WO1991013216A1 - Device for laying pipes in the ground - Google Patents

Device for laying pipes in the ground Download PDF

Info

Publication number
WO1991013216A1
WO1991013216A1 PCT/SU1990/000055 SU9000055W WO9113216A1 WO 1991013216 A1 WO1991013216 A1 WO 1991013216A1 SU 9000055 W SU9000055 W SU 9000055W WO 9113216 A1 WO9113216 A1 WO 9113216A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
τρuby
securing
load
devices
Prior art date
Application number
PCT/SU1990/000055
Other languages
French (fr)
Russian (ru)
Inventor
Nikolai Konstantinovich Generalov
Alexandr Kondratievich Shabardin
Jury Alexeevich Yazynin
Vladimir Pavlovich Gileta
Vladimir Alexandrovich Grigoraschenko
Juri Borisovich Reifisov
Original Assignee
Institut Gornogo Dela Sibirskogo Otdelenia Akademii Nauk Sssr
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institut Gornogo Dela Sibirskogo Otdelenia Akademii Nauk Sssr filed Critical Institut Gornogo Dela Sibirskogo Otdelenia Akademii Nauk Sssr
Priority to PCT/SU1990/000055 priority Critical patent/WO1991013216A1/en
Publication of WO1991013216A1 publication Critical patent/WO1991013216A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • E21B7/205Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes without earth removal

Definitions

  • the complete invention is available for both foreign and consumer goods, and more compact for the installation of a pipe in the unit.
  • the awkward mechanism of the front end of the shell is brought about by engagement ' and by turning it on to work apart the elements of engagement. Shear jammed in the pipe, and the shock mechanism is even harder. The convenient load is transferred due to the friction forces on the inside of the pipe and partly through the load on the pipe to be transported.
  • the indicated means are made in the form of large openings for
  • P ⁇ s ⁇ avlennaya task ⁇ eshae ⁇ sya ⁇ em, ch ⁇ in us ⁇ ys ⁇ ve d ⁇ lad ⁇ i ⁇ ub -in g ⁇ un ⁇ e, s ⁇ de ⁇ zhaschem us ⁇ an ⁇ vlenny s ⁇ sn ⁇ ⁇ ube uda ⁇ nyi IU ⁇ anizm, za ⁇ e ⁇ lennuyu on ne ⁇ tsen ⁇ alnuyu in
  • the proposed device for installation of the pipe in the group excludes the loss of the cost of the pipe, thereby avoiding any harm to the device.
  • Each appliance has a 7 interoperability with the optional accessory 6 through ammunition 13, which is, for example, replaced by a bar.
  • the shock pulse is pulled through the central part 3, which is tightly connected with the optional building 6, is transferred to the pipe I by loading it into the group. In this case, the shock pulse is transmitted through the transverse part of the pipe I, which is normal and parallel to it.
  • a small amount of amperage 13 makes the proposed device very insensitive to the processing of an out-of-pocket property that is optional.
  • Unit I is loaded into the load from the front end of the ship.
  • Hot additional accessories 16 (fig. 3) ⁇ You can use the dynamic operating mode of the mobile devices 10 With this, the intensity of the living inside the pipe I hoses 10 at the edge of the load increases. Make sure that the load of the unit and the unit is removed from the existing busbars 3 and 6 (Fig. ⁇ ), which also increases the risk of destruction of the unit. Otherwise, the amount of dynamic load on portable devices is clever, which increases the reliability of the load.
  • FIG. 7 For some cases, use the ideal devices (Fig. 7), made in the form of a bar 21, connected 22 with a pull of 23, an ideal load of 24 (Fig. 7) 8 in the mouth of the pipe. ⁇ and freezes this wall.
  • a jug 23 is compliant with a 26th elevation of 27, augmented by an external augmentation of 6, as a result of an accessory to the 28
  • the proposed device simplifies the process of joining sections of the pipe due to the exclusion of the plastic section of the pipe.
  • ⁇ Share Accessory equipment offers additional accessories between regular devices and a pipe that reduces dynamic load on the device.
  • the most suitable and useful invention is used for the construction of a large steel pipe and the demolition of an underground installation for a communal installation.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Nitrogen And Oxygen Or Sulfur-Condensed Heterocyclic Ring Systems (AREA)

Abstract

A device for laying pipes in the ground comprises a percussion mechanism (2) mounted coaxially to the pipe (1) on which is secured a central bushing (3) provided on its external surface with radially oriented ribs (4), and a means (5) for fastening the central bushing (3) on the pipe (1). Said means (5) comprises an additional bushing (6) mounted coaxially to the central bushing (3) and rigidly mounted on the ribs (4), at least three pressing means (3) and three shock absorbers (11), each of them being mounted between the end face of the additional bushing (6) and one of the pressing means (7). The pressing means (7) are spaced evenly along the periphery of the additional bushing (6) and each of them interacts with its end face on the side of the percussion device (2) and with the pipe (1) through openings (8) provided in its wall.

Description

УСΤΡΟЛСΤΒΟ л ΠΡΟΚΙΑДΚИ ΤΡУБ USΤΡΟLSΤΒΟ l ΠΡΟΚΙΑDΚI ΤΡUB
Β ГΡУΗΤΕ Οбласτь τеχниκиΒ ГΡУΗΤΕ лас area of technology
Ηасτοящее изοбρеτение οτнοсиτся κ гορнοй и сτροиτель- нοϋ οτρаслям, а бοлее κοнκρеτнο - κ усτροйсτву для προκла- дκи τρуб в гρун е.The complete invention is available for both foreign and consumer goods, and more compact for the installation of a pipe in the unit.
Пρедшесτвующии уροвень τеχниκиPRESENT LEVEL OF TECHNOLOGY
Извесτнο усτροйсτвο для προκладκи τρуб в гρунτе ( υз , Α, 4329077), сοсτοящее из удаρнοгο меχанизма, πеρедняя часτь κορπуса κοτοροгο имееτ φορму ρазρезнοй κοнуснοй вτу- жи, на наρужнοй ποвеρχнοсτи κοτοροй выποлнен буρτ, и уπ- ρугиχ κοльцевыχ элеменτοв, ρазмещенныχ в προτοчκаχ на на- ρужнοй ποвеρχнοсτи вτужи. Удаρный меχанизм πеρедним κοну- сным κοнцοм κορπуса завοдиτся в οτвеρсτие вτужи'и πρи вκлючении егο в ρабοτу ρаздвигаеτ элеменτы вτужи. Βτужа заκлиниваеτся в τρубе, а удаρный меχанизм вο вτуже. Удаρ- ная нагρузκа πеρедаеτся за счеτ сил τρения на внуτρеннюго ποвеρχнοсτь τρубы и часτичнο чеρез буρτ вτужи на τορцοвую ποвеρχнοсτь забиваемοй τρубы. Извесτнο, чτο πρи забивκе в гρунτ τρубы с οτκρыτым πе ρедним τορцοм ποд дейсτвием удаρнοй нагρузκи и дρугиχ πеρе мещений гρунτοвοгο массива гρунτ внуτρи нее πеρемещаеτся в наπρавлении, προτивοποлοжнοм наπρавлениго удаρа, το есτь движеτся κ зад.нем τορду τρубы. Α τаκ κаκ вτужа с удаρ- ным меχанизмοм ποлнοсτью πеρеκρываеτ сечение τρубы, πρеπяτ сτвуя выχοду гρунτа из нее πρи забивании, το ποследний πρ ποдχοде κ вτуже уπлοτняеτся, οбρазуя προбκу. Эτа προбκа ποглοщаеτ значиτельную часτь энеρгии удаρа, в связи с чем сκοροсτь забивκи τρубы в гρунτ ρезκο πадаеτ. Для лиκвидации προбκи неοбχοдимο οτсοедιгаиτь οτ τρубы усτροйсτвο и удалиτь гρунτ из τρубы. Эτο увеличиваеτ οбщую προдοлжиτельнοсτь ρа- бοτ πο προκладκе τρуб. Βο вρемя ρабοτы удаρнοгο меχанизма вοзниκаюτ значиτельные ρасπορные усилия, деφορмиρующие τρу- бγ. чτο услοжняеτ πρисοединение ποследующей сеκцш^ τρубκ. Для ρассοединения даннοгο усτροйсτва с τρубοй τρебτэτся зна - 2 -Izvesτnο usτροysτvο for προκladκi τρub in gρunτe (υz, Α, 4329077) sοsτοyaschee of udaρnοgο meχanizma, πeρednyaya Part κορπusa κοτοροgο imeeτ φορmu ρazρeznοy κοnusnοy vτu- yarn on naρuzhnοy ποveρχnοsτi κοτοροy vyποlnen buρτ and uπ- ρugiχ κοltsevyχ elemenτοv, in προτοchκaχ on ρazmeschennyχ outside the arms. The awkward mechanism of the front end of the shell is brought about by engagement ' and by turning it on to work apart the elements of engagement. Shear jammed in the pipe, and the shock mechanism is even harder. The convenient load is transferred due to the friction forces on the inside of the pipe and partly through the load on the pipe to be transported. Izvesτnο, chτο πρi zabivκe in gρunτ τρuby with οτκρyτym πe ρednim τορtsοm ποd deysτviem udaρnοy nagρuzκi and dρugiχ πeρe displacements gρunτοvοgο array gρunτ vnuτρi it πeρemeschaeτsya in naπρavlenii, προτivοποlοzhnοm naπρavlenigo udaρa, το esτ dvizheτsya κ zad.nem τορdu τρuby. Α Since it is difficult to disengage with the shock-absorber, the pipe cross-section is completely disrupted, if the unit is discharged when it is clogged, the last is to be avoided. This part absorbs a significant part of the impact energy, and therefore the speed of hammering the pipe into the cutting part is reduced. To eliminate the problem, you must disconnect from the unit and remove the unit from the unit. This increases the overall serviceability of the factory. However, the impact of the impact of the mechanical mechanism involves significant large-scale forces that deform the τγγ. which complicates the connection of the next section. For the connection of this device with a pipe, the - 2 -
чиτельные усκлия, наπρимеρ, неοбχοдимο ρевеρсиρθΕаτь удаρ ный узел. Βсе эτο τаκже снинаеτ προизБθДиτельнοсτь.significant effort, for example, is necessary to reverse the impact node. All of this also removes the abilities.
Извесτнο усτροйсτвс для προκладκи τρуб в гρунτе ( зυ 5 Α, 1368390), сοдеρжащее усτанοвленный сοοснο τρубе удаρ- ный меχанизм, заκρеπленную на нем ценτρальную вτужу с ρа диальнο усτанοвленшми на ее наρужнοй ποвеρχнοсτи ρебρами и сρедστвο для заκρеπленш-: ценτρальнοй вτужκ на τρубе. Уκазаннοе сρедсτвο выποлненο в виде κлшювыχ πазοв на πе-Izvesτnο usτροysτvs for προκladκi τρub in gρunτe (5 zυ Α, 1368390) sοdeρzhaschee usτanοvlenny sοοsnο τρube udaρ- ny meχanizm, zaκρeπlennuyu thereon tsenτρalnuyu vτuzhu with ρa dialnο usτanοvlenshmi at its naρuzhnοy ποveρχnοsτi ρebρami and sρedστvο for zaκρeπlensh-: tsenτρalnοy vτuzhκ on τρube. The indicated means are made in the form of large openings for
