US534919A - And nicholas h - Google Patents

And nicholas h Download PDF

Info

Publication number
US534919A
US534919A US534919DA US534919A US 534919 A US534919 A US 534919A US 534919D A US534919D A US 534919DA US 534919 A US534919 A US 534919A
Authority
US
United States
Prior art keywords
dike
piles
pile
dikes
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Publication date
Application granted granted Critical
Publication of US534919A publication Critical patent/US534919A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment

Definitions

  • spur or wing dikes of New Orleans, La parish, State of Louthat class of dikes, known as spur or wing dikes, and it has for its object to provide a dike of this character which will possess the required stability to withstand at all times the current pressure, which will effectively serve to deflect the current in the direction desired and which can be economicallyand quickly constructed.
  • a further object of our invention is to provide a dike of such construction and disposed relatively to the direction of the current, in such a manner that the river bed at the base of the dike cannot be washed away, or the dike undermined.
  • FIG. 1 is a diagrammatic view of a portion of a river, showing the manner in which our improved dikes are set, relatively to the direction of the current.
  • Fig. 2 is a side elevation of one of ourimproved dikes.
  • Fig. 3 is a detail perspective View of a portion of the upper end of the dike, illustrating the manner of bracing the upper ends of the piles.
  • Fig. 4 is a detail view illustrating one way of Fig.
  • Fig. 5 is a cross section of the dike on line 5-5 Fig. 2.
  • Figs. 6 and 6 are detail perspective views hereinafter more particularly referred to.
  • Fig. 7 is a side view of a modified arrangement of the piles, and
  • Fig. 8 is a diagram view hereinafter referred to.
  • Fig. 9 illustrates in detail a modified construction of a settional pile.
  • spur or wing dikes have been arranged to project on an obtuse angle, that is, in the direction of the current, whereby to avoid receiving the full impact force of such current, while deflecting Serial No. 513,103- (No model.)
  • our improved dike is constructed of a series of piles joined together and braced to form a solid and compact body.
  • the piles may be all formed of a single length, but when used in very deep streams we form each piledouble and spliced together, as shown.
  • the dike is made of stepped portions, 2'. e., the portion X which is disposed above the low water line extends a short distance out, and has its front edge inclined downward as at X, while the main or body portion projects up just above the low water level and is extended out into the stream any desired distance.
  • diagonal braces D are employed for the main or body portions, which braces are secured at their upper ends by bolts d to the piles. As shown in Fig.
  • braces are arranged in pairs to straddle the piles, and to provide for securing such braces to such piles at points below the water line, the braces have cross boltsD at suitable intervals, and to hold the braces in place their ends in practice are weighted,which keeps them down, and as the angle at which they are held is known, at points where the cross bolts D are, the piles at such points are cut out to form a notched way D which, when the pile is driven home registers with the cross bolt D and forms a seat therefor in which it is held by the next pile driven in place.
  • the distance between the bolts D is sufficient to allow of a springing of the bar between such points, when pulled upward, which can be done by attaching a rope to the end of the bar and pulling it upward by a suitably arranged wrench provided for such purpose, which is loosened when the lower end of the last notched pile passes the bolt D.
  • This allows the bolt to be pressed tightly against the notched pile by the spring of the brace whereby when the notch reaches the bolt, such bolt will spring into the notch.
  • Fig. 9 we have shown a modified construction of a spliced pile, such comprising a series of single pile members placed end to end, which are secured together by the side timbers 0 0 to which are fitted the dovetail and grooved strips B, which timbers and strips are nailed to the pile as shown.
  • An improved dike formed of piles joined at the edges and braced to form a solid mass disposed or projected into the stream, whereby to form an eddy at each side, said dike having portions at its upper end below the water line left free for the passage of water, substantially as shown and for the purposes specified.
  • An improved dike formed of a series of piles, the upper ends of the innermost piles being extended upward, and joined with the lowermost section by an inclined or stepped portion, and horizontal braces connecting the upper ends of the upper and lower sections of the piles substantially as and for the purpose shown and described.
  • a dike formed of aseries of pilesjoined at their edges and braced to form a solid mass, and projected into the stream to form eddies at each side, the body of such dike having water ways or apertures to admit of the pas sage of mixed water and silt or mud, from one eddy to the other all substantially as and for the purposes described.
  • An improved dike formed of a series of piles joined to form a solid mass, and having transverse apertures or Water ways near its upper end substantially as and for the purpose shown and described.
  • bracebars extended diagonally downward below the water line, and pivotally connected at their upper ends to the piles, said brace bars held to straddle the piles, and provided at intervals with transverse bolts, and the tie piles having notches adapted to receive the said transverse bolts when they register with such bolts, all sub stantially as shown and forthe purposes described.
  • An improved spur dike consisting of a member formed of sections spliced together, series of piles held closely together to form a all substantially as and for the purposes desolid body, horizontal brace bars secured to scribed.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Description

R. H. P.& H. SEWALL.
DIKE.
Patent ed Feb. 26, 1895.
(NoModeL) 2 sheets -sheet 2.
R. H. P. & N. H. SEWALL.
DIKE.
No. 534,919. Patented Feb. 26, 1895.
Z Z W a. a W
W/TNESSES:
grwiwlasl ,8 all A TTOHNEYS.
' splicing the piles.
PATENT FFIQE.
ROBERT H. F. SEWALL, OF NEWV ORLEANS, LOUISIANA, AND NICHOLAS H. SEWALL, OF BESSEMEB, ALABAMA.
DIKE.
SPECIFICATION formingpart of Letters Patent No. 534,919, dated February 26, 1895.
Application'illed May 31, 1894-.-
To all whom it may concern.-
Be it known that we, ROBERT H. F. SEWALL,
of New Orleans, Orleans parish, State of Louthat class of dikes, known as spur or wing dikes, and it has for its object to provide a dike of this character which will possess the required stability to withstand at all times the current pressure, which will effectively serve to deflect the current in the direction desired and which can be economicallyand quickly constructed.
A further object of our invention is to provide a dike of such construction and disposed relatively to the direction of the current, in such a manner that the river bed at the base of the dike cannot be washed away, or the dike undermined.
'With other minor objects in view, which will hereinafter be referred to, our invention consists in the peculiar arrangement, and construction of a dike, such aswill be first described in detail and then particularly pointed out in the appended claims, reference being had to the accompanying drawings,in which- Figure 1 is a diagrammatic view of a portion of a river, showing the manner in which our improved dikes are set, relatively to the direction of the current. Fig. 2 is a side elevation of one of ourimproved dikes. Fig. 3 is a detail perspective View of a portion of the upper end of the dike, illustrating the manner of bracing the upper ends of the piles. Fig. 4 is a detail view illustrating one way of Fig. 5 is a cross section of the dike on line 5-5 Fig. 2. Figs. 6 and 6 are detail perspective views hereinafter more particularly referred to. Fig. 7 is a side view of a modified arrangement of the piles, and Fig. 8 is a diagram view hereinafter referred to. Fig. 9 illustrates in detail a modified construction of a settional pile.
Heretofore, so far as we know, spur or wing dikes have been arranged to project on an obtuse angle, that is, in the direction of the current, whereby to avoid receiving the full impact force of such current, while deflecting Serial No. 513,103- (No model.)
it inward. In such arrangement of dike it has been found in use, that the current will engage such dikes practically in the direction indicated by arrows in Fig. 8 of the drawings, which not alone continuously washes away, to a measure, the bank at the inner end of such dike, but also washes out the earth at the front and base of the dike until it undermines the same, and thereby soon removes its base support, which renders it (the dike) useless. To overcome this very objectionable feature, we have found that by projecting the dike slightly at an acute angle to the direction of the current, it forms not only a check for the current, to deflect it as desired, but also produces an eddy in front ofand to the rear of the dike, which serves to change the channel or as the mud and silt in such eddies will de-v posit at each side of the dike, and thereby maintain at all times, a compact and solid foundation for such dike.
Referring now more particularly to Figs. 2, 3, 4. and 5 of the drawings it will be noticed our improved dike is constructed of a series of piles joined together and braced to form a solid and compact body. At this point we desire to state that, when used in shallow streams, the piles may be all formed of a single length, but when used in very deep streams we form each piledouble and spliced together, as shown.
The detailed construction of our dike is best explained as follows: At the point where it is desired to build a dike, piles are driven into the ground on shore as shown at a, and such piles are joined by dovetailed tongue and groove connections B B as most clearly shown in Fig. 3, and aftera number of the piles have been successively joined and driven home, their upper ends are securely braced by the horizontal beams O O, which are bolted to the said upper ends as shown. In case the bottom of the river is of a depth greater than the ordinarylength of pile,a long pile is first formed, by joining two sets of piles, by splicing, which is preferably done in the manner most clearly shown at c c in Fig. 4.
It will be noticed by reference to Fig. 2 that the dike is made of stepped portions, 2'. e., the portion X which is disposed above the low water line extends a short distance out, and has its front edge inclined downward as at X, while the main or body portion projects up just above the low water level and is extended out into the stream any desired distance. As an additional strengthening means diagonal braces D are employed for the main or body portions, which braces are secured at their upper ends by bolts d to the piles. As shown in Fig. 5 such braces are arranged in pairs to straddle the piles, and to provide for securing such braces to such piles at points below the water line, the braces have cross boltsD at suitable intervals, and to hold the braces in place their ends in practice are weighted,which keeps them down, and as the angle at which they are held is known, at points where the cross bolts D are, the piles at such points are cut out to form a notched way D which, when the pile is driven home registers with the cross bolt D and forms a seat therefor in which it is held by the next pile driven in place.
In practice the distance between the bolts D is sufficient to allow of a springing of the bar between such points, when pulled upward, which can be done by attaching a rope to the end of the bar and pulling it upward by a suitably arranged wrench provided for such purpose, which is loosened when the lower end of the last notched pile passes the bolt D. This allows the bolt to be pressed tightly against the notched pile by the spring of the brace whereby when the notch reaches the bolt, such bolt will spring into the notch.
As the greatest amount of silt and mud deposit occurs at the front of the dike, and as it is desirable that the deposit on each side should be nearly alike, we form the dike piles with a series of apertures or openings F, through which some of the water passes and as such water passes through from the eddy in front, it follows, that as it enters the rear eddy a large amount of the silt and mud which passes through the openings F, will deposit at the rear of the dike. See Fig. 5. Instead of providing holes in the piles as shown in Fig. 5, it is mainifest that water ways may be formed by driving each alternate pile lower, at a point below the low water line, as shown in Fig. 7. This allows for a mud deposit at the rear, and also relieves thedike from considerable lateral strain.
It is also manifest that by our improved system, a mud sill can be easily constructed across streams, by driving the center piles down to near the bed of the river.
From the foregoing it will be readily seen that we provide a simple but'effective dike, which can be built without interfering with the current, and as it is gradually formed from the shore inward, it follows, that it cannot be weakened by the current. Furthermore by projecting it substantially at an upstream angle, the danger of its being washed away by undermining is entirely avoided, and by forming it of piles spliced, and braced as shown, it can be adapted for use in any stream where wing or spur dikes may be required.
It is obvious that our improved construction of dike can be also used for closing crevasses and the like, and if desired the dikes may have anchor braces extended to the shore, as indicated in dotted lines in Fig. 1.
In Fig. 9 we have shown a modified construction of a spliced pile, such comprisinga series of single pile members placed end to end, which are secured together by the side timbers 0 0 to which are fitted the dovetail and grooved strips B, which timbers and strips are nailed to the pile as shown.
Having thus described our invention, what we claim, and desire to secure by Letters Patent, is
1. An improved dike formed of piles joined at the edges and braced to form a solid mass disposed or projected into the stream, whereby to form an eddy at each side, said dike having portions at its upper end below the water line left free for the passage of water, substantially as shown and for the purposes specified.
2. An improved dike formed of a series of piles, the upper ends of the innermost piles being extended upward, and joined with the lowermost section by an inclined or stepped portion, and horizontal braces connecting the upper ends of the upper and lower sections of the piles substantially as and for the purpose shown and described.
3. As an improvement in bank protecting dikes,a dike formed of aseries of pilesjoined at their edges and braced to form a solid mass, and projected into the stream to form eddies at each side, the body of such dike having water ways or apertures to admit of the pas sage of mixed water and silt or mud, from one eddy to the other all substantially as and for the purposes described.
4. An improved dike formed of a series of piles joined to form a solid mass, and having transverse apertures or Water ways near its upper end substantially as and for the purpose shown and described.
5. As an improvement in dikes, in combination with the piles, of bracebars extended diagonally downward below the water line, and pivotally connected at their upper ends to the piles, said brace bars held to straddle the piles, and provided at intervals with transverse bolts, and the tie piles having notches adapted to receive the said transverse bolts when they register with such bolts, all sub stantially as shown and forthe purposes described.
6. An improved spur dike, consisting of a member formed of sections spliced together, series of piles held closely together to form a all substantially as and for the purposes desolid body, horizontal brace bars secured to scribed.
the upper ends thereof, diagonal brace bars R. H. F. SEWALL. 5 pivotally connected at their upper ends to N. H. SEWALL.
the piles, provided with transverse pins, and notched portions in the piles adapted to re- \Vitnesses to signature of R. H. F. Sewall: ceive the said pins all substantially as shown JOHN J. RYAN, and for the purposes described. P. T. NICHOLSON.
IO 7. As an improvement in the construction Witnesses for N. H. Sewall:
of dikes, dams, and the like, a pile formed of H. E. KIRK,
' a plurality of members bolted together, each M. J. McADoRY.
US534919D And nicholas h Expired - Lifetime US534919A (en)

Publications (1)

Publication Number Publication Date
US534919A true US534919A (en) 1895-02-26

Family

ID=2603681

Family Applications (1)

Application Number Title Priority Date Filing Date
US534919D Expired - Lifetime US534919A (en) And nicholas h

Country Status (1)

Country Link
US (1) US534919A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3333420A (en) * 1964-10-05 1967-08-01 Kenneth W Henson Method and system for controlling the course of a river
US3461674A (en) * 1967-01-20 1969-08-19 Dow Chemical Co River management
US20040206516A1 (en) * 2002-05-31 2004-10-21 Benedict Charles E. Permanent and semi-permanent groyne structures and method for shoreline and land mass reclamation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3333420A (en) * 1964-10-05 1967-08-01 Kenneth W Henson Method and system for controlling the course of a river
US3461674A (en) * 1967-01-20 1969-08-19 Dow Chemical Co River management
US20040206516A1 (en) * 2002-05-31 2004-10-21 Benedict Charles E. Permanent and semi-permanent groyne structures and method for shoreline and land mass reclamation
US6932539B2 (en) 2002-05-31 2005-08-23 Benedict Engineering Co., Inc. Permanent and semi-permanent groyne structures and method for shoreline and land mass reclamation

Similar Documents

Publication Publication Date Title
US534919A (en) And nicholas h
US946841A (en) Coffer-dam for placer-mining and pier-building.
US1165906A (en) Snow-fence.
US1877113A (en) Pile structure and method of making and using the same
US1584766A (en) Dike
US510264A (en) Bridge construction
US645885A (en) Piling.
US757368A (en) Construction of bulkheads.
US426807A (en) Wire riprap and jetty work
US752781A (en) Gabion
US202428A (en) Improvement in water-bed fences
US565019A (en) Newbueg
US411704A (en) Construction of breakwaters
US611588A (en) Protecting shores
US1858976A (en) Dike
US1968993A (en) Slope-retainer
US325127A (en) Submarine wall
US214299A (en) Improvement in breakwaters or piers
US258025A (en) Levee
US589856A (en) eabitz
US459973A (en) Bulk-head
US979036A (en) Snow-fence.
US408046A (en) Log-boom
US275132A (en) Thomas e
US207537A (en) Improvement in fences