WO2004113677A1 - Appareil et procedes pour reseau autoalimente de communications et de capteurs - Google Patents

Appareil et procedes pour reseau autoalimente de communications et de capteurs Download PDF

Info

Publication number
WO2004113677A1
WO2004113677A1 PCT/US2004/019020 US2004019020W WO2004113677A1 WO 2004113677 A1 WO2004113677 A1 WO 2004113677A1 US 2004019020 W US2004019020 W US 2004019020W WO 2004113677 A1 WO2004113677 A1 WO 2004113677A1
Authority
WO
WIPO (PCT)
Prior art keywords
autonomous telemetry
telemetry station
autonomous
tubular string
tubular
Prior art date
Application number
PCT/US2004/019020
Other languages
English (en)
Inventor
Roger W. Fincher
Peter S. Aronstam
Larry A. Watkins
Randy Gold
Original Assignee
Baker Hugues Incorporated
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hugues Incorporated filed Critical Baker Hugues Incorporated
Priority to GB0526058A priority Critical patent/GB2419365B/en
Publication of WO2004113677A1 publication Critical patent/WO2004113677A1/fr
Priority to NO20056008A priority patent/NO339508B1/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0085Adaptations of electric power generating means for use in boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • E21B47/13Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • E21B47/14Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling using acoustic waves
    • E21B47/16Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling using acoustic waves through the drill string or casing, e.g. by torsional acoustic waves

Definitions

  • This invention relates to transmission of information along a tubular string, and more particularly to a system of autonomous telemetry stations positioned along the tubular string for low-power, adaptive communication and measurement.
  • the oilfield industry currently uses two extremes of communication within wellbores.
  • the classification of these two extremes relate to the timing of the wellbore construction, typically during the wellbore construction and after construction during the operation of the wellbore for production of hydrocarbons.
  • MWD measurement while drilling
  • Alternative methods of telemetry such as low frequency electromagnetic and acoustics, have been investigated and found to be of limited or specialized use.
  • MWD telemetry is bound by the speed of sound and the viscous properties in the drilling fluid, thus data rates for mud pulse telemetry seldom exceed 10 bits per second.
  • An increase in the number and complexity of downhole sensors in MWD systems has increased the need for higher data rates for the telemetry link.
  • introduction of rotary closed loop steering systems has increased the need for bi-directional telemetry from the top to the bottom of the well.
  • a common element of these well operation sensors and devices is the sending of power and information along the installed telemetry path.
  • the telemetry path is typically installed in long lengths across multiple sections of jointed tubular. Thus, the installation of the telemetry path is required after major tubulars are installed in the well.
  • the devices along the telemetry path must comply with a common interface and power specification. Any malfunction in the line puts the power transmission and communication in jeopardy.
  • a measurement and communication system for use with a tubular string, comprises a plurality of spaced apart, autonomous telemetry stations disposed at predetermined locations along the tubular string. Power is extracted from potential energy sources proximate each autonomous telemetry station. Each of the plurality of autonomous telemetry stations is adapted to receive at least one first signal and transmit at least one second signal related to the at least one first signal.
  • a method of communicating information along a tubular string comprises disposing a plurality of spaced apart, autonomous telemetry stations at predetermined locations along the tubular string.
  • a preferred transmission path is autonomously determined at each of the autonomous telemetry stations.
  • Information is transmitted along the tubular string according to the autonomously determined preferred path.
  • Figure 1 is a schematic drawing of a drilling system having a jointed tubular string in a borehole according to an embodiment of the present invention
  • Figure 2 is a schematic drawing of a jointed connection having an autonomous telemetry station disposed therein, according to an embodiment of the present invention
  • Figure 3 is an electrical schematic of a circuit for providing power from a piezoelectric device, according to an embodiment of the present invention
  • Figure 4 is a schematic drawing of a galvanic power source, according to an embodiment of the present invention.
  • Figure 5 is a schematic drawing of an autonomous telemetry station having an extension sleeve extending into an adjacent section of drill string, according to an embodiment of the present invention
  • Figure 6 is a schematic drawing of an autonomous telemetry station having an extension sleeve extending substantially the length of a section of drill string, according to an embodiment of the present invention
  • Figure 7 is a schematic drawing of method of expanding a sleeve into a section of drill string, according to an embodiment of the present invention
  • Figure 8A,B are schematic drawings of a method of installing an elastic sleeve into a section of drill string, according to an embodiment of the present invention
  • Figure 9 is a schematic of multiple transmission paths along a jointed tubular string, according to an embodiment of the present invention.
  • Figure 10A,B are schematic drawings of an autonomous telemetry station having a plurality of telemetry modules therein, according to an embodiment of the present invention
  • FIGS. 11A,B are schematic drawings of a piezoelectric power generator according to an embodiment of the present invention.
  • FIGS 12A-D are schematic drawings of waveguide devices for use with the present invention.
  • Figure 13 is a schematic drawing depicting a magneto-hydrodynamic power generator for use as a power source according to an embodiment of the present invention
  • Figure 14 is a schematic drawing of an eccentric mass generator for use in an autonomous telemetry station according to an embodiment of the present invention.
  • Figures 15A,B are schematic drawings of a rolling ball generator for use in an autonomous telemetry station according to an embodiment of the present invention
  • Figures 16A,B are schematic drawings of a section of drill string having a waveguide attached thereto, according to an embodiment of the present invention
  • Figures 17A,B are schematic drawings of a micro turbine generator in a drill string, according to an embodiment of the present invention
  • Figure 18 is a schematic drawing of a micro turbine generator supplying power to multiple autonomous telemetry stations, according to an embodiment of the present invention
  • Figure 19 is a schematic drawing of a galvanic power source utilizing the drill string section as a cathode, according to an embodiment of the present invention.
  • Figure 20 is a schematic drawing of a galvanic cell having anode and cathode electrically insulated from the drill string section, according to an embodiment of the present invention
  • Figure 21 is a schematic drawing of an instrumented sub inserted in a drill string, according to an embodiment of the present invention.
  • FIGS 22A-C are schematic drawings of an optical communication system, according to an embodiment of the present invention.
  • Figure 23 is a schematic drawing showing a system for detecting multi-phase flow in a wellbore, according to an embodiment of the present invention.
  • Figure 24 is a schematic drawing of a system for creating flow eddies and generating power therefrom, according to an embodiment of the present invention.
  • a drilling operation has a conventional derrick 10 for supporting a drill string 3 in a borehole 2, also called a wellbore.
  • Drill string 3 comprises multiple sections of drill pipe 1 connected together by threaded connections 4.
  • a bottomhole assembly 9 is attached to the bottom end of drill string 3 and has a drill bit 8 attached to a bottom end thereof. Drill bit 8 is rotated to drill through the earth formations.
  • Bottom hole assembly 9 comprises multiple sections of drill collars 6 and may have a measurement while drilling (MWD) system 7 attached therein, above bit 8. Drill collar sections 6 and MWD system 7 are connected through threaded connections 5.
  • MWD measurement while drilling
  • Measurement while drilling and/or logging while drilling (LWD) systems are well known in the art. Such systems commonly measure a number of parameters of interest regarding the drilling operation, the formations, surrounding the borehole 2 and the position and direction of the drill bit 8 in the borehole 2.
  • Such systems may include downhole processors (not shown) to provide open or closed loop control, in conjunction with a steerable system (not shown), of the borehole 2 path toward a predetermined target in the subterranean formations.
  • Drilling fluid 11 commonly called drilling mud
  • Drilling fluid is pumped by pump 16 through the drill string 3, exits the bit 8, and returns back to the surface in the annulus 12 between drill string 3 and borehole 2.
  • Drilling flow rates may commonly range from the order of 100 gpm to in excess of 1000 gpm, depending, at least to some extent, on the borehole size and the ability of the fluid to remove the cuttings from the borehole.
  • the potential energy in the drilling fluid flowing through the drill string is typically well in excess of 100 kilowatts.
  • ATS 20 Located at each of the threaded connections 4 and 5 is an autonomous telemetry station (ATS) 20, see Fig. 2, located between internal shoulders of the pin section 21 and the box section 22 making up the threaded connection 4 of two sections of drill pipe 1.
  • ATS 20 is a torus, or donut, shaped ring captured by the pin shoulder, also called pin nose, 46 and the boreback box shoulder 47.
  • ATS 20 comprises a signal receiver 25, a signal transmitter 23, a controller 24, and a power source (not shown).
  • ATS 20 may also contain sensors (not shown) for measuring parameters of interest related to the drilling process and the formations surrounding the borehole 2.
  • ATS 20 may be encapsulated in a suitable compliant material, for example an elastomer, such that ATS 20 is compressed a predetermined amount between the pin nose 46 and boreback shoulder 47 and may be installed in the field during the makeup of each connection.
  • a suitable compliant material for example an elastomer
  • Suitable elastomers are known in the art and are commonly used for submerged acoustic transducers.
  • ATS 20 operates on power levels on the order of tens of milliwatts to a few watts as contrasted to conventional downhole telemetry systems that operate on tens to hundreds of watts.
  • an acoustic signal 26 travels through a section of drill string la toward connection 4.
  • the signal is transmitted from the section of drill string la to the receiver 25 in ATS 20.
  • ATS 20 processes the signal and retransmits the signal using transmitter 23 into the next section of drill string lb.
  • the process is repeated at each connection in drill string 3 and is detected by a surface located transceiver 30 attached to surface controller 15, see Fig. 1.
  • signals may be transmitted from the surface system to a downhole ATS 20 and/or to MWD system 7 in Fig.
  • the power source for each ATS 20 scavenges, or harvests, electrical power from sources of potential energy at the location of each ATS 20.
  • sources of potential energy For example, mechanical vibration from the tubular elements of the drill string and/or inefficient fluid motion (such as parasitic velocity head loss) related energy may be extracted from the drill string and the fluids moving inside the drill string. Similar sources of energy are present, for example, in production strings and pipelines and are intended to be covered by the invention disclosed herein.
  • the scavenged power may come from naturally occurring "lost" energy, such as existing tubular vibration energy or existing fluid differential pressures (caused by existing geometry).
  • devices or geometries near each ATS may be adapted so as to cause a vibration for mechanical energy or a fluid derived energy (turbulence or differential pressure) for scavenging by the ATS.
  • additional devices may be inserted in the flow stream or in the drill string, remote from the ATS, that induce additional energy within the tubular system and/or flow stream for scavenging by the ATS.
  • the drill string 3 vibrates, both axially, rotationally, and laterally, during the drilling process.
  • the drilling fluid 11 is typically in turbulent flow inside the drill string at normal operating flow rates. Both the vibrational energy of the drill string 3 and the turbulent flow energy of the drilling fluid 11 provide sources of potential energy that may be converted, by suitable techniques, to provide sufficient power for ATS 20.
  • piezoelectric materials are used to harvest electrical power from at least one of these potential energy sources. As is well known, when a force is applied to a piezoelectric material, positive and negative charges are induced on opposite crystal surfaces. Such materials as quartz and barium titanate are examples of piezoelectric materials.
  • piezoelectric materials may be mounted in ATS 20 of Fig. 2, such that they react to the general vibration motion of the drill string 3.
  • the materials may be mounted as discrete crystals.
  • ATS 20 has a controller 24 and power source 100 in a housing 110 with receiver 25 and transmitter 23 captured between pin nose 46 and boreback shoulder 47.
  • Controller 24 has suitable circuitry for converting the power signals from power source 100 to suitable voltages for the various devices, as required.
  • Power source 100 comprises an annular ring mass 101 attached to multiple piezoelectric bars oriented around the donut shaped annular configuration of ATS 20.
  • the inertial mass of ring 101 causes the piezoelectric bars 102 to flex creating bending loads and generating electrical power.
  • the components are contained in housing 110 that is filled with a dielectric fluid 103.
  • Dielectric fluid 103 is separated from drilling fluid 11 by flexible diaphragm 104.
  • Drilling fluid is vented through compensation hole 105 such that the downhole pressure and temperature are equalized inside the housing 110.
  • each piezoelectric bar 102 may have a mass consisting of a segment of a ring (not shown) such that the bar/mass system is free to respond to both lateral and whirling motion of the drill string.
  • the piezoelectric materials may be formed as any number of micro- electromechanical systems (MEMS) type devices.
  • MEMS micro- electromechanical systems
  • piezoelectric MEMS accelerometers are commercially available that generate electrical signals in response to vibrational energy. Such devices may be configured to generate electrical power.
  • Figure 3 shows an exemplary circuit for converting the output of a piezoelectric device 35.
  • the output from piezoelectric device 35 is rectified by diode bridge 36 to charge a power storage device 37 that supplies power to the load 38 that may be any combination of electrically powered devices in ATS 20.
  • the power storage device is preferably a capacitor but may alternatively be a rechargeable battery. Multiple capacitors and/or batteries may be used.
  • ATS 20 has an extension tube 41 attached thereto.
  • Extension tube 41 extends a predetermined distance into the bore 42 of the box connection 22.
  • Extension 41 may extend (i) downstream from ATS 20; (ii) upstream from ATS 20 into the pin connection 21, see Fig. 5; or (iii) in both upstream and downstream directions (not shown).
  • Extension 41 may have piezoelectric devices embedded therein, such that such devices react to pressure variations in the fluid flow 11. Such pressure variations may be due to turbulent fluctuations in the fluid and/or due to pressure fluctuations caused by the positive displacement pump 16 that pumps the drilling fluid 11 through the drill string 3.
  • the extension 41 may have a piezo-polymer material, such as polyvinylidene difluoride (PNDF) attached to the inner surface such that the PNDF film (not shown) is exposed to the flow energy to generate electrical power.
  • PNDF polyvinylidene difluoride
  • the extension tube 41 length may be chosen such that sufficient area is exposed to the flow to generate sufficient power, including extending the tube substantially the length of a section 1 of drill string 3 .
  • the power harvested from such systems in the fluid flow may be used to power ATS 20.
  • turbulence inducing protuberances may be positioned on the ATS and/or along an extensions sleeve and extended into the flow stream to induce turbulent eddies in the flow stream that contain sufficient energy.
  • protuberances can be used with any of the piezoelectric fluid scavenging techniques.
  • protuberances include, but are not limited to button shape or ring shape.
  • dimples may be spaced around the donut shaped ATS and /or along an extension sleeve to induce turbulence.
  • ATS 260 is made of a suitable elastomeric material and is captured between sections 265 and 266 at connection 264.
  • ATS 260 has a sleeve 263 attached thereto having piezoelectric materials (not shown) incorporated, as previously described therein.
  • ATS 260 is sized such that a predetermined protuberance 261 is generated when the connection is made up. Protuberance 261 causes turbulent eddies (not shown) to be created that impact sleeve 263 causing voltages to be generated from the incorporated piezoelectric materials. The voltages are rectified by circuits in ATS 260.
  • extension 41 is made of an electrically insulating material and has a sacrificial anode sleeve 43 is attached to an im er diameter thereof.
  • a galvanic current is established between the sacrificial anode and the steel drill string 3 in the presence of a conductive drilling fluid 11. Using techniques known in the art based on the materials used and the conductivity of the drilling fluid 11, a predetermined amount of power may be generated for use in powering ATS 20.
  • extension 41 may contain a suitable number of batteries suitable for downhole use.
  • the batteries may be expendable and replaceable or rechargeable. Any suitable form configuration of battery may be used consistent with the space constraints known in the art. Redundant batteries may be provided.
  • thermoelectric generators based on temperature differentials between the inside and outside of the drill string 3;
  • micro fuel cell devices based on temperature differentials between the inside and outside of the drill string 3;
  • micro fuel cell devices based on temperature differentials between the inside and outside of the drill string 3;
  • micro fuel cell devices based on temperature differentials between the inside and outside of the drill string 3;
  • micro fuel cell devices based on temperature differentials between the inside and outside of the drill string 3;
  • photon absorption from natural gamma emission of the surrounding formation iv) photon absorption from natural gamma emission from a source carried downhole;
  • long piezoelectric film streamers, or socks adapted to flutter in the flowing drilling fluid thereby amplifying the motion experienced and power generated;
  • magneto-hydrodynamic generators and
  • eccentric mass generators Such a micro fuel cell device may contained in ATS 20 and be self contained with sufficient fuel and oxidizer for operating for a predetermined period.
  • permanent magnets 130 are arranged in ATS 135 such that they induce a magnetic field across fluid flow area 133.
  • ATS 135 such that they induce a magnetic field across fluid flow area 133.
  • voltages are induced at electrodes 131 in a plane orthogonal to both the plane of the magnetic field and the direction of the flow. Such voltages may be used to generate power stored in source 132.
  • an annular coil (not shown, is disposed in an ATS 20 such that drilling fluid 11 passes through the center of the coil.
  • the drilling fluid has ferromagnetic particles, such as hematite, dispersed therein.
  • the flow of magnetic particles through the coil induces electric currents in the coil that may be stored in a power source for use in the ATS.
  • an eccentric mass 141 pivots about a shaft 142 in proximity to coils 143 mounted in an ATS in a drill string.
  • Permanent magnet 140 is disposed in the mass 141 near an outer end.
  • the mass will be induced to rotate magnet 140 past coils 143 and inducing a current to flow in the coils that may be stored in power source 145.
  • Many such eccentric masses may be bridged and rectified together, such as in a MEMS device, to generate power from the motion of the drill string.
  • a plurality of balls 150 are constrained to roll between coil assemblies 152 in response to lateral vibration and whirl of the drill string.
  • Each ball has a permanent magnet 151 such that as the ball with the magnet rolls, it passes the magnetic flux lines through the coils 154 in coil assemblies 152.
  • the induced currents and related voltages are rectified by bridge 155 and stored in power source 156.
  • the complete power, sensor and communication elements may be packaged in a sleeve that protrudes into the tubular above or below the tool joint of interest.
  • the sleeve see Fig. 6, is rigid thin wall tube 61 that is be dropped or pushed into a connection joint. Bonded to tube 61, or encapsulated therein, is an ATS 60 having a receiver, a controller, a transmitter and other elements including sensors and any power device, as previously described, and/or electrical or optical conductors (not shown) required to enable alternative communication methods described later.
  • antenna wires may be attached to, or alternatively, embedded in the sleeve along the length of the sleeve for enabling RF and EM communication, as described later, and the sleeve may extend the length of the section of drill string 1.
  • the tube may be substantially pressure neutral (immersed) into the drilling fluid 11 within the drill string 1 and all components are electrically and mechanically insulated and isolated from the section of drill string 1 and drilling fluid 11.
  • the rigid sleeve 61 may be constructed of any number of materials, including, but not limited to plastics, fiber reinforced composites, and metal. The materials may be deigned to be expandable. The material selection is dependent on the function of the sleeve 61 as related to power generation and/or radio wave transmission, and may be selected by one skilled in the art without undue experimentation.
  • sleeve 71 is a plastically deformable sleeve that is smaller in diameter than the ID of the section 1 of drill string 3 to which it is to be inserted.
  • the OD of the inserted sleeve 71 may be coated with a material 75, such as an elastomer or a plastic material, that has electrical and/or optical conductors and other required components pre-placed within the material 75.
  • the under size sleeve 71 is inserted and then expanded by a mandrel 73 pulled with rod 74 so that the expanded sleeve 72 is plastically deformed and placed in compression against the inside surface of drill string section 1 and anchors the expanded sleeve 72 within drill string section 1.
  • One technique to remove expanded sleeve 72 is an internal spiral cutter (not shown), known in the art, that allows the cut sleeve to be pulled out in an elongated ribbon.
  • an elastic sleeve 81 for example of a rubber material suitable for downhole use, has ATS 80 and antenna 82 encapsulated therein.
  • Sleeve 81 has a relaxed diameter 81' greater than the internal diameter of drill string section 1. By stretching sleeve 81' in a lengthwise direction using techniques known in the art, the OD of the sleeve 81' is reduced to that of 81". If stretched the correct amount, then sleeve 81" may be placed within section 1 without interference.
  • Anchor 83 may be used to add sealing and prevent flowing fluids from stripping the sleeve 81 from section 1.
  • Anchor 83 may be swaged or expanded during the final installation process. Removal of the inserted sleeve 81 may be by a re-stretching and removal technique or alternatively by a spiral cut technique, as discussed above.
  • radio frequency (RF) transmission refers to transmissions in the range of approximately 10 kHz to 10 GHz
  • EM electromagnetic
  • the previously described acoustic system essentially uses the ATS to transmit a signal across the connection joint and uses the drill string section as a relatively low loss waveguide between connections.
  • RF and EM signal transmission media are the surrounding earth formation and the fluids in the wellbore and formation. It is known in the art that the attenuation in such media is highly dependent on the localized properties including, but not limited to, formation, fluid resistivity, and signal frequency. In some situations, attenuation may be unacceptable for low power transmissions over the distance between connections, typically on the order of 30 feet. However, using the extended sleeve configurations and techniques described previously, the effective transmission distance may be substantially reduced, thereby allowing low power communication between connections, see Fig. 6.
  • miniaturized low power RF transceiver are commercially available and have been described for downhole use wherein an interrogation transceiver is passed in close proximity to an RF identification device for locating specific connections in a wellbore, see US Patents Nos. 6,333,699 and 6,333,700.
  • antenna wires may be run the length of the sleeve 61, providing a transmission length on the order of tenths of a inch to several inches, as required.
  • the other sleeve configurations described can be run the entire length of a drill string section for greatly reducing the transmission lengths, and enabling low power RF and/or EM communication across connections.
  • the sleeve may be of such a length to coaxially overlap the ATS of the adjacent connection for establishing communication.
  • a waveguide 115 is inserted the length of drill string sections lb.
  • Waveguide 115 has an external, wave-transmitting section 111 and a reflective inner shield 112 that together channel signal energy from ATS 110c to ATS 110b between the inner diameter of drill string section lb and reflective shield 112.
  • the transmission medium may be a solid, liquid or gas material depending on the type of energy transmitted and the power available.
  • Fig. 12c shows one example of waveguide 115 with energy reflective inner shield 112 separated by axial ribs, or standoffs, 120 arranged around the periphery of shield 112.
  • wave-transmitting section 111 comprises multiple liquid filled channels 122 that are sealed by seal 125 creating a liquid filled waveguide that transmits the acoustic energy from ATS 110c to ATS 110b.
  • Reflective shield 112 may be a composite material having microbeads (not shown) embedded inside. The microbeads have entrapped air and serve to provide an acoustic impedance interface that internally reflects the acoustic signal transmitted to keep the signal within the waveguide channel. By effectively capturing all the transmitted acoustic energy within the channel, the signal is not subject to substantial attenuation that would be present if the wave were transmitted as a normal spherical wave from source to receiver.
  • the channels 122 may be filled with a gas, for example air, and the signal transmitted is an RF signal.
  • the reflective shield 112 may be a metallic shield for reflecting the RF energy back into the waveguide channels 122.
  • the gas filled channels will provide greatly reduced attenuation as contrasted with RF signals transmitted through the surrounding formation.
  • wave transmitting section 120 is sandwiched between reflective shield 121 and drill string section lb.
  • transmitting section 120 may be an elastomer material such as rubber.
  • the acoustic impedance of rubber is on the same order of magnitude as that of water and oil. Therefore, if an acoustic transmitter in ATS 110c, referring to Fig. 12 A, transmits into drilling fluid 11 surrounding the transmitter, the signal will readily enter a rubber transmitting section 120 and propagate along the waveguide, provided the reflective shield 121 has an acoustic impedance such that the acoustic energy is trapped in the transmitting section 120. As described previously, the inclusion of gas-filled microbeads in the reflective shield 121 provide an acoustic impedance mismatch such as to reflect the acoustic signals back into the transmitting section.
  • RF energy may be channeled through a solid insulator layer 120, see Fig. 12D, wherein a suitable reflective shield prevents the RF signal from escaping the waveguide 115.
  • a suitable reflective shield prevents the RF signal from escaping the waveguide 115.
  • optical fibers may be run in a sleeve and brought in close proximity to light emitting devices in the ATS of the adjoining connection. Because the transmission distance is short, even a low power optical source may provide sufficient received light energy to be received across the fluid media interface.
  • the fluid interface may contain drilling fluid.
  • the gap may be a controlled environment containing a fluid with suitable optical properties for transmission.
  • back reflectance techniques may be used to transmit signals across joint connections.
  • an oscillating circuit signal run through the conductors in an extended sleeve, sleeve 61 of Fig. 6 for example, of a first section of drill string is affected by an inductive load in the ATS of the adjacent connection to a second drill string section.
  • a change may be detected in the oscillating circuit signal in the first section and thereby transmit information across the connection.
  • ATS is adapted to modulate a local magnetic field to modulate the light traveling in an optical fiber in a sleeve attached to an adjacent section of drill string.
  • the nature of the particular communication system is dependent, to a large extent, on the transmission characteristics of the surrounding formations and the drilling fluid in the borehole.
  • the concepts disclosed below enable such communications between joints of drill pipe using low energy levels.
  • one of several network structures and operational configurations become viable.
  • the nature of the selected communication devices will determine the practicality of a given network type.
  • the communication link is a serial system and transmits at least one of, see Fig. 9, (i) a pin to box short hop across one joint 4a ( on the order of 1/8 to 4 inches) 86; (ii) from joint 4a to joint 4b ( on the order of 30 to 45 feet) 87; and (iii) across more one than one joint, for example from 4a to 4c ( on the order of 60 to 90 feet) 89.
  • Software instructions stored in the downhole controller of each ATS controls the communications from each ATS to the next and allow only those joints required to become active, to enable apparently continuous communication along the wellbore or tubular string.
  • each ATS may have a unique address for communication and the order of installation may be controlled such that each ATS in the system knows the addresses of the adjacent ATS.
  • the system will attempt to transmit over the longest distance allowing acceptable transmission integrity. Initially, the system may go through an initial adaptive learning mode of transmitting known predetermined signals sequentially from each ATS to the next in order. By determining, for example, that ATS 20c is receiving the same signal from ATS 20a and ATS 20b, ATS may instruct ATS 20b to enter a quiescent mode and transmit only when ATS 20b has new data, such as local sensor data, to transmit.
  • ATS 20c may instruct ATS 20b to begin transmitting information from ATS 20a.
  • an ATS may alter, according to programmed instructions, its transmission parameters, such as lowering transmission frequency.
  • the ATS may cycle through multiple frequencies seeking suitable communication. Interruptions in signal transmission may result in data stacking , wherein data or signals to be retransmitted are stored in a buffer memory. Such data may be transmitted at a later date or maintained in buffer memory for retrieval at the surface for both data and diagnostic purposes.
  • Signal integrity may be determined from various transmission parameters including, but not limited to, received signal level and data drop outs.
  • each ATS may include in its data stream, status signals regarding the relative "health" of the ATS.
  • each ATS may transmit information regarding its power storage status and/or it's power generating status. If ATS 20b, for example, is in a quiescent mode and receives status information indicating that ATS 20a is at low power, ATS 20b may, according to programmed instructions in it's controller, begin transmitting signals received from ATS 20a, including the low power status of ATS 20a to alert the rest of the network, including the surface system, to the status of ATS 20a. The surface system alerts the operator who may want to take corrective action, such as replacing ATS 20, the next time the drill string is removed from the borehole.
  • an ATS 95 has multiple telemetry modules 90a-h encapsulated in ring 91 suitable for insertion in a threaded connection as described previously.
  • Each module 90a-h has a receiver , a transmitter, and a controller with a processor and memory.
  • Each module 90a- h may also contain, or be connected to, one or more sensors for detecting a parameter of interest.
  • the modules 90a-h may be attached to a power source as described previously.
  • Each module 90a-h may be connected to a separate power source, or, alternatively, they may be connected to a central power source. Any of the power sources previously described may be used.
  • Each of the modules acts to establish a separate communication link with like modules at each connection joint. Examples of such modules are described in U.S. Patent Application Serial Number 10/421475, filed on April 23, 2003, assigned to the assignee of this application, and incorporated herein by reference.
  • the multiple telemetry modules 90a-h may be configured to carry at least one of (i) independent data streams, (ii) redundant data streams, and (iii) multiple paths for a single data stream, thereby providing higher bandwidth for the data stream.
  • the multiple telemetry modules may be directed, under local program control, to allow graceful degradation of bandwidth during periods of high demand, power limitations, and partial system failure.
  • a hierarchy protocol may be established directing a particular telemetry module to be a master module that directs the transmissions of the slave modules at each ATS location.
  • the protocol provides a predetermined order of succession for data transmission should the master module or any other of the slave modules fail.
  • the protocol also provides a hierarchical list of data streams such that as bandwidth capacity is reduced, by failure of a module for example.
  • An exemplary data stream may contain measurements related downhole pressure, temperature, and vibration. It is known that, in most circumstances, the vibration data is significantly more variable over time than is temperature.
  • the predetermined protocol may, for example, reduce the transmission of temperature data in order to maintain suitable transmission of vibration data.
  • any number of telemetry modules that can be suitably packaged in the available space may be used with the present system.
  • Any of the previously discussed transmission techniques may be used with the parallel transmission techniques. For example, multiple transmission frequencies may be used with acoustic, RF, and EM transmissions, and wavelength division multiplexing is common for sending multiple signals over optical systems.
  • any of the previously described autonomous telemetry stations may contain one or more sensors for detecting parameters of interest related to the ATS or the local environment. Such measurements may be added to signals passing through the ATS or, alternatively, be transmitted by the ATS by themselves.
  • sensors include, but are not limited to (i) pressure sensors for measuring pressure of the drilling fluid inside and/or outside the drill string; (ii) temperature sensors for measuring drill string and/or drilling fluid temperatures; (iii) vibration sensors for measuring local drill string vibration; (iv) sensors for measuring parameters related to the proper operation of the ATS such as power voltage and/or current levels.
  • digital diagnostic status of the processor may be transmitted.
  • an ATS may communicate with permanently installed devices, for example in a productions string.
  • Such devices may be passive devices that take their power from the signal transmitted by the ATS, or the devices may have batteries or power scavenging devices as described herein.
  • an independent sensor module having multiple sensors may be installed in the drill string 3, such as a formation evaluation device (not shown) and/or a device for measuring strain of the drill string section at a predetermined location. Examples of such devices are described in U. S. Patent Application Serial Number 10/421475, filed on April 23, 2003, assigned to the assignee of this application, and previously incorporated herein by reference. Such devices may be adapted to communicate with and/or through the ATS network as previously described. Alternatively, such a system may have its own primary telemetry capability, such as a mud pulse system, and use the described ATS system as a fall back system when such primary system fails.
  • All of the previously described systems are intended to enable bi-directional communication between at least (i) multiple ATS devices, (ii) a surface controller and ATS devices, and (iii) ATS devices and externally located downhole devices.
  • Such surface generated signals may be used to download instructions, including commands, to any and/or all ATS devices.
  • Such transmissions include but are not limited to instructions that may (i) cause changes in operation format of an ATS, (ii) cause an ATS to issue a command to an externally located device, for example a downhole valve in a production string, and (iii) cause the system to reestablish the preferred communication path.
  • tubular member 161 has a cross-sectional area substantially less than the internal diameter of drill pipe section 160 and is placed within each section of drill pipe 160.
  • the length of tube 161 is of a predetermined length such that it extends substantially the length of section 160 but does not interfere when connecting drill pipe sections. When the sections of drill pipe are joined the tubes 161 form a waveguide for bi-directional surface-to-subsurface communication via electromagnetic, optic and/or acoustic energy.
  • Tube 161 provides and/or contains all or part of the transmission medium for communication along the length of section 160.
  • tube 161 may contain one or more electrical conductors 162 and/or optical fibers 165.
  • at least one optical fiber 165 is firmly attached inside tube 161 which is firmly attached to section 160.
  • Optical fiber 165 is used to determine the strain of the optical fiber 165 caused by the axial loading on section 160. The optical fiber strain may be then related to the loading on section 160 by analytical and/or experimental methods known in the art. Such optical strain measurements may be made by techniques known in the art.
  • at least one fiber Bragg grating may be disposed in optical fiber 165.
  • the Bragg grating reflects a predetermined wavelength of light, related to the Bragg grating spacing. As the load on section 160 changes, the spacing of the Bragg grating changes resulting in changes in the wavelength of light reflected therefrom, which are related to the load on section 160.
  • the optical components for such a measurement may be located in electronics 164 in each tube 161 and the results telemetered along the communication system. Any other optical strain technique is suitable for the purposes of this invention.
  • tube 161 may provide a waveguide path for acoustic and/ or RF transmission. Such a waveguide, when firmly attached to section 160 may be used to provide a strain indication of section 160.
  • an acoustic or RF pulse may be transmitted along the wave guide from one end and reflected back from the other end. Changes in the time of flight of the signal may be related to changes in the length of section 160 using analytical and/or experimental methods known in the art.
  • Electronics 164 and transceiver 163 are located at each end of each tube 161 for communicating to and receiving signals from ATS 162.
  • ATS 162 receives a signal from transceiver 163c, adds data to the signal as required, and retransmits the signal to transceiver 163b for transmission along tube 161a using any of the previously mentioned transmission media.
  • the system also provides devices, as previously described, for scavenging energy from available energy sources as described previously.
  • the power source may be integral to the tubes employed for communication or provided by other tubes or systems proximate the communication tube being powered.
  • One example would employ a piezoelectric material along the length of tube 161 to produce a voltage from the dynamic pressure variations and/or turbulent eddies that occur in the drilling fluid flow as a result of the surface pump pulsations and/or flow perturbations in the drilling fluid flow stream.
  • Tube 161 may be positioned substantially against the perimeter of the internal diameter of the drill pipe 160.
  • the force to hold the tube in position may be provided by mechanical devices, such as by bow springs known in the art, or by a magnetic force provided by magnets distributed along the length of the tube, or by other means such as adhesives, etc.
  • Tube 161 may also be placed substantially centralized in the drill-pipe using bow-spring centralizers (not shown), or other devices known in the art.
  • the tube can be made of a metallic or from a plastic or composite material, such as polyetherether ketone, for example. Communication between tubes may be achieved through electromagnetic, acoustic, optical, and/or other techniques described previously, and relayed through ATS 162. Alternatively, the signals may be transmitted from one transceiver 163 directly to another transceiver in an adjacent tube 163.
  • a micro turbine-generator is integrated into ATS 172 for supplying power to ATS 172.
  • the MTG comprises a substantially cylindrically shaped rotor 179 having a number of turbine blades 175 formed on an inner diameter of rotor 179.
  • Turbine blades 175 intercept a portion of the flow of drilling fluid 177 and cause the rotor to rotate as indicated by arrow 176 about the center of the drill string section.
  • Rotor 179 is supported by bearings 174 and has a number of permanent magnets 178 arranged around the periphery of the rotor 179. The magnets are preferably polarized as shown in Fig.
  • the magnets 178 may be any suitable shape, including, but not limited to, bar magnets and disk, also called button, magnets.
  • the magnets are arranged around the periphery of rotor 179 such that alternating positive and negative faces and their magnetic fields pass by at least one stationary electrically conductive coil 173 in ATS 172 and generate alternating voltages therein. More than one coil may be located in ATS 172.
  • Suitable circuitry known in the art, is located in ATS 172 to convert the alternating voltages to usable power for the sensors and transceivers located in ATS 172 and described previously. The amount of power generated by such an MTG is determinable from techniques known in the art without undue experimentation.
  • the rotor 179 may be made of at least one of ceramic, metallic, and elastomeric materials.
  • the bearings 174 may be made of at least one of ceramic materials, including diamond coated, and elastomeric materials. Such bearings are known in the art and will not be described in further detail.
  • each individual telemetry module may have its own coil for generating power from the rotating magnets.
  • MTG 184 provides power to multiple telemetry stations, for example, ATS 181, 182, 183.
  • the MTG as previously described, generates an alternating current (AC) voltage that may be inductively coupled to conductors (not shown) in sleeves 186 a-d.
  • AC current flowing through a coil will produce a related time-varying magnetic field.
  • a time-varying magnetic field acting on a coil of wire will produce a time varying current in the coil.
  • Two such coils may be positioned in appropriate proximity to transfer power from one coil to the other. The power transfer can be affected by various factors, including, but not limited to, the gap size, dielectric properties of intervening materials, coil turns, and coil diameter.
  • Each sleeve 186 a-d has an inductive coupler at each end 185a,b and transmits energy to and/or through each ATS 181-183.
  • Each ATS may tap the AC voltage for internal conversion and use it to power each ATS and the sensors, as previously described, attached to each ATS.
  • the raw voltage, as generated, may be inductively coupled along the conductors in sleeves 186a-d.
  • Sleeves 186a-d may be any of the sleeves previously described, for example, in Figures 6-8B and 16A,B, or any other suitable sleeve and conductor combination.
  • the voltage may be conditioned by circuitry (not shown, in ATS 181 to alter the voltage and/or frequency to enhance the inductive coupling efficiency.
  • circuitry not shown, in ATS 181 to alter the voltage and/or frequency to enhance the inductive coupling efficiency.
  • the actual spacing between adjacent MTG 184 units is application specific and depends on factors, including but not limited to, the types and power requirements of the sensors, the efficiency of the inductive coupling, and the losses in the conductors.
  • another power source comprises a sleeve 191 that extends substantially the length of a section of drill string 190.
  • Sleeve 191 is a sacrificial anode separated from section 190 by a suitable electrolytic material 192, thereby establishing a galvanic cell running the length of sleeve 191.
  • a galvanic cell running the length of sleeve 191.
  • Such a cell may be designed to provide predetermined amounts of power using techniques known in the art.
  • the voltage generated depends on the sleeve and drill pipe section materials, and the total current capacity is related to the conductivities of the sleeve 191 and gel 192 and the area of contact between the sleeve and the gel, which is related to the length of the sleeve.
  • the sleeve may be installed using any of the techniques described previously, for example expanding such a sleeve 191 into contact with the section 190 while capturing the gel 192 in between.
  • Suitable circuitry (not shown) may be embedded into the ends of such a sleeve 191 to convert the generated voltage to any suitable voltage required.
  • such circuitry can be used to converted DC power to AC power for use in inductively coupling such power to adjacent sections of drill string.
  • insulating sleeve 204 is inserted between drill section 200 and cathode 203.
  • Electrolytic gel 202 is sandwiched between cathode 203 and anode 201 setting up a galvanic cell.
  • the use of a separate cathode 203 insulated from the drill section 200 provides for more freedom in selecting the cell materials and cell voltage.
  • the electrolytic gel of Fig. 19 and 20 may be embedded or captured in a suitable open-cell mesh and/or honeycomb material (not shown) to prevent the gel from being extruded out from between the anode and cathode materials during installation and operation.
  • Any of the battery configurations described previously may be configured, using techniques known in the art, to be rechargeable using appropriate materials.
  • Any of the energy scavenging devices or the MTG may be used to recharge such a battery system. Such a battery would be able to at least provide power during non-drilling and/or non- flowing periods and be recharged once such activity resumed.
  • an instrumented sub 210 is installed in the drill string between sections 215 and 216.
  • Sub 210 has, for example, sensors 212 and 217 mounted on an outer and inner diameter, respectively.
  • sensors 212 and 217 mounted on an outer and inner diameter, respectively.
  • sensors 212 and 217 may be mounted on the inside and/or outside diameters of sub 210.
  • These sensors include, but are not limited to, (i) pressure sensors, (ii) temperature sensors, (iii) strain sensors, (iv) chemical species sensors, (v) fluid resistivity sensors, and (vi) fluid flow sensors.
  • Sensors 212 and 217 may be powered by ATS 211 and interfaced through electronics module 213 attached to sub 210.
  • Electronics module 213 may communicate to adjacent ATS 211, in either direction, using any of the previously discussed communication techniques.
  • Multiple subs 210 may be inserted in the drill string at predetermined locations. The locations are application specific and may depend on factors such as the desired measurement and spatial resolution along the length of the drill string.
  • sub 210 may have a transceiver (not shown) located on an outer diameter for communicating with and/or interrogating sensors or other devices mounted on production tubulars, and or production hardware.
  • such an external transceiver may be used to communicate with and/or interrogate devices in lateral branches of multilateral wells in both the drilling and production environments.
  • sub 253 is disposed in a drill string (not shown) in a substantially horizontal wellbore 250 and has multiple sensors 254 attached to an outer diameter of the sub 253.
  • Drilling fluid 251 and influx fluid 252 are flowing past sub 253 forming a combined multi-phase fluid, where multi-phase refers to at least one of (i) an oil-drilling fluid mixture, (ii) a drilling fluid-gas mixture, and (iii) a drilling fluid-oil-gas mixture.
  • the effects of gravity tend to cause the separation of the fluids into fluids 251 and 252.
  • Fluid 252 may be a gas, water, oil, or some combination of these.
  • Sensors 254 may measure the resistivity of the fluid passing in close proximity to each sensor 254, thereby providing a cross-sectional profile related to the fluid makeup near each sensor. These measurements are communicated to the surface using the techniques of the present invention. Changes in the profile may be used to detect changes in the amount and composition of the fluid influx passing a measurement station along the wellbore. Such measurements may be used, for example, to monitor the placement of specialty drilling fluids and/or chemicals, commonly called pills, at a desired location in the wellbore. In addition, multiple cross sectional profiles may be measured and compared to determine the changes in the profiles along the wellbore.
  • optical fibers may be incorporated in the sleeves described in Figs. 6-8 and the tubes described in 16A,B for communicating between automated telemetry stations.
  • the use of optical fibers can provide high bandwidth at relatively low signal loss along the fiber.
  • Major impediments to the use of optical fibers in such an application include making optical connections at each ATS and the losses associated with optical connectors.
  • Shown in Figs. 22 A and B is one preferred embodiment of a system to provide optical coupling to optical fibers that are not aligned and/or not in close enough proximity to allow direct coupling.
  • Tubular sections 225a-b are joined at threaded connection 224.
  • Optical fibers 223 and 222 are attached to an inside diameter of sections 225a and 225b, respectively, and form part of an optical communication channel.
  • An ATS 220 is placed in the boreback area 230.
  • ATS 220 contains sensors as previously described and an optical transceiver 233 for boosting the optical signal transmitted along the optical communication channel.
  • the optical transceiver 233 comprises an optical coupler 231 for transferring the received optical signal to a optical receiver 226.
  • the received optical signal is processed using circuitry 230 and a processor (not shown). Additional locally generated signals may be added to the received signal and the combined signal is retransmitted by optical transmitter 228 through transmitted optical coupler 232.
  • OCM 221 may be an optically translucent material such that it transmits sufficient energy to be detected and at the same time diffuses the energy such that the optical fiber 222 and the optical coupler 231 may be rotationally misaligned similar to that shown for optical fibers in Fig. 22C.
  • OCM 221 may be made translucent by doping the material with reflective materials.
  • OCM 221 is a translucent potting material having sufficient natural diffusion characteristics to provide acceptable light reception at optical receiver 226. For example, clear to translucent silicone potting materials are commercially available and are commonly used in potting electronic devices.
  • ATS 220 may be encapsulated in the potting material in a shape approximating the boreback cavity 230 but slightly oversized such that when captured in connection 224 the optical fibers 222 and 223 are brought in intimate contact with OCM 221 providing optical coupling between optical fibers 222 and 223 and optical transceiver 233.
  • any suitably transparent and/or translucent material may be used as OCM 221.
  • OCM 221 may be doped with a phosphorescent material such that signal light injected into OCM 221 causes the phosphorescent material to emit light within OCM 221 that may be detected by the optical receiver in transceiver 233.
  • Transceiver 233 may be powered by its own power source
  • transceiver 233 may be powered by any of the power systems previously described.
  • optical fiber 236 provides a relatively low-loss redundant optical path for optical signal 234 to pass from optical fiber 222 to optical fiber 223. The attenuation in OCM
  • OCM 221 is typically substantially greater than through an optical fiber, such as fiber 236, and may not allow such a transmission through OCM 221 alone.
  • the combined path has
  • each transceiver is adapted to receive and transmit the same frequency light signal.
  • a hierarchy may be established among such transceivers. Dispersion of the incoming signal in OCM 221 allows transceivers adjacent to a primary transceiver to detect the incoming signal and determine if the primary transceiver has transmitted the signal onward. Should the primary transceiver fail to transmit the signal, for example within in predetermined time period, one of the adjacent transceivers, according to the programmed hierarchy assumes the task and transmits the signal.
  • each of the multiple optical transceivers may receive and transmit a different light frequency.
  • Such a system may provide for multiple redundant channels transmitting the same signal.
  • each of multiple channels may communicate a different signal, at a different light wavelength, with selected channels having redundant transceivers.
  • Figs. 22 A, B refers to a unidirectional signal.
  • bi-directional signals may be transmitted along the optical communication path by incorporating optical transceivers for transmitting in both directions.
  • Such a system may include multiple optical fibers extending along each section with signals traveling in only a single direction in any one fiber.
  • bidirectional signals may be transmitted over a single fiber using a number of techniques, including but not limited to, time division multiplexing and wave division multiplexing. It is intended that, for the purposes of this invention, any suitable multiplexing scheme known in the art may be used for bi-directional transmissions.
  • More than one physical transmission technique may be used to communicate information along the communication network as described herein.
  • an optical system may be used to transmit signals in an optical fiber disposed along a section of drill string. The signal at each end of the drill string section is transmitted to the next section using, for example, an RF transmission technique, as previously described.
  • Any combination of techniques described may be used.
  • multiple non-interfering physical transmission techniques may be used. For example, acoustic and RF, or RF and optical techniques may be both used to transmit information across a connection joint. The use of such multiple techniques will increase the probability of transmission across the connection joint. Any number of such non-interfering techniques may be used. Such combinations can be adapted to the particular field requirements by one skilled in the art without undue experimentation.
  • the distributed measurement and communication network provides the ability to determine changing conditions along the length of the well in both the drilling and production operations.
  • sensor information may be available at the surface and near the bit, for example from Measurement While Drilling devices. Little, if any, information is available along the length of the drill string.
  • the drag on the drill string is typically measured only at the surface.
  • indications of distributed and/or localized drag on the drill string may be used to improve the tripping process and to identify locations of high drag that may require remedial action, such as reaming.
  • the use of such real-time measurement data allows the tripping process to be substantially automated to ensure that the pull on any joint in the string does not exceed the maximum allowable load.
  • distributed measurements of pressure along the string may be used to maintain the surge and swab pressures within acceptable limits.
  • profiles of parameters such as, for example, strain, drag, and torque may be compared at different time intervals to detect time-dependent changes in drilling conditions along the wellbore.
  • the distributed sensor system provides profiles of localized torque and vibration measurements (both axial and whirl) along the drill string enabling the operator to identify the problem locations and to take corrective action, such as installing a roller assembly in the drill string at a point of high drag. Such profiles may be compared at different time intervals to detect time-dependent changes, such as for example, build up of drill cuttings and other operating parameters.
  • the drill string In rotary drilling applications, the drill string has been shown to exhibit axial, lateral, and whirl dynamic instabilities that may damage the drill string and or downhole equipment and/or reduce the rate of penetration.
  • the various vibrational modes along the drill string are complex and are not easily discernible from only end point (surface and bottomhole) measurements.
  • Distributed vibrational and whirl measurements from the present invention are telemetered to the surface and processed by the surface controller to provide an enhanced picture of the dynamic movement of the drill string. The operator may then be directed, by suitable drilling dynamic software in the surface controller to modify drilling parameters to control the drill string vibration and whirl.
  • the drill string may become stuck in the wellbore during normal drilling operations, the strain and/or load measurements along the drill string allow the determination of the location where the drill string is stuck and allows the operator to take corrective actions known in the art.
  • pressure and/or temperature measurements are made at the sensors distributed along the length of the drill string. Profiles of such measurements along the well length may be monitored and used to detect and control well influxes, also called kicks.
  • well influxes also called kicks.
  • a wellbore may traverse multiple producing formations.
  • the pressure and temperature profiles of the distributed measurements of the present invention may be used to control the equivalent circulating density (ECD) along the wellbore and prevent damage due to over pressure in the annulus near each of the formations.
  • ECD equivalent circulating density
  • changes in the pressure and temperature profiles may be used to detect fluid inflows and outflows at the multiple formations along the wellbore.
  • distributed pressure and temperature measurements may be used to control an artificial lift pump placed downhole to maintain predetermined ECD at multiple formations.
  • An example of such a pumping system is disclosed in published application U.S. 20030098181 Al, published May 29, 2003, and incorporated herein by reference.
  • sensors such as those described in U. S. Patent Application Serial Number 10/421475, filed on April 23, 2003, assigned to the assignee of this application, and previously incorporated herein by reference, are attached to the outside of casing as it is run in the wellbore to monitor parameters related to the cementing of the casing in the wellbore.
  • Such sensors may be self-contained with limited battery life for the typical duration of such an operation, on the order of 100 hours.
  • the sensors may be adapted to acoustically transmit through the casing to autonomous telemetry stations mounted on a tubular string internal to the casing. Pressure and temperature sensors so distributed provide information related to the placement and curing of the cement in the annulus between the casing and the borehole.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Acoustics & Sound (AREA)
  • Geophysics (AREA)
  • Electromagnetism (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
  • Selective Calling Equipment (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

La présente invention a trait à un système de mesure et de communication destiné à être utilisé avec un train tubulaire (3) comportant un train tubulaire comprenant un ensemble de stations de télémétrie (20) autonomes et autoalimentées disposées à des emplacements prédéterminés le long du train tubulaire. Chaque station de télémétrie est adaptée à la réception (25) d'au moins un premier signal et à la transmission (23) d'au moins un deuxième signal associé au dit au moins un premier signal. L'énergie est extraite de sources d'énergie potentielle à proximité de chaque station de télémétrie autonome. Un procédé de communication d'information le long du train tubulaire comprend : le placement d'une station de télémétrie autonome à des emplacements prédéterminés le long du train tubulaire. Un trajet de transmission préféré est déterminé de manière autonome au niveau de chacune des stations de télémétrie autonomes. L'information est transmise le long du train tubulaire selon le trajet préféré déterminé de manière autonome.
PCT/US2004/019020 2003-06-13 2004-06-14 Appareil et procedes pour reseau autoalimente de communications et de capteurs WO2004113677A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB0526058A GB2419365B (en) 2003-06-13 2004-06-14 Apparatus and methods for self-powered communication and sensor network
NO20056008A NO339508B1 (no) 2003-06-13 2005-12-16 System og fremgangsmåte for selvdrevet kommunikasjon og sensornettverk i et borehull

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US47823703P 2003-06-13 2003-06-13
US60/478,237 2003-06-13

Publications (1)

Publication Number Publication Date
WO2004113677A1 true WO2004113677A1 (fr) 2004-12-29

Family

ID=33539079

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2004/019020 WO2004113677A1 (fr) 2003-06-13 2004-06-14 Appareil et procedes pour reseau autoalimente de communications et de capteurs

Country Status (3)

Country Link
GB (1) GB2419365B (fr)
NO (1) NO339508B1 (fr)
WO (1) WO2004113677A1 (fr)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007019319A1 (fr) * 2005-08-04 2007-02-15 Schlumberger Canada Limited Systeme de telemetrie bidirectionnelle pour train de tiges permettant les mesures et la commande de forage
WO2007137326A1 (fr) * 2006-05-25 2007-12-06 Welldata Pty Ltd Procédé et système d'acquisition et de transmission de données de fond de puits
US7954560B2 (en) 2006-09-15 2011-06-07 Baker Hughes Incorporated Fiber optic sensors in MWD Applications
US7962288B2 (en) 2004-03-04 2011-06-14 Halliburton Energy Services, Inc. Multiple distributed force measurements
US9133707B2 (en) 2008-05-23 2015-09-15 Martin Scientific LLP Reliable downhole data transmission system
CN107762491A (zh) * 2016-08-17 2018-03-06 中国石油化工股份有限公司 一种随钻声波测井辐射装置
US10072495B1 (en) 2017-03-13 2018-09-11 Saudi Arabian Oil Company Systems and methods for wirelessly monitoring well conditions
US10218074B2 (en) 2015-07-06 2019-02-26 Baker Hughes Incorporated Dipole antennas for wired-pipe systems
US10274628B2 (en) 2015-07-31 2019-04-30 Halliburton Energy Services, Inc. Acoustic device for reducing cable wave induced seismic noises
WO2019112790A1 (fr) * 2017-12-06 2019-06-13 Saudi Arabian Oil Company Détermination des propriétés tomographiques structurales d'une formation géologique
US10329856B2 (en) 2015-05-19 2019-06-25 Baker Hughes, A Ge Company, Llc Logging-while-tripping system and methods
WO2019133366A1 (fr) * 2017-12-28 2019-07-04 Baker Hughes Oilfield Operations Llc Réseaux de télémesure de fond de trou hybrides en série
CN114059996A (zh) * 2020-07-31 2022-02-18 沙特阿拉伯石油公司 自供电主动振动和旋转速度传感器
US11542814B2 (en) 2019-11-27 2023-01-03 Baker Hughes Oilfield Operations Llc Telemetry system combining two telemetry methods
US11835675B2 (en) 2019-08-07 2023-12-05 Saudi Arabian Oil Company Determination of geologic permeability correlative with magnetic permeability measured in-situ
US11840919B2 (en) 2021-01-04 2023-12-12 Saudi Arabian Oil Company Photoacoustic nanotracers
US11860077B2 (en) 2021-12-14 2024-01-02 Saudi Arabian Oil Company Fluid flow sensor using driver and reference electromechanical resonators
US11867049B1 (en) 2022-07-19 2024-01-09 Saudi Arabian Oil Company Downhole logging tool
US11879328B2 (en) 2021-08-05 2024-01-23 Saudi Arabian Oil Company Semi-permanent downhole sensor tool
US11913329B1 (en) 2022-09-21 2024-02-27 Saudi Arabian Oil Company Untethered logging devices and related methods of logging a wellbore
US12000278B2 (en) 2021-12-16 2024-06-04 Saudi Arabian Oil Company Determining oil and water production rates in multiple production zones from a single production well

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3970877A (en) * 1973-08-31 1976-07-20 Michael King Russell Power generation in underground drilling operations
US4518888A (en) * 1982-12-27 1985-05-21 Nl Industries, Inc. Downhole apparatus for absorbing vibratory energy to generate electrical power
EP0921269A1 (fr) * 1997-12-03 1999-06-09 Halliburton Energy Services, Inc. Répéteur de signal à sécurité intégrée dans un puits

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3970877A (en) * 1973-08-31 1976-07-20 Michael King Russell Power generation in underground drilling operations
US4518888A (en) * 1982-12-27 1985-05-21 Nl Industries, Inc. Downhole apparatus for absorbing vibratory energy to generate electrical power
EP0921269A1 (fr) * 1997-12-03 1999-06-09 Halliburton Energy Services, Inc. Répéteur de signal à sécurité intégrée dans un puits

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7962288B2 (en) 2004-03-04 2011-06-14 Halliburton Energy Services, Inc. Multiple distributed force measurements
WO2007019319A1 (fr) * 2005-08-04 2007-02-15 Schlumberger Canada Limited Systeme de telemetrie bidirectionnelle pour train de tiges permettant les mesures et la commande de forage
WO2007137326A1 (fr) * 2006-05-25 2007-12-06 Welldata Pty Ltd Procédé et système d'acquisition et de transmission de données de fond de puits
US7954560B2 (en) 2006-09-15 2011-06-07 Baker Hughes Incorporated Fiber optic sensors in MWD Applications
US9133707B2 (en) 2008-05-23 2015-09-15 Martin Scientific LLP Reliable downhole data transmission system
US9422808B2 (en) 2008-05-23 2016-08-23 Martin Scientific, Llc Reliable downhole data transmission system
US10329856B2 (en) 2015-05-19 2019-06-25 Baker Hughes, A Ge Company, Llc Logging-while-tripping system and methods
US10995567B2 (en) 2015-05-19 2021-05-04 Baker Hughes, A Ge Company, Llc Logging-while-tripping system and methods
US10218074B2 (en) 2015-07-06 2019-02-26 Baker Hughes Incorporated Dipole antennas for wired-pipe systems
US10274628B2 (en) 2015-07-31 2019-04-30 Halliburton Energy Services, Inc. Acoustic device for reducing cable wave induced seismic noises
CN107762491A (zh) * 2016-08-17 2018-03-06 中国石油化工股份有限公司 一种随钻声波测井辐射装置
CN107762491B (zh) * 2016-08-17 2020-09-25 中国石油化工股份有限公司 一种随钻声波测井辐射装置
US10641085B2 (en) 2017-03-13 2020-05-05 Saudi Arabian Oil Company Systems and methods for wirelessly monitoring well conditions
US10072495B1 (en) 2017-03-13 2018-09-11 Saudi Arabian Oil Company Systems and methods for wirelessly monitoring well conditions
US10156136B2 (en) 2017-03-13 2018-12-18 Saudi Arabian Oil Company Systems and methods for wirelessly monitoring well conditions
US10436022B2 (en) 2017-03-13 2019-10-08 Saudi Arabian Oil Company Systems and methods for wirelessly monitoring well conditions
US10619475B2 (en) 2017-03-13 2020-04-14 Saudi Arabian Oil Company Systems and methods for wirelessly monitoring well conditions
US11002595B2 (en) 2017-12-06 2021-05-11 Saudi Arabian Oil Company Determining structural tomographic properties of a geologic formation
US10330526B1 (en) 2017-12-06 2019-06-25 Saudi Arabian Oil Company Determining structural tomographic properties of a geologic formation
US10444065B2 (en) 2017-12-06 2019-10-15 Saudi Arabian Oil Company Determining structural tomographic properties of a geologic formation
WO2019112790A1 (fr) * 2017-12-06 2019-06-13 Saudi Arabian Oil Company Détermination des propriétés tomographiques structurales d'une formation géologique
CN111433436A (zh) * 2017-12-06 2020-07-17 沙特阿拉伯石油公司 确定地质构造的结构层析成像特性
US10612969B2 (en) 2017-12-06 2020-04-07 Saudi Arabian Oil Company Determining structural tomographic properties of a geologic formation
US10612968B2 (en) 2017-12-06 2020-04-07 Saudi Arabian Oil Company Determining structural tomographic properties of a geologic formation
US11467026B2 (en) 2017-12-06 2022-10-11 Saudi Arabian Oil Company Determining structural tomographic properties of a geologic formation
US10895497B2 (en) 2017-12-06 2021-01-19 Saudi Arabian Oil Company Determining structural tomographic properties of a geologic formation
US11549368B2 (en) 2017-12-28 2023-01-10 Baker Hughes Oilfield Operations Llc Serial hybrid downhole telemetry networks
US11846182B2 (en) 2017-12-28 2023-12-19 Baker Hughes Oilfield Operations Llc Serial hybrid downhole telemetry networks
GB2583278B (en) * 2017-12-28 2022-09-14 Baker Hughes Oilfield Operations Llc Serial hybrid downhole telemetry networks
GB2583278A (en) * 2017-12-28 2020-10-21 Baker Hughes Oilfield Operations Llc Serial hybrid downhole telemetry networks
WO2019133366A1 (fr) * 2017-12-28 2019-07-04 Baker Hughes Oilfield Operations Llc Réseaux de télémesure de fond de trou hybrides en série
US11835675B2 (en) 2019-08-07 2023-12-05 Saudi Arabian Oil Company Determination of geologic permeability correlative with magnetic permeability measured in-situ
US11542814B2 (en) 2019-11-27 2023-01-03 Baker Hughes Oilfield Operations Llc Telemetry system combining two telemetry methods
CN114059996A (zh) * 2020-07-31 2022-02-18 沙特阿拉伯石油公司 自供电主动振动和旋转速度传感器
US11840919B2 (en) 2021-01-04 2023-12-12 Saudi Arabian Oil Company Photoacoustic nanotracers
US11879328B2 (en) 2021-08-05 2024-01-23 Saudi Arabian Oil Company Semi-permanent downhole sensor tool
US11860077B2 (en) 2021-12-14 2024-01-02 Saudi Arabian Oil Company Fluid flow sensor using driver and reference electromechanical resonators
US12000278B2 (en) 2021-12-16 2024-06-04 Saudi Arabian Oil Company Determining oil and water production rates in multiple production zones from a single production well
US11867049B1 (en) 2022-07-19 2024-01-09 Saudi Arabian Oil Company Downhole logging tool
US11913329B1 (en) 2022-09-21 2024-02-27 Saudi Arabian Oil Company Untethered logging devices and related methods of logging a wellbore

Also Published As

Publication number Publication date
NO20056008L (no) 2006-02-03
NO339508B1 (no) 2016-12-27
GB2419365A (en) 2006-04-26
GB2419365B (en) 2007-09-19
GB0526058D0 (en) 2006-02-01

Similar Documents

Publication Publication Date Title
CA2570344C (fr) Dispositifs et procedes pour reseau de communications et de capteurs auto-alimentes
US7400262B2 (en) Apparatus and methods for self-powered communication and sensor network
WO2004113677A1 (fr) Appareil et procedes pour reseau autoalimente de communications et de capteurs
US11828172B2 (en) Communication networks, relay nodes for communication networks, and methods of transmitting data among a plurality of relay nodes
US11092000B2 (en) Apparatuses and methods for sensing temperature along a wellbore using temperature sensor modules comprising a crystal oscillator
US11286769B2 (en) Apparatuses and methods for sensing temperature along a wellbore using resistive elements
US6442105B1 (en) Acoustic transmission system
US20210381364A1 (en) Apparatuses and methods for sensing temperature along a wellbore using semiconductor elements
US10598810B2 (en) Optical magnetic field sensor units for a downhole environment
CA2847633C (fr) Emetteur recepteur de telemetrie acoustique
WO2018118028A1 (fr) Procédés et systèmes de couplage inductif de fond de trou
CN109642459B (zh) 通信网络,用于通信网络的中继节点,以及在多个中继节点之间发送数据的方法
Kyle et al. Acoustic telemetry for oilfield operations
EA041839B1 (ru) Электроакустический преобразователь

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 0526058.3

Country of ref document: GB

Ref document number: 0526058

Country of ref document: GB

122 Ep: pct application non-entry in european phase