WO2001063093A1 - Apparatus and method for controlling well fluid sample pressure - Google Patents

Apparatus and method for controlling well fluid sample pressure Download PDF

Info

Publication number
WO2001063093A1
WO2001063093A1 PCT/US2000/023382 US0023382W WO0163093A1 WO 2001063093 A1 WO2001063093 A1 WO 2001063093A1 US 0023382 W US0023382 W US 0023382W WO 0163093 A1 WO0163093 A1 WO 0163093A1
Authority
WO
WIPO (PCT)
Prior art keywords
fluid
sample
pressure
wellbore
piston
Prior art date
Application number
PCT/US2000/023382
Other languages
French (fr)
Inventor
Paul Andrew Reinhardt
Original Assignee
Baker Hughes Incorporated
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from PCT/US2000/004992 external-priority patent/WO2000050736A1/en
Application filed by Baker Hughes Incorporated filed Critical Baker Hughes Incorporated
Priority to CA002401375A priority Critical patent/CA2401375C/en
Priority to DE60041005T priority patent/DE60041005D1/en
Priority to EP00959416A priority patent/EP1257730B1/en
Publication of WO2001063093A1 publication Critical patent/WO2001063093A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells
    • E21B49/10Obtaining fluid samples or testing fluids, in boreholes or wells using side-wall fluid samplers or testers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells
    • E21B49/081Obtaining fluid samples or testing fluids, in boreholes or wells with down-hole means for trapping a fluid sample

