GB2318141A - Off-shore oil or gas production unit - Google Patents

Off-shore oil or gas production unit Download PDF

Info

Publication number
GB2318141A
GB2318141A GB9719441A GB9719441A GB2318141A GB 2318141 A GB2318141 A GB 2318141A GB 9719441 A GB9719441 A GB 9719441A GB 9719441 A GB9719441 A GB 9719441A GB 2318141 A GB2318141 A GB 2318141A
Authority
GB
United Kingdom
Prior art keywords
jacket
platform
oil
unit according
gas unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB9719441A
Other versions
GB9719441D0 (en
GB2318141B (en
Inventor
Raymond John Pepperell
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kvaerner Oil and Gas AS
Original Assignee
Kvaerner Engineering AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GBGB9621195.8A external-priority patent/GB9621195D0/en
Application filed by Kvaerner Engineering AS filed Critical Kvaerner Engineering AS
Priority to GB9719441A priority Critical patent/GB2318141B/en
Publication of GB9719441D0 publication Critical patent/GB9719441D0/en
Publication of GB2318141A publication Critical patent/GB2318141A/en
Application granted granted Critical
Publication of GB2318141B publication Critical patent/GB2318141B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/02Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor

Abstract

In an off-shore oil or gas production unit 1 for providing access to at least one well head conductor or riser each having a christmas tree well control system 16, the unit having an upper topside part and a lower base or jacket part 2, the upper topside part comprising a main platform 4 and a drilling platform 11 arranged above the main platform and said top-side part also comprising a work-over deck (21, Fig 5) arranged above the Christmas trees 16 for the operation and location of coiled tubing (30), or other work-over related equipment, and the jacket part comprising a plurality of generally vertical jacket legs 5 connected together by a plurality of horizontal jacket members 6, the unit 1 also comprises a injacket platform 10 provided below the first main platform and arranged within the jacket 2. The injacket platform 10 comprises the tie-backs for the conductor risers ad access to the shut-down valves ad has caissons 20 connected directly to it.

