WO2002088276A1 - A wall structure for use in a furnace or the similar and a method for its construction - Google Patents

A wall structure for use in a furnace or the similar and a method for its construction Download PDF

Info

Publication number
WO2002088276A1
WO2002088276A1 PCT/NO2002/000156 NO0200156W WO02088276A1 WO 2002088276 A1 WO2002088276 A1 WO 2002088276A1 NO 0200156 W NO0200156 W NO 0200156W WO 02088276 A1 WO02088276 A1 WO 02088276A1
Authority
WO
WIPO (PCT)
Prior art keywords
wall structure
brick
bricks
accordance
wall
Prior art date
Application number
PCT/NO2002/000156
Other languages
French (fr)
Inventor
Anders Ruud
Hogne Linga
Arnstein Fardal
Arnt Johnny Fluge
Original Assignee
Norsk Hydro Asa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Norsk Hydro Asa filed Critical Norsk Hydro Asa
Priority to AT02720681T priority Critical patent/ATE302251T1/en
Priority to CA2445417A priority patent/CA2445417C/en
Priority to EP02720681A priority patent/EP1385920B1/en
Priority to DE60205607T priority patent/DE60205607T2/en
Publication of WO2002088276A1 publication Critical patent/WO2002088276A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B13/00Furnaces with both stationary charge and progression of heating, e.g. of ring type, of type in which segmental kiln moves over stationary charge
    • F27B13/02Furnaces with both stationary charge and progression of heating, e.g. of ring type, of type in which segmental kiln moves over stationary charge of multiple-chamber type with permanent partitions; Combinations of furnaces
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • C10B29/02Brickwork, e.g. casings, linings, walls
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D1/00Casings; Linings; Walls; Roofs
    • F27D1/16Making or repairing linings increasing the durability of linings or breaking away linings
    • F27D1/1621Making linings by using shaped elements, e.g. bricks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/04Ram or pusher apparatus

