US6755001B2 - Suspended concrete flooring system and method - Google Patents
Suspended concrete flooring system and method Download PDFInfo
- Publication number
- US6755001B2 US6755001B2 US09/978,636 US97863601A US6755001B2 US 6755001 B2 US6755001 B2 US 6755001B2 US 97863601 A US97863601 A US 97863601A US 6755001 B2 US6755001 B2 US 6755001B2
- Authority
- US
- United States
- Prior art keywords
- joists
- concrete
- bearing members
- load
- sheets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 91
- 238000009408 flooring Methods 0.000 title claims abstract description 67
- 238000000034 method Methods 0.000 title claims description 23
- 239000004568 cement Substances 0.000 claims abstract description 32
- 239000000835 fiber Substances 0.000 claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 12
- 239000010959 steel Substances 0.000 claims abstract description 12
- 238000009428 plumbing Methods 0.000 claims description 5
- 239000000463 material Substances 0.000 abstract description 10
- 239000003562 lightweight material Substances 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 28
- 230000008901 benefit Effects 0.000 description 18
- 238000009415 formwork Methods 0.000 description 13
- 238000010586 diagram Methods 0.000 description 8
- 239000002131 composite material Substances 0.000 description 7
- 238000005553 drilling Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 7
- 238000013461 design Methods 0.000 description 6
- 239000010425 asbestos Substances 0.000 description 5
- 239000002184 metal Substances 0.000 description 5
- 238000012856 packing Methods 0.000 description 5
- 229910052895 riebeckite Inorganic materials 0.000 description 5
- 238000011065 in-situ storage Methods 0.000 description 4
- 239000000047 product Substances 0.000 description 4
- 239000012744 reinforcing agent Substances 0.000 description 4
- 241000256602 Isoptera Species 0.000 description 2
- 239000011449 brick Substances 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 239000003365 glass fiber Substances 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 230000000135 prohibitive effect Effects 0.000 description 2
- 229920002972 Acrylic fiber Polymers 0.000 description 1
- 229910001208 Crucible steel Inorganic materials 0.000 description 1
- 241000607479 Yersinia pestis Species 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 239000003513 alkali Substances 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 239000002585 base Substances 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000011468 face brick Substances 0.000 description 1
- 230000009970 fire resistant effect Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 239000013529 heat transfer fluid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000001404 mediated effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000012779 reinforcing material Substances 0.000 description 1
- 238000009436 residential construction Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 239000012209 synthetic fiber Substances 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
- E04C3/06—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with substantially solid, i.e. unapertured, web
- E04C3/07—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with substantially solid, i.e. unapertured, web at least partly of bent or otherwise deformed strip- or sheet-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
- E04C2003/0404—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
- E04C2003/0408—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by assembly or the cross-section
- E04C2003/0421—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by assembly or the cross-section comprising one single unitary part
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
- E04C2003/0404—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
- E04C2003/0426—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by material distribution in cross section
- E04C2003/043—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by material distribution in cross section the hollow cross-section comprising at least one enclosed cavity
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
- E04C2003/0404—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
- E04C2003/0443—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section
- E04C2003/0465—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section square- or rectangular-shaped
Definitions
- the present invention relates to flooring systems, and in particular relates to suspended concrete flooring systems for use in residential and commercial construction projects.
- Suspended flooring systems are gaining popularity for both residential and commercial construction projects. This is increasingly true for projects on sloped construction sites. Traditionally, a sloped site must be leveled by cutting away a suitable area for a foundation, and then erecting substantial retaining shoring to uphold the surrounding terrain. This is often costly, and thus, suspended flooring systems offer an attractive alternative because the land does not have to be substantially altered before construction can begin.
- Another construction technique involves positioning pre-cast slabs or beams into an arranged framework. This method involves less supportwork than traditional poured floors; however, pre-cast slabs or beams are generally too heavy for manual installation and this technique often requires the use of heavy machinery, such as cranes, to position the heavy slabs into the framework, which makes construction projects on sloped construction sites problematic. Additionally, the slabs or beams must be poured and cured off-site and then hauled to the construction site. Not only are there additional costs associated with delivery of the slabs, but the additional handling of the cured slabs, (e.g. truck loading and unloading, lifting the slabs with a crane, positioning the slabs into the framework) presents opportunity for the slabs to become damaged.
- heavy machinery such as cranes
- the ability to span a large area of floor with a minimum of supports during construction is a significant challenge in construction, and is a constant goal of suspended concrete flooring system design.
- Synthetic fibers are excellent alternatives to supplement or replace glass and asbestos fiber reinforcing agents.
- Acrylic fibers are one of the most important types of fibers as reinforcing agents for ambient-cured cement composites. These materials offer a high modulus of elasticity, good alkali resistance and good adhesion when properly oriented in a cement mix. Wet stretch, plastic stretch or heat-transfer fluid mediated stretching techniques assure fiber orientation in the composites, which is required for high modulus characteristics.
- Fiber reinforcing a cement composite gives it the advantageous characteristics of higher tensile strength and a higher modulus of elasticity. These improved characteristics allow the cement to maintain its structural integrity over greater unsupported spans, achieve sufficient structural strength with less material, and offer a reduced cost option because less material is required. Accordingly, it would be advantageous to have a suspended concrete flooring system that takes advantage of the properties of fiber cement products to make such flooring systems more applicable to residential use. It would be a further advantage for a flooring system to combine the benefits of the above-mentioned flooring systems while eliminating the drawbacks of each.
- a pre-cast floor has the benefit of requiring a minimal amount of supportwork, while the poured floor offers the benefits of creating a monolithic floor without the need for slab transportation and heavy machinery installation.
- the framework includes strong, lightweight load-bearing members or supporting walls and joists arranged so as to allow for a large floor span between supports.
- the result is a monolithic concrete floor that is easily constructed, can be installed manually without the need for large machinery, and can span larger unsupported distances thus reducing the necessary framework, installation time, and labor cost.
- a first aspect is a cement flooring system suspended above the ground either by a plurality of spaced-apart load-bearing members or supporting walls arranged substantially parallel to one another supported by traditional footings.
- the system further includes a plurality of spaced-apart joists having opposing sides and arranged at substantially right-angles to the load-bearing members or supporting walls and are supported thereby.
- Each joist except perhaps for the outer joists, has a support shelf formed along the length of each opposing side.
- the system also includes a plurality of deck sheets supported between the joists by the support shelves so as to span the space between the joists in the horizontal plane defined by the support shelves and provide a substructure to receive the poured concrete.
- the deck sheets are corrugated fiber cement sheets.
- a shrinkage control mesh is arranged atop the joists and is oriented in the directions of the load-bearing members and the joists.
- a concrete topping layer is poured atop the corrugated fiber cement sheets and encompasses the shrinkage control mesh.
- the concrete topping layer is formed to have a flat, horizontal upper surface that serves as a floor.
- a second aspect is a method of installing a concrete flooring system suspended above the ground in which a plurality of footings have been previously installed.
- the method includes the step of first arranging a corresponding pier on each of the footings.
- the second step involves positioning and securing a plurality of load-bearing members atop the piers.
- support for the joists can be in the form of supporting walls, such as masonry walls.
- the third step comprises positioning and securing a plurality of spaced apart joists to the plurality of load-bearing members or supporting walls at substantially right angles so that the joists are supported by the load-bearing members or supporting walls and define a space for receiving the fiber cement corrugated sheets.
- the fourth step includes placing a plurality of fiber cement corrugated sheets in the space between the joists so as to be supported in a horizontal plane by the joists and to span the space between the joists.
- the fifth step involves arranging a shrinkage control mesh atop the joists in orientation with the load-bearing members and the joists.
- the final step includes pouring concrete over the corrugated sheets so as to encompass the shrinkage control mesh and to form a flat horizontal floor surface.
- FIG. 1 is a cross-sectional diagram of a suspended concrete flooring system according to one embodiment of the present invention.
- FIG. 2 is a perspective cut-away view of the flooring system of FIG. 1, showing a steel post pier supporting the floor, and also showing the shrinkage control mesh.
- FIG. 3 is a cross-sectional diagram of a joist used in the flooring system in one embodiment of the present invention, showing the rebate and shelf used to support and secure the corrugated sheets shown in FIG. 4 .
- FIG. 4 is a perspective view of a corrugated sheet used in one embodiment of the present invention.
- FIG. 5 is a plan view of an embodiment of a flooring system without the corrugated sheets installed, showing the location of the supporting piers, and the approximate relative dimensions and arrangement of the bearing members and joists.
- FIG. 6 is a cross-sectional diagram of a masonry-type pier suitable for use in one embodiment of the present invention, along with the footing installed in the ground to support the pier.
- FIG. 7 a is a cross-sectional diagram of a suspended concrete flooring system showing an edge detail.
- FIG. 7 b is a cross-sectional diagram of a suspended concrete flooring system showing an edge detail from a view orthogonal to that of FIG. 7 a.
- FIG. 8 a is a cross-sectional diagram of the suspended concrete flooring system showing an external wall detail.
- FIG. 8 b is a cross-sectional diagram of the suspended concrete flooring system showing an external wall detail from a view orthogonal to that of FIG. 8 a.
- FIG. 9 is a flow diagram of the steps associated with installing the flooring system in one embodiment of the present invention.
- FIG. 10 a is an internal set down detail on a ground floor level.
- FIG. 10 b is a view of an internal set down detain on a ground floor level from a view orthogonal to that of FIG. 10 a.
- FIG. 11 a is one embodiment of an external set down detail.
- FIG. 11 b is another embodiment of an external set down detail.
- FIG. 12 a is one embodiment showing a garage slab set down.
- FIG. 12 b is another embodiment showing a garage slab set down detail.
- FIG. 12 c is yet another embodiment showing a garage slab set down detail.
- FIG. 13 a is one embodiment of a verandah edge detail.
- FIG. 13 b is another embodiment of a verandah edge detail.
- FIG. 14 a shows a plan view of a point load detail.
- FIG. 14 b is a cross-sectional view of the point load detail of FIG. 14 a.
- FIG. 15 a is a cross-sectional view of an internal set down detail.
- FIG. 15 b is a cross-sectional view of an internal set down detail from a view orthogonal to that of FIG. 15 a.
- FIG. 16 is a cross-sectional view showing an external set down detail having a continuous slab.
- a suspended concrete flooring system 100 that includes two or more horizontally arranged elongate load-bearing members 110 each having an upper surface 111 and a lower surface 112 .
- Bearing member 110 is preferably constructed of metal, such as 2.5 mm gauge, galvanized, rectangular hollow section (RHS), but any suitable material and configuration, including the use of supporting masonry walls, may be used as a bearing member for the joists as long as it demonstrates the requisite structural properties.
- RHS galvanized, rectangular hollow section
- One such example of a suitable bearing member 110 is SupaGal® RHS Bearer, sold by James Hardie Building Products, Inc., Rosehill, NSW, Australia.
- Bearing member 110 is typically installed on a pier or support post 260 (FIG. 2 ).
- Upper surface 111 of bearing member 110 supports two or more elongate joists 122 , arranged perpendicular to the bearing member 110 and spaced apart so that the bearing members and joists form a support grid.
- the arrangement of joists 122 relative to bearing members 110 is discussed in greater detail below. Before greater discussion of the system, it becomes necessary to describe the joist 122 in relation to FIG. 3 .
- Each joist 122 has an upper surface 123 , a lower surface 124 , and opposing sides 125 .
- Opposing sides 125 each have a rebate 126 with a shelf portion 127 formed along the entire length of the joist 122 near upper surface 123 .
- Rebate 126 and shelf 127 are designed to engage and support the edges of a deck sheet 130 , as discussed below.
- Shelves 127 define a horizontal plane to be spanned by the deck sheets.
- joist 122 has measurements “x”, “y”, and “z.”
- Length “x” is a fixed distance from upper surface 123 to shelf 127 formed on sides 125 , and in one embodiment, is preferably about 60 mm.
- Depth “y” is preferably about 150 mm in one embodiment.
- width “z” preferably is about 110 mm.
- Joists 122 are preferably constructed of metal, such as high strength, galvanized, roll-formed steel, and are preferably fastened to bearing members 110 via self-drilling screws.
- One such joist 122 is the HardifloorTM Joist, sold by James Hardie Building Products, Inc., Rosehill, NSW, Australia.
- the dimensions given are illustrative of one embodiment of the invention, and notably, other configurations of the HardifloorTM Joist are presently available. Other dimension are easily calculable based on the joists 122 and bearing members 110 used.
- system 100 further includes a plurality of deck sheets 130 .
- these deck sheets are corrugated fiber cement sheets having ends 131 and edges 132 , an upper surface 133 and a lower surface 134 .
- Sheets 130 are arranged between joists 122 such that edges 132 fit within rebates 126 , with lower surface 134 at edges 132 supported by shelf 127 .
- Sheets 130 are thus arranged to span the space between the joists and are in a horizontal plane defined by shelves 127 .
- Sheets 130 are designed to be high-strength and highly impact resistant, even when exposed to moisture.
- An exemplary sheet 130 is JH Super 6 corrugated fiber cement sheet, sold under the trade name HardiformTM Corrugate made by James Hardie Building Products, Inc., Rosehill, NSW, Australia.
- the spacing between joists 122 is about 825 mm.
- other sheet dimensions could be used. The disclosed dimensions are based upon the corrugated sheet's strength in supporting wet concrete and other construction loads. Therefore, in contemplating other types of deck sheets, the dimensions and spacing of the joists may change as allowable by the deck sheet strength requirements.
- other types of sheets may be interposed between the joists for a deck layer to support poured concrete. These may include flat fiber cement sheets, composite panels, or extruded panels of various shapes and densities.
- a shrinkage-control mesh 140 made up of a cross-grid of metal rods, preferably steel of F62 or F72.
- the designations F62 and F72 are descriptive codes, referring to characteristics of the mesh.
- F72 refers to steel mesh fabric having 7 mm diameter bars at 200 mm centers.
- Shrinkage control mesh 140 is laid such that the mesh grid is generally oriented in the directions of bearing members 110 and joists 122 , thus providing added concrete tensional strength as well as shrinkage control.
- a concrete topping layer 150 having a floor surface 151 is poured on top of mesh 140 and sheets 130 . Concrete topping layer 150 is finished to form a smooth, horizontal concrete slab surface as required.
- Concrete topping layer 150 is a standard pre-mixed concrete, and in one embodiment, is mixed to achieve a 28-day cured strength of about 20 MPa. Concrete topping layer 150 is applied in a slump to encompass mesh 140 and to preferably have a thickness between about 75 and 105 mm when smooth. Because of this thickness compared with traditional poured floors, only a minimum of formwork is required to install flooring system 100 .
- FIG. 2 shows additional features of a suspended concrete flooring system 100 .
- a plurality of footings poured into the ground to provide a solid base for the flooring system 100 .
- piers 260 mounted atop the footings are piers 260 arranged so as to support the floor at predetermined locations.
- Each pier 260 provides support for the bearing members 110 mounted thereon.
- the bearing members provide support for the plurality of joists 122 .
- each joist 122 is provided with a rebate 126 into which corrugated fiber cement sheets 130 are inserted and supported by shelf 127 . In this way, the joists 122 and sheets 130 provide the necessary formwork for receiving the poured concrete.
- a shrinkage control mesh 140 is placed on top of the joists 122 so that when the concrete is poured, the mesh 140 is encompassed by the concrete 150 and provides increased tensional strength in addition to shrinkage control.
- FIG. 5 shows a plan view of one arrangement of a suspended concrete flooring system 100 .
- joists 122 are laid substantially perpendicular to bearing members 107 , 108 , 109 , and 110 and are fastened to the bearing members with self-drilling screws, as is generally known in the art.
- Bearing members are preferably spaced apart at intervals of length “a.” In one embodiment, length “a” is equal to about 3600 mm. In another embodiment utilizing a 150 mm joist, length “a” may be equal to about 4200 mm.
- the spacing “a” of the bearing members is controlled by the structural properties of the joists 122 . Therefore, joists 122 with greater rigidity and bending strength may be supported at distances longer than described herein.
- the spacing “d” of the piers 260 is a function of the bearing members used in the construction project. The stronger the bearing member, the farther the allowable spacing between the piers 260 .
- Bearing members are supported by piers 161 - 164 .
- First pier 161 and second pier 162 are located under a first internal bearing member 109
- second and third posts 163 and 164 are located under a second bearing member.
- Length “c” defines the distance between a first wall 240 and piers 161 and 163 . In one embodiment, length “c” is equal to about 2000 mm. Length “c” also defines the length between first pier 161 and second pier 162 , and similarly, is the distance between third pier 163 and fourth pier 164 . As noted above, this distance is dependent upon the physical characteristics of the bearing members, and is calculated based upon the material and configuration of the bearing member. The recited dimensions are exemplary and do not limit the spacing contemplated herein.
- first wall 240 Along the perimeter of outer first external bearing member 107 , first wall 240 , second external bearing member 108 , and second wall 241 , are engaged piers 260 (e.g., 260A-260V), described in greater detail below.
- Piers 260 are spaced at intervals of length “d,” calculated to provide sufficient load bearing capability while preserving as large a span as possible with the given thicknesses and materials selected for the construction project.
- FIG. 6 shows a portion of flooring system 100 that illustrates one embodiment of a pier 260 for supporting a load-bearing member 110 and floor system 100 as a whole.
- a footing 420 is formed in the ground and has an upper surface 421 on which rests support column 410 , as is generally known in the art. Footings 420 are preferably made of concrete, and are constructed by the builder in specified locations prior to construction of the flooring system 100 , based on the predetermined design of the flooring system 100 .
- Support column 410 may be a brick pier, as shown in FIG. 6, or may be an adjustable steel post system as shown in FIG. 2 .
- Pier 260 further includes packing 440 placed between bearing member 110 and a support column 410 to position bearing member 110 at a predetermined elevation.
- Packing 440 may be made of compressed fiber cement, or any other material providing sufficient support with minimal compression.
- Each pier 260 has a predetermined height in accordance with the particular design of floor system 100 and the elevation of the ground 430 . This system is especially practical in situations where the ground 430 is uneven, and therefore, each pier 260 may have a different length to achieve a horizontal flooring surface. Additionally, it is sometimes desirable to have floors at separate elevations from one another, for example, in a garage, or sunken room, which require the supporting piers 260 to have different heights.
- Each component of flooring system 100 may be easily handled and installed by construction workers without the use of heavy lifting equipment. Because heavy equipment is not required, the embodiments of the present invention may be used in locations where conventional concrete laying cannot be used, such as sloped building sites.
- the strength of the suspended concrete flooring system has been measured to be greater than the sum of its component strengths, and as a result, provides a flooring system that provides all the strength advantages of an on slab concrete floor while utilizing much less concrete.
- FIGS. 7 a and 7 b show one embodiment of an edge detail of the flooring system 100 .
- the bearing member 110 is supported on a pier (not shown).
- a plurality of joists 122 are arranged on the bearing members 110 to form a supporting grid for the concrete.
- a plurality of supporting deck sheets, such as corrugated fiber cement sheets 130 are inserted into the rebates formed in the joists 122 to create a horizontal surface for supporting the poured concrete.
- a shrinkage control mesh 140 is placed on top of the joists 122 .
- an edge angle 145 is mounted to the joists 122 around the periphery of the floor with self-drilling screws.
- the poured concrete is poured onto the corrugated fiber cement sheets and bounded by the edge angles 145 around the periphery of the floor.
- FIGS. 8 a and 8 b show one embodiment of a flooring system adjacent to an exterior wall of the building.
- Footings are first formed in the ground as is generally known in the art.
- Piers 410 are erected on top of the footings, which provide support for the bearing members 110 .
- the joists 122 may be supported directly by the pier 410 , or by a supporting wall.
- Fastened to the top of the bearing members 110 are joists 122 , separated from the bearing members 110 by packing 440 .
- the packing 440 is ideally compressed fiber cement and allows small elevational adjustments of the piers before installing the bearing members onto the piers. The use of packing 440 ensures that the finished floor will be level, even if the piers are not exactly the same height.
- Deck sheets 130 are supported by the shelves of the joists 122 and provide a supporting platform to receive the poured concrete.
- a shrinkage control mesh 140 is placed atop the joists 122 , after which edge angles 145 are fastened to the joists around the periphery of the floor to provide a boundary for the poured concrete.
- a flashing and termite barrier 167 may be installed by the builder along outer walls 160 of the structure.
- Piers 410 along the outer periphery of the flooring system are termed engaged piers and provide adequate support for the flooring system as well as any bearing walls or other structure built on top of them.
- Engaged piers 410 are more numerous than point load piers because they are the supporting structure for the entire building structure, while point load piers serve to support only one location along the flooring system.
- Step 610 Pre-designing suspended concrete flooring system
- designers use a computer program to calculate the required number of piers, bearing members, and joists, and to create a design and blueprint to be used for a specific suspended concrete flooring system.
- Step 620 Installing footings and piers
- the builder installs strip footings, perimeter face brick walls and engaged piers to required height, and isolated piers (such as masonry or steel post piers) by conventional methods per the design.
- the footings required to support the piers will already have been installed by the builder.
- Step 630 Positioning bearing members, joists, and corrugated fiber cement sheets
- the bearing members are positioned and fixed across engaged piers. After the bearing member installation is complete, the joists are positioned and fixed to bearing members preferably with self-drilling screws. Following joist installation, the deck sheets are positioned in the joist rebates and span the distance between joists.
- Step 640 Installing plumbing services
- a plumber installs plumbing services through the deck sheets. Holes may be made in the deck sheets for receiving plumbing services by striking it with a hammer, by drilling, or other known techniques.
- Step 650 Placing shrinkage control mesh
- the shrinkage control mesh is placed over the joists and deck sheets.
- Step 660 Installing formwork
- a minimal amount of formwork primarily edge angles, is installed around the perimeter of the suspended concrete flooring system, and in any set down locations to create a bounded volume prior to concrete pouring.
- Step 670 Placing and finishing concrete topping
- Pre-mixed concrete is poured onto the corrugated sheets and over the shrinkage control mesh, and is floated to an in-situ finish, thereby forming a flat, horizontal floor surface. After 24 hours, the floor supports walking; after one week, the floor may be worked upon to continue construction. In one embodiment, the suspended concrete flooring system is considered fully cured after 28 days.
- the flooring system underside may be finished in any traditional method, such as installing battens to the bearing members and attaching plasterboard sheets thereon.
- FIGS. 10 a and 10 b show additional details regarding a typical internal set down.
- a set down is created. Examples of this type of set down are to create a “sunken” room or a “raised” floor. The degree of set down is determined by the height difference in adjacent piers 410 .
- FIGS. 11 a and 11 b show details for creating an external set down.
- the interior floor is separated from the exterior by an outer wall 160 , which may be of any traditional construction technique.
- the exterior wall may be directly supported on a footing 420 , as shown in figure 11 a , or may be supported by the concrete floor, according to FIG. 11 b .
- the bearing member may be omitted and the joist can be supported directly by a supporting wall 160 .
- This construction detail may be implemented for creating an external floor, such as for a patio.
- FIGS. 12 a through 12 c show various options for creating a garage slab 184 .
- FIG. 12 a shows one arrangement for creating a garage slab 184 set down. This is formed by pouring the garage slab independent of the suspended concrete flooring system in a traditional manner. Because a garage slab 184 is intended to support loads greater than an interior concrete floor, the garage slab 184 is usually much thicker than an interior slab, and is preferably a slab on ground, which allows the garage slab 184 to have the added support of the underlying ground.
- FIG. 12 b illustrates how a slab on ground garage floor 184 can be used as a supporting structure for an interior floor.
- a suspended floor can subsequently be constructed on top of the garage slab 184 .
- a bearing member is not required, as the joist 122 is supported directly by the garage slab 184 . This creates a set down for the garage slab 184 below the interior floor.
- FIG. 12 c illustrates another embodiment for creating a set down garage slab 184 .
- This construction technique utilizes a shelf formed in the garage slab 184 for supporting the joists 122 .
- a bearing member is not required since the garage slab 184 provides the necessary support along this periphery of the interior floor.
- the set down is optional by varying the thickness of the garage slab 184 as desired.
- FIGS. 13 a and 13 b show one embodiment for creating a verandah edge.
- An external wall 160 provide support for the concrete layer 150 .
- traditional formwork is required to create a bounded volume for containing the poured concrete until cured.
- bearing member 110 could be omitted joist 122 could extend to, and be supported by, the supporting wall 160 .
- FIGS. 14 a and 14 b show one embodiment for forming a point-load pier for providing additional support at a discrete location along a suspended concrete floor.
- a traditional footing 420 is provided to support a pier 410 , which may be any suitable pier.
- Edge angles 180 are affixed to the pier 410 by self-drilling screws 148 and provide a supporting shelf for the deck sheets 130 .
- the deck sheets 130 are placed to allow the pier 410 to protrude therethrough. As the concrete topping layer 150 is poured, it rests directly upon the point load pier 410 . In this way, the pier 410 provides increased support to a discrete location along the suspended concrete floor.
- FIGS. 15 a and 15 b show an additional embodiment for creating an internal set down.
- a metal rod 186 such as a Y 12 bar, is formed into substantially a Z-shape and is placed on top of the deck sheets 130 to provide additional strength for the concrete.
- the set down height “x” is determined by the builder according to the building plans.
- the use of the metal rod 186 provides additional strength to the poured concrete and allows the discrete-height flooring to be monolithic and poured at the same time. Traditional formwork is required to contain the set down portion of the floor until cured.
- FIG. 16 shows a continuous slab forming an interior and exterior floor.
- the exterior floor may be set down a distance “x” as per the building plan.
- the interior floor is supported as described above, while the exterior suspended floor may be supported by an exterior wall 160 , in addition to the pier 410 and bearing member 110 .
- the exterior slab provides support for an exterior wall 160 erected thereon. This embodiment has the added benefit of creating a monolithic floor and allowing the entire floor to be poured at once.
- the flooring system 100 described above has many advantages.
- a first advantage is that it is easily installed.
- System 100 is modular and can be put in place step by step without heavy equipment.
- the lightweight steel supporting members, i.e., the bearing members 110 and joists 122
- a second advantage of system 100 is that installation and subsequent removal of extensive formwork is not required. The minimal amount of formwork is integral to the floor and is left permanently in place.
- a third advantage of system 100 is that it is cost competitive with traditional suspended concrete flooring systems.
- a fourth advantage of system 100 is that the suspended concrete flooring system components are easily mass-produced compared to pre-cast concrete and cast steel sections associated with other flooring systems.
- a fifth advantage of system 100 is that the suspended concrete flooring system exhibits greater strength than the sum of its parts—known as “composite action,” which results in a floor that is exceptionally strong compared to the individual strengths of the structural members.
- a sixth advantage of the system 100 is that workers may walk on the suspended concrete flooring system 24 hours after the concrete topping is applied. Continued work may be performed on the suspended concrete flooring system after 7 days of curing. This allows for fast construction of the flooring system and the associated structures (e.g., the building for which the floor has been installed). The suspended nature of the system allows for under floor access for plumbing, electrical, or pest control services. Finally, there is no need to cut and fill sloping terrain prior to construction.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Floor Finish (AREA)
Abstract
Description
Claims (19)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/978,636 US6755001B2 (en) | 2000-10-16 | 2001-10-15 | Suspended concrete flooring system and method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US24104200P | 2000-10-16 | 2000-10-16 | |
US09/978,636 US6755001B2 (en) | 2000-10-16 | 2001-10-15 | Suspended concrete flooring system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
US20020078646A1 US20020078646A1 (en) | 2002-06-27 |
US6755001B2 true US6755001B2 (en) | 2004-06-29 |
Family
ID=26933943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/978,636 Expired - Lifetime US6755001B2 (en) | 2000-10-16 | 2001-10-15 | Suspended concrete flooring system and method |
Country Status (1)
Country | Link |
---|---|
US (1) | US6755001B2 (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030196402A1 (en) * | 2001-06-21 | 2003-10-23 | Roen Roger C. | Structurally integrated accessible floor system |
US20050097859A1 (en) * | 2003-11-12 | 2005-05-12 | Sciortino Philip J. | Process and apparatus for making corrugated walls |
US20050193662A1 (en) * | 2004-02-23 | 2005-09-08 | Stadter Victor E. | Floor structure |
US20070000198A1 (en) * | 2005-06-30 | 2007-01-04 | United States Gypsum Company | Corrugated steel deck system including acoustic features |
US7181888B1 (en) * | 2006-01-12 | 2007-02-27 | George Facaros | Interconnected double hull construction for basements |
US20070245642A1 (en) * | 2006-04-07 | 2007-10-25 | Wigasol Ag | Floor system |
US20090126312A1 (en) * | 2007-11-20 | 2009-05-21 | Bcm Developments Ltd. | Method of building construction |
US20090282766A1 (en) * | 2001-06-21 | 2009-11-19 | Roen Roger C | Structurally integrated accessible floor system |
US20110047917A1 (en) * | 2009-09-01 | 2011-03-03 | Roen Roger C | Structurally integrated accessible floor system |
US20130133282A1 (en) * | 2010-01-26 | 2013-05-30 | Piers St. John Spencer Galliard Cave | Loft flooring system |
US8777120B2 (en) * | 2006-04-15 | 2014-07-15 | International Business Machines Corporation | Hydronic radiant flooring heating system |
AU2013201787B2 (en) * | 2012-10-17 | 2015-07-23 | Grc Environments Pty Ltd | Improved decking assembly using glass reinforced concrete |
US10822750B2 (en) | 2018-07-27 | 2020-11-03 | Edward H. Easter | Resilient deck structure |
US11377801B2 (en) | 2018-07-27 | 2022-07-05 | Edward H. Easter | Resilient deck structure |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7131239B2 (en) * | 2002-04-09 | 2006-11-07 | Williams Jonathan P | Structural slab and wall assembly for use with expansive soils |
US8234827B1 (en) * | 2005-09-01 | 2012-08-07 | Schroeder Sr Robert | Express framing building construction system |
US7591110B2 (en) * | 2006-11-10 | 2009-09-22 | Advanced Building Concepts, Llc | Building foundation |
CA2694271C (en) * | 2007-07-02 | 2016-04-26 | Ecoform Pty Ltd | An abutment for a modular decking system |
WO2014165913A1 (en) * | 2013-04-12 | 2014-10-16 | Bfre Pty Ltd As Trustee | Slab construction |
TWM459265U (en) * | 2013-04-25 | 2013-08-11 | zhe-an Cai | Stone raised floor |
EP3480135B1 (en) * | 2017-11-06 | 2025-05-21 | Kärcher Futuretech GmbH | Mobile container building for military, humanitarian and/or expedition-like use |
AU2021103539C4 (en) * | 2021-06-22 | 2022-12-15 | SHAPE Australia Pty Limited | A flooring panel, system and method for constructing a fire-rated suspended floor |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4335557A (en) * | 1978-08-23 | 1982-06-22 | Verco Manufacturing, Inc. | Shear load resistant structure |
US4597233A (en) * | 1984-03-05 | 1986-07-01 | Rongoe Jr James | Girder system |
US5519971A (en) * | 1994-01-28 | 1996-05-28 | Ramirez; Peter B. | Building panel, manufacturing method and panel assembly system |
US5809722A (en) * | 1997-02-06 | 1998-09-22 | Keith M. Wright | Girder supported reinforced concrete slab building structures with shearing connectors, and methods of constructing the building structures and connectors |
US5857292A (en) * | 1979-11-13 | 1999-01-12 | Harold Simpson, Inc. | Roof support apparatus |
US5927041A (en) * | 1996-03-28 | 1999-07-27 | Hilti Aktiengesellschaft | Mounting rail |
US6044610A (en) * | 1994-04-22 | 2000-04-04 | Banks Lumber Co., Inc. | Floor frame assembly |
US6094873A (en) * | 1997-11-24 | 2000-08-01 | Hoffman; Keith M. | Foundation for manufactured homes |
US6189274B1 (en) * | 1995-12-13 | 2001-02-20 | Ahto Ollikainen | Building horizontal structure |
US6192636B1 (en) * | 1992-09-18 | 2001-02-27 | Hayashi Kensetsu Kougyou Co., Ltd. | Method of forming a base structure assembly used in a wooden axial structure in wooded architectural construction and joint parts thereof |
-
2001
- 2001-10-15 US US09/978,636 patent/US6755001B2/en not_active Expired - Lifetime
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4335557A (en) * | 1978-08-23 | 1982-06-22 | Verco Manufacturing, Inc. | Shear load resistant structure |
US5857292A (en) * | 1979-11-13 | 1999-01-12 | Harold Simpson, Inc. | Roof support apparatus |
US4597233A (en) * | 1984-03-05 | 1986-07-01 | Rongoe Jr James | Girder system |
US6192636B1 (en) * | 1992-09-18 | 2001-02-27 | Hayashi Kensetsu Kougyou Co., Ltd. | Method of forming a base structure assembly used in a wooden axial structure in wooded architectural construction and joint parts thereof |
US5519971A (en) * | 1994-01-28 | 1996-05-28 | Ramirez; Peter B. | Building panel, manufacturing method and panel assembly system |
US6044610A (en) * | 1994-04-22 | 2000-04-04 | Banks Lumber Co., Inc. | Floor frame assembly |
US6189274B1 (en) * | 1995-12-13 | 2001-02-20 | Ahto Ollikainen | Building horizontal structure |
US5927041A (en) * | 1996-03-28 | 1999-07-27 | Hilti Aktiengesellschaft | Mounting rail |
US5809722A (en) * | 1997-02-06 | 1998-09-22 | Keith M. Wright | Girder supported reinforced concrete slab building structures with shearing connectors, and methods of constructing the building structures and connectors |
US6094873A (en) * | 1997-11-24 | 2000-08-01 | Hoffman; Keith M. | Foundation for manufactured homes |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090282766A1 (en) * | 2001-06-21 | 2009-11-19 | Roen Roger C | Structurally integrated accessible floor system |
US20030196402A1 (en) * | 2001-06-21 | 2003-10-23 | Roen Roger C. | Structurally integrated accessible floor system |
US8850770B2 (en) | 2001-06-21 | 2014-10-07 | Roger C. Roen | Structurally integrated accessible floor system |
US7546715B2 (en) * | 2001-06-21 | 2009-06-16 | Roen Roger C | Structurally integrated accessible floor system |
US20050097859A1 (en) * | 2003-11-12 | 2005-05-12 | Sciortino Philip J. | Process and apparatus for making corrugated walls |
US7010896B2 (en) * | 2003-11-12 | 2006-03-14 | Sciortino Philip J | Process and apparatus for making corrugated walls |
US20050193662A1 (en) * | 2004-02-23 | 2005-09-08 | Stadter Victor E. | Floor structure |
US20070000198A1 (en) * | 2005-06-30 | 2007-01-04 | United States Gypsum Company | Corrugated steel deck system including acoustic features |
US7908810B2 (en) * | 2005-06-30 | 2011-03-22 | United States Gypsum Company | Corrugated steel deck system including acoustic features |
US7181888B1 (en) * | 2006-01-12 | 2007-02-27 | George Facaros | Interconnected double hull construction for basements |
US7874111B2 (en) * | 2006-04-07 | 2011-01-25 | Wigasol Ag | Floor system |
