WO1999002786A1 - Unmanned platform for recovery of minerals from sea bed and directions for its foundation - Google Patents

Unmanned platform for recovery of minerals from sea bed and directions for its foundation Download PDF

Info

Publication number
WO1999002786A1
WO1999002786A1 PCT/PL1998/000030 PL9800030W WO9902786A1 WO 1999002786 A1 WO1999002786 A1 WO 1999002786A1 PL 9800030 W PL9800030 W PL 9800030W WO 9902786 A1 WO9902786 A1 WO 9902786A1
Authority
WO
WIPO (PCT)
Prior art keywords
platform
main support
sea bed
deck
pillars
Prior art date
Application number
PCT/PL1998/000030
Other languages
French (fr)
Original Assignee
PRZEDSIEBIORSTWO POSZUKIWAN I EKSPLOATACJI Z$m(C)ÓZ ROPY I GAZU 'PETROBALTIC'
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PRZEDSIEBIORSTWO POSZUKIWAN I EKSPLOATACJI Z$m(C)ÓZ ROPY I GAZU 'PETROBALTIC' filed Critical PRZEDSIEBIORSTWO POSZUKIWAN I EKSPLOATACJI Z$m(C)ÓZ ROPY I GAZU 'PETROBALTIC'
Publication of WO1999002786A1 publication Critical patent/WO1999002786A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0065Monopile structures

Definitions

  • the object of the present invention is an unmanned platform for the recovery of minerals from sea bed and directions for its foundation on the bottom of the sea.
  • the object of the present invention is an unmanned platform for the recovery of minerals from sea bed and directions for its foundation on the bottom of the sea.
  • the structure of the unmanned platform in Danish STAR system consists of a central column joined by a pulled out tripod of downward pipes forming the angle of 18 degrees to vertical line.
  • the sloping pipes in the tripod form also the stiffening of the central column and a guide for piles angularly driven into the sea bed.
  • In the central column there are passages with guiding sockets for production risers.
  • Deck modules are situated in the upper part of the central column.
  • the foundation of the unmanned platform according to the Danish system is based on the principle that the basic construction, i.e the central column with the tripod, is barged to the cantilever jack-up.
  • a protractile mounting crane lifts the basic platform structure over the barge which is then pulled away.
  • the lifted unmanned platform structure is lowered onto the sea bed and then piles are driven into the pipe columns at an obtuse angle and deck modules are placed on the upper part of the central column.
  • the essence of the present invention in the field of construction is an unmanned platform, which has a bottom plate with the main carrying pillars braced together by clippers through segment wedge inserts.
  • a deck module consisting of a mooring platform, stay-ropes maintenance deck, nose deck and upper deck with crane.
  • the carrying pillars dependently of conditions, form a combination with the stiffening pillars by filling the space between them with cement inject and stay-ropes moored by mooring plates.
  • Bracing clippers of the main carrying pillars have passages for the pillars and the production risers. At the end of the passages there are sockets mating with upper and lower segment wedge inserts.
  • the essence of the present invention in the field of unmanned platform foundation is based on the principle that the bottom plate is placed on the sea bed, clippers are underslung in the platform operating space and the main carrying pillars connected by connectors are introduced, guided to the bottom plate and lowered down to the sea bed. Clippers with wedge segments are spaced and wedged on the main carrying pillars, which is followed by the placement of the deck module elements. After wedging clippers by wedge segments on the main carrying pillars, stiffening pillars are inserted, the pillars are placed on the sea bed and spaces between them are filled by cement inject. Additionally stay-ropes are established, tightened with hydraulic cylinders and locked by chain stoppers on the stay-ropes maintenance deck.
  • the unmanned platform for the recovery of minerals from the sea bed, especially oil and natural gas allows surface heading of four exploratory holes and one hole for water compression.
  • Distribution of a couple of unmanned platforms in the radius of 4000 m from the production centre on the main platform is enough for the effective deposit exploitation.
  • the construction affords possibilities for the deposit drilling in automatic mode without working personnel participation during platform exploitation.
  • Scheduled maintenance and repairs, made by a maintenance team transported by sea, are completed during the period of up to 12 hours.
  • Control is provided by high frequency radiolink from the main platform.
  • Environment protection against pollution by crude oil spill is provided by leakproof head deck construction with sump tank.
  • the platform has inflatable life rafts, evacuation equipment, life buoys, thermal suits.
  • Cranes designed in the form of gantry, assure vertical transportation and possibility to measure bottom-hole pressures and easy work like stamping, templeting.
  • the platform and its foundation on the sea bed are adapted for the Baltic Sea conditions and after the exploitation has been completed it can be disassembled by ordinary equipment, without the necessity to use specialised equipment and induced expenses.
  • fig.1 presents schematic overview of the unmanned platform, founded and anchored in the sea bed
  • fig.2 presents end view of the clipper
  • fig.3 top view of the clipper presents end view of the clipper
  • fig.4 longitudinal section of the lower part of the main pillar with stiffening pillars
  • fig.5 cross-section of the main pillar presents end view of the clipper
  • fig.6 cross-section of the main pillar with stiffening pillar
  • fig.7 cross-section of the main pillar with the stiffening pillars
  • fig.8 cross-section of the stiffening pillars.
  • Object of the present invention in the field of construction in the effect example consist of the bottom plate 8, with four main support pillars 15 joined by clippers 6 through lower 13 and upper 14 wedging inserts. It has the deck module 23 over the sea level, which consist of mooring stage 5, stay-ropes deck 4, heading deck 3 and upper deck 2 with crane 1 in form of gantry. Main support pillars 15 in the lower part form a complex with stiffening pillars 11 and 12 by filling the space between them by cement inject 16.
  • the unmanned platform has stay-ropes 7 anchored by anchoring plates 9, fixed to the sea bed by pillars 10. Distributed on the main support columns 15, clippers 6, have connected through construction elements 19, main support pillars 15 passages 18 and production risers 20 passages 17, which are ended by seats 21 and 22 co-operating with upper 14 and lower 13 segmented wedging inserts.
  • Object of the present invention in the field of foundation of the unmanned platform in the effect example is based on the bottom plate 8 lying on the sea bed.
  • Clippers 6 are underslinged in the operating field of the drilling platform and into its passages 18 main support pillars 15 are introduced and joined by connectors which are next guided onto holes in the submerged bottom plate 8 and lowered onto the sea bed.
  • main support pillars 15 On the length between sea bed and sea level of main support pillars 15, clippers 6 are placed and wedged by lower 13 and upper 14 wedge segment.
  • After wedging stiffening pillars 11 and then the stiffening pillar 12 are introduced into the main support pillars 15 and lowered down onto the sea bed and the space between them is filled by cement inject 16.
  • stay ropes 7 are established and then tightened by hydraulic cylinders and fixed by chain stoppers on the stay ropes deck 4.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

Unmanned platform for the recovery of minerals especially crude oil and natural gas from sea bed and the way of its foundation, consists of a bottom plate (8), in which are introduced main support pillars (15) and joined by clippers (6) through segment wedge inserts (13 and 14), over the sea level deck module (23). The way of foundation of the unmanned platform for the recovery of minerals, especially crude oil and natural gas from the sea bed, is to be based on preparing on the mainland parts of the unmanned platform, transportation to self-lifting drilling platform in place of placement of unmanned platform and laying of the bottom plate (8). Next, clippers (6) are underslinged in the operating field of the drilling platform, main support pillars (15) joined by connectors are introduced, next guiding onto bottom plate (8) and lowered down into the sea bed, on the length of main support pillars (15) are displaced clippers (6), wedged by lower (13) and upper (14) wedges segments and are placed parts of the deck module (23).

Description

Unmanned platform for recovery of minerals from sea bed and directions for its foundation
The object of the present invention is an unmanned platform for the recovery of minerals from sea bed and directions for its foundation on the bottom of the sea. As a guide to better understanding of certain features of the present invention, it may be noted that at present two systems are known: Danish STAR and American TARPOON systems of the unmanned platforms and directions for their foundation.
The structure of the unmanned platform in Danish STAR system consists of a central column joined by a pulled out tripod of downward pipes forming the angle of 18 degrees to vertical line. The sloping pipes in the tripod form also the stiffening of the central column and a guide for piles angularly driven into the sea bed. In the central column there are passages with guiding sockets for production risers. Deck modules are situated in the upper part of the central column.
The foundation of the unmanned platform according to the Danish system is based on the principle that the basic construction, i.e the central column with the tripod, is barged to the cantilever jack-up. A protractile mounting crane lifts the basic platform structure over the barge which is then pulled away. The lifted unmanned platform structure is lowered onto the sea bed and then piles are driven into the pipe columns at an obtuse angle and deck modules are placed on the upper part of the central column.
The essence of the present invention in the field of construction is an unmanned platform, which has a bottom plate with the main carrying pillars braced together by clippers through segment wedge inserts. Above the sea level there is a deck module consisting of a mooring platform, stay-ropes maintenance deck, nose deck and upper deck with crane. In the lower part the carrying pillars, dependently of conditions, form a combination with the stiffening pillars by filling the space between them with cement inject and stay-ropes moored by mooring plates. Bracing clippers of the main carrying pillars have passages for the pillars and the production risers. At the end of the passages there are sockets mating with upper and lower segment wedge inserts.
The essence of the present invention in the field of unmanned platform foundation, is based on the principle that the bottom plate is placed on the sea bed, clippers are underslung in the platform operating space and the main carrying pillars connected by connectors are introduced, guided to the bottom plate and lowered down to the sea bed. Clippers with wedge segments are spaced and wedged on the main carrying pillars, which is followed by the placement of the deck module elements. After wedging clippers by wedge segments on the main carrying pillars, stiffening pillars are inserted, the pillars are placed on the sea bed and spaces between them are filled by cement inject. Additionally stay-ropes are established, tightened with hydraulic cylinders and locked by chain stoppers on the stay-ropes maintenance deck. According to the present invention the unmanned platform for the recovery of minerals from the sea bed, especially oil and natural gas, allows surface heading of four exploratory holes and one hole for water compression. Distribution of a couple of unmanned platforms in the radius of 4000 m from the production centre on the main platform is enough for the effective deposit exploitation. The construction affords possibilities for the deposit drilling in automatic mode without working personnel participation during platform exploitation. Scheduled maintenance and repairs, made by a maintenance team transported by sea, are completed during the period of up to 12 hours. Control is provided by high frequency radiolink from the main platform. Environment protection against pollution by crude oil spill is provided by leakproof head deck construction with sump tank. The platform has inflatable life rafts, evacuation equipment, life buoys, thermal suits. Cranes, designed in the form of gantry, assure vertical transportation and possibility to measure bottom-hole pressures and easy work like stamping, templeting. The platform and its foundation on the sea bed are adapted for the Baltic Sea conditions and after the exploitation has been completed it can be disassembled by ordinary equipment, without the necessity to use specialised equipment and induced expenses. The object of the present invention is presented on the drawing, where fig.1 presents schematic overview of the unmanned platform, founded and anchored in the sea bed, fig.2 presents end view of the clipper, fig.3 top view of the clipper, fig.4 longitudinal section of the lower part of the main pillar with stiffening pillars, fig.5 cross-section of the main pillar, fig.6 cross-section of the main pillar with stiffening pillar, fig.7 cross-section of the main pillar with the stiffening pillars, fig.8 cross-section of the stiffening pillars.
Object of the present invention in the field of construction in the effect example consist of the bottom plate 8, with four main support pillars 15 joined by clippers 6 through lower 13 and upper 14 wedging inserts. It has the deck module 23 over the sea level, which consist of mooring stage 5, stay-ropes deck 4, heading deck 3 and upper deck 2 with crane 1 in form of gantry. Main support pillars 15 in the lower part form a complex with stiffening pillars 11 and 12 by filling the space between them by cement inject 16. The unmanned platform has stay-ropes 7 anchored by anchoring plates 9, fixed to the sea bed by pillars 10. Distributed on the main support columns 15, clippers 6, have connected through construction elements 19, main support pillars 15 passages 18 and production risers 20 passages 17, which are ended by seats 21 and 22 co-operating with upper 14 and lower 13 segmented wedging inserts.
Object of the present invention in the field of foundation of the unmanned platform, in the effect example is based on the bottom plate 8 lying on the sea bed. Clippers 6 are underslinged in the operating field of the drilling platform and into its passages 18 main support pillars 15 are introduced and joined by connectors which are next guided onto holes in the submerged bottom plate 8 and lowered onto the sea bed. On the length between sea bed and sea level of main support pillars 15, clippers 6 are placed and wedged by lower 13 and upper 14 wedge segment. After wedging stiffening pillars 11 and then the stiffening pillar 12 are introduced into the main support pillars 15 and lowered down onto the sea bed and the space between them is filled by cement inject 16. On the main support pillars 15, in overwater part, parts of deck module are placed. Next stay ropes 7 are established and then tightened by hydraulic cylinders and fixed by chain stoppers on the stay ropes deck 4.

Claims

What is claimed is:
1. Unmanned platform for recovery of minerals especially crude oil and natural gas from sea bed, consisting essentially of upper deck, head deck, pillars, mooring platform, stay ropes, overhead crane, significant that has a bottom plate (8), with introduced main support pillars (15) joined by clippers (6) through segment wedge inserts (13) and (14), with an over the sea level deck module (23).
2. Platform in accordance with claim 1 consisting of the main support pillars (15) in the lower part forming the complex with stiffening pillars (11), or (11) and (12) through filling the space between them by cement inject (16).
3. Platform in accordance with claims 1 and 2 consisting of stay ropes (7) anchored by anchoring plates (9).
4. Platform in accordance with claim 1 consisting of clipper (6) has main support columns (15) passages (18), operating columns
(20) passages (17), with passages (18) has on its ends seats
(21) and (22) co-operating with upper (14) and lower (13) segmented wedging inserts.
5. Platform in accordance with claim 1 consisting of the deck module (23) forms the mooring platform (5), stay rope deck (4), head deck (3), upper deck (2) with crane (1).
6. Way of foundation of unmanned platform for recovery of minerals especially crude oil and natural gas from sea bed, to be based essentially on preparing on the mainland parts of the unmanned platform, transportation to the drilling platform in place of placement of the unmanned platform, consisting of the bottom plate (8) are laid on the sea bed, clippers (6) are underslinged in the operating field of the drilling platform, main support pillars (15) are introduced and joined by connectors, next guiding onto bottom plate (8) and lowered down into sea bed, on the length of main support pillars (15) are displaced clippers (6), wedged by lower (13) and upper (14) wedge segment and are placed parts of the deck module (23).
7. The way in accordance with claim 6 consisting of after wedging of clippers (6) by the wedge segments (13) and (14) on the main support pillars (15), there are introduced inside main support pillars (15) and lowered down into sea bed, stiffening pillars (11) or (11) and (12) and filled by cement inject (16) with additionally established stay ropes (7), which are tighten by hydraulic cylinders and fixed by chain stoppers on the stay ropes maintenance deck (4).
PCT/PL1998/000030 1997-07-11 1998-07-08 Unmanned platform for recovery of minerals from sea bed and directions for its foundation WO1999002786A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PL97321115A PL183685B1 (en) 1997-07-11 1997-07-11 Unattended off-shore mining platform and method of founding same
PLP.321115 1997-07-11

Publications (1)

Publication Number Publication Date
WO1999002786A1 true WO1999002786A1 (en) 1999-01-21

Family

ID=20070296

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/PL1998/000030 WO1999002786A1 (en) 1997-07-11 1998-07-08 Unmanned platform for recovery of minerals from sea bed and directions for its foundation

Country Status (2)

Country Link
PL (1) PL183685B1 (en)
WO (1) WO1999002786A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016145492A (en) * 2015-02-09 2016-08-12 清水建設株式会社 Underwater bedrock excavation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2505410A1 (en) * 1975-02-08 1976-08-19 Salzgitter Maschinen Ag Riser pipe assembly - for offshore drilling platform prefabricated on shore as reinforced bundle and floated on site
US4117690A (en) * 1976-09-02 1978-10-03 Chevron Research Company Compliant offshore structure
WO1982000675A1 (en) * 1980-08-21 1982-03-04 Hayes D Rope guiding device
US4378179A (en) * 1981-06-26 1983-03-29 Exxon Production Research Co. Compliant pile system for supporting a guyed tower
US4599014A (en) * 1985-04-16 1986-07-08 Bechtel International Corporation Buoyant guyed tower
US5443330A (en) * 1991-03-28 1995-08-22 Copple; Robert W. Deep water platform with buoyant flexible piles

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2505410A1 (en) * 1975-02-08 1976-08-19 Salzgitter Maschinen Ag Riser pipe assembly - for offshore drilling platform prefabricated on shore as reinforced bundle and floated on site
US4117690A (en) * 1976-09-02 1978-10-03 Chevron Research Company Compliant offshore structure
WO1982000675A1 (en) * 1980-08-21 1982-03-04 Hayes D Rope guiding device
US4378179A (en) * 1981-06-26 1983-03-29 Exxon Production Research Co. Compliant pile system for supporting a guyed tower
US4599014A (en) * 1985-04-16 1986-07-08 Bechtel International Corporation Buoyant guyed tower
US5443330A (en) * 1991-03-28 1995-08-22 Copple; Robert W. Deep water platform with buoyant flexible piles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016145492A (en) * 2015-02-09 2016-08-12 清水建設株式会社 Underwater bedrock excavation method

Also Published As

Publication number Publication date
PL321115A1 (en) 1999-01-18
PL183685B1 (en) 2002-06-28

Similar Documents

Publication Publication Date Title
CA1110458A (en) Mooring system for tension leg platform
EP0837813B1 (en) Minimal production platform for small deep water reserves
KR102252116B1 (en) Subsea support unit and method of providing shallow water drilling terminal
US4746245A (en) Offshore drilling and/or production system
US4666340A (en) Offshore platform with removable modules
CN105603881B (en) A kind of the integral erection system and its construction method of large-scale arch bridge over strait
EP1189804B1 (en) Device for positioning and lifting a marine structure, particularly a platform deck
US4607982A (en) Method and apparatus for installation of an offshore platform
CN110984004B (en) Method for dismantling lower supporting structure of bridge
CN102720140A (en) Large-span prestress concrete continuous beam deepwater pier construction process
CN109506044A (en) A kind of pipeline under the ocean construction technology
US4566824A (en) System for drilling from a water surface, which is insensitive to the swell
US4417831A (en) Mooring and supporting apparatus and methods for a guyed marine structure
EP2171159A1 (en) Device and method for marine tower structure
KR20180124108A (en) Undersea base structure and its installation method
WO2013044978A1 (en) Method of building an offshore power storage facility and corresponding offshore power storage facility
US6668746B1 (en) Lifting vessel and method for positioning, lifting and handling a platform deck and a jacket
WO2011102738A2 (en) A method and vessel for offshore transport and installation of windmill assemblies
US4108102A (en) Anchorable, floating platform
USRE32119E (en) Mooring and supporting apparatus and methods for a guyed marine structure
EP3532678B1 (en) Harbour plant and method for mooring a floating body in a harbour plant
WO1999002786A1 (en) Unmanned platform for recovery of minerals from sea bed and directions for its foundation
CN110984003B (en) Method for removing pier and bearing platform at lower part of river-crossing bridge
CN107585269B (en) Seawater three-dimensional oil tank platform, system and construction method thereof
TWI702327B (en) Harbour plant and method for mooring a floating body in a harbour plant

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): LT LV RU

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase