JP2016145492A - Underwater bedrock excavation method - Google Patents
Underwater bedrock excavation method Download PDFInfo
- Publication number
- JP2016145492A JP2016145492A JP2015023140A JP2015023140A JP2016145492A JP 2016145492 A JP2016145492 A JP 2016145492A JP 2015023140 A JP2015023140 A JP 2015023140A JP 2015023140 A JP2015023140 A JP 2015023140A JP 2016145492 A JP2016145492 A JP 2016145492A
- Authority
- JP
- Japan
- Prior art keywords
- excavation
- steel pipe
- work floor
- bedrock
- rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
本発明は、ダム湖底などの水底の岩盤を掘削する方法に関する。 The present invention relates to a method for excavating a bedrock such as a dam lake bottom.
高度経済成長期前後から多数建設されたダムは、経年的な劣化も認められ、我が国の優れた治水インフラを継続的に維持する観点から、リニューアル工事を随時行ってゆくことが必要になる。 Many dams constructed from around the period of high economic growth have also deteriorated over time, and it is necessary to carry out renewal work from time to time in order to maintain Japan's excellent flood control infrastructure.
一方、ダムのリニューアル工事を行う際には、ダムを支持する岩盤の掘削が必要になるケースが多々ある。そして、新設のダムであれば発破工法等を適用して岩盤掘削を行うことができるが、リニューアル工事においては、既設ダムを供用しながらの施工になるため、発破工法を適用することができない。 On the other hand, there are many cases where excavation of the bedrock that supports the dam is necessary when renovating the dam. And if it is a new dam, rock digging can be carried out by applying the blasting method, etc. However, in the renewal construction, the blasting method cannot be applied because the construction is performed while the existing dam is in service.
これに対し、ラップしながら岩盤を掘削し、またバケットで掘削土を搬出しながら掘削を進めてゆくCD工法などのオールケーシング工法の適用が検討されている(特許文献1参照)。 On the other hand, the application of an all-casing method such as a CD method in which excavation is advanced while excavating soil with a bucket while excavating soil with a bucket is being studied (see Patent Document 1).
しかしながら、CD工法などのオールケーシング工法の適用する場合には、岩盤が固いと、CD工法の前にダウンザホール工法(ダウンザホールハンマーを用いた補助工法)が必要になることが多く、高コスト、工期の長期化を招くおそれがある。 However, when all-casing methods such as the CD method are applied, if the bedrock is hard, the down-the-hole method (auxiliary method using the down-the-hole hammer) is often required before the CD method, resulting in high costs and a long construction period. There is a risk that
また、ダウンザホール工法は、そのような岩盤にも対応できるが、施工位置を精度よく調整することが非常に難しい。このため、現状では施工性の面も含め、補助工法への適用に限られている。 The down-the-hole method can also be used for such rocks, but it is very difficult to adjust the construction position with high accuracy. For this reason, at present, it is limited to the application to the auxiliary construction method, including the workability.
本発明は、上記事情に鑑み、より効率的にダム湖底などの水底の岩盤を掘削することを可能にした水底の岩盤掘削方法を提供することを目的とする。 In view of the above circumstances, an object of the present invention is to provide a method for excavating a rocky bottom, which makes it possible to more efficiently excavate a rocky bottom such as a dam lake bottom.
上記の目的を達するために、この発明は以下の手段を提供している。 In order to achieve the above object, the present invention provides the following means.
本発明の水底の岩盤掘削方法は、水底の岩盤を掘削する方法であって、ダウンザホールハンマーで掘削するとともに鋼管杭を建て込み、該鋼管杭に支持させて作業床を設置し、先行設置した前記作業床を用いて順次前記鋼管杭の建て込み、前記作業床の設置を行って掘削対象領域に桟橋を設置し、前記桟橋から掘削対象領域の岩盤に複数の掘削孔をラップさせずに穿設し、該複数の掘削孔を穿設した岩盤を掘削機で掘削するとともに、順次前記作業床及び前記鋼管杭を撤去しながら前記作業床の下方の岩盤に複数の掘削孔をラップさせずに穿設し前記掘削機で掘削してゆくことを特徴とする。 The method of excavating a rock bed of the bottom of the present invention is a method of drilling a rock bed of the bed, drilling with a down-the-hole hammer and building a steel pipe pile, supporting the steel pipe pile, installing a work floor, Build the steel pipe piles sequentially using a work floor, install the work floor and install a pier in the excavation target area, and pierce without drilling a plurality of excavation holes from the pier to the rock in the excavation target area Then, excavating the bedrock having the plurality of excavation holes with an excavator and sequentially removing the work floor and the steel pipe pile without wrapping the plurality of excavation holes in the bedrock below the work floor. And excavating with the excavator.
また、本発明の水底の岩盤掘削方法においては、前記掘削対象領域の岩盤に複数の掘削孔をラップさせずに穿設する際に、ダウンザホール用テンプレートを用いることが望ましい。 In the method for excavating a rocky bottom of the present invention, it is desirable to use a down-the-hole template when drilling without drilling a plurality of excavation holes in the rock in the excavation target area.
本発明の水底の岩盤掘削方法においては、ダウンザホールハンマーで掘削するとともに鋼管杭を建て込み、作業床を掘削対象領域まで延設し、この作業床から掘削対象領域の岩盤に、ラップさせずに複数の掘削孔を穿設することで、クラブバケットなどを用いて掘削対象領域の岩盤を所定深度まで掘削することができる。 In the water bed excavation method of the present invention, excavation with a down-the-hole hammer and a steel pipe pile are built, the work floor is extended to the excavation target area, and a plurality of rocks are excavated from the work floor to the rock in the excavation target area. By drilling the excavation hole, the rock in the excavation target area can be excavated to a predetermined depth using a club bucket or the like.
そして、作業床、鋼管杭の撤去を行うとともに、順次掘削孔の穿設、岩盤の掘削を行ってゆくことで、水底の岩盤を効率的に掘削することが可能になる。 And while removing a work floor and a steel pipe pile, it becomes possible to excavate the bedrock underwater efficiently by drilling a drilling hole and excavating the bedrock sequentially.
以下、図1から図3を参照し、本発明の一実施形態に係る水底の岩盤掘削方法について説明する。 Hereinafter, with reference to FIG. 1 to FIG. 3, a method for excavating a rock bed according to an embodiment of the present invention will be described.
ここで、本実施形態では、例えば、ダムのリニューアル工事を行うために、ダムを支持する水底の岩盤を掘削するものとして説明を行う。なお、本発明にかかる岩盤掘削方法は、ダムを支持する岩盤の掘削にその適用を限定する必要はなく、海底、川底、湖底など、水底に存在する岩盤を掘削するあらゆるケースに適用可能である。 Here, in this embodiment, for example, in order to perform a dam renewal construction, the description will be made on the assumption that a bedrock underwater that supports the dam is excavated. The rock excavation method according to the present invention does not need to be limited to the excavation of the rock supporting the dam, and can be applied to all cases of excavating the rock existing on the bottom of the sea such as the seabed, riverbed, and lake bottom. .
まずはじめに、本実施形態の水底の岩盤掘削方法では、図1及び図2示すように、陸地R1から掘削対象領域R2上に作業足場となる桟橋1を設置する。
First, in the bottom rock excavation method according to the present embodiment, as shown in FIGS. 1 and 2, a
このとき、図1、図2(a)〜図2(f)に示すように、陸地R1からダム湖の岩盤Gの所定位置をダウンザホールハンマー2で掘削し、掘削孔3に鋼管杭4を建て込み、複数の鋼管杭4に支持させて作業床5を設置する。ここで、本実施形態では作業床5の前端側と後端側にそれぞれ1列ずつ5本の鋼管杭4を設置し、これら鋼管杭4で作業床5を支持する。なお、鋼管杭4の数を限定する必要はなく、例えば作業床5の前端側と後端側の両側端側に鋼管杭4を設置し、1列2本ずつの鋼管杭4作業床5を支持するようにしてもよい。
At this time, as shown in FIGS. 1, 2 (a) to 2 (f), a predetermined position of the rock G of the dam lake is excavated by the down-the-
次に、本実施形態の水底の岩盤掘削方法では、構築した桟橋1を適宜他の作業などに使用した後、図1、図2(g)に示すように、最前方の作業床5(1スパン目の作業床5)を撤去する。そして、作業床5上に掘削機6を配置し、作業床5を撤去した部分の掘削対象領域R2の岩盤Gの所定位置をダウンザホールハンマー2で掘削する。
Next, in the water bed excavation method of this embodiment, after using the constructed
このとき、図1、図2、図3(a)に示すように、ダウンザホールの掘削位置に応じた複数の貫通孔7が形成された鋼製のダウンザホール用テンプレート(孔あきプレート)8を作業床5を撤去した部分の掘削対象領域R2に設置する。このダウンザホール用テンプレート8の貫通孔7にダウンザホールハンマー2を配置して掘削してくことで、掘削対象領域R2に所望の間隔で精度よく整列配置して掘削孔3を穿設することができる。
At this time, as shown in FIGS. 1, 2, and 3A, a steel down-the-hole template (perforated plate) 8 in which a plurality of through
また、岩盤(地盤)Gの強度などに応じて、図3(b)に示すような貫通孔7を千鳥配置して貫通孔7同士の距離を小さくしたダウンザホール用テンプレート8を用いるなどし、掘削孔3を密に配置するようにしてもよい。
なお、掘削孔3の数、配置は地盤Gの強度などに応じて決定すればよい。
Further, depending on the strength of the bedrock (ground) G, the down-the-hole template 8 in which the through
In addition, what is necessary is just to determine the number and arrangement | positioning of the
次に、図2(h)に示すように、ダウンザホール用テンプレート8を撤去し、テンプレートの先端側を支持していた鋼管杭4を撤去する。そして、複数の掘削孔3を穿設して強度を低下させた桟橋1前方の岩盤領域R2を桟橋1からグラブバケットで掘削してゆく。このようにグラブバケットで掘削して土砂を地上に繰り返し排除してゆくことにより、所望の深度まで岩盤領域R2全体を掘削する。
Next, as shown in FIG. 2 (h), the down-the-hole template 8 is removed, and the
次に、桟橋1の最前方の作業床5(2スパン目の作業床5)を撤去するとともに、作業床5を撤去した部分の鋼管杭4を引き抜いて撤去する。
Next, the foremost work floor 5 (
このように2スパン目の作業床5及び鋼管杭4を撤去した段階で、ダウンザホール用テンプレート8を用い、桟橋1から岩盤領域Rに掘削孔3を穿設し、複数の掘削孔3を穿設して強度を低下させた領域R2全体の岩盤Gを、前述と同様、グラブバケットで所定の深度まで掘削する。
When the
このような作業床5及び鋼管杭4の撤去、ダウンザホール用テンプレート8の設置、複数の掘削孔3の穿設、ダウンザホール用テンプレート8の撤去、クラブバケットでの掘削を繰り返し行うことで、図2(i)、図2(j)に示すように、陸地R側まで所定領域Rの岩盤Gを掘削する。
By repeatedly removing the
したがって、本実施形態の水底の岩盤掘削方法においては、ダウンザホールハンマー3で掘削するとともに鋼管杭4を建て込み、作業床5を掘削対象領域R2まで延設し、この作業床5から掘削対象領域R2の岩盤Gに、ラップさせずに掘削孔3を穿設することで、クラブバケットなどを用いて掘削対象領域R2の岩盤Gを所定深度まで掘削することができる。
Therefore, in the water bed excavation method of the bottom of this embodiment, it excavates with the down the
そして、作業床5、鋼管杭4の撤去を行うとともに、順次掘削孔3の穿設、岩盤Gの掘削を行ってゆくことで、水底の岩盤Gを効率的に掘削することが可能になる。
Then, by removing the
以上、本発明に係る水底の岩盤掘削方法の一実施形態について説明したが、本発明は上記の一実施形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。 As mentioned above, although one Embodiment of the water bed rock excavation method concerning this invention was described, this invention is not limited to said one Embodiment, In the range which does not deviate from the meaning, it can change suitably.
1 桟橋
2 ダウンザホールハンマー
3 掘削孔
4 鋼管杭
5 作業床
6 掘削機
7 貫通孔
8 ダウンザホール用テンプレート
G 岩盤
R1 陸地
R2 掘削対象領域
DESCRIPTION OF
Claims (2)
ダウンザホールハンマーで掘削するとともに鋼管杭を建て込み、該鋼管杭に支持させて作業床を設置し、先行設置した前記作業床を用いて順次前記鋼管杭の建て込み、前記作業床の設置を行って掘削対象領域に桟橋を設置し、
前記桟橋から掘削対象領域の岩盤に複数の掘削孔をラップさせずに穿設し、該複数の掘削孔を穿設した岩盤を掘削機で掘削するとともに、
順次前記作業床及び前記鋼管杭を撤去しながら前記作業床の下方の岩盤に複数の掘削孔をラップさせずに穿設し前記掘削機で掘削してゆくことを特徴とする水底の岩盤掘削方法。 A method of drilling underwater bedrock,
Excavate with a down-the-hole hammer and build a steel pipe pile, install a work floor supported by the steel pipe pile, build the steel pipe pile sequentially using the work floor installed in advance, and install the work floor A pier in the area to be excavated,
Drilling a plurality of excavation holes without wrapping from the pier to the rock in the excavation target area, excavating the rock mass with the plurality of excavation holes drilled with an excavator,
A method of excavating a bedrock under water, wherein a plurality of excavation holes are not wrapped in a bedrock below the work floor while the work floor and the steel pipe pile are sequentially removed and drilled by the excavator. .
前記掘削対象領域の岩盤に複数の掘削孔をラップさせずに穿設する際に、ダウンザホール用テンプレートを用いることを特徴とする水底の岩盤掘削方法。 The method of excavating a rocky bottom of a rock according to claim 1,
A method of excavating a rocky bottom of a rock, wherein a down-the-hole template is used when drilling without drilling a plurality of excavation holes in the rock in the excavation target area.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015023140A JP6544556B2 (en) | 2015-02-09 | 2015-02-09 | Bedrock drilling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015023140A JP6544556B2 (en) | 2015-02-09 | 2015-02-09 | Bedrock drilling method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016145492A true JP2016145492A (en) | 2016-08-12 |
JP6544556B2 JP6544556B2 (en) | 2019-07-17 |
Family
ID=56686125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015023140A Active JP6544556B2 (en) | 2015-02-09 | 2015-02-09 | Bedrock drilling method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6544556B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019078018A (en) * | 2017-10-20 | 2019-05-23 | 国立大学法人 東京大学 | Mining device, marine resources lifting device provided with the same and marine resources lifting method |
CN112195779A (en) * | 2020-08-11 | 2021-01-08 | 中国建筑第七工程局有限公司 | Multifunctional trestle construction method suitable for thick pebble layer |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4408932A (en) * | 1980-12-30 | 1983-10-11 | Armco Inc. | Subsea template levelling system and method |
JPH01174720A (en) * | 1987-12-28 | 1989-07-11 | Shimizu Corp | Method of drilling successive excavating holes and underground excavating device |
JPH02116589U (en) * | 1989-03-01 | 1990-09-18 | ||
JPH0530289U (en) * | 1991-09-27 | 1993-04-20 | 三和機材株式会社 | Hammer rod support device for casing pushing type excavator. |
JPH07293167A (en) * | 1994-04-26 | 1995-11-07 | Nippon Sharyo Seizo Kaisha Ltd | Rock-bed excavating method and its device |
WO1999002786A1 (en) * | 1997-07-11 | 1999-01-21 | PRZEDSIEBIORSTWO POSZUKIWAN I EKSPLOATACJI Z$m(C)ÓZ ROPY I GAZU 'PETROBALTIC' | Unmanned platform for recovery of minerals from sea bed and directions for its foundation |
JP2000080877A (en) * | 1998-09-07 | 2000-03-21 | Kajima Corp | Anti-pollution, muck receiving device for excavating device |
JP2000328863A (en) * | 1999-05-19 | 2000-11-28 | Maruei Kogyo Kk | Auger drilling method and apparatus for the same |
JP2006336408A (en) * | 2005-06-06 | 2006-12-14 | Kencho Co Ltd | Ground excavating device and ground excavating method |
JP2012112191A (en) * | 2010-11-25 | 2012-06-14 | Kouchi Marutaka:Kk | Landing bridge construction method |
JP2013147926A (en) * | 2011-12-21 | 2013-08-01 | Yokoyama Kiso Koji:Kk | Tubular pile installation method, excavation method, inner digger device and gripping device |
-
2015
- 2015-02-09 JP JP2015023140A patent/JP6544556B2/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4408932A (en) * | 1980-12-30 | 1983-10-11 | Armco Inc. | Subsea template levelling system and method |
JPH01174720A (en) * | 1987-12-28 | 1989-07-11 | Shimizu Corp | Method of drilling successive excavating holes and underground excavating device |
JPH02116589U (en) * | 1989-03-01 | 1990-09-18 | ||
JPH0530289U (en) * | 1991-09-27 | 1993-04-20 | 三和機材株式会社 | Hammer rod support device for casing pushing type excavator. |
JPH07293167A (en) * | 1994-04-26 | 1995-11-07 | Nippon Sharyo Seizo Kaisha Ltd | Rock-bed excavating method and its device |
WO1999002786A1 (en) * | 1997-07-11 | 1999-01-21 | PRZEDSIEBIORSTWO POSZUKIWAN I EKSPLOATACJI Z$m(C)ÓZ ROPY I GAZU 'PETROBALTIC' | Unmanned platform for recovery of minerals from sea bed and directions for its foundation |
JP2000080877A (en) * | 1998-09-07 | 2000-03-21 | Kajima Corp | Anti-pollution, muck receiving device for excavating device |
JP2000328863A (en) * | 1999-05-19 | 2000-11-28 | Maruei Kogyo Kk | Auger drilling method and apparatus for the same |
JP2006336408A (en) * | 2005-06-06 | 2006-12-14 | Kencho Co Ltd | Ground excavating device and ground excavating method |
JP2012112191A (en) * | 2010-11-25 | 2012-06-14 | Kouchi Marutaka:Kk | Landing bridge construction method |
JP2013147926A (en) * | 2011-12-21 | 2013-08-01 | Yokoyama Kiso Koji:Kk | Tubular pile installation method, excavation method, inner digger device and gripping device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019078018A (en) * | 2017-10-20 | 2019-05-23 | 国立大学法人 東京大学 | Mining device, marine resources lifting device provided with the same and marine resources lifting method |
CN112195779A (en) * | 2020-08-11 | 2021-01-08 | 中国建筑第七工程局有限公司 | Multifunctional trestle construction method suitable for thick pebble layer |
Also Published As
Publication number | Publication date |
---|---|
JP6544556B2 (en) | 2019-07-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6661448B2 (en) | Construction method of underground diaphragm wall | |
JP6774132B1 (en) | Construction method of steel pipe pile | |
CN111705785A (en) | Grooving method for underground continuous wall | |
CN105569051A (en) | Foundation pit support system of sandy pebble boulder geological stratification and construction method | |
CN108867692A (en) | The protection of city big cross section open trench tunnel Nearby Structure and tunnel foundation pit method for digging | |
CN102660955A (en) | Quick construction method for foundation pit slope support | |
JP6544556B2 (en) | Bedrock drilling method | |
CN105909262B (en) | A kind of bored tunnel driving method | |
JP6319935B2 (en) | Tubing pile driving method | |
CN102587385A (en) | Foundation pit supporting method for sludge-exchanged and filled soft soil | |
JP2017128877A (en) | Construction method of precast pile | |
JP5406628B2 (en) | Cast-in-place pile installation method | |
JP2007332559A (en) | Removal method for existing underground pile | |
KR20160047228A (en) | Cross-Section Tunnel Construction Method Using Rock Mass Quality Rating | |
JP2011063958A (en) | Open shield machine and method for constructing caisson foundation for open shield tunneling method | |
JP5524642B2 (en) | Cutting method | |
JPH08184058A (en) | Landslide protection construction | |
JP5584373B1 (en) | Sheet pile placing method | |
KR100968431B1 (en) | Jacket Installing process of jacket facility structure using R.C.D. reamming bit for excavating enlarged hole in the earth | |
KR20130118529A (en) | Underground structure and structure for protecting landslide using the same | |
JP7089928B2 (en) | How to build cast-in-place concrete piles | |
JP2008013999A (en) | Construction method of cast-in-place concrete pile | |
JP3205279U (en) | Cut bucket | |
JP2019060227A (en) | Construction method of jacket structure | |
CN116906055B (en) | Construction method for controlling deformation of tunnel underpass railway bed and shed frame supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20171206 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20181002 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180928 |
|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20181005 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20181128 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20190507 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20190605 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6544556 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |