WO2004051051A1 - Subsea structure and methods of construction and installation thereof - Google Patents

Subsea structure and methods of construction and installation thereof Download PDF

Info

Publication number
WO2004051051A1
WO2004051051A1 PCT/EP2003/014833 EP0314833W WO2004051051A1 WO 2004051051 A1 WO2004051051 A1 WO 2004051051A1 EP 0314833 W EP0314833 W EP 0314833W WO 2004051051 A1 WO2004051051 A1 WO 2004051051A1
Authority
WO
WIPO (PCT)
Prior art keywords
buoyancy
subsea structure
installing
elongate
acting
Prior art date
Application number
PCT/EP2003/014833
Other languages
French (fr)
Inventor
Tegwen Bertrand Marie Miorcec De Kerdanet
Original Assignee
Stolt Offshore Sa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stolt Offshore Sa filed Critical Stolt Offshore Sa
Priority to US10/535,792 priority Critical patent/US8282317B2/en
Priority to GB0424775A priority patent/GB2410989B/en
Priority to AU2003298236A priority patent/AU2003298236A1/en
Priority to BR0311416-3A priority patent/BR0311416A/en
Publication of WO2004051051A1 publication Critical patent/WO2004051051A1/en
Priority to NO20052953A priority patent/NO334142B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/012Risers with buoyancy elements

Definitions

  • the present invention relates to method and apparatus for buoyancy distribution of offshore deepwater structures, in particular, but not restricted to, buoyancy distribution along a substantially vertical submarine structure, such as a riser, a bundle of risers, or any other structural member.
  • the structure may form part of a so-called hybrid riser, having an upper and/or lower portions ("jumpers") made of flexible conduit.
  • US-A-6082391 proposes a particular Hybrid Riser Tower consisting of an empty central core, supporting a bundle of riser pipes, some used for oil production some used for water and gas injection. This type of tower has been developed and deployed for example in the Girassol field off
  • Buoyancy of offshore structures is achieved by using temporarily or permanently attached buoyancy modules providing an upward thrust when submerged in the sea.
  • Conventional devices such as stop-collars and clamps are used to transmit the buoyancy thrust from the buoyancy modules to the supported structure.
  • the buoyancy thrust acts upon the structure where it is generated.
  • the buoyancy modules are clamped around stop collars using straps or bolts.
  • buoyancy may be required for the supporting of a structure in two (or more) completely different orientations, such as a horizontal orientation (during installation) and a vertical orientation (in operation).
  • the buoyancy thrust has to be transmitted in both orientations along two perpendicular directions, depending upon the orientation of the structure at the time. Having the buoyancy acting onto the structure where it is generated may be advantageous in one direction (supporting of horizontal risers during fabrication and installation), but a hindrance in another direction.
  • two or more risers are bundled together it can be difficult to clamp buoyancy modules along each riser (due to differential thermal expansion, for example), or along one riser only (due to effective compression).
  • the modules are clamped to just one of the risers.
  • the forces associated with weight compensation may induce a large compressive load on the riser to which the buoyancy modules are attached.
  • a method of installing an elongate subsea structure wherein said subsea structure is provided with a plurality of buoyancy modules, said buoyancy modules being slidably mounted to said subsea structure, such that when said subsea structure is deployed at sea in a substantially vertical orientation said buoyancy modules are free to adjust their positions up or down said subsea structure by sliding, the buoyancy force of each buoyancy module acting upon the buoyancy module above it rather than locally along the structure, and the cumulative buoyancy force from said buoyancy modules acting substantially against the top of said subsea structure.
  • substantially vertically can be taken to be some degree off true vertical, but orientated such that said elongate object rises substantially from seabed to surface.
  • substantially acting from the top can be taken to mean acting some metres below the top, but such that the buoyancy is acting near the top taking into consideration the full length of the elongate object.
  • Said subsea structure will usually be a riser, such as a steel catenary riser, or a bundle of risers.
  • Said bundle of risers may be a bundle of seven risers arranged with one in the centre and the rest spaced apart and distributed evenly around this.
  • the central one may be a supporting core. In such a case, the transfer of the buoyant forces to the top of the structure is performed by the buoyancy modules, rather than by one core or core riser conduit. The excessive compressive loads otherwise imposed on that core conduit are thus avoided.
  • Each of said buoyancy modules may come in a number of sections, such that it can be fitted around all of the risers in a bundle of risers, as illustrated in WO '869, mentioned above.
  • Said buoyancy force may act from the top as a result of each buoyancy module acting on the one above, either directly or via an intermediary, the uppermost buoyancy module acting against a top plate.
  • the uppermost module could be fixed to said subsea structure.
  • the intermediary may be a pad of compressible material.
  • Said buoyancy modules may, in their original configuration, be spaced substantially evenly along said subsea structure to enable said subsea structure to be floated to the deployment site in a substantially horizontal orientation prior to deployment.
  • the structure may be provided with a substantial top buoyancy.
  • the structure may be supported completely by distributed buoyancy.
  • the content of that other application is incorporated herein by reference (GB 0227850.5 agent's ref 64314GB, published as WO ).
  • Fig. 1 is a schematic side-view of a known type of hybrid riser tower positioned horizontally during fabrication and installation, where the forces associated with weight / buoyancy compensation are distributed locally, throughout the whole of the structure;
  • Fig. 2 is a side view of the tower of Figure 1, positioned vertically after installation, or during operation;
  • Fig. 3 is a side view of a tower modified in accordance with the invention, where the compensation forces are transmitted to the top of the structure via inter-buoyancy- module devices, rather than via the risers;
  • Fig. 4 is a more detailed side view of the improved method of buoyancy distribution showing combined buoyancy modules, risers and anchored core pipe;
  • Fig. 5 is a side view of an alternative embodiment where riser towers are supported without using a top buoy.
  • Figure 1 shows a conventional method for providing buoyancy to a structure 100, by attaching buoyancy modules 110 to the riser(s) 120, 130 at regularly spaced points.
  • buoyancy modules 110 to the riser(s) 120, 130 at regularly spaced points.
  • the forces P induced by the buoyancy modules are well distributed. It is impractical to clamp the buoyancy modules onto all of the risers due to the effects of differential thermal expansion, therefore they are only attached at single points X and usually to one of the risers, or support core.
  • Figure 2 shows the structure of Figure 1 in a vertical orientation.
  • the risers hang freely from the top structure 105 of the bundle.
  • the induced thrust provided by the weight compensation induces a large compressive load along the length of the riser 130 onto which the buoyancy modules are attached.
  • the compression forces are at their greatest where the core riser 130 attaches 120 to the top of the structure, as the core riser 130 at that point has to balance the weights of the risers and their contents and the thrust of the buoyancy modules below.
  • Figure 3 shows an improved method for providing buoyancy to a structure 100. All of the buoyancy forces P are transmitted onto the top of the structure without any force being transmitted via the riser(s) 120, 130.
  • the buoyancy modules 110 are allowed to slide along the structure and transmit by themselves the cumulative up-lift force.
  • Compliant inter- module devices 310 are used as an interface between the buoyancy modules to ensure that the up-lift forces are evenly transmitted between adjacent modules. Doing so maximises the contact surface area, thereby minimising stress points caused by surface irregularities, or where the structure is slightly bent.
  • Figure 4 shows a first embodiment of a riser tower 400 having a vertical set of pipes (riser(s) 410 and/or structural members 420), which has been fabricated onshore, towed to the site, upended and set operational in a near-vertical configuration. Buoyancy is required during installation (towing and upending) perpendicularly to the tower axis and once installed, co-linearly to the tower axis. To avoid damage to the structure in the horizontal configuration, the buoyancy modules 430 have to be evenly distributed along the structure.
  • the up-thrust is transmitted to the top plate 440 forming part of the riser top structure 400 to compensate for the weight of the risers.
  • the up- thrust is transmitted through surface contact between vertically adjacent buoyancy modules, as indicated by arrows, 450, with optional compliant devices between modules, not shown in Figure 4. Transmission of the total thrust 460 to top plate 440 of the tower structure is via the uppermost buoyancy module.
  • the cross-sectional area of the buoyancy modules is such that the resulting stress in the uppermost module can be sustained, whereas if the up-thrust was transmitted via one of the pipes/risers then it would lead to unsustainable compressive loads.
  • the top structure 400 may comprise a substantial buoy, as in the prior examples.
  • Export of hydrocarbons is via flexible jumper hoses (not shown), one for each riser conduit.
  • Figure 5 shows an example of this alternative structure, whereby two riser bundles, or individual risers, 500, 510 connect to a floating vessel (FPSO) 515. Any additional top buoyancy has been replaced with distributed buoyancy.
  • the figure shows the surface vessel subject to a positioning excursion (caused by the sea-state, for example).
  • the left-hand riser is under greater tension than the right hand riser, but use of flexible top sections 520 allows the risers to accommodate the transitions.
  • Buoyancy for the risers is provided by the buoyancy already distributed along them for installation purposes, evenly distributing the complement required in operational conditions. It may be desirable to compensate for any surplus of buoyancy, during installation, by filling the structure with fluids heavier than those that will fill the conduits in operation. This will assist the process of sinking the lower part of the riser to the anchor point.
  • the installation process is broadly the same as that illustrated in US 6082391, mentioned above.
  • the height of the installed structure may for example be 500m, or over 1 km.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Electric Cable Installation (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Revetment (AREA)

Abstract

There is provided method and apparatus for buoyancy distribution along a substantially vertical submarine structure (100), in which the structure is provided with multiple modules (110), slidably mounted to the structure such that when vertically deployed at sea the modules are free to adjust their positions up or down the structure by sliding, the force of each module acting upon the module above it rather than locally along the structure, resulting in the cumulative force (460) from the modules acting substantially against the top of the structure. Forces between modules may be evenly distributed by use of compliant intermediaries (310).

Description

SUBSEA STRUCTURE AND METHODS OF CONSTRUCTION AND INSTALLATION THEREOF
The present invention relates to method and apparatus for buoyancy distribution of offshore deepwater structures, in particular, but not restricted to, buoyancy distribution along a substantially vertical submarine structure, such as a riser, a bundle of risers, or any other structural member.
The structure may form part of a so-called hybrid riser, having an upper and/or lower portions ("jumpers") made of flexible conduit. US-A-6082391 (Stolt/Doris) proposes a particular Hybrid Riser Tower consisting of an empty central core, supporting a bundle of riser pipes, some used for oil production some used for water and gas injection. This type of tower has been developed and deployed for example in the Girassol field off
Angola. Insulating material in the form of syntactic foam blocks surrounds the core and the pipes and separates the hot and cold fluid conduits. Further background has been published in paper "Hybrid Riser Tower: from Functional Specification to Cost per
Unit Length" by J-F Saint-Marcoux and M Rochereau, DOT XIII Rio de Janeiro, 18
October 2001. Updated versions of such risers have been proposed in WO 02/053869
Al. The contents of all these documents are incorporated herein by reference, as background to the present disclosure.
Buoyancy of offshore structures is achieved by using temporarily or permanently attached buoyancy modules providing an upward thrust when submerged in the sea. Conventional devices such as stop-collars and clamps are used to transmit the buoyancy thrust from the buoyancy modules to the supported structure. The buoyancy thrust acts upon the structure where it is generated. The buoyancy modules are clamped around stop collars using straps or bolts.
In particular cases, such as a hybrid riser tower (bundle of risers, fabricated onshore), buoyancy may be required for the supporting of a structure in two (or more) completely different orientations, such as a horizontal orientation (during installation) and a vertical orientation (in operation). The buoyancy thrust has to be transmitted in both orientations along two perpendicular directions, depending upon the orientation of the structure at the time. Having the buoyancy acting onto the structure where it is generated may be advantageous in one direction (supporting of horizontal risers during fabrication and installation), but a hindrance in another direction. Where two or more risers are bundled together it can be difficult to clamp buoyancy modules along each riser (due to differential thermal expansion, for example), or along one riser only (due to effective compression). To overcome this difficulty the modules are clamped to just one of the risers. However, in operation if the risers are hanging freely from the top structure of the bundle, the forces associated with weight compensation may induce a large compressive load on the riser to which the buoyancy modules are attached.
It is therefore an object of the invention to provide method and apparatus to transfer the substantial compressive forces provided by the buoyancy modules directly to the subsea structure, once installed, rather than via one or more of the risers.
In a first aspect of the invention there is provided a method of installing an elongate subsea structure, wherein said subsea structure is provided with a plurality of buoyancy modules, said buoyancy modules being slidably mounted to said subsea structure, such that when said subsea structure is deployed at sea in a substantially vertical orientation said buoyancy modules are free to adjust their positions up or down said subsea structure by sliding, the buoyancy force of each buoyancy module acting upon the buoyancy module above it rather than locally along the structure, and the cumulative buoyancy force from said buoyancy modules acting substantially against the top of said subsea structure.
This method allows all of the suspended weight of the subsea structure to be taken from its top, where all of the buoyancy force is applied. As a result, no single part of the structure, such as a riser, has to support the majority of the structure's weight. For the above, substantially vertically can be taken to be some degree off true vertical, but orientated such that said elongate object rises substantially from seabed to surface. Also substantially acting from the top can be taken to mean acting some metres below the top, but such that the buoyancy is acting near the top taking into consideration the full length of the elongate object.
Said subsea structure will usually be a riser, such as a steel catenary riser, or a bundle of risers. Said bundle of risers may be a bundle of seven risers arranged with one in the centre and the rest spaced apart and distributed evenly around this. Instead of a riser, the central one may be a supporting core. In such a case, the transfer of the buoyant forces to the top of the structure is performed by the buoyancy modules, rather than by one core or core riser conduit. The excessive compressive loads otherwise imposed on that core conduit are thus avoided.
Each of said buoyancy modules may come in a number of sections, such that it can be fitted around all of the risers in a bundle of risers, as illustrated in WO '869, mentioned above.
Said buoyancy force may act from the top as a result of each buoyancy module acting on the one above, either directly or via an intermediary, the uppermost buoyancy module acting against a top plate. Alternatively the uppermost module could be fixed to said subsea structure. The intermediary may be a pad of compressible material.
Said buoyancy modules may, in their original configuration, be spaced substantially evenly along said subsea structure to enable said subsea structure to be floated to the deployment site in a substantially horizontal orientation prior to deployment.
The structure may be provided with a substantial top buoyancy. Alternatively, and in accordance with the invention of a further patent application having the same priority date as the present application, the structure may be supported completely by distributed buoyancy. The content of that other application is incorporated herein by reference (GB 0227850.5 agent's ref 64314GB, published as WO ). In further aspects of the invention there are provided a structure prepared for installation by the method as described above, and a structure installed according to the method.
BRIEF DESCRIPTION OF THE DRAWINGS
Embodiments of the invention will now be described, by way of example only, by reference to the accompanying drawings, in which:
Fig. 1 is a schematic side-view of a known type of hybrid riser tower positioned horizontally during fabrication and installation, where the forces associated with weight / buoyancy compensation are distributed locally, throughout the whole of the structure;
Fig. 2 is a side view of the tower of Figure 1, positioned vertically after installation, or during operation;
Fig. 3 is a side view of a tower modified in accordance with the invention, where the compensation forces are transmitted to the top of the structure via inter-buoyancy- module devices, rather than via the risers;
Fig. 4 is a more detailed side view of the improved method of buoyancy distribution showing combined buoyancy modules, risers and anchored core pipe; and
Fig. 5 is a side view of an alternative embodiment where riser towers are supported without using a top buoy. DETAILED DESCRIPTION OF THE EMBODIMENTS
Figure 1 shows a conventional method for providing buoyancy to a structure 100, by attaching buoyancy modules 110 to the riser(s) 120, 130 at regularly spaced points. During construction, or installation, and where the structure lies flat on the ocean, the forces P induced by the buoyancy modules are well distributed. It is impractical to clamp the buoyancy modules onto all of the risers due to the effects of differential thermal expansion, therefore they are only attached at single points X and usually to one of the risers, or support core.
Figure 2 shows the structure of Figure 1 in a vertical orientation. When submerged and upended, the risers hang freely from the top structure 105 of the bundle. The induced thrust provided by the weight compensation induces a large compressive load along the length of the riser 130 onto which the buoyancy modules are attached. The compression forces are at their greatest where the core riser 130 attaches 120 to the top of the structure, as the core riser 130 at that point has to balance the weights of the risers and their contents and the thrust of the buoyancy modules below.
Figure 3 shows an improved method for providing buoyancy to a structure 100. All of the buoyancy forces P are transmitted onto the top of the structure without any force being transmitted via the riser(s) 120, 130. The buoyancy modules 110 are allowed to slide along the structure and transmit by themselves the cumulative up-lift force. Compliant inter- module devices 310 are used as an interface between the buoyancy modules to ensure that the up-lift forces are evenly transmitted between adjacent modules. Doing so maximises the contact surface area, thereby minimising stress points caused by surface irregularities, or where the structure is slightly bent.
Figure 4 shows a first embodiment of a riser tower 400 having a vertical set of pipes (riser(s) 410 and/or structural members 420), which has been fabricated onshore, towed to the site, upended and set operational in a near-vertical configuration. Buoyancy is required during installation (towing and upending) perpendicularly to the tower axis and once installed, co-linearly to the tower axis. To avoid damage to the structure in the horizontal configuration, the buoyancy modules 430 have to be evenly distributed along the structure.
In the upended configuration, the up-thrust is transmitted to the top plate 440 forming part of the riser top structure 400 to compensate for the weight of the risers. The up- thrust is transmitted through surface contact between vertically adjacent buoyancy modules, as indicated by arrows, 450, with optional compliant devices between modules, not shown in Figure 4. Transmission of the total thrust 460 to top plate 440 of the tower structure is via the uppermost buoyancy module.
The cross-sectional area of the buoyancy modules is such that the resulting stress in the uppermost module can be sustained, whereas if the up-thrust was transmitted via one of the pipes/risers then it would lead to unsustainable compressive loads.
As mentioned in the introduction, the top structure 400 may comprise a substantial buoy, as in the prior examples. Export of hydrocarbons is via flexible jumper hoses (not shown), one for each riser conduit.
Alternatively, the structure may rely entirely on distributed buoyancy, as described in our co-pending patent application (Agent's reference 64314GB). Figure 5 shows an example of this alternative structure, whereby two riser bundles, or individual risers, 500, 510 connect to a floating vessel (FPSO) 515. Any additional top buoyancy has been replaced with distributed buoyancy. The figure shows the surface vessel subject to a positioning excursion (caused by the sea-state, for example). The left-hand riser is under greater tension than the right hand riser, but use of flexible top sections 520 allows the risers to accommodate the transitions.
Buoyancy for the risers is provided by the buoyancy already distributed along them for installation purposes, evenly distributing the complement required in operational conditions. It may be desirable to compensate for any surplus of buoyancy, during installation, by filling the structure with fluids heavier than those that will fill the conduits in operation. This will assist the process of sinking the lower part of the riser to the anchor point.
A consequence of the absence of a top buoy is that the structure supported in such a manner cannot withstand a large bending moment at top, since the only counteracting stiffness is given by the steel and is therefore very low, due to the slenderness of the structure. Using flexible sections 520 to connect to the top of the structure overcomes this problem, and providing them with a steep- wave shape, in order to apply tension co- linear with the structure, avoids a large bending, or rotational, moment. Each flexible section 520, at least in the region 530 above the junction 540 with the rigid portion 500/510, is also provided with distributed buoyancy for this purpose. The tension given by the flexibles, during operation, is taken into account when determining the buoyancy required along the structure itself.
In either type of installation, the installation process is broadly the same as that illustrated in US 6082391, mentioned above. The height of the installed structure may for example be 500m, or over 1 km.
The skilled person will further appreciate that the exact form of components and methods used can vary from the ones described herein without departing from the spirit and scope of invention.

Claims

1. A method of installing an elongate subsea structure, wherein said subsea structure is provided with a plurality of buoyancy modules, said buoyancy modules being slidably mounted to said subsea structure, such that when said subsea structure is deployed at sea in a substantially vertical orientation said buoyancy modules are free to adjust their positions up or down said subsea structure by sliding, the buoyancy force of each buoyancy module acting upon the buoyancy module above it rather than locally along the structure, and the cumulative buoyancy force from said buoyancy modules acting substantially against the top of said subsea structure.
2. A method of installing an elongate subsea structure as claimed in claim 1, wherein said substantially vertically comprises some degree off true vertical, but orientated such that said elongate object rises substantially from seabed to surface.
3. A method of installing an elongate subsea structure as claimed in claims 1 or 2, wherein said substantially acting from the top comprises acting some metres below the top, but such that the buoyancy is acting near the top taking into consideration the full length of the elongate object.
4. A method of installing an elongate subsea structure as claimed in any preceding claim, wherein said subsea structure is a steel catenary riser.
5. A method of installing an elongate subsea structure as claimed in any of claims 1 to 3, wherein said subsea structure comprises a bundle of risers.
6. A method of installing an elongate subsea structure as claimed in claim 5, wherein said bundle of risers comprises a bundle of seven risers arranged with one in the centre and the rest spaced apart and distributed evenly around this.
7. A method of installing an elongate subsea structure as claimed in claim 6, wherein said central riser comprises a supporting core.
8. A method of installing an elongate subsea structure as claimed in any preceding claim, wherein said buoyancy modules are provided in a number of sections, to facilitate fitting around at least one of said risers.
9. A method of installing an elongate subsea structure as claimed in any preceding claim, wherein said buoyancy force acts cumulatively as a result of each buoyancy module acting directly on the one above.
10. A method of installing an elongate subsea structure as claimed in claims 1-9, wherein said buoyancy force acts cumulatively as a result of each buoyancy module acting on the one above via an intermediary.
11. A method of installing an elongate subsea structure as claimed in claim 10, wherein said intermediary comprises a pad of compressible material.
12., A method of installing an elongate subsea structure as claimed in claims 9 to 11 wherein said structure further comprises a top plate, said buoyancy force acting from the top of said structure as a result of the uppermost buoyancy module acting against said top plate.
13. A method of installing an elongate subsea structure as claimed in any of claims 9 to 11, wherein said buoyancy force acts from the top of said structure as a result of the uppermost module being fixed to said subsea structure.
14. A method of installing an elongate subsea structure as claimed in any preceding claim, wherein said buoyancy modules are, in their original configuration, spaced substantially evenly along said subsea structure to enable said subsea structure to be floated to the deployment site in a substantially horizontal orientation prior to deployment.
15. A method of installing an elongate subsea structure as claimed in any preceding claim, wherein said structure is provided with a substantial top buoyancy.
16. A method of installing an elongate subsea sfructure as claimed in any of claims 1 to 14, wherein the structure is supported completely by distributed buoyancy.
17. An elongate subsea structure prepared for installation by the method as claimed in any preceding claim.
18. An elongate subsea structure installed by the method as claimed in any of claims 1 to 16.
PCT/EP2003/014833 2002-11-29 2003-11-25 Subsea structure and methods of construction and installation thereof WO2004051051A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US10/535,792 US8282317B2 (en) 2002-11-29 2003-11-25 Subsea structure and methods of construction and installation thereof
GB0424775A GB2410989B (en) 2002-11-29 2003-11-25 Subsea structure and methods of construction and installation thereof
AU2003298236A AU2003298236A1 (en) 2002-11-29 2003-11-25 Subsea structure and methods of construction and installation thereof
BR0311416-3A BR0311416A (en) 2002-11-29 2003-11-25 Subsea structure and processes for its construction and installation
NO20052953A NO334142B1 (en) 2002-11-29 2005-06-16 Procedure for installing an elongated underwater structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB0227851.3 2002-11-29
GBGB0227851.3A GB0227851D0 (en) 2002-11-29 2002-11-29 Subsea structure and methods of construction and installation thereof