Definitions

  • the present invention concerns a wall structure for use in a furnace or the similar, for example a furnace for calcination of carbon bodies.
  • the invention also concerns a method for constructing such a wall structure.
  • the invention relates in particular, but not exclusively, to walls or partition walls with internal flue gas ducts, i.e. flue walls.
  • Furnaces for calcination of carbon blocks to be used in the production of aluminium in accordance with the Hall-Heroult process may be designed with several sections arranged in two parallel rows. Such furnaces have a combustion cycle which is moved in relation to the sections as the carbon material is calcinated.
  • the sections are mutually and successively linked by ducts which conduct hot combustion gas or flue gas through the furnace structure.
  • Each section can be divided into several smaller pits by means of flue walls or cassette walls. These flue walls are provided with several flue gas ducts, through which hot gas is conducted in order to be able to transfer heat efficiently to objects placed in the sections so that the calcination process becomes as homogeneous as possible.
  • CH 258544 shows a furnace in which a partition wall may comprise flue gas ducts (fig. 3).
  • a partition wall may comprise flue gas ducts (fig. 3).
  • an attempt is made to absorb longitudinal changes in the partition wall as a consequence of thermal heating/cooling in vertical joints between each brick, while the wall ends are fixed in place.
  • One problem which will arise over time when using this principle for expansion/contraction is that particles from material placed in the furnace may be deposited in the joints and prevent the intended expansion fully or partially. If the wall has a certain clearance between where it is fixed and the rest of the structure of the furnace, this clearance will gradually be used up as the partition wall is extended permanently as a consequence of the stated mechanism. Over time, therefore, a structure of this type may bow and lose its parallelism.
  • Fig. 1 shows, in sections from above, details concerning the fixing of one end of a partition wall in relation to adjacent brickwork
  • Fig. 2 shows, in sections from above, two parallel partition walls fixed at their ends to adjacent brickwork
  • Fig. 3 shows a detail of the fixing of the ends of the partition walls
  • Fig. 4 shows a detail of the end of the partition wall
  • Fig. 5 shows another detail of the end of the partition wall
  • FIG. 6 shows a detail of the structure of the partition wall.
  • Figure 1 shows, in sections from above, brickwork 1 , which may be a head wall in a furnace which may be built up from a row of individual bricks.
  • the brickwork shown in the figure is adapted for the fixing of partition walls 3', 3", 3"', 3"" (only four are partially shown in the figure).
  • the connection 2 between the partition wall 3' and the brickwork 1 is shown in an enlarged section in the lower part of the figure.
  • This section shows an end brick 4 in the partition wall 3', a wedge brick 6 and an anchor brick 5 which constitutes part of the brickwork 1 and is permanently fixed to it.
  • the wedge brick 6 may expediently have a rectangular cross-section and have side surfaces 10, 10' which interact with the respective surfaces 8, 9 and 8', 9' of the end brick and anchor brick.
  • the anchor brick 5 and end brick 4 are mutually movable and expansion of the partition wall of which the end brick is a part is permitted via the expansion joint 7 between the end surface 14 of the wedge brick and the surface 11 of the end brick. Contraction, which may occur in the wall structure, can be compensated for in that the end brick 4 is permitted to move away from the anchor brick 5 while the connection via the wedge brick 6 is maintained.
  • the connection may consist of only two elements, i.e. without the wedge brick, in that a shape equivalent to the wedge brick is made as an integral part of either the anchor brick or end brick.
  • the size of the expansion joint 7 is adjusted according to experience, depending on the brick material, operating conditions with the application in question or other conditions. The same will apply to the longitudinal contact in the connection 2 with regard to contraction of the wall structure.
  • connection 2 It is expedient for the interacting surfaces in the connection 2 to run along the full vertical extent of the partition wall, i.e. all courses of bricks in the partition wall and equivalent courses in the brickwork are designed in the way shown in the figure.
  • One advantage of such a design is that variations in the length of the wall structure, including in its vertical direction, can be absorbed in the connection 2.
  • the adjacent surfaces 13, 12 on the anchor brick 5 and end brick 4 respectively are designed with chamfor so that the surfaces create a V-shape.
  • the aim of such a V-shape is that particle material which may lie against the partition wall and which consequently may be pressed in against the connection can be drained out of this area in connection with an expansion (extension) of the partition wall.
  • the surfaces it is also advantageous for the surfaces to have a V-shape during emptying/cleaning of the section.
  • the angle between the surfaces may expediently be 30° or more. The size of this angle will, among other things, depend on the material to be drained away and the surface pressure for which the surfaces are designed.
  • the connection 2 will comprise surfaces which form a seal to the extent that no problems will arise with the penetration of material into the connection during a contraction-related movement of the end brick 4.
  • Figure 2 shows, in sections from above, two parallel partition walls 114, 115 which are fixed at their ends to adjacent brickwork 101 , 102.
  • the connections are designed so that the anchor bricks 103, 104, 105, 106 are shaped in such a way that the wedge brick forms an integral part of the anchor brick.
  • the anchor bricks thus interact directly with the adjacent end bricks 107, 108, 109, 110.
  • FIG. 11 shows that the pattern for bricks in the course in partition wall 114 is different from that in partition wall 115 with regard to the design of the bricks.
  • end brick 107 has one flue gas duct 111
  • end brick 108 in partition wall 115 has two flue gas ducts 112, 113.
  • An equivalent arrangement is shown at the other ends of the partition walls.
  • brick 116 with flue gas ducts 118, 119 in partition wall 114 has the same design as brick 117 with flue gas ducts 120, 121 in partition wall 115, but the horizontal position in the respective walls is different.
