WO1987006994A1 - Process for repairing damage to pipes of a supply system - Google Patents
Process for repairing damage to pipes of a supply system Download PDFInfo
- Publication number
- WO1987006994A1 WO1987006994A1 PCT/HU1987/000023 HU8700023W WO8706994A1 WO 1987006994 A1 WO1987006994 A1 WO 1987006994A1 HU 8700023 W HU8700023 W HU 8700023W WO 8706994 A1 WO8706994 A1 WO 8706994A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- supply system
- damage
- supply
- liability
- harmful
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D5/00—Protection or supervision of installations
Definitions
- the invention relates to a method for eliminating a harmful liability of pipelines of a supply system, wherein an area of the harmful liability is freed from a means conveyed in the pipelines and the damage liability is eliminated.
- supply systems are used for industrial purposes, e.g. applied within a company.
- the invention can be used for public municipal supply systems, e.g. are used for water supply or gas supply, where the funds are transported in pipelines.
- public municipal supply systems e.g. are used for water supply or gas supply, where the funds are transported in pipelines.
- the consumer points cannot be notified in advance of the impending supply failure, which is particularly disadvantageous for larger consumers in factories.
- the same also applies to switching on the system after the fault has been eliminated.
- the invention now has the task of eliminating the imperfections of the previously known methods and a method for eliminating harmful substances in the process
- the further development according to the invention now consists in first locating the position of the harmful liability on a network map of the supply system, then the type and position of the location of the harmful liability u ⁇ -
- the closure organs can also be operated remotely.
- Wirklic'hurrgen 15 allows wherein the fernbetätigb 'are ⁇ encryption Psychia ⁇ en the supply system through the machine Rechen ⁇ be controlled automatically and notifying the Disstelle ⁇ on the elimination and the Ein ⁇ the supply circuit by the calculator automatically carried 0th
- the details of the pipe section and the closure organs are also given.
- the corresponding repair unit can immediately speak accordingly be selected and alarmed, who have the tools, materials and machines required for disposal. At the same time, the affected consumer units can be informed of the impending supply failure and, if necessary, of its duration. be notified.
- the repair unit selected in accordance with the defective item now moves to the precisely specified location of the defective pipeline and actuates the closure armature, which is also precisely specified, to close.
- the type of locking armature and the manner of actuation, or the operations to be carried out at the damaged area, are already well known.
- the defective pipe section is unlocked and the ' fault is eliminated, whereby all the tools, materials and machines required for the work processes are available in the vehicle. Then the working gruge is added again and the surface is at least provisionally restored.
- the information describing the damage liability is entered into the computing machine and stored there. From this information, statistics can be compiled that enable statements to be made about the frequency of damage and the expected service life of the individual sections of the supply system. In this way, on the one hand, preparation can be made in advance for future damage, on the other hand, the scheduled maintenance can be directed to the more endangered areas, or the reconstruction in the areas can be adjusted accordingly. The same also applies to the objects provided in the supply system, the renewal of which can also be decided by the statistics of the defective items.
- the statistics furthermore provide extensive operating experience which can be useful in the expansion and / or reconstruction of the supply system. This can be, for example, the location of a new water source or the
- 5 a branch can be determined from the existing system.
- the operating situation that arises after a section has been shut off can be evaluated at the headquarters and measures can be taken to reduce the adverse effects of the section's shutdown. After removal
- the materials used can be made up immediately and the stock can be replenished.
- the computing machine can be connected to the central printer, so that the defective damage and its remedies can be documented and archived.
- On the abacus hereinafter also disclose such organs and the repair can be connected, which are remote-controlled, with the transfer to Schliesse ⁇ of the closure orga ⁇ s abacus from "comes automatically. With the calculators can
- the method according to the invention can of course not only be used for water supply systems
- Z5 are, but it is also suitable for other municipal or also for internal supply systems. Its use is of particular advantage for high-quality and / or dangerous conveyed funds.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Process for repairing damage to pipes of a supply system, whereby a monitoring station indicates, on a pipe network plan of the supply system, the damaged section of pipe, together with the type of damage which has occurred, the shut-off valves situated closest to the point of damage, as well as the material and operating parameters of the damaged pipe section. Next, the appropriate shut-off valves are operated and the repair personnel sent to the site of the damage, together with the necessary spare parts and mechanical equipment. On completion of the repairs, the shut-off valves are opened, with the result that the repaired pipe section of the supply system is again made available for the conveyance of the medium.
Description
Verfahren zur Schadensbehebung bei Rohrleitungen eines Versorgungssystems Procedure for repairing damage to the piping of a supply system
Gegenstand der ErfindungSubject of the invention
Die Erfindung bezieht sich auf ein Verfahren zur Beseitigung einer Schadhaftwerduπg von Rohrleitungen eines Versorgungssystems, wobei ein Bereich der Schadhaftwerduπg von einem in den Rohrleitungen beförderten Mittel befreit und die Schadhaftwerdung beseitigt wird. Solche Versorgungs¬ systeme werden für industrielle Zwecke, z.B. innerhalb eines Betriebes angewendet. Die Erfindung kann jedoch für öffentliche kommunale Versorgungssysteme, z.B. für die Wasserversorgung oder Gasversorgung Anwendung finden, wo.- bei die Mittel in Rohrleitungen befördert werden. Stand der Technik Die Beseitigung von Schadhaftwerdungeπ und dieThe invention relates to a method for eliminating a harmful liability of pipelines of a supply system, wherein an area of the harmful liability is freed from a means conveyed in the pipelines and the damage liability is eliminated. Such supply systems are used for industrial purposes, e.g. applied within a company. However, the invention can be used for public municipal supply systems, e.g. are used for water supply or gas supply, where the funds are transported in pipelines. PRIOR ART The elimination of harmful liability and the
Instandhaltung von grössereπ Versorgungssystemen, insbe¬ sondere die der kommunalen Wasser- und Gasversorgung be¬ reiten heutzutage erhöhte Schwierigkeiten. Diese Versorgungs¬ systeme sind teilweise stark. veraltet, besonders in den Grossstädten, sodass die Schadhaftwerduπgeπ ziemlich häufig und rapsodisch auftreten, und die Instandhaltung ohne realen Angaben über den Zustand des ganzen Systems, meistens mit ad hoc Character verwirklicht wird. Es ist wohl bekannt, dass die in Versorgungssystemen beförderten Mittel, sei es nur Wasser, einen immer höher werdenden Wert haben, und die aus dem Versorgungssystem bei dem schadhaft ge¬ wordenen Abschnitt ausströmenden Mittel gegebenfalls hohe Schaden verursachen können. Im weiteren verursachen die mit der Beseitigung öfters verbundenen Strassensperren beträchtliche Verkehrsbehinderungeπ sowie die wegen derMaintaining larger supply systems, in particular those of the municipal water and gas supply, present increased difficulties today. These supply systems are sometimes strong. obsolete, especially in the big cities, so that the malicious damage occurs fairly frequently and rapsodically, and the maintenance is carried out without real information about the condition of the whole system, mostly with an ad hoc character. It is well known that the means conveyed in supply systems, be it only water, have an ever increasing value, and the means flowing out of the supply system in the damaged section can possibly cause high damage. Furthermore, the roadblocks often associated with the removal cause considerable traffic obstructions as well as those due to
*§>
Beseitigung notwendigen Ausfälle der Versorgung Unannemhlich- keiten oder sogar Betreib.sstörungen bei der Verbraucherstellen.* §> Elimination of necessary supply failures, inconveniences or even operational disruptions at the consumer offices.
