WO2002008673A1 - Electric storage boilers control enabling delayed charging - Google Patents

Electric storage boilers control enabling delayed charging Download PDF

Info

Publication number
WO2002008673A1
WO2002008673A1 PCT/BG2001/000012 BG0100012W WO0208673A1 WO 2002008673 A1 WO2002008673 A1 WO 2002008673A1 BG 0100012 W BG0100012 W BG 0100012W WO 0208673 A1 WO0208673 A1 WO 0208673A1
Authority
WO
WIPO (PCT)
Prior art keywords
time
boiler
hot water
heating process
water consumption
Prior art date
Application number
PCT/BG2001/000012
Other languages
French (fr)
Original Assignee
Kostadinov, Kossyu Todorov
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kostadinov, Kossyu Todorov filed Critical Kostadinov, Kossyu Todorov
Priority to AU2001270359A priority Critical patent/AU2001270359A1/en
Publication of WO2002008673A1 publication Critical patent/WO2002008673A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
    • F24H9/2021Storage heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/10Control of fluid heaters characterised by the purpose of the control
    • F24H15/156Reducing the quantity of energy consumed; Increasing efficiency
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/10Control of fluid heaters characterised by the purpose of the control
    • F24H15/172Scheduling based on user demand, e.g. determining starting point of heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/212Temperature of the water
    • F24H15/223Temperature of the water in the water storage tank
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/30Control of fluid heaters characterised by control outputs; characterised by the components to be controlled
    • F24H15/355Control of heat-generating means in heaters
    • F24H15/37Control of heat-generating means in heaters of electric heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/30Control of fluid heaters characterised by control outputs; characterised by the components to be controlled
    • F24H15/395Information to users, e.g. alarms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/40Control of fluid heaters characterised by the type of controllers
    • F24H15/486Control of fluid heaters characterised by the type of controllers using timers

Definitions

  • the method applied to control their operation is based on the Heater (4) built-in in their structure, heating the water up to desired temperature and powered by electric main through in serial connected a Thermal electric cutout (2) and a Thermal controller (3).
  • the heating process starts in T x time (Fig.l) in current water temperature t ⁇ , coincident with T 2 boiler switch on time and lengthens up to reaching maximum water temperature t m , adjusted by means of the thermal controller.
  • the line “a” is the theoretical heating curve with no thermal losses, and the line “b” is the real curve accounting the thermal losses.
  • the S x areas are the thermal losses for the T x -T period.
  • T p - a time of hot water consumption. Duration of the heating process is variable and it depends on: the heater power; the water temperature within the reservoir in initial heating time;boiler thermal isolating properties; ambient temperature;
  • the electric boiler operation in ON/OFF mode posses the following negative sides: a) irreparable energy loss - the thermal radiation in environment is to the highest degree because of water temperature is held up by the thermal controller to values, close to the maximum and in a period when hot water isn't consumed; b) the frequent and unbroken for long periods thermal controller turns on/off damage it quickly too (whereupon cases of boiler explosions are recorded) and the repair-to-repair periods are shorted; c) starting boiler operation more before period where the hot water would be consumed.
  • the essence of the proposal is consist in that to propose a new method controlling volumetric electric storage boilers operation enabling them to operate in delaying mode.
  • the method is based on the possibility the heating process to be shifted in time in such manner that heating to be independent on switching on time and to finish in time when starting heat water consumption is expected.
  • a controller unit is added-in into the boiler design, which enables: - to watch in-boiler water current temperature in continuous mode;
  • the heater 3 powered by electric main through con- troller unit 2 heats water up to desired temperature.
  • the essential in this case is that the method, by the controller unit, enables in arbitrary time T 2 (Fig.2) wanted later time T to be fixed, which is start of hot water consumption in such manner that the T x time of start of hot water consumption to start when the time T 3 needed for reaching the water temperature defined by the thermal controller to synchronize to the T n time, when the hot water will start to be consumed.
  • thermocouple 2 feeding data about current water te pera- ture to the adjustable controller 3, is mounted on the boiler's water reservoir 1.
  • the test lamp 4 lights when voltage is applied by switch 8.
  • the display 5 shall be reset by button 7, and desired time, when hot water would be consumed, shall be adjusted by buttons 9 and 10;
  • Voltage is applied to the controller by turning on switch 8, then the test light indicator 4 is energized; In this position, the controller doesn't feed voltage to the heater 12; - On the next day only, the controller, receiving by the thermocouple 2 data for boiler water current temperature, shall switch on and apply voltage to the heater in such time that the heating process to finish in 13.00 o'clock. This switch on time and heating duration (usually 1-3 hours) depend very much on residual stored energy from previous boiler turnings on and heater 12 power.

Abstract

The method cans be applied in all the standard volumetric storage electric boilers, as it enables the most efficient usage of stored energy. The current control methods foresee the start of the heating process (storage) immediately after turning on and applying voltage to the boiler and to finish in a moment of reaching the maximum temperature defined by its thermal controller. Considerable disadvantage in the case is that between this time and period of hot water consumption there is a long time period usually, when the boiler: (a) - operates in ON/OFF mode, leading to accelerating damaging the thermal controller; (b) radiates irreparably energy in environment; (c) loading useless the energy system. The proposed method resolves these problems as enables the boiler to operate in delay mode, i.e., the heating process to be shifted in time in such manner that one to be independent on the switching on time and to finish in time when the hot water consumption is expected.

Description

ELECTRIC STORAGE BOILERS CONTROL ENABLING DELAYED CHARGING
TECHNICAL FIELD OF THE INVENTION.
The fields of application of this method are the volumetric storage electric boiler production and consumption. BACKCROUND OF THE INVENTION
The high-capacity storage electric boilers produced and offered on our and abroad market, have the following principal functional block-scheme:
Figure imgf000002_0001
The method applied to control their operation is based on the Heater (4) built-in in their structure, heating the water up to desired temperature and powered by electric main through in serial connected a Thermal electric cutout (2) and a Thermal controller (3). The heating process starts in Tx time (Fig.l) in current water temperature tτ, coincident with T2 boiler switch on time and lengthens up to reaching maximum water temperature tm, adjusted by means of the thermal controller. The line "a" is the theoretical heating curve with no thermal losses, and the line "b" is the real curve accounting the thermal losses. The Sx areas are the thermal losses for the Tx-T period. Tp - a time of hot water consumption. Duration of the heating process is variable and it depends on: the heater power; the water temperature within the reservoir in initial heating time;boiler thermal isolating properties; ambient temperature;
On reaching water temperature, defined by the thermal controller, one cuts out the electric power. If after that there is not water consumption from the boiler, a period of lengthening thermal radiating follows and as a result of that the water temperature starts to diminish - the curve "c". Duration of this process depends on the boiler thermal isolating properties, ambient temperature and the thermal controller hysteresis characteristics and it continues up to T4 time where the thermal controller turns on the electric power and a new heating cycle begins - the curve "d", etc. This operation "ON-OFF mode" is valid up to hot water consumption starting time Tp or up to switching power off by the boiler switch. It is very typical for the period from 22.0 to 06.00 o'clock of 24-hour day/night cycle, where the advantage of cheaper night electric power is applied, as also for periods, when the turning off heater by the thermal controller goes before starting the hot water consump- tion time, for instance, when the boiler is being switched on in beginning work time, in order to heat water and then the heated hot water to be consummated immediately after closing work day;
The electric boiler operation in ON/OFF mode posses the following negative sides: a) irreparable energy loss - the thermal radiation in environment is to the highest degree because of water temperature is held up by the thermal controller to values, close to the maximum and in a period when hot water isn't consumed; b) the frequent and unbroken for long periods thermal controller turns on/off damage it quickly too (whereupon cases of boiler explosions are recorded) and the repair-to-repair periods are shorted; c) starting boiler operation more before period where the hot water would be consumed. SUMMARY OF THE INVENTION
The essence of the proposal is consist in that to propose a new method controlling volumetric electric storage boilers operation enabling them to operate in delaying mode. The method is based on the possibility the heating process to be shifted in time in such manner that heating to be independent on switching on time and to finish in time when starting heat water consumption is expected. For implementing this method a controller unit is added-in into the boiler design, which enables: - to watch in-boiler water current temperature in continuous mode;
- to determine time when hot water consumption will start;
- as take for base in-boiler water current temperature, starting heating time to be selected thus that reaching maximum water temperature (i.e., stopping heating process) to synchronize with hot water consumption starting time. In result of the proposed method the principal functional block-scheme acquires the following appearance: 1 2 3 4
Electric power Controller Heater Hot water
Where the heater 3, powered by electric main through con- troller unit 2 heats water up to desired temperature. The essential in this case is that the method, by the controller unit, enables in arbitrary time T2 (Fig.2) wanted later time T to be fixed, which is start of hot water consumption in such manner that the Tx time of start of hot water consumption to start when the time T3 needed for reaching the water temperature defined by the thermal controller to synchronize to the Tn time, when the hot water will start to be consumed. As result of this method, enabling of the storage electric boilers to operate in delay mode, the following advantages are effected: the necessity of boiler operation much before time when hot water would be consumed, and as result en- ergy losses would reduced many times, as result of thermal radiation on environment - for comparison (scaled) hatched area S-L (Fig.l), representing thermal losses of normally operating storage boiler is many times larger than the area S2 (Fig.2), representing thermal losses of storage boiler operating in delay mode. For both figures equal time periods are considered;
Eliminated are the frequent and unbroken for long periods turns thermocontroller ON/OFF after reaching the maximum water temperature, which increases the reliability and prolongs the boiler's "repair-to-repair" periods; The energy system is total relieved, as a positive effect is produced and in so-called "peak hours".
BRIEF DESCRIPTION OF THE DRAWINGS.
As an example for application of the method of control, leading to volumetric storage boiler operation in delay mode, the scheme of Fig.3 could be examined.
EXEMPLARY EMBODIMENTS OF THE INVENTION
A thermocouple 2, feeding data about current water te pera- ture to the adjustable controller 3, is mounted on the boiler's water reservoir 1. The test lamp 4 lights when voltage is applied by switch 8. On display 5 after pressing the timer button 6 the current time is displayed, and after pressing RESET knob 7 the hot water consumption time is displayed. Minute setting but- ton 9 and the hour setting button 10 provide time setting. On display 11 the boiler water current temperature is displayed. For explanation of this method we accept the supposition that today the person X would travel to a neighbour town and he would be returned about 13.00 o'clock on next day, when he needed by hot water. In this case, we, in order to apply this method, leading to storage boiler operation delay mode, we shall execute the following procedures by means of the controller unit (Fig.3) :
The display 5 shall be reset by button 7, and desired time, when hot water would be consumed, shall be adjusted by buttons 9 and 10;
Voltage is applied to the controller by turning on switch 8, then the test light indicator 4 is energized; In this position, the controller doesn't feed voltage to the heater 12; - On the next day only, the controller, receiving by the thermocouple 2 data for boiler water current temperature, shall switch on and apply voltage to the heater in such time that the heating process to finish in 13.00 o'clock. This switch on time and heating duration (usually 1-3 hours) depend very much on residual stored energy from previous boiler turnings on and heater 12 power.

Claims

PATENT CLAIMS
A method for storage volumetric electric boilers operation control enabling them a possibility to operate in delaying mode, that the storage boilers start the heating process right after applying electric voltage and providing the hot water in un- needed time, to can operate in manner featuring with that heating process is shifted in time in relation to boiler switching on time in such manner that independent on this switching on time, one to finish in the moment when hot water consumption is expected.
PCT/BG2001/000012 2000-07-04 2001-07-04 Electric storage boilers control enabling delayed charging WO2002008673A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2001270359A AU2001270359A1 (en) 2000-07-04 2001-07-04 Electric storage boilers control enabling delayed charging

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BG104576A BG104576A (en) 2000-07-04 2000-07-04 Method for controlling the operation of large-size accumulation electric hot water tanks enabling the opportunity of operating them in a mode of delayed action
BG104576 2000-07-04

Publications (1)

Publication Number Publication Date
WO2002008673A1 true WO2002008673A1 (en) 2002-01-31

Family

ID=3928122

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/BG2001/000012 WO2002008673A1 (en) 2000-07-04 2001-07-04 Electric storage boilers control enabling delayed charging

Country Status (3)

Country Link
AU (1) AU2001270359A1 (en)
BG (1) BG104576A (en)
WO (1) WO2002008673A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005076432A1 (en) * 2004-01-11 2005-08-18 Michael Von Seidel Switch and system for controlling electrical loads
WO2008132570A2 (en) * 2007-04-27 2008-11-06 Ariston Thermo S.P.A. Delaying method for the management of water temperature in a storage water heater
CN102186037A (en) * 2011-05-23 2011-09-14 广州视源电子科技有限公司 Startup LOGO replacing method and television

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2465389A1 (en) * 1979-09-14 1981-03-20 Radiotechnique Compelec Delayed switch-on off=peak storage heaters - adjusts input to D=A converter to produce ramp input to circuit for comparison with heater temp. to delay turn-on
EP0084614A1 (en) * 1982-01-23 1983-08-03 DIETER GRÄSSLIN Feinwerktechnik Charging control for electric storage heaters
DE3426905A1 (en) * 1984-07-20 1986-01-30 Stiebel Eltron Gmbh & Co Kg, 3450 Holzminden Electric hot-water storage heater
GB2171539A (en) * 1985-02-22 1986-08-28 Diamond H Controls Ltd Storage heater control apparatus
GB2203861A (en) * 1986-03-26 1988-10-26 Horstmann Gear Group Ltd Electrical heating control

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2465389A1 (en) * 1979-09-14 1981-03-20 Radiotechnique Compelec Delayed switch-on off=peak storage heaters - adjusts input to D=A converter to produce ramp input to circuit for comparison with heater temp. to delay turn-on
EP0084614A1 (en) * 1982-01-23 1983-08-03 DIETER GRÄSSLIN Feinwerktechnik Charging control for electric storage heaters
DE3426905A1 (en) * 1984-07-20 1986-01-30 Stiebel Eltron Gmbh & Co Kg, 3450 Holzminden Electric hot-water storage heater
GB2171539A (en) * 1985-02-22 1986-08-28 Diamond H Controls Ltd Storage heater control apparatus
GB2203861A (en) * 1986-03-26 1988-10-26 Horstmann Gear Group Ltd Electrical heating control

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005076432A1 (en) * 2004-01-11 2005-08-18 Michael Von Seidel Switch and system for controlling electrical loads
WO2005076431A1 (en) * 2004-01-11 2005-08-18 Michael Von Seidel Switching system for controlling electrical loads
US7504749B2 (en) 2004-01-11 2009-03-17 Von Seidel Michael Switch and system for controlling electric loads
WO2008132570A2 (en) * 2007-04-27 2008-11-06 Ariston Thermo S.P.A. Delaying method for the management of water temperature in a storage water heater
WO2008132570A3 (en) * 2007-04-27 2009-02-26 Merloni Termosanitari Spa Delaying method for the management of water temperature in a storage water heater
CN102186037A (en) * 2011-05-23 2011-09-14 广州视源电子科技有限公司 Startup LOGO replacing method and television

Also Published As

Publication number Publication date
BG104576A (en) 2002-01-31
AU2001270359A1 (en) 2002-02-05

Similar Documents

Publication Publication Date Title
CA2366243A1 (en) Proportional band temperature control for one or more heating elements
CA2437023C (en) Radiation thermometer comprising a heated measuring tip
TW308398U (en) Appliance for prepartion of hot drink
CN101276211A (en) Heating control method of electric water heater
CN108477999A (en) A kind of intelligent electric kettle
CN102176852A (en) Toilet seat device
DE69718299D1 (en) ELECTRIC HEATING SYSTEMS
WO2002008673A1 (en) Electric storage boilers control enabling delayed charging
JP2004267370A (en) Facial treatment apparatus
JPH0455626A (en) Electrical cooking device
CN209003586U (en) A kind of intelligent electric kettle
JPH0833236B2 (en) Electric water heater
CN111789473A (en) Cup warming pad, cup warming pad control method and storage medium
JPH02219948A (en) Electrical hot water heater
JPS59138849A (en) Electric water heater
SE8602735D0 (en) CLUTCH DEVICE IN ELECTRONIC HEATERS FOR POWER POWER CONTROL
JPS6243458Y2 (en)
JPS6340175Y2 (en)
JP2615923B2 (en) Electric water heater
JP2650818B2 (en) Heat storage heater
JP2646932B2 (en) Water heater
JPH09264604A (en) Controller for hot-water storage type electric water heater
JPS6030935A (en) Control device for hot water storage type electric water heater
GB2208763A (en) Delayed switch-on device
JP2004317025A (en) Heat pump water heater and its energizing control method

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AT AT AU AZ BA BR BY CA CH CN CZ DE DE DK EE ES FI GB HR HU ID IL IN JP KR KZ LT LV MK MX NO NZ PL PT RO RU SE SG SI SK TR UA US UZ YU ZA

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
ENP Entry into the national phase

Ref document number: 2003133984

Country of ref document: RU

Kind code of ref document: A

Format of ref document f/p: F

NENP Non-entry into the national phase

Ref country code: JP