  • the bricks By laying alternating courses equivalent to that shown in the section of partition wall 114 and that shown in the section of partition wall 115 over each other when building up the partition walls, the bricks will be anchored to each other via courses of bricks above and below each other by means of interacting contact elements, among other things by means of the design of the flue gas ducts. This will be illustrated in further detail in figures 4-6.
  • Figure 3 shows details of the fixing of the ends of the partition walls, more precisely an expedient design of an anchor brick.
  • the upper part of the figure shows, in perspective, the lower side of a brick 150, while the lower part of the figure shows, in perspective, the upper side of an equivalent brick 150'.
  • the bricks' external shapes correspond to that shown in earlier figures, but figure 3 also shows interacting elements which are designed to ensure mutual retention between the different courses of anchor bricks.
  • anchor brick 150 is provided with rotationally symmetrical recesses 151 which interact with the rotationally symmetrical bosses 151' in anchor brick 150'.
  • the interacting elements may have a semi-spherical shape or rounded cone shape. However, other geometrical shapes may also be used.
  • the bricks' protruding parts 153, 153' (equivalent to the integral wedge brick in 6 in figure 1 ) are provided with interacting elements 152, 152'.
  • the element 152 consists of a rotationally symmetrical recess, while the equivalent element 152' consists of a rotationally symmetrical protrusion. It is expedient for these elements to have a mainly cylindrical shape.
  • a structure of anchor bricks as shown here will produce stable brickwork in which forces which may arise locally in, for example, one or more bricks, can be distributed partially to bricks in courses above and below.
  • Figure 4 shows a brick equivalent to brick 107 as shown in figure 2.
  • the upper part of the figure shows the brick from above.
  • the lower part of the figure shows the brick in a section from the side.
  • the figure shows the flue gas duct 111 , which, at its top, has a raised end 200 and, at its lower part, has a recess 201.
  • the raised end 200 is adapted to an equivalent recess in a brick designed to be placed on brick 107, while the recess 201 is designed to fit on a raised part of an underlying brick (not shown).
  • the raised ends and recesses will contribute to the flue gas duct having a sealed connection between the courses and they will contribute to a good mutual anchoring of the bricks.
  • the brick 107 may be provided with transverse tongue 202, 202' at its top and equivalent transverse recesses 203 at its bottom for further stabilisation of the brick.
  • Figure 5 shows a brick equivalent to brick 108 in figure 2.
  • the upper part of the figure shows the brick from above and the lower part of the figure shows the brick in a section from the side.
  • the figure shows flue gas ducts 112, 113, which, at their top, have raised ends 250, 251 and, at their lower parts, have recesses 252, 253.
  • the raised ends 250, 251 are adapted to equivalent recesses in one or two bricks designed to be placed on brick 108, while the recesses 252, 253 are designed to fit on raised parts of one or two underlying bricks (not shown).
  • the raised ends and recesses will contribute to the flue gas ducts having a sealed connection between the courses and they will contribute to a good mutual anchoring of the bricks.
  • the brick 108 may be provided with transverse tongues 254, 254' at its top and equivalent transverse recesses 255 at its bottom for further stabilisation of the brick.
  • Figure 6 shows a brick equivalent to brick 116 in figure 2.
  • the upper part of the figure shows the brick from above and the lower part of the figure shows the brick in a section from the side.
  • the figure shows flue gas ducts 118, 119, which, at their top, have raised ends 300, 301 and, at their lower parts, have recesses 302, 303.
  • the raised ends 300, 301 are adapted to equivalent recesses in one or two bricks designed to be placed on brick 116, while the recesses 302, 303 are designed to fit on raised parts of one or two underlying bricks (not shown).
  • the raised ends and recesses will contribute to the flue gas ducts having a sealed connection between the courses and they will contribute to a good mutual anchoring of the bricks. However, it may be necessary to use mortar or a sealing compound for further stabilisation of the connections between the bricks.
  • partition walls with flue gas ducts Although the examples show partition walls with flue gas ducts, equivalent advantages and principles to those in the present invention may also be exploited for wall structures without ducts running through them, where the structure is exposed to large thermal loads in another way. This may, for example, be the case for wall structures installed inside a furnace chamber in order to divide the chamber.
  • the contact elements are designed so that protrusions are arranged on the top of the bricks, while recesses are arranged on the bottom of the bricks.
  • the protrusions were arranged on the bottom and the recesses on the top or possibly if a combination of these were used.
  • the movements which arise in the wall structure are mainly absorbed at at least one end, which may be fixed against other brickwork in a furnace. A certain relative movement must also be permitted between the wall structure and its underlying structure, for example a fixed floor structure.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Baking, Grill, Roasting (AREA)
  • Tunnel Furnaces (AREA)
  • Cookers (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Building Environments (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention concerns a wall structure and a method for constructing such an anchored wall structure. The wall structure is designed for use in a furnace or the similar, where the structure is exposed to cyclical thermal load. The structure consists of a row of individual elements which are placed in the longitudinal direction of the structure and are arranged in one or more courses, one resting on the other. The individual elements may consist of bricks of refractory material and the wall structure may also be provided with internal flue gas ducts. The wall structure is also designed to be able to compensate for longitudinal changes and any vertical changes as a consequence of cyclical thermal load. The wall structure's longitudinal changes are compensated for in a connection (2) arranged at least one end of the wall structure. The structure's individual elements are fixed to each other in the horizontal direction by means of mutually interacting contact elements. This produces a structure which remains stable after repeated thermal cycles, and costs related to restoration and stoppages can be reduced.

Description

A wall structure for use in a furnace or the similar and a method for its construction
The present invention concerns a wall structure for use in a furnace or the similar, for example a furnace for calcination of carbon bodies. The invention also concerns a method for constructing such a wall structure. The invention relates in particular, but not exclusively, to walls or partition walls with internal flue gas ducts, i.e. flue walls.
Furnaces for calcination of carbon blocks to be used in the production of aluminium in accordance with the Hall-Heroult process may be designed with several sections arranged in two parallel rows. Such furnaces have a combustion cycle which is moved in relation to the sections as the carbon material is calcinated. The sections are mutually and successively linked by ducts which conduct hot combustion gas or flue gas through the furnace structure. Each section can be divided into several smaller pits by means of flue walls or cassette walls. These flue walls are provided with several flue gas ducts, through which hot gas is conducted in order to be able to transfer heat efficiently to objects placed in the sections so that the calcination process becomes as homogeneous as possible. One problem with such furnaces, in which the flue walls may extend for several metres both vertically and horizontally, is that the walls lose their parallelism over time as a consequence of heating/cooling cycles with large temperature differences. In the worst cases, bowing and creep can cause problems running the furnace in a satisfactory manner. This is on account of leakage and burn-off or problems inserting/removing objects as a consequence of large geometrical deviations in the pits.
CH 258544 shows a furnace in which a partition wall may comprise flue gas ducts (fig. 3). In this solution, an attempt is made to absorb longitudinal changes in the partition wall as a consequence of thermal heating/cooling in vertical joints between each brick, while the wall ends are fixed in place. One problem which will arise over time when using this principle for expansion/contraction is that particles from material placed in the furnace may be deposited in the joints and prevent the intended expansion fully or partially. If the wall has a certain clearance between where it is fixed and the rest of the structure of the furnace, this clearance will gradually be used up as the partition wall is extended permanently as a consequence of the stated mechanism. Over time, therefore, a structure of this type may bow and lose its parallelism. Further problems which may arise are that bricks may be crushed fully or partially if the necessary expansion is not permitted after a given number of thermal cycles. A subsequent collapse of brick work may thus occur, which will give rise to expensive repair work and put the furnace fully or partially out of operation for a period of time.
The above problems can be fully or partially avoided with the present invention. In accordance with the present invention, the necessary expansion/contraction of the wall in its longitudinal direction as a consequence of thermal cycles will be compensated for at at least one end of the wall, while the bricks are mutually locked to each other. Walls in accordance with the present invention have proved to be very stable over repeated temperature cycles and the costs related to restoration of brickwork and possible stoppages of the furnace can thus be reduced considerably.
The present invention will be described in further detail in the following by means of examples and figures, where:
Fig. 1 shows, in sections from above, details concerning the fixing of one end of a partition wall in relation to adjacent brickwork,
Fig. 2 shows, in sections from above, two parallel partition walls fixed at their ends to adjacent brickwork,
Fig. 3 shows a detail of the fixing of the ends of the partition walls,
Fig. 4 shows a detail of the end of the partition wall,
Fig. 5 shows another detail of the end of the partition wall,
Fig. 6 shows a detail of the structure of the partition wall. Figure 1 shows, in sections from above, brickwork 1 , which may be a head wall in a furnace which may be built up from a row of individual bricks. The brickwork shown in the figure is adapted for the fixing of partition walls 3', 3", 3"', 3"" (only four are partially shown in the figure). The connection 2 between the partition wall 3' and the brickwork 1 is shown in an enlarged section in the lower part of the figure. This section shows an end brick 4 in the partition wall 3', a wedge brick 6 and an anchor brick 5 which constitutes part of the brickwork 1 and is permanently fixed to it. The wedge brick 6 may expediently have a rectangular cross-section and have side surfaces 10, 10' which interact with the respective surfaces 8, 9 and 8', 9' of the end brick and anchor brick. The anchor brick 5 and end brick 4 are mutually movable and expansion of the partition wall of which the end brick is a part is permitted via the expansion joint 7 between the end surface 14 of the wedge brick and the surface 11 of the end brick. Contraction, which may occur in the wall structure, can be compensated for in that the end brick 4 is permitted to move away from the anchor brick 5 while the connection via the wedge brick 6 is maintained. In an alternative embodiment, the connection may consist of only two elements, i.e. without the wedge brick, in that a shape equivalent to the wedge brick is made as an integral part of either the anchor brick or end brick. The size of the expansion joint 7 is adjusted according to experience, depending on the brick material, operating conditions with the application in question or other conditions. The same will apply to the longitudinal contact in the connection 2 with regard to contraction of the wall structure.
It is expedient for the interacting surfaces in the connection 2 to run along the full vertical extent of the partition wall, i.e. all courses of bricks in the partition wall and equivalent courses in the brickwork are designed in the way shown in the figure. One advantage of such a design is that variations in the length of the wall structure, including in its vertical direction, can be absorbed in the connection 2.
In the example shown in the figure, the adjacent surfaces 13, 12 on the anchor brick 5 and end brick 4 respectively are designed with chamfor so that the surfaces create a V-shape. The aim of such a V-shape is that particle material which may lie against the partition wall and which consequently may be pressed in against the connection can be drained out of this area in connection with an expansion (extension) of the partition wall. It is also advantageous for the surfaces to have a V-shape during emptying/cleaning of the section. The angle between the surfaces may expediently be 30° or more. The size of this angle will, among other things, depend on the material to be drained away and the surface pressure for which the surfaces are designed. Moreover, the connection 2 will comprise surfaces which form a seal to the extent that no problems will arise with the penetration of material into the connection during a contraction-related movement of the end brick 4.
Figure 2 shows, in sections from above, two parallel partition walls 114, 115 which are fixed at their ends to adjacent brickwork 101 , 102. In this embodiment, the connections are designed so that the anchor bricks 103, 104, 105, 106 are shaped in such a way that the wedge brick forms an integral part of the anchor brick. The anchor bricks thus interact directly with the adjacent end bricks 107, 108, 109, 110.
The figure shows that the pattern for bricks in the course in partition wall 114 is different from that in partition wall 115 with regard to the design of the bricks. In the first partition wall, end brick 107 has one flue gas duct 111 , while end brick 108 in partition wall 115 has two flue gas ducts 112, 113. An equivalent arrangement is shown at the other ends of the partition walls. Moreover, brick 116 with flue gas ducts 118, 119 in partition wall 114 has the same design as brick 117 with flue gas ducts 120, 121 in partition wall 115, but the horizontal position in the respective walls is different.
By laying alternating courses equivalent to that shown in the section of partition wall 114 and that shown in the section of partition wall 115 over each other when building up the partition walls, the bricks will be anchored to each other via courses of bricks above and below each other by means of interacting contact elements, among other things by means of the design of the flue gas ducts. This will be illustrated in further detail in figures 4-6.
Figure 3 shows details of the fixing of the ends of the partition walls, more precisely an expedient design of an anchor brick. The upper part of the figure shows, in perspective, the lower side of a brick 150, while the lower part of the figure shows, in perspective, the upper side of an equivalent brick 150'. The bricks' external shapes correspond to that shown in earlier figures, but figure 3 also shows interacting elements which are designed to ensure mutual retention between the different courses of anchor bricks. In the example shown, anchor brick 150 is provided with rotationally symmetrical recesses 151 which interact with the rotationally symmetrical bosses 151' in anchor brick 150'. It is expedient for the interacting elements to have a semi-spherical shape or rounded cone shape. However, other geometrical shapes may also be used. As the figure also shows, the bricks' protruding parts 153, 153' (equivalent to the integral wedge brick in 6 in figure 1 ) are provided with interacting elements 152, 152'. In the embodiment shown, the element 152 consists of a rotationally symmetrical recess, while the equivalent element 152' consists of a rotationally symmetrical protrusion. It is expedient for these elements to have a mainly cylindrical shape. A structure of anchor bricks as shown here will produce stable brickwork in which forces which may arise locally in, for example, one or more bricks, can be distributed partially to bricks in courses above and below. This will be particularly favourable for the protruding parts of the bricks, where, for example, forces which arise on the protruding part 153 on brick 150 can be distributed to the underlying brick 150' via interacting elements 152, 152' and, in equivalent fashion, to any brick above (not shown).
Figure 4 shows a brick equivalent to brick 107 as shown in figure 2. The upper part of the figure shows the brick from above. The lower part of the figure shows the brick in a section from the side. The figure shows the flue gas duct 111 , which, at its top, has a raised end 200 and, at its lower part, has a recess 201. The raised end 200 is adapted to an equivalent recess in a brick designed to be placed on brick 107, while the recess 201 is designed to fit on a raised part of an underlying brick (not shown). The raised ends and recesses will contribute to the flue gas duct having a sealed connection between the courses and they will contribute to a good mutual anchoring of the bricks. Moreover, the brick 107 may be provided with transverse tongue 202, 202' at its top and equivalent transverse recesses 203 at its bottom for further stabilisation of the brick.
Figure 5 shows a brick equivalent to brick 108 in figure 2. The upper part of the figure shows the brick from above and the lower part of the figure shows the brick in a section from the side. The figure shows flue gas ducts 112, 113, which, at their top, have raised ends 250, 251 and, at their lower parts, have recesses 252, 253. The raised ends 250, 251 are adapted to equivalent recesses in one or two bricks designed to be placed on brick 108, while the recesses 252, 253 are designed to fit on raised parts of one or two underlying bricks (not shown). The raised ends and recesses will contribute to the flue gas ducts having a sealed connection between the courses and they will contribute to a good mutual anchoring of the bricks. As in the previous figure, the brick 108 may be provided with transverse tongues 254, 254' at its top and equivalent transverse recesses 255 at its bottom for further stabilisation of the brick.
Figure 6 shows a brick equivalent to brick 116 in figure 2. The upper part of the figure shows the brick from above and the lower part of the figure shows the brick in a section from the side. The figure shows flue gas ducts 118, 119, which, at their top, have raised ends 300, 301 and, at their lower parts, have recesses 302, 303. The raised ends 300, 301 are adapted to equivalent recesses in one or two bricks designed to be placed on brick 116, while the recesses 302, 303 are designed to fit on raised parts of one or two underlying bricks (not shown). The raised ends and recesses will contribute to the flue gas ducts having a sealed connection between the courses and they will contribute to a good mutual anchoring of the bricks. However, it may be necessary to use mortar or a sealing compound for further stabilisation of the connections between the bricks.
Although the examples show partition walls with flue gas ducts, equivalent advantages and principles to those in the present invention may also be exploited for wall structures without ducts running through them, where the structure is exposed to large thermal loads in another way. This may, for example, be the case for wall structures installed inside a furnace chamber in order to divide the chamber.
In the embodiments shown, the contact elements are designed so that protrusions are arranged on the top of the bricks, while recesses are arranged on the bottom of the bricks. However, it would also lie within the framework of the present invention if the protrusions were arranged on the bottom and the recesses on the top or possibly if a combination of these were used. In accordance with the present invention, the movements which arise in the wall structure are mainly absorbed at at least one end, which may be fixed against other brickwork in a furnace. A certain relative movement must also be permitted between the wall structure and its underlying structure, for example a fixed floor structure.

Claims

Claims
1. A wall structure for use in a furnace or similar, where the structure is exposed to cyclical thermal load, the structure consists of a row of individual elements, which may consist of bricks of refractory material, where the wall structure may comprise internal flue gas ducts, the wall structure further being able to compensate for longitudinal changes as a consequence of cyclical thermal load, characterised in that the structure's longitudinal changes and any changes in the vertical direction are absorbed in a connection (2) arranged at at least one end of the wall structure and that the structure's individual elements are firmly anchored to each other in the horizontal direction by means of interacting contact elements.
2. A wall structure in accordance with claim 1 , characterised in that the connection (2) comprises at least one end brick (4) and one anchor brick (5) arranged for mutually movement in the longitudinal direction of the wall structure.
3. A wall structure in accordance with claim 2, characterised in that the connection (2) is also designed for movement between the end brick (4) and the anchor brick (5) in the vertical direction.
4. A wall structure in accordance with claim 2, characterised in that the end brick (4) and anchor brick (5) are connected to each other by means of a wedge brick (6).
5. A wall structure in accordance with claim 2 or 4, characterised in that the end brick (4), anchor brick (5) and any connecting bridge (6) are provided with interacting connecting surfaces which are mainly parallel to the longitudinal direction of the wall structure.
6. A wall structure in accordance with claim 2, characterised in that the anchor brick (5) is permanently connected to brickwork, such as a head wall, and is also provided with contact elements at its top and bottom.
7. A wall structure in accordance with claim 2, characterised in that the anchor brick (5) and end brick (4) are designed with surfaces (13, 12) which mutually form a V-shape for drainage of any material away from the connection.
8. A wall structure in accordance with one or more of the above claims 1-7, characterised in that it comprises bricks (116, 117) with interacting contact elements, where the bricks are offset in relation to each other in adjacent courses, thereby achieving mutual anchoring in the horizontal direction between the bricks.
9. A method for constructing an anchored wall structure for use in a furnace or the similar, where the structure is exposed to cyclical thermal load, the structure consists of a row of individual elements which are placed in the longitudinal direction of the structure and are arranged in one or more courses, one resting on the other, the individual elements may consist of bricks of refractory material and the wall structure may be provided with internal flue gas ducts, the wall structure is further designed to be able to compensate for longitudinal changes as a consequence of cyclical thermal load, characterised in that the structure's longitudinal changes and any changes in the vertical direction are compensated for in a connection (2) arranged at at least one end of the wall structure and that the structure's individual elements are fixed to each other in the horizontal direction by means of mutually interacting contact elements.
10. A method in accordance with claim 9, characterised in that the wall structure is permitted both contraction movement and expansion movement at the connection (2) via interacting connecting surfaces which are mainly parallel to the longitudinal direction of the wall structure.
11. A method in accordance with claim 10, characterised in that the wall structure is movable in its longitudinal direction in relation to an underlying support such as a floor.
PCT/NO2002/000156 2001-04-26 2002-04-24 A wall structure for use in a furnace or the similar and a method for its construction WO2002088276A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AT02720681T ATE302251T1 (en) 2001-04-26 2002-04-24 WALL CONSTRUCTION FOR USE IN AN OVEN
CA2445417A CA2445417C (en) 2001-04-26 2002-04-24 A wall structure for use in a furnace or the similar and a method for its construction
EP02720681A EP1385920B1 (en) 2001-04-26 2002-04-24 A wall structure for use in a furnace
DE60205607T DE60205607T2 (en) 2001-04-26 2002-04-24 WALL CONSTRUCTION FOR USE IN AN OVEN

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20012044 2001-04-26
NO20012044A NO313897B1 (en) 2001-04-26 2001-04-26 Wall structure for use in a stove or equivalent and method of forming the same

Publications (1)

Publication Number Publication Date
WO2002088276A1 true WO2002088276A1 (en) 2002-11-07

Family

ID=19912401

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2002/000156 WO2002088276A1 (en) 2001-04-26 2002-04-24 A wall structure for use in a furnace or the similar and a method for its construction

Country Status (6)

Country Link
EP (1) EP1385920B1 (en)
AT (1) ATE302251T1 (en)
CA (1) CA2445417C (en)
DE (1) DE60205607T2 (en)
NO (1) NO313897B1 (en)
WO (1) WO2002088276A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363685B (en) * 2007-08-09 2010-04-07 沈阳铝镁设计研究院 Anode roasting furnace for aluminum
CN102042753A (en) * 2010-12-22 2011-05-04 本钢板材股份有限公司 Tunnel furnace flue and making method thereof
WO2011153600A1 (en) * 2010-06-09 2011-12-15 Magnesita Refratários S.A. Refractory lining process for anode firing furnaces
CN108375305A (en) * 2018-05-25 2018-08-07 河南龙成煤高效技术应用有限公司 A kind of stove liner expands with heat and contract with cold collocation structure and stove
WO2021067531A1 (en) * 2019-10-02 2021-04-08 Fosbel, Inc. Methods and systems for construction and/or repair of coke oven walls

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH258544A (en) * 1946-08-26 1948-12-15 Soc D Tech Ind Coke oven.
WO1992022780A1 (en) * 1991-06-12 1992-12-23 Riedhammer Gmbh Und Co. Kg Partition wall for a multi-compartment furnace
US5704781A (en) * 1994-09-17 1998-01-06 Riedhammer Gmbh And Co. Kg Refractory wall brick for a heating channel of a ring pit furnace

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH258544A (en) * 1946-08-26 1948-12-15 Soc D Tech Ind Coke oven.
WO1992022780A1 (en) * 1991-06-12 1992-12-23 Riedhammer Gmbh Und Co. Kg Partition wall for a multi-compartment furnace
US5704781A (en) * 1994-09-17 1998-01-06 Riedhammer Gmbh And Co. Kg Refractory wall brick for a heating channel of a ring pit furnace

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363685B (en) * 2007-08-09 2010-04-07 沈阳铝镁设计研究院 Anode roasting furnace for aluminum
WO2011153600A1 (en) * 2010-06-09 2011-12-15 Magnesita Refratários S.A. Refractory lining process for anode firing furnaces
CN102042753A (en) * 2010-12-22 2011-05-04 本钢板材股份有限公司 Tunnel furnace flue and making method thereof
CN108375305A (en) * 2018-05-25 2018-08-07 河南龙成煤高效技术应用有限公司 A kind of stove liner expands with heat and contract with cold collocation structure and stove
CN108375305B (en) * 2018-05-25 2024-01-23 河南龙成煤高效技术应用有限公司 Furnace liner thermal expansion and contraction compensation structure and furnace
WO2021067531A1 (en) * 2019-10-02 2021-04-08 Fosbel, Inc. Methods and systems for construction and/or repair of coke oven walls
US11441079B2 (en) 2019-10-02 2022-09-13 Fosbel, Inc. Methods and systems for construction and/or repair of coke oven walls

Also Published As

Publication number Publication date
NO20012044D0 (en) 2001-04-26
EP1385920A1 (en) 2004-02-04
DE60205607D1 (en) 2005-09-22
NO20012044L (en) 2002-10-28
ATE302251T1 (en) 2005-09-15
DE60205607T2 (en) 2006-06-08
EP1385920B1 (en) 2005-08-17
CA2445417C (en) 2011-07-05
NO313897B1 (en) 2002-12-16
CA2445417A1 (en) 2002-11-07

Similar Documents

Publication Publication Date Title
JP7241722B2 (en) Coke oven with monolithic component structure
CA2445417C (en) A wall structure for use in a furnace or the similar and a method for its construction
KR20170084281A (en) Monolithic refractory crown and rider arches for glass furnace regenerators and glass furnace regenerators including the same
AU2008250641B2 (en) Ring furnace including baking pits with a large horizontal aspect ratio and method of baking carbonaceous articles therein
CN105924024A (en) Fireproof brick for lining of limestone vertical kiln
US5466150A (en) Sagger wall for a ring pit furnace
CN110205143B (en) Pouring masonry mixed structure for dry quenching of furnace body cooling section structure and preparation method thereof
US3092051A (en) Basic open hearth roof construction
CN103808147B (en) A kind of cylindrical shape turns round the anchoring process of hot equipment kiln lining
CN220062576U (en) C-type double-chamber kiln inner ring masonry structure
US1896669A (en) Furnace floor structure
EP2851640A1 (en) Refractory ceramic lining brick and corresponding refractory ceramic lining
EP0786067B1 (en) Heat insulating arrangement
CN116608696A (en) Masonry method of C-type double-chamber kiln inner ring masonry structure
RU80546U1 (en) LAYER PLATE
US2105804A (en) Arch and wall construction
CN220708082U (en) Anti-drop structure of refractory material in cement kiln
EP0090449B1 (en) Coke oven battery
SU1030396A1 (en) Heating partition wall of coking oven
WO2011159184A1 (en) Method for repairing a refractory lining of coke batteries
EP1409939B1 (en) A method for creating a thermally stable base structure and furnace comprising a thermally stable structure
SU1330440A1 (en) Brickwork for regenerator packing
SU1765153A1 (en) Coke oven overlap
US1685568A (en) Tile-anchoring device
RU2393402C9 (en) Cartridge chamber of pit-type furnace, as well as shaped brick for it, and manufacturing method of shaped brick

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG US UZ VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2445417

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2002720681

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 2002720681

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWG Wipo information: grant in national office

Ref document number: 2002720681

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office

Country of ref document: JP