WO2001025596A1 - Procede de traitement de la couche productrice dans la zone du fond de trou, packer correspondant et procede et fixation du packer dans un fond de trou - Google Patents
Procede de traitement de la couche productrice dans la zone du fond de trou, packer correspondant et procede et fixation du packer dans un fond de trou Download PDFInfo
- Publication number
- WO2001025596A1 WO2001025596A1 PCT/RU2000/000402 RU0000402W WO0125596A1 WO 2001025596 A1 WO2001025596 A1 WO 2001025596A1 RU 0000402 W RU0000402 W RU 0000402W WO 0125596 A1 WO0125596 A1 WO 0125596A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- pack
- well
- liquid
- temperature
- fact
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 48
- 238000012545 processing Methods 0.000 title claims abstract description 13
- 238000004519 manufacturing process Methods 0.000 title abstract description 10
- 239000007788 liquid Substances 0.000 claims abstract description 45
- 239000000725 suspension Substances 0.000 claims abstract description 10
- 239000012530 fluid Substances 0.000 claims description 40
- 238000010438 heat treatment Methods 0.000 claims description 26
- 238000001816 cooling Methods 0.000 claims description 11
- 239000000463 material Substances 0.000 claims description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 7
- 230000007423 decrease Effects 0.000 claims description 6
- 238000009825 accumulation Methods 0.000 claims description 5
- 238000009835 boiling Methods 0.000 claims description 4
- 238000004880 explosion Methods 0.000 claims description 2
- 210000004072 lung Anatomy 0.000 claims 1
- 239000007789 gas Substances 0.000 description 15
- 239000003921 oil Substances 0.000 description 14
- 230000000694 effects Effects 0.000 description 8
- RTAQQCXQSZGOHL-UHFFFAOYSA-N Titanium Chemical compound [Ti] RTAQQCXQSZGOHL-UHFFFAOYSA-N 0.000 description 6
- 230000008569 process Effects 0.000 description 6
- 239000010936 titanium Substances 0.000 description 6
- 229910052719 titanium Inorganic materials 0.000 description 6
- 238000002485 combustion reaction Methods 0.000 description 5
- 238000000605 extraction Methods 0.000 description 5
- 238000007789 sealing Methods 0.000 description 5
- 230000015572 biosynthetic process Effects 0.000 description 4
- 229910052751 metal Inorganic materials 0.000 description 4
- 239000002184 metal Substances 0.000 description 4
- 239000000203 mixture Substances 0.000 description 4
- 230000009467 reduction Effects 0.000 description 4
- UHOVQNZJYSORNB-UHFFFAOYSA-N Benzene Chemical compound C1=CC=CC=C1 UHOVQNZJYSORNB-UHFFFAOYSA-N 0.000 description 3
- 229910045601 alloy Inorganic materials 0.000 description 3
- 239000000956 alloy Substances 0.000 description 3
- 238000005422 blasting Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 238000005056 compaction Methods 0.000 description 3
- 239000000470 constituent Substances 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000001914 filtration Methods 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- 239000012528 membrane Substances 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- PXHVJJICTQNCMI-UHFFFAOYSA-N Nickel Chemical compound [Ni] PXHVJJICTQNCMI-UHFFFAOYSA-N 0.000 description 2
- 238000007792 addition Methods 0.000 description 2
- 239000000654 additive Substances 0.000 description 2
- 238000005275 alloying Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 230000001627 detrimental effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 239000002360 explosive Substances 0.000 description 2
- 235000013305 food Nutrition 0.000 description 2
- 238000011835 investigation Methods 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 208000036993 Frustration Diseases 0.000 description 1
- 229910001060 Gray iron Inorganic materials 0.000 description 1
- 229910000990 Ni alloy Inorganic materials 0.000 description 1
- 238000001467 acupuncture Methods 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 239000012223 aqueous fraction Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 235000019504 cigarettes Nutrition 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000010779 crude oil Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005485 electric heating Methods 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 238000011049 filling Methods 0.000 description 1
- 239000000295 fuel oil Substances 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 239000007943 implant Substances 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000011068 loading method Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 229910052759 nickel Inorganic materials 0.000 description 1
- 239000007800 oxidant agent Substances 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- -1 paraffins Substances 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 230000002028 premature Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
- 238000005382 thermal cycling Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 230000008016 vaporization Effects 0.000 description 1
- 239000006200 vaporizer Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
- 230000036642 wellbeing Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/126—Packers; Plugs with fluid-pressure-operated elastic cup or skirt
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B36/00—Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
Definitions
- the main disadvantage of the system is the possibility of its use in a narrow area - there is a risk of high-speed and high-frequency stress
- the described method is used in a practical implementation, since it is often discharged from the batteries due to the unsatisfactory heating
- the size of the metal system is chosen from the supply of their equipment, as well as their accessory to the area.
- ⁇ ⁇ aches ⁇ ve medlenn ⁇ g ⁇ yascheg ⁇ is ⁇ chni ⁇ a ⁇ e ⁇ miches ⁇ g ⁇ v ⁇ zdeys ⁇ viya is ⁇ lzuyu ⁇ is ⁇ chni ⁇ ⁇ e ⁇ m ⁇ gaz ⁇ v ⁇ g ⁇ or ⁇ e ⁇ m ⁇ gaza ⁇ imiches ⁇ g ⁇ v ⁇ zdeys ⁇ viya, ⁇ l ⁇ s ⁇ s ⁇ start combustion ⁇ g ⁇ ⁇ as ⁇ lagayu ⁇ below nizhni ⁇ ⁇ e ⁇ atsi ⁇ nny ⁇ ⁇ ve ⁇ s ⁇ y ⁇ b ⁇ aba ⁇ yvaem ⁇ g ⁇ in ⁇ e ⁇ vala 5-15% eg ⁇ length and ⁇ sle a ⁇ umuli ⁇ vaniya ⁇ e ⁇ la in ⁇ b ⁇ aba ⁇ yvaem ⁇ m in ⁇ e ⁇ vale ⁇ izv ⁇ dya ⁇
- SIGNIFICANT FOX (DR. 26) 2 was being processed.