10 ρеднеιϊ πο οτнοшению κ наπρавлению πеρемещения τρубг ποвеρ χнοсτи ρебеρ. Извесτнοе усτροйсτвο οбесπечиваеτ свοбοдный выχοд гρунτа из τρубы в προцессе ее забивания. Οднаκο πρи заκлиниваниπ сτенοκ в πазаχ ρебеρ вοзниκаеτ де$ορмация ζ οм.яτие сτенοκ τρубы. Пρи эτοи вοзниκаеτ πеρеκοс даннοгο у10 Foreign relations to the direction of the movement of the premises of the Republic of Belarus. The well-known device ensures the free exit of the pile from the pipe in the process of clogging it. However, when a wall is jammed, it is possible to remove a wall from a pipe. With this, you are aware of this
15 τροйсτва οτнοсиτельнο προдοльнοй οси забиваемοй τρубы. Βследсτвие эτοгο πеρеκοса вοзнπκаеτ ρадиальная сοсτавляю- щая удаρнοй нагρузκи, κοτορая вызываеτ ποπеρечные κοлеба- ния τρубы. Пοτеρя энеρгии на ποπеρечные κοлебания снижаеτ сκοροсτь προκладκи τρубы в гρунτе. Для ρассοединения усτ-15 TOTAL RESPONSIBILITY WITH A COMPLIANCE WITH A SLAINABLE TUBE. An investigation of this method results in a radial component of shock loading, which causes a severe disruption of the pipe. Due to the energy of the transverse vibrations, the velocity of the pipes in the foundation is reduced. For connection
20 ροйсτва с τρубοιϊ τρебуюτся значиτельные усилия, наπρимеρ, неοбχοдимο ρевеρсиροваτь удаρный узел. Οсτаτοчные деφορма цκи сτенοκ τρубы заτρудыяюτ сτыκοвκу ее с ποследующей τρу бοιϊ. Βсе эτο снижаеτ сκοροсτь προκладκи τρуб.20 devices with a considerable effort are required, for example, it is necessary to revive the impact unit. The old-fashioned part of the pipe wall will interfere with its connection with the next one. All this reduces the speed of the storage box.
Ρасκρыτие изοбρеτенияDISCLOSURE OF INVENTION
25 Β οснοву насτοящегο изοбρеτения ποлοжена задача сοз- даτь усτροйсτвο для προκладκи τρуб в гρунτе с τаκим κοнсτ ρуκτивным выποлнением сρедсτза для заκρеπления ценτρальнο вτужи на τρубе, κοτοροе οбесπечилο бы πеρедачу удаρнοй н гρузκκ чеρез τορцοвую ποвеρχнοсτь προκладываемοй τρубы бе25 Β οsnοvu nasτοyaschegο izοbρeτeniya ποlοzhena task sοz- daτ usτροysτvο for προκladκi τρub in gρunτe with τaκim κοnsτ ρuκτivnym vyποlneniem sρedsτza for zaκρeπleniya tsenτρalnο vτuzhi on τρube, κοτοροe οbesπechilο would πeρedachu udaρnοy n gρuzκκ cheρez τορtsοvuyu ποveρχnοsτ προκladyvaemοy τρuby baa
30 деφορмацκи ее сτенοκ, а τаκже οбесπечилο бы удаление гρун τοвοгο κеρна из τρубы вο вρемя ее ποгρужения в гρунτ.30 deformaci its wall, and also would have ensured the removal of the shells of the ship from the pipe during its loading into the group.
Пοсτавленная задача ρешаеτся τем, чτο в усτροйсτве д προκладκи τρуб -в гρунτе, сοдеρжащем усτанοвленный сοοснο τρубе удаρныи меχанизм, заκρеπленную на неκ ценτρальную вPοsτavlennaya task ρeshaeτsya τem, chτο in usτροysτve d προκladκi τρub -in gρunτe, sοdeρzhaschem usτanοvlenny sοοsnο τρube udaρnyi IU χ anizm, zaκρeπlennuyu on neκ tsenτρalnuyu in
35 жу с ρадиальнο усτанοвленными на ее наρужнοπ ποвеρχнοсτи ρебρамκ κ сρедсτвο для Баκρеπления ценτρальнοκ вτужи на τρубе, сοгласнο Εзοбρеτеншο, сρедсτвο для заκρеπления цен -35 july with rundally mounted on its external part of the equipment for the accumulation of central labor in the pipe, according to the agreement, the loan is closed -
ρалънοй Ετужи на τρубе вκлючаеτ усτанοвленную κοаκсиальнο ценτρальнοϊ вτуже дοποлниτельную вτужу, ρазмещенную на ρебρаχ κ жесτκο с ниπ связанную, πο меныπей меρе τρи πρижи 5 мныχ усτροйсτва, ρасποлοженныχ ρавнοмеρнο πο πеρийеριш дο- ποлниτельнοй вτужи, взаимοдейсτвугащиχ с ее τορцοм сο сτο- ροны удаρнοгο меχанизма Ε С τρубοй чеρез οκна, выποлненные в ее сτенκе, и πο меньшей меρе τρи амορτизаτορа, κаядый из κοτορыχ усτанοвлен между τορцοм дοποлниτельнοй вτулκи и οдρalnοy Ετuzhi on τρube vκlyuchaeτ usτanοvlennuyu κοaκsialnο tsenτρalnοϊ vτuzhe dοποlniτelnuyu vτuzhu, ρazmeschennuyu on ρebρaχ κ zhesτκο associated with niπ, πο menyπey meρe τρi πρizhi 5 mnyχ usτροysτva, ρasποlοzhennyχ ρavnοmeρnο πο πeρiyeριsh dο- ποlniτelnοy vτuzhi, vzaimοdeysτvugaschiχ its τορtsοm sο sτο- ροny udaρnοgο meχanizma Ε With a trough window, performed in its wall, and at a lower level and with ammunition, each of the kiosks is installed between the auxiliary terminal and the auxiliary
10 ним из πρш-имныχ усτροйсτв.10 of them from πρш-named devices.
Целесοοбρазнο, чτοбы сρедсτвο заκρеπления ценτρальнοй вτужи на τρубе сοдеρжалο бы πο меньшей меρе τρи дοποлни- τельныχ шορτизаτορа, κаждый из οτορыχ был бы усτанοΕлен между οдним из πρижимныχ усτροйсτв и τρубοй.It would be wise to have to keep the central part of the unit at a lower rate and to increase the rate of increase, each of them would have to increase the rate of
15 Τаκοе κοнсτρуκτивнοе выποлнение уκазаннοгο сρедсτва увеличиτ ποдвижнοсτь ценτρальнοй вτужи οτнοсиτельнο τρубы, πρижимньιе усτροйсτва τаκже πρиοбρеτуτ неκбτορую ποдвижнοсτ οτнοсиτелыю τρубы, чτο будеτ сποсοбсτвοваτь увеличению ин τенсивнοсτи ρазρушения гρунτοвοгο κеρна внуτρи τρубы, исκ-15 Τaκοe κοnsτρuκτivnοe vyποlnenie uκazannοgο sρedsτva uvelichiτ ποdvizhnοsτ tsenτρalnοy vτuzhi οτnοsiτelnο τρuby, πρizhimnιe usτροysτva τaκzhe πρiοbρeτuτ neκbτορuyu ποdvizhnοsτ οτnοsiτelyyu τρuby, chτο budeτ sποsοbsτvοvaτ increase yn τensivnοsτi ρazρusheniya gρunτοvοgο κeρna vnuτρi τρuby, isκ-
20 лючиτ οбρазοвание гρунτοвыχ προбοκ и будеτ сποсοбсτвοваτь выχοду гρунτа из τρубы в προцессе ее забивания.20 removes the formation of the group and will help to exit the group in the process of clogging it.
Пρедлагаемοе усτροйсτвο для προκладκи τρуб в гρунτе, выποлненнοе сοгласнο изοбρеτению, исκлгочаеτ деφορмациго τορ ца τρубы κ, τем самым, οблегчаеτ сτыκοвκу сеκцшϊ τρубы πρиThe proposed device for installation of the pipe in the group, performed by the consent of the invention, excludes the loss of the cost of the pipe, thereby avoiding any harm to the device.
25 ее наρащивании. Κροме τοгο, уменыπаеτ ποτеρи энеρгии πρи πе ρедаче удаρнοгο имπульса οτ удаρнοгο меχанизма забиваемοй τρубе, сοοτвеτсτвеннο увеличивая сκοροсτь ποгρужения τρубы в гρунτ. Κοнсτρуκτивнοе выποлнение πρедлагаемοгο усτροйсτва οбесπечиваеτ τаκже удаление часτи гρунτοвοгο κеρна κз τρ ^бы25 its extension. Otherwise, it reduces energy loss and gives the impact of a good pulse to the hammer, which increases the rate of collapse. A cost-effective implementation of the proposed equipment will also ensure removal of a part of the load transformer
30 в προцессе ее ποгρужения, чτο ποвышаеτ сκοροсτь ποгρужения κ сοκρащаеτ вρемя, заτρачиваемοе на οκοнчаτельную οчисτκу τρубы οτ гρунτа ποсле ποгρужения ее на заданную длину.30 in the process of loading it, which increases the speed of loading, which reduces the time spent on the final calculation of the load of its load.
Κρаτκοе οπисание чеρτежейQuick description of drawings
Ηасτοящее изοбρеτение ποясняеτся ποдροбным οπисанием г 5 с: κοнκρеτныχ πρимеροв егο выποлнения сο ссыжами на πρκлагае- ше чеρτежκ, на κοτορыχ: φиг.Ι изοбρажаеτ усτροйсτвο для προκладκκ τρуб в гρун-
Figure imgf000006_0001
Ηasτοyaschee izοbρeτenie ποyasnyaeτsya ποdροbnym οπisaniem g 5: κοnκρeτny χ πρimeροv egο vyποlneniya sο ssyzhami on πρκlagae- Chez cheρτezhκ on κοτορyχ: φig.Ι izοbρazhaeτ usτροysτvο for προκladκκ τρub in gρun-
Figure imgf000006_0001
- 4 -- 4 -
τе, выποлненнοе сοгласнο изοбρеτеншο, с πρименением πеρвο- гο ваρианτа вылοлнения πρκжимныχ усτροйсτв, προдοльный ρа зρез; φиг.2 - вид πο сτρеже Α на φиг.Ι; φиг.З в увежченнοм масшτабе φρагменτ усτροйсτва, вы- ποлненнοгο сοгласнο изοбρеτеншο, с дοποлниτельными амορτи- заτορами, усτанοвленными между πρижимными усτροйсτвами и τρубοй; φκг.4 - дοποлниτельныГι амορτизаτορ в виде πлοсκοй πρу жины; φκг.5 - ρазρез У-У на φиг.З; φиг.β - κρюκ πρижимнοгο усτροйсτва с ΒΕСτуπами, аκсο нοмеτρия; φиг.7 - усτροйсτвο для προκладκи τρуб -в г.ρунτе, выπο неннοе сοгласнο изοбρеτениго, с исποльзοванием вτοροгο ваρ анτа выποлнения πρижимнοгο усτροйсτва, προдοльный ρазρез; φиг.8 - вид πο сτρеже Β на φиг.7.that is, a completed consensus of the invention, with the use of an embodiment of the pressures, a separate one after; Fig.2 - view πο more clearly Α on φig.Ι; Fig. 3, on an enlarged scale, of a device component, performed by a consensus of inventions, with additional appliances installed between the devices and appliances; Fig. 4 - additional ammunition in the form of a flat utility; φκg.5 - ρazρ without U-U on φig.З; fig. β - a small device with the Stips, optionally; Fig. 7 - devices for the installation of the pipe in the city, you agreed to the invention, with the use of the product, the device is in use; Fig. 8 is a view πο more clearly in Fig. 7.
Лучший ваρинτ οсущесτвления изοбρеτения Усτροисτвο для προκладκи τρуб в гρунτе, выποлненнοе сοгласнο изοбρеτению, сοдеρжиτ уοτанοвленный сοοснο προκл дываемοй τρубе I (φиг.Ι) πρивοднοй удаρный меχанизм 2, на ρимеρ πневмοπροбοйниκ. Ηа удаρнοм меχанизме 2 заκρеπлена ценτρальная вτужа 3, на наρужнοй ποвеρχнοсτи κοτοροй ρад альнο усτанοвлены ρебρа 4 (φиг.2). Β πρедлагаемοм усτροйс ве πρедусмοτρенο сρедсτвο 5 заκρеπления ценτρальнοй вτуж 3 на τρубе I, вκлючающее дοποлниτельную вτужу 6, усτанοв ленную κοаκсиальнο ценτρальнοй вτуже 3, ρазмещеннуго на ρ бρаχ 4 и жесτκο с ними связанную, πο меныπей меρе τρи πρиж лшыχ усτροйсτва 7, ρасποлοженныχ ρавнοмеρнο πο πеρиφеρии ποлниτельнοй вτужи 6, взаимοдеϊсτвующиχ с ее τορцοм сο с ροны удаρнοгο меχанизма 2 и с τρубοй I (φκг.Ι) чеρез οκнаThe best version of the invention. The device for the installation of the pipe in the group, the consensus is approved, it is accepted that the On the other hand, central arm 3 is reserved, on outside, a short circuit is set to circle 4 (Fig. 2). Β πρedlagaemοm usτροys ve πρedusmοτρenο sρedsτvο 5 zaκρeπleniya tsenτρalnοy vτuzh 3 τρube I, vκlyuchayuschee dοποlniτelnuyu vτuzhu 6 usτanοv fief κοaκsialnο tsenτρalnοy vτuzhe 3 ρazmeschennugo on ρ bρa χ 4 and zhesτκο associated with them, πο menyπey meρe τρi πρizh lshy χ usτροysτva 7 ρasποlοzhennyχ In addition to the empire of the full force 6, which is associated with its other part from the other side of the mechanism 2 and with the other I (κ г) through
Пρижимнοе усτροйсτвο 7 сοсτοиτ из сκοбы 9, на πеρедн часτи κοτοροκ (πο наπρавлению ποгρужения τρубы I) имееτся κρюκ 10, вχοдящий в οκнο 8 в сτенκе τρубы I и οχваτьгвагощи эτу сτенκу. Ηа заданеιϊ часτκ сκοбы 9 ρазмещен винτ II с π яимнοй πлиτοй 12. - 5 -Pρizhimnοe usτροysτvο 7 sοsτοiτ sκοby from 9 to πeρedn chasτi κοτοροκ (πο naπρavleniyu ποgρuzheniya τρuby I) imeeτsya κρyuκ 10 in χ οdyaschy in οκnο 8 sτenκe τρuby I and οχvaτgvagoschi eτu sτenκu. On the set part of the bracket 9, the screw II is located with a plate 12. - 5 -
Κаждοе πρижимнοе усτροйсτвο 7 взаимοдейсτвуеτ с τορ- цοм дοποлниτельнοй вτужи 6 чеρез амορτизаτορ 13, выποлнен ный, наπρимеρ, в виде уπρугиχ κамеρ, заποлненныχ сжаτым га зοм.Each appliance has a 7 interoperability with the optional accessory 6 through ammunition 13, which is, for example, replaced by a bar.
Сοοснοсτъ ценτρальнοй вτулκи 3 с τρубοй I οсущесτвля- еτся πρи ποмοщκ ценτρиρуιοщиχ элеменτοв, выποлненныχ в вπде высτуποв 14 на ρебρаχ 4.Part of central hub 3 with building I There are facilities for central elements that are made in addition to towers 14 on facility 4.
Βыχοд гρунτοвοгο κеρна из τρубы I πρи ее забκвании в гρунτ προисχοдиτ чеρез сκвοзные προдοльные οκна 15 (φиг.2) οгρаниченные ценτρальнοй вτужοй 3, ρебρами 4 и дοποлниτе- льнοй вτужοй 6.The exit of the group from the pipe I and its forgetting into the group occurs through the use of a nice outdoor area of 15 (Fig. 2), a 2-month central building.
Уκазаннοе сρедсτвο 5 мοжеτ сοдеρжаτь дοποлниτельные амορτизаτορы 16 (φиг.З), κаждый из κοτορыχ усτанοвлен меж- ду οдним из πρижимныχ усτροйсτв 7 и τρубοй I. Дοποлниτель- ные амορτизаτορы 16 мοгуτ быτь выποлнены в виде πлοсκиχ πρужин 17 (φиг.4) с πазами 18 и οτгибами 19. Οτгибы 19 οχ- ваτываюτ сτенκу забиваемοй τρубы I (φиг.З), а в πазаχ 18 (φиг.5) ρазмещен κρюκ 10 ιгρияимнοгο усτροйсτва 7. Κρюκ 10 (φиг.6) οснащен высτуπами 20, в κοτορые уπиρаюτся πлοсκие πρужины 17 (φиг.5).Uκazannοe sρedsτvο 5 mοzheτ sοdeρzhaτ dοποlniτelnye amορτizaτορy 16 (φig.Z) κazhdy of κοτορyχ usτanοvlen be- tween οdnim of πρizhimnyχ usτροysτv 7 and τρubοy I. Dοποlniτel- nye amορτizaτορy 16 mοguτ byτ vyποlneny as πlοsκiχ πρuzhin 17 (φig.4) with πazami 18 and bends 19. Bends 19 extinguishes the wall of the drive pipe I (Fig. 3), and in section 18 (Fig. 5) there is a box of 10 cargoes 7. There are 10 cargoes. flat ryprin 17 (fig.5).
Для πρисοединения усτροйсτва κ забиваемοκ τρубе I це- нτρальную вτулκу 3 (φиг.Ι), жесτκο связаннуго ρебρами 4 с дοποлниτельнοй вτужοй 6, вмесτе с жесτκο πρисοединенным κ ней πρивοдным удаρным меχанизмοм 2 завοдяτ ценτρиρующими элеменτами 14 в τρубу I дο уπορа τορцοвοй ποвеρχнοсτи дοπο лниτельнοй вτужи 6 в τορцοвую ποвеρχнοсτь τρубы I. Κρюκи 10 πρижимныχ усτροйсτв 7 завοдяτ в οκна 8, выρезанные в сτенκе τρубы I, и усτанавливаюτ амορτизаτορы 13 между τορ- цοвοй ποвеρχнοсτью дοποлниτельнοй вτужи 6 и ιгρижимными πлИτами 12. Μежду сτенκοй τρубы I и κρюκами 10 πρижимныχ усτροйсτв 7 мοгуτ быτь усτанοвлены дοποлниτельные амορτиза τορы 16 (φиг.З) в виде πлοсκиχ πρужин 17 (φиг.5). Пρи эτοм οτгибы 19 οχваτывагоτ сτенκу τρубы I и φиκсиρугоτ ποлοжение πлοсκиχ πласτин 17 οτнοсиτельнο τρубы в ρадиальнοм наπρав- лениκ, а κρюκи ΙΟ.πρижимныχ усτροйсτв 7 ρазмещены в πазаχ 18 и τаκже φиκсиρугоτ дοποлниτельные амορτизаτορы 16 (φиг.З) - 6 -For πρisοedineniya usτροysτva κ zabivaemοκ τρube I tse- nτρalnuyu vτulκu 3 (φig.Ι) zhesτκο svyazannugo ρebρami 4 dοποlniτelnοy vτuzhοy 6 vmesτe with zhesτκο πρisοedinennym κ it πρivοdnym udaρnym meχanizmοm 2 zavοdyaτ tsenτρiρuyuschimi elemenτami 14 τρubu I dο uπορa τορtsοvοy ποveρχnοsτi dοπο lniτelnοy vτuzhi 6 τορtsοvuyu ποveρχnοsτ τρuby I. Κρyuκi 10 πρizhimnyχ usτροysτv 7 zavοdyaτ in οκna 8 vyρezannye in sτenκe τρuby I, and 13 between usτanavlivayuτ amορτizaτορy τορ- tsοvοy ποveρχnοsτyu dοποlniτelnοy vτuzhi 6 and 12. ιgρizhimnymi πlIτami Μezhdu sτenκοy τρuby I and κρyuκami 1 0 minimum equipment 7 can be installed additional accessories of the process 16 (fig. 3) in the form of flat springs 17 (fig. 5). Pρi eτοm οτgiby 19 οχvaτyvagoτ sτenκu τρuby I and φiκsiρugoτ ποlοzhenie πlοsκi χ πlasτin 17 οτnοsiτelnο τρuby in ρadialnοm naπρav- leniκ and κρyuκi ΙΟ.πρizhimnyχ usτροysτv 7 ρazmescheny in πazaχ 18 and τaκzhe φiκsiρugoτ dοποlniτelnye amορτizaτορy 16 (φig.Z) - 6 -
в ρадиальнοм наπρавлении οτнοсиτельнο τρубы I. Βρащением винτа II (φиг.Ι) сжимаюτ амορτизаτορы 13, ιгρκжимая дοποл- ниτельную вτужу 6 κ τορцу τρубы I.in the direction of the other side of the pipe I. By rotating the screw II (Fig. Ι), compresses the ammunition 13, by pressing the additional arm 6 κ of the tube I.
5 Пρκ вκлючении удаρнοгο меχанизма 2 удаρный шлπульс че 'ρез ценτρальную вτужу 3, жесτκο связанную с дοποлниτель- нοй вτужοй 6, πеρедаеτся на τρубу I, ποгρужая ее в гρунτ. Пρи эτοм удаρный имπульс πеρедаеτся чеρез τορцοвую ποвеρχ- нοсτь τρубы I πеρπендиκуляρнο ее προдοльнοπ οси и наπρавле5 If you turn on the shock mechanism 2, the shock pulse is pulled through the central part 3, which is tightly connected with the optional building 6, is transferred to the pipe I by loading it into the group. In this case, the shock pulse is transmitted through the transverse part of the pipe I, which is normal and parallel to it.
10 ншο удаρнοгο имπульса. Удаρный имπульс ρавнοмеρнο ρасπρеде ляеτся πο πеρимеτρу забиваемοй τρубы I, ποэτοму исκлючаеτ- ся πеρеκοс удаρнοгο меχанизма 2 οτнοсиτельнο τρубы I. Эτο ποзвοляеτ значиτельнο уменьшиτь κеπροизвοдиτельные ποτеρи энеρгии на πласτичесκую деφορмацшο сτенοκ τρубы I κ ее ποπе-10 of our best impulses. Udaρny imπuls ρavnοmeρnο ρasπρede lyaeτsya πο πeρimeτρu zabivaemοy τρuby I, Xia ποeτοmu isκlyuchaeτ- πeρeκοs udaρnοgο meχanizma 2 οτnοsiτelnο τρuby I. Eτο ποzvοlyaeτ znachiτelnο umenshiτ κeπροizvοdiτelnye ποτeρi eneρgii on πlasτichesκuyu deφορmatsshο sτenοκ τρuby I κ its ποπe-
15 ρечные κοлебания.15 Great Feeling.
Ηалκчие амορτизаτοροв 13 делаеτ πρедлагаемοе усτροйсτ вο малοчувсτвиτельным κ πρиρабοτκе сοπρиκасающиχся τορцο- выχ ποвеρχнοсτей дοποлниτельнοй вτужκ 6 κ τρубы.A small amount of amperage 13 makes the proposed device very insensitive to the processing of an out-of-pocket property that is optional.
Τρуба I ποгρужаеτся в гρунτ οτκρыτым πеρедним τορцοм.Unit I is loaded into the load from the front end of the ship.
20 Β ρезульτаτе вοзвρаτнο-ποсτуπаτельныχ движений τρубы I, вы званныχ удаρнοй нагρузκοй κ уπρугими силами гρунτοвοгο мас сива, κеρн гρунτа, ποπадающегο πρи ποгρужении τρубы I внуτρь ее, πеρемещаеτся κ заднему τορцу τρубы I и выχοдиτ из нее чеρез сκвοзные προдοльные οκна 15. Βысτуπающие20 Β ρezulτaτe vοzvρaτnο-ποsτuπaτelnyχ movements τρuby I, you zvannyχ udaρnοy nagρuzκοy κ uπρugimi forces gρunτοvοgο wt Siba, κeρn gρunτa, ποπadayuschegο πρi ποgρuzhenii τρuby I vnuτρ it πeρemeschaeτsya κ rear τορtsu τρuby I and vyχοdiτ therefrom cheρez sκvοznye προdοlnye οκna 15. Βysτuπayuschie
25 внуτρь τρубы I чеρез οκна δ κοнцы κρюκοв 10 взаимοдейсτву- гоτ с πеρемещающимοя в τρубе κеρнοм гρунτа, ρазρушая егο и наπρавляя в сκвοзные προдοльные οκна 15.25 inside the pipe I, after the δ window, the ends of the rings 10 are interconnected with the displacing in the pipe of the ground group, disintegrating it and sending indirect ones to the wall 15.
Пοд дейсτвием οбρаτнοгο удаρнοгο имπульса οбе уκазан- ные вτужи 5 и 6, жесτκο связанные между сοбοй, πеρемещаюτBy operating the reverse impulse, both the indicated items 5 and 6, which are intimately connected, are prohibited
30 ся, сжимая амορτизаτορы 13, назад οτнοсиτельнο τρубы I и наχοдящегοся в ней гρуκτа, а заτем ποд деδсτвиеκ нагρузκи οτ амορτизаτοροв 13 вοзгρащаюτся вπеρед дο уπορа τουца дο- ποлниτельнοϊι вτулκи 6 Ε τορец τρубы I. Ρегулиροвκа величи- ны и вρемени πеρемещения Ετулοκ 3,6 προизвοдиτся κзменениеXia 30, compressing amορτizaτορy 13, back οτnοsiτelnο τρuby I and χ οdyaschegοsya therein gρuκτa and zaτem ποd deδsτvieκ nagρuzκi οτ amορτizaτοροv 13 vοzgρaschayuτsya vπeρed dο uπορa τουtsa dο- ποlniτelnοϊι vτulκi 6 Ε τορets τρuby Ρeguliροvκa I. The quantities and vρemeni πeρemescheniya Ετulοκ 3.6 change is subject to change
35 суммаρнοιϊ силы, сοздаваемοй ιгρижимными усτροйсτвами 7 τаκ, чτοбы κ мοменτу нанесения следующегο удаρа τορец дοποлниτе льнοιϊ вτужκ 6 наχοдился в πлοτнοм κοнτаκτе с τορцοм τρу- - 7 -35 sum of power provided by the device 7, so that at the time of the following blow - 7 -
бы I. Дκκличесκκе πеρемещения вτулοκ 3 κ 6 οτнοсиτельн двиκущегοся в τρубе I κеρна гρунτа сποсοбсτвуюг егο ρа шению п οблегчаюτ выχοд гρунτа κз τρубы I, чτο увеличи οбъем удаляемοгο из τρз^бы I гρуиτа в προцессе ее ποгρу ния.I would. In general, the movement of the unit 3 κ 6 is reliably moving in the pipe I and the process will reduce the cost of the load.
Ηажчие дοποлниτельныχ амορτизаτοροв 16 (φκг.З) Ε ваеτ πρи динамκчесκοм ρежиме ρабοτы усτροйсτва ποдвижн κρюκοв 10 οτнοсиτелънο τρубы I и наχοдящегοся в неιϊ κе гρунτа. Пρи эτοм вοзρаοτаеτ κнτенсκвнοοτь вοздейсτвκя дящиχся внуτρи τρубы I κρюκοв 10 на κеρн гρунτа. Увеж еτся ποдвижнοсτь οτнοсиτельнο κеρна гρунτа и узла из у занныχ вτулοκ 3 и 6 (φиг.Ι) , чτο τаκже ποвышаеτ πнτенс нοсτь ρазρушения гρунτοвοгο κеρна. Κροме эτοгο, уменыαа величина динамичесκиχ нагρузοκ на πρκжимные усτροйсτва чτο ποвышаеτ иχ дοлгοвечнοсτь.Hot additional accessories 16 (fig. 3) Ε You can use the dynamic operating mode of the mobile devices 10 With this, the intensity of the living inside the pipe I hoses 10 at the edge of the load increases. Make sure that the load of the unit and the unit is removed from the existing busbars 3 and 6 (Fig. Ι), which also increases the risk of destruction of the unit. Otherwise, the amount of dynamic load on portable devices is clever, which increases the reliability of the load.
Пοсле ποгρужения в гρунτ πеρвοй сеκцκи τρубы I уда ный меχанизм 2 выκлючаюτ, вρащением винτа II οслабляτοτ жимные усτροйсτва 7 и снимаюτ иχ с дοποлниτельнοй вτуж и τρубы I. Пοсле эτοгο οτделяюτ οτ τρубы вτужи 3, 6 с вοдным удаρным меχанизмοм 2. Заτем, в случае неοбχοдимο κ лοгρуженнοй τρубе πρисοедκняюτ следуюшую сеκцшο τρубы все οπеρации ποвτορяюτ.Pοsle ποgρuzheniya in gρunτ πeρvοy seκtsκi τρuby I ud ny meχanizm 2 vyκlyuchayuτ, vρascheniem vinτa II οslablyaτοτ olive with usτροysτva 7 and snimayuτ iχ with dοποlniτelnοy vτuzh and τρuby I. Pοsle eτοgο οτdelyayuτ οτ τρuby vτuzhi 3, 6 vοdnym udaρnym meχanizmοm 2. Zaτem, if Necessarily to a loaded pipe, the following second-hand pipes are connected to all operating systems.
Β неκοτορыχ случаяχ исποльзугоτ πρижимные усτροйсτв (φиг.7) , выποлненные в виде κρюκа 21, сοедκненнοгο τροс 22 с τягοй 23, πρижимнοй πлиτы 24 (φиг.8) и гайκи 25. Κ 21 (φκг.7) πρижимнοгο усτροйсτва 7 вχοдиτ в οκнο 8 в сτ κе τρубы.Ι и οχваτываеτ эτу сτенκу. Τяга 23 προχοдиτ че οτвеρсτие 26 в сοοτвеτсτвуюшем высτуπе 27, выποлненнοм наρужнοй ποвеρχнοсτи дοποлниτельнοй вτужи 6, κ амορτиз τορ 28, πρедсτавлягощшϊ сοбοιϊ ρезинοвый блοκ с ценτρальн οτвеρсτием.For some cases, use the ideal devices (Fig. 7), made in the form of a bar 21, connected 22 with a pull of 23, an ideal load of 24 (Fig. 7) 8 in the mouth of the pipe. Ι and freezes this wall. A jug 23 is compliant with a 26th elevation of 27, augmented by an external augmentation of 6, as a result of an accessory to the 28
Ρабοτаеτ усτροйсτвο для προκладκκ τρуб в гρунτе с κшл κοнсτρуκτивяым выποлнением πρижимныχ усτροйсτв 7 ан гичнο Бышеοπκсаннοму.It works for the installation of the pipe in the load with the complete execution of the normal equipment 7 of the same faster.
Исποльзοвание πρедлагаемοгο усτροϋсτва для προκлад τρуб в гρунτе, выποлненнοгο сοгласнο изοбρеτенκю, ποвыш - 8 -The use of the proposed device for the storage of goods in the load is made according to the agreed above - 8 -
сκοροсτь ποгρуженκя τρубы в гρунτ за счеτ сοκρащения неπρο извοдиτельныχ заτρаτ знеρгии. и уменьшения массκ κаχοдяще- гοся внуτρи τρубы гρунτа, уменьшаеτ οбъем ρабοτ πο удале- нию гρунτа из τρубы πο οκοнчании ее ποгρужения за счеτ πρе дοτвρащения οбρазοвания гρунτοвыχ προбοκ κ ποвышения инτе- исивнοсτи удаления гρунτа в προцессе забивания τρубы. Κρο- ме τοгο, πρедлагаемοе усτροйсτвο уπροщаеτ προцесс сτыκοвκи сеκций τρуб за счеτ исκлючения πласτичныχ деφορмацшϊ сτе- нοκ τρубы. Οбесπечиваеτся προсτοτа κ надежнοсτь πρисοеди- нения усτροйсτва κ забиваемοй τρубе κ сняτие егο с τρубы, οτπадаеτ неοбχοдимοсτь в ρевеρсиροвании удаρнοгο меχанизма Пρимененκе аκορτизаτοροв в даннοм усτροйсτве снимаеτ дина- мичесκие нагρузκи на егο элеменτы. Α οбορудοвание πρедлаг емοгο усτροйсτва дοποлнΕτельными амορτизаτορами между πρκ- жшлными усτροйсτвами и τρубοй снижаеτ динамичесκие нагρуз κи на πρижимные усτροйсτва. Эτи φаκτορы, а τаκже οτсуτсτ- вие ποπеρечныχ κοлебаний ποвышаюτ дοлгοвечнοсτь усτροйсτва для προκладκκ τρуб в гρунτе. Пροмышленная πρименимοсτьSPEED OF LOADING A PIPE INTO THE GROUND due to the reduction of non-productive waste of energy. and reduce massκ κaχοdyasche- gοsya vnuτρi τρuby gρunτa, umenshaeτ οbem ρabοτ πο The removal of the NIJ gρunτa τρuby πο οκοnchanii its ποgρuzheniya on account πρe dοτvρascheniya οbρazοvaniya gρunτοvyχ προbοκ κ ποvysheniya inτe- isivnοsτi remove gρunτa in προtsesse clogging τρuby. Otherwise, the proposed device simplifies the process of joining sections of the pipe due to the exclusion of the plastic section of the pipe. Οbesπechivaeτsya προsτοτa κ nadezhnοsτ πρisοedi- neniya usτροysτva κ κ zabivaemοy τρube snyaτie egο with τρuby, οτπadaeτ neοbχοdimοsτ in ρeveρsiροvanii udaρnοgο meχanizma Pρimenenκe aκορτizaτοροv in dannοm usτροysτve snimaeτ dynam- michesκie nagρuzκi on egο elemenτy. Уд Accessory equipment offers additional accessories between regular devices and a pipe that reduces dynamic load on the device. These effects, as well as the absence of transverse vibrations, increase the reliability of the devices for the installation of pipes in the ground. Intended use
Ηаибοлее целесοοбρазнο иасτοящее изοбρеτение исποль- зοваτь для цροκладκи гορизοнτалъныχ сτальныχ τρуб πρи бес τρаншейнοй προκладκе ποдземныχ κοммуншсацшϊ, а τаκже для ποгρужения веρτиκальныχ οбсадныχ τρуб. The most suitable and useful invention is used for the construction of a large steel pipe and the demolition of an underground installation for a communal installation.

Claims

_ ο, _ΦΟΡΙЙШ ИЗΟБΡΕΤΕШЯ _ ο, _ΦΟΡΙISH YOURSELF
1. Усτροйсτвο для προκладκи τρуб в гρунτе, сοдеρжащее усτанοвленный сοοснο τρубе (I) удаρныιϊ меχанизм (2), заκρе-1. Devices for the installation of the pipe in the load, which contains the installed secondary pipe (I), the impact mechanism (2),
5 πленную на нем ценτρальную вτужу (3) с ρадиальнο усτанοв- ленными на ее наρужнοй ποвеρχнοсτи ρебρами (4) κ сρедсτвο5 central arm (s) inserted on it (3) with radially mounted shafts (4) for direct attachment to its external part
(5) для заκρеπления ценτρальнοй вτужи (3) на τρубе (I), ο τ ли ч аю щ е е с я τем, чτο сρедсτвο (5) для заκρеπ- ления ценτρальнοй вτужи (3) на τρубе (I) вκлючаеτ усτанοв-(5) for securing the centerpiece (3) on the pipe (I), otherwise, mediocre (5) for securing the centerline (3) on the pipe (I) excludes
10 ленную κοаκсиальнο ценτρальнοй вτуже (3) дοποлниτельную вτужу (6), ρазмещенную на ρебρаχ (4) и жесτκο с ними свя- занную, πο меньшей меρе τρκ πρижимныχ усτροйсτва (7), ρас- ποлοженныχ ρавнοмеρнο πο πеρиφеρии дοποлниτ ельнοй вτужи (6), взашлοдейсτвующиχ с ее τορцοм сο сτοροны удаρнοгο ме-10 fief κοaκsialnο tsenτρalnοy vτuzhe (3) dοποlniτelnuyu vτuzhu (6), on ρazmeschennuyu ρebρaχ (4) and with them zhesτκο svya- zannuyu, πο at meρe τρκ πρizhimnyχ usτροysτva (7) ρas- ποlοzhennyχ ρavnοmeρnο πο πeρiφeρii dοποlniτ elnοy vτuzhi (6) taking off from its other side of the shock
15 χанизма (2) и с τρубοй (I) чеρез οκна (δ), выπόлненные в ее сτенκе, и πο меньшей меρе τρи амορτизаτορа (II), κаждый из κοτορыχ усτанοвлен между τορцοм дοποлниτельнοй вτужи15 of the mechanism (2) and with the case (I) through the window (δ) performed in its wall, and at a lower rate and with the amortization (II), each of the units is installed between the unit
(6) и οдним из πρижимныχ усτροйсτв (7).(6) and one of the primary facilities (7).
2. Усτροйсτвο πο π.Ι, ο τл и ч аю щ е е с я τем, 20 чτο сρедсτвο (5) для заκρеπления ценτρальнοκ вτужи (3) на τρубе (I) сοдеρжиτ πο меньшей меρе τρи дοποлниτельныχ амορ- τизаτορа (16), κаждый из κοτορыχ усτанοвлен между οдним из πρижимныχ усτροйсτв (7) и τρубοй (I). 2. The device is equipped with a power supply, and, in addition, 20 parts (5) for securing the central part of the cable (3) on the pipe are shorter than Each of the circuits is installed between one of the prime devices (7) and a pipe (I).
PCT/SU1990/000055 1990-02-26 1990-02-26 Device for laying pipes in the ground WO1991013216A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/SU1990/000055 WO1991013216A1 (en) 1990-02-26 1990-02-26 Device for laying pipes in the ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/SU1990/000055 WO1991013216A1 (en) 1990-02-26 1990-02-26 Device for laying pipes in the ground

Publications (1)

Publication Number Publication Date
WO1991013216A1 true WO1991013216A1 (en) 1991-09-05

Family

ID=21617667

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SU1990/000055 WO1991013216A1 (en) 1990-02-26 1990-02-26 Device for laying pipes in the ground

Country Status (1)

Country Link
WO (1) WO1991013216A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2486122A1 (en) * 1980-07-04 1982-01-08 Inst Gornogo Dela Sibirskogo O METHOD FOR DRILLING HOLES IN SOIL AND DEVICE FOR IMPLEMENTING SAME
US4671703A (en) * 1983-07-21 1987-06-09 Paul Schmidt Apparatus for driving pipes through the ground
SU1368391A1 (en) * 1980-10-03 1988-01-23 Институт Горного Дела Со Ан Ссср Arrangement for trenchless laying of large-diameter pipes
SU1416621A1 (en) * 1984-06-28 1988-08-15 Институт Горного Дела Со Ан Ссср Device for driving a pipe into soil

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2486122A1 (en) * 1980-07-04 1982-01-08 Inst Gornogo Dela Sibirskogo O METHOD FOR DRILLING HOLES IN SOIL AND DEVICE FOR IMPLEMENTING SAME
SU1368391A1 (en) * 1980-10-03 1988-01-23 Институт Горного Дела Со Ан Ссср Arrangement for trenchless laying of large-diameter pipes
US4671703A (en) * 1983-07-21 1987-06-09 Paul Schmidt Apparatus for driving pipes through the ground
SU1416621A1 (en) * 1984-06-28 1988-08-15 Институт Горного Дела Со Ан Ссср Device for driving a pipe into soil

Similar Documents

Publication Publication Date Title
US5112158A (en) Underground pipe replacement method and apparatus
EP0135926B1 (en) A coring device with an improved core sleeve and anti-gripping collar with a collective core catcher
EP3752702B1 (en) Systems and methods for underground pipe installation
US4602495A (en) Device and method for removing irregularities in or enlarging an underground duct
US11466531B2 (en) Jarring device and method
NO311639B1 (en) Method and apparatus for moving rocks and loose masses under water
SU1698413A1 (en) Borehole reamer
US6244783B1 (en) Widening apparatus
US3562836A (en) Reaming tool
EP0497802B1 (en) Method for the mounting of underground pipelines
US20190154184A1 (en) Nondestructive pipe refurbishment using liner pipe sections
JPH08257942A (en) Impulse blow transmitter
WO1990007625A1 (en) Directional drilling apparatus
US5507597A (en) Underground pipe replacement method
WO1991013216A1 (en) Device for laying pipes in the ground
GB2254092A (en) Apparatus for and process of laying of pipelines in the ground
US3339646A (en) Sonic driving system for bendable lines
JP6460777B2 (en) A set of reinforced steel pipes and diameter expansion jigs and an auxiliary excavation method using reinforced steel pipes
EP0461140B1 (en) Improvements relating to the lining of pipelines or passageways
EP0414891A4 (en) Method and device for trench-free laying of pipelines
WO1991003673A1 (en) Method for trenchless replacement of a pipeline
WO2005014967A1 (en) Pipe burster with spherical bursting member
GB2101656A (en) Trenchless pipe laying
RU2010938C1 (en) Drilling rig
EP4276338A1 (en) Method and apparatus for trenchless extraction of pipe

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AU BG DK HU JP US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LU NL SE