Die bekannten und früher angewendeten Methoden der Beseitigung der Schadhaftwerduπgen berühren hauptsäch-The known and previously used methods of eliminating the harmful substances mainly affect
5 ' lieh auf den örtlichen Kenntnissen der Belegschaft der5 ' borrowed from the local knowledge of the workforce
Diensstellen der Beseitigung. Bei der Meldung einer Schad- haftwerduπg wird dementsprechend das dientsleisteπde Personal alarmiert, das mit einem Kraftfahrzeug sich zu der besser oder: eniger bestimmten Stelle der Schadhaf werduπg eilt,Disposal services. Accordingly, when a damage report is reported, the service personnel are alerted who rushes to the better or less specific point of the damage with a motor vehicle,
IQ: den "C_τarakte "den Schadhaftwerdung mit Prüfung der auf dervOber.fLache sichtbaren Zeichen durch Augenschein bestimmt und 'danach; die Ausschaltung des schadhaft gewordenen Ab¬ schnittes' d:es Ve sorgungssystemes beginnt. Die mehr Er¬ fahrungen habenden Mitglieder des Personals erinnern sichIQ: the "C_τarakte " determines the incidence of damage by examining the signs visible on the top surface by eye inspection and 'afterwards; the removal of the defective section ' d: es supply system begins. The members of the staff who have more experience remember
15; auf die Stellen und gegebeπfalls auf die-Art der zu. dem15; to the positions and, if necessary, to the type of. the
Ort der Schadhaftwerduπg am nächsten fallenden Verschluss¬ armaturen, die in dem Versorgungssystem vorgesehen sind. Diese aufgefundenen Verschlussarmaturen werden danach zum SchLiessen betätigt, bis das Ausströmen des Mittels ausThe location of the closing fittings which fall closest to the damage and which are provided in the supply system. These locking devices are then operated to close until the agent flows out
2C_:- der schadhaft gewordenen Rohrleitung bei der Fehlerstelle nicht mehr erfolgt. Dabei kommt es öfters vor, dass eine ziemlich grosse Region aus dem Versorgungssystem ausge¬ schaltet wird, da die zu der Fehlerstelle am nächsten fallenden Verschlussorgaπe nicht immer aufgefunden oder wenn jedoch-2C _: - the damaged pipe no longer occurs at the fault location. It often happens that a fairly large region is switched off from the supply system, since the closure organs closest to the fault location are not always found or if, however,
2 : gefunden,, mit den zur Verfügung stehenden Werkzeugen nicht immer geschlossen werden können. Am wichtigsten ist es dabei, dass das Austreten des beförderten Mittels aus der Rohrleitung so schnell wie möglich abgestellt werden soll, besonders bei solchen gefährlichen Mitteln w.ie z.B. Erdgas.2 : found ,, cannot always be closed with the tools available. The most important thing is that the conveyance of the conveyed agent from the pipeline should be stopped as soon as possible, especially with such dangerous agents as natural gas.
30" • Als nächster Schritt der bekannten Methoden wird die schadhaft gewordene Rohrleitung aufgeschlossen. Meistens kommt es jedoch dazu, dass das beförderte Mittel nicht dort auf die Oberfläche kommt, wo die Rohrleitung liegt, sondern es z.B.' in der Erde versickert und nur an einer 35.. weiteren Stelle sichtbar wird. Die AufSchliessung selbst
- 3 -30 "• The next step in the known methods is to open up the damaged pipeline. Most of the time, however, the conveyed agent does not come to the surface where the pipeline is, but rather, for example, ' seeps into the ground and only on one 35 .. another point becomes visible. The unlocking itself - 3 -
kann auch Schwierigkeiten bereiten. Das zur Stelle der Schadhaftwerdung ankommende Personal uss die zur Auf¬ schliessung benötigten Werkzeuge und Maschinen bei sich haben. Wenn nicht das der Fall ist, sollen die benötigten Werkzeuge und Maschinen zusätzlich an die Stelle gebracht werden.can also be difficult. The personnel arriving at the point of becoming liable for damage must have the tools and machines required for unlocking with them. If this is not the case, the necessary tools and machines should also be put in place.
Das gleiche gilt für das Reparieren der schadhaft gewordenen und aufgeschlossenen Rohrleitung. Wenn die dazu benötigten Werkzeuge, Materialien und Maschinen nicht dabei sind, sollen diese extra dorthin gebracht werden.The same applies to repairing the damaged and unlocked pipeline. If the necessary tools, materials and machines are not included, they should be brought there.
Wie aus den obigen ersichtlich, nimmt die Beseitigung von Schadhaftwerduπgeπ meistens, eine ziemlich lange Zeit in Anspruch und das Abschalten den kleinsten Abschnittes des Versorguπgssystemes wird auch nicht möglich. Nachtei __»lig ist es noch bei den bekannten Methoden, dass ein relativ grosser Vorrat an Personal, Materialien, Werkzeugen und Maschinen in Bereitschaft gehalten und zur Stelle der Schad- haftwerduπg .befördert werden soll. Es können im weiteren keine Aussagen über die zu erwartenden Schadhaftwerduπgen und/oder über die voraussichtliche Lebensdauer und in dieser Weise über die nötig gewordenen Instandhaltungen des Systems gemacht werden.As can be seen from the above, the removal of malicious files usually takes a fairly long time and it is also not possible to switch off the smallest section of the supply system. With the known methods, it is still a disadvantage that a relatively large supply of personnel, materials, tools and machines should be kept on standby and transported to the site of the damaging process. No further statements can be made about the damage to be expected and / or about the expected service life and in this way about the maintenance of the system that has become necessary.
Die Verbraucherstelleπ können nach den vorbekaπnteπ Verfahren über den bevorstehenden Ausfall der Versorgung nicht vorher benachrichtigt werden, was bei grösseren Ver¬ brauchern, in Betrieben besonders nachteilig ist. Das gleiche gilt auch für die einschaltung des Systems nach der Be¬ seitigung des Fehlers.According to the previously known methods, the consumer points cannot be notified in advance of the impending supply failure, which is particularly disadvantageous for larger consumers in factories. The same also applies to switching on the system after the fault has been eliminated.
Das Ausschalten des schadhaft gewordenen Abschnittes betrifft manchmal auch einen Teil einer Hauptleitung, wo¬ durch die Versorgung der nicht ausgeschalteten, aber nach dem schadhaft gewordenen Abschnitt befindlichen Verbraucher schlechter wird. In dem bekannten Verfahren werden keine Weisungen zu der Minderung dieser Schwierigkeiten geliefert. In der Praxis hat sich gezeigt, dass bei der Planung
und Verwirklichung einer Erneuerung, Erweiterung oder sogar Rekonstruktion des Versorgungssystems die Betriebserfahrungen, insbesondere die vorherigen Schadhaftwerduπgen in Betracht gezogen werden sollen. Das ist nach den bekannten MethodenSwitching off the section which has become defective sometimes also affects part of a main line, as a result of which the supply to the consumers which have not been switched off but are located after the section which has become defective becomes worse. In the known process, no instructions are given to alleviate these difficulties. Practice has shown that when planning and implementation of a renewal, extension or even reconstruction of the supply system, the operating experience, in particular the previous damage claims, should be taken into account. That is according to the known methods
5 nicht möglich.5 not possible.
Wesen der ErfindungEssence of the invention
Die Erfindung hat nun die Aufgabe, die Unzlänglich- keiteπ der vorbekaπnteπ Methoden zu eliminieren und ein Verfahren zur Beseitigung von Schadha twerduπgen in denThe invention now has the task of eliminating the imperfections of the previously known methods and a method for eliminating harmful substances in the process
10 Rohrleitungen eines Versorgungssystems zu schaffen, womit die; Beseitigung viel .schneller, einfacher, kostengünstiger und mit weniger negativen Auswirkungen auf die Verbraucher- steilen verwirklicht werden kann und das auch die Instand¬ haltung, den Betrieb, die Rekonstruktion des Versorguπgs-10 pipes to create a supply system, with which the ; Elimination much quicker, easier, cheaper and with less negative effects on the consumer can be realized and that also the maintenance, operation, reconstruction of the supply
15 Systems günstiger macht. • 15 makes systems cheaper. •
Die erfinduπgsgemässe Weiterentwicklung besteht nun darin, dass zuerst an einem Netzplaπ des Versorgungs¬ systems die Position der Schadhaftwerduπg geortet, danach die Art .und Position der den Ort der Schadhaftwerduπg uπ-The further development according to the invention now consists in first locating the position of the harmful liability on a network map of the supply system, then the type and position of the location of the harmful liability uπ-
20 mittelbar umfangenden, in den Rohrleitungen vorgesehenen Verschlussarmaturen sowie die Material- und Betriebspara- πre^ter der schadhaft gewordenen Rohrleitung festgestellt werden, danach die zur Beseitigung der Schadhaf werduπg benötigte Be-Iagschaft, Materialien und Maschinen ausgewählt20 indirect sealing fittings provided in the pipelines as well as the material and operating parameters of the damaged pipeline are determined, then the workforce, materials and machines required to eliminate the harmful substances are selected
25.'- unτj zur Stelle der Schadhaf werdung .befördert werden, die vorher bestimmten Verschlussarmaturen betätigt werden und d'äτjurch der schadhaft gewordene Abschnitt des Versorgungs¬ systems ausgeschaltet wird, danach die Schadhaftwerdung - beseitigt wird, die Verschlussarmaturen zum Öffnen betätigt25 '- are unτj .befördert to the site of Schadhaf Werdung, the predetermined lock valves are actuated, and d' is the äτjurch become defective portion of the Versorgungs¬ off system, after which the Schadhaftwerdung - is eliminated, the shutter valves operated to open
30 werden und dadurch der Abschnitt des Versorgungssystems wieder eingeschaltet wird.30 and thereby the section of the supply system is switched on again.
Dabei ist es vorteilhaft, wenn nach der Feststellung der zu betätigenden Verschlussarmaturen die an dem auszu¬ schaltenden Abschnitt des Versorgungssystems angeschlossenIt is advantageous if, after the locking fittings to be actuated are ascertained, those connected to the section of the supply system to be switched off
35.' Verbraucherstelleπ über den bevorstehenden Ausfall der
Versorgung benachrichtigt werden. Die Verschlussorgaπe können auch fernbetätigt werden.35. ' Konsumentstelleπ about the impending failure of the Supply to be notified. The closure organs can also be operated remotely.
In einer vorteilhaften Verwirklichung des erfiπduπgs- gemässeπ Verfahrens können wir so vorgehen, dass den typischen Arten der Schadhaftwerdung entsprechend mehrere Sätze von Belegschaft, Werkzeugen, Materialien und Maschinen der Beseitigung zusammengestellt und in Bereitschaft gehalten werden. Dabei kann jeder Satz an einem Kraftfahrzeug ange¬ ordnet werden. Im Sinne der Erfindung ist es vorteilhaft, wenn die Ortung der Schadhaftwerduπg, die Feststellung der Ver¬ schlussorgaπe und der Material- und Betriebsparameter sowie die Auswahl der geeigneten Reparatureiπheit, gegebenfalls die Benachrichtigung der Verbraucherstellen und die Ferπ- betätigung der Verschlussarmaturen in und von einer zentralen Stelle verwirklicht werden, worin die Schadhaftwerduπg gemeldet wird. Es ist dabei weiter vom Vorteil, wenn in der zentralen Stelle alle Parameter des Versorgungssystems, insbesondere die topologischen und strömungstechnischen Angaben der Rohrleitungen, der Quellen des Versorgungs¬ systems, die technischen und topologischen Angaben der in dem Versorgungssystem vorgesehenen Objekten, die Ideπtifika tionsaπgaben der dem Versorgungsnetz angeschlossenen Ver¬ braucherstellen sowie der zur Verfügung stehende Vorrat an, Materialien und Maschieπeπ der Beseitigung und Reperatur- einheiten in Übersicht gehalten werden. In der zentralen Stelle können dabei auch die gemeldeten Schadhaftwerdungen sowie Ablauf der Beseitigungen registriert werden. Damit wird es im. Sinne der Erfindung ermöglicht, dass die plan- m ssige Instandhaltung des Versorguπssystems aufgrund der in Übersicht gehaltenen sowie registrierten Angaben bestimmt wird und dass aus- den Angaben eine Statistik der' Schadhaft- werduπgeπ erstellt wird, woraus auf die weiteren und/oder zukünftlichen Betriebsumständeπ des Versorgungssystems gefolgert wird. Aufgrund der Folgerungen aus der Statistik
können vorteilhafterweise die in der Bereitschaft zu haltende Belegschaft, Materialien' und Maschienen bestimmt werden. Es ist im weiteren auch möglich, dass aufgrund der Statistik Schadhaftwerduπgen simuliert werden und dadurch auf BeseitigungenIn an advantageous implementation of the method according to the invention, we can proceed in such a way that, according to the typical types of damage, several sets of personnel, tools, materials and machines for disposal are put together and kept on standby. Each set can be arranged on a motor vehicle. In the sense of the invention, it is advantageous if the location of the damage, the determination of the closure organs and the material and operating parameters as well as the selection of the suitable repair unit, if necessary the notification of the consumer points and the remote actuation of the closure fittings in and from a central location Place to be realized, in which the harmful liability is reported. It is further of advantage if all parameters of the supply system, in particular the topological and fluidic data of the pipelines, the sources of the supply system, the technical and topological data of the objects provided in the supply system, the ideas of the requirements of the The supply points connected to the supply network and the available supply of materials and machines for disposal and repair units are kept in an overview. The reported damage claims as well as the process of remedial measures can also be registered in the central location. So it will be in. The meaning of the invention enables the planned maintenance of the supply system to be determined on the basis of the information which is kept as an overview and registered, and that the information is used to produce a statistic of the 'harmful liability factors', from which further and / or future operating circumstances of the Supply system is inferred. Because of the conclusions from the statistics can be determined advantageously the staff, materials ' and machinery to be kept ready. It is also possible in the following that damage statistics are simulated on the basis of statistics and thus for eliminations
5.' von zukünftlicheπ Schadhaftwerdungen aufbereitet wird oder dass eine Erweiterung und/oder Rekonstruktion des Versorgungs¬ systems unter Berücksichtigung der Statistik verwirklicht werden.5. ' Future damage claims are processed or that an expansion and / or reconstruction of the supply system is carried out taking into account the statistics.
Im Sinne der Erfindung ist eine äusserst einfacheIn the sense of the invention, an extremely simple one
10 Verwirklichung gegeben, wenn dabei mathematische Methoden, rechentechπische Mittel angewendet werden. Es ist dabei vom Vorteil, w.eπn eine Rechenmaschine in der zentralen Stelle mit Peripherien der Dateneingabe und Datenanzeige angewendet wird. Dadurch wird im Sinne der Erfindung Ver-10 Realization if mathematical methods, computational means are used. It is advantageous here if a computing machine is used in the central location with peripherals for data input and data display. For the purposes of the invention,
15 wirklic'hurrgen ermöglicht, worin die fernbetätigb'areπ Ver- schlussorgaπen der Versorgungssystems durch die Rechen¬ maschine automatisch gesteuert werden und die Benachrichtigung der Verbraucherstelleπ über die Ausschaltung und der Ein¬ schaltung der Versorgung durch die Rechenmaschine automatisch 0 erfolgen.Wirklic'hurrgen 15 allows wherein the fernbetätigb 'areπ encryption schlussorgaπen the supply system through the machine Rechen¬ be controlled automatically and notifying the Verbraucherstelleπ on the elimination and the Ein¬ the supply circuit by the calculator automatically carried 0th
Detailierte Beschreibung von Verwirklichungsbeispielen Weitere Einzelheiten der Erfindung werden an Hand des Verwirklichungsbeispieles eines kommunalen Wasserver¬ sorgungssystems -näher dargestellt. 5 In der Zentrale des Wasserversorgungssyste es ist eine Rechenmaschine' mit den üblichen Dateneingabe- und Datenzeigegeräteπ installiert, worin, alle Angaben des zu der Zentrale gehörenden Versorgungssystemes eingegeben sind. Dazu uss in den meistens Fällen das bestehende System 0 vorangehend aufgemessen werden. In dieser Weise werden die Lage,die topologischen, strömuπgstechnischen, hydraulischen und Materialangaben der Rohrleitung, die Lage und technischen Parameter der in den Rohrleitungen vorgesehenen- Objekte, z.B. die der Verschlussorgane und der Speisewasserquellen. 5 die Identi ikationsangaben und Verbrauchmengen der an dem
- -DETAILED DESCRIPTION OF REALIZATION EXAMPLES Further details of the invention are presented in more detail with reference to the implementation example of a municipal water supply system. 5 In the center of the Wasserversorgungssyste it is installed a calculating machine 'with the usual data input and Datenzeigegeräteπ wherein, all figures of belonging to the central supply system are entered. In most cases, the existing system 0 must be measured beforehand. In this way, the location, the topological, fluidic, hydraulic and material details of the pipeline, the location and technical parameters of the objects provided in the pipelines, for example those of the closure members and the feed water sources. 5 the identi ification information and consumption quantities of the - -
Versorgungssystem angeschlossenen Verbraucherstellen sowie die Qualifikations- und Mengenangaben der zur Verfügung stehenden Belagschaft, Werkzeuge, Materialien und Maschinen gespeichert. Im Sinne der Erfindung werden mehrere Sätze vonSupply system connected consumer points as well as the qualification and quantity information of the available staff, tools, materials and machines saved. For the purposes of the invention, several sets of
Personal, Werkzeugen, Materialien, Maschinen in Bereit¬ schaft gehalten, die in Abhängigkeit der Eigenschaften des gegebenen Versorgungssystems zusammengestellt sind. In dieser Weise können Arbeitsgruppen für unter Asphalt- pflastes befindliche Rohrleitungen aus Gusseisen oder andere für im Gebäuden befindlichen Rohrleitungen aus Kunststoff usw. zusammengestellt werden. Diese Einheiten der Be¬ seitigung werden jeweils in einem Kraftfahrzeug, z.B. in einem Lastwagen mit geschlossener Ladefläche angeordnet und mit allen zu ihren speziellen Aufgaben benötigbaren Mitteln versehen.Personnel, tools, materials, machines kept in readiness, which are put together depending on the properties of the given supply system. In this way, working groups can be put together for pipes made of cast iron under asphalt pavement or other for pipes made of plastic etc. in buildings. These units of elimination are each in a motor vehicle, e.g. arranged in a truck with a closed loading area and provided with all the means necessary for its special tasks.