US20070245642A1 (en) * | 2006-04-07 | 2007-10-25 | Wigasol Ag | Floor system |
US8777120B2 (en) * | 2006-04-15 | 2014-07-15 | International Business Machines Corporation | Hydronic radiant flooring heating system |
US20090126312A1 (en) * | 2007-11-20 | 2009-05-21 | Bcm Developments Ltd. | Method of building construction |
US20110047917A1 (en) * | 2009-09-01 | 2011-03-03 | Roen Roger C | Structurally integrated accessible floor system |
US9273464B2 (en) | 2009-09-01 | 2016-03-01 | Roger C. Roen | Structurally integrated accessible floor system |
US20130133282A1 (en) * | 2010-01-26 | 2013-05-30 | Piers St. John Spencer Galliard Cave | Loft flooring system |
US9206602B2 (en) * | 2010-01-26 | 2015-12-08 | Piers St. John Spencer Galliard Cave | Loft flooring system |
AU2013201787B2 (en) * | 2012-10-17 | 2015-07-23 | Grc Environments Pty Ltd | Improved decking assembly using glass reinforced concrete |
US10822750B2 (en) | 2018-07-27 | 2020-11-03 | Edward H. Easter | Resilient deck structure |
US11377801B2 (en) | 2018-07-27 | 2022-07-05 | Edward H. Easter | Resilient deck structure |
Also Published As
Publication number | Publication date |
---|---|
US20020078646A1 (en) | 2002-06-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6755001B2 (en) | Suspended concrete flooring system and method | |
US6244008B1 (en) | Lightweight floor panel | |
US9982445B2 (en) | Insulated concrete form and method of using same | |
US5678378A (en) | Joist for use in a composite building system | |
US7017316B2 (en) | Concrete panel construction system | |
US8099918B2 (en) | Special and improved configurations for unitized post tension block systems for masonry structures | |
US5930965A (en) | Insulated deck structure | |
JP2023514035A (en) | MODULAR COMPOSITE ACTION PANEL AND STRUCTURAL SYSTEM USING THE SAME | |
US20150247317A1 (en) | Tension Reinforcement for Concrete | |
US12345044B2 (en) | Composite structure including a structural panel and a metal support | |
US5373675A (en) | Composite building system and method of manufacturing same and components therefor | |
CN103797197A (en) | Building structure with precast monolithic walls and floors | |
US20070044392A1 (en) | Modular building construction employing concrete mold assembly | |
US20050115185A1 (en) | Masonry block constructions with polymeric coating | |
US20040098934A1 (en) | Load bearing building panel | |
US7700024B1 (en) | Corrugated concrete wall panel form and method of construction thereof | |
CN218990425U (en) | Fully assembled stairwell | |
WO2012060863A2 (en) | Wall panel construction and method for in situ assembly | |
AU2010256330A1 (en) | Modular building system | |
RU2652402C1 (en) | Method of multi-storey building lightened floors installation | |
RU2175045C2 (en) | Monolithic concrete building | |
US20240209616A1 (en) | Framing member, construction panel, and methods of manufacturing | |
RU76656U1 (en) | COMMUNICATED PLATE-SPACER (OPTIONS), ASSEMBLY UNIT FOR COMMUNICATED PLATE-SPACERS (OPTIONS) AND FRAMED-COMMUNICATED OR COMMUNICATED MOBILE PLATFORM | |
AU2007200925A1 (en) | Building Construction System | |
JPS6215368Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: JAMES HARDIE RESEARCH PTY LIMITED, AUSTRALIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:EATON, PETER FRANCIS;REEL/FRAME:012452/0840 Effective date: 20020111 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
AS | Assignment |
Owner name: JAMES HARDIE INTERNATIONAL FINANCE B.V., NETHERLAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JAMES HARDIE RESEARCH PTY LIMITED;REEL/FRAME:016309/0067 Effective date: 20050207 Owner name: JAMES HARDIE INTERNATIONAL FINANCE B.V.,NETHERLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JAMES HARDIE RESEARCH PTY LIMITED;REEL/FRAME:016309/0067 Effective date: 20050207 |
|
AS | Assignment |
Owner name: JAMES HARDIE INTERNATIONAL FINANCE B.V., NETHERLAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JAMES HARDIE RESEARCH PTY LIMITED;REEL/FRAME:015980/0271 Effective date: 20050207 Owner name: JAMES HARDIE INTERNATIONAL FINANCE B.V.,NETHERLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JAMES HARDIE RESEARCH PTY LIMITED;REEL/FRAME:015980/0271 Effective date: 20050207 |
|
CC | Certificate of correction | ||
FPAY | Fee payment |
Year of fee payment: 4 |
|
AS | Assignment |
Owner name: JAMES HARDIE TECHNOLOGY LIMITED,IRELAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JAMES HARDIE INTERNATIONAL FINANCE B.V.;REEL/FRAME:024103/0809 Effective date: 20091215 Owner name: JAMES HARDIE TECHNOLOGY LIMITED, IRELAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JAMES HARDIE INTERNATIONAL FINANCE B.V.;REEL/FRAME:024103/0809 Effective date: 20091215 |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Free format text: PAYER NUMBER DE-ASSIGNED (ORIGINAL EVENT CODE: RMPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FPAY | Fee payment |
Year of fee payment: 8 |
|
FPAY | Fee payment |
Year of fee payment: 12 |