Definitions

  • the present invention relates to the art of earth boring and the collection of formation fluid samples from a wellbore. More particularly, the invention relates to methods and apparatus for collecting a deep well formation sample and preserving the in situ constituency of the sample upon surface retrieval.
  • Earth formation fluids in a hydrocarbon producing well typically comprise a mixture of oil, gas, and water.
  • the pressure, temperature and volume of formation fluids control the phase relation of these constituents.
  • high well fluid pressures often entrain gas within the oil above the bubble point pressure.
  • the pressure is reduced, the entrained or dissolved gaseous compounds separate from the liquid phase sample.
  • the accurate measure of pressure, temperature, and formation fluid composition from a particular well affects the commercial interest in producing fluids available from the well.
  • the data also provides information regarding procedures for maximizing the completion and production of the respective hydrocarbon reservoir.
  • United States Patent No. 5,361 ,839 to Griffith et al. (1993) disclosed a transducerfor generating an output representative of fluid sample characteristics downhole in a wellbore.
  • United States Patent No. 5,329,811 to Schultz et al. disclosed an apparatus and method for assessing pressure and volume data for a downhole well fluid sample.
  • United States Patent No. 4,5 83,595 to Czenichow et al. (1986) disclosed a piston actuated mechanism for capturing a well fluid sample.
  • United States Patent No. 4,721 ,157 to Berzin (1988) disclosed a shifting valve sleeve for capturing a well fluid sample in a chamber.
  • United States Patent No. 4,766,955 to Petermann (1988) disclosed a piston engaged with a control valve for capturing a well fluid sample
  • United States Patent No.4,903,765 to Zun el (1990) disclosed a time delayed well fluid sampler.
  • Temperature downhole in a deep wellbore often exceed 300 degrees F.
  • the resulting drop in temperature causes the formation fluid sample to contract.
  • a pressure drop changes in the situ formation fluid parameters, and can permit phase separation between liquids and gases entrained within the formation fluid sample. Phase separation significantly changes the formation fluid characteristics, and reduces the ability to evaluate the actual properties of the formation fluid.
  • the present invention provides an apparatus and method for controlling the pressure of a pressurized wellbore fluid sample collected downhole in an earth boring.
  • the apparatus comprises a housing having a hollow interior.
  • a compound piston within the housing interior defines a fluid sample chamber wherein the piston is moveabie within the housing interior to selectively change the fluid sample chamber volume.
  • the compound piston comprises an outer sleeve and an inner sleeve moveabie relative to the outer sleeve. However, movement of the inner sleeve relative to the outer sleeve is unidirectional.
  • An external pump extracts formation fluid for delivery under pressure into the fluid sample chamber.
  • a positioned opened valve permits pressurized wellbore fluid to move said piston for pressurizing the fluid sample within the fluid sample chamber so that the fluid sample remains pressurized when the fluid sample is moved to the well surface.
  • the method of the invention is practiced by lowering a housing into a wellbore.
  • the compound piston is displaced within the sample chamber by formation fluid delivered by the external pump.
  • a valve is opened to introduce wellbore fluid at hydrostatic wellbore pressure against the piston to move the piston for pressurizing the well fluid sample within the fluid sample chamber.
  • force on a inner sleeve of the compound piston is unbalanced to compress the fluid sample by a volumetric reduction.
  • the reduced volume is secured by mechanically securing the relative positions of the compound piston against the sample chamber.
  • FIG. 1 is a schematic earth section illustrating the invention operating environment
  • FIG. 2 is a schematic of the invention in operative assembly with cooperatively supporting tools
  • FIG. 3 is a schematic of a representative formation fluid extraction and delivery system
  • FIG. 4 is an isometric view of a sampling tank magazine
  • FIG. 5 is an isometric view of the present invention
  • FIG. 6 is an axially sectioned isometric view of the invention
  • FIG. 7 is a sectioned detail of the sample inlet end of the invention
  • FIG.8 is a sectioned detail of the sample chamber portion of the invention assembly
  • FIG.9 is a sectioned detail of the hydrostatic wellbore pressure end of the compound piston
  • FIG. 10 is an axially sectioned isometric view of the invention in the course of receiving a sample of formation fluid;
  • FIG. 11 is a sectioned detail of the compound piston position for wellbore fluid entry;
  • FIG. 12 is a sectioned detail of relative axial displacement between the elements of the compound piston;
  • FIG. 13 is an axially sectioned view of the invention in the course of sample extraction; and, FIG. 14 is an orthographic axial section of the invention.
  • FIG. 1 schematically represents a cross-section of earth 10 along the length of a wellbore penetration 11.
  • the wellbore will be at least partially filled with a mixture of liquids including water, drilling fluid, and formation fluids that are indigenous to the earth formations penetrated by the wellbore.
  • formation fluid hereinafter refers to a specific formation fluid exclusive of any substantial mixture or contamination by fluids not naturally present in the specific formation.
  • formation fluid Suspended within the wellbore 11 at the bottom end of a wireline 12 is a formation fluid sampling tool 20.
  • the wireline 12 is often carried over a pulley 13 supported by a derrick 14. Wireline deployment and retrieval is performed by a powered winch carried by a service truck 15, for example.
  • FIG.2 a preferred embodiment of a sampling tool 20 is schematically illustrated by FIG.2.
  • such sampling tools are a serial assembly of several tool segments that are joined end-to-end by the threaded sleeves of mutual compression unions 23.
  • An assembly of tool segments appropriate for the present invention may include a hydraulic power unit 21 and a formation fluid extractor 23. Below the extractor 23, a large displacement volume motor/pump unit 24 is provided for line purging. Below the large volume pump is a similar motor/pump unit 25 having a smaller displacement volume that is quantitatively monitored as described more expansively with respect to FIG. 3. Ordinarily, one or more tank magazine sections 26 are assembled below the small volume pump. Each magazine section 26 may have three or more fluid sample tanks 30.
  • the formation fluid extractor 22 comprises an extensible suction probe 27 that is opposed by borewall feet 28. Both, the suction probe 27 and the opposing feet 28 are hydraulically extensible to firmly engage the wellbore walls. Construction and operational details of the fluid extraction tool 22 are more expansively described by U.S. Patent No. 5,303,775, the specification of which is incorporated herewith.
  • the constituency of the hydraulic power supply unit 21 comprises an A.C. motor 32 coupled to drive a positive displacement, hydraulic power pump 34.
  • the hydraulic power pump energizes a closed loop hydraulic circuit 36.
  • the hydraulic circuit is controlled, by a solenoid actuated 4- way valve 47, for example, to drive the motor section 42 of an integrated, positive displacement, pump/motor unit 25.
  • the pump portion 44 of the pump/motor unit 25 is monitored by means such as a rod position sensor 46, for example, to report the pump displacement volume.
  • Formation fluid drawn through the suction probe 27, is directed by a solenoid controlled valve 48 to alternate chambers of the pump 44 and to a tank distributor 49.
  • sample volumes of selected formation fluid is extracted directly from respective in situ formations and delivered to designated sample chambers among the several sample tank tools 30.
  • the large volume motor/pump unit 27 is employed to purge the formation fluid flow lines between the suction probe 27 and the small volume pump 25. Since these sub-steps do not require accurate volumetric data, measurement of the pump displacement volume is not required. Otherwise, the motor/pump unit 24 may be substantially the same as motor/pump unit 25 except for the preference that the pump of unit 24 have a greater displacement volume capacity.
  • a representative magazine section 26 is illustrated by FIG. 4 to include a fluted cylinder 50.
  • the cylinder 50 is fabricated to accommodate three or four tanks 30. Each tank 30 is operatively loaded into a respective alcove 52 with a bayonet-stab fit.
  • Two or more cylinders 50 are joined by an internally threaded sleeve 23 that is axially secured to one end of one cylinder but freely rotatable about the cylinder axis.
  • the sleeve 23 is turned upon the external threads of a mating joint boss 52 to draw the boss into a compression sealed juncture therebetween whereby the fluid flow conduits 54 drilled into the end of each boss 52 are continuously sealed across the joint .
  • FIGs. 5, 6 and 7 illustrate each tank 30 as comprising a cylindrical pressure housing 60 that is delineated at opposite ends by cylinder headwalls.
  • the bottom-end headwall comprises a valve sub-assembly 62 having a socket boss 63 and a fluid conduit nipple 66 projecting axially therefrom.
  • a conduit 68 within the nipple 66 is selectively connected by a respective conduit 54 to the tank distributor 49 and, ultimately, to the suction probe 22 of the formation fluid extractor 27. Fluid flow within the conduit 68 is rectified by a check valve 69.
  • Within the valve sub-assembly 62 is a formation fluid flow path 74 between the conduit 68 and a formation fluid reservoir internally of the pressure housing 60.
  • a solenoid actuated shut-off valve 76 is disposed to selectively open and close the channel of flow path 74. As best seen from the isometric detail of FIG. 7, a bleed valve 78 selectively closes a shunt conduit 79 that junctions with the flow path 74.
