WO1990015223A1 - Tunnel a pont immerge - Google Patents
Tunnel a pont immerge Download PDFInfo
- Publication number
- WO1990015223A1 WO1990015223A1 PCT/AU1990/000234 AU9000234W WO9015223A1 WO 1990015223 A1 WO1990015223 A1 WO 1990015223A1 AU 9000234 W AU9000234 W AU 9000234W WO 9015223 A1 WO9015223 A1 WO 9015223A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- tunnel
- immersed
- headstocks
- concrete
- crossing
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
- E02D29/067—Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed
Definitions
- the present invention seeks to provide a new form of tunnel crossing which requires shorter accessways and are cheaper to construct than existing conventional crossings.
- Figure 1 shows one embodiment of the present invention in its reinforced concrete form
- Figure 4a to 4c illustrate one method of positioning piers using steel piles and steel headstock to support a tunnel of the present invention
- FIG. 9 illustrates the joining of two immersed tunnel elements
- the tunnels according to the embodiments of the present invention can be constructed as shown in Figures 1, 2 and 3 wherein the immersed tunnel units 1 are supported on headstocks 2 which are held above the sea floor by appropriate piles 3.
- the appropriate pile caps or headstocks can be constructed from steel or concrete or in appropriate composite and levelled in line under water by any existing technique, such techniques are commonly used in off shore oil platform constructions.
- FIG. 5a to 5c A further method of construction of the headstocks is shown in Figures 5a to 5c wherein the headstocks 8 are temporarily supported on falsework piles 9 and the appropriate piles 3 are driven into engagement at the correct angle through the respective holes in the bottom of the headstock 8.
- the raked pile foundation provides vertical support for the immersed bridge as well as transverse stability and holds the immersed bridge units against uplift.
- the design of the immersed bridge units are very similar to that of the conventionally immersed tunnel units, except that whereas the conventional tunnel units are supported evenly along their base, the bridge units of the presen ⁇ . invention are supported at 2 or 3 locations by appropriately piled headstocks and by the connecting shear keys used conventionally to connect immersed units.
- TIT TE SHEET units which have to support the weight of the overlaying material, used to protect the existing units from shipping.
- the immersed bridge units would be joined together underwater by any existing appropriate method. Internal concrete ballast is then placed to produce a relative density on each unit of 1.20, after which the immersed bridge unit is permanently secured to the foundation headstocks to ensure that the uplift factor of safety is at least 1.5.
- the tunnel element 14 can then be floated to an outfitting site, where reinforced concrete forming the inner lining of the tunnel can be poured for example by three transverse pours by traveller mounted forms, and longitudinal segmented pours the size of which are
- SUBSTITUTE SHEET determined so as to complement the concrete production rate and limit overstressing of the plate by hydrostatic loads or by excessive hogging or sagging moments.
- the tunnel element is secured by tiedowns or jacks 15 to the adjacent element and the headstock 2. Concrete is then poured into the cap 13 completing the ballasting operation as shown in Figure 7.
- the temporary jacks 15 are replaced by tiedown pins or bolts 16.
- Ventilation of the immersed bridge section is firstly considered as part of the total tunnel and all the required services including ventilation are designed for the total tunnel. Those services required for the immersed bridge units are then constructed into those units.
- the present invention by providing a unique combination of tunnel units and raised piered supports provides a water crossing which is cheaper than existing tunnel crossings and which requires less actual land tunnelling than conventional tunnelling processes.
Abstract
L'invention se rapporte à une nouvelle forme de tunnel de traversée qui nécessite des voies d'accès plus courtes et qui est moins cher à construire que les tunnels existants. L'invention utilise des unités de tunnel qui sont immergées, tout en étant soutenues sur des chevalets (2), lesquels sont maintenus au-dessus du fond marin par des piliers appropriés (3), à une profondeur suffisante pour ne pas gêner la navigation. Les éléments de tunnel immergés (14) sont fixés en position au moyen de flotteurs et sont assujettis par des tirants ou des pitons (15) aux chevalets (2). Ces éléments de tunnel sont ensuite assemblés au tunnel creusé pour former une traversée sous l'eau.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AUPJ4473 | 1989-05-31 | ||
AUPJ447389 | 1989-05-31 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO1990015223A1 true WO1990015223A1 (fr) | 1990-12-13 |
Family
ID=3773950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/AU1990/000234 WO1990015223A1 (fr) | 1989-05-31 | 1990-05-31 | Tunnel a pont immerge |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO1990015223A1 (fr) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592634A (zh) * | 2017-01-11 | 2017-04-26 | 中铁隧道勘测设计院有限公司 | 一种海底观光隧道结构 |
CN106759494A (zh) * | 2017-01-11 | 2017-05-31 | 中铁隧道勘测设计院有限公司 | 一种带观光功能的海底真空隧道 |
CN107037433A (zh) * | 2017-03-22 | 2017-08-11 | 中交第航务工程局有限公司 | 一种用于沉管安装的声呐偏差测控系统及偏差测控方法 |
US10253904B1 (en) * | 2017-11-03 | 2019-04-09 | Cccc Highway Consultants Co., Ltd. | Integrated immersed tube coupling and installation method thereof as well as installation closure method of immersed tube coupling |
CN113094783A (zh) * | 2021-03-19 | 2021-07-09 | 中铁第六勘察设计院集团有限公司 | 一种沉管隧道接头关键设计参数的快速计算方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE582590C (de) * | 1931-01-17 | 1933-08-18 | Siemens Bauunion G M B H Komm | Verfahren zur Herstellung von Untergrundtunneln |
US2211589A (en) * | 1935-08-07 | 1940-08-13 | Arthur J Widmer | Submerged bridge or tunnel construction |
DE1759253A1 (de) * | 1968-04-13 | 1970-05-06 | Polensky & Zoellner | Unterwassertunnel |
GB1316603A (en) * | 1969-05-05 | 1973-05-09 | Ballast Nedam Groep Nv | Excavation of underwater ground |
-
1990
- 1990-05-31 WO PCT/AU1990/000234 patent/WO1990015223A1/fr unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE582590C (de) * | 1931-01-17 | 1933-08-18 | Siemens Bauunion G M B H Komm | Verfahren zur Herstellung von Untergrundtunneln |
US2211589A (en) * | 1935-08-07 | 1940-08-13 | Arthur J Widmer | Submerged bridge or tunnel construction |
DE1759253A1 (de) * | 1968-04-13 | 1970-05-06 | Polensky & Zoellner | Unterwassertunnel |
GB1316603A (en) * | 1969-05-05 | 1973-05-09 | Ballast Nedam Groep Nv | Excavation of underwater ground |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592634A (zh) * | 2017-01-11 | 2017-04-26 | 中铁隧道勘测设计院有限公司 | 一种海底观光隧道结构 |
CN106759494A (zh) * | 2017-01-11 | 2017-05-31 | 中铁隧道勘测设计院有限公司 | 一种带观光功能的海底真空隧道 |
CN107037433A (zh) * | 2017-03-22 | 2017-08-11 | 中交第航务工程局有限公司 | 一种用于沉管安装的声呐偏差测控系统及偏差测控方法 |
US10253904B1 (en) * | 2017-11-03 | 2019-04-09 | Cccc Highway Consultants Co., Ltd. | Integrated immersed tube coupling and installation method thereof as well as installation closure method of immersed tube coupling |
CN113094783A (zh) * | 2021-03-19 | 2021-07-09 | 中铁第六勘察设计院集团有限公司 | 一种沉管隧道接头关键设计参数的快速计算方法 |
CN113094783B (zh) * | 2021-03-19 | 2022-03-29 | 中铁第六勘察设计院集团有限公司 | 一种沉管隧道接头关键设计参数的快速计算方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3865627B1 (fr) | Structure de tunnel flottante à haubans submergés | |
US7942607B2 (en) | Underwater tunnel | |
US4661014A (en) | Prefabricated civil engineering module, method for the construction of a structure including said module and resulting structure | |
EP2614186B1 (fr) | Construction d'un pont flottant | |
CN111424716B (zh) | 一种人工岛接力延伸的斜拉锚碇式悬浮隧道结构 | |
Rasmussen | Concrete immersed tunnels—Forty years of experience | |
Nazir | Multispan balanced suspension bridge | |
US3958426A (en) | Offshore harbor tank and installation | |
CN111254983B (zh) | 一种水下斜拉式悬浮隧道的接岸结构 | |
WO1990015223A1 (fr) | Tunnel a pont immerge | |
Gursoy | Immersed steel tube tunnels: An American experience | |
CN113585343B (zh) | 一种具有缆流墩的斜拉式悬浮隧道及其施工方法 | |
JP7389893B2 (ja) | 海上構造及び建設方法 | |
CN114059437A (zh) | 造价低工期短的轻型长距离跨海智能永久铁路公路浮桥 | |
JPH0748849A (ja) | 水中トンネル | |
US1877994A (en) | Subaqueous tunnel | |
Derrington | Paper 13: Construction of McAlpine/Sea Tank gravity platforms at Ardyne Point, Argyll | |
CN115787728A (zh) | 一种组合式的水中悬浮隧道 | |
BRAKEL et al. | DISCUSSION. SOME CONSIDERATIONS OF SUBMERGED TUNNELLING. | |
Gerwick Jr | Construction of Large Concrete Ocean Structures | |
Fraenkel et al. | SPECIAL FEATURES OF THE CIVIL ENGINEERING WORKS AT ABERTHAW POWER STATION.(INCLUDES PLATES.) | |
Gursoy | Immersed tube tunnels | |
BRAKEL | SOME CONSIDERATIONS OF SUBMERGED TUNNELLING. | |
Crisp et al. | DESIGN AND CONSTRUCTION OF A SUBMARINE SEA OUTFALL AT HASTINGS. | |
Havno | THE ELBE TUNNEL, HAMBURG: SOUTHERN RAMP AND SUBMERGED TUNNEL. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AT AU BB BG BR CA CH DE DK ES FI GB HU JP KP KR LK LU MC MG MW NL NO RO SD SE SU US |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE BF BJ CF CG CH CM DE DK ES FR GA GB IT LU ML MR NL SE SN TD TG |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
NENP | Non-entry into the national phase |
Ref country code: CA |