WO1999015276A1 - Modular transportable processing plant and mineral process evaluation unit - Google Patents

Modular transportable processing plant and mineral process evaluation unit Download PDF

Info

Publication number
WO1999015276A1
WO1999015276A1 PCT/AU1998/000820 AU9800820W WO9915276A1 WO 1999015276 A1 WO1999015276 A1 WO 1999015276A1 AU 9800820 W AU9800820 W AU 9800820W WO 9915276 A1 WO9915276 A1 WO 9915276A1
Authority
WO
WIPO (PCT)
Prior art keywords
stage
plant
crushing
fines
metal
Prior art date
Application number
PCT/AU1998/000820
Other languages
French (fr)
Inventor
Mohammed El-Ansary
Bruno Sceresini
Keith Dodd
Brian Coupe
Original Assignee
Advance R & D Pty. Ltd.
Aretrend Pty. Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Advance R & D Pty. Ltd., Aretrend Pty. Ltd. filed Critical Advance R & D Pty. Ltd.
Priority to AU93314/98A priority Critical patent/AU737288B2/en
Publication of WO1999015276A1 publication Critical patent/WO1999015276A1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B11/00Obtaining noble metals
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C21/00Disintegrating plant with or without drying of the material
    • B02C21/02Transportable disintegrating plant
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03BSEPARATING SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS
    • B03B9/00General arrangement of separating plant, e.g. flow sheets

Definitions

  • the present invention relates to a processing plant for recovery of metal values using inter-alia carbon loading of cyanide-metal complexes.
  • the invention relates to such a process plant that is readily transportable.
  • concentration and recovery stage will be varied.
  • a modular and transportable processing plant for processing metalliferous ore to recover of metal values therefrom, said processing plant comprising: a crushing stage which comprises a primary dry crushing stage and optionally a secondary crushing stage, where a screening stage is included after said primary crushing stage to separate oversize for return to the primary crushing stage; a post-crushing stage which comprises a classification stage to separate fines from non-fines, and a ball mill to grind said non-fines, the ground said non- fines being recycled to said classification stage; a dewatering and/or thickening stage to extract water from said fines to produce a concentrated slurry; and an extraction and recovery stage to extract and recover said metal values from said concentrated slurry.
  • said processing plant is adapted for recovery of metal values by loading of cyanide-metal complexes onto activated carbon
  • said extraction and recovery stage comprises: at least one leach stage incorporating agitation with oxygen, to form a cyanide metal complex; at least one adsorption stage to adsorb cyanide metal complex on activated carbon; and a continuous elution stage to recover metal values therefrom for subsequent recovery of metal therefrom.
  • the metal may most preferably be electro-won from said metal values.
  • said extraction and recovery stage may be a flotation module, for recovering nickel, copper, or other metal values, or any other suitable processing stage.
  • said primary dry crushing stage comprises a jaw crusher.
  • said jaw crusher is has a crushed ore nominal maximum output size of between 50 mm and 70 mm.
  • the nominal maximum output size of the crushed ore is 60 mm. It will be understood that up to 10 % of the crushed ore may exceed the nominal maximum output size, as is typical with crushers of all types. Any ore exceeding the nominal maximum output size is considered to be oversize, and is separated by the screening stage for return to the primary dry crushing stage.
  • the primary dry crushing stage is defined as operating in closed circuit configuration.
  • the undersize from said primary crusher is arranged to discharge to a reversible conveyor, the reversible conveyor being arranged to discharge to said plant when operated in a forward direction, and being arranged to discharge to a stockpile or alternative or additional processing when operated in a reverse direction.
  • the primary crusher can produce well in excess of the required plant capacity, the use of a reversible conveyor in the manner described provides a simple way of diverting excess ore from the primary crusher. This diverted ore from the primary crusher can be sent for additional or alternative processing. Additional processing could include duplicated downstream processing of the ore from the primary crusher, while alternative processing for gold bearing ore could include subjecting the gold ore to a heap leach.
  • said secondary crushing stage is a secondary wet crushing stage.
  • said secondary wet crushing stage includes a cone crusher which has water added to the feed along with crushed ore from said first crushing stage.
  • a "Waterflush” TM cone crusher is suitable for this purpose, and most preferred.
  • the purpose of using water in the crushing stage is to prevent choking of the cone crusher.
  • the secondary crushing stage may be omitted entirely, or the secondary crusher may be run dry (without water).
  • a screening stage is included after said secondary wet crushing stage to screen out all oversize for return to said secondary crushing stage.
  • the dimension for oversize from said secondary crushing stage is greater than between 3.5 and 10 mm.
  • the most preferred dimension for oversize from said wet second crushing stage is greater than 6 mm.
  • said ball mill utilises an in-line drive with a planetary gearbox.
  • Such an arrangement can be assembled on a chassis for transport by road.
  • said post-crushing stage includes means to remove coarse metal from said non-fines, before said non-fines enter said ball mill.
  • said coarse metal is subsequently further purified.
  • the further purification may take the form of treating said coarse metal to form cyano- metal complex and electro-winning metal therefrom. This is particularly appropriate where the processing plant is used for recovery of noble metals.
  • said at least one leach stage includes at least two leach tanks, with at least one of said leach tanks including a closed circuit high agitation reactor and associated oxygen injection, to allow rapid leaching of the precious metals and thereby minimise the residence time of the concentrated slurry in the leach stage.
  • each said leach tank includes a draft tube and agitator to circulate the concentrated slurry undergoing leaching.
  • the adsorption stage includes a plurality of tanks arranged to operate in carousel mode, to allow feed to be diverted to any tank, whereby any tank may be selectively drained for subsequent processing of its contents and/or for maintenance of the tank and its screen which separates ore slurry containing cyanide metal complex from the activated carbon.
  • the tanks are interconnected by piping having valves, so that the first and last tanks in the sequence can be selected, or more preferably the entire order of tanks in the sequence can be selected.
  • said continuous elution stage comprises an acid wash and hot water stripping.
  • a method of processing metalliferous ore for recovery of metal values comprising subjecting said ore to a crushing step which comprises a primary dry crushing step and optionally a secondary crushing step, where said ore is subjected to a screening step after said primary crushing step to separate oversize for return to the primary crushing step; subjecting crushed ore from said crushing step to a post-crushing step which first includes classification to remove fines from non-fines, and processing said non-fines in a grinding step carried out in a ball mill, and recirculating the ground said non-fines to said classification step; subjecting said fines to a dewatering and/or thickening step to extract water and to produce a concentrated slurry; and subjecting said concentrated slurry to an extraction and recovery step to extract and recover said metal values from said concentrated slurry.
  • the method is most preferably utilised for the processing of ore for recovering metal values by loading of cyanide-metal complexes onto activated carbon, wherein said extraction and recovery step comprises adding cyanide to said concentrated slurry and subjecting it to at least one leach step incorporating agitation with oxygen, to form a cyanide metal complex; adsorbing said cyanide metal complex onto activated carbon; eluting said activated carbon containing adsorbed cyanide metal complex in a continuous elution stage to recover metal values therefrom for subsequent recovery of metal therefrom.
  • the metal may most preferably be electro-won from said metal values.
  • said primary dry crushing step utilises a jaw crusher.
  • said secondary crushing step is a wet crushing step.
  • said secondary wet crushing step utilises a cone crusher which has water added to the feed along with ore.
  • a "Waterflush” TM cone crusher is suitable for this purpose, and most preferred.
  • said ball mill utilises an in-line drive with a planetary gearbox.
  • Such an arrangement can be assembled on a chassis for transport by road.
  • said post-crushing step includes a step where coarse metal is removed from said non-fines, before said non-fines enter said ball mill.
  • said coarse metal is subsequently subjected to further purification.
  • the further purification may take the form of treating said coarse metal to form cyano-metal complex and electro-winning metal therefrom. This is particularly appropriate where the processing plant is used for recovery of noble metals, such as gold.
  • the adsorption step is conducted in a plurality of tanks arranged to operate in carousel mode, to allow feed to be diverted to any tank, whereby any tank may be selectively drained for subsequent processing of its contents.
  • said continuous elution step incorporates a continuous acid wash and hot water wash of said activated carbon.
  • Figure 1 is a flow diagram showing the crushing stage of the plant and method thereof
  • Figure 2 is a flow diagram showing the post-crushing stage, de- watering/thickening stage and leach stages, of the plant and method thereof;
  • Figure 3 is a flow diagram showing the carbon adsorption stage and elution stage, and an optional coarse metals purification stage of the plant and method thereof;
  • Figure 4 is a side elevation of a ball mill utilised in the plant
  • Figure 5 is a diagram showing a continuous acid wash stage utilised ahead of the elution stage in the plant
  • Figure 6 is a diagram showing the elution stage of the plant.
  • Figure 7 is a site plan showing a typical overall plant setup.
  • the processing plant has been designed as a relocatable modular plant for on site treatment of gold bearing and other metalliferous ores, at a continuous rate of between 20 and 30 tonnes per hour, nominally 25 tonnes per hour. All sections of the plant are designed in a modular format to allow the components to be easily assembled on a site and subsequently disassembled for relocation to another site on completion of an assignment.
  • run of mine ore is loaded into a hopper 11 before being sent to a primary crushing stage in the form of a jaw crusher 13, via a vibratory feeder (not shown).
  • the jaw crusher 13 is a compact unit with an opening size of 750 mm by 1000 mm, and is sized to ensure that the normally expected size lumps can be accepted from the run of mine material.
  • the jaw crusher 13 can handle up to 150 tph with a closed side setting of 60 mm, which gives a nominal maximum output size of the crushed ore of 60 mm.
  • Crushed ore leaves the jaw crusher 13 and enters a reversible conveyor 14, at a position away from either end thereof.
  • the reversible conveyor 14 is operated in a forward direction and discharges crushed ore to a scalping screen 15
  • the scalping screen 15 separates the crusher product into three streams, oversize which is greater than 60 mm, which is conveyed to a stockpile 17 for recirculation through the jaw crusher 13.
  • Crushed ore which lies between 6 mm and 60 mm is conveyed from the scalping screen 15 to a plant feed bin 19, with excess over demand being diverted by a splitter box 20 to a plant feed stockpile 21.
  • Crushed ore which is less than 6 mm is conveyed from the scalping screen 15 to a fines stockpile 23.
  • the jaw crusher 13 and scalping screen 15 are only required to operate on a day shift basis. Feed to the remainder of the plant during night shift operations is provided from the plant feed stockpile 21. However, it will be understood that some sites or operations may lend themselves to full utilisation of the primary crushing stage by crushing for a heap leach or other operations when not required for the plant of the embodiment.
  • the reversible conveyor 14 can be operated in a reverse direction and the discharge 24 can be directed to heap leaching. It will be understood that the presence of oversize does not greatly affect a heap leach process.
  • the hopper 11 is accessible by a front end loader which delivers run of mine ore.
  • the assembled module comprising the hopper 11 and jaw crusher 13 has a bin located below and beside the hopper 11. Aggregate is packed around the void and body to build a ramp extending over the void to the hopper 11. The weight of aggregate around the body provides the assembled module with stability, and reduces the size of concrete slab required, on which such crushing stages are typically built. Alternatively, the bin could be filled with aggregate to provide additional stability if desired.
  • the hopper 11 and jaw crusher 13 comprise one module when assembled, but are transported as separate pieces.
  • a first piece comprises a base having a body at one end containing the bin, a flight of access stairs at the other end, and an area in the centre where the reversible conveyor 14 is fitted for receiving discharge from the jaw crusher 13.
  • the reversible conveyor discharges over either side of the base, and is removed for transport in order to reduce the width of the module for ease of transportation.
  • the second piece sits on top of the first piece and contains the remainder of the body continuing the void at one end, a further flight of stairs at the other end to continue the stairs of the first piece, and the jaw crusher 13 in the centre.
  • the third piece contains the hopper 11 at one end located above the void, with the vibratory feeder leading to the feed opening of the jaw crusher 13, and with a landing from the access stairs at the other end.
  • the ramp is removed, before the assembled module is broken up into its three pieces.
  • Crushed ore from the plant feed bin has lime added for pH adjustment, before being conveyed to the secondary crushing stage.
  • the secondary crushing stage includes a Waterflush crusher 25 which is a 980 mm cone crusher, and crushes the ore to 6 mm or less.
  • the Waterflush crusher 25 has been selected for its ability to crush from 60 mm feed to 6 mm product, thereby eliminating the need for tertiary crushing or SAG milling ahead of the ball mill.
  • a high recirculating load for plus 6 mm size ore is designed into the screening and conveying circuit to allow for treatment of hard ores.
  • any fines (6 mm or less) in the fines stockpile are conveyed via the plant feed bin 19, after the plant feed bin 19 is emptied of 60 mm to 6 mm product which it normally carries. These fines are diverted via the screen feeder 27 in order to bypass the Waterflush crusher 25.
  • the post-crushing stage comprises an initial classification stage 29 where particles fine enough to allow liberation of the gold in the leaching process (fines) are diverted as overflow to a thickener stage 31.
  • Underflow (non-fines) which requires further grinding is sent via a sieve bend 32 with a 2 mm aperture size.
  • Undersize from the sieve bend 32 proceeds to a splitter box 33 where high specific gravity material is separated.
  • This high specific gravity material will comprise coarse gold in a gold mining operation.
  • a gravity concentrator 35 (a high 'g' force Falcon concentrator) separates coarse gold from fines entrained in solution. The coarse gold is sent for further processing. It will be understood that where the ore is of such a type that coarse gold (native gold) is not present, the splitter box 33 and gravity concentrator 35 may be omitted.
  • non-fines are ground in a ball mill 37, along with oversize from the sieve bend 32, and after grinding the ground product is returned to the classification stage 29. As non-fines are ground sufficiently to fines, they are diverted as overflow to the thickener stage 31 in the classification stage 29.
  • the ball mill 37 is shown in greater detail in Figure 4, and has a 520 kW power plant 39 for drive, with power being transferred through a planetary-type transmission.
  • the assembly of the ball mill 37, the power plant 39 and the transmission is mounted on a chassis 41 , to allow transport thereof as a unit direct to any mine site. This obviates set-up and alignment routines that would be required if the assembly required dismantling and assembling between use at different sites.
  • the overflow fines which are nominally 80% minus 75 microns, after thickening in the thickener 31 are fed to the leach stage.
  • the thickener 31 is a "Wren Technologies" unit which has no moving parts and can be transported as one unit, on its side.
  • the thickener has a maximum diameter of 3.4 metres, and a height of 9 metres.
  • the leach stage includes two identical leach tanks 43a and 43b from which thickened ore slurry and cyanide is pumped by pumps 45a and 45b through high agitation reactors 47a and 47b, which include oxygen injection into the slurry to allow rapid leaching of the precious metals from the fine ore.
  • the injection of oxygen into the slurry and a high recirculating load in this process enables the residence time required for leaching to be minimised.
  • the output of reactors 47a and 47b is recirculated to the leach tanks 43a and 43b respectively.
  • Output from the leach tank 43a is fed to pump 45b, and output from the leach tank 43b is fed to a third leach tank 43c.
  • the three leach tanks 43a, 43b, and 43c are included with draft tubes and agitators, and are able to be transported as complete tanks.
  • the leach tanks 43 each have a volume of 40 cubic metres, and a diameter of 2.9 metres.
  • the reactors 47a and 47b are in line 'Filblast' units, although other similar high agitation and oxygen injection technology could be employed.
  • Gold cyanide complex from the third leach tank 43c is fed to the adsorption stage.
  • the adsorption stage 48 includes Anglo American 'pump cells' in six tanks 49 of equal volume, which operate in a carousel mode. All gold bearing carbon is eluted and re-activated prior to contact with the gold bearing slurry, promoting fast loading and high loading rates of the gold onto the activated carbon.
  • carousel mode the tanks are arranged so that any tank may be selectively drained for subsequent processing of its contents and/or for maintenance of the tank and its screen which separates ore slurry containing cyanide metal complex from the activated carbon.
  • the tanks are interconnected by piping having valves, so that the first and last tanks in the sequence can be selected, and in addition the entire order of tanks in the sequence can be selected.
  • the six tanks 49 are arranged on two side by side chassis as two rows of three tanks, which may be divided for transport as two units. The total volume of the six tanks 49 is 75 cubic metres.
  • the elution stage 51 for removing the gold from the carbon has been designed as a continuous operation, based on the AARL system, to handle nominally 1 tonne of carbon a day, thus minimising equipment sizes and heat load requirements.
  • the elution system and electrowinning cell are incorporated into one module which can be transported in one load.
  • the loaded carbon undergoes a continuous acid wash in a column 55.
  • the loaded carbon is fed into the top of the column 55 and falls under the influence of gravity.
  • Hot water is fed into the base of the column and flows upward past the carbon.
  • hydrochloric acid is introduced and flows up the column with the hot water. Aqueous acid solution over-flows the top of the column.
  • Recovered treated carbon is then subjected to elution in the elution column 57, shown in detail in Figure 6.
  • the loaded carbon is stripped of gold (or other metal).
  • gold stripping the loaded carbon is stripped using hot water, and is removed via a 500um mesh wire screen filter 59, where the gold is then electro-won using a standard electrowinning technique.
  • fine gold from the gravity concentrator 35 is fed to a gold purification stage which comprises a jig table 53.
  • Ancillary equipment such as the trash screen, the tailings screen, the reactivation module 61 for reactivating carbon, the chemical mixing module 63, water tanks, lime silo 65, and motor/electrical control rooms 67 are all of modular design and generally each able to be transported as one assembled component. All of the equipment breaks down into transportable modules (some of which have been described here in detail) that do not exceed 4.25 metres in width and 4.25 metres in height, with a maximum length of 13.5 metres.
  • the main commercial applications of the modular and transportable plant are in marginal mineral deposits where short term operation of hitherto known and used plant is not economically viable.
  • the modular and transportable plant allows utilisation as a relocatable production plant on small deposits that would otherwise not warrant the development of a full scale permanent production facility.
  • the modular and transportable plant allows pilot testing and evaluation of ore deposits to be readily undertaken, particularly on those deposits having complex metallurgy which requires investigation of process options. Evaluation of operating cost of gold recovery in economically marginal deposits can readily be undertaken at minimal expense.
  • the modular and transportable plant allows for establishment of process steps and operating costs as a prelude to final plant design and or as part of a detailed feasibility study on a major ore body.
  • the modular and transportable plant can also be utilised in existing mine sites where processing difficulties are being encountered, so that process modifications may be tested, without disrupting the day to day operations of the mine and its existing plant.
  • the form that the "downstream" processing takes after crushing and grinding will depend on the nature of the ore. For ores other than gold ores or other metals amenable to extraction by carbon loading and elution, different downstream processing of the concentrated slurry will be required. For example, an alternative embodiment may be utilised for extraction of metal values from sulphide ores.
  • sulphide ores of nickel and base metals including copper, lead and zinc
  • flotation is the process by which a frothing agent is added to the ground slurry and air is passed through the mixture. The desired sulphide mineral is separated from the mixture by preferential attachment to the froth bubbles, which are collected from the top of the flotation cell.
  • the waste material which, does not float, is separated from the bottom of the cell. Smelting, chemical or biological leaching, solvent extraction, electrowinning, etc can further process the concentrate. However, this further processing is commonly not conducted at the mine site, with the concentrate being transported to a central production facility for this purpose. Accordingly, in such an alternative embodiment, the carbon adsorption stage, continuous elution stage and the electrowin ⁇ ing stage will be replaced by a flotation module.
  • biological leaching may be used on refractory gold or other metal sulphide ores, either in conjunction with flotation or as an alternative processing option.
  • Acid leaching, atmospheric or pressure leach, and ammoniacal leaching are other methods of treating metalliferous ore slurries, particularly for nickel and copper oxidised ores, which are believed to be readily catered for if required, by making appropriate changes to the plant of the invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Food Science & Technology (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

A modular and transportable processing plant for recovery of metal values, comprising a crushing stage which comprises a primary dry crushing stage (13), a screening stage (15) included after the primary crushing stage (13) to separate oversize for return to the primary crushing stage (13), and a secondary wet crushing stage (25); a post-crushing stage which comprises a classification stage (29) to separate fines from non-fines, and a ball mill (37) to grind the non-fines, the ground non-fines being recycled to said classification stage (29); a dewatering and/or thickening stage (31) to extract water from the fines to produce a concentrated slurry, a leaching circuit (43) incorporating agitation with oxygen, to form a cyanide metal complex, an adsorption circuit (49) to adsorb the cyanide metal complex on activated carbon; and a continuous elution stage (51) to recover metal values therefrom for subsequent recovery of metal therefrom.

Description

TITLE
Modular Transportable Processing Plant and Mineral Process Evaluation Unit
FIELD OF THE INVENTION
The present invention relates to a processing plant for recovery of metal values using inter-alia carbon loading of cyanide-metal complexes. In particular, the invention relates to such a process plant that is readily transportable. Depending upon the metal value being recovered from the ore, the concentration and recovery stage will be varied.
BACKGROUND ART
There exist marginal mineral deposits which are potential short term mines, which are usually not mined due to the high initial set-up cost rendering mining not economically viable. These leases are usually small deposits, but can include deposits whose mineralogy results in high refining costs.
It is an object of this invention to provide a processing plant which can be put to use on small deposits, and can also be used for pilot testing and evaluation of ore deposits.
Throughout the specification, unless the context requires otherwise, the word "comprise" or variations such as "comprises" or "comprising", will be understood to imply the inclusion of a stated integer or group of integers but not the exclusion of any other integer or group of integers.
DISCLOSURE OF THE INVENTION
In the following description, the elements of the processing plant are in sequential order corresponding to the main flow of ore therethrough. In accordance with the invention there is provided a modular and transportable processing plant for processing metalliferous ore to recover of metal values therefrom, said processing plant comprising: a crushing stage which comprises a primary dry crushing stage and optionally a secondary crushing stage, where a screening stage is included after said primary crushing stage to separate oversize for return to the primary crushing stage; a post-crushing stage which comprises a classification stage to separate fines from non-fines, and a ball mill to grind said non-fines, the ground said non- fines being recycled to said classification stage; a dewatering and/or thickening stage to extract water from said fines to produce a concentrated slurry; and an extraction and recovery stage to extract and recover said metal values from said concentrated slurry.
Preferably said processing plant is adapted for recovery of metal values by loading of cyanide-metal complexes onto activated carbon, and said extraction and recovery stage comprises: at least one leach stage incorporating agitation with oxygen, to form a cyanide metal complex; at least one adsorption stage to adsorb cyanide metal complex on activated carbon; and a continuous elution stage to recover metal values therefrom for subsequent recovery of metal therefrom.
In the case of processing gold bearing ore, the metal may most preferably be electro-won from said metal values.
Alternatively said extraction and recovery stage may be a flotation module, for recovering nickel, copper, or other metal values, or any other suitable processing stage.
Preferably said primary dry crushing stage comprises a jaw crusher. Preferably said jaw crusher is has a crushed ore nominal maximum output size of between 50 mm and 70 mm. Preferably the nominal maximum output size of the crushed ore is 60 mm. It will be understood that up to 10 % of the crushed ore may exceed the nominal maximum output size, as is typical with crushers of all types. Any ore exceeding the nominal maximum output size is considered to be oversize, and is separated by the screening stage for return to the primary dry crushing stage. In this regard the primary dry crushing stage is defined as operating in closed circuit configuration.
Preferably the undersize from said primary crusher is arranged to discharge to a reversible conveyor, the reversible conveyor being arranged to discharge to said plant when operated in a forward direction, and being arranged to discharge to a stockpile or alternative or additional processing when operated in a reverse direction. Since the primary crusher can produce well in excess of the required plant capacity, the use of a reversible conveyor in the manner described provides a simple way of diverting excess ore from the primary crusher. This diverted ore from the primary crusher can be sent for additional or alternative processing. Additional processing could include duplicated downstream processing of the ore from the primary crusher, while alternative processing for gold bearing ore could include subjecting the gold ore to a heap leach.
Preferably said secondary crushing stage is a secondary wet crushing stage.
Preferably said secondary wet crushing stage includes a cone crusher which has water added to the feed along with crushed ore from said first crushing stage. A "Waterflush" ™ cone crusher is suitable for this purpose, and most preferred. The purpose of using water in the crushing stage is to prevent choking of the cone crusher.
It will be understood that where the ore is sufficiently friable, the secondary crushing stage may be omitted entirely, or the secondary crusher may be run dry (without water). Preferably a screening stage is included after said secondary wet crushing stage to screen out all oversize for return to said secondary crushing stage.
Preferably the dimension for oversize from said secondary crushing stage is greater than between 3.5 and 10 mm. The most preferred dimension for oversize from said wet second crushing stage is greater than 6 mm.
Preferably said ball mill utilises an in-line drive with a planetary gearbox. Such an arrangement can be assembled on a chassis for transport by road.
Preferably said post-crushing stage includes means to remove coarse metal from said non-fines, before said non-fines enter said ball mill. In such an arrangement, preferably said coarse metal is subsequently further purified. The further purification may take the form of treating said coarse metal to form cyano- metal complex and electro-winning metal therefrom. This is particularly appropriate where the processing plant is used for recovery of noble metals.
Preferably said at least one leach stage includes at least two leach tanks, with at least one of said leach tanks including a closed circuit high agitation reactor and associated oxygen injection, to allow rapid leaching of the precious metals and thereby minimise the residence time of the concentrated slurry in the leach stage.
Preferably each said leach tank includes a draft tube and agitator to circulate the concentrated slurry undergoing leaching.
Preferably the adsorption stage includes a plurality of tanks arranged to operate in carousel mode, to allow feed to be diverted to any tank, whereby any tank may be selectively drained for subsequent processing of its contents and/or for maintenance of the tank and its screen which separates ore slurry containing cyanide metal complex from the activated carbon. In such an arrangement, the tanks are interconnected by piping having valves, so that the first and last tanks in the sequence can be selected, or more preferably the entire order of tanks in the sequence can be selected. Preferably said continuous elution stage comprises an acid wash and hot water stripping.
In accordance with a second aspect of the invention there is provided a method of processing metalliferous ore for recovery of metal values, said method comprising subjecting said ore to a crushing step which comprises a primary dry crushing step and optionally a secondary crushing step, where said ore is subjected to a screening step after said primary crushing step to separate oversize for return to the primary crushing step; subjecting crushed ore from said crushing step to a post-crushing step which first includes classification to remove fines from non-fines, and processing said non-fines in a grinding step carried out in a ball mill, and recirculating the ground said non-fines to said classification step; subjecting said fines to a dewatering and/or thickening step to extract water and to produce a concentrated slurry; and subjecting said concentrated slurry to an extraction and recovery step to extract and recover said metal values from said concentrated slurry.
The method is most preferably utilised for the processing of ore for recovering metal values by loading of cyanide-metal complexes onto activated carbon, wherein said extraction and recovery step comprises adding cyanide to said concentrated slurry and subjecting it to at least one leach step incorporating agitation with oxygen, to form a cyanide metal complex; adsorbing said cyanide metal complex onto activated carbon; eluting said activated carbon containing adsorbed cyanide metal complex in a continuous elution stage to recover metal values therefrom for subsequent recovery of metal therefrom.
In the case of processing gold bearing ore, the metal may most preferably be electro-won from said metal values.
Preferably said primary dry crushing step utilises a jaw crusher.
Preferably said secondary crushing step is a wet crushing step. Preferably said secondary wet crushing step utilises a cone crusher which has water added to the feed along with ore. A "Waterflush" ™ cone crusher is suitable for this purpose, and most preferred.
Preferably said ball mill utilises an in-line drive with a planetary gearbox. Such an arrangement can be assembled on a chassis for transport by road.
Preferably said post-crushing step includes a step where coarse metal is removed from said non-fines, before said non-fines enter said ball mill. In such a method, preferably said coarse metal is subsequently subjected to further purification. The further purification may take the form of treating said coarse metal to form cyano-metal complex and electro-winning metal therefrom. This is particularly appropriate where the processing plant is used for recovery of noble metals, such as gold.
Preferably the adsorption step is conducted in a plurality of tanks arranged to operate in carousel mode, to allow feed to be diverted to any tank, whereby any tank may be selectively drained for subsequent processing of its contents.
Preferably said continuous elution step incorporates a continuous acid wash and hot water wash of said activated carbon.
BRIEF DESCRIPTION OF THE DRAWINGS
The invention will now be described in the following description of one specific embodiment thereof being a modular and transportable processing plant for recovery of gold from ore containing the same, made with reference to the drawings in which:
Figure 1 is a flow diagram showing the crushing stage of the plant and method thereof;
Figure 2 is a flow diagram showing the post-crushing stage, de- watering/thickening stage and leach stages, of the plant and method thereof;
Figure 3 is a flow diagram showing the carbon adsorption stage and elution stage, and an optional coarse metals purification stage of the plant and method thereof;
Figure 4 is a side elevation of a ball mill utilised in the plant;
Figure 5 is a diagram showing a continuous acid wash stage utilised ahead of the elution stage in the plant;
Figure 6 is a diagram showing the elution stage of the plant; and
Figure 7 is a site plan showing a typical overall plant setup.
BEST MODE(S) FOR CARRYING OUT THE INVENTION
The processing plant has been designed as a relocatable modular plant for on site treatment of gold bearing and other metalliferous ores, at a continuous rate of between 20 and 30 tonnes per hour, nominally 25 tonnes per hour. All sections of the plant are designed in a modular format to allow the components to be easily assembled on a site and subsequently disassembled for relocation to another site on completion of an assignment.
Referring to Figure 1 , run of mine ore is loaded into a hopper 11 before being sent to a primary crushing stage in the form of a jaw crusher 13, via a vibratory feeder (not shown). The jaw crusher 13 is a compact unit with an opening size of 750 mm by 1000 mm, and is sized to ensure that the normally expected size lumps can be accepted from the run of mine material. The jaw crusher 13 can handle up to 150 tph with a closed side setting of 60 mm, which gives a nominal maximum output size of the crushed ore of 60 mm.
Crushed ore leaves the jaw crusher 13 and enters a reversible conveyor 14, at a position away from either end thereof. The reversible conveyor 14 is operated in a forward direction and discharges crushed ore to a scalping screen 15 The scalping screen 15 separates the crusher product into three streams, oversize which is greater than 60 mm, which is conveyed to a stockpile 17 for recirculation through the jaw crusher 13. Crushed ore which lies between 6 mm and 60 mm is conveyed from the scalping screen 15 to a plant feed bin 19, with excess over demand being diverted by a splitter box 20 to a plant feed stockpile 21. Crushed ore which is less than 6 mm is conveyed from the scalping screen 15 to a fines stockpile 23.
The jaw crusher 13 and scalping screen 15 are only required to operate on a day shift basis. Feed to the remainder of the plant during night shift operations is provided from the plant feed stockpile 21. However, it will be understood that some sites or operations may lend themselves to full utilisation of the primary crushing stage by crushing for a heap leach or other operations when not required for the plant of the embodiment. To provide feed for a heap leach process, the reversible conveyor 14 can be operated in a reverse direction and the discharge 24 can be directed to heap leaching. It will be understood that the presence of oversize does not greatly affect a heap leach process.
In the assembled module, the hopper 11 is accessible by a front end loader which delivers run of mine ore. The assembled module comprising the hopper 11 and jaw crusher 13 has a bin located below and beside the hopper 11. Aggregate is packed around the void and body to build a ramp extending over the void to the hopper 11. The weight of aggregate around the body provides the assembled module with stability, and reduces the size of concrete slab required, on which such crushing stages are typically built. Alternatively, the bin could be filled with aggregate to provide additional stability if desired.
The hopper 11 and jaw crusher 13 comprise one module when assembled, but are transported as separate pieces. A first piece comprises a base having a body at one end containing the bin, a flight of access stairs at the other end, and an area in the centre where the reversible conveyor 14 is fitted for receiving discharge from the jaw crusher 13. The reversible conveyor discharges over either side of the base, and is removed for transport in order to reduce the width of the module for ease of transportation. The second piece sits on top of the first piece and contains the remainder of the body continuing the void at one end, a further flight of stairs at the other end to continue the stairs of the first piece, and the jaw crusher 13 in the centre. The third piece contains the hopper 11 at one end located above the void, with the vibratory feeder leading to the feed opening of the jaw crusher 13, and with a landing from the access stairs at the other end.
When it is desired to move the assembled module, the ramp is removed, before the assembled module is broken up into its three pieces.
Crushed ore from the plant feed bin has lime added for pH adjustment, before being conveyed to the secondary crushing stage.
The secondary crushing stage includes a Waterflush crusher 25 which is a 980 mm cone crusher, and crushes the ore to 6 mm or less. The Waterflush crusher 25 has been selected for its ability to crush from 60 mm feed to 6 mm product, thereby eliminating the need for tertiary crushing or SAG milling ahead of the ball mill. A high recirculating load for plus 6 mm size ore is designed into the screening and conveying circuit to allow for treatment of hard ores.
Any fines (6 mm or less) in the fines stockpile are conveyed via the plant feed bin 19, after the plant feed bin 19 is emptied of 60 mm to 6 mm product which it normally carries. These fines are diverted via the screen feeder 27 in order to bypass the Waterflush crusher 25.
Referring to Figure 2, the post-crushing stage comprises an initial classification stage 29 where particles fine enough to allow liberation of the gold in the leaching process (fines) are diverted as overflow to a thickener stage 31. Underflow (non-fines) which requires further grinding is sent via a sieve bend 32 with a 2 mm aperture size. Undersize from the sieve bend 32 proceeds to a splitter box 33 where high specific gravity material is separated. This high specific gravity material will comprise coarse gold in a gold mining operation. A gravity concentrator 35 (a high 'g' force Falcon concentrator) separates coarse gold from fines entrained in solution. The coarse gold is sent for further processing. It will be understood that where the ore is of such a type that coarse gold (native gold) is not present, the splitter box 33 and gravity concentrator 35 may be omitted.
The remaining non-fines are ground in a ball mill 37, along with oversize from the sieve bend 32, and after grinding the ground product is returned to the classification stage 29. As non-fines are ground sufficiently to fines, they are diverted as overflow to the thickener stage 31 in the classification stage 29.
The ball mill 37 is shown in greater detail in Figure 4, and has a 520 kW power plant 39 for drive, with power being transferred through a planetary-type transmission. The assembly of the ball mill 37, the power plant 39 and the transmission is mounted on a chassis 41 , to allow transport thereof as a unit direct to any mine site. This obviates set-up and alignment routines that would be required if the assembly required dismantling and assembling between use at different sites.
The overflow fines which are nominally 80% minus 75 microns, after thickening in the thickener 31 are fed to the leach stage. The thickener 31 is a "Wren Technologies" unit which has no moving parts and can be transported as one unit, on its side. The thickener has a maximum diameter of 3.4 metres, and a height of 9 metres.
Referring to Figure 3, the leach stage includes two identical leach tanks 43a and 43b from which thickened ore slurry and cyanide is pumped by pumps 45a and 45b through high agitation reactors 47a and 47b, which include oxygen injection into the slurry to allow rapid leaching of the precious metals from the fine ore. The injection of oxygen into the slurry and a high recirculating load in this process, enables the residence time required for leaching to be minimised. The output of reactors 47a and 47b is recirculated to the leach tanks 43a and 43b respectively.
Output from the leach tank 43a is fed to pump 45b, and output from the leach tank 43b is fed to a third leach tank 43c. The three leach tanks 43a, 43b, and 43c are included with draft tubes and agitators, and are able to be transported as complete tanks. The leach tanks 43 each have a volume of 40 cubic metres, and a diameter of 2.9 metres. The reactors 47a and 47b are in line 'Filblast' units, although other similar high agitation and oxygen injection technology could be employed. Gold cyanide complex from the third leach tank 43c is fed to the adsorption stage.
The adsorption stage 48 includes Anglo American 'pump cells' in six tanks 49 of equal volume, which operate in a carousel mode. All gold bearing carbon is eluted and re-activated prior to contact with the gold bearing slurry, promoting fast loading and high loading rates of the gold onto the activated carbon. By the term "carousel mode", the tanks are arranged so that any tank may be selectively drained for subsequent processing of its contents and/or for maintenance of the tank and its screen which separates ore slurry containing cyanide metal complex from the activated carbon. In this embodiment, the tanks are interconnected by piping having valves, so that the first and last tanks in the sequence can be selected, and in addition the entire order of tanks in the sequence can be selected. The six tanks 49 are arranged on two side by side chassis as two rows of three tanks, which may be divided for transport as two units. The total volume of the six tanks 49 is 75 cubic metres.
The elution stage 51 for removing the gold from the carbon has been designed as a continuous operation, based on the AARL system, to handle nominally 1 tonne of carbon a day, thus minimising equipment sizes and heat load requirements. The elution system and electrowinning cell are incorporated into one module which can be transported in one load. Referring now to Figure 5 the loaded carbon undergoes a continuous acid wash in a column 55. The loaded carbon is fed into the top of the column 55 and falls under the influence of gravity. Hot water is fed into the base of the column and flows upward past the carbon. At a position near the top third of the column, hydrochloric acid is introduced and flows up the column with the hot water. Aqueous acid solution over-flows the top of the column. Recovered treated carbon is then subjected to elution in the elution column 57, shown in detail in Figure 6. The loaded carbon is stripped of gold (or other metal). In the case of gold stripping, the loaded carbon is stripped using hot water, and is removed via a 500um mesh wire screen filter 59, where the gold is then electro-won using a standard electrowinning technique.
The use of a continuous acid wash in the manner described herein has a number of advantages over other known techniques. The use of a column and injection of the acid into hot water flowing up the column obviates the need to use a heat exchanger for the acid. Heat exchangers for heating acid are expensive, in view of the material from which they must be constructed, given the corrosive nature of hydrochloric acid. In addition, less potable quality rinse water is required than other known processes require for pre-elution washing of loaded carbon. Finally, the temperature parameters for the acid wash and elution steps in the process may be altered depending upon the metal being recovered.
Referring to Figure 3, coarse gold from the gravity concentrator 35 is fed to a gold purification stage which comprises a jig table 53.
Ancillary equipment such as the trash screen, the tailings screen, the reactivation module 61 for reactivating carbon, the chemical mixing module 63, water tanks, lime silo 65, and motor/electrical control rooms 67 are all of modular design and generally each able to be transported as one assembled component. All of the equipment breaks down into transportable modules (some of which have been described here in detail) that do not exceed 4.25 metres in width and 4.25 metres in height, with a maximum length of 13.5 metres.
The main commercial applications of the modular and transportable plant are in marginal mineral deposits where short term operation of hitherto known and used plant is not economically viable. The modular and transportable plant allows utilisation as a relocatable production plant on small deposits that would otherwise not warrant the development of a full scale permanent production facility. The modular and transportable plant allows pilot testing and evaluation of ore deposits to be readily undertaken, particularly on those deposits having complex metallurgy which requires investigation of process options. Evaluation of operating cost of gold recovery in economically marginal deposits can readily be undertaken at minimal expense. In addition, the modular and transportable plant allows for establishment of process steps and operating costs as a prelude to final plant design and or as part of a detailed feasibility study on a major ore body. The modular and transportable plant can also be utilised in existing mine sites where processing difficulties are being encountered, so that process modifications may be tested, without disrupting the day to day operations of the mine and its existing plant.
It should be appreciated that the scope of the invention is not limited to the scope of the particular embodiment described herein, which is given by way of example only. It will be understood that depending upon the metal value being recovered from the ore, the concentration and recovery stage will be varied. For example, while the embodiment utilises carbon loading and elution to extract, concentrate, and recover gold from the concentrated slurry, this is simply because this technique is most suitable for recovering gold values from ore.
The form that the "downstream" processing takes after crushing and grinding will depend on the nature of the ore. For ores other than gold ores or other metals amenable to extraction by carbon loading and elution, different downstream processing of the concentrated slurry will be required. For example, an alternative embodiment may be utilised for extraction of metal values from sulphide ores. Typically, sulphide ores of nickel and base metals (including copper, lead and zinc) are concentrated by flotation. Flotation is the process by which a frothing agent is added to the ground slurry and air is passed through the mixture. The desired sulphide mineral is separated from the mixture by preferential attachment to the froth bubbles, which are collected from the top of the flotation cell. The waste material, which, does not float, is separated from the bottom of the cell. Smelting, chemical or biological leaching, solvent extraction, electrowinning, etc can further process the concentrate. However, this further processing is commonly not conducted at the mine site, with the concentrate being transported to a central production facility for this purpose. Accordingly, in such an alternative embodiment, the carbon adsorption stage, continuous elution stage and the electrowinπing stage will be replaced by a flotation module.
As an alternative processing option, biological leaching may be used on refractory gold or other metal sulphide ores, either in conjunction with flotation or as an alternative processing option. Acid leaching, atmospheric or pressure leach, and ammoniacal leaching are other methods of treating metalliferous ore slurries, particularly for nickel and copper oxidised ores, which are believed to be readily catered for if required, by making appropriate changes to the plant of the invention.

Claims

THE CLAIMS DEFINING THE INVENTION ARE AS FOLLOWS
1. A modular and transportable processing plant for processing metalliferous ore to recover of metal values therefrom, said processing plant comprising: a crushing stage which comprises a primary dry crushing stage and optionally a secondary crushing stage, where a screening stage is included after said primary crushing stage to separate oversize for return to the primary crushing stage; a post-crushing stage which comprises a classification stage to separate fines from non-fines, and a ball mill to grind said non-fines, the ground said non-fines being recycled to said classification stage; a dewatering and/or thickening stage to extract water from said fines to produce a concentrated slurry; and an extraction and recovery stage to extract and recover said metal values from said concentrated slurry.
2. A processing plant as claimed in claim 1 , adapted for recovery of metal values by loading of cyanide-metal complexes onto activated carbon, wherein said extraction and recovery stage comprises: at least one leach stage incorporating agitation with oxygen, to form a cyanide metal complex; at least one adsorption stage to adsorb cyanide metal complex on activated carbon; and a continuous elution stage to recover metal values therefrom for subsequent recovery of metal therefrom.
3. A plant as claimed in claim 1 or 2 wherein an electrowinning stage is utilised after said continuation elution stage, to electro-win metal from said metal values.
4. A processing plant as claimed in claim 1 , adapted for recovery of metal values as sulphides, wherein said extraction and recovery stage comprises a flotation module
5. A plant as claimed in any one of the preceding claims wherein said primary dry crushing stage comprises a jaw crusher.
6. A plant as claimed in claim 5 wherein said jaw crusher is has a crushed ore nominal maximum output size of between 50 mm and 70 mm.
7. A plant as claimed in claim 6 wherein the nominal maximum output size of the crushed ore is 60 mm, and the primary crushing circuit is configured to operate in closed circuit configuration.
8. A plant as claimed in any one of the preceding claims wherein the undersize from said primary crusher is arranged to discharge to a reversible conveyor, the reversible conveyor being arranged to discharge to said plant when operated in a forward direction, and being arranged to discharge to a stockpile or alternative or additional processing when operated in a reverse direction.
9. A plant as claimed in any one of the preceding claims wherein said secondary crushing stage is a cone crusher which has water added to the feed along with crushed ore from said first crushing stage.
10. A plant as claimed in any one of the preceding claims wherein a screening stage is included after said secondary crushing stage to screen out all oversize for return to said secondary wet crushing stage.
11. A plant as claimed in any one of the preceding claims wherein the dimension for oversize from said secondary crushing stage is greater than between 3.5 and 10 mm.
12. A plant as claimed in claim 11 wherein the dimension for oversize from said secondary crushing stage is greater than 6 mm.
13. A plant as claimed in any one of the preceding claims wherein said ball mill utilises an in-line drive with a planetary gearbox, and is assembled on a chassis for transport by road.
14. A plant as claimed in any one of the preceding claims wherein said post- crushing stage includes means to remove coarse metal from said non-fines, before said non-fines enter said ball mill.
15. A plant as claimed in any one of the preceding claims wherein said at least one leach stage includes at least two leach tanks, with at least one of said leach tanks including a closed circuit high agitation reactor and associated oxygen injection, to allow rapid leaching of the precious metals and thereby minimise the residence time of the concentrated slurry in the leach stage.
16. A plant as claimed in claim 15 wherein each said leach tank includes a draft tube and agitator to circulate the concentrated slurry undergoing leaching.
17. A plant as claimed in any one of the preceding claims wherein the adsorption stage includes a plurality of tanks arranged to operate in carousel mode, to allow feed to be diverted to any tank, whereby any tank may be selectively drained for subsequent processing of its contents or for maintenance, and wherein the tanks are interconnected by piping having valves, so that the first and last tanks in the sequence can be selected, and optionally the entire order of tanks in the sequence can be selected.
18. A plant as claimed in any one of the preceding claims wherein said continuous elution stage is configured for acid washing and hot water stripping.
19. A method of processing metalliferous ore for recovery of metal values, said method comprising subjecting said ore to a crushing step which comprises a primary dry crushing step and optionally a secondary crushing step, where said ore is subjected to a screening step after said primary crushing step to separate oversize for return to the primary crushing step; subjecting crushed ore from said crushing step to a post-crushing step which first includes classification to remove fines from non-fines, and processing said non-fines in a grinding step carried out in a ball mill, and recirculating the ground said non-fines to said classification step; subjecting said fines to a dewatering and/or thickening step to extract water and to produce a concentrated slurry; and subjecting said concentrated slurry to an extraction and recovery step to extract and recover said metal values from said concentrated slurry.
20. A method as claimed in claim 19 utilised for the processing of ore for recovering metal values by loading of cyanide-metal complexes onto activated carbon, wherein said extraction and recovery step comprises adding cyanide to said concentrated slurry and subjecting it to at least one leach step incorporating agitation with oxygen, to form a cyanide metal complex; adsorbing said cyanide metal complex onto activated carbon; eluting said activated carbon containing adsorbed cyanide metal complex in a continuous elution stage to recover metal values therefrom for subsequent recovery of metal therefrom.
21. A method as claimed in claim 19 or 20 wherein the metal is electro-won from said metal values.
22. A method as claimed in any one of claims 9 to 21 wherein said primary dry crushing step utilises a jaw crusher.
23. A method as claimed in any one of claims 19 to 22 wherein said secondary wet crushing step utilises a cone crusher which has water added to the feed along with ore.
24. A method as claimed in any one of claims 19 to 23 wherein said ball mill utilises an in-line drive with a planetary gearbox, assembled on a chassis for transport by road.
25. A method as claimed in any one of claims 19 to 24 wherein said post-crushing step includes a step where coarse metal is removed from said non-fines, before said non-fines enter said ball mill.
26. A method as claimed in of claims 25 wherein said coarse metal is subsequently subjected to further purification.
27. A method as claimed in any one of claims 19 to 26 wherein the adsorption step is conducted in a plurality of tanks arranged on a carousel, to allow feed to be diverted to any tank, whereby any tank may be selectively drained for subsequent processing of its contents.
28. A method as claimed in any one of claims 19 to 27 wherein said continuous elution step incorporates a continuous acid wash and hot water wash of said activated carbon.
29. A modular and transportable processing plant for recovery of metal values by loading of cyanide-metal complexes onto activated carbon, substantially as herein described with reference to the drawings.
30. A method of processing ore for recovery of metal values by loading of cyanide-metal complexes onto activated carbon, substantially as herein described with reference to the description of the embodiment.
PCT/AU1998/000820 1997-09-25 1998-09-25 Modular transportable processing plant and mineral process evaluation unit WO1999015276A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU93314/98A AU737288B2 (en) 1997-09-25 1998-09-25 Modular transportable processing plant and mineral process evaluation unit

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AUPO9442A AUPO944297A0 (en) 1997-09-25 1997-09-25 Modular and transportable processing plant and mobile mineral process evaluation unit
AUPO9442 1997-09-25

Publications (1)

Publication Number Publication Date
WO1999015276A1 true WO1999015276A1 (en) 1999-04-01

Family

ID=3803724

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU1998/000820 WO1999015276A1 (en) 1997-09-25 1998-09-25 Modular transportable processing plant and mineral process evaluation unit

Country Status (3)

Country Link
AU (1) AUPO944297A0 (en)
WO (1) WO1999015276A1 (en)
ZA (1) ZA988778B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004067449A1 (en) * 2003-01-29 2004-08-12 Milos Karovic Modular device and methods for copper exploitation from waste, flotation waste, mine waters and waste waters
WO2009039559A1 (en) * 2007-09-26 2009-04-02 Gekko Systems Pty Ltd Modular ore processor
DE102008014211A1 (en) 2008-03-14 2009-09-17 Bayer Materialscience Ag Aqueous dispersion of anionically modified polyurethane ureas for coating a textile fabric
ITRM20090576A1 (en) * 2009-11-09 2011-05-10 Hitech S R L FULLY MODULAR ALUMINUM ALLOY FOUNDATION PLANT.
CN102527495A (en) * 2010-12-22 2012-07-04 佛冈县山深陶瓷原料有限公司 Mineral separation process for non-metal ore
WO2012164107A1 (en) * 2011-05-31 2012-12-06 Cemengal, S.A. Modular plant for milling cement
US8361192B2 (en) 2009-04-16 2013-01-29 Freeport-Mcmoran Corporation Methods and systems for recovering rhenium from a copper leach
RU2542924C2 (en) * 2013-04-29 2015-02-27 Владимир Кушукович Совмен Complex for processing gold ore deposits of shale formation of stringer-porphyry mineralisation type
WO2015121799A1 (en) * 2014-02-11 2015-08-20 Scorpion Mineral Processing (Pty) Limited Apparatus and process for the improved economic extraction of metal from a metal-bearing material
CN105126957A (en) * 2015-10-09 2015-12-09 河南东大矿业股份有限公司 Crushing-grinding method for bauxite waste slag high-pressure rolling-grinding
RU2627141C1 (en) * 2016-10-03 2017-08-03 Федеральное государственное бюджетное образовательное учреждение высшего образования "Забайкальский государственный университет" (ФГБОУ ВПО "ЗабГУ") Recovery method of gold factories waste pulpes
CN108025316A (en) * 2015-09-18 2018-05-11 伊梅里斯矿物有限公司 Mobile grinding facility
CN109811142A (en) * 2019-02-28 2019-05-28 宁波锦越新材料有限公司 A kind of control method of ultra-pure aluminum purifying partial crystallization device
CN113926571A (en) * 2021-10-19 2022-01-14 厦门兑泰环保科技有限公司 Tailing activation process system based on drying, grinding and selecting integrated intelligent production equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU1959434A (en) * 1934-10-06 1935-09-19 Schrank Michael. A portable plant for crushing, pulverising and concentrating ore
US4056261A (en) * 1976-02-17 1977-11-01 Darrah Robert M Recovery of gold and silver from mine-run dumps or crushed ores using a portable ion-exchange carbon plant
AU2047883A (en) * 1982-10-15 1984-04-19 Vickers Australia Ltd. Portable mineral processing apparatus
US4598875A (en) * 1978-09-11 1986-07-08 Allis-Chalmers Corporation Portable crushing and screening plant
RU2019298C1 (en) * 1991-12-27 1994-09-15 Риф Шарифович Зайнуров Mobile refining apparatus for processing placer deposit samples
RU2055643C1 (en) * 1995-05-22 1996-03-10 Федотов Константин Вадимович Gold-bearing ores processing complex
RU2062797C1 (en) * 1994-06-07 1996-06-27 Акционерное общество "Иргиредмет" Line for processing gold-containing flotation concentrates
RU2062798C1 (en) * 1994-06-07 1996-06-27 Акционерное общество "Иргиредмет" Plant for processing resistant gold containing concentrates

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU1959434A (en) * 1934-10-06 1935-09-19 Schrank Michael. A portable plant for crushing, pulverising and concentrating ore
US4056261A (en) * 1976-02-17 1977-11-01 Darrah Robert M Recovery of gold and silver from mine-run dumps or crushed ores using a portable ion-exchange carbon plant
US4598875A (en) * 1978-09-11 1986-07-08 Allis-Chalmers Corporation Portable crushing and screening plant
AU2047883A (en) * 1982-10-15 1984-04-19 Vickers Australia Ltd. Portable mineral processing apparatus
RU2019298C1 (en) * 1991-12-27 1994-09-15 Риф Шарифович Зайнуров Mobile refining apparatus for processing placer deposit samples
RU2062797C1 (en) * 1994-06-07 1996-06-27 Акционерное общество "Иргиредмет" Line for processing gold-containing flotation concentrates
RU2062798C1 (en) * 1994-06-07 1996-06-27 Акционерное общество "Иргиредмет" Plant for processing resistant gold containing concentrates
RU2055643C1 (en) * 1995-05-22 1996-03-10 Федотов Константин Вадимович Gold-bearing ores processing complex

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
AUSTRALASIAN MINING AND METALLURGY, THE SIR MAURICE MAWBY MEMORIAL, 2nd Edition, Volume 2, THE AUSTRALASIAN INSTITUTE OF MINING AND METALLURGY, 1993, ISBN 094910678x, pages 806, 921, 923-929, 932-942, 953, 968-973, 982-985, 990-992, 1002-1004, 1010-1012, 1029-1036, 1038-1041, 1084-1085. *
DERWENT ABSTRACT, Accession No. 95-159817/21, Class P41; & RU 2019298 C1 (ZAINUROV R SH) 15 September 1994. *
DERWENT ABSTRACT, Accession No. 96-495914/49, Class M25; & RU 2055643 C1 (FEDOTOV K V) 10 March 1996. *
DERWENT ABSTRACT, Accession No. 97-106753/10, Class M25; & RU 2062797 C1 (IRGIREDMET STOCK CO) 27 June 1996. *
DERWENT ABSTRACT, Accession No. 97-106754/10, Class M25; & RU 2062798 C1 (IRGIREDMET STOCK CO) 27 June 1996. *
PATENT ABSTRACTS OF JAPAN; & JP 10137625 A (NARITA SADAICHI) 26 May 1998. *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004067449A1 (en) * 2003-01-29 2004-08-12 Milos Karovic Modular device and methods for copper exploitation from waste, flotation waste, mine waters and waste waters
AU2008303049B2 (en) * 2007-09-26 2013-01-24 Gekko Systems Pty Ltd Modular ore processor
WO2009039559A1 (en) * 2007-09-26 2009-04-02 Gekko Systems Pty Ltd Modular ore processor
EA017605B1 (en) * 2007-09-26 2013-01-30 Гекко Системз Пти Лтд. Modular ore processor
US8302890B2 (en) 2007-09-26 2012-11-06 Gekko Systems Pty Ltd. Modular ore processor
DE102008014211A1 (en) 2008-03-14 2009-09-17 Bayer Materialscience Ag Aqueous dispersion of anionically modified polyurethane ureas for coating a textile fabric
US8491700B2 (en) 2009-04-16 2013-07-23 Freeport-Mcmoran Corporation Methods and systems for recovering rhenium from a copper leach
US8361192B2 (en) 2009-04-16 2013-01-29 Freeport-Mcmoran Corporation Methods and systems for recovering rhenium from a copper leach
WO2011055402A1 (en) * 2009-11-09 2011-05-12 Hitech Srl. Completely modular plant for melting and casting aluminium from scrap material
ITRM20090576A1 (en) * 2009-11-09 2011-05-10 Hitech S R L FULLY MODULAR ALUMINUM ALLOY FOUNDATION PLANT.
CN102527495A (en) * 2010-12-22 2012-07-04 佛冈县山深陶瓷原料有限公司 Mineral separation process for non-metal ore
WO2012164107A1 (en) * 2011-05-31 2012-12-06 Cemengal, S.A. Modular plant for milling cement
RU2542924C2 (en) * 2013-04-29 2015-02-27 Владимир Кушукович Совмен Complex for processing gold ore deposits of shale formation of stringer-porphyry mineralisation type
WO2015121799A1 (en) * 2014-02-11 2015-08-20 Scorpion Mineral Processing (Pty) Limited Apparatus and process for the improved economic extraction of metal from a metal-bearing material
CN108025316A (en) * 2015-09-18 2018-05-11 伊梅里斯矿物有限公司 Mobile grinding facility
CN105126957A (en) * 2015-10-09 2015-12-09 河南东大矿业股份有限公司 Crushing-grinding method for bauxite waste slag high-pressure rolling-grinding
RU2627141C1 (en) * 2016-10-03 2017-08-03 Федеральное государственное бюджетное образовательное учреждение высшего образования "Забайкальский государственный университет" (ФГБОУ ВПО "ЗабГУ") Recovery method of gold factories waste pulpes
CN109811142A (en) * 2019-02-28 2019-05-28 宁波锦越新材料有限公司 A kind of control method of ultra-pure aluminum purifying partial crystallization device
CN113926571A (en) * 2021-10-19 2022-01-14 厦门兑泰环保科技有限公司 Tailing activation process system based on drying, grinding and selecting integrated intelligent production equipment

Also Published As

Publication number Publication date
AUPO944297A0 (en) 1997-10-16
ZA988778B (en) 2000-07-31

Similar Documents

Publication Publication Date Title
AU779033B2 (en) Recovery of copper values from copper ores
AU658705B2 (en) Hydrometallurgical process for the treatment of copper-bearing ore
CN111094601A (en) Beneficiation of valuable metals from ores by heap leaching process
WO1999015276A1 (en) Modular transportable processing plant and mineral process evaluation unit
CA2321703C (en) Apparatus and methods for recovering valuable metals
AU737288B2 (en) Modular transportable processing plant and mineral process evaluation unit
Lunt et al. Process flowsheet selection
Ellis et al. Ultra fine grinding-a practical alternative to oxidative treatment of refractory gold ores
RU2318887C1 (en) Method for gold extraction from ores
CN101443466A (en) Process for recovery of antimony and metal values from antimony- and metal value-bearing materials
JP7273254B2 (en) Metal recovery from metal-bearing materials
Adams Summary of gold plants and processes
RU2055643C1 (en) Gold-bearing ores processing complex
RU55367U1 (en) EXPERIMENTAL PLANT FOR PROCESSING GOLD-CONTAINING ORES AND CONCENTRATES (OPTIONS)
US20170175226A1 (en) Apparatus and Process for the Improved Economic Extraction of Metal from a Metal-Bearing Material
US5205858A (en) Precious metals recovery process
Lewis Increased recovery from preg-robbing gold ore at Penjom gold mine
RU2224806C1 (en) Gold- and silver-containing floatation concentrates production line
Johns, MW* & Matthews Recovery of gold from ashed woodchips
AU766903B2 (en) Leach reactor
Ryan et al. Feasibility study plant design
Stanley Gold extraction plant practice in South Africa
Gow Recent advances in uranium ore processing
Gray et al. Commissioning and operating experience with Gekko’s gold ore treatment plants
Rollwagen et al. Gold recovery at Detour Lake mine

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AL AM AT AU AZ BA BB BG BR BY CA CH CN CU CZ DE DK EE ES FI GB GE GH GM HR HU ID IL IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT UA UG US UZ VN YU ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW SD SZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 93314/98

Country of ref document: AU

NENP Non-entry into the national phase

Ref country code: KR

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: CA

WWG Wipo information: grant in national office

Ref document number: 93314/98

Country of ref document: AU