preferred that the topside is secured to the second pile section using a second grouted connection. If this is the case, it is preferred that the topside includes a second sleeve portion.
  • This invention is particularly applicable to a platform which is not normally manned and consequently has a minimal topside having facilities for workers only suitable for use in rare circumstances including a blast resistant temporary refuge. It is therefore preferred that the platform comprises only one pile comprising at least two pile sections and a topside.
  • the pile is preferably substantially hollow as this allows conduits and pipes to be located within the pile which provides protection for those pipes and conduits within the pile.
  • a hollow pile also enables the pile to be installed over an existing wellhead, or for the well to be drilled through the pile once the platform has been installed.
  • the present invention is particularly intended for a gas platform which includes a riser passing away from the platform, a condu.it for passing gas from the wellhead to the topside and a tree on the topside connecting the conduit and the riser. It is preferred that the pile is substantially hollow and the conduit is located within the pile. It is also preferred that the riser passes through the hollow interior of at least some of the second pile section.
  • the invention also provides an offshore platform comprising a pile embedded in a seabed and extending to a level above sea level, the pile having a substantially hollow interior, the platform further comprising a topside supported by said pile, a tree located on said topside, a riser and a conduit connected to said tree, the riser for passing fluid from the platform and the conduit for passing fluid from a sub-sea wellhead to the tree, wherein the conduit and riser are located within the hollow interior of the pile in a region of the pile vulnerable to ship impact such that the riser and conduit are substantially protected from ship impact.
  • An offshore platform according to the invention is preferably a not normally manned gas platform comprising only one pile which is most preferably formed by the method of the present invention as described above. It should be understood that an offshore platform according to the invention may be constructed by a method according to the invention .
  • Figure 1 shows a platform constructed according to the inventio ;
  • Figure 2 shows a different platform constructed according to the invention.
  • Figure 1 shows a not normally manned gas platform 1.
  • the platform 1 includes one substantially hollow pile 2 and a topside 4.
  • the pile 2 comprises two sections, a first pile section 6 and a second pile section 8.
  • the first pile section 6 includes a joining portion 10
  • the second pile section 8 includes a sleeve portion 12.
  • the sleeve portion 12 is secur-ed over the joining portion 10 using a grout 14 between the portions 10,12.
  • a root portion 18 of the first pile section 6 is driven into a seabed 16 to a depth of about 25 m below an upper level 17 of the seabed 16.
  • a stem portion 20 exrtends substantially vertically upwards from the seabed 16 to a level below a Lowest Astronomical Tide (LAT) level 22.
  • LAT Lowest Astronomical Tide
  • the sleeve portion 12 of the second pile section 8 is then located over the joining portion 10 of the first pile section 6 and the grout 14 is forced into the joint between the portions 10,12 to secure the first pile section 6 to the second pile section 8. This forms a grouted connection 24.
  • the topside 4 is attached to the second pile section 8 before the second pile section 8 is installed onto the first pile section 6.
  • a wellhead 26 is located within the hollow pile 2 and a conduit 28 passes within the pile to the topside 4.
  • the conduit 28 is connected to a tree 30 on the topside 4 that connects the conduit 28 to a riser 32.
  • the riser 32 passes down through the interior of the second pile section 8 from the tree 30 until sleeve portion 12 is reached, at which point the riser passes out through the pile 2 and to the seabed 16. In this way, the riser and conduit are protected within the pile at levels above the Lowest Astronomical Tide Level 22 and the riser 32 does not. pass though the first pile section 6 and so is protected from damage during the driving operation.
  • the conduit 28 will typically be a substantially rigid vertical pipe, although it may be possible for the conduit to be flexible or take a different form.
  • the topside includes a helideck 34 at the top and a temporary blast refuge 36 for workers that have to stay on the platform overnight for any reason.
  • FIG. 2 shows a different platform 101 constructed according to the invention.
  • the platform 101 includes a single pile 102 that comprises three pile sections, a first pile section 6, a second pile section 108 and a third pile section 38 to which the topside 4 is attached.
  • the first and second pile sections are joined using a grouted connection 24.
  • the second and third pile sections 108,38 are also joined using a grouted connection 124 with the third pile section 38 comprising a sleeve portion 112 and the second pile section 108 comprising a joining portion 110.
  • each sleeve portion 12,112 includes a conduit means 40 through which grout 14 may be forced and guided into the gap between the joining portions 10,110 and the sleeve portions 12,112 to form the connections 24,124.

Abstract

The invention provides a method of constructing an offshore platform (1). The platform includes at least one pile (2) and a topside (4). The pile has at least two pile sections (6,8), one of the pile sections having a sleeve portion (12) and the other pile section including a joining portion (10). The method includes the steps of driving a first pile section (6) into a seabed (16) in the desired location for the platform (1) such that a root portion (18) of the first pile section (6) extends into the seabed (16) and a stem portion (20) extends substantially vertically upwards to a level below a Lowest Astronomical Tide level (22). A second pile section (8) is arranged above the first pile section (6) such that the sleeve portion (12) substantially surrounds the joining portion (10). A grout (14) is inserted between the joining portion (10) and the sleeve portion (12) to form a grouted connection (24) to secure the two pile sections (6,8) together and the topside (4) is supported using the pile (2).

Description

METHOD OF CONSTRUCTING AN OFFSHORE PLATFORM COMPRISING AT LEAST ONE PILE
The present invention relates to a method of constructing an offshore platform and to an offshore platform which may be constructed by said method.
Offshore platforms are used to exploit oil and gas reserves that exist below a seabed. A well is drilled into the seabed in a potential oil or gas field and, if sufficient oil or gas is found, exploitation of the well may commence. A tree is coupled to the wellhead, the tree comprising safety valves and distribution connections. The tree may be located on the seabed, or on a platform above sea level installed above the wellhead. Oil and gas extracted from the well pass up to the platform and may be processed before being piped to storage on or offshore.
Installing a platform is a complex and expensive operation usually requiring the hiring of specialist installation vessels that have cranes or hoists with the required reach and. lift capacity. Typically platforms are only installed over wells that have a comparatively high expected output as this helps to justify the high capital cost of installation. For wells that have a low expected output the tree is often installed on the seabed and the oil or gas pumped to a nearby platform for distribution. This can increase the useful life of a platform and therefore further help to justify the capital cost of platform installation. However, sub-sea trees suffer from comparatively high intervention costs in the event of a malfunction as divers and sub-sea vessels are usually required to perform the required intervention. It is an obj ect of the present invention to provide a method of constructing an offshore platform and an offshore platform that address some of the above issues.
According to the invention there is provided a method of constructing an offshore platform, the platform comprising at least one pile and a topside, the pile comprising at least two pile sections, one of the pile sections having a sleeve portion attached thereto and the other pile section including a joining portion, the method comprising the steps of; a. driving a first pile section into a seabed in the desired location for the platform such that a root portion of the first pile section extends into the seabed and a stem portion of first pile section extends substantially vertically upwards from the seabed to a level below a Lowest Astronomical Tide level; b. locating a second pile section above the first pile section such that the sleeve portion substantially surrounds the joining portion such that the second pile section extends substantially parallel to the first pile section; c. inserting a grout between the joining portion and the sleeve portion to form a grouted connection to secure the two pile sections together; and d. supporting the topside using the pile.
Building the platform in sections in this way reduces the weight and overall dimensions of each section of the platform and the result is that there are an increased number of vessels that could potentially install each section and this reduces the installation cost as there is increased competition. Each section is smaller and so is more easily manoeuvrable and can more easily be arranged as required and this is likely to reduce the installation time .
By having a first pile section that extends into the seabed and substantially vertically upwards to a level below the Lowest Astronomical Tide (LAT) < level the section that is driven into the seabed can be free of non-essential attached apparatus. Any apparatus required can be attached to the second or other section of the pile. This reduces the likelihood of damage to the attached apparatus during the driving operation.
A grouted connection is a rapid and reliable way to secure two sections of pile to one another and does not require sub-sea operations to be carried out. The grout is preferably pumped from above sea level through a pipe into the space between the sleeve portion and the joining portion and allowed to cure to secure the two sections together. It should be understood that other methods of inserting the grout between the two sections could be employed.
The term grout is used herein to refer to an adhesive that may be pumped into the gap between the sleeve portion and the j oining portion and allowed to set to secure the two portions to one another .
The use of a joining portion and a sleeve portion that substantially surrounds the j oining portion facilitates the alignment of the sections of the pile.
It is preferred that the sleeve portion is attached to the second pile section as this allows a feed pipe for the grout to be attached to the second pile section which reduces the likelihood of damage to the feed pipe during positioning and also during driving of the first pile section. The second pile section may also comprise an integral conduit means for guiding grout between the joining portion and the sleeve
The topside may be attached to the second pile section before the second pile section is installed, or it may be installed afterwards. If the topside is installed after the installation of the second pile section then it is preferred that the topside is secured to the second pile section using a second grouted connection. If this is the case, it is preferred that the topside includes a second sleeve portion.
This invention is particularly applicable to a platform which is not normally manned and consequently has a minimal topside having facilities for workers only suitable for use in rare circumstances including a blast resistant temporary refuge. It is therefore preferred that the platform comprises only one pile comprising at least two pile sections and a topside.
The pile is preferably substantially hollow as this allows conduits and pipes to be located within the pile which provides protection for those pipes and conduits within the pile. A hollow pile also enables the pile to be installed over an existing wellhead, or for the well to be drilled through the pile once the platform has been installed.
The present invention is particularly intended for a gas platform which includes a riser passing away from the platform, a condu.it for passing gas from the wellhead to the topside and a tree on the topside connecting the conduit and the riser. It is preferred that the pile is substantially hollow and the conduit is located within the pile. It is also preferred that the riser passes through the hollow interior of at least some of the second pile section.
The invention also provides an offshore platform comprising a pile embedded in a seabed and extending to a level above sea level, the pile having a substantially hollow interior, the platform further comprising a topside supported by said pile, a tree located on said topside, a riser and a conduit connected to said tree, the riser for passing fluid from the platform and the conduit for passing fluid from a sub-sea wellhead to the tree, wherein the conduit and riser are located within the hollow interior of the pile in a region of the pile vulnerable to ship impact such that the riser and conduit are substantially protected from ship impact.
An offshore platform according to the invention is preferably a not normally manned gas platform comprising only one pile which is most preferably formed by the method of the present invention as described above. It should be understood that an offshore platform according to the invention may be constructed by a method according to the invention .
The invention will now be further described, by way of example, with refer-ence to the accompanying drawings, in which:
Figure 1 shows a platform constructed according to the inventio ; Figure 2 shows a different platform constructed according to the invention.
Figure 1 shows a not normally manned gas platform 1. The platform 1 includes one substantially hollow pile 2 and a topside 4. The pile 2 comprises two sections, a first pile section 6 and a second pile section 8. The first pile section 6 includes a joining portion 10 and the second pile section 8 includes a sleeve portion 12. The sleeve portion 12 is secur-ed over the joining portion 10 using a grout 14 between the portions 10,12.
To construct the platform 1, a root portion 18 of the first pile section 6 is driven into a seabed 16 to a depth of about 25 m below an upper level 17 of the seabed 16. A stem portion 20 exrtends substantially vertically upwards from the seabed 16 to a level below a Lowest Astronomical Tide (LAT) level 22.
The sleeve portion 12 of the second pile section 8 is then located over the joining portion 10 of the first pile section 6 and the grout 14 is forced into the joint between the portions 10,12 to secure the first pile section 6 to the second pile section 8. This forms a grouted connection 24. The topside 4 is attached to the second pile section 8 before the second pile section 8 is installed onto the first pile section 6.
A wellhead 26 is located within the hollow pile 2 and a conduit 28 passes within the pile to the topside 4. The conduit 28 is connected to a tree 30 on the topside 4 that connects the conduit 28 to a riser 32. The riser 32 passes down through the interior of the second pile section 8 from the tree 30 until sleeve portion 12 is reached, at which point the riser passes out through the pile 2 and to the seabed 16. In this way, the riser and conduit are protected within the pile at levels above the Lowest Astronomical Tide Level 22 and the riser 32 does not. pass though the first pile section 6 and so is protected from damage during the driving operation. It should be noted that the conduit 28 will typically be a substantially rigid vertical pipe, although it may be possible for the conduit to be flexible or take a different form.
The topside includes a helideck 34 at the top and a temporary blast refuge 36 for workers that have to stay on the platform overnight for any reason.
Figure 2 shows a different platform 101 constructed according to the invention. The platform 101 includes a single pile 102 that comprises three pile sections, a first pile section 6, a second pile section 108 and a third pile section 38 to which the topside 4 is attached. As with the platform 1 of Figure 1, the first and second pile sections are joined using a grouted connection 24. The second and third pile sections 108,38 are also joined using a grouted connection 124 with the third pile section 38 comprising a sleeve portion 112 and the second pile section 108 comprising a joining portion 110. In the platform 101, each sleeve portion 12,112 includes a conduit means 40 through which grout 14 may be forced and guided into the gap between the joining portions 10,110 and the sleeve portions 12,112 to form the connections 24,124.
It should be understood that the invention has been described above by way of example only and that modifications in detail may be made without departing from the scope of the invention as described in the claims.

Claims

Claims
1. A method of constructing an offshore platform, the platform comprising at least one pile and a topside, the pile comprising at least two pile sections, one of the pile sections having a sleeve portion attached thereto and the other pile section including a joining portion, the method comprising the steps of; a. driving a first pile section into a seabed in the desired location for the platform such that a root portion of the first pile section extends into the seabed and a stem portion of first pile section extends substantially vertically upwards from the seabed to a level below a Lowest Astronomical Tide level; b. locating a second pile section above the first pile section such that the sleeve portion substantially surrounds the joining portion such that the second pile section extends substantially parallel to the first pile section; c. inserting grout between the joining portion and the sleeve portion to form a grouted connection to secure the two pile sections together; and d. supporting the topside using the pile.
2. A method as claimed in claim 1, in which the sleeve portion is attached to the second pile section.
3. A method as claimed in claim 1 or claim 2 in which the second pile section includes conduit means which are used for guiding grout between the joining portion and the sleeve portion.
4. A method as claimed in any preceding claim, in which the topside is secured to the second pile section using a second sleeve portion, a second joining portion and grout to form a second grouted connection.
5. A method as claimed in any preceding claim, in which the platform comprises only one pile.
6. A method as claimed in claim 5, in which the pile installed has a substantially hollow interior.
7. A method as claimed in claim 6, in which the first pile section is driven into the seabed over an existing wellhead.
8. A method as claimed in claim 7, in which the platform installed is a gas platform and the method includes the steps of installing a riser for passing gas away from the platform, a conduit for passing gas from the wellhead to the topside and a tree on the topsides connecting the conduit and the riser.
9. A method as claimed in claim 8, in which the conduit is installed within the hollow interior of the pile.
10. A method as claimed in claim 8 or claim 9, in which the riser is installed so that it passes through the hollow interior of at least some of the second pile section.
11. An offshore platform comprising a pile embedded in a seabed and extending to a level above sea level, the pile having a substantially hollow interior, the platform further comprising a topside supported by said pile, a tree located on said topside, a riser and a conduit connected to said tree, the riser for passing fluid from the platform and the conduit for passing fluid from a sub- sea wellhead to the tree, wherein the conduit and riser are located within the hollow interior of the pile in a region of the pile vulnerable to ship impact such that the riser and conduit are substantially protected from ship impact.
12. An offshore platform as claimed in claim 11, in which the offshore platform comprises only one pile.
13. An offshore platform as claimed in claim 12, in which the offshore platform is a not normally manned platform and the topside includes a blast resistant temporary refuge.
14. An offshore platform as claimed in any of claims 11 to 13, in which the topside comprises at least two conduits and two trees.
15. An offshore platform as claimed in any of claims 11 to 14, in which the pile is embedded into the seabed over an existing wellhead.
16. A method of constructing an offshore platform substantially as herein described with reference to the accompanying drawings.
17. An offshore platform substantially as herein described with reference to, or as shown in, the accompanying drawings .
PCT/GB2004/005034 2003-12-03 2004-12-01 Method of constructing an offshore platform comprising at least one pile WO2005054585A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP04801249A EP1699980B1 (en) 2003-12-03 2004-12-01 Method of constructing a single pile offshore platform.
DE602004023230T DE602004023230D1 (en) 2003-12-03 2004-12-01 Method of making an offshore platform with a pier.
AT04801249T ATE443185T1 (en) 2003-12-03 2004-12-01 METHOD FOR MAKING AN OFFSHORE PLATFORM WITH A PIER.
TNP2006000163A TNSN06163A1 (en) 2003-12-03 2006-05-30 Method of constructing an offshore platform comprising at least one pile

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB0327940A GB2408767A (en) 2003-12-03 2003-12-03 Method of constructing a piled offshore platform
GB0327940.3 2003-12-03

Publications (1)

Publication Number Publication Date
WO2005054585A1 true WO2005054585A1 (en) 2005-06-16

Family

ID=29764437

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2004/005034 WO2005054585A1 (en) 2003-12-03 2004-12-01 Method of constructing an offshore platform comprising at least one pile

Country Status (6)

Country Link
EP (1) EP1699980B1 (en)
AT (1) ATE443185T1 (en)
DE (1) DE602004023230D1 (en)
GB (1) GB2408767A (en)
TN (1) TNSN06163A1 (en)
WO (1) WO2005054585A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216121A (en) * 2021-05-21 2021-08-06 河南城建学院 Stable supporting device of offshore drilling platform and using method
WO2022227348A1 (en) * 2021-04-30 2022-11-03 上海勘测设计研究院有限公司 Rotating construction platform based on single pile foundation