- the cost of this method is its high occupancy and cost associated with the use of salable aggregates.
- SIGNIFICANT FOX (DR. 26) 3 on the inside of the machined area, install a removable capacitance with a membrane. Then dissolve this membrane, as a result of which it is created
- the closest analogue to the technical essence and the achievable effect are the means of processing the well borehole at a distance of 683. ⁇ 21 ⁇ 43 / 25, ⁇ publ. in BI Zh23, 1997, including the removal of deep-water treatment with a charge from a slow burning
- 25 is ⁇ chni ⁇ a ⁇ e ⁇ miches ⁇ g ⁇ v ⁇ zdeys ⁇ viya, ⁇ sledneg ⁇ combustion ⁇ b ⁇ aba ⁇ yvaem ⁇ m in ⁇ e ⁇ vale, ⁇ e ⁇ n ⁇ l ⁇ giches ⁇ uyu vyde ⁇ zh ⁇ u for a ⁇ umuli ⁇ vaniya ⁇ e ⁇ la in ⁇ b ⁇ aba ⁇ yvaem ⁇ m in ⁇ e ⁇ vale, de ⁇ essi ⁇ nn ⁇ e v ⁇ zdeys ⁇ vie and removing chas ⁇ i s ⁇ vazhinn ⁇ y zhid ⁇ s ⁇ i with ⁇ s ⁇ u ⁇ ivshimi it ⁇ i de ⁇ essi ⁇ nn ⁇ m v ⁇ zdeys ⁇ vii of ⁇ izab ⁇ yn ⁇ y z ⁇ ny ⁇ lma ⁇ i ⁇ uyuschimi elemen ⁇ ami.
- the consumptions of this method are: a) the complexity of the implementation associated with the displacement of the equipment along with the equipment being processed; b) the duration of the process associated with the displacement of equipment and process supplies for replacement in the processed gas processing unit of the well; c) small deviations from the borehole, which are at a very low temperature (there is no reason to ignore the neglect of this All of these drawbacks reduce the efficiency of the use of the utilized method.
- P ⁇ i e ⁇ m ⁇ a ⁇ e ⁇ ⁇ zhu ⁇ m is equipped with ⁇ adialnymi ⁇ analami, us ⁇ an ⁇ vlennym over u ⁇ l ⁇ ni ⁇ elnym elemen ⁇ m, ⁇ b ⁇ azuyuschim with ⁇ us ⁇ m ⁇ ame ⁇ u in ⁇ y us ⁇ an ⁇ vlena ⁇ d ⁇ uzhinennaya sh ⁇ utse ⁇ naya v ⁇ ul ⁇ a and communications za ⁇ ubn ⁇ g ⁇ nad ⁇ a ⁇ e ⁇ n ⁇ g ⁇ ⁇ s ⁇ ans ⁇ va with vnu ⁇ i ⁇ ubnym ⁇ susches ⁇ vlyae ⁇ sya che ⁇ ez ⁇ anal sh ⁇ utse ⁇ n ⁇ y v ⁇ ul ⁇ i.
- SIGNIFICANT FOX (DR. 26) 5 a hard disk connected to it has been installed, which is a part of the main ring road. and with a sealing element, a switch is installed which is a part of the entire chamber, which communicates with the koltsev territory, and is internally disconnected.
- the product is intended for liquid handling, and it cannot be used for medical use.
- a cheaply known product is the low reliability of its operation due to the possible clogging of the channels “a” and “b” and the area of “ ⁇ ” and the part of the city Otherwise, the cross-section of the central channel of the compressor is reduced due to the centrally-located open circuit, the end of the circuit and the compressor
- the cost of the devices used is the inadequate use of it when it is blown up, since there is no contact with the product.
- SIGNIFICANT FOX (DR. 26) 6 ⁇ ⁇ 571581.
- the internal plates are equipped with ends, which are located in an elastic cuff and are rigidly connected with external plates.
- the lower turnaround of the pack is performed by a flat one, passing into a medical one. then get into the flat and medical.
- the most convenient way of the wedge is the wedge “karman”.
- SIGNIFICANT FOX (DR. 26) 7 By returning to the home, the elastic cuff is returned to its original location for special purposes. The described method is unavailable for using two devices to fix the hole and disconnect, which complicates the installation.
- a disadvantageous method is the impossibility of installing a device with a high downhole bore. Otherwise, the use of two devices for fixation and disconnection makes it difficult to operate the device and use it.
- the closest analogue to the technical essence and the achievable effect is the method of fixing the tool in the borehole, implemented in the machine. testimonial. ⁇ ⁇ 304345, ⁇ l. ⁇ 21vZZ / 12, ⁇ publ. in BI Zh17, 1971, which is included in the radial deformation of the sealing ring element due to its high pressure compression by hydraulic pressure. pumped into the well.
- SIGNIFICANT FOX (DR. 26) 8 the pressure is reduced and the reliability is improved in the borehole due to the temporary disengagement and increased tension between the vessels.
- SIGNIFICANT FOX (DR. 26) 9 I left one of the constituent lightweight fractions of the net.
- SIGNIFICANT FOX 10 ⁇ réelle ⁇ formulate ⁇
- ⁇ su ⁇ s ⁇ vie " ⁇ a ⁇ man ⁇ v” is ⁇ lyuchae ⁇ ⁇ azge ⁇ me ⁇ izatsiyu ⁇ a ⁇ e ⁇ a (b ⁇ lee ⁇ g ⁇ , uluchshae ⁇ ge ⁇ me ⁇ izatsiyu) and being ⁇ azha ⁇ elem, na ⁇ avlyae ⁇ vz ⁇ yvnuyu v ⁇ lnu vd ⁇ l ⁇ si s ⁇ vazhiny in na ⁇ avlenii ⁇ du ⁇ ivn ⁇ g ⁇ ⁇ las ⁇ a, ch ⁇ ⁇ vyshae ⁇ e ⁇ e ⁇ ivn ⁇ s ⁇ ⁇ b ⁇ ab ⁇ i ⁇ du ⁇ ivn ⁇ g ⁇ ⁇ las ⁇ a in ⁇ izab ⁇ yn ⁇ y z ⁇ ne s ⁇ vazhiny
- This type of packaging is the easiest to make and blow. By directing a blast wave along an integral well, it ensures its self-compaction.
- Such a design of the compressor increases the efficiency of its compaction and the direction of the explosive wave along the integral borehole. Because the lower end face of the borehole at the borehole has a longer length and is more smoothly transitions into a cylindrical one.
- the feasible thermal element of the pack is executed in the form of a screw.
- a good way of working with the device is to ensure that there is a good heating effect on it, which eliminates the need for energy saving.
- the feasible thermal element of the pack is performed in the form of an electric spiral connected to the source of the current. This type of product is the most convenient for manufacturing and allows you to heat up the components of the machine a lot.
- the feasible thermal element of the pack is designed as a cooling thermopair. Such an operation of the device eliminates the need for sustained energy flow through the well bore (energy is used
- SIGNIFICANT FOX (DR. 26) 12 only when removing it from the well or installing it in the well).
- ⁇ a ⁇ ⁇ a ⁇ ⁇ bes ⁇ echivae ⁇ nadezhn ⁇ s ⁇ eg ⁇ ⁇ i ⁇ satsii is zavisim ⁇ s ⁇ i ⁇ diame ⁇ a s ⁇ vazhiny and manzhe ⁇ y - u ⁇ l ⁇ ni ⁇ elya ⁇ a ⁇ e ⁇ a
- the diameter of the borehole has a different value at different places at a depth.
- the other side Thanks to its easy-to-use operation, it ensures a reliable fixation to the borehole and the connection. and also free extraction from the well. ⁇ how to fix the pack in the borehole.
- v ⁇ lyuchayuschem eg ⁇ s ⁇ us ⁇ in s ⁇ vazhinu on ⁇ ebuemuyu depth increase diame ⁇ aln ⁇ g ⁇ ⁇ azme ⁇ a ⁇ a ⁇ e ⁇ a and de ⁇ matsiyu in ⁇ adialn ⁇ m na ⁇ avlenii eg ⁇ manzhe ⁇ y - u ⁇ l ⁇ ni ⁇ elya, s ⁇ glasn ⁇ ⁇ e ⁇ niches ⁇ mu ⁇ esheniyu, ⁇ a ⁇ e ⁇ ⁇ dve ⁇ gayu ⁇ ⁇ em ⁇ e ⁇ a ⁇ u ⁇ n ⁇ mu v ⁇ zdeys ⁇ viyu, ⁇ lichn ⁇ mu ⁇ ⁇ em ⁇ e ⁇ a ⁇ u ⁇ y s ⁇ vazhinn ⁇ y zhid ⁇ s ⁇ i in mes ⁇ e eg ⁇ us ⁇ an ⁇ v ⁇ i.
- SIGNIFICANT FOX (DR. 26) 13 Borehole fluid temperatures.
- ⁇ s ⁇ vazhinu ( ⁇ bsadnuyu ⁇ ubu) 1 is ⁇ lzuya s ⁇ eds ⁇ v ⁇ ⁇ dves ⁇ i ( ⁇ s or ⁇ ubu) 2 ⁇ us ⁇ ayu ⁇ in ⁇ izab ⁇ ynuyu z ⁇ nu nag ⁇ eva ⁇ elny elemen ⁇ 3 ( ⁇ ig. 1) ⁇ y m ⁇ zhe ⁇ ime ⁇ any ⁇ ns ⁇ u ⁇ tsiyu and ⁇ intsi ⁇ deys ⁇ viya ⁇ g ⁇ ⁇ sn ⁇ van on lyub ⁇ m ⁇ iziches ⁇ m or ⁇ imiches ⁇ m phenomenon. ⁇ note ⁇ . for example.
- SIGNIFICANT FOX (DR. 26) 15 Due ⁇ vysheniya ⁇ em ⁇ e ⁇ a ⁇ u ⁇ y ⁇ is ⁇ di ⁇ ⁇ bemn ⁇ e ⁇ asshi ⁇ enie zhid ⁇ s ⁇ i in ⁇ izab ⁇ yn ⁇ y ⁇ ame ⁇ e 6 ch ⁇ ⁇ ed ⁇ edelyae ⁇ v ⁇ zni ⁇ n ⁇ venie ⁇ a zhid ⁇ s ⁇ i in s ⁇ nu zab ⁇ ya s ⁇ vazhiny 1 and sled ⁇ va ⁇ eln ⁇ and ⁇ du ⁇ ivny ⁇ las ⁇ ( ⁇ ig. 3).
- the minimum flow rate of the product will be in case that the cooling unit is in the absence of a waste of the product. However, this operation may be accelerated.
- cooler 7 (fig. 5). It is advisable to cool the cooler 7 and the heating element 3 to the pack 4 from the bottom and to lower them into the well 1 at a time.
- the cooler 7 can be operated at any operating principle: mechanically, when the well 1 is at a standstill, it is necessary to turn off the cold water; electric, when used for cooling thermostats, or chemical, using expanding gases.
- SIGNIFICANT FOX (DR. 26) 16 and the development of new things. Cases are known. When the product is treated with a free liquid zone with the use of an imperfection, the product is inaccessible due to inadvertent failure. Occasionally, well 1, operated by mechanized methods, are transferred to operators.
- the partial pressure in the normal chamber 6 is generated only by the light vapor fractions. If heated higher, you will experience partial pressure from light fractions, water and heavy oil fractions. Correspondingly, the total gas pressure is not chemically compatible with each other, as well as the sum of the partial pressures of these gases (long range).
- the temperature of the heating can be lowered, and, moreover, the severity of severe (viscous) frustrations is At any temperature, the liquid that does not go into steam will increase its volume and thereby ensure that the product is free of charge. However, this component will be less than the impact
- SIGNIFICANT FOX (DR. 26) 17 of the pressure of the steam or other oil and water fractions.
- P ⁇ i is ⁇ lz ⁇ vanii ⁇ i ⁇ e ⁇ niches ⁇ i ⁇ za ⁇ yad ⁇ v bude ⁇ nablyuda ⁇ sya z ⁇ nalny ⁇ g ⁇ ev
- SIGNIFICANT FOX (DR. 26) 18 u ⁇ avleniya s ⁇ e ⁇ enyu ⁇ g ⁇ eva zhid ⁇ s ⁇ i in ⁇ izab ⁇ yn ⁇ y z ⁇ ne in zavisim ⁇ s ⁇ i ⁇ s ⁇ s ⁇ ava ne ⁇ i and ⁇ ⁇ tsen ⁇ n ⁇ g ⁇ s ⁇ de ⁇ zhaniya it leg ⁇ i ⁇ and ⁇ yazhely ⁇ ⁇ a ⁇ tsy and ⁇ a ⁇ zhe ⁇ liches ⁇ va v ⁇ dy, ch ⁇ in ⁇ edelenn ⁇ y me ⁇ e, ⁇ zv ⁇ lyae ⁇ snizi ⁇ ene ⁇ ge ⁇ iches ⁇ ie za ⁇ a ⁇ y on e ⁇ u ⁇ e ⁇ atsiyu.
- the proposed method ensures that the physical cables and the cable are protected. Placed above the irregular zone (above Park 4).
- the next step is to fill in a funny camera with a 6 bath liquid. At the same time, this prevents the flow of well fluid, which is located above Pack 4, into a random chamber 6 (Fig. 1 1). ⁇ In connection with this, the gas pressure in the portable chamber 6 will decrease, that is, it will be generated
- SIGNIFICANT FOX (DR. 26) 19 pressure drop, and in the chamber 6 there will be a free flow of liquid. By doing so, they will wash the products of the cremation. located in the public With the borehole fluid, certain parts of the mud located in the cracks and in the reservoirs that are in the process of filtering will also be washed.
- variable zone of well 1 first, hydraulic disruption, and then the pressure loss
- the proposed industrial impact on the variable zone of well 1 will increase the efficiency of the in- ductivity. that, in the end, in the end. Increase oil production in well 1.
- Pack 4 contains a unit of 10 (Fig. 8,9) with a component of 1 1 radial compaction (Fig. Shows a rubber plug, which is heated)
- SIGNIFICANT FOX (DR. 26) 20 4 Descends to the desired depth on the medium of suspension 2 (Fig. 8), as a result of which it can serve as a pipe or pipe. Pack 4 is executed with channels (channel) 12 (Fig. 8-1 1), which connect it to the circuit.
- Channels 12 can be executed in parallel with the optional axis 4 (Fig. 8.9) or inclined (Fig. 10.1 1). ⁇ terrorism channel 12 or outside ⁇ , as shown in FIG. 8-1 1.
- sm ⁇ n ⁇ i ⁇ van ⁇ b ⁇ a ⁇ ny ⁇ la ⁇ an 13 za ⁇ e ⁇ lenny ⁇ ⁇ usu 10 ⁇ a ⁇ e ⁇ a 4.
- ⁇ a che ⁇ ezha ⁇ ⁇ b ⁇ a ⁇ ny ⁇ la ⁇ an 13 ⁇ azan as ⁇ l ⁇ s ⁇ y elas ⁇ ichn ⁇ y ⁇ las ⁇ iny, za ⁇ e ⁇ lenn ⁇ y in tsen ⁇ aln ⁇ y chas ⁇ i ⁇ ⁇ usu 10 ⁇ a ⁇ e ⁇ a 4.
- Pack 4 drops the required depth and any known means of saving the walls of well 1 (Fig. 8).
- the bore fluid is at all costs of the manifold 4.
- the lower part of the reservoir 4 may be suspended by a suspension of 9/8.
- a ballot with compressed gas may be used or an explosive package may be used.
- Generator 8 of pressure may be suspended on a special circuit, allowed through pack 4. After blasting (Fig. 9) after being allowed to vent gas, be allowed to dissolve through channels 12 of chamber 4, the upper part of the wellbore fluid located in well 6 will be ejected in chamber 1 (step 1). With this inverse valve 13 in the form of an elastic plate, deforming, disrupts the borehole fluid in a safety device. The lower part of the wellbore fluid.
- SIGNIFICANT FOX (DR. 26) 21 and t-holes in the open hole of well 1.
- steps 4 at the quick fixation to the walls of the borehole (off-side pipe) 1 there is a temperature inlet. Parameters of this feature are shown in FIG. 12-15.
- a secured suspension of the suspension 2 in the form of a pipe (Fig. 12.13) or pipe (Fig. 14.15) is installed in well 1 (Fig. 14-15) or a rear pipe 1 (Fig. 12-13).
- the operation of Park 4 can be any. However, according to the technical solution, it must be equipped with a heating element 14 (this may be either a heating element, for example, an electric heater)
- ⁇ a ⁇ ig. 14 A package is shown with a hardware element made from a material with a memory of the company.
- the diametrical increase in its size is due to the large expansion of the material of the components (as described above) and the size of the frame With this second factor in dozens. but on the whole, it’s always higher than the first.
- Tsilind ⁇ 19 with leaves 20 it is removed from a material with a memory of a form, therefore they serve as a spare part (with a separation), and together with an elastic cassette - it is removable. partly prevents the gap between unit 4 and the borehole (open pipe) 1.
- the cylinder 19 with the flanges20 and the length of the 21sts is not to be too long.
- the element 14 is made in the form of a temperature, which is desirable to mount near the blades 20 for more efficient cooling.
- the power of the thermal element 14 - the heaters may be carried out with the accessories 23.
- the cylinder 19 is made from a material with memory. for example, from a nickel alloy with titanium (for example, titanium nickelide ⁇ with a content of 50% nickel and 50% titanium).
- SIGNIFICANT FOX (DR. 26) 22 "hears" his original form. ⁇ em ⁇ e ⁇ a ⁇ u ⁇ y M n and M K yavlyayu ⁇ sya ⁇ em ⁇ e ⁇ a ⁇ u ⁇ ami beginning ⁇ ntsa ⁇ yam ⁇ g ⁇ ma ⁇ ensi ⁇ n ⁇ g ⁇ ⁇ ev ⁇ ascheniya and alpha n and ⁇ ⁇ - s ⁇ ve ⁇ s ⁇ venn ⁇ ⁇ em ⁇ e ⁇ a ⁇ u ⁇ ami beginning ⁇ ntsa ⁇ b ⁇ a ⁇ n ⁇ g ⁇ ma ⁇ ensi ⁇ n ⁇ g ⁇ ⁇ ev ⁇ ascheniya.
- the voltage necessary for an initial deformation should be no more than 50-100 Pa.
- material on the basis of titanium nickelide has been introduced.
- a hole (or a detachable pipe) 1 is released on the suspension 2 in the form of a pipe (fig. 12,13) or pipe (fig. 14-15), 4 for the depth to be avoided.
- Uchi ⁇ yvaya, ch ⁇ with glubin ⁇ y ⁇ em ⁇ e ⁇ a ⁇ u ⁇ a s ⁇ vazhinn ⁇ y zhid ⁇ s ⁇ i (e ⁇ m ⁇ zhe ⁇ by ⁇ bu ⁇ v ⁇ y ⁇ as ⁇ v ⁇ or mixture ne ⁇ i with v ⁇ d ⁇ y) ⁇ vyshae ⁇ sya, diame ⁇ alny ⁇ azme ⁇ ⁇ a ⁇ e ⁇ a 4 ⁇ dbi ⁇ ayu ⁇ ⁇ a ⁇ im, ch ⁇ by ⁇ i ⁇ em ⁇ e ⁇ a ⁇ u ⁇ e s ⁇ vazhinn ⁇ y zhid ⁇ s ⁇ i a depth eg ⁇ ⁇ i ⁇ satsii, diame ⁇ alny ⁇ azme ⁇ ⁇ a ⁇ e ⁇
- SIGNIFICANT FOX (DR. 26) 23 4 performed in a compliant manner with a diametrical size smaller than the borehole 1, that is, the heating may have a non-critical element 14, for example, is electrically unsafe
- the appliance for heating it will be carried out one after the other, and then this temperature controller will be supported to keep the fluid well.
- tank 1 To remove ⁇ a ⁇ e ⁇ a 4 of s ⁇ vazhiny 1 ne ⁇ b ⁇ dim ⁇ ⁇ susches ⁇ vi ⁇ ⁇ em ⁇ e ⁇ a ⁇ u ⁇ nuyu ⁇ azg ⁇ uz ⁇ u ( ⁇ ladi ⁇ ⁇ a ⁇ e ⁇ 4) ⁇ sle cheg ⁇ ⁇ iz ⁇ yde ⁇ reduction ⁇ bema eg ⁇ ⁇ ns ⁇ u ⁇ ivny ⁇ elemen ⁇ v, diame ⁇ alny
- the size of tank 1 is decreasing, and it can be removed from well 1. Cooling can be natural (when the temperature of the well is small), there is a lot of heat ⁇ balnado In the latter case, the process is controlled better, since it is practically not dependent on the temperature of the borehole fluid.
- P ⁇ i ⁇ a ⁇ m is ⁇ lnenii ne ⁇ b ⁇ dim ⁇ ⁇ s ⁇ yann ⁇ za ⁇ achiva ⁇ ene ⁇ giyu, ch ⁇ by ⁇ bes ⁇ echi ⁇ ⁇ i ⁇ satsiyu ⁇ a ⁇ e ⁇ a 4 ⁇ s ⁇ en ⁇ e s ⁇ vazhiny ( ⁇ bsadn ⁇ y ⁇ uby) 1.
- unit 4 It is advisable to install unit 4 in well 1 at the required depth and keep it cool (at the moment of descent). In order to do this, it is possible to use various means (for example, to take advantage of it in ice), in which case 1 is most suitable for use P ⁇ i ⁇ lazhdenii ⁇ a ⁇ e ⁇ a 4 diame ⁇ alny eg ⁇ ⁇ azme ⁇ umeny ⁇ i ⁇ sya and ⁇ n s ⁇ ane ⁇ susches ⁇ venn ⁇ less diame ⁇ a s ⁇ vazhiny 1 ch ⁇ u ⁇ s ⁇ i ⁇ ⁇ tsess ⁇ us ⁇ aniya ⁇ a ⁇ e ⁇ a 4 s ⁇ vazhinu 1.
- SIGNIFICANT FOX (DR. 26) 24 downhole fluid between the lateral borehole of borehole 4 and borehole 1. Force absorbing bore. Ensure that partition 4 is fixed to well 1. To remove step 4 from well 1, it is necessary to cool it down (to ensure that there is no burden). With this diameter, its size will become smaller than the diameter of well 1. After that, it will be possible to remove Park 4 from well 1.
