US9482075B2 - Retrieval of subsea production and processing equipment - Google Patents

Retrieval of subsea production and processing equipment Download PDF

Info

Publication number
US9482075B2
US9482075B2 US14/423,664 US201214423664A US9482075B2 US 9482075 B2 US9482075 B2 US 9482075B2 US 201214423664 A US201214423664 A US 201214423664A US 9482075 B2 US9482075 B2 US 9482075B2
Authority
US
United States
Prior art keywords
fluid
subsea
equipment
adjustable
accumulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
US14/423,664
Other languages
English (en)
Other versions
US20150315878A1 (en
Inventor
Eric Randall SMEDSTAD
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FMC Technologies Inc
Original Assignee
FMC Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FMC Technologies Inc filed Critical FMC Technologies Inc
Publication of US20150315878A1 publication Critical patent/US20150315878A1/en
Application granted granted Critical
Publication of US9482075B2 publication Critical patent/US9482075B2/en
Assigned to FMC TECHNOLOGIES, INC. reassignment FMC TECHNOLOGIES, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SMEDSTAD, Eric Randall
Assigned to JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT reassignment JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FMC TECHNOLOGIES, INC., SCHILLING ROBOTICS, LLC
Assigned to DNB BANK ASA, NEW YORK BRANCH, AS ADMINISTRATIVE AGENT reassignment DNB BANK ASA, NEW YORK BRANCH, AS ADMINISTRATIVE AGENT SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FMC TECHNOLOGIES, INC., SCHILLING ROBOTICS, LLC
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0007Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K31/00Actuating devices; Operating means; Releasing devices
    • F16K31/001Actuating devices; Operating means; Releasing devices actuated by volume variations caused by an element soluble in a fluid or swelling in contact with a fluid

Definitions

  • the present invention relates to equipment that is used for subsea oil and gas operations, and more particularly to systems that may be used to facilitate the retrieval and/or replacement of subsea oil and gas production and/or processing equipment.
  • subsea production and processing equipment hereafter generally and collectively referred to as subsea equipment
  • subsea equipment may occasionally require routine maintenance or repair due to regular wear and tear, or due to the damage and/or failure of the subsea equipment that may be associated with unanticipated operational upsets or shutdowns, and the like.
  • operations must be performed to retrieve the subsea equipment from its location at the sea floor for repair, and to replace the subsea equipment so that production and/or processing operations may continue with substantially limited interruption.
  • subsea equipment packages In many applications, various cost and logistical design considerations may lead to configuring at least some subsea equipment components as part of one or more subsea production and/or processing equipment skid packages, generally referred to herein as subsea equipment packages or subsea equipment skid packages.
  • various mechanical equipment components such as vessels, pumps, separators, compressors, and the like, may be combined in a common skid package with various interconnecting piping and flow control components, such as pipe, fittings, flanges, valves and the like.
  • skid packaging of subsea equipment generally provides many fabrication and handling benefits, it may present at least some challenges during the equipment retrieval process, as will be described below.
  • the various equipment and piping components making up the skid package may contain many hundreds of gallons of hydrocarbons, or even more, during normal operation. In general, this volume of hydrocarbons in the subsea equipment skid package must be properly handled and/or contained during the equipment retrieval process so as to avoid an undesirable release of hydrocarbons to the surrounding subsea environment.
  • subsea systems often operate in water depths of 5000 feet or greater, and under internal pressures in excess of 10,000 psi or more. It should be appreciated that while it may be technically feasible to shut in subsea equipment and retrieve it from those depths to the surface while maintaining the equipment under such high pressure, it can be difficult to safely handle and move the equipment package on and around an offshore platform or intervention vessel, as may be the case, while it is under such high pressure. Moreover, and depending on local regulatory requirements, it is may not be permissible to move or transport such equipment and/or equipment skid packages while under internal pressure.
  • potentially damaging constituents such as carbon dioxide (CO 2 ) or hydrogen sulfide (H 2 S) and the like, may be present in solution in the liquid hydrocarbons that may be trapped inside of the equipment during shutdown.
  • hydrogen sulfide can potentially form sulfuric acid (H 2 SO 4 ) in the presence of water, which may attack the materials of the some subsea equipment, particularly when flow through the equipment is stopped and the sulfuric acid remains in contact with the wetted parts of the equipment for an extended period of time.
  • a system includes, among other things, subsea equipment that is adapted to contain a first fluid while operating in a subsea environment, and an accumulator device that is in fluid communication with the subsea equipment, wherein a pressure boundary of the accumulator device is adapted to move in response to a pressure change on the subsea equipment as the subsea equipment is raised from the subsea environment.
  • Also disclosed herein is another illustrative system that includes subsea equipment that is adapted to contain a first fluid at a first fluid pressure while operating in a subsea environment, and an accumulator includes a first adjustable accumulator chamber that is in fluid communication with the subsea equipment and is adapted to receive at least a portion of the first fluid, a second adjustable accumulator chamber that is adapted to contain a second fluid.
  • the accumulator device may further include a first movable piston positioned between the first adjustable accumulator chamber and the second adjustable accumulator chamber, the first movable piston being adapted to move in response to a pressure change on the subsea processing equipment as the subsea processing equipment is raised from the subsea environment, the movement adjusting a size of at least one of the first and second adjustable accumulator chambers.
  • the system also includes, among other things, a first valve that is positioned to be in fluid communication with at least one of the first and second adjustable accumulator chambers, the first valve being adapted to reduce the first fluid pressure in response to said pressure change.
  • a system in another illustrative embodiment disclosed herein, includes, among other things, subsea equipment that is adapted to contain a first fluid while operating in a subsea environment, an accumulator device that is adapted to receive and store a quantity of a second fluid while the subsea equipment is positioned in the subsea environment, and a valve that is adapted to controllably inject at least a portion of the quantity of second fluid stored in the accumulator device into the subsea equipment.
  • FIG. 1A is a schematic process flow diagram of an illustrative subsea equipment package in accordance with one illustrative embodiment of the present disclosure
  • FIGS. 1B-1G are schematic process flow diagrams of various illustrative accumulator devices that may be used in conjunction with the subsea equipment package of FIG. 1A in accordance with some illustrative embodiments disclosed herein;
  • FIG. 2A is a schematic process flow diagram of an illustrative subsea equipment package in accordance with another illustrative embodiment of the present disclosure.
  • FIGS. 2B and 2C are schematic process flow diagrams of exemplary accumulator devices that may be used in conjunction with the subsea equipment package of FIG. 2A in accordance with other illustrative embodiments disclosed herein.
  • an accumulator device may be positioned so that it is in fluid communication with a piece of subsea equipment.
  • the accumulator device and the subsea equipment may both be included as part of a common subsea skid package, which may be retrieved from its position at or near the sea floor as may be necessary for equipment maintenance and/or repair.
  • the accumulator device may be adapted to act as a pulsation dampener during normal operation of the subsea equipment so as to reduce or minimize the effects of undesirable operating conditions and/or pressure fluctuations on the subsea equipment.
  • the accumulator device may be adapted to act as a pressure compensator so as to overcome the hydraulic locking effect on any flanged joints connecting the subsea equipment or skid package to adjacent subsea piping and/or other subsea equipment, thereby facilitating separation and retrieval of the subsea equipment or skid package.
  • an accumulator device that is adapted to act as a pressure relief device may be positioned in fluid communication with a piece of subsea equipment, and/or as part of a subsea equipment skid package.
  • the accumulator device may be adapted to lower the pressure of any hydrocarbons or other fluids that may be isolated within the subsea equipment during its retrieval from the sea floor, thereby facilitating the handling and/or transportation of the equipment after it has reached the surface.
  • the accumulator device may be further adapted to vent any expanding gases that may be released by the liquid hydrocarbons and/or other isolated fluids as the internal pressure on the subsea equipment is reduced during equipment retrieval.
  • an accumulator device that is adapted to store a quantity of equipment protection fluids may be positioned in fluid communication with a piece of subsea equipment, whereas in certain embodiments, both the accumulator device and the subsea equipment may be part of a common subsea equipment skid package. In certain embodiments, the accumulator device may be further adapted to release at least a portion of the quantity of the stored equipment protection fluids into the subsea equipment and/or skid package so as to thereby protect the equipment during retrieval to the surface, or in the event of an unanticipated equipment shutdown.
  • the accumulator device may be adapted so that the equipment protection fluids released therefrom sweeps at least a portion of any liquid hydrocarbons present in the subsea equipment out of the equipment prior to isolating the equipment and retrieving it to the surface.
  • FIG. 1A is a schematic process flow diagram depicting a subsea equipment package 100 according to one illustrative embodiment of the present disclosure.
  • the illustrative subsea equipment package 100 may be, for example, a subsea pump package that includes a pair of pumps 101 .
  • the pumps 101 may be used to pump liquid hydrocarbons and/or other produced fluids through skid flow lines 102 , which may be removably attached via skid connections 104 , e.g., flanged connections and the like, to subsea production lines 103 .
  • the pumps 101 may be any one of several types that are commonly used in subsea oil and gas applications, such as helical axial pumps, electrical submersible pumps, and the like.
  • the subsea equipment package 100 may also include skid isolation valves 106 , which may be used to isolate the skid flow lines 102 from the subsea production lines 103 so that the subsea equipment package 100 can be separated at the skid connections 104 prior to retrieval to the surface.
  • each of the skid isolation valves 106 may be manually operable, and furthermore may have a mechanical override for operation via a remotely operated subsea vehicle (ROV) (not shown).
  • ROV remotely operated subsea vehicle
  • the subsea equipment package 100 may also include a plurality of control valves 105 , the quantity and positioning of which may vary depending on the overall design parameters of the subsea equipment package 100 , such as the quantity of pumps 101 , the desired flow scheme, and the like.
  • the control valves 105 may be, for example, hydraulically operated and/or automatically controlled, and may also have a mechanical ROV override.
  • the subsea equipment package 100 may also include equipment isolation valves 108 , which in some embodiments may be used to isolate the subsea equipment, i.e., the pumps 101 shown in the depicted example, as may be required.
  • equipment connections 107 such as flanged connections and the like, may in turn be used to removably attach the pumps 101 to the remainder of the subsea equipment package 100 .
  • the subsea equipment package 100 may also include, among other things, chemical injection lines 111 , which may be positioned at one or more strategic locations throughout the subsea equipment package 100 .
  • the chemical injection lines may be used to inject any one or more of a variety of different chemicals into the package 100 during equipment operation, either automatically or on command.
  • the injection lines 111 may be used to introduce various flow assurance chemicals into the subsea equipment package 100 so as to avoid, or at least minimize, the formation of hydrates or undesirable hydrocarbon precipitates, such as asphaltenes, resins, paraffins, and the like.
  • flow assurance chemicals should be understood to mean any type of chemical that may be utilized in an effort to assist with or insure flow of hydrocarbon materials through at least some portion of the subsea equipment package 100 and/or the flow lines 103 .
  • Illustrative examples of such flow assurance chemicals includes, but is not necessarily be limited to, liquids such as diesel oil, xylene, methanol (MeOH), ethylene glycol (glycol or MEG), and low dosage hydrate inhibitors (LDHI) such as anti-agglomerates and kinetic inhibitors.
  • each chemical injection line 111 may be controlled via an appropriately designed chemical injection control valve 109 , which may be hydraulically operated and/or automatically controlled, as well as a check valve 110 , which may be adapted to prevent the back-flow of hydrocarbons and/or other produced fluids into the chemical injection lines 111 .
  • an appropriately designed chemical injection control valve 109 which may be hydraulically operated and/or automatically controlled, as well as a check valve 110 , which may be adapted to prevent the back-flow of hydrocarbons and/or other produced fluids into the chemical injection lines 111 .
  • the chemical injection lines 111 may also be used to introduce various other material protection chemicals into the subsea equipment package so as to neutralize, or at least substantially reduce, the potential material-damaging effects that may be caused by the presence of unfavorable constituents in the produced hydrocarbons, such as hydrogen sulfide and/or carbon dioxide and the like.
  • unfavorable constituents may tend to form acids in the presence of water
  • the term “material protection chemicals” should be understood to mean any type of chemical that may be employed in an effort to substantially prevent or reduce the formation of acids in the liquids that may be trapped inside of the subsea equipment package 100 , or to at least partially neutralize any acids that may be formed.
  • Some illustrative examples of such material protection chemicals includes but is not necessarily limited to high pH liquids, such as sodium hydroxide (NaOH) and the like, which may act to neutralized any acids that do form in the subsea equipment package 100 .
  • the subsea equipment package 100 may also include one or more accumulator devices 120 , which, as previously noted, may be adapted to perform one or more of several different functions.
  • an accumulator device 120 may be adapted to act as: 1) a pulsation dampener during equipment operation; 2) a pressure compensator during equipment separation and retrieval; 3) a pressure relief device during equipment retrieval; and/or 4) a venting device during equipment retrieval, as will be further described with respect to FIGS. 1B-1F below.
  • the accumulator devices 120 may be positioned to be in fluid communication with a piece of subsea equipment, i.e., a pump 101 .
  • the accumulator device 120 may be positioned on the suction side, i.e., upstream, of the pump 101 .
  • an accumulator device 120 may be positioned on the discharge side, i.e., downstream, of the pump 101 (as indicated by dashed lines in FIG. 1A ), and which may be used either alternatively to or in addition to the accumulator device 120 that is shown in FIG. 1A as being positioned on the suction side of the pump 101 .
  • the specific layout of the subsea equipment package 100 shown in FIG. 1A and the quantity and type of equipment, i.e., pumps 101 , included therein are illustrative only, as other layouts utilizing different types and/or quantities of subsea equipment may also be used.
  • the layout of the subsea equipment package 100 may be adjusted so as to include only one pump 101 , whereas in other embodiments the package 100 may include three or more pumps.
  • the subsea equipment package 100 may include, additionally or alternatively, other types of subsea equipment, such as separator(s), knockout drum(s), compressor(s), flow meter(s), flow conditioner(s), and the like.
  • any illustrative embodiments of the subsea equipment package 100 disclosed herein are not limited to any certain types of applications, but may be associated with subsea production or processing operations, as may be the case depending on the specific application requirements.
  • FIG. 1B schematically depicts one exemplary configuration of an accumulator device 120 a , which may be representative of one or more of the accumulator devices 120 shown in FIG. 1A .
  • the accumulator device 120 a may function as pulsation dampener during the normal operation of the subsea equipment package 100 , and/or as a pressure compensator during the separation and retrieval of the package 100 .
  • the accumulator device 120 a may be in fluid communication, via connection line 121 , with a skid flow line 102 , and thereby in fluid communication with the various equipment on the subsea equipment package 100 , e.g., the pumps 101 (see, FIG. 1A ).
  • the accumulator device 120 a may be configured as a piston-type accumulator, wherein a movable piston 140 separates a first adjustable accumulator chamber 130 from a second adjustable accumulator chamber 131 , and which acts as a pressure boundary that moves in response to pressure changes within either or both of the two adjustable accumulator chambers 131 , 132 .
  • the accumulator device 120 a may be configured as a different type of accumulator, such as bladder-type accumulator or diaphragm-type accumulator, and the like.
  • the bladder or diaphragm of such devices may similarly act as a pressure boundary that separates adjustably sized chambers, and which is movable under pressure changes during the operation of the accumulator.
  • the accumulator device 120 a is in fluid communication with the skid flow line 102 via connection line 121 , and as such, the first adjustable accumulator chamber 130 may contain hydrocarbons and/or other produced fluids that are being handled by the subsea equipment package 100 .
  • the second adjustable accumulator chamber 131 may be pre-charged prior to deployment of the subsea equipment package 100 into the subsea environment with a compressible fluid, e.g., a gas such as nitrogen or helium and the like, or a compressible liquid such as glycerin or silicon oil and the like.
  • the pre-charge pressure in the second adjustable accumulator chamber 131 may be adjusted such that the movement of the piston 140 against the compressible fluid contained in the second adjustable accumulator chamber 131 provides a spring-like behavior. Accordingly, the accumulator device 120 a may thereby act to dampen the effects of any pressure fluctuations that may occur in the skid flow lines 102 during operation of the subsea equipment package 100 .
  • the accumulator device 120 a may also include a biasing spring 150 positioned in the second adjustable accumulator chamber 131 and in contact with the piston 140 , which may be used to further control the damping factor of the accumulator device 120 a.
  • the accumulator device 120 a shown in FIG. 1B may be adapted to function as a pressure compensator so as to allow the disassembly of the connections 104 (see, FIG. 1A ) during separation of the subsea equipment package 100 from the adjacent production lines 103 .
  • flanged connections that are used in subsea applications such as the connections 104
  • the surrounding seawater which is substantially incompressible, may therefore act to hydraulically “lock” the flanged joint together.
  • the spring-like effect of the piston 140 acting on the compressible fluid in the second adjustable accumulator chamber 131 may provide the degree of compressibility necessary to “unlock” the flanges that make up the connection 104 , and substantially without permitting either the ingress of seawater into the subsea equipment package 100 , or leakage of hydrocarbons into the subsea environment 160 .
  • the hydrocarbons that are processed by the subsea equipment package 100 are typically produced and handled in a liquid state, and maintained at very high pressures, such as in excess of 10,000 psi. These produced hydrocarbons usually contain a substantial quantity of short-chain hydrocarbons that would generally be in a gaseous state at pressures closer to ambient, but which are held in a liquid state under the high operating pressures of the subsea equipment package 100 .
  • the gas-to-oil ratio (GOR) of hydrocarbons that are produced from subsea wells may be in the range of 250:1 to 500:1 or even greater, such as a GOR of 1000:1 or more.
  • the accumulator device 120 a of FIG. 1B may be adapted to allow for some expansion of the gas contained in the liquid hydrocarbons during the retrieval of the subsea equipment package 100 from its subsea environment to the surface.
  • the accumulator device 120 a may be positioned at or near a high point on the subsea equipment package 100 and sized so that the first adjustable accumulator chamber 130 can contain a certain quantity of the expanded gas.
  • FIG. 1C schematically depicts an exemplary accumulator device 120 b , which may be representative of a further illustrative embodiment of any one or more of the accumulator devices 120 shown FIG. 1A , and which may also be adapted to operate as a pulsation dampener, a pressure compensator, and/or a gas buster, as previously described.
  • the accumulator device 120 b of FIG. 1C may be in fluid communication with the skid flow line 102 via the connection line 121 .
  • the accumulator device 120 b may include a movable piston 140 that separates the accumulator device 120 b into a first adjustable accumulator chamber 130 containing liquid hydrocarbons and/or other produced liquids and a second adjustable accumulator chamber 131 .
  • the second adjustable accumulator chamber 131 of the accumulator device 120 b shown in FIG. 1C may be open to, i.e., biased to, the subsea environment 160 via the biasing line 122 , such that the pressure in the second adjustable accumulator chamber 131 is substantially the same as hydrostatic pressure of the subsea environment 160 at the depth where the subsea equipment package 100 may be positioned at any given time.
  • a filter 151 may be positioned in the biasing line 122 so as to substantially prevent the ingress of marine life and/or other subsea contaminants, thereby substantially avoiding any fouling of the accumulator device 120 b during operation.
  • the accumulator device 120 b may also include a biasing spring 150 that is positioned in the second adjustable accumulator chamber 131 and contacts the piston 140 .
  • the damping factor of the accumulator device 120 b may be tuned by selecting the biasing spring 150 with an appropriate spring rate, and/or adjusting the size of any flow orifice (not shown) between the second adjustable accumulator chamber 131 and the biasing line 122 .
  • the accumulator device 120 b shown in FIG. 1C may function as a pulsation dampener and/or a pressure compensator in a substantially similar fashion as the illustrative embodiment shown in FIG. 1B and described above.
  • second adjustable accumulator chamber 131 is biased to the hydrostatic pressure of the subsea environment 160 , the pressure in the second chamber 131 will be gradually reduced during retrieval of the subsea equipment package 100 to the surface.
  • an additional amount of expanded gas may be allowed to enter the first adjustable accumulator chamber 130 as the subsea equipment package 100 is being raised.
  • FIG. 1D schematically depicts a further illustrative accumulator device 120 c that is substantially similar to the accumulator device 120 b shown in FIG. 1C , wherein however the accumulator device 120 c also includes an adjustable control valve 152 , such as a needle choke valve and the like, which has been positioned in the biasing line 122 so as to control the flow of seawater into and/or out of the second adjustable accumulator chamber 131 .
  • an adjustable control valve 152 such as a needle choke valve and the like
  • the adjustable control valve 152 may be adjusted so as to control the damping factor of the accumulator device 120 c during the normal operation of the subsea equipment package 100 , together with an orifice (not shown) between the second adjustable accumulator chamber 131 and the biasing line 122 and/or a biasing spring 150 , when those elements may be provided.
  • the adjustable control valve 152 may be further adjusted and/or set during the retrieval operation of the subsea equipment package 100 such that flow through the biasing line 122 is substantially prevented until the package 100 has been raised to a certain predetermined water depth, and/or the hydrostatic pressure of the subsea environment 160 has been reduced to a predetermined level.
  • the expansion of any hydrocarbon gases that may be present within the liquid hydrocarbons contained in the subsea equipment package 100 may be substantially restricted during an initial phase of the equipment retrieval operation, which may be more conducive to at least some gas venting operations, which will be further described with respect to FIG. 1E below.
  • FIG. 1E schematically depicts yet another exemplary accumulator device 120 d that may be representative of a further illustrative embodiment of one or more of the accumulator devices 120 shown in FIG. 1A and described above.
  • the accumulator device 120 d may be adapted to function as one or more of a pulsation dampener and a pressure compensator as previously described.
  • the accumulator device 120 d may be configured in a substantially similar fashion as the accumulator device 120 a shown in FIG.
  • connection line 121 may also include a pressure relief valve 155 that is in fluid communication with the connection line 121 , the first adjustable accumulator chamber 130 , and the skid flow line 102 by way of a relief line 121 a , as shown in FIG. 1E .
  • the relief valve 155 may be adapted to allow any gaseous hydrocarbons that may expand out of the liquid hydrocarbons contained in the subsea equipment package 100 to be vented into the subsea environment 160 as the package 100 is being raised to the surface. Furthermore, the relief valve 155 may be configured such that venting of expanding gases may only occur when the internal pressure in the subsea equipment package 100 is greater than the hydrostatic pressure of the subsea environment 160 by a predetermined threshold amount, e.g., so that gas venting does not occur until the package 100 has been raised to predetermined water depth.
  • the rate at which the expanding gas is vented from the accumulator 120 d may be carefully controlled in such a manner as to substantially prevent the inadvertent carryover of liquid hydrocarbons during the venting process, thereby substantially avoiding a potentially detrimental spillage of liquid hydrocarbons into the subsea environment 160 .
  • the accumulator device 120 d may configured in a substantially similar fashion to one of the accumulator devices 120 b or 120 c as shown in FIGS. 1C and 1D , respectively, such that the second adjustable accumulator chamber 131 of the accumulator device 120 d is biased to the subsea environment 160 . In this way, additional control may be provided over the pressure at which the venting of expanding gaseous hydrocarbons from the accumulator device 120 d may commence, as well as the rate at which the gases are vented.
  • FIG. 1F schematically illustrates yet another exemplary accumulator device 120 e , which may also be representative of further illustrative embodiments of one or more of the accumulator devices 120 shown in FIG. 1A .
  • the accumulator device 120 e may include, among other things, a first adjustable accumulator chamber 130 , a second adjustable accumulator chamber 131 , and a third adjustable accumulator chamber 132 .
  • the accumulator device 120 e may also include a pre-charge valve 153 that is connected to the accumulator device 120 e via a pre-charge line 123 and a retrieval valve 154 that is connected to the accumulator device 120 e via a retrieval line 124 .
  • connection line 121 may provide fluid communication between the skid flow line 102 and the first adjustable accumulator chamber 130 , which may therefore contain a portion of the hydrocarbons and/or other produced liquids that are handled by the subsea equipment package 100 .
  • the first adjustable accumulator chamber 130 of the accumulator device 120 e may be separated from the second adjustable accumulator chamber 131 by a first movable piston 140 .
  • the second adjustable accumulator chamber 131 may be pre-charged prior to deployment of the subsea equipment package 100 into the subsea environment with a compressible fluid, e.g., a gas or a compressible liquid as previously described, and which may be isolated in the second adjustable accumulator chamber 131 by the pre-charge valve 153 .
  • a compressible fluid e.g., a gas or a compressible liquid as previously described
  • the pre-charge pressure in the second adjustable accumulator chamber 131 may be adjusted such that the movement of the first movable piston 140 against the compressible fluid contained in the second adjustable accumulator chamber 131 provides a spring-like behavior. It should therefore be appreciated that the accumulator device 120 e may be adapted to function as a pulsation dampener and/or a pressure compensator, as described above.
  • the third adjustable accumulator chamber 132 may be separated from the second adjustable accumulator chamber 131 by a second movable piston 142 .
  • the third adjustable accumulator chamber 132 may also be pre-charged prior to deployment with a substantially incompressible liquid, such as water or seawater, and which may be isolated in the third adjustable accumulator chamber 132 by way of the retrieval valve 154 .
  • the substantially incompressible pre-charge liquid may also include a suitable hydrate inhibitor, such as MeOH or MEG and the like, so as to reduce the likelihood that hydrates may form during operation in the event any hydrocarbons inadvertently bypass the seals on the first and second movable pistons 140 and 142 .
  • a suitable hydrate inhibitor such as MeOH or MEG and the like
  • the third adjustable accumulator chamber 132 may not be pre-charged as described above, and instead the retrieval valve 154 may be left open during deployment of the subsea equipment package 100 to it subsea location so that, during operation, the third adjustable accumulator chamber 132 is biased to the hydrostatic pressure of the subsea environment 160 , as previously described with respect to the accumulator devices 120 b and 120 c of FIGS. 1C and 1D , respectively.
  • a biasing spring 150 may also be positioned in the third adjustable accumulator chamber 132 such that it is in contact with the second movable piston 142 , thereby providing an additional degree of control over the effective damping factor of the accumulator device 120 e during the various operational and/or retrieval phases of the subsea equipment package 100 .
  • piston stops 141 may be positioned inside of the accumulator device 120 e and between the first and second movable pistons 140 and 142 so as to thereby limit travel of the first movable piston 140 toward the third adjustable accumulator chamber 132 , and to limit travel of the second movable piston 142 toward the second adjustable accumulator chamber 131 .
  • piston stop 143 may be positioned inside of the accumulator device 120 e on an opposite of the second movable piston 142 from the first movable piston 140 so as to thereby limit travel of the second movable piston 142 away from the first movable piston 140 .
  • the accumulator device 120 e may also be operated so as to function as a pressure relief device during retrieval of the subsea equipment package 100 , and so that expanding gaseous hydrocarbons may be safely vented to the subsea environment 160 .
  • the retrieval valve 154 may be opened so that at least some of the pre-charged incompressible fluid initially contained therein can be discharged through the retrieval line 124 and into the subsea environment 160 , thereby allowing the second movable piston 142 to move toward the piston stop 143 .
  • Movement of the second movable piston 142 in this manner also allows the first movable piston 140 to move in the same direction, i.e., toward the piston stops 141 .
  • movement of the first and second movable pistons 140 and 142 may continue at least until the first movable piston 140 moves past the opening of the pre-charge line 123 , and may further continue until the first movable piston 140 stops after coming into contact with the piston stops 141 .
  • FIG. 1G schematically illustrates the accumulator device 120 e after the above-described operations, i.e., after the second movable piston 142 has moved toward the piston stop 143 and the second movable piston 140 has moved into contact with the piston stops 141 .
  • the size of the first adjustable accumulator chamber 130 increases. Furthermore, since the first adjustable accumulator chamber 130 is in fluid communication with the subsea equipment package 100 via the connection line 121 , the pressure within the package 100 will also drop, thereby permitting at least a portion of the gas present in the liquid hydrocarbons contained in the package 100 to expand out of the liquid phase. After the first movable piston has moved at least past the opening to the pre-charge line 123 , the pre-charge valve 153 may be opened so that the expanding gaseous hydrocarbons may be controllably vented to the subsea environment 160 .
  • the retrieval valve 154 may be opened after the subsea equipment package 100 has been isolated using the isolation valves 106 and disconnected from the production flow lines 103 at the connections 104 (see, FIG. 1A ), but before the package 100 is raised from its position near the sea floor.
  • the pre-charge valve 153 may also be opened while the package 100 is in its position near the sea floor so as to vent at least a portion of the expanding gases coming out of the liquid hydrocarbons.
  • the hydrostatic pressure of the subsea environment 160 near the sea floor may be too high to permit all of the gaseous hydrocarbons that may be present in the liquid phase to fully expand, in which case the subsea equipment package 100 may be raised toward the surface so that the hydrostatic pressure is reduced, thereby allowing more gases to expand and be vented through the pre-charge line 123 and pre-charge valve 153 as the package 100 is raised.
  • the subsea equipment package 100 may be raised at least part of the way to the surface, i.e., to a shallower water depth and a lower hydrostatic pressure, before the pre-charge valve 153 is opened and the venting of expanding gas is commenced.
  • venting sequences are similarly applicable to those embodiments of the present disclosure wherein the third adjustable accumulator chamber 132 was not initially pre-charged with an incompressible fluid, but was instead simply biased to the subsea environment 160 through an open retrieval valve 154 .
  • the retrieval valve 154 may not be opened until after the subsea equipment package 100 has been disconnected from the production flow lines 103 (see, FIG. 1A ) and thereafter raised from its position near the sea floor at least part of the way to the surface, i.e., to a shallower water depth and a lower hydrostatic pressure.
  • the pre-charge valve 153 may be opened after the first movable piston 140 has moved past the opening to the pre-charge line 123 , and/or after pressure in the third adjustable accumulator chamber 132 has equalized with that of the subsea environment 160 , thereby commencing the pressure-relieving operation, as well as the venting operation of the expanding hydrocarbon gases.
  • discharge of the incompressible fluid from the third adjustable accumulator chamber 132 may be gradually controlled as the subsea equipment package 100 is being raised from the sea floor, for example, by using an adjustable control valve as the retrieval valve 154 .
  • an adjustable control valve may be used as the pre-charge valve 153 , thereby allowing pressure-relieving and venting operations to be performed in a substantially controlled manner.
  • FIG. 2A schematically depicts a further illustrative embodiment of the subsea equipment package 100 , wherein one or more accumulator devices 170 may be used to accumulate and store a quantity of one or more flow assurance chemicals, one or more material protection chemicals, or a combination thereof as may be required, and which, for simplicity, may collectively be referred to hereinafter as “equipment protection fluids.” Furthermore, in at least some illustrative embodiments, the equipment protection fluids stored in the accumulator device or devices 170 may be injected into the package 100 during a stage of equipment shutdown and/or prior to equipment retrieval, as will be described in further detail below.
  • a chemical injection line 111 a may be used to feed a supply of one or more appropriate equipment protection fluids to the accumulator device 170 after the subsea equipment package 100 has been deployed to its subsea location, thereby at least partially filling, or pre-charging, the accumulator device 170 with a volume of equipment protection fluids.
  • the accumulator device 170 may be pre-charged with equipment protection fluids through the chemical injection line 111 a from any one of several sources that may commonly be used in subsea production and/or processing operations.
  • the equipment protection fluids may be provided from a subsea chemical injection package (not shown), which may be a stand-alone package, or which may be part of a subsea Christmas tree assembly, and the like.
  • the equipment protection fluids may be provided through an umbilical line (not shown) that may be lowered from an intervention vessel at the surface.
  • the equipment protection fluids may be provided by an ROV (not shown), which may carry a quantity of equipment protection fluids to the subsea location of the subsea equipment package 100 in a belly skid.
  • the flow assurance chemical may be stored in the accumulator device 170 for a period of time, after which it may be injected at an appropriate time (as further described below) into, for example, a skid flow line 102 of the subsea equipment package 100 through the chemical injection line 111 b by operation of the chemical injection control valve 109 a.
  • the specific location of the accumulator device 170 shown in FIG. 2A is exemplary only, as the accumulator devices 170 may be used to inject a flow assurance chemical into the illustrative subsea equipment package 100 at any appropriate location as may be required by the specific design layout and operational characteristics of the package 100 .
  • the subsea equipment package 100 may include two or more appropriately located accumulator devices 170 , each of which may be adapted to store one or more different equipment protection fluids for later injection into the package 100 via the chemical injection line 111 b and chemical injection control valve 109 a.
  • equipment protection fluids may be stored in the accumulator device 170 until such time as a specific predetermined operational phase of the subsea equipment package 100 requires that at least a portion of the equipment protection fluids be released into package 100 .
  • the equipment protection fluids may be released from the accumulator device 170 and into subsea equipment package 100 upon command, whereas in other embodiments the equipment protection fluids may be released automatically based upon a predetermined condition, as will be described in further detail below.
  • an appropriate control signal may be sent to the chemical injection control valve 109 a instructing the valve 109 a to release at least a portion of the equipment protection fluids from the accumulator device 170 into the package 100 .
  • the signal instructing the chemical injection control valve 109 a to release the equipment protection fluids may be sent to the valve 109 a after the subsea equipment package 100 has been shut in and isolated but before the pumps 101 have been shut down, i.e., while the pumps 101 are still circulating hydrocarbons and/or other produced liquids through the skid flow lines 102 .
  • the equipment protection fluids from the accumulator device 170 may be at least partially circulated to the various piping components, valves, and pieces of subsea equipment and the like that may be a part of the subsea equipment package 100 , which may be advantageous for larger subsea equipment packages containing several hundred gallons, or even more, of produced liquid.
  • the equipment protection fluids may be released by the chemical injection control valve 109 a after the pumps 101 have been shut down, which may be sufficient for smaller subsea equipment packages containing less than a few hundred gallons of produced liquid, and/or when the injected equipment protection fluids may be sufficiently miscible in the produced liquid to allow the equipment protection fluids to circulation substantially throughout the subsea equipment package 100 without the assistance of the pumps 101 .
  • the equipment protection fluids may be automatically released from the accumulator device 170 by the chemical injection control valve 109 a upon the occurrence of a predetermined condition.
  • the chemical injection control valve 109 a may automatically release equipment protection fluids when one or both of the pumps 101 inadvertently shut down, such as during a loss of power to the subsea equipment package 100 .
  • the equipment protection fluids that are automatically released from the accumulator device 170 by the chemical injection control valve 109 a may at least partially protect the subsea equipment package 100 from the inadvertent detrimental effects associated with hydrate formation, precipitate formation, material corrosion, and the like.
  • the chemical injection control valve 109 a may be, for example, a solenoid operated valve, which may closed while the solenoid control is energized, and which may open when the solenoid is de-energized, such as during those cases when power is lost to the subsea equipment package 100 .
  • the accumulator device 170 may be adapted and operated to release equipment protection fluids into the subsea equipment package 100 , either automatically or on command, during normal operation of the package 100 .
  • the accumulator device 170 may be operated to inject flow assurance chemical either alone or in conjunction with the chemical injection operations that may be performed through the various other chemical injection lines 111 (see, FIG. 1A ).
  • the relatively small amount of equipment protection fluids that may be needed to adequately protect the subsea equipment package 100 may be a volume that is equal to no more than about 1-2% of the total volume of produced liquid that may be contained within the shut-in and isolated package 100 , as may be the case when the equipment protection fluids may be a flow assurance chemicals, such as low dosage hydrate inhibitors and the like.
  • the accumulator device 170 may be sized to hold no more than a single pre-charged dose of equipment protection fluids, in which case the accumulator device 170 must once again be pre-charged after an operation wherein the single dose is injected into the subsea equipment package 100 . In some embodiments, however, the accumulator device 170 may be sized to hold a volume that is equal to two or more doses of equipment protection fluids, in which case the accumulator device 170 may not need to be pre-charged prior to each injection operation.
  • a substantial portion of the hydrocarbons and/or other produced fluids may be contained within the subsea equipment package 100 by sweeping a large volume equipment protection fluids throughout the entire package 100 .
  • the equipment protection fluids may be injected into the subsea equipment package 100 from the accumulator device 170 in such a manner that the equipment protection fluids sweep away and substantially replace a large portion of the volume of liquid hydrocarbons and/or other produced fluids.
  • the sweeping operation described herein may not necessarily displace substantially all of the liquid hydrocarbons present in the subsea equipment package 100 , as may sometimes be expected during a flushing and/or purging operation, since it may be difficult for the equipment protection fluids to reach all internal areas of equipment during a single sweeping operation. Accordingly, in certain embodiments, the sweeping operation may require a volume of equipment protection fluids that is at least equal to the total volume of the subsea equipment package 100 , and in some embodiments may be up to twice the volume of the package 100 . Furthermore, the above-described sweeping operation may displace up to approximately 90% or even more of the volume hydrocarbons and/or other produced fluids with the equipment protection fluids that are injected from the accumulator device 170 .
  • a sweeping liquid having a higher viscosity than the liquid hydrocarbons, and/or which may be substantially immiscible in the liquid hydrocarbons may be stored in the accumulator device 170 and used to sweep the liquid hydrocarbons out of the subsea equipment package 100 .
  • the sweeping liquid may be, for example, a gelled liquid, such as gelled diesel oil or gelled MEG and the like.
  • Other sweeping liquids may also be used, provided they are capable of sweeping a substantial amount of the liquid hydrocarbons and/or other produced fluids out of the subsea equipment package 100 .
  • FIG. 2B schematically illustrates an exemplary accumulator device 170 a that may be representative of at least some embodiments of the accumulator device 170 shown in FIG. 2A .
  • the illustrative accumulator device 170 a may be configured in a substantially similar fashion to the accumulator device 120 a shown in FIG. 1B , in which first and second adjustable accumulator chamber 130 and 131 are separated by a movable piston 140 .
  • the second adjustable accumulator chamber 131 may be pre-charged with a gas or compressible liquid, as previous described with respect to FIG. 1B , which may be pre-charged prior to deployment of the subsea equipment package 100 to its subsea location.
  • the gas pre-charge pressure in the second adjustable accumulator chamber 131 may be adjusted as necessary to control the amount of equipment protection fluids that may be stored in the first adjustable accumulator chamber 130 .
  • the gas pre-charge pressure may be further adjusted so as to adjust the injection pressure of the equipment protection fluids, thereby substantially assuring that the equipment protection fluids can be injected from accumulator device 170 a into the skid flow lines 102 as required.
  • the accumulator device 170 a may be configured in a substantially similar manner to either of the accumulator devices 120 b or 120 c as shown in FIGS. 1C and 1D , respectively. Using either of these configurations, the second adjustable accumulator chamber of the accumulator device 170 a may be biased directly to the hydrostatic pressure of the subsea environment 160 , which may be used to control the quantity of equipment protection fluids that are stored in the first adjustable accumulator chamber 130 .
  • a biasing spring 150 may also be used as previously described, thereby enabling an additional degree of adjustment of the pressure that is exerted on the movable piston 140 by the second adjustable chamber 131 , which may again control the amount of equipment protection fluids that may be stored in the first adjustable accumulator chamber 130 .
  • FIG. 2C schematically depicts an illustrative accumulator device 170 b that may be representative of further exemplary embodiments of the accumulator device 170 shown in FIG. 2A .
  • the accumulator device 170 b may be configured in a substantially similar fashion as the accumulator device 120 e illustrated in FIGS. 1F and 1G and described above.
  • the accumulator device 170 b may include, among other things, first, second and third adjustable accumulator chambers 130 , 131 and 132 , wherein the first and second adjustable accumulator chambers 130 and 131 are separated by a first movable piston 140 , and wherein the second and third adjustable accumulator chambers 131 and 132 are separated by a second movable piston 141 .
  • the pre-charge fluids in the second and third adjustable accumulator chambers 131 and 132 may be as previously described with respect to the accumulator device 120 e above.
  • the pre-charge pressures in the second and third adjustable accumulator chambers 131 and 132 may be adjusted as described with respect to the accumulator device 170 a above so as to control the quantity of equipment protection fluids that may be stored in the first adjustable accumulator chamber 130 of the accumulator device 170 b . Additionally, the pre-charge pressures may be further adjusted and the operation of the pre-charge valves 153 and 154 controlled in such a manner as to adjust the injection pressure of the equipment protection fluids, thereby substantially assuring that the equipment protection fluids can be injected from the accumulator device 170 b into the skid flow lines 102 .
  • the disclosed systems and methods may include, among other things, an accumulator device that is in fluid communication with the subsea equipment as it is being retrieved, and which may have a pressure boundary that is adapted to move in response to a pressure change on the subsea equipment as it is being raised from a subsea environment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supply Devices, Intensifiers, Converters, And Telemotors (AREA)
  • Earth Drilling (AREA)
US14/423,664 2012-08-24 2012-08-24 Retrieval of subsea production and processing equipment Active US9482075B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2012/052197 WO2014031122A1 (en) 2012-08-24 2012-08-24 Retrieval of subsea production and processing equipment

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2012/052197 A-371-Of-International WO2014031122A1 (en) 2012-08-24 2012-08-24 Retrieval of subsea production and processing equipment

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/253,319 Continuation US9605516B2 (en) 2012-08-24 2016-08-31 Retrieval of subsea production and processing equipment

Publications (2)

Publication Number Publication Date
US20150315878A1 US20150315878A1 (en) 2015-11-05
US9482075B2 true US9482075B2 (en) 2016-11-01

Family

ID=46800368

Family Applications (2)

Application Number Title Priority Date Filing Date
US14/423,664 Active US9482075B2 (en) 2012-08-24 2012-08-24 Retrieval of subsea production and processing equipment
US15/253,319 Active US9605516B2 (en) 2012-08-24 2016-08-31 Retrieval of subsea production and processing equipment

Family Applications After (1)

Application Number Title Priority Date Filing Date
US15/253,319 Active US9605516B2 (en) 2012-08-24 2016-08-31 Retrieval of subsea production and processing equipment

Country Status (8)

Country Link
US (2) US9482075B2 (pt)
EP (2) EP2893129B1 (pt)
CN (1) CN104884734B (pt)
AU (2) AU2012388218B2 (pt)
BR (1) BR112015002834B1 (pt)
CA (1) CA2879286C (pt)
RU (1) RU2600066C1 (pt)
WO (1) WO2014031122A1 (pt)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170145774A1 (en) * 2015-11-25 2017-05-25 Shell Oil Company Pressure Variance Systems for Subsea Fluid Injection
US10344550B2 (en) * 2016-07-25 2019-07-09 Fmc Technologies, Inc. Systems for reversing fluid flow to and from a single-direction fluid flow device
US11480034B2 (en) * 2017-12-22 2022-10-25 National Oilwell Varco, L.P. Overpressure protection apparatus

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9482075B2 (en) * 2012-08-24 2016-11-01 Fmc Technologies, Inc. Retrieval of subsea production and processing equipment
BR112017012735B1 (pt) 2014-12-15 2022-11-16 Enpro Subsea Limited Aparelho de acesso de fluxo, instalação de produção submarina e método para realizar uma operação
US10815977B2 (en) * 2016-05-20 2020-10-27 Onesubsea Ip Uk Limited Systems and methods for hydrate management
NO343439B1 (en) * 2017-09-04 2019-03-11 Aker Solutions As A subsea processing module and methods for installation and removal
US11644155B2 (en) * 2018-01-25 2023-05-09 Petróleo Brasileiro S.A,—Petrobras Auxiliary system and method for starting or restarting the flow of gelled fluid
US11293251B2 (en) 2018-04-21 2022-04-05 Enpro Subsea Limited Apparatus, systems and methods for oil and gas operations
KR20220100005A (ko) * 2019-11-11 2022-07-14 제이. 레이 맥더모트 에스.에이. 해저 시스템을 위한 디스럽티브 커플링 시스템 및 방법
BR112022006526A2 (pt) * 2019-12-06 2022-08-23 Halliburton Energy Services Inc Aparelho para caracterizar sistemas de manipulação de fluido, e, método para testar equipamento de manipulação de fluido

Citations (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1002564A1 (ru) 1981-08-05 1983-03-07 за вители Гидравлическое устройство ударного действи
US4903628A (en) * 1988-11-07 1990-02-27 William Lansford Pressure equalizer
US5166677A (en) * 1990-06-08 1992-11-24 Schoenberg Robert G Electric and electro-hydraulic control systems for subsea and remote wellheads and pipelines
RU2055218C1 (ru) 1992-08-10 1996-02-27 Научно-исследовательский, проектный и конструкторский институт горного дела и металлургии цветных металлов Способ разнопрочной закладки подземных выработок и устройство для его осуществления
US6422315B1 (en) 1999-09-14 2002-07-23 Quenton Wayne Dean Subsea drilling operations
US20030170077A1 (en) 2000-03-27 2003-09-11 Herd Brendan Paul Riser with retrievable internal services
US6640901B1 (en) 1999-09-10 2003-11-04 Alpha Thames Ltd. Retrievable module and operating method suitable for a seabed processing system
US6648562B1 (en) * 2001-06-08 2003-11-18 Charles D. Calkins Apparatus for tapping a hole in a pipeline
US20040094306A1 (en) * 2002-11-12 2004-05-20 John Goode Subsea coiled tubing injector with pressure compensated roller assembly
US6783107B2 (en) * 2002-02-14 2004-08-31 Hp&T Products, Inc. Hydraulic actuator with built-in pressure compensator
US20040168811A1 (en) 2002-08-14 2004-09-02 Bake Hughes Incorporated Subsea chemical injection unit for additive injection and monitoring system for oilfield operations
US6851481B2 (en) * 2000-03-02 2005-02-08 Shell Oil Company Electro-hydraulically pressurized downhole valve actuator and method of use
US20050178560A1 (en) 2004-02-18 2005-08-18 Fmc Technologies, Inc. System for controlling a hydraulic actuator, and methods of using same
US7108006B2 (en) * 2001-08-24 2006-09-19 Vetco Gray Inc. Subsea actuator assemblies and methods for extending the water depth capabilities of subsea actuator assemblies
US20060210361A1 (en) * 2005-03-17 2006-09-21 Kellogg Brown And Root, Inc. Continuously pressurized pipeline
US7137450B2 (en) * 2004-02-18 2006-11-21 Fmc Technologies, Inc. Electric-hydraulic power unit
US7424917B2 (en) * 2005-03-23 2008-09-16 Varco I/P, Inc. Subsea pressure compensation system
RU2367786C1 (ru) 2008-05-20 2009-09-20 Закрытое Акционерное Общество Финансовая Компания "Центр-Космос-Нефть-Газ" Нефтяная скважина
US7628207B2 (en) * 2006-04-18 2009-12-08 Schlumberger Technology Corporation Accumulator for subsea equipment
US20100084588A1 (en) 2008-10-07 2010-04-08 Diamond Offshore Drilling, Inc. Deepwater Hydraulic Control System
US20100193194A1 (en) 2007-09-25 2010-08-05 Stoisits Richard F Method For Managing Hydrates In Subsea Production Line
US20100294383A1 (en) * 2006-10-20 2010-11-25 Aker Subsea As Subsea accumulator monitoring system
US20110011593A1 (en) * 2007-12-21 2011-01-20 Fmc Kongsberg Subsea As Method and system for circulating fluid in a subsea intervention stack
US20110018630A1 (en) 2009-07-22 2011-01-27 Sunplus Technology Co., Ltd. Automatic gain control loop with hysteresis switching
WO2011048213A2 (en) 2009-10-23 2011-04-28 Framo Engineering As Pressure intensifier system for subsea running tools
US20110114329A1 (en) 2009-11-18 2011-05-19 Chevron U.S.A. Inc. Apparatus and method for providing a controllable supply of fluid to subsea well equipment
US20120241009A1 (en) * 2011-03-24 2012-09-27 Viper Subsea Technology Limited Pressure Compensating Device
US20120291688A1 (en) * 2010-01-19 2012-11-22 John Arthur Dawes Subsea Pressure Compensation System
US20130327535A1 (en) * 2012-06-07 2013-12-12 Kellogg Brown & Root Llc Subsea Overpressure Relief Device
US8833465B2 (en) * 2008-08-04 2014-09-16 Cameron International Corporation Subsea differential-area accumulator
US9169714B2 (en) * 2009-10-01 2015-10-27 Enovate Systems Limited Flushing system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3877520A (en) * 1973-08-17 1975-04-15 Paul S Putnam Subsea completion and rework system for deep water oil wells
BRPI0917784B1 (pt) 2008-08-21 2019-04-09 Shell Internationale Research Maatschappij B.V Sistema e método de instalação ou remoção de estrutura submarina
CN102180243B (zh) * 2011-04-13 2013-03-27 浙江大学 水下滑翔机浮力调节机构的驱动装置
CN102434535B (zh) * 2011-12-08 2014-04-30 中国海洋石油总公司 水下生产设施液压控制系统的等效模拟试验系统
US9482075B2 (en) * 2012-08-24 2016-11-01 Fmc Technologies, Inc. Retrieval of subsea production and processing equipment

Patent Citations (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1002564A1 (ru) 1981-08-05 1983-03-07 за вители Гидравлическое устройство ударного действи
US4903628A (en) * 1988-11-07 1990-02-27 William Lansford Pressure equalizer
US5166677A (en) * 1990-06-08 1992-11-24 Schoenberg Robert G Electric and electro-hydraulic control systems for subsea and remote wellheads and pipelines
RU2055218C1 (ru) 1992-08-10 1996-02-27 Научно-исследовательский, проектный и конструкторский институт горного дела и металлургии цветных металлов Способ разнопрочной закладки подземных выработок и устройство для его осуществления
US6640901B1 (en) 1999-09-10 2003-11-04 Alpha Thames Ltd. Retrievable module and operating method suitable for a seabed processing system
US6422315B1 (en) 1999-09-14 2002-07-23 Quenton Wayne Dean Subsea drilling operations
US6851481B2 (en) * 2000-03-02 2005-02-08 Shell Oil Company Electro-hydraulically pressurized downhole valve actuator and method of use
US20030170077A1 (en) 2000-03-27 2003-09-11 Herd Brendan Paul Riser with retrievable internal services
US6648562B1 (en) * 2001-06-08 2003-11-18 Charles D. Calkins Apparatus for tapping a hole in a pipeline
US7108006B2 (en) * 2001-08-24 2006-09-19 Vetco Gray Inc. Subsea actuator assemblies and methods for extending the water depth capabilities of subsea actuator assemblies
US6783107B2 (en) * 2002-02-14 2004-08-31 Hp&T Products, Inc. Hydraulic actuator with built-in pressure compensator
US20040168811A1 (en) 2002-08-14 2004-09-02 Bake Hughes Incorporated Subsea chemical injection unit for additive injection and monitoring system for oilfield operations
US20040094306A1 (en) * 2002-11-12 2004-05-20 John Goode Subsea coiled tubing injector with pressure compensated roller assembly
US20050178560A1 (en) 2004-02-18 2005-08-18 Fmc Technologies, Inc. System for controlling a hydraulic actuator, and methods of using same
US7137450B2 (en) * 2004-02-18 2006-11-21 Fmc Technologies, Inc. Electric-hydraulic power unit
US20060210361A1 (en) * 2005-03-17 2006-09-21 Kellogg Brown And Root, Inc. Continuously pressurized pipeline
US7424917B2 (en) * 2005-03-23 2008-09-16 Varco I/P, Inc. Subsea pressure compensation system
US7628207B2 (en) * 2006-04-18 2009-12-08 Schlumberger Technology Corporation Accumulator for subsea equipment
US20100294383A1 (en) * 2006-10-20 2010-11-25 Aker Subsea As Subsea accumulator monitoring system
US20100193194A1 (en) 2007-09-25 2010-08-05 Stoisits Richard F Method For Managing Hydrates In Subsea Production Line
US8684089B2 (en) * 2007-12-21 2014-04-01 Fmc Kongsberg Subsea As Method and system for circulating fluid in a subsea intervention stack
US20110011593A1 (en) * 2007-12-21 2011-01-20 Fmc Kongsberg Subsea As Method and system for circulating fluid in a subsea intervention stack
RU2367786C1 (ru) 2008-05-20 2009-09-20 Закрытое Акционерное Общество Финансовая Компания "Центр-Космос-Нефть-Газ" Нефтяная скважина
US8833465B2 (en) * 2008-08-04 2014-09-16 Cameron International Corporation Subsea differential-area accumulator
US20100084588A1 (en) 2008-10-07 2010-04-08 Diamond Offshore Drilling, Inc. Deepwater Hydraulic Control System
US20110018630A1 (en) 2009-07-22 2011-01-27 Sunplus Technology Co., Ltd. Automatic gain control loop with hysteresis switching
US9169714B2 (en) * 2009-10-01 2015-10-27 Enovate Systems Limited Flushing system
WO2011048213A2 (en) 2009-10-23 2011-04-28 Framo Engineering As Pressure intensifier system for subsea running tools
US9097267B2 (en) * 2009-10-23 2015-08-04 Framo Engineering As Pressure intensifier system for subsea running tools
US20110114329A1 (en) 2009-11-18 2011-05-19 Chevron U.S.A. Inc. Apparatus and method for providing a controllable supply of fluid to subsea well equipment
US20120291688A1 (en) * 2010-01-19 2012-11-22 John Arthur Dawes Subsea Pressure Compensation System
US20120241009A1 (en) * 2011-03-24 2012-09-27 Viper Subsea Technology Limited Pressure Compensating Device
US20130327535A1 (en) * 2012-06-07 2013-12-12 Kellogg Brown & Root Llc Subsea Overpressure Relief Device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
PCT International Search Report and Written Opinion dated May 21, 2013 for International Application no. PCT/US2012/052197.
PCT International Search Report and Written Opinion dated May 21, 2013 for International Application No. PCT/US2012/052203.
Search Report for Russian patent application No. 2015110164, filed on Aug. 24, 2012 (PCT effective).

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170145774A1 (en) * 2015-11-25 2017-05-25 Shell Oil Company Pressure Variance Systems for Subsea Fluid Injection
US9822604B2 (en) * 2015-11-25 2017-11-21 Cameron International Corporation Pressure variance systems for subsea fluid injection
US10344550B2 (en) * 2016-07-25 2019-07-09 Fmc Technologies, Inc. Systems for reversing fluid flow to and from a single-direction fluid flow device
US11480034B2 (en) * 2017-12-22 2022-10-25 National Oilwell Varco, L.P. Overpressure protection apparatus

Also Published As

Publication number Publication date
WO2014031122A9 (en) 2015-03-26
RU2600066C1 (ru) 2016-10-20
CN104884734B (zh) 2017-11-28
CN104884734A (zh) 2015-09-02
AU2012388218A1 (en) 2015-04-09
US20150315878A1 (en) 2015-11-05
AU2017239627B2 (en) 2018-02-01
EP2893129B1 (en) 2018-10-10
US20160369598A1 (en) 2016-12-22
EP3421714B1 (en) 2019-12-04
CA2879286C (en) 2018-02-13
US9605516B2 (en) 2017-03-28
WO2014031122A1 (en) 2014-02-27
AU2017239627A1 (en) 2017-11-02
BR112015002834B1 (pt) 2021-06-01
AU2012388218A2 (en) 2015-05-28
BR112015002834A2 (pt) 2017-09-19
CA2879286A1 (en) 2014-02-27
AU2012388218B2 (en) 2017-07-06
EP3421714A1 (en) 2019-01-02
EP2893129A1 (en) 2015-07-15

Similar Documents

Publication Publication Date Title
US9605516B2 (en) Retrieval of subsea production and processing equipment
AU2017276188B2 (en) Methods for retrieval and replacement of subsea production and processing equipment
US9441452B2 (en) Oilfield apparatus and methods of use
US9303488B2 (en) Method and apparatus for removing hydrate plugs
US10215321B2 (en) Subsea flowline pressure surge relief system
US9664207B2 (en) Gas handling method for dual bottle subsea accumulators
US9580995B2 (en) Controlled pressure equalization
CN107208469A (zh) 减小液压流/水锤的bop控制系统回路
US20140090853A1 (en) Subsea Well Containment Systems and Methods
BR102018000013B1 (pt) Processo e sistema para partida e reinício de operação de poços produtores de petróleo que operam com sistemas pneumáticos de elevação

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

AS Assignment

Owner name: FMC TECHNOLOGIES, INC., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SMEDSTAD, ERIC RANDALL;REEL/FRAME:043858/0546

Effective date: 20150723

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4

AS Assignment

Owner name: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT, TEXAS

Free format text: SECURITY INTEREST;ASSIGNORS:FMC TECHNOLOGIES, INC.;SCHILLING ROBOTICS, LLC;REEL/FRAME:064193/0870

Effective date: 20230623

Owner name: DNB BANK ASA, NEW YORK BRANCH, AS ADMINISTRATIVE AGENT, NEW YORK

Free format text: SECURITY INTEREST;ASSIGNORS:FMC TECHNOLOGIES, INC.;SCHILLING ROBOTICS, LLC;REEL/FRAME:064193/0810

Effective date: 20230623

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 8