  • the pressure housing top-end headwall comprises a sub 64 having a fluid inlet conduit 70 that connects the interior bore 80 of the pressure housing 60 with a threaded tubing nipple socket 72.
  • the conduit 70 is a normally open fluid flow path between the interior bore 80 and the in situ wellbore environment.
  • a traveling trap sub-assembly 82 that comprises the coaxial assembly of an inner traveling/locking sleeve 86 within an outer traveling sleeve 84 as shown by FIG.8.
  • a locking piston rod 90 Unitized with the outer traveling sleeve 84 by a retaining bolt 88 as shown by FIG. 9, is a locking piston rod 90.
  • a fluid channel 92 along the length of the rod 90 openly communicates the inner face 96 of a floating piston 94 with the open well bore conduit 70.
  • a mixing ball 99 is placed within the sample (formation fluid) receiving chamber 95 that is geometrically defined as that variable volume within the interior bore 80 of pressure housing 60 between the valve sub- assembly 62 and the end area of the traveling trap sub-assembly 82.
  • a body lock ring 100 having internal barb rings 102 and external barb rings 104 selectively connects the rod 90 to the inner traveling/locking sleeve 86. The selective connection of the barbed lock ring 100 permits the sleeve 86 to move coaxially along the rod 90 from the piston 84 but prohibits any reversal of that movement.
  • Another construction detail of the inner traveling/locking sleeve 86 is the sealed partition 122 between the opposite ends of the sleeve 86.
  • the chamber 124 created between the partition 122 and the piston head 106 of the rod 90 is sealed to the atmospheric pressure present in the chamber at the time of assembly.
  • the body lock ring 100 between the locking piston rod 90 and the inner bore wall of the innertraveling/locking sleeve 86 above the partition 122 does not provide a fluid pressure barrier. Consequently, the chamber 126 between the partition 122 and the body lock ring 100 functions at the same fluid pressure as the wellbore fluid flood chamber 120 when the flood valve 110 is opened..
  • the base of the floating piston/sleeve 84 includes a flood valve 110 having a pintle 112 biased by a spring 114 against a seal seat 116.
  • the pintle includes a stem 118 that projects beyond the end plane of the floating piston /sleeve 84.
  • the pintle 112 is displaced from engagement with the seal seat 116 to admit wellbore fluid into the flood chamber 120 as is illustrated by FIGs. 11 and 12.
  • the flood chamber 120 is geometrically defined as the variable volume bounded by the annular space between the outer perimeter of the rod 90 and the inner bore 85 of the outer traveling sleeve 84.
  • Preparation of the sample tanks 30 prior to downhole deployment includes the closure of bleed valve 78 and the opening of shut-off valve 76. Under the power and control of instrumentation carried by the service truck 15, the sampling tool is located downhole at the desired sample acquisition location.
  • the hydraulic power unit 21 When located, the hydraulic power unit 21 is engaged by remote control from the service truck 15. Hydraulic power from the unit 21 is directed to the formation fluid extractor unit 22 for borewall engagement of the formation fluid suction probe 27 and the borewall feet 28.
  • the suction probe 27 provides an isolated, direct fluid flow channel for substantially pure formation fluid.
  • Such formation fluid flow into the suction probe 27 is first induced by the suction of large volume pump 24 which is driven by the hydraulic power unit 21.
  • the large volume pump 24 is operated for a predetermined period of time to flush the sample distribution conduits of contaminated wellbore fluids with formation fluid drawn through suction probe 27.
  • hydraulic power is switched from the large volume pump 24 to the small volume piston pump 25. Referring to FIG.
  • formation fluid drawn from the suction probe 27 by the pump 25 is shuttled by 4-way valve 48 into successively opposite chambers 44. Simultaneously, the valve 48 directs discharge from the chambers to a multiple port rotary valve 49, for example, which further directs the formation fluid on to the desired sample tank 30.
  • Formation fluid enters the tank 30 through the nipple conduit 68 and is routed past the check valve 69 and along the flow path 74 into the sample receiving chamber 95.
  • the tank shut-off valve 76 was opened before the tank was lowered into the wellbore.
  • Pressure of the pumped formation fluid in the receiving chamber 95 displaces both, the outer traveling sleeve 84 and the inner traveling/locking sleeve 86, against the standing wellbore pressure in the interior bore 80 of pressure housing 60 as shown by FIG. 10.
  • high pressure check valve closes to trap the sample of formation fluid within the sample chamber 30 and passage 32.
  • the base plane of the outer traveling sleeve 84 will engage the inside face of the top sub 64. Thereby, the stem 118 is axially displaced to open the flood valve 110.
  • Internal conduits within the outer traveling sleeve 84 direct wellbore fluid into the flood chamber 120.
  • the wellbore pressure in the flood chamber 120 bears against the inner traveling/locking sleeve 84 over the cross-sectional area of the flood chamber 120 annulus.
  • Opposing the flood chamber force on the traveling/locking sleeve 86 are two pressure sources.
  • One source is the formation fluid pressure in the sample chamber 95 bearing on the annular end section of the traveling/locking sleeve
  • the force balance on the traveling/locking sleeve 86 favors the flood chamber side to press the annular end of the sleeve 86 into the sample chamber 95. Since the liquid formation fluid is substantially incompressible, intrusion of the solid structure of the sleeve 86 annulus into the sample chamber volume exponentially increases the pressure in the sample chamber until a final force equilibrium is achieved. Nevertheless, at the pressures of this environment, measurable liquid compression may be achieved.
  • a down hole fluid sample can have a hydrostatic wellbore pressure of 10,000 psi.
  • the typical compressibility for such a fluid is 5X10" 6 so that a volume decrease of only eight percent would raise the fluid sample pressure by 16,000 psi to 26,000 psi, for a boost ratio os 2.6 to 1.0.
  • the formation fluid sample temperature will cool, thereby returning the formation fluid sample pressure toward the original pressure of 10,000 psi.
  • the resulting 200° drop in temperature will lower the fluid sample pressure by approximately 15,300 psi in a fixed volume, thereby resulting in a surface fluid sample pressure of approximately 10,700 psi.
  • inner traveling/locking sleeve 86 is fixed relative to outer traveling sleeve 84 during retrieval of the magazine 26.
  • the invention accomplishes the fixed relationship by means of the body lock ring 100.
  • This mechanism permits additional boost to be added to the formation fluid sample pressure within the sample chamber 95 as a proportionality of the in situ wellbore pressure.
  • the magazine section 26 may subsequently be lowered to additional depths within a wellbore 11 where the hydrostatic pressure is greater than a prior sample extraction.
  • the hydrostatic wellbore pressure increase is transmitted through flood valve 112 into flood chamber 120 to further move the innertraveling/locking sleeve 86 and to further compress the formation fluid sample within the sample chamber 95 to a greater pressure.
  • Such pressure boost con be accomplished quickly and magazine 26 removed to the surface of wellbore 11 before a significant amount of heat from the additional wellbore depth is transferred to the previously collected formation fluid sample.
  • tank shut-off valve 76 is closed to trap the formation fluid sample. Thereafter, bleed valve 78 may be opened to relieve the fluid pressure in the flow passage between tank shut-off valve 76 and the high pressure check valve 69. This pressure release provides a positive indication of fluid pressure and facilitates removal of a tank 30 from a magazine 26.
  • Fig. 13 illustrates one technique for removing the formation fluid sample under pressure from within fluid sample chamber 95.
  • Tank 30 is connected to a pressure source 130 engaged with aperture 132 through top sub 64. Pressure from the pressure source 130 is introduced until the inverse of the boost ratio times the expected pressure within fluid sample chamber 95 is reached. For a fluid sample pressure of 10,000 psi, the extraction pressure required would be:
  • shut-off valve 76 is cracked open and the formation fluid sample is permitted to pass through passage 74 into an attached receiver line 140.
  • the reverse boost pressure can be increased to displace the collected formation fluid sample until the sleeve edge of the inner traveling/locking sleeve 86 bottoms out against the valve sub 62.
  • Continued extraction fluid from the pressure source 130 displaces the outer traveling sleeve 84 relative to the inner sleeve 86.
  • the piston head 106 engages the floating piston 94 to sweep most of the formation fluid sample from the chamber
  • tank 30 permits multiple tanks 30 to be lowered in the same operation so that different zones within wellbore 11 can be sampled.
  • Each tank can be selectively operated to collect different samples at different pressures and to compress each sample to different rates exceeding the bubble point for gas within the sample. Operating costs are significantly reduced because less rig time is required to sample multiple zones.
  • the invention prevents the pressure within each fluid sample from being reduced below the bubble point therefore delivering each fluid sample to the wellbore surface in substantially the same pressure state as the downhole sampling state. The invention accomplishes this function without requiring expanding gases, large springs and complicated mechanical systems.
  • the fluid sample is collected under pressure and additional pressure is added with a force exerted by the downhole hydrostatic pressure.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

An apparatus and method for maintaining the pressure of a well fluid sample as the sample is transported to the well surface from a downhole wellbore location. The invention collects a formation fluid sample under pressure. The fluid sample is further pressurized with a traveling piston powered by the hydrostatic wellbore pressure. The pressurized formation fluid sample is contained under high pressure within a fixed volume chamber for retrieval to the well surface. Multiple collection tanks can be lowered into the wellbore during the same run to sample different zones with minimal rig time. The tanks can be emptied at the well surface with an evacuation pressure so that the fluid sample pressure is maintained above a selected pressure at all times.

Description

Title: APPARATUS AND METHOD FOR CONTROLLING
WELL FLUID SAMPLE PRESSURE
BACKGROUND OF THE INVENTION
FIELD OF THE INVENTION
The present invention relates to the art of earth boring and the collection of formation fluid samples from a wellbore. More particularly, the invention relates to methods and apparatus for collecting a deep well formation sample and preserving the in situ constituency of the sample upon surface retrieval.
DESCRIPTION OF RELATED ART
Earth formation fluids in a hydrocarbon producing well typically comprise a mixture of oil, gas, and water. The pressure, temperature and volume of formation fluids control the phase relation of these constituents. In a subsurface formation, high well fluid pressures often entrain gas within the oil above the bubble point pressure. When the pressure is reduced, the entrained or dissolved gaseous compounds separate from the liquid phase sample. The accurate measure of pressure, temperature, and formation fluid composition from a particular well affects the commercial interest in producing fluids available from the well. The data also provides information regarding procedures for maximizing the completion and production of the respective hydrocarbon reservoir.
Certain techniques analyze the well fluids downhole in the wellbore. United States Patent No. 5,361 ,839 to Griffith et al. (1993) disclosed a transducerfor generating an output representative of fluid sample characteristics downhole in a wellbore. United States Patent No. 5,329,811 to Schultz et al. (I 994) disclosed an apparatus and method for assessing pressure and volume data for a downhole well fluid sample.
Other techniques capture a well fluid sample for retrieval to the surface. United States Patent No. 4,5 83,595 to Czenichow et al. (1986) disclosed a piston actuated mechanism for capturing a well fluid sample. United States Patent No. 4,721 ,157 to Berzin (1988) disclosed a shifting valve sleeve for capturing a well fluid sample in a chamber. United States Patent No. 4,766,955 to Petermann (1988) disclosed a piston engaged with a control valve for capturing a well fluid sample, and United States Patent No.4,903,765 to Zun el (1990) disclosed a time delayed well fluid sampler. United States Patent No.
5,009,100 to Gruber et al. (1991) disclosed a wireline sampler for collecting a well fluid sample from a selected wellbore depth, United States Patent No. 5,240,072 to Schultz et al. (1993) disclosed a multiple sample annulus pressure responsive sampler for permitting well fluid sample collection at different time and depth intervals, and United States Patent No. 5,322, 120 to Be et al. (1994) disclosed an electrically actuated hydraulic system for collecting well fluid samples deep in a wellbore.
Temperature downhole in a deep wellbore often exceed 300 degrees F. When a hot formation fluid sample is retrieved to the surface at 70 degrees F, the resulting drop in temperature causes the formation fluid sample to contract.
If the volume of the sample is unchanged, such contraction substantially reduces the sample pressure. A pressure drop changes in the situ formation fluid parameters, and can permit phase separation between liquids and gases entrained within the formation fluid sample. Phase separation significantly changes the formation fluid characteristics, and reduces the ability to evaluate the actual properties of the formation fluid.
To overcome this limitation, various techniques have been developed to maintain pressure of the formation fluid sample. United States Patent No. 5,337,822 to Massie et al. (1994) pressurized a formation fluid sample with a hydraulically driven piston powered by a high pressure gas. Similarly, United
States Patent No. 5,662,166 to Shammai (1997) used a pressurized gas to charge the formation fluid sample. United States Patent Nos. 5,303,775 (1994) and 5,377,755 (1995) to Michaels et al. disclosed a bi-directional, positive displacement pump for increasing the formation fluid sample pressure above the bubble point so that subsequent cooling did not reduce the fluid pressure below the bubble point. Existing techniques for maintaining the sample formation pressure are limited by many factors. Pretension or compression springs are not suitable because the required compression forces require extremely large springs. Shear mechanisms are inflexible and do not easily permit multiple sample gathering at different locations within the wellbore. Gas charges can lead to explosive decompression of seals and sample contamination. Gas pressurization systems require complicated systems including tanks, valves and regulators which are expensive, occupy space in the narrow confines of a wellbore, and require maintenance and repair. Electrical or hydraulic pumps require surface control and have similar limitations.
Accordingly, there is a need for an improved system capable of compensating for hydrostatic wellbore pressure loss so that a formation fluid sample can be retrieved to the well surface at substantially the original formation pressure. The system should be reliable and should be capable of collecting the samples from the different locations within a wellbore.
SUMMARY OF THE INVENTION
The present invention provides an apparatus and method for controlling the pressure of a pressurized wellbore fluid sample collected downhole in an earth boring. The apparatus comprises a housing having a hollow interior. A compound piston within the housing interior defines a fluid sample chamber wherein the piston is moveabie within the housing interior to selectively change the fluid sample chamber volume. The compound piston comprises an outer sleeve and an inner sleeve moveabie relative to the outer sleeve. However, movement of the inner sleeve relative to the outer sleeve is unidirectional. An external pump extracts formation fluid for delivery under pressure into the fluid sample chamber. A positioned opened valve permits pressurized wellbore fluid to move said piston for pressurizing the fluid sample within the fluid sample chamber so that the fluid sample remains pressurized when the fluid sample is moved to the well surface. The method of the invention is practiced by lowering a housing into a wellbore. The compound piston is displaced within the sample chamber by formation fluid delivered by the external pump. When the sample chamber has filled, a valve is opened to introduce wellbore fluid at hydrostatic wellbore pressure against the piston to move the piston for pressurizing the well fluid sample within the fluid sample chamber. By means of piston area differential, force on a inner sleeve of the compound piston is unbalanced to compress the fluid sample by a volumetric reduction. The reduced volume is secured by mechanically securing the relative positions of the compound piston against the sample chamber.
BRIEF DESCRIPTION OF THE DRAWINGS The advantages and further aspects of the invention will be readily appreciated by those of ordinary skill in the art as the same becomes better understood by reference to the following detailed description when considered in conjunction with the accompanying drawings in which:
FIG. 1 is a schematic earth section illustrating the invention operating environment;
FIG. 2 is a schematic of the invention in operative assembly with cooperatively supporting tools;
FIG. 3 is a schematic of a representative formation fluid extraction and delivery system; FIG. 4 is an isometric view of a sampling tank magazine;
FIG. 5 is an isometric view of the present invention; FIG. 6 is an axially sectioned isometric view of the invention; FIG. 7 is a sectioned detail of the sample inlet end of the invention; FIG.8 is a sectioned detail of the sample chamber portion of the invention assembly;
FIG.9 is a sectioned detail of the hydrostatic wellbore pressure end of the compound piston;
FIG. 10 is an axially sectioned isometric view of the invention in the course of receiving a sample of formation fluid; FIG. 11 is a sectioned detail of the compound piston position for wellbore fluid entry; FIG. 12 is a sectioned detail of relative axial displacement between the elements of the compound piston;
FIG. 13 is an axially sectioned view of the invention in the course of sample extraction; and, FIG. 14 is an orthographic axial section of the invention.
DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 schematically represents a cross-section of earth 10 along the length of a wellbore penetration 11. Usually, the wellbore will be at least partially filled with a mixture of liquids including water, drilling fluid, and formation fluids that are indigenous to the earth formations penetrated by the wellbore.
Hereinafter, such fluid mixtures are referred to as "wellbore fluids". The term "formation fluid" hereinafter refers to a specific formation fluid exclusive of any substantial mixture or contamination by fluids not naturally present in the specific formation. Suspended within the wellbore 11 at the bottom end of a wireline 12 is a formation fluid sampling tool 20. The wireline 12 is often carried over a pulley 13 supported by a derrick 14. Wireline deployment and retrieval is performed by a powered winch carried by a service truck 15, for example.
Pursuant to the present invention, a preferred embodiment of a sampling tool 20 is schematically illustrated by FIG.2. Preferably, such sampling tools are a serial assembly of several tool segments that are joined end-to-end by the threaded sleeves of mutual compression unions 23. An assembly of tool segments appropriate for the present invention may include a hydraulic power unit 21 and a formation fluid extractor 23. Below the extractor 23, a large displacement volume motor/pump unit 24 is provided for line purging. Below the large volume pump is a similar motor/pump unit 25 having a smaller displacement volume that is quantitatively monitored as described more expansively with respect to FIG. 3. Ordinarily, one or more tank magazine sections 26 are assembled below the small volume pump. Each magazine section 26 may have three or more fluid sample tanks 30. The formation fluid extractor 22 comprises an extensible suction probe 27 that is opposed by borewall feet 28. Both, the suction probe 27 and the opposing feet 28 are hydraulically extensible to firmly engage the wellbore walls. Construction and operational details of the fluid extraction tool 22 are more expansively described by U.S. Patent No. 5,303,775, the specification of which is incorporated herewith.
Operation of the tool is fundamentally powered by electricity delivered from the service truck 15 along the wireline 12 to the hydraulic power supply unit 21. With respect to FIG. 3, the constituency of the hydraulic power supply unit 21 comprises an A.C. motor 32 coupled to drive a positive displacement, hydraulic power pump 34. The hydraulic power pump energizes a closed loop hydraulic circuit 36. The hydraulic circuit is controlled, by a solenoid actuated 4- way valve 47, for example, to drive the motor section 42 of an integrated, positive displacement, pump/motor unit 25. The pump portion 44 of the pump/motor unit 25 is monitored by means such as a rod position sensor 46, for example, to report the pump displacement volume. Formation fluid drawn through the suction probe 27, is directed by a solenoid controlled valve 48 to alternate chambers of the pump 44 and to a tank distributor 49. By this route, sample volumes of selected formation fluid is extracted directly from respective in situ formations and delivered to designated sample chambers among the several sample tank tools 30.
As sub-steps in the formation fluid extraction procedure of the present invention, the large volume motor/pump unit 27 is employed to purge the formation fluid flow lines between the suction probe 27 and the small volume pump 25. Since these sub-steps do not require accurate volumetric data, measurement of the pump displacement volume is not required. Otherwise, the motor/pump unit 24 may be substantially the same as motor/pump unit 25 except for the preference that the pump of unit 24 have a greater displacement volume capacity. A representative magazine section 26 is illustrated by FIG. 4 to include a fluted cylinder 50. Preferably, the cylinder 50 is fabricated to accommodate three or four tanks 30. Each tank 30 is operatively loaded into a respective alcove 52 with a bayonet-stab fit. Two or more cylinders 50 are joined by an internally threaded sleeve 23 that is axially secured to one end of one cylinder but freely rotatable about the cylinder axis. The sleeve 23 is turned upon the external threads of a mating joint boss 52 to draw the boss into a compression sealed juncture therebetween whereby the fluid flow conduits 54 drilled into the end of each boss 52 are continuously sealed across the joint .
FIGs. 5, 6 and 7 illustrate each tank 30 as comprising a cylindrical pressure housing 60 that is delineated at opposite ends by cylinder headwalls. The bottom-end headwall comprises a valve sub-assembly 62 having a socket boss 63 and a fluid conduit nipple 66 projecting axially therefrom. A conduit 68 within the nipple 66 is selectively connected by a respective conduit 54 to the tank distributor 49 and, ultimately, to the suction probe 22 of the formation fluid extractor 27. Fluid flow within the conduit 68 is rectified by a check valve 69. Within the valve sub-assembly 62 is a formation fluid flow path 74 between the conduit 68 and a formation fluid reservoir internally of the pressure housing 60.
A solenoid actuated shut-off valve 76 is disposed to selectively open and close the channel of flow path 74. As best seen from the isometric detail of FIG. 7, a bleed valve 78 selectively closes a shunt conduit 79 that junctions with the flow path 74. Referring again to the axial half-section of FIG. 6, the pressure housing top-end headwall comprises a sub 64 having a fluid inlet conduit 70 that connects the interior bore 80 of the pressure housing 60 with a threaded tubing nipple socket 72. The conduit 70 is a normally open fluid flow path between the interior bore 80 and the in situ wellbore environment. Within the interior bore 80 of the pressure housing 60 is a traveling trap sub-assembly 82 that comprises the coaxial assembly of an inner traveling/locking sleeve 86 within an outer traveling sleeve 84 as shown by FIG.8. Unitized with the outer traveling sleeve 84 by a retaining bolt 88 as shown by FIG. 9, is a locking piston rod 90. A fluid channel 92 along the length of the rod 90 openly communicates the inner face 96 of a floating piston 94 with the open well bore conduit 70. The floating piston
94 is axially confined within the inner bore of the inner traveling/locking sleeve 86 by a retaining ring 98. A mixing ball 99 is placed within the sample (formation fluid) receiving chamber 95 that is geometrically defined as that variable volume within the interior bore 80 of pressure housing 60 between the valve sub- assembly 62 and the end area of the traveling trap sub-assembly 82. A body lock ring 100 having internal barb rings 102 and external barb rings 104 selectively connects the rod 90 to the inner traveling/locking sleeve 86. The selective connection of the barbed lock ring 100 permits the sleeve 86 to move coaxially along the rod 90 from the piston 84 but prohibits any reversal of that movement. Another construction detail of the inner traveling/locking sleeve 86 is the sealed partition 122 between the opposite ends of the sleeve 86. The chamber 124 created between the partition 122 and the piston head 106 of the rod 90 is sealed to the atmospheric pressure present in the chamber at the time of assembly. The body lock ring 100 between the locking piston rod 90 and the inner bore wall of the innertraveling/locking sleeve 86 above the partition 122 does not provide a fluid pressure barrier. Consequently, the chamber 126 between the partition 122 and the body lock ring 100 functions at the same fluid pressure as the wellbore fluid flood chamber 120 when the flood valve 110 is opened.. Still with respect to FIG.9, the base of the floating piston/sleeve 84 includes a flood valve 110 having a pintle 112 biased by a spring 114 against a seal seat 116. The pintle includes a stem 118 that projects beyond the end plane of the floating piston /sleeve 84. When the end plane of the floating piston/sleeve 84 is pressed against the inner face of the top sub 64 (FIG. 11), the pintle 112 is displaced from engagement with the seal seat 116 to admit wellbore fluid into the flood chamber 120 as is illustrated by FIGs. 11 and 12. The flood chamber 120 is geometrically defined as the variable volume bounded by the annular space between the outer perimeter of the rod 90 and the inner bore 85 of the outer traveling sleeve 84. OPERATION
Preparation of the sample tanks 30 prior to downhole deployment includes the closure of bleed valve 78 and the opening of shut-off valve 76. Under the power and control of instrumentation carried by the service truck 15, the sampling tool is located downhole at the desired sample acquisition location.
When located, the hydraulic power unit 21 is engaged by remote control from the service truck 15. Hydraulic power from the unit 21 is directed to the formation fluid extractor unit 22 for borewall engagement of the formation fluid suction probe 27 and the borewall feet 28. The suction probe 27 provides an isolated, direct fluid flow channel for substantially pure formation fluid. Such formation fluid flow into the suction probe 27 is first induced by the suction of large volume pump 24 which is driven by the hydraulic power unit 21. The large volume pump 24 is operated for a predetermined period of time to flush the sample distribution conduits of contaminated wellbore fluids with formation fluid drawn through suction probe 27. When the predetermined line flushing interval has concluded, hydraulic power is switched from the large volume pump 24 to the small volume piston pump 25. Referring to FIG. 3, formation fluid drawn from the suction probe 27 by the pump 25 is shuttled by 4-way valve 48 into successively opposite chambers 44. Simultaneously, the valve 48 directs discharge from the chambers to a multiple port rotary valve 49, for example, which further directs the formation fluid on to the desired sample tank 30.
Formation fluid enters the tank 30 through the nipple conduit 68 and is routed past the check valve 69 and along the flow path 74 into the sample receiving chamber 95. The tank shut-off valve 76 was opened before the tank was lowered into the wellbore. Pressure of the pumped formation fluid in the receiving chamber 95 displaces both, the outer traveling sleeve 84 and the inner traveling/locking sleeve 86, against the standing wellbore pressure in the interior bore 80 of pressure housing 60 as shown by FIG. 10. When the pressure of the formation fluid sample within the formation fluid sample chamber 95 reaches the boost pressure limit of pump 25, high pressure check valve closes to trap the sample of formation fluid within the sample chamber 30 and passage 32. Also, when the sample receiving chamber 95 is full, the base plane of the outer traveling sleeve 84 will engage the inside face of the top sub 64. Thereby, the stem 118 is axially displaced to open the flood valve 110. Internal conduits within the outer traveling sleeve 84 direct wellbore fluid into the flood chamber 120. The wellbore pressure in the flood chamber 120 bears against the inner traveling/locking sleeve 84 over the cross-sectional area of the flood chamber 120 annulus.
Opposing the flood chamber force on the traveling/locking sleeve 86 are two pressure sources. One source is the formation fluid pressure in the sample chamber 95 bearing on the annular end section of the traveling/locking sleeve
86 as was provided by the small volume pump unit 25. The other pressure opposing the flood chamber pressure is the closed atmosphere chamber 124 acting on the area of the annular partition 122. Initially, the force balance on the traveling/locking sleeve 86 favors the flood chamber side to press the annular end of the sleeve 86 into the sample chamber 95. Since the liquid formation fluid is substantially incompressible, intrusion of the solid structure of the sleeve 86 annulus into the sample chamber volume exponentially increases the pressure in the sample chamber until a final force equilibrium is achieved. Nevertheless, at the pressures of this environment, measurable liquid compression may be achieved.
This axial movement of the innertraveling/locking sleeve 86 relative to the outer sleeve 84 also translates to the piston rod 90 which is secured to the outer sleeve 84 via the retaining bolt 88. Consequently, the sleeve 86 partition 122 is displaced toward the piston head 106 to compress the gaseous atmosphere of chamber 124 thereby adding to the equilibrium forces.
Due to the internal and external barb rings 102 and 104 respective to the body lock ring 100, movement of the piston 90 relative to the inner traveling sleeve 86 is rectified to maintain this volumetric invasion of the structure 86 into the sample chamber volume. By compressing the volume of the formation fluid sample, the fluid sample pressure is greatly above the wellbore pressure. Although this greatly increased in situ pressure declines when the confined formation sample is removed from the wellbore, the operative components may be designed so that when the collected formation sample is removed from the well, the sample pressure does not decline below the bubble point of entrained or dissolved gas. Movement of the inner traveling/locking sleeve 86 further compresses the collected formation fluid sample above the boost capability of the pump 25. Such compression continues until the desired boost ratio is accomplished.
For example, a down hole fluid sample can have a hydrostatic wellbore pressure of 10,000 psi. The typical compressibility for such a fluid is 5X10"6 so that a volume decrease of only eight percent would raise the fluid sample pressure by 16,000 psi to 26,000 psi, for a boost ratio os 2.6 to 1.0. When the magazine section 26 and the collected formation fluid sample is raised to the surface of wellbore 11 , the formation fluid sample temperature will cool, thereby returning the formation fluid sample pressure toward the original pressure of 10,000 psi. If the downhole fluid temperature is 270 °F and the wellbore 11 surface temperature is 70°F, the resulting 200° drop in temperature will lower the fluid sample pressure by approximately 15,300 psi in a fixed volume, thereby resulting in a surface fluid sample pressure of approximately 10,700 psi.
To hold the volume of fluid sample chamber 95 constant as the magazine 26 is removed from the wellbore 11, inner traveling/locking sleeve 86 is fixed relative to outer traveling sleeve 84 during retrieval of the magazine 26. The invention accomplishes the fixed relationship by means of the body lock ring 100. This mechanism permits additional boost to be added to the formation fluid sample pressure within the sample chamber 95 as a proportionality of the in situ wellbore pressure. For example, the magazine section 26 may subsequently be lowered to additional depths within a wellbore 11 where the hydrostatic pressure is greater than a prior sample extraction. The hydrostatic wellbore pressure increase is transmitted through flood valve 112 into flood chamber 120 to further move the innertraveling/locking sleeve 86 and to further compress the formation fluid sample within the sample chamber 95 to a greater pressure. Such pressure boost con be accomplished quickly and magazine 26 removed to the surface of wellbore 11 before a significant amount of heat from the additional wellbore depth is transferred to the previously collected formation fluid sample. At the surface of wellbore 11, tank shut-off valve 76 is closed to trap the formation fluid sample. Thereafter, bleed valve 78 may be opened to relieve the fluid pressure in the flow passage between tank shut-off valve 76 and the high pressure check valve 69. This pressure release provides a positive indication of fluid pressure and facilitates removal of a tank 30 from a magazine 26.
Fig. 13 illustrates one technique for removing the formation fluid sample under pressure from within fluid sample chamber 95. Tank 30 is connected to a pressure source 130 engaged with aperture 132 through top sub 64. Pressure from the pressure source 130 is introduced until the inverse of the boost ratio times the expected pressure within fluid sample chamber 95 is reached. For a fluid sample pressure of 10,000 psi, the extraction pressure required would be:
1/2.6 X 10,000 = 3,850 psi After the inverse boost ratio is reached, shut-off valve 76 is cracked open and the formation fluid sample is permitted to pass through passage 74 into an attached receiver line 140. The reverse boost pressure can be increased to displace the collected formation fluid sample until the sleeve edge of the inner traveling/locking sleeve 86 bottoms out against the valve sub 62. Continued extraction fluid from the pressure source 130 displaces the outer traveling sleeve 84 relative to the inner sleeve 86. Hence, the piston head 106 engages the floating piston 94 to sweep most of the formation fluid sample from the chamber
95. The only volume within the chamber 95 not removed by the extraction pressure is found in an annular space between the outer traveling sleeve 84 and the valve sub 62. The components of tank 30 can be dissembled and reset for another use. In summary, the invention permits multiple tanks 30 to be lowered in the same operation so that different zones within wellbore 11 can be sampled. Each tank can be selectively operated to collect different samples at different pressures and to compress each sample to different rates exceeding the bubble point for gas within the sample. Operating costs are significantly reduced because less rig time is required to sample multiple zones. The invention prevents the pressure within each fluid sample from being reduced below the bubble point therefore delivering each fluid sample to the wellbore surface in substantially the same pressure state as the downhole sampling state. The invention accomplishes this function without requiring expanding gases, large springs and complicated mechanical systems. The fluid sample is collected under pressure and additional pressure is added with a force exerted by the downhole hydrostatic pressure.
Although the invention has been described in terms of certain preferred embodiments, it will become apparent to those of ordinary skill in the art that modifications and improvements can be made to the inventive concepts herein without departing form the scope of the invention. The embodiments shown herein are merely illustrative of the inventive concepts and should not be interpreted as limiting the scope of the invention.

Claims

1. An apparatus for controlling the pressure of a pressurized wellbore fluid sample collected downhole in a well, comprising: a housing having a hollow interior; a piston within said housing interior for defining a fluid sample chamber, wherein said piston is moveabie within said housing interior to selectively change said fluid sample chamber volume; a pump for introducing a fluid sample under pressure into said fluid sample chamber; and a valve for permitting pressurized wellbore fluid to move said piston, wherein said piston movement pressurizes the fluid sample within said fluid sample chamber so that the fluid sample remains pressurized when the fluid sample is moved to the well surface.
2. An apparatus as recited in Claim 1 , further comprising a check valve engaged between said pump and said fluid sample chamber for preventing said piston from forcing the fluid sample toward said pump.
3. An apparatus as recited in Claim 1 , wherein said valve is attached to said piston.
4. An apparatus as recited in Claim 1, further comprising a tank shut-off valve engaged between said pump and said fluid sample chamber for selectively permitting said fluid sample chamber to be pressure isolated from said pump
5. An apparatus as recited in Claim 1 , further comprising a lock for retaining said piston fixed relative to said housing to maintain the volume of said fluid sample chamber.
6. An apparatus as recited in Claim 1 , wherein said piston includes an outer sleeve and an inner sleeve moveabie relative to said outer sleeve, and wherein said valve is capable of permitting the pressurized wellbore fluid to contact said inner sleeve for moving said inner sleeve relative to said outer sleeve to pressurized the fluid sample.
7. An apparatus as recited in Claim 6, further comprising a lock for retaining said inner sleeve fixed relative to said outer sleeve to maintain the volume of said fluid sample chamber.
8. An apparatus as recited in Claim 6, further comprising a flood chamber between said inner sleeve and said outer sleeve for receiving the pressurized wellbore fluid so that the fluid exerts a differential pressure against said inner sleeve to move said inner sleeve relative to said outer sleeve.
9. An apparatus as recited in Claim 8, further comprising an atmospheric chamber between said inner sleeve and said outer sleeve which initially has a pressure lower than the hydrostatic pressure and which is reduced in volume as said inner sleeve moves relative to said outer sleeve.
10. An apparatus as recited in Claim 1, further comprising a second piston engaged with said housing to define a second fluid sample chamber and engaged with said pump and said valve for selectively pressurizing a fluid sample to a different pressure than the fluid pressure within the other fluid sample chamber.
11. An apparatus for controlling the pressure of a pressurized wellbore fluid sample collected downhole in a well, comprising: a housing having a hollow interior; a piston within said housing interior for defining a fluid sample chamber, wherein said piston is moveabie within said housing interior to selectively change said fluid sample chamber volume, and wherein said piston comprises an outer sleeve and an inner sleeve moveabie relative to said outer sleeve; a pump for introducing a fluid sample under pressure into said fluid sample chamber; retainer means for retaining said piston outer sleeve relative to said housing; and a valve for selectively permitting pressurized wellbore fluid to move said piston inner sleeve relative to said piston outer sleeve so that fluid in said fluid sample chamber is compressed.
12. An apparatus as recited in Claim 11 , further comprising a valve for selectively blocking fluid communication between said pump and said fluid sample chamber.
13. An apparatus as recited in Claim 12, wherein said valve comprises a check valve.
14. An apparatus as recited in Claim 11 , further comprising a lock for retaining said piston inner sleeve stationary relative to said housing.
15. A method for controlling the pressure of a pressurized well fluid sample from a wellbore, comprising : lowering a housing into the wellbore, wherein said housing has a piston within a hollow interior of said housing which is moveabie to define a fluid sample chamber; pumping well fluid into said fluid sample chamber to collect a well fluid sample; operating a valve to introduce well fluid at a downhole hydrostatic pressure into contact with said piston to move said piston for pressurizing the well fluid sample within said fluid sample chamber; retaining the well fluid sample within said fluid sample chamber as said piston moves to compress the well fluid sample within said fluid sample chamber; locking said piston relative to said housing to fix the volume of well fluid sample within said fluid sample chamber when the well fluid reaches a selected pressure above the downhole hydrostatic pressure; and, withdrawing said housing to the well surface.
16. A method as recited in Claim 15, further comprising the step of removing the well fluid sample from said fluid sample chamber while maintaining the pressure of the well fluid sample above a selected pressure.
17. A method as recited in Claim 15, further comprising the step of moving said housing to another location within the wellbore after said piston is locked relative to said housing, and further comprising the steps of pumping a second well fluid sample into a second well fluid chamber, of operating said valve to move a second piston to compress the second fluid sample, and of locking said piston relative to the said housing to fix the volume of the second fluid sample.
18. A method as recited in Claim 17, wherein said second pressure compresses the second fluid sample to a pressure greater gm the pressure of the other fluid sample.
19. A method as recited in Claim 15, further comprising the step of lowing said housing within the wellbore so that a greater hydrostatic fluid pressure moves said piston to further compress the well fluid sample before said housing is withdrawn to the well surface.
20. A method as recited in Claim 15, wherein said piston compresses the well fluid sample to a pressure so that the well fluid sample does not change phase when said housing is withdrawn to the well surface.
21. A process for transferring a sample of earth formation fluid from a downhole production depth to a wellbore surface, said process comprising: (a) lowering a unitized assembly of downhole tools into a wellbore, said assembly including a formation fluid extraction tool, a formation fluid sample retrieval tank and a surface controlled pump for selectively charging said sample retrieval tank with formation fluid; (b) positioning said fluid extraction tool at a first wellbore depth; (c) extracting formation fluid at said first wellbore depth; (d) charging a first sample volume in said sample retrieval tank with a corresponding volume of the first depth formation fluid; (e) applying in situ wellbore pressure to an element of said sample retrieval tank to reduce the first sample volume of said first sample tank to a second sample volume less that said first sample volume without displacement of fluid from said sample retrieval tank whereby the first sample volume of first depth formation fluid is compressed to a pressure substantially greater than said in situ wellbore pressure; (f) structurally securing said second sample volume; and, (g) retrieving the downhole tool assembly to the wellbore surface.
22. A process as described by claim 21 wherein said downhole tool assembly includes a second sample retrieval tank and said process further comprises: (a) repositioning said formation extraction tool to a second wellbore depth prior to surface retrieval of said tool assembly; (b) extracting formation fluid at said second wellbore depth; (c) charging a first sample volume of said second sample retrieval tank with second depth formation fluid; (d) applying said second in situ wellbore pressure to an element of said second sample retrieval tank to reduce the first sample volume thereof to a second sample volume less than said first sample volume without displacement of fluid from said second sample retrieval tank whereby the first sample volume of second depth formation fluid is compressed to a pressure substantially greater than said second in situ wellbore pressure; and, (e) structurally securing said second enclosed volume of said second sample retrieval tank.
23. A process as described by claim 21 wherein said structural component of said sample retrieval tank is provided less effective pressure area within said first enclosed volume than effective pressure area receiving said wellbore pressure.
24. A process for extracting a sample of earth formation fluid comprising: (a) preparing a sample retrieval tank with a variable volume sample chamber; (b) placing said sample retrieval tank in a wellbore; (c) filling, in situ, a first volume of said sample chamber with a first volume of formation fluid; (d) applying in situ wellbore pressure against a structural component of said sample retrieval tank to reduce said sample chamber to a second volume less than said first volume without displacement of fluid from said sample chamber whereby said formation fluid therein is compressed to a pressure substantially greaterthan said in situ wellbore pressure; (e) securing the second volume position of said structural component; and, (f) removing said sample retrieval tank from said wellbore.
25. A process as described by claim 24 wherein said structural component is a moveabie partition between in situ wellbore fluid and formation fluid within said sample chamber.
26. A process as described by claim 24 wherein the in situ wellbore pressure applied against said structural component displaces said component into said sample chamber to reduce the chamber volume thereof.
27. A process as described by claim 26 wherein said in situ wellbore fluid bears upon a greater area of said structural component than formation fluid within said sample chamber.
28. An apparatus for retrieving a sample of earth formation fluid from a wellbore comprising: (a) a cylinder having a moveabie piston therein to define a variable volume sample chamber, said piston having relatively moveabie first and second pressure bearing elements, each of said pressure bearing elements having respective sample chamber pressure bearing areas and wellbore pressure bearing areas wherein the wellbore pressure bearing area of said second pressure bearing element is greater than the sample chamber pressure bearing area of said second pressure bearing element; (b) a pump for extracting fluid from an earth formation and for discharge of said fluid through a transfer conduit into said sample chamber; (c) a first valve in said transfer conduit for preventing fluid flow reversal from said sample chamber; (d) a second valve for admitting wellbore fluid against the wellbore pressure area of said second pressure bearing element, said second valve being positioned on said first pressure bearing element and operable by arrival of said first pressure bearing element at a position corresponding to a maximum sample chamber volume.
29. An apparatus as described by claim 28 wherein said first and second pressure bearing elements include coaxially moveabie first and second sleeve members, respectively, the second sleeve member being moveabie within the first sleeve member.
30. An apparatus as described by claim 29 wherein said first and second sleeve members have mutually engaged barb members to rectify relative displacement between said sleeve members.
31. An apparatus as described by claim 30 wherein the wellbore pressure bearing area of said first pressure bearing element comprises a substantially continuous piston face across one end of said first sleeve member, said valve being disposed within said piston face.
32. An apparatus as described by claim 29 wherein said cylinder is terminated at opposite ends by respective end walls whereby said variable volume sample chamber is expanded by displacement of said piston along said cylinder toward a first end wall.
33. An apparatus as described by claim 32 wherein said second valve is positioned on said first sleeve member to be opened by proximity of said piston with said first cylinder end wall.
34. An apparatus as described by claim 33 wherein said second valve admits wellbore fluid between said first and second sleeve members to axially displace said second sleeve member relative to said first sleeve member.
35. An apparatus as described by claim 34 wherein said first and second sleeve members include a cooperative displacement rectifier whereby the displacement of said second sleeve member relative to said first sleeve member is unidirectional.
PCT/US2000/023382 2000-02-25 2000-08-25 Apparatus and method for controlling well fluid sample pressure WO2001063093A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CA002401375A CA2401375C (en) 2000-02-25 2000-08-25 Apparatus and method for controlling well fluid sample pressure
DE60041005T DE60041005D1 (en) 2000-02-25 2000-08-25 METHOD AND DEVICE FOR CONTROLLING THE PRESSURE OF A FORMATING LIQUID IN THE BOREOLE
EP00959416A EP1257730B1 (en) 2000-02-25 2000-08-25 Apparatus and method for controlling well fluid sample pressure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PCT/US2000/004992 WO2000050736A1 (en) 1999-02-25 2000-02-25 Apparatus and method for controlling well fluid sample pressure
USPCT/US00/04992 2000-02-25

Publications (1)

Publication Number Publication Date
WO2001063093A1 true WO2001063093A1 (en) 2001-08-30

Family

ID=21741094

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2000/023382 WO2001063093A1 (en) 2000-02-25 2000-08-25 Apparatus and method for controlling well fluid sample pressure

Country Status (5)

Country Link
EP (1) EP1257730B1 (en)
CA (1) CA2401375C (en)
DE (1) DE60041005D1 (en)
RU (1) RU2244123C2 (en)
WO (1) WO2001063093A1 (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1427912A2 (en) * 2001-09-19 2004-06-16 Baker Hughes Incorporated Dual piston single phase sampling mechanism and procedure
EP1799959A2 (en) * 2004-10-13 2007-06-27 Baker Hughes Incorporated A method and apparatus for storing energy and multiplying force to pressurize a downhole fluid sample
EP1860278A1 (en) * 2006-05-23 2007-11-28 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
US7367394B2 (en) 2005-12-19 2008-05-06 Schlumberger Technology Corporation Formation evaluation while drilling
WO2008151000A1 (en) * 2007-06-04 2008-12-11 Baker Hughes Incorporated Downhole pressure chamber and method of making same
US7472589B2 (en) 2005-11-07 2009-01-06 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
US7546885B2 (en) 2005-05-19 2009-06-16 Schlumberger Technology Corporation Apparatus and method for obtaining downhole samples
US7565835B2 (en) 2004-11-17 2009-07-28 Schlumberger Technology Corporation Method and apparatus for balanced pressure sampling
US7874206B2 (en) 2005-11-07 2011-01-25 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
US7967067B2 (en) 2008-11-13 2011-06-28 Halliburton Energy Services, Inc. Coiled tubing deployed single phase fluid sampling apparatus
US8429961B2 (en) 2005-11-07 2013-04-30 Halliburton Energy Services, Inc. Wireline conveyed single phase fluid sampling apparatus and method for use of same
US8993957B2 (en) 2009-05-20 2015-03-31 Halliburton Energy Services, Inc. Downhole sensor tool for nuclear measurements
US9097100B2 (en) 2009-05-20 2015-08-04 Halliburton Energy Services, Inc. Downhole sensor tool with a sealed sensor outsert
US9429014B2 (en) 2010-09-29 2016-08-30 Schlumberger Technology Corporation Formation fluid sample container apparatus
WO2024118835A1 (en) * 2022-12-02 2024-06-06 Saudi Arabian Oil Company Subsurface sampling tool

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7634936B2 (en) * 2006-02-17 2009-12-22 Uti Limited Partnership Method and system for sampling dissolved gas
RU2490451C1 (en) * 2012-02-28 2013-08-20 Андрей Александрович Павлов Method for downhole sample control
US10294783B2 (en) 2012-10-23 2019-05-21 Halliburton Energy Services, Inc. Selectable size sampling apparatus, systems, and methods
UA115371U (en) * 2016-11-17 2017-04-10 A GLASS SENSOR

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4583595A (en) 1983-12-22 1986-04-22 Schlumberger Technology Corp. Method and apparatus for obtaining fluid samples in a well
US4721157A (en) 1986-05-12 1988-01-26 Baker Oil Tools, Inc. Fluid sampling apparatus
US4766955A (en) 1987-04-10 1988-08-30 Atlantic Richfield Company Wellbore fluid sampling apparatus
US4903765A (en) 1989-01-06 1990-02-27 Halliburton Company Delayed opening fluid sampler
US5009100A (en) 1988-11-17 1991-04-23 Western Atlas International, Inc. Down hole reservoir fluid sampler
US5240072A (en) 1991-09-24 1993-08-31 Halliburton Company Multiple sample annulus pressure responsive sampler
US5303775A (en) 1992-11-16 1994-04-19 Western Atlas International, Inc. Method and apparatus for acquiring and processing subsurface samples of connate fluid
US5322120A (en) 1991-05-03 1994-06-21 Norsk Hydro A.S. Electro hydraulic deep well sampling assembly
US5329811A (en) 1993-02-04 1994-07-19 Halliburton Company Downhole fluid property measurement tool
US5337822A (en) 1990-02-15 1994-08-16 Massie Keith J Well fluid sampling tool
US5361839A (en) 1993-03-24 1994-11-08 Schlumberger Technology Corporation Full bore sampler including inlet and outlet ports flanking an annular sample chamber and parameter sensor and memory apparatus disposed in said sample chamber
US5377755A (en) 1992-11-16 1995-01-03 Western Atlas International, Inc. Method and apparatus for acquiring and processing subsurface samples of connate fluid
US5473939A (en) * 1992-06-19 1995-12-12 Western Atlas International, Inc. Method and apparatus for pressure, volume, and temperature measurement and characterization of subsurface formations
WO1996012088A1 (en) * 1994-10-14 1996-04-25 Oilphase Sampling Services Limited Well fluid sampling tool and well fluid sampling method
US5609205A (en) * 1992-01-07 1997-03-11 Massie; Keith J. Well fluid sampling tool
US5662166A (en) 1995-10-23 1997-09-02 Shammai; Houman M. Apparatus for maintaining at least bottom hole pressure of a fluid sample upon retrieval from an earth bore
EP0903464A2 (en) * 1997-09-23 1999-03-24 Halliburton Energy Services, Inc. Well fluid sampling apparatus

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4583595A (en) 1983-12-22 1986-04-22 Schlumberger Technology Corp. Method and apparatus for obtaining fluid samples in a well
US4721157A (en) 1986-05-12 1988-01-26 Baker Oil Tools, Inc. Fluid sampling apparatus
US4766955A (en) 1987-04-10 1988-08-30 Atlantic Richfield Company Wellbore fluid sampling apparatus
US5009100A (en) 1988-11-17 1991-04-23 Western Atlas International, Inc. Down hole reservoir fluid sampler
US4903765A (en) 1989-01-06 1990-02-27 Halliburton Company Delayed opening fluid sampler
US5337822A (en) 1990-02-15 1994-08-16 Massie Keith J Well fluid sampling tool
US5322120A (en) 1991-05-03 1994-06-21 Norsk Hydro A.S. Electro hydraulic deep well sampling assembly
US5240072A (en) 1991-09-24 1993-08-31 Halliburton Company Multiple sample annulus pressure responsive sampler
US5609205A (en) * 1992-01-07 1997-03-11 Massie; Keith J. Well fluid sampling tool
US5473939A (en) * 1992-06-19 1995-12-12 Western Atlas International, Inc. Method and apparatus for pressure, volume, and temperature measurement and characterization of subsurface formations
US5377755A (en) 1992-11-16 1995-01-03 Western Atlas International, Inc. Method and apparatus for acquiring and processing subsurface samples of connate fluid
US5303775A (en) 1992-11-16 1994-04-19 Western Atlas International, Inc. Method and apparatus for acquiring and processing subsurface samples of connate fluid
US5329811A (en) 1993-02-04 1994-07-19 Halliburton Company Downhole fluid property measurement tool
US5361839A (en) 1993-03-24 1994-11-08 Schlumberger Technology Corporation Full bore sampler including inlet and outlet ports flanking an annular sample chamber and parameter sensor and memory apparatus disposed in said sample chamber
WO1996012088A1 (en) * 1994-10-14 1996-04-25 Oilphase Sampling Services Limited Well fluid sampling tool and well fluid sampling method
US5662166A (en) 1995-10-23 1997-09-02 Shammai; Houman M. Apparatus for maintaining at least bottom hole pressure of a fluid sample upon retrieval from an earth bore
EP0903464A2 (en) * 1997-09-23 1999-03-24 Halliburton Energy Services, Inc. Well fluid sampling apparatus

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7621325B2 (en) 2001-09-19 2009-11-24 Baker Hughes Incorporated Dual piston, single phase sampling mechanism and procedure
EP1427912A4 (en) * 2001-09-19 2005-11-02 Baker Hughes Inc Dual piston single phase sampling mechanism and procedure
US7246664B2 (en) 2001-09-19 2007-07-24 Baker Hughes Incorporated Dual piston, single phase sampling mechanism and procedure
EP1427912A2 (en) * 2001-09-19 2004-06-16 Baker Hughes Incorporated Dual piston single phase sampling mechanism and procedure
EP1799959A2 (en) * 2004-10-13 2007-06-27 Baker Hughes Incorporated A method and apparatus for storing energy and multiplying force to pressurize a downhole fluid sample
NO338773B1 (en) * 2004-10-13 2016-10-17 Baker Hughes Inc Method and apparatus for printing a downhole sample
EP1799959A4 (en) * 2004-10-13 2013-03-20 Baker Hughes Inc A method and apparatus for storing energy and multiplying force to pressurize a downhole fluid sample
US7913554B2 (en) 2004-11-17 2011-03-29 Schlumberger Technology Corporation Method and apparatus for balanced pressure sampling
US7565835B2 (en) 2004-11-17 2009-07-28 Schlumberger Technology Corporation Method and apparatus for balanced pressure sampling
US7546885B2 (en) 2005-05-19 2009-06-16 Schlumberger Technology Corporation Apparatus and method for obtaining downhole samples
US7966876B2 (en) 2005-11-07 2011-06-28 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
US7950277B2 (en) 2005-11-07 2011-05-31 Halliburton Energy Services, Inc. Apparatus for actuating a pressure delivery system of a fluid sampler
US7673506B2 (en) 2005-11-07 2010-03-09 Halliburton Energy Services, Inc. Apparatus and method for actuating a pressure delivery system of a fluid sampler
US7762130B2 (en) 2005-11-07 2010-07-27 Halliburton Energy Services, Inc. Sampling chamber for a single phase fluid sampling apparatus
US7856872B2 (en) 2005-11-07 2010-12-28 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
US7874206B2 (en) 2005-11-07 2011-01-25 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
US7472589B2 (en) 2005-11-07 2009-01-06 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
US7926342B2 (en) 2005-11-07 2011-04-19 Halliburton Energy Services, Inc. Apparatus for actuating a pressure delivery system of a fluid sampler
US7946166B2 (en) 2005-11-07 2011-05-24 Halliburton Energy Services, Inc. Method for actuating a pressure delivery system of a fluid sampler
US8429961B2 (en) 2005-11-07 2013-04-30 Halliburton Energy Services, Inc. Wireline conveyed single phase fluid sampling apparatus and method for use of same
US7596995B2 (en) 2005-11-07 2009-10-06 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
US8056625B2 (en) 2005-12-19 2011-11-15 Schlumberger Technology Corporation Formation evaluation while drilling
US8118097B2 (en) 2005-12-19 2012-02-21 Schlumberger Technology Corporation Formation evaluation while drilling
US10711603B2 (en) 2005-12-19 2020-07-14 Schlumberger Technology Corporation Formation evaluation while drilling
US8636064B2 (en) 2005-12-19 2014-01-28 Schlumberger Technology Corporation Formation evaluation while drilling
US7367394B2 (en) 2005-12-19 2008-05-06 Schlumberger Technology Corporation Formation evaluation while drilling
EP2267271A3 (en) * 2006-05-23 2017-04-12 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
EP1860278A1 (en) * 2006-05-23 2007-11-28 Halliburton Energy Services, Inc. Single phase fluid sampling apparatus and method for use of same
US8210267B2 (en) 2007-06-04 2012-07-03 Baker Hughes Incorporated Downhole pressure chamber and method of making same
WO2008151000A1 (en) * 2007-06-04 2008-12-11 Baker Hughes Incorporated Downhole pressure chamber and method of making same
US8215390B2 (en) 2008-11-13 2012-07-10 Halliburton Energy Services, Inc. Coiled tubing deployed single phase fluid sampling apparatus and method for use of same
US8215391B2 (en) 2008-11-13 2012-07-10 Halliburton Energy Services, Inc. Coiled tubing deployed single phase fluid sampling apparatus and method for use of same
US8146660B2 (en) 2008-11-13 2012-04-03 Halliburton Energy Services, Inc. Coiled tubing deployed single phase fluid sampling apparatus and method for use of same
US7967067B2 (en) 2008-11-13 2011-06-28 Halliburton Energy Services, Inc. Coiled tubing deployed single phase fluid sampling apparatus
US8993957B2 (en) 2009-05-20 2015-03-31 Halliburton Energy Services, Inc. Downhole sensor tool for nuclear measurements
US9097100B2 (en) 2009-05-20 2015-08-04 Halliburton Energy Services, Inc. Downhole sensor tool with a sealed sensor outsert
US10280735B2 (en) 2009-05-20 2019-05-07 Halliburton Energy Services, Inc. Downhole sensor tool with a sealed sensor outsert
US9429014B2 (en) 2010-09-29 2016-08-30 Schlumberger Technology Corporation Formation fluid sample container apparatus
US10458232B2 (en) 2010-09-29 2019-10-29 Schlumberger Technology Corporation Formation fluid sample container apparatus
WO2024118835A1 (en) * 2022-12-02 2024-06-06 Saudi Arabian Oil Company Subsurface sampling tool

Also Published As

Publication number Publication date
EP1257730B1 (en) 2008-12-03
RU2244123C2 (en) 2005-01-10
DE60041005D1 (en) 2009-01-15
RU2002125501A (en) 2004-03-10
EP1257730A1 (en) 2002-11-20
CA2401375A1 (en) 2001-08-30
CA2401375C (en) 2007-01-23

Similar Documents

Publication Publication Date Title
US6439307B1 (en) Apparatus and method for controlling well fluid sample pressure
US6557632B2 (en) Method and apparatus to provide miniature formation fluid sample
CA2401375C (en) Apparatus and method for controlling well fluid sample pressure
CA2460831C (en) Dual piston single phase sampling mechanism and procedure
RU2363846C2 (en) Downhole tool for reservoir testing
AU739721B2 (en) Non-flashing downhole fluid sampler and method
US6527052B2 (en) Methods of downhole testing subterranean formations and associated apparatus therefor
CA2147027C (en) Method and apparatus for acquiring and processing subsurface samples of connate fluid
US4766955A (en) Wellbore fluid sampling apparatus
US7258167B2 (en) Method and apparatus for storing energy and multiplying force to pressurize a downhole fluid sample
EP0347050B1 (en) Tubing conveyed downhole sampler
CN101424170A (en) Coring tool, core convey assembly and core convey method
US7066281B2 (en) Formation fluid sampling and hydraulic testing tool and packer assembly therefor
US4595060A (en) Downhole tool with compressible well fluid chamber
CN104838089A (en) Pressurized fluid sampler for monitoring geological storage of gas
US4617999A (en) Downhole tool with compression chamber
US20130220594A1 (en) Tube-in-tube device useful for subsurface fluid sampling and operating other wellbore devices
AU2014225914A1 (en) Sample chamber assembly and methods
RU2078924C1 (en) Formation tester
EP0183482B1 (en) Downhole tool
CA1335877C (en) Apparatus and method for testing a well

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): CA ID KG RU UA UZ

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2401375

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2000959416

Country of ref document: EP

ENP Entry into the national phase

Ref country code: RU

Ref document number: 2002 2002125501

Kind code of ref document: A

Format of ref document f/p: F

WWP Wipo information: published in national office

Ref document number: 2000959416

Country of ref document: EP