US763213A - Method of forming concrete piles. - Google Patents

Method of forming concrete piles. Download PDF

Info

Publication number
US763213A
US763213A US19518404A US1904195184A US763213A US 763213 A US763213 A US 763213A US 19518404 A US19518404 A US 19518404A US 1904195184 A US1904195184 A US 1904195184A US 763213 A US763213 A US 763213A
Authority
US
United States
Prior art keywords
pile
dam
coffer
concrete
preparatory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US19518404A
Inventor
Frank Shuman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US19518404A priority Critical patent/US763213A/en
Application granted granted Critical
Publication of US763213A publication Critical patent/US763213A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Definitions

  • My invention consists of a method of forming concrete piles under water or where the pile is to project above stable ground, whether in water, unstable ground, or air, the invention being an improvement upon that set forth in my Patent No. 739,263, dated September 15, 1903.v and the objects of my present invention being to render the coffer-dam independent of the pile, so that it can be used in connection with preparatory piles of any desired character, also to facilitate the removal of the coffer-dam after the completion of the pile and to enable the @offer-dam to be used as a means of applying a stiffening or strengthening struct-ure to the pile.
  • Figure l represents the first step in the formation of a concrete pile in accordance with my present invention
  • Fig. 2 a further step in the operation
  • Fig. 3 a still further step
  • Figs. 4 to 8, inclusive views of special forms of eoffer-dam made in accordance with my invention
  • Fig. 9 is an enlarged view of part of' Fig. 2.
  • l first drive or otherwise sink the preparatory pile l to the proper depth and then drive or otherwise sink the coffer-dam 2 around the upper end of the preparatory pile until the lower end of said coffer-dam is embedded to a sufficient depth in the firm ground beneath the water and mud or silt, or the coffer-dam may be first driven or sunk to the required depth and the preparatory pile then driven or sunk through the same.
  • the preparatory pile is then Withdrawn, and the opening formed thereby,'as well as the opening within 'the coffer-dam, is filled with concrete, andv after the latter becomes set the coffer-dam can be removed or not, as desired.
  • the preparatory pile may be of any desired character, having either a fiush or an enlarged head, and said head may be attached to the pile, or it may be detachable therefrom, so as to remain in the opening when the pile is withdrawn, or it may be collapsed and withdrawn through the hollow pile.
  • the pile may be withdrawn before filling the opening with concrete; but in the case of a hollow pile it is preferable to fill the opening through the pile as the latter is being slowly or intermittently withdrawn.
  • a metal reinforce- such as shown, for instance, at 3 in Figs. 2 and 9- may be introduced into the hollow pile before the withdrawal of the same, so as to be embedded in the concrete which is filled into the opening by being fed through the pile as the latteris being slowly or intermittently withdrawn, the pile thus serving asa backing or support for the reinforce, so as to prevent destruction or distortion of the same by the pressure of the concrete thereupon as it is being rammed.
  • a similar metallic rcinforce such, for instance, as shown at i in Fig. Qmay be inserted between the pile and the @offer-dam, so as to be embedded in the outer surface of the upper portion of the completed pile. This reinforce may be placed in position either before or after the placing of the coffer-dam.
  • 4 and 5 consists of a longitudinally-split tube 2, with flanges upon its meeting edges, one of' these fianges 5 having projecting staples 6, which pass through slots in the opposite fiange and are engaged by a key7 to hold the edges of' the tube together, separation of the flanges and consequent expansion of the tube being permitted when this key is withdrawn.
  • the split tube shown in Fig. 6 is normally retained in closed position by means of a rope, cord, or wire 8, wound spirally around the same, expansion of' the tube being permitted when this restraining influence is withdrawn, and the split tube shown in Fig. 7 is normally retained in the closed position by means of' a series of rings 9, slipped over the same and connected by chains l() or other suitable means, so that they can be easily withdrawn to permit of the expansion of the tube.
  • the coffer-dam may consist of a tube composed of' any desired number of' segments held together in either of the ways described or in any other desired manner, so as to be readily freed from the restraining influence when it is desired to remove the coiffer-dam from the pile.
  • FIG. 8 Another method of constructing the cofferdam so as to facilitate its withdrawal from the pile is shown in Fig. 8, in which the tube 2" instead of being split is tapered slightly, being larger in diameter at the lower end than at the upper end. It is' preferable, also, to lubricate the inner surface of the eoffer-dam in order to prevent it from sticking to the concrete.
  • the method of forming concrete piles which consists in first sinking a preparatory pile and a coffer-dam surrounding the upper portion of said preparatory pile, introducing a metallic reinforce between the two, and withdrawing tlie preparatory pile and filling the opening thereby formed with concrete, which also fills the coffer-dam and engages the metallic reinforce therein, substantially as specified.
  • the method of' forming concrete piles which consists in first driving or sinking a hollow preparatory pile with detachable point, then independently driving or sinking a cofferdam surrounding the upper portion of' the pile, then slowly or intermittently withdrawing the preparatory pile, without the point, and, during such withdrawal, filling in the concrete until the coffer-dam and the opening below the same have been filled, and then permitting the concrete to set, substantially as specified.
  • the method of' forming concrete piles ⁇ which consists in first driving or sinking a hollow preparatory pile with detachable point, then independently driving or sinking a cofferd am surrounding the upper portion ofl the pile, then slowly or intermittently withd rawing the preparatory pile, without the point, and, during such withdrawal, filling in the concrete until the coffer-dam and the opening below the same have been filled, then permitting the concrete to set, relaxing or increasing the diameter of the coffer-dam and then removing the same, substantially as specified.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

PATENTED JUNE 2l, 1904.
E. SHUMAN. METHOD 0E EORMING CONCRETE PILES.
APPLICATION FILED PEB. 25. 1904.
2 SHEETS-SHEET 1.
NO MODEL.
me mums vvcns CO. moToLn'no, wAsHmGTuN, u c.
PATENTED JUNE 21, 1904,
P.. SHUMAN. METHOD 0F FORMING CONCRETE PILES.
APPLICATION FILED FEB. 25, 1904.
2 SHEETS-SHBET 2.
No MODELS Nirnn STATES Patented June 21, 1904.
VAreNr Price.
IVIETHOD OF FORIVIING CONCRETE PILES.
SPECIFICATION forming part of Letters Patent No. 763,213, dated June 21, 1904.
l Application filed February 25, 1904. Serial No. 195, L84. (No model.)
To MZ whom /f/ may concern:
Be it known that I, FRANK SHUMAN, a citizen of the United States, residing in Philadelphia, Pennsylvania, have invented certain Improvenients in the Formation of Concrete Piles, of which the following is a specification.
My invention consists of a method of forming concrete piles under water or where the pile is to project above stable ground, whether in water, unstable ground, or air, the invention being an improvement upon that set forth in my Patent No. 739,263, dated September 15, 1903.v and the objects of my present invention being to render the coffer-dam independent of the pile, so that it can be used in connection with preparatory piles of any desired character, also to facilitate the removal of the coffer-dam after the completion of the pile and to enable the @offer-dam to be used as a means of applying a stiffening or strengthening struct-ure to the pile. These objects I attain in the manner hereinafter set forth, Vreference being had to the accompanying drawings, in which Figure l represents the first step in the formation of a concrete pile in accordance with my present invention; Fig. 2, a further step in the operation; Fig. 3, a still further step; Figs. 4 to 8, inclusive, views of special forms of eoffer-dam made in accordance with my invention; and Fig. 9 is an enlarged view of part of' Fig. 2.
In my previous patent, before referred to, a coffer-dam consisting' of a tube surrounding' the preparatory pile was confined between an enlarged head on the pile and a ring mounted on the pile some distance back of the head, both pile and coffer-dam being first driven until the lower end of said coffer-dam had been forced below the water and unstable soil, whereupon its connection with the pile was released and the driving of the pile continued until an opening of the desired depth had been formed in the solid ground, the preparatory pile being then withdrawn and the opening and coffer-dam filled with concrete which was permitted to set, the coffer-dam being either permitted to remain as a sheathing for the upper portion of the pile or being removed when such sheathing was not required.
In carrying out my present invention l first drive or otherwise sink the preparatory pile l to the proper depth and then drive or otherwise sink the coffer-dam 2 around the upper end of the preparatory pile until the lower end of said coffer-dam is embedded to a sufficient depth in the firm ground beneath the water and mud or silt, or the coffer-dam may be first driven or sunk to the required depth and the preparatory pile then driven or sunk through the same. The preparatory pile is then Withdrawn, and the opening formed thereby,'as well as the opening within 'the coffer-dam, is filled with concrete, andv after the latter becomes set the coffer-dam can be removed or not, as desired. v
The preparatory pile may be of any desired character, having either a fiush or an enlarged head, and said head may be attached to the pile, or it may be detachable therefrom, so as to remain in the opening when the pile is withdrawn, or it may be collapsed and withdrawn through the hollow pile. i
, The pile may be withdrawn before filling the opening with concrete; but in the case of a hollow pile it is preferable to fill the opening through the pile as the latter is being slowly or intermittently withdrawn.
Vhen it is desired to stifi'en or strengthen the concrete pile, a metal reinforce-such as shown, for instance, at 3 in Figs. 2 and 9- may be introduced into the hollow pile before the withdrawal of the same, so as to be embedded in the concrete which is filled into the opening by being fed through the pile as the latteris being slowly or intermittently withdrawn, the pile thus serving asa backing or support for the reinforce, so as to prevent destruction or distortion of the same by the pressure of the concrete thereupon as it is being rammed. A similar metallic rcinforcesuch, for instance, as shown at i in Fig. Qmay be inserted between the pile and the @offer-dam, so as to be embedded in the outer surface of the upper portion of the completed pile. This reinforce may be placed in position either before or after the placing of the coffer-dam.
In order to facilitate the removal of the cofferdam from the completed pile, various means for relaxing or increasing the diameter of said coffer-dam may be adopted. For instance, that form of coffer-dam shown in Figs.
IOO
4 and 5 consists of a longitudinally-split tube 2, with flanges upon its meeting edges, one of' these fianges 5 having projecting staples 6, which pass through slots in the opposite fiange and are engaged by a key7 to hold the edges of' the tube together, separation of the flanges and consequent expansion of the tube being permitted when this key is withdrawn.
The split tube shown in Fig. 6 is normally retained in closed position by means of a rope, cord, or wire 8, wound spirally around the same, expansion of' the tube being permitted when this restraining influence is withdrawn, and the split tube shown in Fig. 7 is normally retained in the closed position by means of' a series of rings 9, slipped over the same and connected by chains l() or other suitable means, so that they can be easily withdrawn to permit of the expansion of the tube.
Instead of' a split tube of the character described the coffer-dam may consist of a tube composed of' any desired number of' segments held together in either of the ways described or in any other desired manner, so as to be readily freed from the restraining influence when it is desired to remove the coiffer-dam from the pile.
Another method of constructing the cofferdam so as to facilitate its withdrawal from the pile is shown in Fig. 8, in which the tube 2" instead of being split is tapered slightly, being larger in diameter at the lower end than at the upper end. It is' preferable, also, to lubricate the inner surface of the eoffer-dam in order to prevent it from sticking to the concrete.
Having thus described my in vention, I claim and desire to secure by Letters Patent-w l. The method of' forming concrete piles, which consists in independently driving or sinking a preparatory pile and a coffer-dam surrounding the upper portion of the same, and then withdrawing the preparatory pile and filling the hole with concrete and permitting the latter to set, substantially as specified.
2. rIhe method of' forming concrete piles which consists in independently driving or sinking a preparatory pile and a coffer-dam surrounding the upper end of' the same, and then withdrawing said pile and filling the opening and also the cofer-dam with concrete and permitting the latter to set, substantially as specified.
3. The method of forming concrete piles which consists in independently sinking a preparatory pile and a coffer-dam surrounding the upper portion ofl the same, then-withdrawing the preparatory pile and filling the opening and the coffer-dam with concrete, permitting the latter to set and then removing the cof'fcr-dam, substantially as specified.
1f. The method of forming concrete piles which consists in driving or sinking a hollow preparatory pile, introducing a. metallic reinforce into the same, slowly or intermittently withdrawing the hollow pile, and filling the concrete into the opening as the pile is thus withdrawn, substantially as specified.
5. The method of forming concrete piles which consists in first sinking a preparatory pile and a coffer-dam surrounding the upper portion of said preparatory pile, introducing a metallic reinforce between the two, and withdrawing tlie preparatory pile and filling the opening thereby formed with concrete, which also fills the coffer-dam and engages the metallic reinforce therein, substantially as specified.
6. rIhe method of' forming concrete piles which consists in first driving or sinking a preparatory pile and a coffer-dam surrounding the upper portion of the same, then withdrawing the preparatory pile and filling the opening formed thereby and also the coffer-dam with concrete, permitting the concrete to set, relaxing or increasing the diameter of' the cofferdam and then removing the same, substantially as specified. y
7. The method of' forming concrete piles which consists in first driving or sinking a hollow preparatory pile with detachable point, then independently driving or sinking a cofferdam surrounding the upper portion of' the pile, then slowly or intermittently withdrawing the preparatory pile, without the point, and, during such withdrawal, filling in the concrete until the coffer-dam and the opening below the same have been filled, and then permitting the concrete to set, substantially as specified.
8. rIhe method of' forming concrete piles which consists in first driving or sinking a hollow preparatory pile with detachable point, then independently driving or sinking a cofferd am surrounding the upper portion of' the pile, then slowly or intermittently withdrawing the preparatory pile, without the point, and, during such withdrawal, filling in the concrete until the coffer-dam and the opening below the same have been filled, then permitting the concrete to set and finally removing the cofferdam, substantially as specified.
9. The method of' forming concrete piles` which consists in first driving or sinking a hollow preparatory pile with detachable point, then independently driving or sinking a cofferd am surrounding the upper portion ofl the pile, then slowly or intermittently withd rawing the preparatory pile, without the point, and, during such withdrawal, filling in the concrete until the coffer-dam and the opening below the same have been filled, then permitting the concrete to set, relaxing or increasing the diameter of the coffer-dam and then removing the same, substantially as specified.
In testimony whereof I have signed my name to this specification in the presence of' two subscribing witnesses.
FRANK SHUMAN. Witnesses:
J Arms MoMonnIs, J os. H. KLEIN.
IOO
IIO
US19518404A 1904-02-25 1904-02-25 Method of forming concrete piles. Expired - Lifetime US763213A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US19518404A US763213A (en) 1904-02-25 1904-02-25 Method of forming concrete piles.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US19518404A US763213A (en) 1904-02-25 1904-02-25 Method of forming concrete piles.

Publications (1)

Publication Number Publication Date
US763213A true US763213A (en) 1904-06-21

Family

ID=2831699

Family Applications (1)

Application Number Title Priority Date Filing Date
US19518404A Expired - Lifetime US763213A (en) 1904-02-25 1904-02-25 Method of forming concrete piles.

Country Status (1)

Country Link
US (1) US763213A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2663064A (en) * 1952-08-18 1953-12-22 Jr Edgar H Latham Apparatus for constructing sea walls
US3468131A (en) * 1966-11-29 1969-09-23 Jacques Seidenberg Retaining structures placed into the ground and their procedures of execution
US3736757A (en) * 1971-03-17 1973-06-05 Raymond Int Inc Cast-in-situ concrete piles

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2663064A (en) * 1952-08-18 1953-12-22 Jr Edgar H Latham Apparatus for constructing sea walls
US3468131A (en) * 1966-11-29 1969-09-23 Jacques Seidenberg Retaining structures placed into the ground and their procedures of execution
US3736757A (en) * 1971-03-17 1973-06-05 Raymond Int Inc Cast-in-situ concrete piles

Similar Documents

Publication Publication Date Title
US2146645A (en) Foundation construction
US763213A (en) Method of forming concrete piles.
US779880A (en) Forming concrete piles and preparatory piles therefor.
US2779161A (en) Method and device for constructing foundation piles in the ground
JPH04505949A (en) Improvement of pile or improvement related to pile
US3543525A (en) Formation of cast-in-place concrete piles
US977356A (en) Method of and sectional core for making concrete piling.
US1558127A (en) Setting composite piles
US1856604A (en) Method and apparatus for forming piles
US1181212A (en) Method of constructing pile foundations.
US822588A (en) Method of sinking and building concrete piles.
US1157444A (en) Method of placing and driving concrete piles.
US848395A (en) Pile-core.
US1366460A (en) Pile
US1654644A (en) Constructing piles
US2797466A (en) Improved mould for moulding concrete poles and the like
US756805A (en) Removable pile for forming concrete piling.
US739268A (en) Process of making concrete piles.
US2050215A (en) Apparatus for driving pile shells
US753008A (en) Forming concrete piles
US1117204A (en) Post-mold.
US2203978A (en) Means and method of shoring bell bottom pile holes
US1842033A (en) Oil and gas reclaiming plug
US1202954A (en) Process for making and placing concrete piles.
US733288A (en) Removable pile for forming concrete piling.