US9014119B2 - Spectrum estimation for low-load LTE signals - Google Patents
Spectrum estimation for low-load LTE signals Download PDFInfo
- Publication number
- US9014119B2 US9014119B2 US13/760,084 US201313760084A US9014119B2 US 9014119 B2 US9014119 B2 US 9014119B2 US 201313760084 A US201313760084 A US 201313760084A US 9014119 B2 US9014119 B2 US 9014119B2
- Authority
- US
- United States
- Prior art keywords
- spectral density
- signal
- frequency
- power spectral
- power level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active, expires
Links
- 238000001228 spectrum Methods 0.000 title description 23
- 230000003595 spectral effect Effects 0.000 claims abstract description 39
- 238000000034 method Methods 0.000 claims abstract description 33
- 238000004891 communication Methods 0.000 claims abstract description 20
- 238000012545 processing Methods 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 claims description 4
- 230000008569 process Effects 0.000 description 12
- 238000012935 Averaging Methods 0.000 description 7
- 238000012360 testing method Methods 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000005259 measurement Methods 0.000 description 4
- 238000010295 mobile communication Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 3
- 239000000969 carrier Substances 0.000 description 2
- 230000000737 periodic effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W48/00—Access restriction; Network selection; Access point selection
- H04W48/16—Discovering, processing access restriction or access information
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W48/00—Access restriction; Network selection; Access point selection
- H04W48/18—Selecting a network or a communication service
Definitions
- the present invention relates generally to wireless communication, and particularly to methods and systems for estimating spectral density of received signals.
- a transmitter transmits known reference signals, and receivers perform measurements on the reference signals.
- Reference signals are used, for example, in Evolved Universal Terrestrial Radio Access (E-UTRA) systems, also referred to as Long Term Evolution (LTE) systems.
- E-UTRA Evolved Universal Terrestrial Radio Access
- LTE Long Term Evolution
- the formats and use of reference signals in LTE systems are specified by the Third Generation Partnership Project (3GPP), in “Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Channels and Modulation (Release 8),” TS 36.211, version 8.8.0, September, 2009, section 6.10, which is incorporated herein by reference.
- An embodiment that is described herein provides a method including receiving a signal in a communication terminal.
- a power spectral density which the signal would have under full-load conditions of a transmitter transmitting the signal, is estimated based on the received signal.
- An operation is performed in the communication terminal using the estimated power spectral density.
- performing the operation includes searching in the terminal, using the estimated power spectral density, for a Public Land Mobile Network (PLMN) with which to communicate.
- performing the operation includes identifying a Radio Access Technology (RAT) used by the PLMN.
- RAT Radio Access Technology
- estimating the power spectral density includes defining multiple hypotheses, each hypothesis specifying a respective set of one or more of time-frequency bins in which the signal is hypothesized to comprise reference signals, measuring a respective received power level of the signal in each of the sets, selecting a hypothesis in which the received power level is maximal, and estimating the power spectral density under the full-load conditions based on the selected hypothesis.
- defining the hypotheses includes specifying the time-frequency bins of the multiple hypotheses in a given frequency sub-band, and estimating the power spectral density under the full-load conditions includes substituting the measured power level of the selected hypothesis to serve as the estimated power spectral density for the frequency sub-band.
- estimating the power spectral density includes processing the frequency sub-band independently of other frequency sub-bands of the signal.
- defining the multiple hypotheses includes, for a communication protocol that transmits the reference signals in one or more predefined patterns of the time-frequency bins, defining multiple shifts, in at least one of time and frequency, that cover possible shifts of the predefined patterns.
- the one or more predefined patterns correspond to respective reference symbol patterns used by transmit antennas of the transmitter.
- defining the hypotheses includes defining multiple time shifts of a predefined pattern of the reference signals
- selecting the hypothesis includes choosing, for each frequency bin, the hypothesis having the maximal received power level for the frequency bin
- estimating the power spectral density includes substituting the maximal received power level to serve as the estimated power spectral density for the frequency bin.
- estimating the power spectral density includes computing a maximum of the maximal received power level over the frequency bin and one or more neighboring frequency bins, and substituting the computed maximum to serve as the estimated power spectral density for the frequency bin.
- receiving the signal includes receiving a Time Division Duplex (TDD) signal having a period
- measuring the received power level includes evaluating the power level over at least the period
- apparatus including reception circuitry and a processor.
- the reception circuitry is configured to receive a signal over a mobile telecommunications air interface.
- the processor is configured to estimate, based on the received signal, a power spectral density that the signal would have under full-load conditions of a transmitter transmitting the signal, and to perform an operation using the estimated power spectral density.
- a communication terminal includes the disclosed apparatus.
- a chipset for processing signals in a communication terminal includes the disclosed apparatus.
- FIG. 1 is a block diagram that schematically illustrates a wireless communication system, in accordance with an embodiment that is described herein;
- FIG. 2 is a flow chart that schematically illustrates a method for full-load spectrum estimation, in accordance with an embodiment that is described herein;
- FIGS. 3 and 4 are diagrams that schematically illustrate hypotheses used for full-load spectrum estimation, in accordance with embodiments that are described herein.
- the traffic load of a transmitter varies over time, and these load variations cause the Power Spectral Density (PSD) of the transmitted signal to change accordingly.
- PSD Power Spectral Density
- a base station that serves mobile communication terminals.
- the traffic load of the base station may vary over time due to variations in the number of served terminals and/or the traffic volume transmitted to each terminal.
- the term “traffic load” or simply “load” refers to the fraction of the channel resources that are actually used by the transmitter at a given time, out of the total available channel resources.
- the load of the transmitter refers to the percentage of available time-frequency bins that are actually used for transmission at a given time. Full-load conditions, for example, occur when the transmitter utilizes all or nearly all available channel resources.
- the PSD When the transmitter is fully-loaded, i.e., fully utilizes its available channel resources for transmission, the PSD is typically uniform across the spectrum that is allocated to the transmitter. Under low-load or otherwise partial-load conditions, the PSD typically deviates from the full-load distribution because of partial utilization of time and/or frequency.
- PSD Spatial Downlink Packet Data
- a mobile communication terminal that estimates the PSD of received signals as a means for identifying candidate wireless networks with which to communicate.
- Variations in PSD as a function of changing traffic load may distort the terminal's estimation measurements and impact the performance of the network search process.
- a receiver receives a signal that was transmitted under certain load conditions of the transmitter. Based on the received signal, the receiver estimates the PSD that the signal would have under full-load conditions, regardless of the actual load conditions under which the signal was transmitted.
- the receiver is able to estimate the PSD that would have been measured under full-load conditions.
- the full-load PSD reflects the entire spectrum that is allocated to the transmitter, rather than the actual spectrum utilization at a given point in time.
- the estimated full-load PSD can be used as part of a network search process (sometimes referred to as “PLMN search”) performed in the terminal.
- PLMN search thus becomes faster, more accurate and more robust, since it is insensitive to the varying traffic load conditions of the base stations.
- the receiver uses the fact that the signal comprises reference signals whose frequency, timing and power level does not depend on load conditions.
- LTE downlink signals typically comprise Common Reference Signals (CRSs) that are distributed in known periodic patterns of time-frequency bins.
- CRSs Common Reference Signals
- the receiver identifies the applicable pattern, explicitly or implicitly, and is thus able to measure the reference signal power level. Having measured the reference signal power level, the receiver substitutes this power level in the relevant frequency sub-bands, so as to produce the estimated full-load PSD.
- the receiver In practice, even though the patterns of reference signals are known to the receiver, the receiver often has no prior information regarding the specific pattern being used in the received signal, or the time-frequency offset of the pattern. Moreover, when the receiver carries out the spectrum estimation process, it may be unsynchronized in time and/or frequency with the actual transmitted signal, since it is still not aware of the actually-used frequency channel or its timing. Thus, in some embodiments the receiver defines multiple hypotheses. Each hypothesis corresponds to a respective set of one or more time-frequency bins that is hypothesized to comprise the reference signals.
- the receiver measures the received power level in each set, i.e., for each hypothesis, and selects the hypothesis having the highest received power level. The receiver then estimates the full-load PSD using the selected hypothesis.
- FIG. 1 is a block diagram that schematically illustrates a wireless communication system 20 , in accordance with an embodiment that is described herein.
- system 20 operates in accordance with the LTE specifications, cited above. In alternative embodiments, however, system 20 may operate in accordance with any other suitable communication standard or protocol.
- System 20 comprises a mobile communication terminal 24 (referred to in LTE terminology as User Equipment—UE) that communicates with a base station 28 (referred to as eNodeB in LTE terminology).
- UE 24 comprises one or more antennas 32 , reception circuitry 36 , and a UE processor 40 .
- Reception circuitry 36 typically receives downlink Radio Frequency (RF) signals via antenna 32 , down-converts the signals to baseband, digitizes the baseband signals and provides the digital signals to UE processor 40 .
- RF Radio Frequency
- UE processor 40 processes the digital signals. Amongst other tasks, the UE processor carries out a process that searches for candidate Public Land Mobile Networks (PLMNs) with which to communicate.
- PLMNs Public Land Mobile Networks
- FIG. 1 shows a single base station, such as an LTE compliant eNodeB, for the sake of clarity, but in real-life scenarios the UE often receives signals from multiple Base stations (BSs).
- the BSs may belong to various PLMNs operating in various spectral bands and in accordance with various Radio Access Technologies (RATs).
- UE processor 40 comprises a PLMN search unit 44 , which carries out the PLMN search process. Any suitable PLMN search process can be used.
- UE processor 40 comprises a spectrum estimation unit 48 .
- Unit 48 estimates the PSD that the downlink signal would have if base station 28 were to operate under full-load conditions, using techniques that are more fully described below.
- Spectrum estimation unit 48 provides the estimated full-load PSD as input to PLMN search unit 44 .
- PLMN search unit 44 is able to identify PLMN characteristics (e.g., channel bandwidth, channel spacing or RAT) with better accuracy and reliability.
- the UE configuration shown in FIG. 1 is an example configuration, which is depicted in a highly simplified manner solely for the sake of clarity. In alternative embodiments, any other suitable UE configuration can be used. UE elements that are not mandatory for understanding of the disclosed techniques, such as elements related to uplink transmission, have been omitted from the figure for the sake of clarity.
- reception circuitry 36 may be implemented using one or more Radio Frequency Integrated Circuits (RFICs)
- UE processor 40 may be implemented using one or more Field-Programmable Gate Arrays (FPGAs) or Application-Specific Integrated Circuits (ASICs).
- RFICs Radio Frequency Integrated Circuits
- FPGAs Field-Programmable Gate Arrays
- ASICs Application-Specific Integrated Circuits
- certain elements of UE 24 are implemented in software, or using a combination of hardware and software elements.
- Some of the elements of UE 24 e.g., reception circuitry 36 and UE processor 40 , may be implemented in a signal-processing chipset.
- certain UE elements for example the functions of unit 44 and/or unit 48 , are implemented in a programmable processor, which is programmed in software to carry out the functions described herein.
- the software may be downloaded to the processor, in whole or in part, in electronic form, over a network, for example, or it may, alternatively or additionally, be provided and/or stored on non-transitory tangible media, such as magnetic, optical, or electronic memory.
- the bottom of FIG. 1 illustrates the structure of the downlink signal transmitted by base station 28 , in an example embodiment.
- the LTE signal comprises a sequence of Orthogonal Frequency Division Multiplexing (OFDM) symbols, each comprising multiple sub-carriers.
- the signal is thus transmitted in multiple time-frequency bins 52 that are referred to as Resource Elements (REs).
- the bandwidth of each RE 52 in this example is 15 KHz.
- the block of twelve REs of fourteen OFDM symbols is referred to as a resource block (RB), in the present example occupying 1 mS-by-180 KHz in the time-frequency plane.
- RB resource block
- the base station transmits multiple RBs in parallel in the frequency domain, within the spectrum that is allocated to the base station.
- REs 52 comprise Common Reference Signals (CRSs).
- CRSs are transmitted in a predefined pattern that typically depends on factors such as the base station ID, the number of base station antennas, and whether a short or long Cyclic Prefix (CP) is used.
- CP Cyclic Prefix
- the CRSs are typically transmitted regardless of load conditions and at a fixed power level.
- FIG. 1 shows, by way of example, two patterns of RSs denoted 56 A and 56 B that are marked using different shadings in the figure. These patterns are typically duplicated periodically in adjacent RBs.
- Pattern 56 A is used when the base station comprises a single antenna, as well as by the first base station antenna in a two-antenna base station.
- Pattern 56 B is used by the second base station antenna in a two-antenna base station. Patterns 56 A and 56 B are used in short CP mode.
- UE processor 40 identifies the CRS pattern in the received signal, and estimates the full-load PSD based on the received power level of the CRSs.
- the UE processor 40 is aware of the possible CRS patterns that may potentially exist in the received signal, it typically has no information as to the actual pattern being used and the time-frequency offset of the pattern. For example, during PLMN search, the UE processor is unaware of the base station ID or the number of base station antennas, and therefore cannot deduce the actual CRS pattern.
- UE processor 40 defines and tests multiple hypotheses. Each hypothesis specifies a different respective set of time-frequency bins that are hypothesized to comprise the CRSs. Testing a given hypothesis means verifying whether the corresponding set of time-frequency bins indeed comprises the CRSs. After finding the true hypothesis, UE processor 40 estimates the full-load PSD of the signal based on the measured power in the bins of this hypothesis.
- FIG. 2 is a flow chart that schematically illustrates a method for full-load spectrum estimation, in accordance with an embodiment that is described herein.
- the method begins with reception circuitry 36 of UE 24 receiving a downlink signal, at a reception operation 60 .
- UE 24 has no prior information as to the actual time offset, frequency offset, RAT or load conditions with which the signal is transmitted.
- Spectrum estimation unit 48 in UE processor 40 of UE 24 defines multiple hypotheses, at a hypotheses definition operation 64 .
- Each hypothesis specifies a respective set of one or more time-frequency bins in the received signal that are hypothesized to comprise the CRSs. Two examples of hypotheses definitions are shown in FIGS. 3 and 4 below.
- Unit 48 measures the average power level of the received signal over each set of time-frequency bins, i.e., for each hypothesis, at a power measurement operation 68 .
- Unit 48 estimates the full-load PSD, i.e., the PSD that the received signal would have if base station 28 were to transmit at full load, at an estimation operation 72 .
- Spectrum estimation unit 48 provides the full-load PSD to PLMN search unit 44 to assist in the PLMN search process.
- searching for PLMN also comprises identifying the RAT used by the PLMN.
- FIG. 3 is a diagram that schematically illustrates multiple hypotheses used for full-load spectrum estimation, in accordance with an embodiment that is described herein.
- unit 48 defines and tests a total of twenty-one hypotheses for each block of six OFDM sub-carriers (90 KHz) by fourteen symbols (1 mS), assuming short CP mode.
- each hypothesis specifies a respective set of time-frequency bins that are hypothesized to comprise the CRSs.
- the various hypotheses are formed by applying respective time-frequency shifts to a predefined CRS pattern.
- one of the sets of time-frequency bins will comprise the CRSs (which are transmitted regardless of loading conditions and at a fixed high power), whereas the other sets of time-frequency bins may or may not comprise data, depending on the base station load conditions. Therefore, the set of bins having the maximum received power level is either the set comprising the CRSs or it is one that has received power level close to it.
- unit 48 measures the average received power level over the time-frequency bins of each hypothesis.
- unit 48 measures the average power over bins [0/0], [4/3], [7/0] and [11/3], wherein the first index denotes the symbol index, and the second index denotes the frequency bin index.
- Unit 48 selects the hypothesis having the maximal received power level.
- Unit 48 substitutes this maximal power level as the power level of the entire six-sub-carrier (90 KHz) frequency sub-band in the estimated full-load PSD. The process is repeated in a similar manner for the other 90 KHz blocks. Each sub-band is typically processed independently of other sub-bands.
- UE 24 is not synchronized to base station 28 in time or frequency at this stage, and has no information as to the CP mode, the performance loss caused by this uncertainty is small. Longer averaging time (e.g., averaging over 5 mS instead of 1 mS) will typically improve the spectrum estimation accuracy at the expense of increased estimation time.
- the estimated full-load PSD can be used for PLMN search in both third-generation RATs and higher (e.g., LTE) and second-generation RATs (e.g., GSM), because the spectral resolution of 90 KHz is lower than the RAT bandwidth in both cases (200 kHz for 2G and 3.84 MHz for 3G).
- the maximization operation introduces only a small amount of distortion into the estimation, since the signal spectrum over 90 KHz bandwidth is usually fairly flat.
- FIG. 4 is a diagram that schematically illustrates multiple hypotheses used for full-load spectrum estimation, in accordance with an alternative embodiment that is described herein.
- spectrum estimation unit 48 estimates the full-load PSD in two stages.
- unit 48 examines each 15 KHz frequency bin individually. In each frequency bin, unit 48 tests seven hypotheses (the seven possible time shifts of the CRS pattern) h 0 . . . h 6 as shown in the figure. Unit 48 measures the average received power level over the REs of each hypothesis, i.e., the average power of time bins 0 and 7 for h 0 , the average power of time bins 1 and 8 for h 1 , and so on. The average power for the k th hypothesis in frequency bin f can be written as
- Unit 48 selects the hypothesis having the maximal average power in the frequency bin, and substitutes the maximal power level for this 15 KHz frequency bin in the estimated full-load PSD.
- the first stage is repeated for the different 15 KHz frequency bins.
- the output of the first stage is a respective maximal average power value for each 15 KHz frequency bin.
- unit 48 replaces the maximal average power value of each 15 KHz frequency bin with the maximum over the value of this bin and one or more of its neighboring frequency bins.
- the estimated full-load PSD for a given frequency bin is set to the maximum of P est1 (f) in this bin and one neighboring bin on either side, i.e., a total of three bins.
- Spectrum estimation unit 48 provides the estimated full-load PSD P est2 (f) to PLMN search unit 44 , for use in the PLMN search process.
- the scheme of FIG. 4 estimates the full-load PSD with a fine resolution of 15 KHz, as opposed to the 90 KHz resolution of the scheme of FIG. 3 above.
- the finer resolution may improve the performance of the PLMN search process.
- the PLMN search process is able to assign respective scores to frequency channels with a fine resolution.
- FIGS. 3 and 4 are example schemes for estimating the full-load PSD based on multiple hypotheses as to the time-frequency locations of the reference signals.
- unit 48 may use any other suitable estimation scheme.
- the downlink signal received by UE 24 is a Time Division Duplex (TDD) signal.
- TDD Time Division Duplex
- the received signal comprises periodic time intervals that are allocated to the uplink direction. These time intervals in the downlink signal contain no signal energy, and specifically no reference signals.
- spectrum estimation unit 48 sets the time period for averaging the received power measurement so as to allow sufficient averaging of TDD signals. The averaging time should typically be selected long enough so that it will include downlink energy even in a cell with no active users.
- an LTE-TDD signal comprises at least one 1 mS downlink sub-frame every 5 mS, and the averaging can therefore be set to 5 mS or higher.
- a TD-SCDMA signal comprises at least one 0.66 mS downlink slot every 10 mS, and the averaging can therefore be set to 10 mS or higher.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Computer Security & Cryptography (AREA)
- Mobile Radio Communication Systems (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/760,084 US9014119B2 (en) | 2012-02-07 | 2013-02-06 | Spectrum estimation for low-load LTE signals |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261595870P | 2012-02-07 | 2012-02-07 | |
US13/760,084 US9014119B2 (en) | 2012-02-07 | 2013-02-06 | Spectrum estimation for low-load LTE signals |
Publications (2)
Publication Number | Publication Date |
---|---|
US20130201853A1 US20130201853A1 (en) | 2013-08-08 |
US9014119B2 true US9014119B2 (en) | 2015-04-21 |
Family
ID=48902802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/760,084 Active 2033-06-23 US9014119B2 (en) | 2012-02-07 | 2013-02-06 | Spectrum estimation for low-load LTE signals |
Country Status (2)
Country | Link |
---|---|
US (1) | US9014119B2 (zh) |
CN (1) | CN103354473B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5850979B2 (ja) * | 2014-05-09 | 2016-02-03 | 株式会社Nttドコモ | ユーザ装置、基地局、セル選択制御方法、及びパラメータ送信方法 |
CN106162687B (zh) * | 2015-04-01 | 2021-06-11 | 索尼公司 | 用于无线通信的用户设备侧和基站侧的装置和方法 |
US10756785B2 (en) | 2016-09-29 | 2020-08-25 | Nokia Technologies Oy | Flexible reference signal design |
US11582001B2 (en) * | 2017-10-02 | 2023-02-14 | Telefonaktiebolaget Lm Ericsson (Publ) | Method for band scanning when reference signal is transmitted over reduced bandwidth |
US11418422B1 (en) * | 2021-02-08 | 2022-08-16 | Mellanox Technologies, Ltd. | Received-signal rate detection |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040058679A1 (en) * | 2000-07-25 | 2004-03-25 | Markus Dillinger | Method for the improved cell selection for multi-mode radio stations in the idle state |
US8498640B2 (en) * | 2011-03-31 | 2013-07-30 | Telefonaktiebolaget Lm Ericsson (Publ) | Fast radio access technology detection for cell search |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1210803B1 (en) * | 1999-09-09 | 2007-03-21 | Nokia Corporation | Determination of data rate, based on power spectral density estimates |
US8750804B2 (en) * | 2009-05-31 | 2014-06-10 | Qualcomm Incorporated | Applying spurious interference rejection to detect incumbent users of television channels |
CN101867548B (zh) * | 2010-05-24 | 2014-01-15 | 北京科技大学 | 一种基于滤波器组多载波的盲频率跟踪算法 |
-
2013
- 2013-02-06 US US13/760,084 patent/US9014119B2/en active Active
- 2013-02-07 CN CN201310065417.1A patent/CN103354473B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040058679A1 (en) * | 2000-07-25 | 2004-03-25 | Markus Dillinger | Method for the improved cell selection for multi-mode radio stations in the idle state |
US8498640B2 (en) * | 2011-03-31 | 2013-07-30 | Telefonaktiebolaget Lm Ericsson (Publ) | Fast radio access technology detection for cell search |
Non-Patent Citations (1)
Title |
---|
3GPP TS 36.211, "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Channels and Modulation (Release 8)", Version 8.8.0, chapter 6.10, pp. 65-72, Sep. 2009. |
Also Published As
Publication number | Publication date |
---|---|
CN103354473A (zh) | 2013-10-16 |
US20130201853A1 (en) | 2013-08-08 |
CN103354473B (zh) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3496476B1 (en) | Method and wireless device for performing position measurement in nb iot | |
EP2116076B1 (en) | Multi transmit antenna synchronization channel transmission cell id detection | |
US8630643B2 (en) | Method and system for frequency scan using an adaptive measurement interval | |
EP2312874B1 (en) | Base station, terminal, band allocation method, and downlink data communication method | |
GB2582788A (en) | Methods and apparatus for configuring 5G new radio uplink positioning reference signals | |
EP2692176B1 (en) | Fast radio access technology detection for cell search | |
US9014119B2 (en) | Spectrum estimation for low-load LTE signals | |
WO2018171924A1 (en) | Network node, wireless communication device, methods and computer programs | |
EP2905916A1 (en) | Neighbour cell quality measurement in a telecommunications system | |
US20120270537A1 (en) | Method and system for frequency scan using a differential power metric | |
EP2454904B1 (en) | Facilitating noise estimation in wireless communication | |
EP2367385A1 (en) | Technique for automatic gain control in a multi-carrier communication system | |
EP2472977B1 (en) | Radio base station, mobile station and measurement method | |
CN103329604A (zh) | 用于测量ue的位置的技术 | |
CN113364557B (zh) | 用于同步的方法和装置 | |
WO2018000440A1 (zh) | 信号检测的方法和装置 | |
GB2583691A (en) | Methods, apparatus, and systems for transmitting and receiving positioning reference signals in 5G new radio networks | |
RU2692481C1 (ru) | Nb-iot приемник, работающий на минимальной частоте дискретизации | |
TW201334582A (zh) | 用於針對具有可變通道頻寬之無線系統執行頻率掃描之方法及裝置 | |
EP2051395B1 (en) | Communication device and method | |
CN108989259B (zh) | 无线综测仪窄带物理上行共享信道的时偏估计方法及系统 | |
CN102271384B (zh) | 一种lte系统小区初搜方法 | |
CN117320046B (zh) | Crs搜索方法、lte时间对齐误差测定方法和用户设备 | |
US8938016B1 (en) | Fast identification of OFDM signal | |
CA2779856C (en) | Method and system for frequency scan using an adaptive measurement interval |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: MARVELL ISRAEL (M.I.S.L) LTD., ISRAEL Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:PERETS, YONA;BEN-ELI, DAVID;YELLIN, DANIEL;SIGNING DATES FROM 20130129 TO 20130130;REEL/FRAME:029853/0460 Owner name: MARVELL INTERNATIONAL LTD., BERMUDA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MARVELL ISRAEL (M.I.S.L) LTD.;REEL/FRAME:029853/0463 Effective date: 20130204 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
AS | Assignment |
Owner name: ASR MICROELECTRONICS (SHANGHAI) CO. LTD., CHINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MARVELL INTERNATIONAL LTD.;REEL/FRAME:043887/0860 Effective date: 20170828 |
|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO SMALL (ORIGINAL EVENT CODE: SMAL) |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2551) Year of fee payment: 4 |
|
AS | Assignment |
Owner name: ASR MICROELECTRONICS CO., LTD., CHINA Free format text: CHANGE OF NAME;ASSIGNOR:ASR MICROELECTRONICS (SHANGHAI) CO. LTD.;REEL/FRAME:053746/0579 Effective date: 20200817 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE UNDER 1.28(C) (ORIGINAL EVENT CODE: M1559); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FEPP | Fee payment procedure |
Free format text: PETITION RELATED TO MAINTENANCE FEES GRANTED (ORIGINAL EVENT CODE: PTGR); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |