US785356A - Process of making concrete structures. - Google Patents

Process of making concrete structures. Download PDF

Info

Publication number
US785356A
US785356A US19565504A US1904195655A US785356A US 785356 A US785356 A US 785356A US 19565504 A US19565504 A US 19565504A US 1904195655 A US1904195655 A US 1904195655A US 785356 A US785356 A US 785356A
Authority
US
United States
Prior art keywords
pipe
pile
concrete structures
shell
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US19565504A
Inventor
Charles R Gow
John E Palmer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US19565504A priority Critical patent/US785356A/en
Application granted granted Critical
Publication of US785356A publication Critical patent/US785356A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Definitions

  • 2115 may concern:
  • This invention relates to improvements in the construction of buildings, walls, or other engineering structures, the improvements particularly relating to the formation of the columns or piles, so that it is possible to utilize a foundation which would ordinarily be unsuitable to support the weight of the structure which is to be carried on such foundation.
  • Wooden piles have several disadvantages, among which may be mentioned the following: Each individual pile being necessarily small in sectional area, its supporting power is consequently small. Hence a large number of such piles are required to safely carry any great weight.A Again,
  • Figure l represents a sectional view of a pipe or a plurality of sections of pipe joined end to end and driven into the earth, the material within said pipe having been removed and the hole extended to a distance below the lower end of said pipe.
  • Fig. 2 represents a view similar to Fig. l, but illustrating a further step in the process.
  • Fig. 3 represents a similar view, but representing the final step in the process and at the same time illustrating our improved pile or column as an article of manufacture.
  • a hollow pipe, tube, or box a of any required size or shape is sunk into the ground by driving, weighting, or otherwise.
  • This pipe, tube, or box may, if required, be put down in short sections, one section being coupled to the preceding one as the work progresses. If necessary, pipes in one -foot lengths could be coupled together as they are driven, thus allowing the work to proceed under walls or where the height might be limited.
  • the pipe has been sunk to the required depth or to the material in which the foundation is to be formed, it is cleared out by one of several well-known methods, such as the waterjet, or, if it becomes necessary, this clearing-out process maybe carried on simultaneously with the sinking of the pipe.
  • a hole b equal in diameter to that of the pipe is excavated by the same process to a depth of a foot or more below the base of the pipe and in the material on which the footing is to rest. It will be understood that the hole thus formed may be in any natural foundation that may be selected for the pile or colunm below the surface of the earth. After the hole has been excavated below the lower end of the pipe a it is laterally enlarged, as represented at b in Fig. 2 by any suitable excavating means.
  • a common form of expander or cutter which may be IOO collapsed, so as to allow of its being lowered through the ipe, may be inserted into the hole b below t e base of the pipe, and by then rotating such expander or cutter by means of a suitable rod extending through the pipe a to the surface the cavity b may be formed of the desired shape, it being understood7 of course, that any suitable means, such as water-jets, may be em loyed for washing out the material cut by tlfie expander and during the opening movements of such expander. rl ⁇ he cavity b thus formed may now be completely pumped out or cleared out by any suitable method, leaving a free open chamber formed in the material immediately below the pipe.
  • This enlarged cavity or space is now filled with a mixture of concrete, cement, or other suitable analogous moldable material, as indicated at c in Fig. 3, after which the pipe a itself may be filled with the same material, as at c. lf it is desired to withdraw the pipe a, this may be done simultaneously with the filling process, leaving the space originallyoccupied by the pipe entirely filled with concrete.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

110.7853356. i PATENTED MAR. 21. 1905;
RG. R. Sow E J. E; PALMER. PROCESS 0E MAKING coNoRETE STRUCTURES. V APPLICATION FILED FEB. 27. 1904.
NTTED STATES Patented March 21, 1905.
PATENT OEEICE.
CHARLES R. GOV AND JOHN E. PALMER, OF BOSTON, MASSACHUSETTS.
PROCESS OF MAKING CONCRETE STRUCTURES.
SPECIFICATION forming part of Letters Patent No. 785,356, dated March 21, 1905. Application flied February 27, 1904. Serial No. 195,655.
To @ZZ whom, 2115 may concern:
Be it known that we, CHARLES R. Gow and JOHN E. PALMER, of Boston, in the county of Suffolk and State of Massachusetts, have invented certain new and useful Improvements in Processes of Making Concrete Structures, of which the following is a specification.
This invention relates to improvements in the construction of buildings, walls, or other engineering structures, the improvements particularly relating to the formation of the columns or piles, so that it is possible to utilize a foundation which would ordinarily be unsuitable to support the weight of the structure which is to be carried on such foundation.
Heretofore it has been customary to seek asuitable material for a foundation below the surface of the ground, which foundation can usually be found by going deep enough. It
. has been customary in such cases to drive wooden piles of a sufhcient length to penetrate the desired stratum of firm material. This is preferable as a usual thing to excavating to a considerable depth and refilling the excavation with masonry or other material. Wooden piles, however, have several disadvantages, among which may be mentioned the following: Each individual pile being necessarily small in sectional area, its supporting power is consequently small. Hence a large number of such piles are required to safely carry any great weight.A Again,
wooden piles are subject to rapid decay un` less continually submerged in water. Consequently it is necessary to excavate at least to the lowest level of the ground-Water in order to cut the piles olf at this level and commence masonry from this point. Furthermore, it is impossible to drive piles inside of an ordinary building, as a sufficient amount of head-room is necessary for the pile-driving apparatus, which is necessarily of a considerable height. In the ease of existing buildings or other structures where settlements take place, threatening the stability of the structure, it is often necessary to secure a new foundation from which to support these walls. Insuch a oase Wooden piles would be out of the question.
For all such purposes, as above mentioned, we propose to employ a concrete pile having an enlarged footing according to our invention, which we will now proceed to describe, and particularly point out in the claims.
Of the accompanying drawings, forming a part of this specification, Figure l represents a sectional view of a pipe or a plurality of sections of pipe joined end to end and driven into the earth, the material within said pipe having been removed and the hole extended to a distance below the lower end of said pipe. Fig. 2 represents a view similar to Fig. l, but illustrating a further step in the process. Fig. 3 represents a similar view, but representing the final step in the process and at the same time illustrating our improved pile or column as an article of manufacture.
Similar reference characters designate similar parts throughout the several views.
A hollow pipe, tube, or box a of any required size or shape is sunk into the ground by driving, weighting, or otherwise. This pipe, tube, or box may, if required, be put down in short sections, one section being coupled to the preceding one as the work progresses. If necessary, pipes in one -foot lengths could be coupled together as they are driven, thus allowing the work to proceed under walls or where the height might be limited. When the pipe has been sunk to the required depth or to the material in which the foundation is to be formed, it is cleared out by one of several well-known methods, such as the waterjet, or, if it becomes necessary, this clearing-out process maybe carried on simultaneously with the sinking of the pipe. A hole b equal in diameter to that of the pipe is excavated by the same process to a depth of a foot or more below the base of the pipe and in the material on which the footing is to rest. It will be understood that the hole thus formed may be in any natural foundation that may be selected for the pile or colunm below the surface of the earth. After the hole has been excavated below the lower end of the pipe a it is laterally enlarged, as represented at b in Fig. 2 by any suitable excavating means. For instance, a common form of expander or cutter, which may be IOO collapsed, so as to allow of its being lowered through the ipe, may be inserted into the hole b below t e base of the pipe, and by then rotating such expander or cutter by means of a suitable rod extending through the pipe a to the surface the cavity b may be formed of the desired shape, it being understood7 of course, that any suitable means, such as water-jets, may be em loyed for washing out the material cut by tlfie expander and during the opening movements of such expander. rl`he cavity b thus formed may now be completely pumped out or cleared out by any suitable method, leaving a free open chamber formed in the material immediately below the pipe. This enlarged cavity or space is now filled with a mixture of concrete, cement, or other suitable analogous moldable material, as indicated at c in Fig. 3, after which the pipe a itself may be filled with the same material, as at c. lf it is desired to withdraw the pipe a, this may be done simultaneously with the filling process, leaving the space originallyoccupied by the pipe entirely filled with concrete.
Of course it will be understood that the size of the column and of its enlarged footing or of either one relatively to the other maybe readily determined for any given case, one of the objects of the invention being to provide means whereby the number of columns or piles necesssary may be limited to the simplest number possible, while still able to secure all of the footing that maybe required for the weight that is to be carried.
We claiml. The process of making a pile or column having an integral enlarged footing, said process consisting in first sinking a shell, then excavating within such shell to a point below the lower end thereof, then laterally enlarging the portion of the excavation below the shell, then filling the enlargement with concrete through the shell to form a base, and nally filling the shell with concrete to form the body of the pile integral with the enlarged base.
2. The process of making a pile or column having an integral enlarged footing, said process consisting in first sinking a shell, then excavating within such shell to a point below the lower end thereof, then. enlarging the lower portion of the excavation and forming it with a fiat base and conical sides, then lilling the enlargement with concrete through the shell to form a base, and finally filling the shell with concrete to form the body of the pile integral with the enlarged base.
In testimony whereof we have affixed our signatures in presence of two witnesses.
CHARLES R. GOW. JOHN E. PALMER.
Witnesses:
A. W. HARRISON, R. M. PmRsoN.
US19565504A 1904-02-27 1904-02-27 Process of making concrete structures. Expired - Lifetime US785356A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US19565504A US785356A (en) 1904-02-27 1904-02-27 Process of making concrete structures.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US19565504A US785356A (en) 1904-02-27 1904-02-27 Process of making concrete structures.

Publications (1)

Publication Number Publication Date
US785356A true US785356A (en) 1905-03-21

Family

ID=2853848

Family Applications (1)

Application Number Title Priority Date Filing Date
US19565504A Expired - Lifetime US785356A (en) 1904-02-27 1904-02-27 Process of making concrete structures.

Country Status (1)

Country Link
US (1) US785356A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4767241A (en) * 1985-11-13 1988-08-30 Wells Gordon T Method for simultaneous forming of concrete footings and piers
US20080072510A1 (en) * 2006-09-21 2008-03-27 Sound Footings, Llc Concrete column forming assembly
US20090020680A1 (en) * 2006-03-14 2009-01-22 Bradac James M Concrete forming tube

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4767241A (en) * 1985-11-13 1988-08-30 Wells Gordon T Method for simultaneous forming of concrete footings and piers
US20090020680A1 (en) * 2006-03-14 2009-01-22 Bradac James M Concrete forming tube
US9758942B2 (en) * 2006-03-14 2017-09-12 James M. Bradac Concrete forming tube
US20080072510A1 (en) * 2006-09-21 2008-03-27 Sound Footings, Llc Concrete column forming assembly
US8485493B2 (en) 2006-09-21 2013-07-16 Soundfootings, Llc Concrete column forming assembly

Similar Documents

Publication Publication Date Title
US3429126A (en) Method of producing a continuous bore pile wall
JP2008075389A (en) Retaining wall
US3336760A (en) Construction of support columns in soil
US785356A (en) Process of making concrete structures.
US747219A (en) Subterranean anchor.
US1164085A (en) Method or process of anchoring steel piles.
RU2334049C1 (en) Method of combined in situ pile manufacturing
KR101462814B1 (en) Gravity type earth retaining wall constructing method
US3555833A (en) Piles suitable for subsidence conditions
US969136A (en) Pile and method of making the same.
KR101765879B1 (en) Composite block for ground reinforcement and reinforceing method of the foundation bottom using the same
US739268A (en) Process of making concrete piles.
US1296628A (en) Stabilizing foundation.
RU72986U1 (en) PILE
CN210857252U (en) Open caisson structure applied to drainage pumping station
JP6832761B2 (en) How to rebuild the building
US2007498A (en) Method of erecting an iron frame building having deep underground floors
US576843A (en) Richard s
US2203978A (en) Means and method of shoring bell bottom pile holes
US983808A (en) Method of sinking concrete columns, piers, and the like.
US1665796A (en) Method of providing and placing piers
US1089573A (en) Method of lining shafts with concrete.
US733288A (en) Removable pile for forming concrete piling.
US957844A (en) Constructing foundations of buildings.
US788410A (en) Concrete casing.