Erfinduπgsgemäss wird eine Schadhaftwerduπg, des Versorgungssystems in die Zentrale' gemeldet, wobei z.B. die Strasse und Hausnummer oder in der Ortschaft zur Identifikation geeignete andere Angaben (z.B. vor der Kirche, auf dem Hauptplatz, usw.) mitgeteilt werden. Der dienst- leisteπde Dispatcher kodiert diese Angaben in der Zentrale und gibt in die Rechenmaschine ein. Nach einigen Sekunden werden dann alle zu der Beseitigung notwendigen Angaben herausgegeben. An einem Netzplaπ des Versorgungssystems wird genau 'der Ort der Schadhaftwerdung angezeigt. Gleich¬ zeitig werden die Positionen der Verschlussorgaπeπ ange¬ geben, die das Ausschalten des schadhaft gewordenen Ab¬ schnittes ermöglichen und zu dem Ort des Fehlers am nächsten liegen. Dadurch wird erreicht, dass der kleinstmögliche Rohrabschnitt des Versorgungssystems ausgeschaltet wird, jedoch wird.die schadhaft gewordene Stelle von dem beförderten Mittel befreit. Es werden ebenfalls die Angaben des Rohr- abschπittes und die der Verschlussorgaπe angegeben. Dement¬ sprechend kann sofort die entsprechende Reparatureinheit
ausgewählt und alarmiert werden, die die zur Beseitigung benötigten Werkzeuge, Materialien und Maschine bie sich hat. Gleichzeitig können die betroffenen Verbraucherstellen über den bevorstehenden Ausfall der Versorgung und gegeben- falls über dessen Dauer. benachrichtigt werden.Erfinduπgsgemäss is reported a Schadhaftwerduπg, the supply system in the headquarters', where, for example, the street name and number, or communicated in the village to identify other suitable information (eg front of the church on the main square, etc.). The service provider dispatcher encodes this information in the central office and enters it into the computing machine. After a few seconds, all the information necessary for the elimination will be released. The place of Schadhaftwerdung is exactly 'on a Netzplaπ of the scheme appears. At the same time, the positions of the closure organ are indicated which enable the defective section to be switched off and which are closest to the location of the fault. This means that the smallest possible pipe section of the supply system is switched off, but the damaged location is freed from the transported means. The details of the pipe section and the closure organs are also given. The corresponding repair unit can immediately speak accordingly be selected and alarmed, who have the tools, materials and machines required for disposal. At the same time, the affected consumer units can be informed of the impending supply failure and, if necessary, of its duration. be notified.
Die der Schadhaftwerduπg entpsrechend ausgewählte Reparatureiπheit fährt nun zu der genau angegebenen Stelle der schadhaft gewordenen Rohrleitung und betätigt zum Schliessen die ebenfalls genau angegebenen Verschluss- armatureπ. Dabei sind schon Art der Verschlussarmatureπ und die Weise der Betätigung, bzw. die bei der Schadstelle auszuführenden Arbeitsvorgänge wohl bekannt. Der schadhafte Rohrabschnitt wird aufgeschlossen und der' Fehler beseitigt, wobei alle zu den Arbeitsvorgängen benötigte Werkezuge, Materiellen und Maschinen.in dem Fahrzeug zur Verfügung stehen. Danach wird die Arbeitsgruge wieder zugegrabeπ und die Oberfläche mindestens provisorisch hergestellt.The repair unit selected in accordance with the defective item now moves to the precisely specified location of the defective pipeline and actuates the closure armature, which is also precisely specified, to close. The type of locking armature and the manner of actuation, or the operations to be carried out at the damaged area, are already well known. The defective pipe section is unlocked and the ' fault is eliminated, whereby all the tools, materials and machines required for the work processes are available in the vehicle. Then the working gruge is added again and the surface is at least provisionally restored.
Am Ende der Beseitigung der Schadhaftwerdung werden die die Schadhaftwerdung beschreibenden Angaben in die Rechenmaschine eingegeben und dort gespeichert. Aus diesen Angaben können Statistiken erstellt werden, die Aussagen über die Häufigkeit der Schadhaftwerdung sowie über die zu erwartende Lebensdauer der einzelnen Abschnitte des Versorgungssystems ermöglichen. Dadurch kann einerseits im voraus auf die zukünftlichen Schadhaftwerdungen vorbe¬ reitet werden, andererseits können die planmässige Instand¬ haltung auf die mehr gefährdeten Bereiche gerichtet, bzw. die Rekonstruktion in den Bereichen entsprechend te piert werden. Das gleiche gilt auch für die in dem Versorguπgs- system vorgesehenen Objekte, deren Erneuerung ebenfalls durch die Statistik der Schadhaftwerduπgen entschieden werden kann.At the end of the elimination of the damage liability, the information describing the damage liability is entered into the computing machine and stored there. From this information, statistics can be compiled that enable statements to be made about the frequency of damage and the expected service life of the individual sections of the supply system. In this way, on the one hand, preparation can be made in advance for future damage, on the other hand, the scheduled maintenance can be directed to the more endangered areas, or the reconstruction in the areas can be adjusted accordingly. The same also applies to the objects provided in the supply system, the renewal of which can also be decided by the statistics of the defective items.
Mit Hilfe der erwähnten Statistik können auch Schad¬ haftwerduπgeπ simuliert werden, wodurch ebenfalls die Vor- bereitung, das Trainieren des Personals gefördert werden.
Die Statistik liefert im weiteren umfassende Betriebser¬ fahrungen, die bei der Erweiterung und/oder Rekonstruktion des Versorgungssystems vom Nutzen sein können. Dadurch kann z.B. die Stelle einer neuen Wasserquelle oder dieWith the help of the above-mentioned statistics, it is also possible to simulate harmful damage factors, which also promotes the preparation and training of the personnel. The statistics furthermore provide extensive operating experience which can be useful in the expansion and / or reconstruction of the supply system. This can be, for example, the location of a new water source or the
5 einer Abzweigung aus deπi bestehenden System bestimmt werden.5 a branch can be determined from the existing system.
In der Zentrale kann die nach dem Absperren eines Abschnittes sich erstellende Betriebssituation ausgewertet und zur Minderung der nachteiligen Wirkungen des Absperreπs des Abschnittes Massnahmen vorgenommen werden.. Nach BeseitigungThe operating situation that arises after a section has been shut off can be evaluated at the headquarters and measures can be taken to reduce the adverse effects of the section's shutdown. After removal
LOL einer Schadhaftwerduπg können die dabei verwendeten Materialien sofort nachgeholt und der Vorrat wieder aufgefüllt werden. Der Rechenmaschine können in der Zentrale Printer angeschlossen sein, wodurch die -Schadhaftwerduπgen und deren Beseitigungen dokumentiert und archiviert werden 15 können. An der Rechenmaschine können im weiteren auch solche Verschlussorgane angeschlossen sein, die fernbetätigbar sind, wobei die Weisung zum Schliesseπ des Verschluss- orgaπs von der "rechenmaschine automatisch ausgeliefert wird. Mit der Rechenmaschinen können auch die Reparatur-In the event of a defective damage, the materials used can be made up immediately and the stock can be replenished. The computing machine can be connected to the central printer, so that the defective damage and its remedies can be documented and archived. On the abacus hereinafter also disclose such organs and the repair can be connected, which are remote-controlled, with the transfer to Schliesseπ of the closure orgaπs abacus from "comes automatically. With the calculators can
ZO eiπheiteπ zur Beseitigung alarmiert, bzw. die daran ange¬ schlossenen Verbraucherstellen automatisch über den bevor¬ stehenden Ausfall der Versorgung benachrichtigt werden.ZO eiπheiteπ alerted for elimination, or the connected consumer stations are automatically notified of the impending failure of the supply.
Das erfindungsge ässen Verfahren kann natürlicher¬ weise nicht nur für Wasserversorguπgssysteme verwendetThe method according to the invention can of course not only be used for water supply systems
Z5 werden, sondern es ist auch für andere kommunale oder aber auch für iππeπbetriebliche Versorgungssysteme geeignet. Seine Anwendung ist bei hochwertigen und/oder gefährlichen beförderten Mitteln vom besonderen Vorteil.
Z5 are, but it is also suitable for other municipal or also for internal supply systems. Its use is of particular advantage for high-quality and / or dangerous conveyed funds.
Claims
Patentansprüche Claims
1. Verfahren zur Beseitigung einer Schadhaftwerduπg von Rohrleitungen eines Versorgungssystems, wobei ein Be¬ reich der Schadhaf werduπg von einem in den Rohrleitungen1. A method for eliminating a damaged pipe from a supply system, a region of the damaged pipe being covered by one in the pipe
5 beförderten Mittel befreit und die Schadhaf werduπg be¬ seitigt wird, dadurch gekennze ichnet , dass zuerst an einem Netzplan des Versorgungssystems die Position der Schadhaftwerduπg geortet, danach die Art und Position der den Ort der Schadhaftwerduπg unmittelbar umfangenden, in5 transported funds is freed and the harmful liability is eliminated, characterized in that first the position of the harmful liability is located on a network plan of the supply system, then the type and position that directly encompasses the location of the harmful liability, in
LQ den Rohrleitungen vorgesehenen Verschlussarmaturen sowie die Material- und Betriebsparameter der schadhaft gewordenen Rohrleitung festgestellt werden, danach die zur Beseitigung der Schadhaftwerduπg benötigte Belagschaft, Materialien und Maschinen ausgewählt und zur Stelle der SchadhaftwerdungLQ the fittings provided for the pipelines as well as the material and operating parameters of the defective pipeline are determined, then the covering, materials and machines required for eliminating the damage are selected and the place of damage becomes
1"5.' befördert werden, die vorher bestimmten Verschlussarmatureπ betätigt .werden und dadurch der schadhaft gewordene Abschnitt des Versorgungssystems, ausgeschaltet wird, danach die Schad- haftwerdung beseitigt wird, "die Verschlussarmaturen zum Öffnen betätigt werden und dadurch der Abschnitt des Ver-1 '5' are conveyed .werden operates the predetermined Verschlussarmatureπ and thereby the defective portion which has become the supply system is turned off, after which the pollutants haftwerdung is eliminated, "the closure valves are operated to open and thereby the portion of the encryption
ZCU sorguπgssystems wieder eingeschaltet wird.ZCU care system is turned on again.
Z".. Verfahren nach Anspruch 1, dadurch gekennzeich- n e-t , dass nach der Feststellung der zu betätigenden Verschlussarmatureπ die an dem auszuschaltenden Abschnitt des Versorgungssystems angeschlossenen VerbraucherstelleπZ " .. Method according to claim 1, characterized in that after the determination of the locking armature to be actuated, the consumer points connected to the section of the supply system to be switched off
Z5 über' den bevorstehenden Ausfall der Versorgung benachrichtigt werden.Be Z5 notifies the imminent failure of the supply over '.
3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet j dass die Verschlussarmaturen fern¬ betätigt werden.3. The method according to claim 1 or 2, characterized in that the locking fittings are operated remotely.
30 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet , dass den typischen Arten der Schad- haftwerdung entsprechend mehrere Sätze von Belagschaft,
Werkzeugen, Materialien und Maschinen der Beseitigung zusammen¬ gestellt und in Bereitschaft gehalten werden.4. The method as claimed in one of claims 1 to 3, characterized in that, according to the typical types of damage liability, several sets of deposits, Tools, materials and machines for disposal are put together and kept ready.
5. Verfahren nach Anspruch 4, dadurch gekennzeich¬ net , dass jeder Satz an einem Kraf fahrzeug als eine5. The method according to claim 4, characterized in that each set of a motor vehicle as one
5 Reperatureiπheit angeordnet wird.5 repair unit is arranged.
6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichne t , dass die Ortung der Schadhaftwerduπg, die Feststellung der Verschlussorgane und der Material- und Betriebsparameter sowie die Auswahl der geeigneten 10. Reperatureiπheit, gegebeπfalls die Benachrichtigung der Verbraucherstellen und die Fernbetätigung der Verschluss¬ armaturen in und von einer zentralen Stelle verwirklicht werden, worin die Schadhaftwerduπg gemeldet wird.6. The method according to any one of claims 1 to 5, characterized in that the location of the Schadhaftwerduπg, the determination of the locking elements and the material and operating parameters as well as the selection of the appropriate 10. repair unit, where appropriate, the notification of the consumer points and the remote actuation of the lock ¬ fittings are realized in and from a central point, in which the harmful liability is reported.
7. Verfahren nach Anspruch 6, dadurch g e k e π πz e i c h - 15. n e t , dass in der zentralen Stelle alle Parameter des7. The method according to claim 6, characterized in that g e k e π πz e i c h - 15. n e t that all parameters of the
Versorgungssystems, insbesondere die topologischen und strömuπgstechnischen Angaben der Rohrleitungen,der Quellen des Versorgungssystems, die technischen und topologischen Angaben der in dem Versorgungssystem vorgesehenen Objekten,Supply system, in particular the topological and flow information of the pipelines, the sources of the supply system, the technical and topological information of the objects provided in the supply system,
20 die Identifikatioπsangabeπ der dem Versorgungsnetz ange¬ schlossenen Verbraucherstelleπ sowie der zur Verfügung stehende Vorrat an Materialien und Maschinen der Beseitigung und. Reperatureiπheiten in Übersicht gehalten werden. 8.. Verfahren nach Anspruch. 6 oder 7, dadurch20 the identification information of the consumer point connected to the supply network and the available stock of materials and machines for disposal and. Repair units are kept in an overview. 8 .. Method according to claim. 6 or 7, thereby
25' gekennzeichnet , dass die gemeldeten Schadhaftwerduπgeπ • sowie Ablauf der Beseitigungen in der zentralen Stelle auch registriert werden.25 ' characterized in that the reported damage detention and the course of the removals are also registered in the central location.
9. Verfahren nach Anspruch 7 oder 8, dadurch gekennzeichnet , dass die planmässige Instandhaltung9. The method according to claim 7 or 8, characterized in that the scheduled maintenance
30 des Versorgungssystems aufgrund der in Übersicht gehaltenen sowie registrierten Angaben bestimmt wird.30 of the supply system is determined on the basis of the information held and registered in an overview.
10. Verfahren nach einem der Ansprüche 7 bis 9, dadurch gekennzeichnet , dass aus den Angaben eine Statistik der Schadhaftwerdung erstellt wird, woraus auf die weiteren10. The method according to any one of claims 7 to 9, characterized in that a statistic of the damage is created from the information, from which to the further
35 und/oder zukünftlichen Betriebsumständen des Versorgungssystems
- 12 -35 and / or future operating conditions of the supply system - 12 -
gefolgert wird.is concluded.
11. Verfahren nach Anspruch 10, dadurch gekennze ich¬ net , dass aufgrund der Folgerungen aus der Statistik die in Bereitschaft zu haltende Belegschaft, Materialien 5 und Maschinen bestimmt werden.11. The method according to claim 10, characterized in that the staff to be kept ready, materials 5 and machines are determined on the basis of the conclusions from the statistics.
12. Verfahren nach Anspruch 10 oder 11, dadurch g e~k ennzeichne t ,- dass aufgrund der Statistik Schad¬ haftwerdungen simuliert werden und dadurch auf Beseitigungen von" zukünf'tLiehen Schadhaftwerdungen aufbereitet wird. 10. 13 Verfahren nach einem der Ansprüche 10 bis 12, da¬ durch ge.-k.ennzeichne t , dass eine Erweiterung und/oder Rekonstr.i_jk.tLon des Versorgungssystems unter Berücksichtigung der Statistik verwirklicht werden.12. The method according to claim 10 or 11, characterized in that damage statistics are simulated on the basis of the statistics and thereby prepared for eliminating "future loans " . 10. 13 Method according to one of claims 10 to 12 , so ge.-k.ennzeichenne t that an expansion and / or Rekonstr.i_jk.tLon of the supply system can be realized taking into account the statistics.
14. Verfahren nach einem .der Ansprüche 1 bis 13, dadurch 15' gekennzeichnet , dass es mit mathematischen Methoden, mit rechentechnischeπ Mitteln verwirklicht wird.14. Method according to .the claims 1 to 13, characterized in 15 'that it is realized using mathematical methods with rechentechnischeπ means.
15. Verfahren nach Anspruch 14, dadurch gekennzeichnet , dass- eine Rechenmaschine in der zentralen Stelle mit Peripherien der Dateneingabe und Daten-15. The method according to claim 14, characterized in that a computer in the central location with peripherals of data input and data
2Q; anzeige angewendet wird.2Q; display is applied.
16. Verfahren nach Anspruch 15, dadurch g e k e n n.z e i c h π e t , dass die ferπbetätigbaren Verschluss¬ organen der Versorgungssystems durch die' Rechenmaschine automatisch gesteuert werden. 5" 17. Verfahren nach Anspruch 15 oder-16, dadurch gekennzeichnet , dass die Benachrichtigung der Ver¬ braucherstellen über die Ausschaltung und der Einschaltung der Versorgung durch die Rechenmaschine automatisch erfolgen.
That the ferπbetätigbaren Verschluss¬ organs of the supply system are automatically controlled by the 'calculator 16. The method according to claim 15, characterized geken nz calibration π et. 5 "17. The method according to claim 15 or 16, characterized in that the notification of the need Ver¬ create carried out via the cut-off and the switching on of the supply by the calculator automatically.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI880034A FI880034A (en) | 1986-05-09 | 1988-01-06 | FOERFARANDE FOER REPARERING AV SKADOR I ROERLEDNINGAR AV ETT TILLFOERSELSYSTEM. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
HU192886 | 1986-05-09 | ||
HU1928/86 | 1986-05-09 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO1987006994A1 true WO1987006994A1 (en) | 1987-11-19 |
Family
ID=10956885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/HU1987/000023 WO1987006994A1 (en) | 1986-05-09 | 1987-05-07 | Process for repairing damage to pipes of a supply system |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0267257A1 (en) |
JP (1) | JPH01500138A (en) |
FI (1) | FI880034A (en) |
WO (1) | WO1987006994A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8423319B2 (en) | 2006-09-11 | 2013-04-16 | Exxonmobil Research And Engineering Company | Process for mapping off-site piping systems in a refinery and/or petrochemical facility and a system for providing emergency isolation and response in a refinery and/or petrochemical facility |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000027244A (en) * | 1998-07-13 | 2000-01-25 | Yokogawa Electric Corp | Waterworks support system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3624627A (en) * | 1970-05-11 | 1971-11-30 | Jack L Evans | Gas leak detection system |
EP0011329A1 (en) * | 1978-11-08 | 1980-05-28 | Ulrich Meyer | Process and device for automatically detecting leaks in a pipeline |
DE3205697A1 (en) * | 1982-02-17 | 1983-09-08 | Standard Meßgerätefabrik GmbH, 4760 Werl | Safety device for the independent shut-off of supply lines for gaseous or liquid media, in particular water lines, during uncontrolled discharge of media or water |
-
1987
- 1987-05-07 JP JP50316187A patent/JPH01500138A/en active Pending
- 1987-05-07 WO PCT/HU1987/000023 patent/WO1987006994A1/en not_active Application Discontinuation
- 1987-05-07 EP EP19870903384 patent/EP0267257A1/en not_active Withdrawn
-
1988
- 1988-01-06 FI FI880034A patent/FI880034A/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3624627A (en) * | 1970-05-11 | 1971-11-30 | Jack L Evans | Gas leak detection system |
EP0011329A1 (en) * | 1978-11-08 | 1980-05-28 | Ulrich Meyer | Process and device for automatically detecting leaks in a pipeline |
DE3205697A1 (en) * | 1982-02-17 | 1983-09-08 | Standard Meßgerätefabrik GmbH, 4760 Werl | Safety device for the independent shut-off of supply lines for gaseous or liquid media, in particular water lines, during uncontrolled discharge of media or water |
Non-Patent Citations (1)
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8423319B2 (en) | 2006-09-11 | 2013-04-16 | Exxonmobil Research And Engineering Company | Process for mapping off-site piping systems in a refinery and/or petrochemical facility and a system for providing emergency isolation and response in a refinery and/or petrochemical facility |
Also Published As
Publication number | Publication date |
---|---|
EP0267257A1 (en) | 1988-05-18 |
FI880034A0 (en) | 1988-01-06 |
FI880034A (en) | 1988-01-06 |
JPH01500138A (en) | 1989-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2350757A1 (en) | System and method for optimized decision-making in water supply networks and/or water supply operations | |
EP2198352A1 (en) | Method for configuring an arrangement for protecting controlling or monitoring an electrical switch or power supply gear | |
DE3445281A1 (en) | METHOD AND DEVICE FOR TIGHTNESS TESTING TWO SHUT-OFF VALVES IN A GAS-FLOWED PIPE | |
WO1987006994A1 (en) | Process for repairing damage to pipes of a supply system | |
DD261196A1 (en) | METHOD FOR ELIMINATING SHEARS ON PIPES OF A SUPPLY SYSTEM | |
EP0450340B1 (en) | Cavity volume measuring device and method | |
DE10312606B3 (en) | Pipeline section de-commissioning device has selected pipeline section bridged by bypass line pipes between spaced sealing cuffs | |
EP1970843A1 (en) | Method and device for determining the flow behaviour of hazardous materials in disasters | |
DE585380C (en) | Locking device with repair lock | |
WO2007054415A1 (en) | Apparatus for automatically servicing a technical system | |
DE3046253A1 (en) | Testing sealing of back pressure valves - using removable blocking plates and two position, pressurised liq. inlet plate | |
WO2022238506A1 (en) | Method for operating an industrial system | |
Bednar | Artificial intelligence of stormwater operations | |
DE2607926C2 (en) | Arrangement of lines and shut-off valves for liquid fuels | |
DE102007010436A1 (en) | Connecting intermediate piece for attaching to a water treatment unit on pipes of a household water supply comprises a servomotor and an electronic control device for controlling the servomotor | |
DE3244460A1 (en) | Method and device for cleaning, repairing and/or inspecting conduits, in particular sewer conduits | |
DE3000077C2 (en) | ||
Feldstein et al. | Pressure test stopper for a pipeline | |
DE2341010A1 (en) | "Floating" procedure of safety valves during operation of steam boiler - by isolating and pressurising with boiler feed water | |
Barker et al. | Reliability assessment for a spillway gate upgrade design in Queensland, Australia | |
DE202012005539U1 (en) | Alarm valve for a pipeline network of fire extinguishing systems | |
DE102014216280A1 (en) | Method for voltage-free maintenance of a stationary transformer station and mobile transformer station | |
Urschitz | Southeast Collector Project–Procurement of TBMs by the client/Southeast Collector Project–Beistellung der TBMs durch den Bauherrn | |
DD267096A1 (en) | METHOD AND ARRANGEMENT FOR THE REPAIR OF PIPES UNDER OPERATING CONDITIONS | |
Sinclair et al. | When Transit Expansions Requires You to Really Understand Your Water System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): BG BR FI JP SU US |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH DE FR GB IT LU NL SE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1987903384 Country of ref document: EP |
|
WWP | Wipo information: published in national office |
Ref document number: 1987903384 Country of ref document: EP |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: 1987903384 Country of ref document: EP |