Publications (1)

Publication Number Publication Date
WO2004051051A1 true WO2004051051A1 (en) 2004-06-17

Family

ID=9948753

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2003/014833 WO2004051051A1 (en) 2002-11-29 2003-11-25 Subsea structure and methods of construction and installation thereof

Country Status (6)

Country Link
US (1) US8282317B2 (en)
AU (1) AU2003298236A1 (en)
BR (2) BR0311416A (en)
GB (2) GB0227851D0 (en)
NO (1) NO334142B1 (en)
WO (1) WO2004051051A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2942497A1 (en) * 2009-02-26 2010-08-27 Saipem Sa MULTI-RISER HYBRID TILT-TYPE FLAT-SURFACE LINK INSTALLATION COMPRISING SLIDING FLOATING MODULES
CN101881025A (en) * 2010-07-01 2010-11-10 中国水电顾问集团华东勘测设计研究院 Design method for shallow-buried flexible anti-slide pile for deep covering layer slope retaining
WO2010094973A3 (en) * 2009-02-20 2011-06-23 Mooring Systems Limited Deep water and ultra deep water mooring system
US8186912B2 (en) 2006-11-08 2012-05-29 Acergy France Sa Hybrid riser tower and methods of installing same
US8231308B2 (en) 2005-06-18 2012-07-31 Acergy France Sa Hybrid riser tower and method of installation thereof
US8998539B2 (en) 2006-11-08 2015-04-07 Acergy France SAS Hybrid riser tower and methods of installing same
CN105386439A (en) * 2015-10-10 2016-03-09 长沙理工大学 Design method of friction pile

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0900101D0 (en) * 2009-01-07 2009-02-11 Acergy Us Inc Methods and associated apparatus of constructing and installing rigid riser structures
BR102013012413B1 (en) * 2013-05-20 2021-09-08 Petróleo Brasileiro S.A. / Petrobras REVERSE HYBRID TRANSFER SYSTEM
WO2015112134A1 (en) * 2014-01-22 2015-07-30 Halliburton Energy Services, Inc. Deployment of high-pressure iron from marine vessel to offshore rig
CN104612144B (en) * 2014-12-18 2016-05-18 中国电建集团贵阳勘测设计研究院有限公司 Method for calculating minimum length of anchor section of slide-resistant pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999041142A1 (en) * 1998-02-12 1999-08-19 Imodco, Inc. Spar system
US6244347B1 (en) * 1999-07-29 2001-06-12 Dril-Quip, Inc. Subsea well drilling and/or completion apparatus
US20020115365A1 (en) * 2000-11-30 2002-08-22 Aker Maritime, Inc.; Buoyancy module with external frame

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2627542A1 (en) * 1988-02-24 1989-08-25 Coflexip DEVICE FOR TRANSFERRING FLUID BETWEEN THE SUB-MARINE BOTTOM AND THE SURFACE
US5150987A (en) * 1991-05-02 1992-09-29 Conoco Inc. Method for installing riser/tendon for heave-restrained platform
US5615977A (en) * 1993-09-07 1997-04-01 Continental Emsco Company Flexible/rigid riser system
GB2309576B (en) 1996-01-26 2000-03-08 Crp Group Ltd Buoyancy device
AU5444298A (en) 1996-11-12 1998-06-03 H.B. Zachry Company Precast, modular spar system
US5944448A (en) * 1996-12-18 1999-08-31 Brovig Offshore Asa Oil field installation with mooring and flowline system
GB2334048B (en) * 1998-02-06 1999-12-29 Philip Head Riser system for sub sea wells and method of operation
GB2336143B (en) 1998-03-04 2002-03-13 Victoria Oilfield Dev Mooring system
US6200180B1 (en) * 1998-09-01 2001-03-13 Nortrans Offshore (S) Pte Ltd Mooring system for tanker vessels
US6386290B1 (en) * 1999-01-19 2002-05-14 Colin Stuart Headworth System for accessing oil wells with compliant guide and coiled tubing
FR2790814B1 (en) * 1999-03-09 2001-04-20 Coflexip HYBRID CONDUIT FOR LARGE DEPTH
FR2825116B1 (en) * 2001-05-25 2003-12-05 Inst Francais Du Petrole METHOD FOR DIMENSIONING A DRILLING RISER

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999041142A1 (en) * 1998-02-12 1999-08-19 Imodco, Inc. Spar system
US6244347B1 (en) * 1999-07-29 2001-06-12 Dril-Quip, Inc. Subsea well drilling and/or completion apparatus
US20020115365A1 (en) * 2000-11-30 2002-08-22 Aker Maritime, Inc.; Buoyancy module with external frame

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8231308B2 (en) 2005-06-18 2012-07-31 Acergy France Sa Hybrid riser tower and method of installation thereof
US8186912B2 (en) 2006-11-08 2012-05-29 Acergy France Sa Hybrid riser tower and methods of installing same
US8998539B2 (en) 2006-11-08 2015-04-07 Acergy France SAS Hybrid riser tower and methods of installing same
WO2010094973A3 (en) * 2009-02-20 2011-06-23 Mooring Systems Limited Deep water and ultra deep water mooring system
FR2942497A1 (en) * 2009-02-26 2010-08-27 Saipem Sa MULTI-RISER HYBRID TILT-TYPE FLAT-SURFACE LINK INSTALLATION COMPRISING SLIDING FLOATING MODULES
WO2010097528A1 (en) * 2009-02-26 2010-09-02 Saipem S.A. Bottom-surface connecting installation of the multi-riser hybrid tower type, comprising sliding buoyancy modules
CN101881025A (en) * 2010-07-01 2010-11-10 中国水电顾问集团华东勘测设计研究院 Design method for shallow-buried flexible anti-slide pile for deep covering layer slope retaining
CN105386439A (en) * 2015-10-10 2016-03-09 长沙理工大学 Design method of friction pile
CN105386439B (en) * 2015-10-10 2017-04-19 长沙理工大学 Design method of friction pile

Also Published As

Publication number Publication date
BRPI0311416B1 (en) 2015-05-12
AU2003298236A1 (en) 2004-06-23
US20060002767A1 (en) 2006-01-05
GB0424775D0 (en) 2004-12-08
NO20052953L (en) 2005-06-16
NO334142B1 (en) 2013-12-16
US8282317B2 (en) 2012-10-09
BR0311416A (en) 2005-03-15
GB0227851D0 (en) 2003-01-08
GB2410989A (en) 2005-08-17
GB2410989B (en) 2006-03-22

Similar Documents

Publication Publication Date Title
EP2079633B1 (en) Method of installing hybrid riser tower
US7434624B2 (en) Hybrid tension-leg riser
OA12418A (en) Marine riser tower.
NO334142B1 (en) Procedure for installing an elongated underwater structure
WO2005103436A1 (en) Marine riser tower
AU2009298035B2 (en) Guide frame for riser tower
US8231308B2 (en) Hybrid riser tower and method of installation thereof
US8998539B2 (en) Hybrid riser tower and methods of installing same
NO333536B1 (en) Underwater construction, as well as methods of construction and installation thereof
AU2013250897B2 (en) Jumper support arrangements for hybrid riser towers
US7001234B2 (en) Marine riser system
WO2011018713A2 (en) Marine riser apparatus and method of installation thereof
AU2013216661B2 (en) Hybrid riser tower
GB2500102A (en) Riser tower with supplementary buoyancy modules
MXPA99011759A (en) Hybrid riser or pipe with flexible and rigid sections for fluid transfer

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
ENP Entry into the national phase

Ref document number: 0424775

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20031125

ENP Entry into the national phase

Ref document number: 2006002767

Country of ref document: US

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 10535792

Country of ref document: US

WWP Wipo information: published in national office

Ref document number: 10535792

Country of ref document: US

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office

Country of ref document: JP