- Figures 12 and 13 show the features of the package 4. They are heated very quickly, and the fixation of the borehole 1 is achieved due to the large expansion of the heater. Using this principle. It is possible to use the package 4 with any well-known equipment, which is equipped with a heating element. In this case, the reliability of the latch increases. tak kak. In addition to mechanical changes of the diameter of the pack 4 (for example, due to the displacement of the inverters in the pack of the automatic certificate ⁇ ⁇ 252244). There is an additional tension due to the voluminous expansion of the material. items 4 have been made from stock.
- Part 4 is shown in sections 14 and 15; In this case, a significant increase in its size is achieved due to the large expansion of the material (as described above) and due to the change in the size of the package 4.
- SIGNIFICANT FOX (DR. 26) 25
- power is supplied to outputs 23 to the heat element 14 as a terminal. serving as a cooler.
- the latter reduces the temperature of the components of the package 4, so its diameter is slightly reduced, and the blade 20 is cut off (14).
- Unit 4 is loaded to the desired depth in well 1. Then, the power to the thermo switch is turned off.
- the unit will be held back for a long time and the temperature will be protected. If you need a faster temperature range, you can optionally supply the unit 4 with an electronic or power supply. Quickly mix between the medium of the suspension 2 and the cuff of the adapter 15 (not shown). Use of additional heating. for example. at the expense of heating the electric burner, it is given in the case.
- SIGNIFICANT FOX (DR. 26) 26 Equipped with 14 thermal elements (heaters and coolers of a different operating principle). In this case, the reliability of the lens increases. It is wise to use step 4, the principle of the operation of the circuits is based only on the influence of the temperature. ⁇ In this case, a greater effect will be achieved, but by name: its operation will be simplified; Reliability of work is improved; There is a significant increase in fixation efficiency. As such, it is provided with a special signal, supplied with a speed, which does not depend on the pressure of the borehole fluid. You can capture 1 at any depth and ensure that it is not removed from well 1.
- ⁇ ns ⁇ u ⁇ tsiya ⁇ a ⁇ e ⁇ a and s ⁇ s ⁇ b eg ⁇ ⁇ i ⁇ satsii ⁇ bes ⁇ echivayu ⁇ ud ⁇ bs ⁇ v ⁇ in u ⁇ avlenii blag ⁇ da ⁇ ya s ⁇ etsialn ⁇ g ⁇ signal is ⁇ lz ⁇ vaniyu, za ⁇ lyuchayuscheg ⁇ sya in nag ⁇ eve and ⁇ lazhdenii elemen ⁇ v ⁇ a ⁇ e ⁇ a d ⁇ ⁇ em ⁇ e ⁇ a ⁇ u ⁇ , ⁇ ye not imeyu ⁇ sya in ⁇ es ⁇ n ⁇ s ⁇ i ⁇ a ⁇ e ⁇ a 4 s ⁇ vazhinn ⁇ y zhid ⁇ s ⁇ i on ne ⁇ b ⁇ dim ⁇ y depth eg ⁇ ⁇ i ⁇ satsii.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Earth Drilling (AREA)
- Nitrogen And Oxygen Or Sulfur-Condensed Heterocyclic Ring Systems (AREA)
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA002388799A CA2388799A1 (en) | 1999-10-01 | 2000-09-29 | Method and packer for processing a productive formation in bottom-hole zone of a well, and method for fixing a packer inside a well |
GB0207260A GB2372526A (en) | 1999-10-01 | 2000-09-29 | Method for processing the production layer in a bottom hole area, packer therefor and method for securing a packer inside the bottom of a hole |
MXPA02003165A MXPA02003165A (es) | 1999-10-01 | 2000-09-29 | Metodo y envasador para procesar una formacion productiva en la zona inferior hueca de un pozo, y metodo para fijar un envasador dentro de un pozo. |
NO20021478A NO20021478L (no) | 1999-10-01 | 2002-03-25 | Fremgangsmåte og pakning for prosessering av en produktiv formasjon i bunnhullsonen i en brönn, og fremgangsmåte for å festeen pakning i en brönn |
US10/106,840 US20020157831A1 (en) | 1999-10-01 | 2002-03-27 | Method and packer for processing a productive formation in bottom-hole zone of a well, and method for fixing a packer inside a well |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU99120960/03A RU2172400C2 (ru) | 1999-10-01 | 1999-10-01 | Способ обработки продуктивного пласта в призабойной зоне скважины и пакер для его осуществления |
RU99120960 | 1999-10-01 | ||
RU99124243 | 1999-11-16 | ||
RU99124243/03A RU2182219C2 (ru) | 1999-11-16 | 1999-11-16 | Пакер и способ его фиксации в скважине |
RU2000106277 | 2000-03-13 | ||
RU2000106277/03A RU2182962C2 (ru) | 2000-03-13 | 2000-03-13 | Способ обработки продуктивного пласта в призабойной зоне скважины и пакер для его осуществления |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/106,840 Continuation US20020157831A1 (en) | 1999-10-01 | 2002-03-27 | Method and packer for processing a productive formation in bottom-hole zone of a well, and method for fixing a packer inside a well |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2001025596A1 true WO2001025596A1 (fr) | 2001-04-12 |
Family
ID=27354205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/RU2000/000402 WO2001025596A1 (fr) | 1999-10-01 | 2000-09-29 | Procede de traitement de la couche productrice dans la zone du fond de trou, packer correspondant et procede et fixation du packer dans un fond de trou |
Country Status (7)
