WO2004018835A2 - System and method for subterranean access - Google Patents

System and method for subterranean access Download PDF

Info

Publication number
WO2004018835A2
WO2004018835A2 PCT/US2003/026124 US0326124W WO2004018835A2 WO 2004018835 A2 WO2004018835 A2 WO 2004018835A2 US 0326124 W US0326124 W US 0326124W WO 2004018835 A2 WO2004018835 A2 WO 2004018835A2
Authority
WO
WIPO (PCT)
Prior art keywords
well bore
entry
slanted
well
subterranean zone
Prior art date
Application number
PCT/US2003/026124
Other languages
French (fr)
Other versions
WO2004018835A3 (en
Inventor
Joseph A. Zupanick
Original Assignee
Cdx Gas, L.L.C.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cdx Gas, L.L.C. filed Critical Cdx Gas, L.L.C.
Priority to AU2003265549A priority Critical patent/AU2003265549B2/en
Priority to CA002495985A priority patent/CA2495985C/en
Priority to EP03793194A priority patent/EP1546505A2/en
Publication of WO2004018835A2 publication Critical patent/WO2004018835A2/en
Publication of WO2004018835A3 publication Critical patent/WO2004018835A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well

Definitions

  • the present invention relates generally to systems and methods for the recovery of subterranean resources and, more particularly, to a system and method for subterranean access .
  • Subterranean deposits of coal contain substantial quantities of entrained methane gas. Limited production and use of methane gas from coal deposits has occurred for many years. Substantial obstacles, however, have frustrated more extensive development and use of methane gas deposits in coal seams. The foremost problem in producing methane gas from coal seams is that while coal seams may extend over large areas of up to several thousand acres, the coal seams are fairly thin, varying from a few inches to several meters. Vertical wells drilled into the coal deposits for obtaining methane gas can only drain a fairly small radius around the coal deposits. Further, coal deposits are not amenable to pressure fracturing and other methods often used for increasing methane gas production from rock formations.
  • the present invention provides a slant entry well system and method for accessing a subterranean zone from the surface that substantially eliminate or reduce the disadvantages and problems associated with previous systems and methods.
  • certain embodiments of the present invention provide a slant entry well system and method for efficiently producing and removing entrained methane gas and water from a coal seam without requiring excessive use of radiused or articulated well bores or large surface area in which to conduct drilling operations .
  • a system for accessing a subterranean zone from the surface includes a first, second, and third entry well bore extending from the surface, the first, second, and third entry well bores located no more than one thousand feet away from each other at the surface .
  • a slanted well bore extends from each of the first and second entry well bores to the subterranean zone.
  • a substantially horizontal drainage pattern extends from the slanted well bores into the subterranean zone.
  • a method for accessing a subterranean zone from the surface includes forming three or more closely spaced entry well bores and forming a plurality of slanted well bores from the entry well bores to the subterranean zone. The method also includes forming drainage patterns from the slanted well bores into the subterranean zone and enlarged cavities in the slanted well bores.
  • Embodiments of the present invention may provide one or more technical advantages. These technical advantages may include the formation of three or more closely spaced entry well bores, a plurality of slanted well bores, and drainage patterns to optimize the area of a subsurface formation which may be drained of gas and liquid resources. This allows for more efficient drilling and production and greatly reduces costs and problems associated with other systems and methods .
  • Another technical advantage includes providing a method for accessing a subterranean zone from the surface using a plurality of slanted well bores with one or more enlarged cavities. The enlarged cavities allow for reduction of velocity of gases escaping through the slanted well bores, aiding in the removal of entrained liquids and optimizing the removal of resources from the subterranean zone .
  • Other technical advantages of the present invention will be readily apparent to one skilled in the art from the following figures, descriptions, and claims.
  • FIGURE 1 illustrates an example slant well system for production of resources from a subterranean zone
  • FIGURE 2A illustrates a vertical well system for production of resources from a subterranean zone
  • FIGURE 2B illustrates a portion of an example slant entry well system in further detail
  • FIGURE 3 illustrates an example method for producing water and gas from a subsurface formation
  • FIGURE 4 illustrates an example entry well bore
  • FIGURE 5 illustrates the use of an example system of an entry well bore and a slanted well bore
  • FIGURE 6 illustrates an example system of an entry well bore and a slanted well bore
  • FIGURE 7 illustrates an example system of a slanted well bore and an articulated well bore
  • FIGURE 8 illustrates production of water and gas in an example slant well system
  • FIGURE 9 illustrates an example drainage pattern for use with a slant well system.
  • FIGURE 1 illustrates an example slant well system for accessing a subterranean zone from the surface.
  • the subterranean zone is a coal seam. It will be understood that other subterranean formations and/or zones can be similarly accessed using the slant well system of the present invention to remove and/or produce water, hydrocarbons, and other fluids in the zone, to treat minerals in the zone prior to mining operations, to inject or introduce fluids, gases, or other substances into the zone or for any other appropriate purpose .
  • a slant well system 10 includes entry well bores 15, slant wells 20, articulated well bores 24, cavities 26, and rat holes 27.
  • Entry well bores 15 extend from the surface 11 towards the subterranean zone 22.
  • Slant wells 20 extend from the terminus of each entry well bore 15 to the subterranean zone 22, although slant wells 20 may alternatively extend from any other suitable portion of an entry well bore 15.
  • "each" means all of a particular subset. Where there are multiple subterranean zones 22 at varying depths, as in the illustrated example, slant wells 20 extend through the subterranean zones 22 closest to the surface into and through the deepest subterranean zone 22.
  • Articulated well bores 24 may extend from each slant well 20 into each subterranean zone 22.
  • One or more cavities 26 may be located along a slant well 20 and a cavity 26 or a rat hole 27 may be located at the terminus of each slant well 20.
  • entry well bores 15 are illustrated as being substantially vertical; however, it should be understood that entry well bores 15 may be formed at any suitable angle relative to the surface 11 to accommodate, for example, surface geometries and attitudes and/or the geometric configuration or attitude of a subterranean resource.
  • each slant well 20 is formed to angle away from entry well bore 15 at an angle designated a, which in the illustrated embodiment is approximately 20 degrees. It will be understood that each slant well 20 may be formed at other angles to accommodate surface topologies and other factors similar to those affecting entry well bores 15.
  • slant wells 20 are formed in relation to each other at an angular separation of approximately sixty degrees. It will be understood that slant wells 20 may be separated by other angles depending likewise on the topology and geography of the area and location of the target coal seam 22.
  • Entry well bores 15 are formed at the surface at a distance of ⁇ feet apart. In the illustrated embodiment, entry well bores 15 are approximately twenty feet apart. It will be understood that entry well bores 15 may be formed at other separations to accommodate surface topologies and/or the geometric configuration or attitude of a subterranean resource.
  • entry well bores 15 may be between two feet and one hundred feet apart . In some embodiments, the entry well bores 15 may be located on the same drilling pad. As used herein, "on the same drilling pad” means located at the same drilling location where drilling operations are being conducted. In some embodiments, entry well bores 15 are closely spaced together. As used herein, "closely spaced” means on the same drilling pad.
  • Cavities 26 may be formed at intervals along slant wells 20 above one or more of articulated well bores 24. For example, cavities 26 may be formed immediately above an articulated well bore 24. Cavities 26 may also be formed proximate to the junction of slant well 20 and articulated well bore 24. As used herein, proximate means immediately above, below, or at the junction of slant well 20 and articulated well bore 24. It will be understood that other appropriate spacing may also be employed to accommodate, for example, sub-surface geometries and attitudes and/or the geometric configuration or attitude of a subterranean resource. Slant well 20 may also include a cavity 26 and/or a rat hole 27 located at the terminus of each slant well 20. Slant wells 20 may include one, both, or neither of cavity 26 and rat hole 27.
  • FIGURES 2A and 2B illustrate by comparison the advantage of forming slant wells 20 at an angle off the vertical.
  • a vertical well bore 30 is shown with an articulated well bore 32 extending into a coal seam 22.
  • fluids drained from coal seam 22 into articulated well bore 32 must travel along articulated well bore 32 upwards towards vertical well bore 30, a distance of approximately W feet before they may be collected in vertical well bore 30. This distance of W feet is known as the hydrostatic head and must be overcome before the fluids may be collected from vertical well bore 30.
  • a slant entry well 34 is shown with an articulated well bore 36 extending into coal seam 22.
  • Slant entry well 34 is shown at an angle ⁇ away from the vertical. As illustrated, fluids collected from coal seam 22 must travel along articulated well bore 36 up to slant entry well 34, a distance of W feet. Thus, the hydrostatic head of a slant entry well system is reduced as compared to a substantially vertical system. Furthermore, by forming slant entry well 34 at angle ⁇ , the articulated well bore 36 drilled from tangent or kick off point 38 has a greater radius of curvature than articulated well bore 32 associated with vertical well bore 30. This allows for articulated well bore 36 to be longer than articulated well bore 32 (since the friction of a drill string against the radiused portion is reduced) , thereby penetrating further into coal seam 22 and draining more of the subterranean zone.
  • FIGURE 3 illustrates an example method of forming a slant entry well 20. The steps of FIGURE 3 will be further illustrated in subsequent FIGURES 4-8.
  • the method begins at step 100 wherein an entry well bore is formed.
  • a fresh water casing or other suitable casing is installed into the entry well bore formed at step 100.
  • the fresh water casing is cemented in place inside the entry well bore of step 100.
  • a drill string is inserted through the entry well bore, and is used to drill approximately fifty feet past the casing.
  • a short, radiused bore is formed.
  • the radiused bore may be two hundred feet long and articulate thirty-five degrees over its length.
  • the drill is oriented to the desired angle of the slant well and, at step 125, a slant well bore is drilled down into and through the target subterranean zone .
  • a slant well bore is drilled down into and through the target subterranean zone .
  • one or more cavities are formed in the slant well.
  • the slant well casing is installed.
  • a short radius curve is drilled into the target coal seam.
  • a substantially horizontal well bore is drilled into and along the coal seam. It will be understood that the substantially horizontal well bore may depart from a horizontal orientation to account for changes in the orientation of the coal seam.
  • a drainage pattern is drilled into the coal seam through the substantially horizontal well.
  • the drainage pattern may comprise a pinnate pattern, a crow's foot pattern, or other suitable pattern.
  • decisional step 155 a determination is made whether additional subterranean zones are to be drained as, for example, when multiple subterranean zones are present at varying depths below the surface. If additional subterranean zones are to be drained, the process repeats steps 140 through 155 for each additional subterranean zone. If no further subterranean zones are to be drained, the process continues to step 160.
  • step 160 a determination is made whether additional slant wells are required. If additional slant wells are required, the process returns along the Yes branch to step 100 and repeats through step 155.
  • a separate entry well bore may be formed for each individual slant well bore. Thus, for each slant well, the process begins at step 100, wherein a substantially vertical well bore is found. In some embodiments, however, multiple slant wells may be formed from one entry well bore.
  • step 165 production equipment is installed into each slant well and at step 170 the process ends with the production of water and gas from the subterranean zone.
  • an enlarged diameter cavity may be found (step 130) above each target zone before any of the short radius curves are drilled (step 140) .
  • all of the short radius curves may be found in each target zone (step 140) before any enlarged diameter cavities are found (step 130) .
  • Other suitable modifications will be apparent to one skilled in the art.
  • FIGURE 4 illustrates entry well bore 15 and casing
  • a cement retainer 46 is poured or otherwise installed around the casing inside entry well bore 15.
  • the cement casing may be any mixture or substance suitable to maintain casing 44 in the desired position with respect to entry well bore 15.
  • a drill string 50 is positioned to begin forming a slant well .
  • a stabilizer 52 may be employed.
  • Stabilizer 52 may be a ring and fin type stabilizer or any other stabilizer suitable to keep drill string 50 relatively centered.
  • stop ring 53 may be employed. Stop ring 53 may be constructed of rubber or metal or any other suitable down-hole environment material .
  • FIGURE 5 illustrates an example system of a slant well 20.
  • well bore 60 is drilled approximately fifty feet past the end of entry well bore 15 (although any other appropriate distance may be drilled) .
  • Well bore 60 is drilled away from casing 44 in order to minimize magnetic interference and improve the ability of the drilling crew to guide the drill bit in the desired direction.
  • well bore 60 may also comprise an articulated well bore with a radius of thirty-five degrees in two hundred feet.
  • the drill bit is oriented in preparation for drilling slant entry well bore 64.
  • a slant entry well bore 64 is drilled from the end of the radius well bore 62 into and through the subterranean zone 22.
  • slant well 20 may be drilled directly from entry well bore 15, without including tangent well bore 60 or radiused well bore.
  • a rat hole 66 which is an extension of slant well 64, is also formed. Rat hole 66 may also be an enlarged diameter cavity or other suitable structure.
  • a cavity 26 is formed in slant well 64.
  • Cavity 26 acts as a velocity reduction chamber, separating entrained liquids from gasses destined for the surface. Without at least one cavity 26 located closer to the surface than the shallowest lateral well bore, entrained liquids form a mist that raises down-hole pressure. Friction is increased by the liquids entrained in escaping gasses, creating increased back pressure (down-hole pressure) . Reducing the gas velocity separates out the liquid as the velocity drops below the speed at which the gas can entrain liquids. Cavity 26 lowers the velocity of the gas enough to separate out the entrained liquids, allowing the gas to proceed to the surface more efficiently.
  • cavity 26 is shown immediately above the expected kick-off point for a subsequent short radiused well bore. It will be understood that cavity 26 may be otherwise suitably located. Moreover, it will be understood that cavity 26 may also be formed after the horizontal drainage pattern is formed.
  • FIGURE 6 is an illustration of the positioning of the casing in a slant well 64. For ease of illustration, only one slant well 64 is shown. Corresponding with step
  • a whipstock casing 70 is installed into the slant entry well bore 64.
  • whipstock casing 70 includes a whipstock 72 which is used to mechanically direct a drill string into a desired orientation. It will be understood that other suitable techniques may be employed and the use of a whipstock 72 is not necessary when other suitable methods of orienting a drill bit through slant well 64 into the subterranean zone 22 are used.
  • Whipstock casing 70 is oriented such that whipstock 72 is positioned so that a subsequent drill bit is aligned to drill into the subterranean zone 22 at a desired depth.
  • FIGURE 7 illustrates whipstock casing 70 and slant entry well bore 64 in further detail.
  • whipstock casing 70 is positioned within slant entry well bore 64 such that a drill string 50 will be oriented to pass through slant entry well bore 64 at a desired tangent or kick off point 38.
  • Drill string 50 is used to drill through slant entry well bore 64 at tangent or kick off point 38 to form articulated well bore 36.
  • articulated well bore 36 has a radius of approximately seventy-one feet and a curvature of approximately eighty degrees per one hundred feet.
  • slant entry well 64 is angled away from the vertical at approximately ten degrees.
  • the hydrostatic head generated in conjunction with production is roughly thirty feet.
  • FIGURE 8 illustrates a slant entry well 64 and articulated well bore 36 after drill string 50 has been used to form articulated well bore 36.
  • a horizontal well and drainage pattern may then be formed in subterranean zone 22, as represented by step 145 and step 150 of FIGURE 3.
  • whipstock casing 70 is set on the bottom of rat hole 66 to prepare for production of oil and gas.
  • a sealer ring 74 may be used around the whipstock casing 70 to prevent gas produced from articulated well bore 36 from escaping outside whipstock casing 70.
  • Gas ports 76 allow escaping gas to enter into and up through whipstock casing 70 for collection at the surface.
  • liquids entrained in the escaping gas may be separated from the gas in enlarged diameter cavities 26 situated above the articulated well bore 36. As the liquids separate from the gas, the liquids travel down slant well 64 and are collected in rat hole 66 .
  • Rat hole 66 may also comprise an enlarged diameter cavity (not shown) to collect liquids arriving from above .
  • a pump string 78 and submersible pump 80 is used to remove water and other liquids that are collected from the subterranean zone through articulated well bore 36. As shown in FIGURE 9, the liquids, under the power of gravity and the pressure in subterranean zone 22, pass through articulated well bore 36 and down slant entry well bore 64 into rat hole 66. From there the liquids travel into the opening in the whipstock 72 of whipstock casing 70 where they come in contact with the installed pump string 78 and submersible pump 80.
  • Submersible pump 80 may be a variety of submersible pumps suitable for use in a down-hole environment to remove liquids and pump them to the surface through pump string 78. Installation of pump string 78 and submersible pump 80 corresponds with step 165 of FIGURE 3.
  • FIGURE 9 illustrates an example drainage pattern 90 that may be drilled from articulated well bores 36.
  • entry well bores 15 are spaced approximately twenty feet apart. It will be understood that other suitable spacings may also be employed.
  • Connecting to each entry well bore 15 is a slant well 20.
  • substantially horizontal well bores 94 roughly forming a "crow's foot" pattern off of each of the slant wells 20. It will be understood that any other suitable drainage patterns, for example, a pinnate pattern, may be used.
  • the horizontal reach of each substantially horizontal well bore 94 is approximately three hundred feet.
  • the lateral spacing between the parallel substantially horizontal well bores 94 is approximately eight hundred feet. In this particular embodiment, a drainage area of approximately six hundred and forty acres would result.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Earth Drilling (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A system for accessing a subterranean zone from the surface includes a first, second and third entry well bore extending from the surface, the first, second and third entry well bores (15) located on the same drilling pad (92) at the surface. A slanted well bore (20) extends from each of the entry well bores to the subterranean zone (22). A substantially horizontal drainage pattern extends from the slanted well bores into the subterranean zone.

Description

SYSTEM AND METHOD FOR SUBTERRANEAN ACCESS
TECHNICAL FIELD OF THE INVENTION
The present invention relates generally to systems and methods for the recovery of subterranean resources and, more particularly, to a system and method for subterranean access .
BACKGROUND OF THE INVENTION
Subterranean deposits of coal contain substantial quantities of entrained methane gas. Limited production and use of methane gas from coal deposits has occurred for many years. Substantial obstacles, however, have frustrated more extensive development and use of methane gas deposits in coal seams. The foremost problem in producing methane gas from coal seams is that while coal seams may extend over large areas of up to several thousand acres, the coal seams are fairly thin, varying from a few inches to several meters. Vertical wells drilled into the coal deposits for obtaining methane gas can only drain a fairly small radius around the coal deposits. Further, coal deposits are not amenable to pressure fracturing and other methods often used for increasing methane gas production from rock formations. As a result, once the gas easily drained from a vertical well bore in a coal seam is produced, further production is limited in volume. Additionally, coal seams are often associated with subterranean water, which must be drained from the coal seam in order to produce the methane . Horizontal drilling patterns have been tried in order to extend the amount of coal seams exposed to a drill bore for gas extraction. Such horizontal drilling techniques, however, require the use of a radiused well bore which presents difficulties in removing the entrained water from the coal seam. The most efficient method for pumping water from a subterranean well, a sucker rod pump, does not work well in horizontal or short radiused bores. A single slanted well bore allows for effective water removal via a sucker rod pump, capturing a benefit of a horizontal well system, without limiting the use of horizontal drainage patterns in the target zone.
SUMMARY OF THE INVENTION
The present invention provides a slant entry well system and method for accessing a subterranean zone from the surface that substantially eliminate or reduce the disadvantages and problems associated with previous systems and methods. In particular, certain embodiments of the present invention provide a slant entry well system and method for efficiently producing and removing entrained methane gas and water from a coal seam without requiring excessive use of radiused or articulated well bores or large surface area in which to conduct drilling operations .
In accordance with one embodiment of the present invention, a system for accessing a subterranean zone from the surface includes a first, second, and third entry well bore extending from the surface, the first, second, and third entry well bores located no more than one thousand feet away from each other at the surface . A slanted well bore extends from each of the first and second entry well bores to the subterranean zone. A substantially horizontal drainage pattern extends from the slanted well bores into the subterranean zone. According to another embodiment of the present invention, a method for accessing a subterranean zone from the surface includes forming three or more closely spaced entry well bores and forming a plurality of slanted well bores from the entry well bores to the subterranean zone. The method also includes forming drainage patterns from the slanted well bores into the subterranean zone and enlarged cavities in the slanted well bores.
Embodiments of the present invention may provide one or more technical advantages. These technical advantages may include the formation of three or more closely spaced entry well bores, a plurality of slanted well bores, and drainage patterns to optimize the area of a subsurface formation which may be drained of gas and liquid resources. This allows for more efficient drilling and production and greatly reduces costs and problems associated with other systems and methods . Another technical advantage includes providing a method for accessing a subterranean zone from the surface using a plurality of slanted well bores with one or more enlarged cavities. The enlarged cavities allow for reduction of velocity of gases escaping through the slanted well bores, aiding in the removal of entrained liquids and optimizing the removal of resources from the subterranean zone . Other technical advantages of the present invention will be readily apparent to one skilled in the art from the following figures, descriptions, and claims.
BRIEF DESCRIPTION OF THE DRAWINGS
For a more complete understanding of the present invention and its advantages, reference is now made to the following description taken in conjunction with the accompanying drawings, wherein like numerals represent like parts, in which:
FIGURE 1 illustrates an example slant well system for production of resources from a subterranean zone;
FIGURE 2A illustrates a vertical well system for production of resources from a subterranean zone; FIGURE 2B illustrates a portion of an example slant entry well system in further detail;
FIGURE 3 illustrates an example method for producing water and gas from a subsurface formation;
FIGURE 4 illustrates an example entry well bore ; FIGURE 5 illustrates the use of an example system of an entry well bore and a slanted well bore;
FIGURE 6 illustrates an example system of an entry well bore and a slanted well bore;
FIGURE 7 illustrates an example system of a slanted well bore and an articulated well bore;
FIGURE 8 illustrates production of water and gas in an example slant well system; and
FIGURE 9 illustrates an example drainage pattern for use with a slant well system. DETAILED DESCRIPTION OF THE INVENTION
FIGURE 1 illustrates an example slant well system for accessing a subterranean zone from the surface. In the embodiment described below, the subterranean zone is a coal seam. It will be understood that other subterranean formations and/or zones can be similarly accessed using the slant well system of the present invention to remove and/or produce water, hydrocarbons, and other fluids in the zone, to treat minerals in the zone prior to mining operations, to inject or introduce fluids, gases, or other substances into the zone or for any other appropriate purpose .
Referring to FIGURE 1, a slant well system 10 includes entry well bores 15, slant wells 20, articulated well bores 24, cavities 26, and rat holes 27. Entry well bores 15 extend from the surface 11 towards the subterranean zone 22. Slant wells 20 extend from the terminus of each entry well bore 15 to the subterranean zone 22, although slant wells 20 may alternatively extend from any other suitable portion of an entry well bore 15. As used herein, "each" means all of a particular subset. Where there are multiple subterranean zones 22 at varying depths, as in the illustrated example, slant wells 20 extend through the subterranean zones 22 closest to the surface into and through the deepest subterranean zone 22. Articulated well bores 24 may extend from each slant well 20 into each subterranean zone 22. One or more cavities 26 may be located along a slant well 20 and a cavity 26 or a rat hole 27 may be located at the terminus of each slant well 20.
In FIGURES 1, and, 4-8, entry well bores 15 are illustrated as being substantially vertical; however, it should be understood that entry well bores 15 may be formed at any suitable angle relative to the surface 11 to accommodate, for example, surface geometries and attitudes and/or the geometric configuration or attitude of a subterranean resource. In the illustrated embodiment, each slant well 20 is formed to angle away from entry well bore 15 at an angle designated a, which in the illustrated embodiment is approximately 20 degrees. It will be understood that each slant well 20 may be formed at other angles to accommodate surface topologies and other factors similar to those affecting entry well bores 15. In the illustrated embodiment, slant wells 20 are formed in relation to each other at an angular separation of approximately sixty degrees. It will be understood that slant wells 20 may be separated by other angles depending likewise on the topology and geography of the area and location of the target coal seam 22.
Entry well bores 15 are formed at the surface at a distance of β feet apart. In the illustrated embodiment, entry well bores 15 are approximately twenty feet apart. It will be understood that entry well bores 15 may be formed at other separations to accommodate surface topologies and/or the geometric configuration or attitude of a subterranean resource.
In some embodiments, entry well bores 15 may be between two feet and one hundred feet apart . In some embodiments, the entry well bores 15 may be located on the same drilling pad. As used herein, "on the same drilling pad" means located at the same drilling location where drilling operations are being conducted. In some embodiments, entry well bores 15 are closely spaced together. As used herein, "closely spaced" means on the same drilling pad.
Cavities 26 may be formed at intervals along slant wells 20 above one or more of articulated well bores 24. For example, cavities 26 may be formed immediately above an articulated well bore 24. Cavities 26 may also be formed proximate to the junction of slant well 20 and articulated well bore 24. As used herein, proximate means immediately above, below, or at the junction of slant well 20 and articulated well bore 24. It will be understood that other appropriate spacing may also be employed to accommodate, for example, sub-surface geometries and attitudes and/or the geometric configuration or attitude of a subterranean resource. Slant well 20 may also include a cavity 26 and/or a rat hole 27 located at the terminus of each slant well 20. Slant wells 20 may include one, both, or neither of cavity 26 and rat hole 27.
FIGURES 2A and 2B illustrate by comparison the advantage of forming slant wells 20 at an angle off the vertical. Referring to FIGURE 2A, a vertical well bore 30 is shown with an articulated well bore 32 extending into a coal seam 22. As shown by the illustration, fluids drained from coal seam 22 into articulated well bore 32 must travel along articulated well bore 32 upwards towards vertical well bore 30, a distance of approximately W feet before they may be collected in vertical well bore 30. This distance of W feet is known as the hydrostatic head and must be overcome before the fluids may be collected from vertical well bore 30. Referring now to FIGURE 2B, a slant entry well 34 is shown with an articulated well bore 36 extending into coal seam 22. Slant entry well 34 is shown at an angle α away from the vertical. As illustrated, fluids collected from coal seam 22 must travel along articulated well bore 36 up to slant entry well 34, a distance of W feet. Thus, the hydrostatic head of a slant entry well system is reduced as compared to a substantially vertical system. Furthermore, by forming slant entry well 34 at angle α, the articulated well bore 36 drilled from tangent or kick off point 38 has a greater radius of curvature than articulated well bore 32 associated with vertical well bore 30. This allows for articulated well bore 36 to be longer than articulated well bore 32 (since the friction of a drill string against the radiused portion is reduced) , thereby penetrating further into coal seam 22 and draining more of the subterranean zone.
FIGURE 3 illustrates an example method of forming a slant entry well 20. The steps of FIGURE 3 will be further illustrated in subsequent FIGURES 4-8. The method begins at step 100 wherein an entry well bore is formed. At step 105, a fresh water casing or other suitable casing is installed into the entry well bore formed at step 100. At step 110, the fresh water casing is cemented in place inside the entry well bore of step 100. At step 115, a drill string is inserted through the entry well bore, and is used to drill approximately fifty feet past the casing. In some embodiments, a short, radiused bore is formed. In some embodiments, the radiused bore may be two hundred feet long and articulate thirty-five degrees over its length. It will be understood that other lengths and degrees may be employed based on the local geology and topography. At step 120, the drill is oriented to the desired angle of the slant well and, at step 125, a slant well bore is drilled down into and through the target subterranean zone . At step 130, one or more cavities are formed in the slant well. At step 135 the slant well casing is installed. Next, at step 140, a short radius curve is drilled into the target coal seam. Next, at step 145, a substantially horizontal well bore is drilled into and along the coal seam. It will be understood that the substantially horizontal well bore may depart from a horizontal orientation to account for changes in the orientation of the coal seam. Next, at step 150, a drainage pattern is drilled into the coal seam through the substantially horizontal well. The drainage pattern may comprise a pinnate pattern, a crow's foot pattern, or other suitable pattern. At decisional step 155, a determination is made whether additional subterranean zones are to be drained as, for example, when multiple subterranean zones are present at varying depths below the surface. If additional subterranean zones are to be drained, the process repeats steps 140 through 155 for each additional subterranean zone. If no further subterranean zones are to be drained, the process continues to step 160.
At decisional step 160, a determination is made whether additional slant wells are required. If additional slant wells are required, the process returns along the Yes branch to step 100 and repeats through step 155. A separate entry well bore may be formed for each individual slant well bore. Thus, for each slant well, the process begins at step 100, wherein a substantially vertical well bore is found. In some embodiments, however, multiple slant wells may be formed from one entry well bore.
If no additional slant wells are required, the process continues along the No branch to step 165. At step 165, production equipment is installed into each slant well and at step 170 the process ends with the production of water and gas from the subterranean zone.
Although the steps have been described in a certain order, it will be understood that they may be performed in any other appropriate order. Furthermore, one or more steps may be omitted, or additional steps performed, as appropriate .
For example, where multiple target zones are present (as determined at step 155) , an enlarged diameter cavity may be found (step 130) above each target zone before any of the short radius curves are drilled (step 140) . Alternatively, all of the short radius curves may be found in each target zone (step 140) before any enlarged diameter cavities are found (step 130) . Other suitable modifications will be apparent to one skilled in the art.
FIGURE 4 illustrates entry well bore 15 and casing
44 in its operative mode as a slant well 20 is about to be drilled. Corresponding with step 110 of FIGURE 3, a cement retainer 46 is poured or otherwise installed around the casing inside entry well bore 15. The cement casing may be any mixture or substance suitable to maintain casing 44 in the desired position with respect to entry well bore 15. A drill string 50 is positioned to begin forming a slant well . In order to keep drill string 50 relatively centered in casing 44, a stabilizer 52 may be employed. Stabilizer 52 may be a ring and fin type stabilizer or any other stabilizer suitable to keep drill string 50 relatively centered. To keep stabilizer 52 at a desired depth in well bore 15, stop ring 53 may be employed. Stop ring 53 may be constructed of rubber or metal or any other suitable down-hole environment material .
FIGURE 5 illustrates an example system of a slant well 20. Corresponding with step 115 of FIGURE 3, well bore 60 is drilled approximately fifty feet past the end of entry well bore 15 (although any other appropriate distance may be drilled) . Well bore 60 is drilled away from casing 44 in order to minimize magnetic interference and improve the ability of the drilling crew to guide the drill bit in the desired direction. As described above in conjunction with FIGURE 3, well bore 60 may also comprise an articulated well bore with a radius of thirty-five degrees in two hundred feet.
Corresponding with step 120 of FIGURE 3, the drill bit is oriented in preparation for drilling slant entry well bore 64. Corresponding with step 125 of FIGURE 3, a slant entry well bore 64 is drilled from the end of the radius well bore 62 into and through the subterranean zone 22. Alternatively, slant well 20 may be drilled directly from entry well bore 15, without including tangent well bore 60 or radiused well bore. A rat hole 66, which is an extension of slant well 64, is also formed. Rat hole 66 may also be an enlarged diameter cavity or other suitable structure. Corresponding with step 130 of FIGURE 3, a cavity 26 is formed in slant well 64. Cavity 26 acts as a velocity reduction chamber, separating entrained liquids from gasses destined for the surface. Without at least one cavity 26 located closer to the surface than the shallowest lateral well bore, entrained liquids form a mist that raises down-hole pressure. Friction is increased by the liquids entrained in escaping gasses, creating increased back pressure (down-hole pressure) . Reducing the gas velocity separates out the liquid as the velocity drops below the speed at which the gas can entrain liquids. Cavity 26 lowers the velocity of the gas enough to separate out the entrained liquids, allowing the gas to proceed to the surface more efficiently.
In the illustrated embodiment, cavity 26 is shown immediately above the expected kick-off point for a subsequent short radiused well bore. It will be understood that cavity 26 may be otherwise suitably located. Moreover, it will be understood that cavity 26 may also be formed after the horizontal drainage pattern is formed.
FIGURE 6 is an illustration of the positioning of the casing in a slant well 64. For ease of illustration, only one slant well 64 is shown. Corresponding with step
135 of FIGURE 3, a whipstock casing 70 is installed into the slant entry well bore 64. In the illustrated embodiment, whipstock casing 70 includes a whipstock 72 which is used to mechanically direct a drill string into a desired orientation. It will be understood that other suitable techniques may be employed and the use of a whipstock 72 is not necessary when other suitable methods of orienting a drill bit through slant well 64 into the subterranean zone 22 are used. Whipstock casing 70 is oriented such that whipstock 72 is positioned so that a subsequent drill bit is aligned to drill into the subterranean zone 22 at a desired depth. FIGURE 7 illustrates whipstock casing 70 and slant entry well bore 64 in further detail. As discussed in conjunction with FIGURE 6, whipstock casing 70 is positioned within slant entry well bore 64 such that a drill string 50 will be oriented to pass through slant entry well bore 64 at a desired tangent or kick off point 38. This corresponds with step 140 of FIGURE 3. Drill string 50 is used to drill through slant entry well bore 64 at tangent or kick off point 38 to form articulated well bore 36. In a particular embodiment, articulated well bore 36 has a radius of approximately seventy-one feet and a curvature of approximately eighty degrees per one hundred feet. In the same embodiment, slant entry well 64 is angled away from the vertical at approximately ten degrees. In this embodiment, the hydrostatic head generated in conjunction with production is roughly thirty feet. However, it should be understood that any other appropriate radius, curvature, and slant angle may be used. FIGURE 8 illustrates a slant entry well 64 and articulated well bore 36 after drill string 50 has been used to form articulated well bore 36. In a particular embodiment, a horizontal well and drainage pattern may then be formed in subterranean zone 22, as represented by step 145 and step 150 of FIGURE 3.
Referring to FIGURE 8, whipstock casing 70 is set on the bottom of rat hole 66 to prepare for production of oil and gas. A sealer ring 74 may be used around the whipstock casing 70 to prevent gas produced from articulated well bore 36 from escaping outside whipstock casing 70. Gas ports 76 allow escaping gas to enter into and up through whipstock casing 70 for collection at the surface. As described above, liquids entrained in the escaping gas may be separated from the gas in enlarged diameter cavities 26 situated above the articulated well bore 36. As the liquids separate from the gas, the liquids travel down slant well 64 and are collected in rat hole 66 . Rat hole 66 may also comprise an enlarged diameter cavity (not shown) to collect liquids arriving from above .
A pump string 78 and submersible pump 80 is used to remove water and other liquids that are collected from the subterranean zone through articulated well bore 36. As shown in FIGURE 9, the liquids, under the power of gravity and the pressure in subterranean zone 22, pass through articulated well bore 36 and down slant entry well bore 64 into rat hole 66. From there the liquids travel into the opening in the whipstock 72 of whipstock casing 70 where they come in contact with the installed pump string 78 and submersible pump 80. Submersible pump 80 may be a variety of submersible pumps suitable for use in a down-hole environment to remove liquids and pump them to the surface through pump string 78. Installation of pump string 78 and submersible pump 80 corresponds with step 165 of FIGURE 3. Production of liquid and gas corresponds with step 170 of FIGURE 3. FIGURE 9 illustrates an example drainage pattern 90 that may be drilled from articulated well bores 36. At the center of drainage pattern 90 is a plurality of entry well bores 15 on a drilling pad 92 at the surface. In one embodiment, entry well bores 15 are spaced approximately twenty feet apart. It will be understood that other suitable spacings may also be employed. Connecting to each entry well bore 15 is a slant well 20. At the terminus of slant well 20, as described above, are substantially horizontal well bores 94 roughly forming a "crow's foot" pattern off of each of the slant wells 20. It will be understood that any other suitable drainage patterns, for example, a pinnate pattern, may be used. In an example embodiment, the horizontal reach of each substantially horizontal well bore 94 is approximately three hundred feet. Additionally, the lateral spacing between the parallel substantially horizontal well bores 94 is approximately eight hundred feet. In this particular embodiment, a drainage area of approximately six hundred and forty acres would result.
Although the present invention has been described with several embodiments, various changes and modifications may be suggested to one skilled in the art. It is intended that the present invention encompass such changes and modifications as fall within the scope of the appended claims .

Claims

WHAT IS CLAIMED IS:
1. A method for accessing a subterranean zone from the surface, comprising: forming a first entry well bore from the surface; forming one or more slanted well bores from the first entry well bore to the subterranean zone; forming a second entry well bore from the surface, the second entry well bore located on the same drilling pad as the first entry well bore at the surface; forming one or more slanted well bores from the second entry well bore to the subterranean zone; forming a third entry well bore from the surface, the third entry well bore located on the same drilling pad as the first and second entry well bores at the surface; forming one or more slanted well bores from the third entry well bore to the subterranean zone; and forming a substantially horizontal drainage pattern from each of the slanted well bores into the subterranean zone.
2. The method of Claim 1, wherein the horizontal drainage patterns comprise a horizontal well bore extending from the slanted well bore and a plurality of lateral well bores extending from the horizontal well bore.
3. The method of Claim 2, wherein the horizontal drainage patterns comprise a crow's foot configuration.
4. The method of Claim 2, wherein the lateral well bores are configured to drain an area of the subterranean zone of at least 640 acres.
5. The method of Claim 2, wherein the horizontal drainage patterns comprise a pinnate configuration.
6. The method of Claim 1, further comprising removing resources from the subterranean zone through the horizontal drainage patterns to the surface.
7. The method of Claim 1, further comprising forming an enlarged cavity in each of the slanted well bores proximate to and above the subterranean zone .
8. The method of Claim 1, further comprising forming an enlarged cavity in each of the slanted well bores above the horizontal drainage pattern.
9. The method of Claim 7, wherein the enlarged cavity is located proximate to the junction of the slanted well bore and the substantially horizontal drainage pattern.
10. The method of Claim 1, wherein the first, second, and third entry well bores are spaced approximately twenty feet apart .
11. The method of Claim 1, further comprising forming a second horizontal drainage pattern from each of the slanted well bores into a second subterranean zone.
12. A system for accessing a subterranean zone from the surface, comprising: a first entry well bore extending from the surface; a second entry well bore extending from the surface, the second entry well bore located on the same drilling pad as the first entry well bore at the surface; a third entry well bore extending from the surface, the third entry well bore located on the same drilling pad as the first and second entry well bores; one or more slanted well bores extending from each of the first, second, and third entry well bores to the subterranean zone; and a substantially horizontal drainage pattern extending from the slanted well bores into the subterranean zone.
13. The system of Claim 12, wherein the horizontal drainage patterns comprise a horizontal well bore extending from the slanted well bore and a plurality of lateral well bores extending from the horizontal well bore .
14. The system of Claim 13, wherein the horizontal drainage patterns comprise a crow's foot configuration.
15. The system of Claim 13, wherein the lateral well bores are configured to drain an area of the subterranean zone of at least 640 acres.
16. The system of Claim 13, wherein the horizontal drainage patterns comprise a pinnate configuration.
17. The system of Claim 12, further comprising an enlarged cavity in each of the slanted well bores proximate to the subterranean zone .
18. The system of Claim 12, further comprising an enlarged cavity in each of the slanted well bores between the surface and the horizontal drainage pattern.
19. The system of Claim 17, wherein the enlarged cavity is located proximate to the junction of the slanted well bore and the substantially horizontal drainage pattern.
20. The system of Claim 12, wherein the first, second, and third entry well bores are spaced approximately twenty feet apart at the surface .
21. The system of Claim 12, further comprising a second substantially horizontal drainage pattern extending from each slanted well bore into a second subterranean zone .
22. A system for accessing a subterranean zone from the surface, comprising: three or more entry well bores extending from the surface; one or more slanted well bores extending from each entry well bore to the subterranean zone; a substantially horizontal drainage pattern extending from the slanted well bores into the subterranean zone; and an enlarged cavity in each of the one or more slanted well bores, located proximate to the junction of the slanted well bore and the substantially horizontal drainage pattern.
23. A system for accessing multiple subterranean zones from the surface, comprising: three ore more entry well bores extending from the surface; one or more slanted well bores extending from each entry well bore to one or more subterranean zones; one or more substantially horizontal drainage patterns extending from the slanted well bores into each of the one or more subterranean zones; and one or more enlarged cavities in each of the slanted well bores positioned proximate to the junction of the slanted well bores and the one or more of the substantially horizontal drainage patterns.
24. The system of Claim 23, wherein the three or more entry well bores are located on the same drilling pad.
PCT/US2003/026124 2002-08-22 2003-08-21 System and method for subterranean access WO2004018835A2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
AU2003265549A AU2003265549B2 (en) 2002-08-22 2003-08-21 System and method for subterranean access
CA002495985A CA2495985C (en) 2002-08-22 2003-08-21 System and method for subterranean access
EP03793194A EP1546505A2 (en) 2002-08-22 2003-08-21 System and method for subterranean access

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/227,057 US20040035582A1 (en) 2002-08-22 2002-08-22 System and method for subterranean access
US10/227,057 2002-08-22

Publications (2)

Publication Number Publication Date
WO2004018835A2 true WO2004018835A2 (en) 2004-03-04
WO2004018835A3 WO2004018835A3 (en) 2004-03-25

Family

ID=31887386

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2003/026124 WO2004018835A2 (en) 2002-08-22 2003-08-21 System and method for subterranean access

Country Status (6)

Country Link
US (1) US20040035582A1 (en)
EP (1) EP1546505A2 (en)
CN (1) CN100535383C (en)
CA (1) CA2495985C (en)
PL (1) PL201821B1 (en)
WO (1) WO2004018835A2 (en)

Families Citing this family (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8376052B2 (en) 1998-11-20 2013-02-19 Vitruvian Exploration, Llc Method and system for surface production of gas from a subterranean zone
US6662870B1 (en) * 2001-01-30 2003-12-16 Cdx Gas, L.L.C. Method and system for accessing subterranean deposits from a limited surface area
US6280000B1 (en) * 1998-11-20 2001-08-28 Joseph A. Zupanick Method for production of gas from a coal seam using intersecting well bores
US8297377B2 (en) * 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US7025154B2 (en) * 1998-11-20 2006-04-11 Cdx Gas, Llc Method and system for circulating fluid in a well system
US7048049B2 (en) * 2001-10-30 2006-05-23 Cdx Gas, Llc Slant entry well system and method
WO2001081240A2 (en) 2000-04-24 2001-11-01 Shell Internationale Research Maatschappij B.V. In-situ heating of coal formation to produce fluid
US7243738B2 (en) * 2001-01-29 2007-07-17 Robert Gardes Multi seam coal bed/methane dewatering and depressurizing production system
US6923275B2 (en) * 2001-01-29 2005-08-02 Robert Gardes Multi seam coal bed/methane dewatering and depressurizing production system
US7051811B2 (en) 2001-04-24 2006-05-30 Shell Oil Company In situ thermal processing through an open wellbore in an oil shale formation
WO2003036037A2 (en) * 2001-10-24 2003-05-01 Shell Internationale Research Maatschappij B.V. Installation and use of removable heaters in a hydrocarbon containing formation
US7360595B2 (en) * 2002-05-08 2008-04-22 Cdx Gas, Llc Method and system for underground treatment of materials
US6991047B2 (en) * 2002-07-12 2006-01-31 Cdx Gas, Llc Wellbore sealing system and method
US7025137B2 (en) * 2002-09-12 2006-04-11 Cdx Gas, Llc Three-dimensional well system for accessing subterranean zones
WO2004038175A1 (en) 2002-10-24 2004-05-06 Shell Internationale Research Maatschappij B.V. Inhibiting wellbore deformation during in situ thermal processing of a hydrocarbon containing formation
US7264048B2 (en) * 2003-04-21 2007-09-04 Cdx Gas, Llc Slot cavity
NZ567052A (en) 2003-04-24 2009-11-27 Shell Int Research Thermal process for subsurface formations
US20060201714A1 (en) * 2003-11-26 2006-09-14 Seams Douglas P Well bore cleaning
US20060201715A1 (en) * 2003-11-26 2006-09-14 Seams Douglas P Drilling normally to sub-normally pressured formations
US7419223B2 (en) * 2003-11-26 2008-09-02 Cdx Gas, Llc System and method for enhancing permeability of a subterranean zone at a horizontal well bore
US7222670B2 (en) * 2004-02-27 2007-05-29 Cdx Gas, Llc System and method for multiple wells from a common surface location
CA2579496A1 (en) 2004-04-23 2005-11-03 Shell Internationale Research Maatschappij B.V. Subsurface electrical heaters using nitride insulation
US7278497B2 (en) * 2004-07-09 2007-10-09 Weatherford/Lamb Method for extracting coal bed methane with source fluid injection
US7311150B2 (en) * 2004-12-21 2007-12-25 Cdx Gas, Llc Method and system for cleaning a well bore
US7225872B2 (en) * 2004-12-21 2007-06-05 Cdx Gas, Llc Perforating tubulars
US7353877B2 (en) * 2004-12-21 2008-04-08 Cdx Gas, Llc Accessing subterranean resources by formation collapse
US7299864B2 (en) * 2004-12-22 2007-11-27 Cdx Gas, Llc Adjustable window liner
US7986869B2 (en) 2005-04-22 2011-07-26 Shell Oil Company Varying properties along lengths of temperature limited heaters
US7571771B2 (en) * 2005-05-31 2009-08-11 Cdx Gas, Llc Cavity well system
GB2451311A (en) 2005-10-24 2009-01-28 Shell Int Research Systems,methods and processes for use in treating subsurface formations
EP2010754A4 (en) 2006-04-21 2016-02-24 Shell Int Research Adjusting alloy compositions for selected properties in temperature limited heaters
CA2653731A1 (en) * 2006-06-28 2008-01-03 Richard E. Scallen Dewatering apparatus
US7540324B2 (en) 2006-10-20 2009-06-02 Shell Oil Company Heating hydrocarbon containing formations in a checkerboard pattern staged process
WO2008131182A1 (en) 2007-04-20 2008-10-30 Shell Oil Company Controlling and assessing pressure conditions during treatment of tar sands formations
US8967297B2 (en) * 2007-08-23 2015-03-03 Schlumberger Technology Corporation Well construction using small laterals
EP2198118A1 (en) 2007-10-19 2010-06-23 Shell Internationale Research Maatschappij B.V. Irregular spacing of heat sources for treating hydrocarbon containing formations
CA2718767C (en) 2008-04-18 2016-09-06 Shell Internationale Research Maatschappij B.V. Using mines and tunnels for treating subsurface hydrocarbon containing formations
US20100101783A1 (en) 2008-10-13 2010-04-29 Vinegar Harold J Using self-regulating nuclear reactors in treating a subsurface formation
WO2010118315A1 (en) 2009-04-10 2010-10-14 Shell Oil Company Treatment methodologies for subsurface hydrocarbon containing formations
CA2713703C (en) * 2009-09-24 2013-06-25 Conocophillips Company A fishbone well configuration for in situ combustion
US8631866B2 (en) 2010-04-09 2014-01-21 Shell Oil Company Leak detection in circulated fluid systems for heating subsurface formations
US8875788B2 (en) 2010-04-09 2014-11-04 Shell Oil Company Low temperature inductive heating of subsurface formations
US9127523B2 (en) 2010-04-09 2015-09-08 Shell Oil Company Barrier methods for use in subsurface hydrocarbon formations
US8701768B2 (en) 2010-04-09 2014-04-22 Shell Oil Company Methods for treating hydrocarbon formations
US9016370B2 (en) 2011-04-08 2015-04-28 Shell Oil Company Partial solution mining of hydrocarbon containing layers prior to in situ heat treatment
EP2815254A4 (en) * 2012-02-14 2016-06-15 Halliburton Energy Services Inc Shear wave source for vsp and surface seismic exploration
US20140076530A1 (en) * 2012-09-18 2014-03-20 Alejandro Augusto Alvarez De Toledo Facility with wells having multiple horizontal galleries for lowering water tables
US20140227035A1 (en) * 2013-02-12 2014-08-14 Chesapeake Operating, Inc. Well pad drain and containment recovery system
CN103161440A (en) * 2013-02-27 2013-06-19 中联煤层气国家工程研究中心有限责任公司 Single-well coalbed methane horizontal well system and finishing method thereof
US9732594B2 (en) * 2013-05-20 2017-08-15 Robert Gardes Continuous circulating concentric casing managed equivalent circulating density (ECD) drilling for methane gas recovery from coal seams
WO2018078591A1 (en) * 2016-10-26 2018-05-03 Davis Jimmy L Method of drilling vertical and horizontal pathways to mine for solid natural resources
CN108590595B (en) * 2018-04-10 2020-04-21 广东石油化工学院 Method for exploiting non-diagenetic natural gas hydrate by utilizing F-shaped well group

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002059455A1 (en) * 2001-01-24 2002-08-01 Cdx Gas, L.L.C. Method and system for enhanced access to a subterranean zone
WO2002061238A1 (en) * 2001-01-30 2002-08-08 Cdx Gas, L.L.C. Method and system for accessing a subterranean zone from a limited surface area
US20020108746A1 (en) * 1998-11-20 2002-08-15 Cdx Gas, L.L.C., A Texas Limited Liability Company Method and system for accessing subterranean zones from a limited surface area

Family Cites Families (100)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US422611A (en) * 1890-03-04 Band twisting machine
US177961A (en) * 1876-05-30 Improvement in the treatment of plow mold-boards
US1089184A (en) * 1913-09-18 1914-03-03 Robert H Bolen Mold for forming sunken concrete structures.
US1485615A (en) * 1920-12-08 1924-03-04 Arthur S Jones Oil-well reamer
US2069481A (en) * 1935-03-25 1937-02-02 Richard A Rott Refrigerated truck
US2150228A (en) * 1936-08-31 1939-03-14 Luther F Lamb Packer
US2783018A (en) * 1955-02-11 1957-02-26 Vac U Lift Company Valve means for suction lifting devices
US2934904A (en) * 1955-09-01 1960-05-03 Phillips Petroleum Co Dual storage caverns
US2980142A (en) * 1958-09-08 1961-04-18 Turak Anthony Plural dispensing valve
US3385382A (en) * 1964-07-08 1968-05-28 Otis Eng Co Method and apparatus for transporting fluids
US3443648A (en) * 1967-09-13 1969-05-13 Fenix & Scisson Inc Earth formation underreamer
US3809519A (en) * 1967-12-15 1974-05-07 Ici Ltd Injection moulding machines
US3578077A (en) * 1968-05-27 1971-05-11 Mobil Oil Corp Flow control system and method
US3503377A (en) * 1968-07-30 1970-03-31 Gen Motors Corp Control valve
US3687204A (en) * 1970-09-08 1972-08-29 Shell Oil Co Curved offshore well conductors
USRE32623E (en) * 1970-09-08 1988-03-15 Shell Oil Company Curved offshore well conductors
US3800830A (en) * 1973-01-11 1974-04-02 B Etter Metering valve
US3874413A (en) * 1973-04-09 1975-04-01 Vals Construction Multiported valve
US4022279A (en) * 1974-07-09 1977-05-10 Driver W B Formation conditioning process and system
US3934649A (en) * 1974-07-25 1976-01-27 The United States Of America As Represented By The United States Energy Research And Development Administration Method for removal of methane from coalbeds
US3957082A (en) * 1974-09-26 1976-05-18 Arbrook, Inc. Six-way stopcock
SE386500B (en) * 1974-11-25 1976-08-09 Sjumek Sjukvardsmek Hb GAS MIXTURE VALVE
US4020901A (en) * 1976-01-19 1977-05-03 Chevron Research Company Arrangement for recovering viscous petroleum from thick tar sand
US4073351A (en) * 1976-06-10 1978-02-14 Pei, Inc. Burners for flame jet drill
US4089374A (en) * 1976-12-16 1978-05-16 In Situ Technology, Inc. Producing methane from coal in situ
US4136996A (en) * 1977-05-23 1979-01-30 Texaco Development Corporation Directional drilling marine structure
US4151880A (en) * 1977-10-17 1979-05-01 Peabody Vann Vent assembly
US4156437A (en) * 1978-02-21 1979-05-29 The Perkin-Elmer Corporation Computer controllable multi-port valve
US4182423A (en) * 1978-03-02 1980-01-08 Burton/Hawks Inc. Whipstock and method for directional well drilling
US4257650A (en) * 1978-09-07 1981-03-24 Barber Heavy Oil Process, Inc. Method for recovering subsurface earth substances
US4366988A (en) * 1979-02-16 1983-01-04 Bodine Albert G Sonic apparatus and method for slurry well bore mining and production
US4312377A (en) * 1979-08-29 1982-01-26 Teledyne Adams, A Division Of Teledyne Isotopes, Inc. Tubular valve device and method of assembly
US4317492A (en) * 1980-02-26 1982-03-02 The Curators Of The University Of Missouri Method and apparatus for drilling horizontal holes in geological structures from a vertical bore
US4328577A (en) * 1980-06-03 1982-05-04 Rockwell International Corporation Muldem automatically adjusting to system expansion and contraction
US4372398A (en) * 1980-11-04 1983-02-08 Cornell Research Foundation, Inc. Method of determining the location of a deep-well casing by magnetic field sensing
US4442896A (en) * 1982-07-21 1984-04-17 Reale Lucio V Treatment of underground beds
FR2545006B1 (en) * 1983-04-27 1985-08-16 Mancel Patrick DEVICE FOR SPRAYING PRODUCTS, ESPECIALLY PAINTS
US4502733A (en) * 1983-06-08 1985-03-05 Tetra Systems, Inc. Oil mining configuration
US4512422A (en) * 1983-06-28 1985-04-23 Rondel Knisley Apparatus for drilling oil and gas wells and a torque arrestor associated therewith
US4494616A (en) * 1983-07-18 1985-01-22 Mckee George B Apparatus and methods for the aeration of cesspools
CA1210992A (en) * 1983-07-28 1986-09-09 Quentin Siebold Off-vertical pumping unit
FR2551491B1 (en) * 1983-08-31 1986-02-28 Elf Aquitaine MULTIDRAIN OIL DRILLING AND PRODUCTION DEVICE
US4565152A (en) * 1983-12-19 1986-01-21 Bennett Charles O Safety flag
US4519463A (en) * 1984-03-19 1985-05-28 Atlantic Richfield Company Drainhole drilling
US4646836A (en) * 1984-08-03 1987-03-03 Hydril Company Tertiary recovery method using inverted deviated holes
US4773488A (en) * 1984-08-08 1988-09-27 Atlantic Richfield Company Development well drilling
US4651836A (en) * 1986-04-01 1987-03-24 Methane Drainage Ventures Process for recovering methane gas from subterranean coalseams
US4662440A (en) * 1986-06-20 1987-05-05 Conoco Inc. Methods for obtaining well-to-well flow communication
US4718485A (en) * 1986-10-02 1988-01-12 Texaco Inc. Patterns having horizontal and vertical wells
US4727937A (en) * 1986-10-02 1988-03-01 Texaco Inc. Steamflood process employing horizontal and vertical wells
US4889199A (en) * 1987-05-27 1989-12-26 Lee Paul B Downhole valve for use when drilling an oil or gas well
CA2009782A1 (en) * 1990-02-12 1991-08-12 Anoosh I. Kiamanesh In-situ tuned microwave oil extraction process
NL9000426A (en) * 1990-02-22 1991-09-16 Maria Johanna Francien Voskamp METHOD AND SYSTEM FOR UNDERGROUND GASIFICATION OF STONE OR BROWN.
US5194859A (en) * 1990-06-15 1993-03-16 Amoco Corporation Apparatus and method for positioning a tool in a deviated section of a borehole
US5197783A (en) * 1991-04-29 1993-03-30 Esso Resources Canada Ltd. Extendable/erectable arm assembly and method of borehole mining
US5193620A (en) * 1991-08-05 1993-03-16 Tiw Corporation Whipstock setting method and apparatus
US5197553A (en) * 1991-08-14 1993-03-30 Atlantic Richfield Company Drilling with casing and retrievable drill bit
US5199496A (en) * 1991-10-18 1993-04-06 Texaco, Inc. Subsea pumping device incorporating a wellhead aspirator
US5201817A (en) * 1991-12-27 1993-04-13 Hailey Charles D Downhole cutting tool
US5289888A (en) * 1992-05-26 1994-03-01 Rrkt Company Water well completion method
US5301760C1 (en) * 1992-09-10 2002-06-11 Natural Reserve Group Inc Completing horizontal drain holes from a vertical well
US5485089A (en) * 1992-11-06 1996-01-16 Vector Magnetics, Inc. Method and apparatus for measuring distance and direction by movable magnetic field source
US5402851A (en) * 1993-05-03 1995-04-04 Baiton; Nick Horizontal drilling method for hydrocarbon recovery
US5394950A (en) * 1993-05-21 1995-03-07 Gardes; Robert A. Method of drilling multiple radial wells using multiple string downhole orientation
US5727629A (en) * 1996-01-24 1998-03-17 Weatherford/Lamb, Inc. Wellbore milling guide and method
US5385205A (en) * 1993-10-04 1995-01-31 Hailey; Charles D. Dual mode rotary cutting tool
US5494121A (en) * 1994-04-28 1996-02-27 Nackerud; Alan L. Cavern well completion method and apparatus
US5564503A (en) * 1994-08-26 1996-10-15 Halliburton Company Methods and systems for subterranean multilateral well drilling and completion
US5501273A (en) * 1994-10-04 1996-03-26 Amoco Corporation Method for determining the reservoir properties of a solid carbonaceous subterranean formation
US5540282A (en) * 1994-10-21 1996-07-30 Dallas; L. Murray Apparatus and method for completing/recompleting production wells
US5501279A (en) * 1995-01-12 1996-03-26 Amoco Corporation Apparatus and method for removing production-inhibiting liquid from a wellbore
US5732776A (en) * 1995-02-09 1998-03-31 Baker Hughes Incorporated Downhole production well control system and method
US5868210A (en) * 1995-03-27 1999-02-09 Baker Hughes Incorporated Multi-lateral wellbore systems and methods for forming same
US5706871A (en) * 1995-08-15 1998-01-13 Dresser Industries, Inc. Fluid control apparatus and method
US5785133A (en) * 1995-08-29 1998-07-28 Tiw Corporation Multiple lateral hydrocarbon recovery system and method
US5720356A (en) * 1996-02-01 1998-02-24 Gardes; Robert Method and system for drilling underbalanced radial wells utilizing a dual string technique in a live well
US6056059A (en) * 1996-03-11 2000-05-02 Schlumberger Technology Corporation Apparatus and method for establishing branch wells from a parent well
US5944107A (en) * 1996-03-11 1999-08-31 Schlumberger Technology Corporation Method and apparatus for establishing branch wells at a node of a parent well
US5879057A (en) * 1996-11-12 1999-03-09 Amvest Corporation Horizontal remote mining system, and method
US5863283A (en) * 1997-02-10 1999-01-26 Gardes; Robert System and process for disposing of nuclear and other hazardous wastes in boreholes
US5884704A (en) * 1997-02-13 1999-03-23 Halliburton Energy Services, Inc. Methods of completing a subterranean well and associated apparatus
US6019173A (en) * 1997-04-04 2000-02-01 Dresser Industries, Inc. Multilateral whipstock and tools for installing and retrieving
US6030048A (en) * 1997-05-07 2000-02-29 Tarim Associates For Scientific Mineral And Oil Exploration Ag. In-situ chemical reactor for recovery of metals or purification of salts
US20020043404A1 (en) * 1997-06-06 2002-04-18 Robert Trueman Erectable arm assembly for use in boreholes
US5868202A (en) * 1997-09-22 1999-02-09 Tarim Associates For Scientific Mineral And Oil Exploration Ag Hydrologic cells for recovery of hydrocarbons or thermal energy from coal, oil-shale, tar-sands and oil-bearing formations
US6050335A (en) * 1997-10-31 2000-04-18 Shell Oil Company In-situ production of bitumen
US6012320A (en) * 1998-01-14 2000-01-11 Oxford Suspension, Inc. Leaf spring straightening apparatus
US6024171A (en) * 1998-03-12 2000-02-15 Vastar Resources, Inc. Method for stimulating a wellbore penetrating a solid carbonaceous subterranean formation
US6135208A (en) * 1998-05-28 2000-10-24 Halliburton Energy Services, Inc. Expandable wellbore junction
US7025154B2 (en) * 1998-11-20 2006-04-11 Cdx Gas, Llc Method and system for circulating fluid in a well system
US6280000B1 (en) * 1998-11-20 2001-08-28 Joseph A. Zupanick Method for production of gas from a coal seam using intersecting well bores
US6681855B2 (en) * 2001-10-19 2004-01-27 Cdx Gas, L.L.C. Method and system for management of by-products from subterranean zones
US6679322B1 (en) * 1998-11-20 2004-01-20 Cdx Gas, Llc Method and system for accessing subterranean deposits from the surface
US6199633B1 (en) * 1999-08-27 2001-03-13 James R. Longbottom Method and apparatus for intersecting downhole wellbore casings
AU2002224445A1 (en) * 2000-10-26 2002-05-06 Joe E. Guyer Method of generating and recovering gas from subsurface formations of coal, carbonaceous shale and organic-rich shales
US6722452B1 (en) * 2002-02-19 2004-04-20 Cdx Gas, Llc Pantograph underreamer
US6976547B2 (en) * 2002-07-16 2005-12-20 Cdx Gas, Llc Actuator underreamer
US7025137B2 (en) * 2002-09-12 2006-04-11 Cdx Gas, Llc Three-dimensional well system for accessing subterranean zones
US8333245B2 (en) * 2002-09-17 2012-12-18 Vitruvian Exploration, Llc Accelerated production of gas from a subterranean zone
US6860147B2 (en) * 2002-09-30 2005-03-01 Alberta Research Council Inc. Process for predicting porosity and permeability of a coal bed

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020108746A1 (en) * 1998-11-20 2002-08-15 Cdx Gas, L.L.C., A Texas Limited Liability Company Method and system for accessing subterranean zones from a limited surface area
WO2002059455A1 (en) * 2001-01-24 2002-08-01 Cdx Gas, L.L.C. Method and system for enhanced access to a subterranean zone
WO2002061238A1 (en) * 2001-01-30 2002-08-08 Cdx Gas, L.L.C. Method and system for accessing a subterranean zone from a limited surface area

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
"MULTILATERAL SYSTEM WITH FULL RE-ENTRY ACCESS INSTALLED" WORLD OIL, GULF PUBLISHING CO. HOUSTON, US, vol. 217, no. 6, 1 June 1996 (1996-06-01), page 29 XP000596577 ISSN: 0043-8790 *
BREANT P: "DES PUITS >CHEZ TOTAL: LES PUITS MULTI-DRAINS. UNE NOUVELLE TECHNOLOGIE DE FORAGE AU SERVICE D'UN DEVELOPPEMENT OPTIMISE DES RESERVES D'HYDROCARBURES" PETROLE ET TECHNIQUES, ASSOCIATION FRANCAISE DES TECHNICIENS DU PETROLE. PARIS, FR, no. 418, January 1999 (1999-01), pages 42-46, XP000846928 ISSN: 0152-5425 *
PASICZYNK A: "EVOLUTION SIMPLIFIES MULTILATERAL WELLS" PETROLEUM ENGINEER INTERNATIONAL, HART PUBLICATIONS, US, vol. 73, no. 6, June 2000 (2000-06), pages 53-55, XP000969304 ISSN: 0164-8322 *
See also references of EP1546505A2 *

Also Published As

Publication number Publication date
EP1546505A2 (en) 2005-06-29
CA2495985A1 (en) 2004-03-04
CN100535383C (en) 2009-09-02
PL375351A1 (en) 2005-11-28
US20040035582A1 (en) 2004-02-26
PL201821B1 (en) 2009-05-29
CN1685131A (en) 2005-10-19
WO2004018835A3 (en) 2004-03-25
CA2495985C (en) 2008-05-20
AU2003265549A1 (en) 2004-03-11

Similar Documents

Publication Publication Date Title
CA2495985C (en) System and method for subterranean access
US7048049B2 (en) Slant entry well system and method
US7090009B2 (en) Three-dimensional well system for accessing subterranean zones
CN101158267B (en) Method and system for accessing subterranean deposits from the surface
AU2002349947A1 (en) An entry well with slanted well bores and method
US6425448B1 (en) Method and system for accessing subterranean zones from a limited surface area
EP1354124B1 (en) Method and system for enhanced access to a subterranean zone
AU2002251776A1 (en) Method and system for accessing subterranean zones from a limited surface area
AU2003265549B2 (en) System and method for subterranean access
US20050051326A1 (en) Method for making wells for removing fluid from a desired subterranean
AU2007229426B2 (en) Slant entry well system and method
AU2007203633A1 (en) System and method for subterranean access

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
ENP Entry into the national phase

Ref document number: 2495985

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2003265549

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 375351

Country of ref document: PL

WWE Wipo information: entry into national phase

Ref document number: 2003793194

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 20038229420

Country of ref document: CN

WWP Wipo information: published in national office

Ref document number: 2003793194

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office

Country of ref document: JP

WWG Wipo information: grant in national office

Ref document number: 2003265549

Country of ref document: AU