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400764B (en) * 2016-11-25 2018-07-17 平煤建工集团特殊凿井工程有限公司 A kind of pin-connected panel sea single-pile foundation construction platform and its construction technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3716994A (en) * 1971-06-28 1973-02-20 Texaco Inc Assembly system for a detachably connected offshore marine structure
US4426173A (en) * 1981-08-27 1984-01-17 Exxon Production Research Co. Remote alignment method and apparatus
US4854779A (en) * 1987-12-14 1989-08-08 Shell Offshore Inc. Installation of multipiece jackets using mating pins
US4934871A (en) * 1988-12-19 1990-06-19 Atlantic Richfield Company Offshore well support system
GB2318141A (en) * 1996-10-11 1998-04-15 Kvaerner Eng Off-shore oil or gas production unit
US5788417A (en) * 1995-03-03 1998-08-04 American Oilfield Divers, Inc. Offshore well stabilization apparatus and method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3482408A (en) * 1966-09-02 1969-12-09 Mobil Oil Corp Telescoped caisson
US3881549A (en) * 1973-04-27 1975-05-06 Interseas Associates Production and flare caisson system
GB9708633D0 (en) * 1997-04-29 1997-06-18 Kvaerner Oil & Gas Ltd Method of installing a tower

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3716994A (en) * 1971-06-28 1973-02-20 Texaco Inc Assembly system for a detachably connected offshore marine structure
US4426173A (en) * 1981-08-27 1984-01-17 Exxon Production Research Co. Remote alignment method and apparatus
US4854779A (en) * 1987-12-14 1989-08-08 Shell Offshore Inc. Installation of multipiece jackets using mating pins
US4934871A (en) * 1988-12-19 1990-06-19 Atlantic Richfield Company Offshore well support system
US5788417A (en) * 1995-03-03 1998-08-04 American Oilfield Divers, Inc. Offshore well stabilization apparatus and method
GB2318141A (en) * 1996-10-11 1998-04-15 Kvaerner Eng Off-shore oil or gas production unit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022227348A1 (en) * 2021-04-30 2022-11-03 上海勘测设计研究院有限公司 Rotating construction platform based on single pile foundation
CN113216121A (en) * 2021-05-21 2021-08-06 河南城建学院 Stable supporting device of offshore drilling platform and using method
CN113216121B (en) * 2021-05-21 2022-08-12 河南城建学院 Stable supporting device of offshore drilling platform and using method

Also Published As

Publication number Publication date
TNSN06163A1 (en) 2007-11-15
GB2408767A (en) 2005-06-08
GB0327940D0 (en) 2004-01-07
EP1699980A1 (en) 2006-09-13
EP1699980B1 (en) 2009-09-16
DE602004023230D1 (en) 2009-10-29
ATE443185T1 (en) 2009-10-15

Similar Documents

Publication Publication Date Title
US7516795B2 (en) Subsea petroleum production system method of installation and use of the same
US3881549A (en) Production and flare caisson system
AU2017350844B2 (en) Relief well injection spool apparatus and method for killing a blowing well
US20090114443A1 (en) Anchored riserless mud return systems
NO20120094A1 (en) Method and apparatus for extracting rudder from a well
MX2010012373A (en) Offshore unit and method of installing wellhead platform using the offshore unit.
US3488967A (en) Combination deep water storage tank and drilling and production platform
NO313340B1 (en) Procedure for piling guide tubes into a water bottom
US9033051B1 (en) System for diversion of fluid flow from a wellhead
JPH04285288A (en) Method and equipment for performing sea oil well work
WO2015054766A1 (en) A process for installing an integral assembly consisting of suction pile and conductor casing
US6203248B1 (en) Sliding-resistant bottom-founded offshore structures
EP1699980B1 (en) Method of constructing a single pile offshore platform.
US5791821A (en) Shaped-charge cutting device for piles and underwater tubular members
EA006866B1 (en) System and method of installing and maintaining an offshore exploration and production system having an adjustable buoyancy chamber
Kibbee et al. The seastar tension-leg platform
MXPA06006242A (en) Method of constructing an offshore platform comprising at least one pile
JP4106180B2 (en) Pumping pipe structure and module for pumping pipe structure
NO20190875A1 (en) Riser stabilization system
US8833462B2 (en) Method and system for installing subsea well trees
Homer et al. Deepwater Templates and Cluster Well Manifolds: Is There a Single Correct Approach?
GB2280214A (en) Offshore structure with oil storage tank
Livett SOUTH-EAST FORTIES PROJECT.
Atteraas et al. Underwater Technology: Offshore Petroleum
Aberle et al. THE YAMMADERRY AND COWLE SMALL OFFSHORE FIELD DEVELOPMENTS

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DPEN Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed from 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2004801249

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: PA/a/2006/006242

Country of ref document: MX

WWP Wipo information: published in national office

Ref document number: 2004801249

Country of ref document: EP