Description

Off-shore Oil or Gas Production Unit The invention relates to an off-shore oil production unit. Such units are used to extract oil or gas or oil and gas from reservoirs located beneath the sea or ocean bed. The units typically comprise a supporting jacket which comprises a plurality ofjacket legs which are supported up from the sea bed and provide the support for a production platform on which the well head of the riser conductors of the well are located. The jacket also provides the support for the remaining structure of the unit, the so-called top-side structure.
The units are used to carry out the initial drilling of the well and also production from the well and also for so-called "workover operations" which are subsequent operations requiring access to the well during the production life of the well, for example, to improve production rates.
Such workover operations require access to the well for a number of reasons, for example to take further measurements of the reservoir by introducing logging devices, for servicing or installation of electric submersible pumps to enhance production rates or for many other reasons. In recent years such workover operations have been increasingly carried out using coiled or continuous reel tubing. The fact that it is a continuous single tube provides several advantages when entering a live oil or gas well which could have anything up to 7,000 psi well head pressure. This means the well does not have to be killed, (i.e. a heavy fluid does not have to be pumped down the production tubing to control the oil or gas producing zone by the effect of its greater hydrostatic pressure). Continuous tubing has the advantage of also being able to pass through the tubing through which the oil and/or gas is being produced, without disturbing the tubing in place.
Since its introduction, the uses and applications for coiled tubing have grown immensely, and now, rather than just being used to circulate various fluids in a well bore, it is not uncommon for coiled tubing to be used for conveying various hydraulically powered tools and more recently electrically powered tools such as electric submersible pumps into the well. In order to keep the drilling programme as short as possible simultaneous drilling and intervention (into adjacent wells) is required. It is also necessary to increase the height of the drilling platform above the well head area to allow concurrent drilling and coiled tubing operations. The standard height requirement for coiled tubing equipment between the top of the Christmas trees in the well head area to the underside of the floor of the drilling deck above is typically 18 metres. This also applies to the removal and maintenance of down hole pumps where space is required to "rack-up" drill pipe, wire-lining and other such operations which can utilise the additional height.
Thus the drilling module is required to be at a level which is much higher than previously, making access to the pipe rack much more difficult and dangerous due to the height difference. Also, access for operators to the drilling platform is also more difficult as the distance required to reach the drilling level from the well head area is much greater. This height difference also incurs the risk of heavy objects falling from a height which is a danger to workers working below.
An object of the present invention is to provide an off-shore oil or gas production unit which overcomes the above disadvantages and is able to support the increased top side burden.
It is also an object of the present invention to provide easier access between the pipe rack and the drilling level for the handling of drill pipe and other equipment.
It is also an objective of the invention to provide easier access for personnel between the well area and the drilling level.
It is also an objective of the invention to provide a simpler installation of the topsides onto the jacket of the platform and to provide for easier drainage of spent materials to the jacket caissons.
According to the invention there is provided an off-shore oil or gas unit for the production of oil or gas from an off-shore location said unit providing access to at least one well head conductor or riser, which transfers the oil and /or gas from the reservoir to the well head, each having a well control system or Christmas tree arrangement including shut down valves and at least one conductor tie-back arranged below the well control system for securing the conductors to the unit, the unit having an upper topside part and a lower base or jacket part, the said lower jacket part projecting above the level of the sea and supporting at its upper end the upper topside part, the said upper topside part comprising a main platform and a drilling platform arranged above the main platform said topside part also comprising a workover equipment deck and a skid beam support for the operation and location of coiled tubing equipment, the base comprising a plurality of generally vertical jacket legs connected together by a plurality of horizontal jacket members, characterised in that the unit also comprises in the lower jacket part an jacket platform provided below the first main platform and arranged within the jacket.
The jacket platform preferably comprises the tie-backs for the conductor risers.
The shut-down valves are also preferably located on the jacket platform. The so-called Christmas tree arrangements of each well head may also be arranged on the jacket platform.
The jacket platform preferably comprises a plated surface in the immediate surrounding area of each of the well heads to avoid spillage into the sea and a grating surface in areas away from the well heads.
Preferably the main platform comprises a drilling equipment storage platform, or driller's pipe-rack arranged alongside the drilling platform to enable easy transfer of equipment between the drilling platform and the equipment storage platform.
Preferably the oil or gas unit also comprises a weather deck with a mud module arranged thereon. Preferably the equipment platform is arranged on the mud module.
The caissons are connected directly to the jacket platform and the tops of the caissons are therefore located lower than the first main platform when it is in the installed position. Drains from the main platform level to the jacket caissons are therefore provided having a positive downward slope.
The invention will now be described in further detail with reference to the following drawings in which: Fig. 1 is a side cross section of a conventional oil or gas unit; Fig. 2 is a side cross section of a more recent prior art oil or gas unit for operating coiled tubing; Fig. 3 is a side cross section of an oil or gas unit according to the invention, Fig. 4 is an open perspective enlarged view of the general arrangement of the offshore oil or gas production unit of Fig. 3, Fig. 5 is an enlarged section of the unit of fig. 3 showing a typical simultaneous drilling and coiled tubing operation utilising the jacket deck, and Fig. 6 is a further enlarged view showing the connection of the jacket deck to the caissons.
Referring to fig. 1 a typical oil or gas unit or platform 1 is shown comprising supporting legs 5 and cross bracing members 3 which together form the base or jacket 2 which is supported on the sea bed.
The normal sea level is shown as level A. At the top of the base or jacket 2 is the first main platform 4 which is located at a level which at the highest level of the sea over a 100 hundred year period. This is known as the 100 year sea level line.
At this first main platform the conductor tie-backs 12 and the well control Christmas tress 16 are located and access is provided to these from this main platform or deck 4. On this main deck 4 there is also located a process area 7 and a utility area 9. Immediately above the main deck 4 is a second platform 13 known as the weather platform which comprises a drilling equipment support 14 in an area known as the mud module. Living quarters 15 extend upwardly from the main deck 4 and continue upwardly through the weather deck 13. Above the weather deck 13 is the drill floor 11 on which the required pipe lengths are manipulated for insertion into the desired well. lhe drill Iloor ll usually comprises skid rails for the lateral transfer to position the desired tubing in-line with the required conductor. Along side the drill floor a storage level for new and used pipe in lengths is provided on the top of the mud module as is often referred to as the driller's pipe-rack 17. A central vertical derrick 18 is arranged above the drill floor. The required pipes are easily manipulated from the pipe rack 17 to the drill floor 11 through a so-called Vee door 19 in the central derrick construction. This conventional structure provides the desired access to the well heads and the ease of manipulation of the drill pipes.
Referring now to fig. 2 an oil or gas production unit 1 is shown which is similar to that in figure 1 but in which the drill floor 11 has been raised higher above the well head area to permit the concurrent drilling and coiled tubing operations which are now advantageous to maximise the production from the reservoir. Such larger distances are, for example, required to enable the coiled tubing equipment to function satisfactorily when connected to the well head. The standard requirement for coiled tubing is that there should be 18 metres clear working height above the top of the Christmas tree well control system 16. As can be seen from the fig. 3 the drill floor is now significantly higher than the pipe-rack located on top of the mud module. This distance between the pipe-rack 17 and the drill floor 11 is shown as D in the fig. 2. This makes the handling of pipe-work and casing through the Vee door 19 to the drill floor 11 much more difficult and dangerous. In addition there is a much greater distance for operators to travel to reach the drilling floor from the main platform which makes operations more time-consuming and tiring. A deck 20 is provided above the Christmas trees for the location of coiled tubing, wire-lining and down-hole pump maintenance etc..
Additional bracing is also located below the drilling deck to provide support for these structures (not shown).
Referring to figs. 3 and 4 there is shown an off-shore oil or gas unit 1 according to an embodiment of the invention. The unit 1 has a base 2 which projects above the level of the sea and supports at its upper end a first platform 4, the base comprising a plurality of generally vertical jacket legs 5 connected together by a plurality of horizontal jacket members 6 to form a so-called jacket. This is similar to the jacket constructions described previously and are commonly used for oil or gas production units. The base similarly provides support for the top-side structure 8 which itself supports the work- over equipment and other supporting equipment as well as any accommodation decks, helicopter pads etc.
Referring again to fig. 3 and 4 the unit 1 also comprises a fourth access platform 10 provided below the first platform 4 and arranged within the jacket 2 and connected thereto. This fourth platform provides a dry location which is still above the normal 100 year wave height and provides access for the conductor tie backs. This allows the Christmas trees 16 to be effectively lowered down from the topside 8 and the level of the main platform 4 above. In fact the main platform 4 is essentially elevated to provide the additional deck below it which is still at the 100 year wave line. The well heads 12 of the production conductor risers 14 are thus located on the fourth access platform 10 as are the caissons 20 and the shutdown valves which enables a safe location for and convenient access to them to be provided which is below the main production platform.
The fourth access platform is located inside the jacket in this embodiment is shown a part of the jacket and may be fabricated as part of the jacket.
Alternatively the fourth access floor or jacket deck may be fabricated separately and installed inside the jacket when the jacket is in the desired position.
This elevation of the main platform 4 relative to the conductors and associated flow control equipment decreases the vertical distance between the main platform 4 and the drill deck 11. The weather deck 13 is correspondingly raised to the same extent as the main platform 4 in order to have the same space available for the process area 7 and the utility area 9 and the mud module 14 that is provided on the weather deck 13. The driller's pipe-rack 17 is also correspondingly raised the same distance above the 100 year wave line. The height of the drill deck is however maintained at the required height above the top of the flow control Christmas trees. Thus the distance D1 between the level of the pipe-rack 17 and the drill deck 11 is correspondingly reduced by the amount by which the main platform 4 is raised above the 100 year wave line which is itself the height of the additional fourth access deck 10. This raising of the main platform and the corresponding modules such as the living quarters, helicopter pad, process area, utility area and mud module would not normally be considered a desirable step due to the raising of the centre of gravity of the overall construction. However the inventor has found that there are surprising advantages in terms of the safe handling of the equipment required at and to and from the drill floor which results in a saving of weight to compensate the raised centre of gravity.
The workover deck 21 is provided above the Christmas trees to allow the location and use of coiled tubing, wire-lining, removal and maintenance of down-hole pumps etc.. Equipment may be handled by overhead gantry cranes, air film transporters or trolleys as required. Sufficient extemal lay-down areas are provided to transfer the required equipment in and out.
The fourth platform 10 comprises a plated surface in the immediate surrounding area of each of the well heads 12 with drain gulleys to avoid local spillage to the sea and a grating surface in areas distant from the well heads.
A number of caissons are normally connected to the topside for example for sea water inlet and/or for the outlet of water sewage and drilling fluids and cuttings.
In this embodiment the caissons are connected directly to the fourth platform 10 which is provided as part of the jacket. Thus when the main platform and the remaining 'topsides' are fitted on the jacket during installation of the platform 1 the required connections to the jacket caissons can be made by connecting pipes leading down from the main platform because the tops of the caissons are located lower than the first platform 4. Thus no welding or pulling of the caissons is therefore required to connect the jacket to the top side structure as would be required for conventional production unit constructions and the installation procedure is therefore simplified. This also allows a positive slope to be utilised between the lowest level of the main platform and the top of the drain caissons, thus leading to improved flow of sewerage and spent drilling fluids etc.
Referring to fig. 5 an enlarged view of the unit of the embodiment of the invention is shown showing the simultaneous drilling and coiled tubing operations utilising the jacket deck. The jacket deck 10 is located within the jacket 2 and is positioned immediately below the main deck 4 and permits access to the tie backs and safety shut-off valves. The work-over deck is arranged above the main deck on which the work-over and coiled tubing equipment is located and operated. A typical coiled tubing set-up 30 is shown located on the work-over deck 13. The weather deck is located above the work-over deck and comprises an area 31 above the work-over area on the work-over deck which is free from steel-work or other structures to permit the vertical extension of the coiled tubing set-up 30.
Referring now to fig. 6 an enlarged view is shown of the details of the support for the caissons to the jacket deck. Conveiltionally, caissons ai.c llOllllily attaclicd to the topsides after the topsides have been located on top of the jacket at the desired well site location. This may be done by pulling the caissons up from the jacket after installation of the topsides offshore and welding a support to the main deck. Alternatively, an extension piece is welded to the caisson to bring it to the main deck level. Both of these methods add significantly to the installation time and therefor delay the time at which the unit can be used for drilling and production. By means of the invention however the caisson are provided already fixed to the jacket deck and no additional installation is required after the unit is located at the well cite.
Referring to fig. 6, the conventional method of attaching the caisson to the main deck 4 of the topsides is shown by a dotted line. The caisson connections 41 according to an embodiment of the invention are shown in full lines as are the caissons 20 and the jacket 10 to which they are attached at the time of fabrication on-shore. Support for the caisson is also provided by an jacket guide 42 which is linked to the jacket frame.
It will be appreciated that the above is a description of a non-limiting exemplary preferred embodiment of the invention and the invention may encompass other embodiments included in the appended claims.

Claims (12)

1. An off-shore oil or gas unit for the production of oil or gas from an offshore location said unit providing access to at least one well head conductor or riser, which transfers the oil and /or gas from the reservoir to the well head, each having a well control system or Christmas tree arrangement including shut down valves and at least one conductor tie-back arranged below the well control system, the unit having an upper topside part and a lower base or jacket part which are constructed as separate parts and transported to the well site as separate parts and assembled together at the well site, the said lower jacket part, in the assembled state projecting above the level of the sea and supporting at its upper end the upper top-side part, the upper topside part comprising a main platform and a drilling platform arranged above the main platform and said top-side part also comprising a work-over deck arranged above the Christmas trees for the operation and location of coiled tubing, or other work-over related equipment, the jacket part comprising a plurality of generally vertical jacket legs connected together by a plurality of horizontal jacket members, characterised in that the unit also comprises a jacket platform provided below the first main platform and arranged within the jacket.
2. An off-shore oil or gas unit according to claim 1, characterised in that the jacket platform comprises the tie-backs for the conductor risers.
3. An off-shore oil or gas unit according to claim 1, characterised in that the jacket platform provides access to the shut-down valves.
4. An off-shore oil or gas unit according to claim 1, characterised in that the jacket platform is provided at the level of the Christmas tree flow control arrangements and provides access to the Christmas tree flow control arrangements of each well head.
5. An off-shore oil or gas unit according to claim 1, characterised in that the jacket platform comprises a plated surface in the immediate surrounding area of each of the well heads and a grating surface in areas distant from the well heads.
6. An off-shore oil or gas unit according to claim 1, characterised in that the main platform comprises an equipment storage platform arranged alongside the drilling platform to enable easy transfer of equipment between the drilling platform and the equipment storage platform.
7. An off-shore oil or gas unit according to claim 1, characterised in that the oil or gas unit comprises a weather deck with a mud module arranged thereon.
8. An off-shore oil or gas unit according to claim 6 and claim 7, characterised in that the equipment platform is arranged on the mud module.
9. An off-shore oil or gas unit according to claim 1, characterised in that the caissons are connected directly to the jacket platform.
10. An off-shore oil or gas unit according to claim 9, characterised in that the tops of the caissons are located lower than the first main platform when it is in the installed position.
11. An off-shore oil or gas unit according to claim 10, characterised in that the drains from the main platform level to the jacket caissons are provided having a positive slope.
12. An off-shore oil or gas unit according to claim 1, characterised in that the topside part comprises an additional deck on which the work-over equipment, such as coiled tubing, wire-line, and down-hole pump maintenance equipment, may be located and operated.
GB9719441A 1996-10-11 1997-09-13 Off-shore oil or gas production unit Expired - Fee Related GB2318141B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB9719441A GB2318141B (en) 1996-10-11 1997-09-13 Off-shore oil or gas production unit

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GBGB9621195.8A GB9621195D0 (en) 1996-10-11 1996-10-11 Off-shore oil or gas production unit
GB9719441A GB2318141B (en) 1996-10-11 1997-09-13 Off-shore oil or gas production unit

Publications (3)

Publication Number Publication Date
GB9719441D0 GB9719441D0 (en) 1997-11-12
GB2318141A true GB2318141A (en) 1998-04-15
GB2318141B GB2318141B (en) 1999-01-06

Family

ID=26310203

Family Applications (1)

Application Number Title Priority Date Filing Date
GB9719441A Expired - Fee Related GB2318141B (en) 1996-10-11 1997-09-13 Off-shore oil or gas production unit

Country Status (1)

Country Link
GB (1) GB2318141B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005054585A1 (en) * 2003-12-03 2005-06-16 Slp Engineering Limited Method of constructing an offshore platform comprising at least one pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1223431A (en) * 1967-03-29 1971-02-24 James Clay Storm Well drilling apparatus
US4561803A (en) * 1983-12-19 1985-12-31 Mcdermott International, Inc. Conductor guide system for offshore drilling platform
GB2177745A (en) * 1985-07-12 1987-01-28 Earl & Wright Ltd Offshore platforms
US4973198A (en) * 1989-12-28 1990-11-27 Shell Oil Company Offshore drilling rig transfer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1223431A (en) * 1967-03-29 1971-02-24 James Clay Storm Well drilling apparatus
US4561803A (en) * 1983-12-19 1985-12-31 Mcdermott International, Inc. Conductor guide system for offshore drilling platform
GB2177745A (en) * 1985-07-12 1987-01-28 Earl & Wright Ltd Offshore platforms
US4973198A (en) * 1989-12-28 1990-11-27 Shell Oil Company Offshore drilling rig transfer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005054585A1 (en) * 2003-12-03 2005-06-16 Slp Engineering Limited Method of constructing an offshore platform comprising at least one pile

Also Published As

Publication number Publication date
GB9719441D0 (en) 1997-11-12
GB2318141B (en) 1999-01-06

Similar Documents

Publication Publication Date Title
US4973198A (en) Offshore drilling rig transfer
US9133643B2 (en) Drilling rig assembly method and apparatus
CA1291945C (en) Modular near-surface completion system
US4934871A (en) Offshore well support system
US7677329B2 (en) Method and device for controlling drilling fluid pressure
AU2140199A (en) Method and apparatus for drilling a plurality of offshore underwater wells
NO20180728A1 (en) Conductor pipe support system for an offshore platform
US10450802B2 (en) Mobile offshore drilling unit, a method of using such a unit and a system comprising such a unit
WO2008100151A1 (en) Mobile equipment for riserless drilling, well intervention, subsea construction and the like from a vessel
US6059039A (en) Extendable semi-clustered subsea development system
EP3390762B1 (en) System and method for performing well operations
NO313465B1 (en) Method and apparatus for drilling an offshore subsea well
WO1998016715A1 (en) Off-shore oil or gas production unit
CA1150717A (en) Method for drilling wellbores from an offshore platform
US5161620A (en) Subsea production wellhead assembly
GB2318141A (en) Off-shore oil or gas production unit
US5722494A (en) Stacked template support structure
US4279542A (en) Subsea well flow lines tie-in using conductors
US4305466A (en) Offshore platform having three decks
NL2023604B1 (en) Semi-submersible drilling vessel with a mud treatment and circulation system.
GB2584584A (en) Hoisting system and method of operation
Husband et al. Extended reach: new generation frontier drilling rigs
Childers et al. Submerged System for Offshore Oil and Gas Production
Hopper et al. Catwell and Sherdaps for deep-water production fields

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 20050913