Country | Link |
---|---|
US (1) | US20020157831A1 (ru) |
CN (1) | CN1387603A (ru) |
CA (1) | CA2388799A1 (ru) |
GB (1) | GB2372526A (ru) |
MX (1) | MXPA02003165A (ru) |
NO (1) | NO20021478L (ru) |
WO (1) | WO2001025596A1 (ru) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117967220A (zh) * | 2024-03-28 | 2024-05-03 | 松原市金信石油技术服务有限公司 | 热洗循环阀油层保护工具 |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NO315868B1 (no) * | 2001-03-26 | 2003-11-03 | Perigon Da | Anordning og fremgangsmåte ved v¶skeadskiller |
US7243732B2 (en) * | 2003-09-26 | 2007-07-17 | Baker Hughes Incorporated | Zonal isolation using elastic memory foam |
US7234533B2 (en) * | 2003-10-03 | 2007-06-26 | Schlumberger Technology Corporation | Well packer having an energized sealing element and associated method |
US7347274B2 (en) | 2004-01-27 | 2008-03-25 | Schlumberger Technology Corporation | Annular barrier tool |
US7809538B2 (en) | 2006-01-13 | 2010-10-05 | Halliburton Energy Services, Inc. | Real time monitoring and control of thermal recovery operations for heavy oil reservoirs |
US7832482B2 (en) | 2006-10-10 | 2010-11-16 | Halliburton Energy Services, Inc. | Producing resources using steam injection |
US7770643B2 (en) | 2006-10-10 | 2010-08-10 | Halliburton Energy Services, Inc. | Hydrocarbon recovery using fluids |
US8360161B2 (en) * | 2008-09-29 | 2013-01-29 | Frank's International, Inc. | Downhole device actuator and method |
CA2759401C (en) * | 2009-05-01 | 2014-12-16 | Weatherford/Lamb, Inc. | Wellbore isolation tool using sealing element having shape memory polymer |
US8763687B2 (en) | 2009-05-01 | 2014-07-01 | Weatherford/Lamb, Inc. | Wellbore isolation tool using sealing element having shape memory polymer |
US8684100B2 (en) | 2011-01-13 | 2014-04-01 | Baker Hughes Incorporated | Electrically engaged, hydraulically set downhole devices |
US9338667B2 (en) | 2011-04-18 | 2016-05-10 | Empire Technology Development Llc | Drilling technology utilizing high temperature and low temperature discharges |
US9850726B2 (en) * | 2011-04-27 | 2017-12-26 | Weatherford Technology Holdings, Llc | Expandable open-hole anchor |
US8967280B2 (en) * | 2011-05-03 | 2015-03-03 | Baker Hughes Incorporated | Locking assembly for mechanically set packer |
US9163474B2 (en) * | 2012-11-16 | 2015-10-20 | Baker Hughes Incorporated | Shape memory cup seal and method of use |
US9777548B2 (en) * | 2013-12-23 | 2017-10-03 | Baker Hughes Incorporated | Conformable devices using shape memory alloys for downhole applications |
KR101472744B1 (ko) | 2014-04-09 | 2014-12-16 | (주)인텔리지오 | 다수의 파쇄대를 갖는 시추공 내의 다중 패커 장치 |
WO2017007475A1 (en) * | 2015-07-09 | 2017-01-12 | Halliburton Energy Services, Inc. | Wellbore plug sealing assembly |
CA2972203C (en) | 2017-06-29 | 2018-07-17 | Exxonmobil Upstream Research Company | Chasing solvent for enhanced recovery processes |
CA2974712C (en) | 2017-07-27 | 2018-09-25 | Imperial Oil Resources Limited | Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes |
CA2978157C (en) | 2017-08-31 | 2018-10-16 | Exxonmobil Upstream Research Company | Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation |
CA2983541C (en) | 2017-10-24 | 2019-01-22 | Exxonmobil Upstream Research Company | Systems and methods for dynamic liquid level monitoring and control |
WO2024081710A1 (en) * | 2022-10-12 | 2024-04-18 | Baker Hughes Oilfield Operations Llc | Borehole sealing with temperature control, method, and system |
US20240125198A1 (en) * | 2022-10-12 | 2024-04-18 | Baker Hughes Oilfield Operations Llc | Borehole sealing with temperature control, method, and system |
US20240125199A1 (en) * | 2022-10-12 | 2024-04-18 | Baker Hughes Oilfield Operations Llc | Seal tool with temperature control material, method, and system |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU132154A1 (ru) * | 1960-01-20 | 1900-01-01 | Н.С. Горохов | Пакер |
SU571581A1 (ru) * | 1974-11-01 | 1977-09-05 | Краснодарский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности | Гидравлический пакер |
US4515213A (en) * | 1983-02-09 | 1985-05-07 | Memory Metals, Inc. | Packing tool apparatus for sealing well bores |
SU1199905A1 (ru) * | 1983-10-11 | 1985-12-23 | Казанский Ордена Трудового Красного Знамени Химико-Технологический Институт Им.С.М.Кирова | Пакер дл создани разделительных мостов в обсаженных скважинах |
SU1293321A1 (ru) * | 1985-08-28 | 1987-02-28 | Казахский Научно-Исследовательский И Проектный Институт Нефтяной Промышленности | Разделительна цементировочна пробка |
SU1609963A1 (ru) * | 1988-02-10 | 1990-11-30 | Северо-Кавказский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности | Уплотнительный элемент пакера |
SU1615330A1 (ru) * | 1988-08-08 | 1990-12-23 | Азербайджанский Институт Нефти И Химии Им.М.Азизбекова | Уплотнительный элемент однопроходного пакера |
SU1691515A1 (ru) * | 1989-04-05 | 1991-11-15 | Всесоюзный Научно-Исследовательский И Проектный Институт Геотермии Производственного Объединения "Союзбургаз" | Способ создани трещин в высокотемпературном пласте |
SU1716109A1 (ru) * | 1990-01-02 | 1992-02-28 | Всесоюзный научно-исследовательский и проектно-конструкторский институт по взрывным методам геофизической разведки | Способ обработки пласта |
RU2132943C1 (ru) * | 1998-02-11 | 1999-07-10 | ООО "Сибрес" | Способ воздействия на призабойную зону скважины и устройство для его осуществления |
-
2000
- 2000-09-29 WO PCT/RU2000/000402 patent/WO2001025596A1/ru active Application Filing
- 2000-09-29 CA CA002388799A patent/CA2388799A1/en not_active Abandoned
- 2000-09-29 GB GB0207260A patent/GB2372526A/en not_active Withdrawn
- 2000-09-29 MX MXPA02003165A patent/MXPA02003165A/es unknown
- 2000-09-29 CN CN00815289A patent/CN1387603A/zh active Pending
-
2002
- 2002-03-25 NO NO20021478A patent/NO20021478L/no unknown
- 2002-03-27 US US10/106,840 patent/US20020157831A1/en not_active Abandoned
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU132154A1 (ru) * | 1960-01-20 | 1900-01-01 | Н.С. Горохов | Пакер |
SU571581A1 (ru) * | 1974-11-01 | 1977-09-05 | Краснодарский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности | Гидравлический пакер |
US4515213A (en) * | 1983-02-09 | 1985-05-07 | Memory Metals, Inc. | Packing tool apparatus for sealing well bores |
SU1199905A1 (ru) * | 1983-10-11 | 1985-12-23 | Казанский Ордена Трудового Красного Знамени Химико-Технологический Институт Им.С.М.Кирова | Пакер дл создани разделительных мостов в обсаженных скважинах |
SU1293321A1 (ru) * | 1985-08-28 | 1987-02-28 | Казахский Научно-Исследовательский И Проектный Институт Нефтяной Промышленности | Разделительна цементировочна пробка |
SU1609963A1 (ru) * | 1988-02-10 | 1990-11-30 | Северо-Кавказский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности | Уплотнительный элемент пакера |
SU1615330A1 (ru) * | 1988-08-08 | 1990-12-23 | Азербайджанский Институт Нефти И Химии Им.М.Азизбекова | Уплотнительный элемент однопроходного пакера |
SU1691515A1 (ru) * | 1989-04-05 | 1991-11-15 | Всесоюзный Научно-Исследовательский И Проектный Институт Геотермии Производственного Объединения "Союзбургаз" | Способ создани трещин в высокотемпературном пласте |
SU1716109A1 (ru) * | 1990-01-02 | 1992-02-28 | Всесоюзный научно-исследовательский и проектно-конструкторский институт по взрывным методам геофизической разведки | Способ обработки пласта |
RU2132943C1 (ru) * | 1998-02-11 | 1999-07-10 | ООО "Сибрес" | Способ воздействия на призабойную зону скважины и устройство для его осуществления |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117967220A (zh) * | 2024-03-28 | 2024-05-03 | 松原市金信石油技术服务有限公司 | 热洗循环阀油层保护工具 |
CN117967220B (zh) * | 2024-03-28 | 2024-06-04 | 松原市金信石油技术服务有限公司 | 热洗循环阀油层保护工具 |
Also Published As
Publication number | Publication date |
---|---|
GB0207260D0 (en) | 2002-05-08 |
CN1387603A (zh) | 2002-12-25 |
GB2372526A (en) | 2002-08-28 |
MXPA02003165A (es) | 2003-08-20 |
NO20021478L (no) | 2002-05-31 |
NO20021478D0 (no) | 2002-03-25 |
US20020157831A1 (en) | 2002-10-31 |
CA2388799A1 (en) | 2001-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2001025596A1 (fr) | Procede de traitement de la couche productrice dans la zone du fond de trou, packer correspondant et procede et fixation du packer dans un fond de trou | |
US10458199B2 (en) | Sealing an undesirable formation zone in the wall of a wellbore | |
RU2490424C2 (ru) | Конструкция заглушки, содержащая гидравлическое разрушающее тело | |
EP2458137B1 (en) | Wireless downhole unit | |
US9109438B2 (en) | Device and method for well stimulation | |
WO2018057361A1 (en) | Sealing an undesirable formation zone in the wall of a wellbore | |
JP2002206388A (ja) | 地中に水平孔を形成するための爆発放射器とその組立体およびそれを利用した発破方法 | |
WO2002002905A1 (fr) | Packer et procede de fixation de celui-ci dans un puits | |
CN112392484B (zh) | 一种不动管柱的二氧化碳相变致裂增透装置及工作方法 | |
CN109139099A (zh) | 一种充填、防砂、注汽一体化装置及其作业方法 | |
WO2002070339A2 (en) | System for lifting water from gas wells using a propellant | |
CN107002485B (zh) | 包含助爆药的油田侧引爆块 | |
RU2519318C1 (ru) | Породоразрушающее изделие | |
US3447607A (en) | Method for sand control in wells | |
US3121465A (en) | stephens | |
CA2761153A1 (en) | Device and method for well stimulation | |
US11585176B2 (en) | Sealing cracked cement in a wellbore casing | |
CN210134898U (zh) | 自流注水完井管柱 | |
CN109611057B (zh) | 一种煤层气抽采用二氧化碳致裂增透装置 | |
WO1997008427A1 (fr) | Procede de traitement de la zone de fond d'un lit et dispositif de mise en oeuvre de ce procede | |
RU2802642C2 (ru) | Устройство для термобарохимической обработки скважин и способы его применения | |
US2212045A (en) | Gun perforator | |
CN216894322U (zh) | 用于油气储层的液体坐封机构及爆燃压裂装置 | |
US2261859A (en) | Oil and gas production gun perforator | |
WO2021150120A1 (en) | Retrofit expandable annulus sealing (reas) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AZ CA CN GB ID KZ MX NO US |
|
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: PA/a/2002/003165 Country of ref document: MX |
|
ENP | Entry into the national phase |
Ref country code: GB Ref document number: 200207260 Kind code of ref document: A Format of ref document f/p: F |
|
WWE | Wipo information: entry into national phase |
Ref document number: 10106840 Country of ref document: US |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2388799 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 008152896 Country of ref document: CN |