Authority
US
United States
Prior art keywords
wall
concrete
trench
earthen
stressing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00231752A
Inventor
N Jurina
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IMPRESA COSTRUZIONI OPERE SPEC
Original Assignee
IMPRESA COSTRUZIONI OPERE SPEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IMPRESA COSTRUZIONI OPERE SPEC filed Critical IMPRESA COSTRUZIONI OPERE SPEC
Application granted granted Critical
Publication of US3760594A publication Critical patent/US3760594A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Definitions

  • ABSTRACT [63] fggiinugtizn-ingart of Ser. No. 850,101, Aug. A method for the construction of subterranean partia an one tions or diaphragm walls in concrete, of the type in which a trench is excavated in the ground by known [30] Fore'gn Apphcauon Pmmty Data means so that when the casting concrete is effected, the June 11, 1969 Italy 18059 A/69 walls f the trench assume directly the f i f moulding boxes. Prior to pouring the concrete, a set of [S2] U.S. Cl. 61/39 meta] stressing members, Such as high if Strength [51] II.- Cl.
  • the thickness is determined on the basis of the rigidity required, so as not to exceed the limits of the internal tensions which are permitted by the concrete;
  • the object of the present invention is a method of the possibility of reducing the unitary tensions in the concrete of the diaphrgams;
  • the method of constructing subterranean bulkheads or diaphragms in concrete is of the type in which, in conformity with the known technique, a reinforcement of metal is first inserted into a trench excavated in the ground, for example in the presence of bentonite muds and the casting of concrete is then effected, the walls of the trench acting directly as a moulding box.
  • a reinforcement of metal is first inserted into a trench excavated in the ground, for example in the presence of bentonite muds and the casting of concrete is then effected, the walls of the trench acting directly as a moulding box.
  • Such a method is essentially characterized by the insertion into the trench of a set of special stressing members, according to an arcuate profile and, when the concrete has set, by subjecting the said members to a traction appropriate to give the bulkhead or diaphragm a pre-inflection in the direction and of the value as may be desired.
  • the method according to the present invention is based namely on the fundamental idea of subjecting the diaphragm to a preliminary flexure, so as to summon at least part of the pressure of the earth even before this occurs naturally during the actual progress of the excavations for the protection of which the diaphragm is provided.
  • the force applied is of such a degree that if the same force were applied to a similar wall element outside the earth, e.g., without the soil counterforce, it would have cracked the wall element.
  • these rods or cables are submerged in the concrete for a certain extent of their lower end portion only, so as to effect a firm attachment of their end in the concrete, which allows them to be subjected to traction starting from the upper portion of the diaphragm.
  • This arrangement can be effected either by inserting the cables or rods at the same time as the relevant sheaths before effecting the casting of concrete, or by inserting only the sheaths before the casting and then inserting the cables or rods inside the sheaths or casings after the concrete has set.
  • the lower ends of the cables or rods will be able to be fixed with cement injections or with suitable mechanical means, of a type known per se.
  • a second arrangement envisages, at the base of the diaphragm, return means connected to the said protective casings, which allows the use of a length of cable in the shape of a loop, the two ends of which are taken to the top of the diaphragm and simultaneously subjected to traction.
  • These cables are arranged in the concrete in a particular shape, dictated by the conditions of pre-inflection which it is desired from time to time to obtain in the diaphragm; this arrangement is effected by means of special supports which allow the cables to be made to follow curved lines more or less sinuous, in order to meet the conditions of restraint of the diaphragms in the various stages of use.
  • These supports can be in the form of simple guide cages, very light, to which the said casings are attached according to the profile envisaged; these cages will be able to be formed in accordance with any known technique.
  • Such supports can, however, be effected in the shape of proper metal reinforcements, to which also the said casings are fastened; this solution is especially preferred in the case when as mentioned above at least a partial recovery of the cables is envisaged, since in such instance this reinforcement is charged with the main function of support in static conditions of completed work.
  • the upper end portions of the cables or rod in harmonic steel are not only simply submerged in the concrete forming the diaphragm, as with the reinforcements at present in use, but are attached by special supports for example collection heads or plates for the cables or rods which allow at will their reattachment with devices (hydraulic or of other types) for their tensioning; this operation can in its turn be carried out and varied at will following schemes dictated by the working conditions of the diaphragm.
  • the rods or cables in harmonic steel of extreme strength can be permanently connected to the mass of concrete forming the diaphragm, by means of injections of mixtures of cement or of some other kind inside the said casings, thus achieving, on the one hand, the protection of the metal structures, and, on the other hand, the permanent static conditions for the functioning of the diaphragm. Or, as mentioned above, there will be opportunity for providing for the complete or partial unthreading of the cables.
  • FIG. 1 is a vertical diagrammatic section of the diaphragm
  • FIGS. 2a and 2b are horizontal sections of the diaphragm, according to two different embodiments.
  • FIGS. 3a, 3b and 3c show some comparative diagrams of the unitary tensions in the concrete, in the various stages of stressing of the diaphragm.
  • FIG. 1 shows in profile one possible form of diaphragm or wall, inserted vertically into the ground, starting from a elevation Q and adapted to resist the horizontal soil pressure (direction T) at the moment when a digging out to the excavation elevation S is effected.
  • the concrete structure of the diaphragm l incorporates a metal reinforcement formed substantially of a cage or support 2, and of a series of traction cables 3, arranged according to an appropriately studied shape.
  • the cables 3 are each contained inside a sheath or casing 4 which allows them to slide even after the concrete has set; all the casing 4 are attached to the cage 2 in such a manner as to keep the cables 3 following the course envisaged in the drawing office.
  • the cables 3 are fixed to the bottom of the diaphragm; at the top, on the other hand, the cables 3 are fastened by means of adjustable attachments 6 which comprise means for gripping the ends of the cables 3 and bringing them to traction, and means for blocking the cables in a position corresponding to a specific value of the said traction.
  • the attachments 5 can be realized, as mentioned above, accordingto variousmethods, for example with injectionsof cement, with mechanical blocking means, or with return means (see for example the return element 5 shown by the hatched line in FIG. 1).
  • the result of a traction exerted on a series of cables 3 arranged as in FIG. 1 is a pre-inflection of the diaphragm expressed in a pressure in the direction of the arrow P which when the digging out and levelling of the bank on one side is concluded co-operates in counter-balancing the thrust T.
  • FIG. 2a shows a sectional view of the diaphragm structure according to FIG. 1, in which the longitudinal spacing between the cables 3 can be seen.
  • FIG. 2b shows the'section of a different embodiment of the diaphragm, wherein successive T-sections are used; in this case, the cables 3 are preferably arranged in the leg of the T, so that a greater arm is available.
  • FIG. 3a shows a partial diagrammatic section of a diaphragm constructed according to the known technique, and this is flanked by diagram of the internal tensions which act on the structure at the conclusion of the digging out of the bank.
  • the neutral axis 7 separates the portion or of the concrete which is compressed and works correctly, from the portion at of the concrete subjected to traction and in which the metal reinforcement 8 consequently works alone.
  • the diagram of the internal tensions caused solely by the forces imposed through the cables 3 is as indicated in M (see FIG. 3b).
  • M represents, on the other hand, the diagram of the tensions caused by that part of the soil pressure summoned by the flexure of the diaphragm.
  • the combination of M and M gives a diagram which clearly indicates that solely forces of compression are present in the structure.
  • diagram M is the actual diagram of stresses present in the concrete as soon as prestressing is applied, prior to any excavation, and it is the resultant of diagram M (showing the stresses that would develop in the concrete if the prestressing was done above the ground, see page 10, line 16 solely by the forces imposed through cables 3") and diagram M (showing the reaction of the earth due to the prestressing). Since building codes establish the allowable stresses to be used in the design of reinforced concrete, the bottom line of diagram M shows the maximum allowable stresses used for design, the bottom line of diagram M, exceeds this limit by the bottom line of diagram M.
  • diagram M is modified by diagram M (due to the lateral pressure of the remaining earth volume, e.g., the one to be supported by the wall) and the resulting diagram is diagram M in which the upper line shows, as in diagram M the maximum allowable stresses in the concrete.
  • the resisting moment can be more than doubled without increasing the thickness of the diaphragm
  • the depth of excavation or digging out can be increased by more than 50 percent, still without increasing the thickness of the diaphragm;
  • a method for the construction of a concrete wall of a given thickness in a trench comprising the steps of:
  • the step of inserting a stressing member is constituted by inserting said cage and said stressing member in said trench so that one elongate end of the stressing member is located substantially at the bottom of the trench and the other elongate end of said stressing member is located substantially at the top of said trench to receive the force applied to said stressing member.
  • said stressing member comprises a protective sheath for a cable having return means for said cable located near the bottom of said trench and wherein said cable is inserted in said protective sheath including said return means so that it is in the shape of a loop, the two ends of which are situated at the top of said sheath and the rounded portion of which is situated in said return means, whereby said cable can be unthreaded from said wall when its use in said wall is no longer required.
  • the method of claim 2 further including the step of digging an excavation adjacent to said wall to a predetermined depth after said stress has been introduced to said concrete wall and thereafter applying another force to said stressing member to introduce a different stress to said concrete wall.
  • each member comprised of an elongated cable housed in an elongated protective sheath or casing said sheath contacting said cage at specific points and not contacting said cage at other specific points, said sheath and said cable having a predeten'nined curved profile determined by the location of said specific points on said cage, said stressing members having a tensile force applied to them which results in a pre-inflection of said concrete body member in the direction of said one earthen side wall such that the concrete wall will have an initialinternal stress which, in the absence of said earthen side walls, would be sufficient to cause said concrete wall to fail, and on the removal of said earthen sidewall parallel and opposite to said one earthen side wall the tensile stresses in said concrete are substantially zero.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)

Abstract

A method for the construction of subterranean partitions or diaphragm walls in concrete, of the type in which a trench is excavated in the ground by known means so that when the casting concrete is effected, the walls of the trench assume directly the function of moulding boxes. Prior to pouring the concrete, a set of metal stressing members, such as high tensile strength steel, is inserted into the trench according to a pre-determined profile. After the concrete has set, the said stressing members are subjected to a traction force to induce a prestress adapted to give the wall pre-inflection in a selected direction and amount. Since the concrete is in the trench and in intimate contact with the walls thereof, the traction force applied is of such a degree that, if the same force were applied to a similar wall element outside the earth, such a wall element would fail and crack.

Description

United States Patent [1 1 Jurina Sept. 25, 1973 [54] BUILDING OF UNDERGROUND PARTITION 3,422,586 1/1969 Parma 52/230 WALLS FOREIGN PATENTS OR APPLICATIONS [75] Invent: 3min, l 1,099,469 2/1961 Germany 61/56 [73] Assignee: I.C.O.S. Impresa Costruzioni Opere Specializzata S.p.A, Milan, Italy Primary Examiner-David J. Williamowsky Assistant Examiner-Philip C. Kannan 2 F 2] Mar 1972 Attorney-Francis C. Browne et a]. [21] Appl. No.: 231,752
Related U.S. Application Data [57] ABSTRACT [63] fggiinugtizn-ingart of Ser. No. 850,101, Aug. A method for the construction of subterranean partia an one tions or diaphragm walls in concrete, of the type in which a trench is excavated in the ground by known [30] Fore'gn Apphcauon Pmmty Data means so that when the casting concrete is effected, the June 11, 1969 Italy 18059 A/69 walls f the trench assume directly the f i f moulding boxes. Prior to pouring the concrete, a set of [S2] U.S. Cl. 61/39 meta] stressing members, Such as high if Strength [51] II.- Cl. E02d steel, i i t d i t th t h according t a [58] Field of Search 61/35, 39, 33, 56; determined profila After the concrete has set the Said 52/230 223 223 225 stressing members are subjected to a traction force to induce a prestress adapted to give the wall pre- [56] References and inflection in a selected direction and amount. Since the UNITED STATES PATENTS concrete is in the trench and in intimate contact with 2,063,558 12/1936 Ravier 61/39 the Walls thereof, the traction force pp is of Such 2,645,090 7/1953 Kinneman et a]... 52/223 R X a degree that, if the same force were applied to a simi- 2,677,957 5/1954 U son 52/230 lar wall element outside the earth, such a wall element 2,863,292 12/1958 Coyne et a] 6l/33 would fail and crack, 2,908,139 10/1959 Horton et al. 61/39 3,197,964 8/1965 Fehlmann et a1. 61/35 7 Claims, 6 Drawing Figures PATENTEUSEPZSIBYS sum 1 or 2 I l I l l Ill Inventor:
meow JURINA 6 a? I Attorneys Inventor mcoLbJuRmA orney diaphragms or bulkheads constructed in the subsoil by means of casting concrete or other material in trenches which are more or less deep and vary in width, excavated in the presence of bentonite muds the main functions of which are those of supporting the earth, intercepting subterranean water courses and foundation.
quired resistance to stresses, more especially the high stresses caused by the pressures of the ground and/or water and/or possible toploads, the designer of diaphragms or bulkheads can, in accordance with the present-day technique, have recourse to:
constructing a subterranean diaphragm or bulkhead or wall which eliminates the aforesaid difficulties of the known techniques and satisfies more fully the present demands. Some advantages of the present invention are:
BUILDING F UNDERGROUND PARTITION WALLS This application is a continuation-in-part of application Ser. No. 850,101 filed Aug. 14, 1969 now abandoned. 5
BACKGROUND OF THE INVENTION FIELD OF INVENTION Current use is now being made of structures called DESCRIPTION OF THE PRIOR ART It is known that, for the purpose of obtaining the rethe adoption of reinforced casts; the metal reinforce? ment can be in ordinary iron or in steel of improved strength, arranged according to traditional schemes for work in reinforced concrete;
the use of various thicknesses of the diaphragms; the thickness is determined on the basis of the rigidity required, so as not to exceed the limits of the internal tensions which are permitted by the concrete;
the use of props or tie-rods (tie-beams); in the case of severe external thrusts, to narrow the spans and to reduce the bending moment; the adoption of special sections; transverse sections are selected which have high moments of inertia, which sections are suitably in the form of a T, H and the like; the adoption of diaphragms with a curvilinear plane section; this configuration tends to form a collaboration between the elements which constitute the diaphragm, so as to obtain an arcuate effect, and circular or elliptical diaphragms are a typical example.
In these types of constructions, cases are still found SUMMARY OF THE INVENTION The object of the present invention is a method of the possibility of reducing the unitary tensions in the concrete of the diaphrgams;
the possibility of eliminating tensions caused by traction in the concrete, particularly noticeable in the diaphragms having the function of hydraulic sealing,
the possibility of facilitating the installation of metal reinforcements, often heavy and bulky, reducing their weight;
the possibility of deriving economic advantages by reducing the quantities of concrete and iron employed, in comparision with the traditional diaphragms.
According to the present invention, the method of constructing subterranean bulkheads or diaphragms in concrete is of the type in which, in conformity with the known technique, a reinforcement of metal is first inserted into a trench excavated in the ground, for example in the presence of bentonite muds and the casting of concrete is then effected, the walls of the trench acting directly as a moulding box. Such a method is essentially characterized by the insertion into the trench of a set of special stressing members, according to an arcuate profile and, when the concrete has set, by subjecting the said members to a traction appropriate to give the bulkhead or diaphragm a pre-inflection in the direction and of the value as may be desired.
The method according to the present invention is based namely on the fundamental idea of subjecting the diaphragm to a preliminary flexure, so as to summon at least part of the pressure of the earth even before this occurs naturally during the actual progress of the excavations for the protection of which the diaphragm is provided. The force applied is of such a degree that if the same force were applied to a similar wall element outside the earth, e.g., without the soil counterforce, it would have cracked the wall element.
The surprising observation has in fact been made that the internal tensions of the concrete, when the diaphragm is in the stage of preliminary flexure, are actually lower than those which in theory correspond to the applied fiexure force; this is due to the intervention of the reaction of the soil, which resists the deformation of the diaphragm just when this would be likely to occur. In other words, it has been possible to ascertain that with a diaphragm or bulkhead of the type indicated above, in which the walls of the trench form a moulding box and are consequently strictly adherent to the surfaces of the diaphragm at the moment when this pre-inflection is being made, the horizontal pressure proceeding from it immediately summons a pressure from the soil substantially equal and of contrary degree, which avoids the arising of internal tensions of traction in the concrete. These internal unitary tensions therefore result, at any instant of the pre-inflection, determined by the algebraic sum of the action artificially provoked and of the counteraction of the soil reacting. As indicated earlier the traction forces are beyond the normal traction forces applied to such members outside the earth, so much that if the same forces were applied to a wall element outside the earth and hence in the absence of the reaction force of the earth the concrete would fail.
It could be said in the main that, at the various depths of the diaphragm, in the stage of pre-inflection, the concrete accumulates internal tensions which can be later restored when the ground pressure actually occurs in the stage of digging out and levelling, the complete concrete section being kept in a constant state of firm compression.
Since the diaphragm, when actually being preinflected, is still completely submerged in the ground, it is also possible to effect the said pre-inflection in such a manner as will summon the ground reaction from either side; this permits to obtain at the various depths of the diaphragm point by point, such internal tensions as may be pre-determined and such that, when added to those derived from the external pressure in the stage of excavation and digging out are contained within predetermined values are particularly within the safety limits of the concrete even though the force applied to the traction member acting by itself would have resulted in a stress greater than a wall of the same thickness and/or reinforcement could have withstood in the absence of the counterforce due to said ground reaction.
Finally, with the pre-infiection of the diaphragm, internal tensions are definitely pre-disposed in the concrete of opposed degree to those which will afterwards be caused by the active pressure appearing in the stage of excavation which, in the various stages, allows the concrete section to remain compressed and thus be completely reactive.
In order to obtain a diaphragm pre-inflected according to the present invention, it is necessary to arrive at a realisable idea which is based on the possibility of employing materials more distinguished for resistance by means of a method different from that which has hitherto been in use for diaphragms.
The study of a pre-inflected diaphragm according to the invention introduces the use, for the first time in the field of cast in situ concrete diaphragms, of steel of extreme strength, such as for example harmonic steel or other types of steel of special quality.
The reinforcement of traditional type are abolished and replaced by cables or rods of harmonic steel surrounded by protective sheaths.
These special steels in the form of rods or cables are inserted into the concrete with the employment of protective sheaths.
According to a first arrangement, these rods or cables are submerged in the concrete for a certain extent of their lower end portion only, so as to effect a firm attachment of their end in the concrete, which allows them to be subjected to traction starting from the upper portion of the diaphragm.
This arrangement can be effected either by inserting the cables or rods at the same time as the relevant sheaths before effecting the casting of concrete, or by inserting only the sheaths before the casting and then inserting the cables or rods inside the sheaths or casings after the concrete has set. In this second instance the lower ends of the cables or rods will be able to be fixed with cement injections or with suitable mechanical means, of a type known per se.
On the other hand, a second arrangement envisages, at the base of the diaphragm, return means connected to the said protective casings, which allows the use of a length of cable in the shape of a loop, the two ends of which are taken to the top of the diaphragm and simultaneously subjected to traction.
This solution permits the cables to be recovered when they have ceased to be of use by unthreading them from the respective casings. This opportunity of recovery is, however, also obtainable by using the above-mentioned mechanical means of attachment, assuming that the latter are provided with suitable means of release.
These cables are arranged in the concrete in a particular shape, dictated by the conditions of pre-inflection which it is desired from time to time to obtain in the diaphragm; this arrangement is effected by means of special supports which allow the cables to be made to follow curved lines more or less sinuous, in order to meet the conditions of restraint of the diaphragms in the various stages of use.
These supports can be in the form of simple guide cages, very light, to which the said casings are attached according to the profile envisaged; these cages will be able to be formed in accordance with any known technique. Such supports can, however, be effected in the shape of proper metal reinforcements, to which also the said casings are fastened; this solution is especially preferred in the case when as mentioned above at least a partial recovery of the cables is envisaged, since in such instance this reinforcement is charged with the main function of support in static conditions of completed work.
The upper end portions of the cables or rod in harmonic steel are not only simply submerged in the concrete forming the diaphragm, as with the reinforcements at present in use, but are attached by special supports for example collection heads or plates for the cables or rods which allow at will their reattachment with devices (hydraulic or of other types) for their tensioning; this operation can in its turn be carried out and varied at will following schemes dictated by the working conditions of the diaphragm.
According to the present invention it is actually possible to make gradual alterations in the flexures which are caused in the diaphragm, for which the method according to the invention can be regarded as providing an important versatility of operation in the various stages of digging out, and levelling in various conditions, during the time; this is precisely due to the power of resuming and altering the tensions in the cables.
In the final working conditions, when the structure which has been made commences its normal function, the rods or cables in harmonic steel of extreme strength can be permanently connected to the mass of concrete forming the diaphragm, by means of injections of mixtures of cement or of some other kind inside the said casings, thus achieving, on the one hand, the protection of the metal structures, and, on the other hand, the permanent static conditions for the functioning of the diaphragm. Or, as mentioned above, there will be opportunity for providing for the complete or partial unthreading of the cables.
BRIEF DESCRIPTION OF THE DRAWING In the attached drawings a diaphragm according to the present invention is illustrated by way of example and not restrictively, together with the diagrammatic arrangement of a reinforcement in harmonic steel for the purpose of obtaining the pre-inflection:
FIG. 1 is a vertical diagrammatic section of the diaphragm;
FIGS. 2a and 2b are horizontal sections of the diaphragm, according to two different embodiments;
FIGS. 3a, 3b and 3c show some comparative diagrams of the unitary tensions in the concrete, in the various stages of stressing of the diaphragm.
DESCRIPTION OF THE PREFERRED EMBODIMENT As mentioned, FIG. 1 shows in profile one possible form of diaphragm or wall, inserted vertically into the ground, starting from a elevation Q and adapted to resist the horizontal soil pressure (direction T) at the moment when a digging out to the excavation elevation S is effected. The concrete structure of the diaphragm l incorporates a metal reinforcement formed substantially of a cage or support 2, and of a series of traction cables 3, arranged according to an appropriately studied shape. The cables 3 are each contained inside a sheath or casing 4 which allows them to slide even after the concrete has set; all the casing 4 are attached to the cage 2 in such a manner as to keep the cables 3 following the course envisaged in the drawing office.
Through the lower attachments 5, the cables 3 are fixed to the bottom of the diaphragm; at the top, on the other hand, the cables 3 are fastened by means of adjustable attachments 6 which comprise means for gripping the ends of the cables 3 and bringing them to traction, and means for blocking the cables in a position corresponding to a specific value of the said traction.
The attachments 5 can be realized, as mentioned above, accordingto variousmethods, for example with injectionsof cement, with mechanical blocking means, or with return means (see for example the return element 5 shown by the hatched line in FIG. 1).
The result of a traction exerted on a series of cables 3 arranged as in FIG. 1 is a pre-inflection of the diaphragm expressed in a pressure in the direction of the arrow P which when the digging out and levelling of the bank on one side is concluded co-operates in counter-balancing the thrust T.
FIG. 2a shows a sectional view of the diaphragm structure according to FIG. 1, in which the longitudinal spacing between the cables 3 can be seen.
FIG. 2b shows the'section of a different embodiment of the diaphragm, wherein successive T-sections are used; in this case, the cables 3 are preferably arranged in the leg of the T, so that a greater arm is available.
FIG. 3a shows a partial diagrammatic section of a diaphragm constructed according to the known technique, and this is flanked by diagram of the internal tensions which act on the structure at the conclusion of the digging out of the bank.
As illustrated, the neutral axis 7 separates the portion or of the concrete which is compressed and works correctly, from the portion at of the concrete subjected to traction and in which the metal reinforcement 8 consequently works alone.
In the case of the pre-inflected diaphragm according to the present invention, on the other hand, it can be arranged that the diagram of the internal tensions caused solely by the forces imposed through the cables 3 is as indicated in M (see FIG. 3b). M represents, on the other hand, the diagram of the tensions caused by that part of the soil pressure summoned by the flexure of the diaphragm. The combination of M and M gives a diagram which clearly indicates that solely forces of compression are present in the structure.
At the instant when the excavation of the bank is completed, the full thrust of the ground occurs, which in so far as being partially absorbed in the preceding stage causes a pressure upon the structure, represented by the diagram M". The combination of M" with M gives diagram M, which is inverted with regard to M but which still shows the forces of compression along are present in the structure.
The combination of the diagrams M and M" represents, on the contrary, the effect of the ground pressure in its entirety.
To reiterate, diagram M is the actual diagram of stresses present in the concrete as soon as prestressing is applied, prior to any excavation, and it is the resultant of diagram M (showing the stresses that would develop in the concrete if the prestressing was done above the ground, see page 10, line 16 solely by the forces imposed through cables 3") and diagram M (showing the reaction of the earth due to the prestressing). Since building codes establish the allowable stresses to be used in the design of reinforced concrete, the bottom line of diagram M shows the maximum allowable stresses used for design, the bottom line of diagram M, exceeds this limit by the bottom line of diagram M. Thus, even though the force applied to the traction member acting by itself would have resulted in a stress in the wall greater than the same wall could have withstood in the absence of force due to the reaction of the earth. The earth, serving as a molding box, permits this force to be applied.
As soon as the excavation is carried out, diagram M is modified by diagram M (due to the lateral pressure of the remaining earth volume, e.g., the one to be supported by the wall) and the resulting diagram is diagram M in which the upper line shows, as in diagram M the maximum allowable stresses in the concrete.
It is obvious that the scope of the present invention includes alterations in the thickness of the diaphragm, the interaxis or the type of the cables, the use of various resistant sections, but always incorporating the idea of pre-inflection; in fact, these alterations, which are connected with the static needs arising from various problems which face the designer, do not in any way exceed the range of variety which the invention permits.
In comparision with the traditional diaphragms, the method of construction of pre-inflected diaphragms according to the invention ofiers advantages:
the resisting moment can be more than doubled without increasing the thickness of the diaphragm;
the depth of excavation or digging out can be increased by more than 50 percent, still without increasing the thickness of the diaphragm;
the diaphragm with special sections allow possibilities of strength and depth of excavation which are noticeably greater still;
the possibility of increasing the maximum limits of excavation hitherto attained, given the greater rigidity of pre-inflected diaphragms;
the elimination, with equality of depth of the excavation of internal or anchoring struts, thereby achieving easier builder's yard conditions; the reduction in the number of intermediate supports (props, tie rods and the like); the achievement of guaranteed impermeability of the concrete with the elimination of cracks, in so far as the traction stresses in the concrete itself are avoided; this results in an effective protection in aggressive surroundings;
case of putting the reinforcements to work, given the reduced weight and their flexibility and manageability;
the possibility of inserting, into the excavation, reinforcements without a break in continuity, even for diaphragms of great depth, by using flexible cables which can be continuously inserted by unwinding them from rolls; this permits, furthermore, working in spaces which are small in height (for example working in cellars or generally in covered spaces) without particular difficulty;
the possibility of recovery and re-utilization of the pre-flexing cables.
What is claimed is:
l. A method for the construction of a concrete wall of a given thickness in a trench, said trench constituting a molding box for said wall and having two side faces which delimit two earth volumes, one of which will later be removed so that the wall will support the remaining earth volume, comprising the steps of:
inserting a stressing member and a concrete admixture into said trench;
allowing said concrete admixture to set and form said concrete wall of a given thickness; applying a force to said stressing member in a direction and magnitude so as to inflect said wall in the direction of one said side faces of said trench which force creates a counterforce of said one of said side faces against said concrete wall which counterforce permits a pre-stress to be induced in said wall to support said remaining volume of earth when one of said volumes of earth is removed while the force on said stressing member acting by itself would have resulted in a stress greater than a wall of said given thickness could have withstood in the absence of said counterforce. 2. The method of claim 1 including constructing a metal cage structured to serve as a permanent reinforcement for said concrete wall after said concrete has set, said stressing member being an elongated member having a diameter which is narrow compared to its length,
positioning said stressing member on said cage so that it contacts said cage at specific points and does not contact said cage at other specific points so that said elongated stressing member assumes a predetermined curved profile shape and a concavity facing the earthen wall constituting the remaining earthen volume,
and the step of inserting a stressing member is constituted by inserting said cage and said stressing member in said trench so that one elongate end of the stressing member is located substantially at the bottom of the trench and the other elongate end of said stressing member is located substantially at the top of said trench to receive the force applied to said stressing member.
3. The method of claim 2 wherein said stressing member comprises a protective sheath for a cable having return means for said cable located near the bottom of said trench and wherein said cable is inserted in said protective sheath including said return means so that it is in the shape of a loop, the two ends of which are situated at the top of said sheath and the rounded portion of which is situated in said return means, whereby said cable can be unthreaded from said wall when its use in said wall is no longer required.
4. The method of claim 2 further including the step of digging an excavation adjacent to said wall to a predetermined depth after said stress has been introduced to said concrete wall and thereafter applying another force to said stressing member to introduce a different stress to said concrete wall.
5. In a method for constructing at least a portion of a horizontally elongated concrete wall in a fluid slurry filled trench having two opposing earthen side faces, each earthen face delimiting a lateral earth volume, a first earth volume being later removed so that said concrete wall will support the remaining second earth volume, comprising the steps of inserting a concrete mixture into the trench to displace said fluid slurry and to form said concrete wall in situ, said two side faces of the trench forming at least part of a molding box for said concrete so that the exterior surfaces of said concrete wall are in intimate contact with said earthen side faces, allowing said concrete to set, and removing said first earth volume so that said concrete wall will sup port the remaining earth volume, the improvement comprising the additional steps of inserting a wall flexing means in said trench after excavation of said trench and prior to inserting said concrete mixture,
applying a force to said wall flexing means in order to inflect said concrete wall against said second earth volume, said inflection causing said concrete wall to bear against a side face of the trench with a force creating a counterforce of said second earth volume against said concrete wall, the resultant of said force and counterforce producing a pre-stress in said concrete wall which can be withstood by said wall without failing only in the presence of said counterforce, said pre-stress and the force of said remaining earth volume on said wall resulting in a stress in the concrete which is substantially completely compressive when said first earth volume is removed.
6. in a relatively thin concrete retaining wall situated at a selected relatively large depth below the level of the ground and against one earthen side wall of an excavation for the purpose of supporting said earthen side wall of the excavation on removal of the earthen side wall parallel and opposite to said one earthen side wall, said concrete wall being comprised of a concrete body member cast in situ in said excavation prior to removal of said earthen side wall parallel to said one earthen side wall having located therein a metal reinforcement cage elongated along the length of said wall, the improvement comprising,
a set of high tensile strength steel stressing members, each member comprised of an elongated cable housed in an elongated protective sheath or casing said sheath contacting said cage at specific points and not contacting said cage at other specific points, said sheath and said cable having a predeten'nined curved profile determined by the location of said specific points on said cage, said stressing members having a tensile force applied to them which results in a pre-inflection of said concrete body member in the direction of said one earthen side wall such that the concrete wall will have an initialinternal stress which, in the absence of said earthen side walls, would be sufficient to cause said concrete wall to fail, and on the removal of said earthen sidewall parallel and opposite to said one earthen side wall the tensile stresses in said concrete are substantially zero.
section so that a greater moment arm is available to apply a greater pre-inflecting force to said stressing members.

Claims (7)

1. A method for the construction of a concrete wall of a given thickness in a trench, said trench constituting a molding box for said wall and having two side faces which delimit two earth volumes, one of which will later be removed so that the wall will support the remaining earth volume, comprising the steps of: inserting a stressing member and a concrete admixture into said trench; allowing said concrete admixture to set and form said concrete wall of a given thickness; applying a force to said stressing member in a direction and magnitude so as to inflect said wall in the direction of one said side faces of said trench which force creates a counterforce of said one of said side faces against said concrete wall which counterforce permits a pre-stress to be induced in said wall to support said remaining volume of earth when one of said volumes of earth is removed while the force on said stressing member acting by itself would have resulted in a stress greater than a wall of said given thickness could have withstood in the absence of said counterforce.
2. The method of claim 1 including constructing a metal cage structured to serve as a permanent reinforcement for said concrete wall after said concrete has set, said stressing member being an elongated member having a diameter which is narrow compared to its length, positioning said stressing member on said cage so that it contacts said cage at specific points and does not contact said cage at other specific points so that said elongated stressing member assumes a predetermined curved profile shape and a concavity facing the earthen wall constituting the remaining earthen volume, and the step of inserting a stressing mEmber is constituted by inserting said cage and said stressing member in said trench so that one elongate end of the stressing member is located substantially at the bottom of the trench and the other elongate end of said stressing member is located substantially at the top of said trench to receive the force applied to said stressing member.
3. The method of claim 2 wherein said stressing member comprises a protective sheath for a cable having return means for said cable located near the bottom of said trench and wherein said cable is inserted in said protective sheath including said return means so that it is in the shape of a loop, the two ends of which are situated at the top of said sheath and the rounded portion of which is situated in said return means, whereby said cable can be unthreaded from said wall when its use in said wall is no longer required.
4. The method of claim 2 further including the step of digging an excavation adjacent to said wall to a predetermined depth after said stress has been introduced to said concrete wall and thereafter applying another force to said stressing member to introduce a different stress to said concrete wall.
5. In a method for constructing at least a portion of a horizontally elongated concrete wall in a fluid slurry filled trench having two opposing earthen side faces, each earthen face delimiting a lateral earth volume, a first earth volume being later removed so that said concrete wall will support the remaining second earth volume, comprising the steps of inserting a concrete mixture into the trench to displace said fluid slurry and to form said concrete wall in situ, said two side faces of the trench forming at least part of a molding box for said concrete so that the exterior surfaces of said concrete wall are in intimate contact with said earthen side faces, allowing said concrete to set, and removing said first earth volume so that said concrete wall will support the remaining earth volume, the improvement comprising the additional steps of inserting a wall flexing means in said trench after excavation of said trench and prior to inserting said concrete mixture, applying a force to said wall flexing means in order to inflect said concrete wall against said second earth volume, said inflection causing said concrete wall to bear against a side face of the trench with a force creating a counterforce of said second earth volume against said concrete wall, the resultant of said force and counterforce producing a pre-stress in said concrete wall which can be withstood by said wall without failing only in the presence of said counterforce, said pre-stress and the force of said remaining earth volume on said wall resulting in a stress in the concrete which is substantially completely compressive when said first earth volume is removed.
6. In a relatively thin concrete retaining wall situated at a selected relatively large depth below the level of the ground and against one earthen side wall of an excavation for the purpose of supporting said earthen side wall of the excavation on removal of the earthen side wall parallel and opposite to said one earthen side wall, said concrete wall being comprised of a concrete body member cast in situ in said excavation prior to removal of said earthen side wall parallel to said one earthen side wall having located therein a metal reinforcement cage elongated along the length of said wall, the improvement comprising, a set of high tensile strength steel stressing members, each member comprised of an elongated cable housed in an elongated protective sheath or casing said sheath contacting said cage at specific points and not contacting said cage at other specific points, said sheath and said cable having a predetermined curved profile determined by the location of said specific points on said cage, said stressing members having a tensile force applied to them which results in a pre-inflection of said concrete body member in the direction of said one earthen side wall such tHat the concrete wall will have an initial internal stress which, in the absence of said earthen side walls, would be sufficient to cause said concrete wall to fail, and on the removal of said earthen side wall parallel and opposite to said one earthen side wall the tensile stresses in said concrete are substantially zero.
7. The invention defined in claim 6 wherein said concrete retaining wall includes a concrete section extending transversly to said wall and having a high moment of inertia, and wherein at least a portion of said stressing members are arranged in said transversly extending section so that a greater moment arm is available to apply a greater pre-inflecting force to said stressing members.
US00231752A 1969-06-11 1972-03-03 Building of underground partition walls Expired - Lifetime US3760594A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT1805969 1969-06-11

Publications (1)

Publication Number Publication Date
US3760594A true US3760594A (en) 1973-09-25

Family

ID=11151713

Family Applications (1)

Application Number Title Priority Date Filing Date
US00231752A Expired - Lifetime US3760594A (en) 1969-06-11 1972-03-03 Building of underground partition walls

Country Status (10)

Country Link
US (1) US3760594A (en)
AT (1) AT317784B (en)
BE (1) BE737510A (en)
CA (1) CA921268A (en)
CH (1) CH501111A (en)
DE (2) DE2028088A1 (en)
ES (1) ES370530A1 (en)
FR (1) FR2045968A1 (en)
GB (1) GB1284753A (en)
NL (1) NL6912415A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5871307A (en) * 1996-03-15 1999-02-16 Trevi Icos Corporation Pre-cast concrete panel wall
US6735913B2 (en) * 2002-08-01 2004-05-18 Sanders & Associates Geostructural Engineering, Inc. Block wall system
US20060051165A1 (en) * 2002-10-07 2006-03-09 Han Man-Yop Innovative prestressed scaffolding system
CN103741685A (en) * 2014-01-24 2014-04-23 王立明 Prestressed concrete steel tube and corresponding prestressed concrete steel tube supporting structure
US9714495B2 (en) 2013-03-05 2017-07-25 Soletanche Freyssinet Pre-stressed molded wall, and method for creating such a wall
CN113605370A (en) * 2021-08-26 2021-11-05 广东省构建工程建设有限公司 Original underground diaphragm wall permanent-changing structure and construction process thereof
CN115182330A (en) * 2022-07-11 2022-10-14 中建海峡建设发展有限公司 Construction method for rock-socketed underground diaphragm wall of deep foundation pit

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52109706A (en) * 1976-03-11 1977-09-14 Takenaka Komuten Co Execution method of continuous underground wall introducing prestress
JPS56142916A (en) * 1980-04-09 1981-11-07 Kajima Corp Construction of continuous wall underground
DE3418318A1 (en) * 1984-05-17 1985-11-21 Friedrich J. Ing. Rottenmann Bodner REINFORCEMENT ELEMENT FOR CONCRETE CONSTRUCTION PARTS
ZA856131B (en) * 1985-08-14 1986-02-13 Lin Juei-Jse A method of making cast-in-place prestressing concrete pile by means of movable casing set
DE3731262A1 (en) * 1987-09-17 1989-04-06 Strabag Bau Ag FENDERPILE

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2063558A (en) * 1931-09-11 1936-12-08 Ravier Sylvain Louis Retaining wall
US2645090A (en) * 1951-02-06 1953-07-14 Raymond Concrete Pile Co Reinforcing of concrete piles
US2677957A (en) * 1952-06-12 1954-05-11 Raymond Concrete Pile Co Prestressed concrete structure
US2863292A (en) * 1953-01-27 1958-12-09 Coyne Andre Reinforced and stabilized dam structure
US2908139A (en) * 1957-07-23 1959-10-13 William B Horton Prestressed masonry structures
DE1099469B (en) * 1953-08-13 1961-02-09 Wayss & Freytag Ag Driving pile, sheet pile or the like made of concrete with prestressed reinforcement
US3197964A (en) * 1959-12-24 1965-08-03 Fehlmann Method for making a reinforced concrete structure
US3422586A (en) * 1966-05-12 1969-01-21 Domenico Parma System for post-stressing concrete slabs,beams or other structures

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2063558A (en) * 1931-09-11 1936-12-08 Ravier Sylvain Louis Retaining wall
US2645090A (en) * 1951-02-06 1953-07-14 Raymond Concrete Pile Co Reinforcing of concrete piles
US2677957A (en) * 1952-06-12 1954-05-11 Raymond Concrete Pile Co Prestressed concrete structure
US2863292A (en) * 1953-01-27 1958-12-09 Coyne Andre Reinforced and stabilized dam structure
DE1099469B (en) * 1953-08-13 1961-02-09 Wayss & Freytag Ag Driving pile, sheet pile or the like made of concrete with prestressed reinforcement
US2908139A (en) * 1957-07-23 1959-10-13 William B Horton Prestressed masonry structures
US3197964A (en) * 1959-12-24 1965-08-03 Fehlmann Method for making a reinforced concrete structure
US3422586A (en) * 1966-05-12 1969-01-21 Domenico Parma System for post-stressing concrete slabs,beams or other structures

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5871307A (en) * 1996-03-15 1999-02-16 Trevi Icos Corporation Pre-cast concrete panel wall
US6735913B2 (en) * 2002-08-01 2004-05-18 Sanders & Associates Geostructural Engineering, Inc. Block wall system
US20060051165A1 (en) * 2002-10-07 2006-03-09 Han Man-Yop Innovative prestressed scaffolding system
US7144200B2 (en) * 2002-10-07 2006-12-05 Han Man-Yop Innovative prestressed scaffolding system
US9714495B2 (en) 2013-03-05 2017-07-25 Soletanche Freyssinet Pre-stressed molded wall, and method for creating such a wall
AU2014224513B2 (en) * 2013-03-05 2017-11-02 Soletanche Freyssinet Pre-stressed molded wall, and method for creating such a wall
CN103741685A (en) * 2014-01-24 2014-04-23 王立明 Prestressed concrete steel tube and corresponding prestressed concrete steel tube supporting structure
CN103741685B (en) * 2014-01-24 2015-12-09 王立明 Comprise the pre-stressed steel pipe concrete truss support structure of pre-stressed steel pipe concrete
CN113605370A (en) * 2021-08-26 2021-11-05 广东省构建工程建设有限公司 Original underground diaphragm wall permanent-changing structure and construction process thereof
CN115182330A (en) * 2022-07-11 2022-10-14 中建海峡建设发展有限公司 Construction method for rock-socketed underground diaphragm wall of deep foundation pit

Also Published As

Publication number Publication date
BE737510A (en) 1970-01-16
DE2028088A1 (en) 1970-12-23
DE7021646U (en) 1971-12-30
CA921268A (en) 1973-02-20
AT317784B (en) 1974-09-10
FR2045968A1 (en) 1971-03-05
GB1284753A (en) 1972-08-09
NL6912415A (en) 1970-12-15
CH501111A (en) 1970-12-31
ES370530A1 (en) 1971-04-16

Similar Documents

Publication Publication Date Title
US3760594A (en) Building of underground partition walls
WO2010097642A1 (en) Hydraulic tie rod for construction projects
US1747038A (en) Retaining wall
JP4780781B2 (en) Seismic reinforcement method for existing concrete pier
CN108487268B (en) Square hollow stepped reducing anti-slide pile structure and construction method
KR102614942B1 (en) Construction structure for precast exterior panel of soil retaining wall and constructing method thereof
JP6292028B2 (en) Embankment reinforcement structure
JPS5829922A (en) Constructing method for underground outer wall
JPH0525821A (en) Continuous underground wall and construction method thereof
JPH05132923A (en) Improving method for soft ground
JPH01226921A (en) Earthquake-proof reinforced revetment construction
KR102226723B1 (en) Constructing method for bridge structure based on principle of action/reaction and bridge structure constructed by the method
JPH0913343A (en) Revetment structure and its construction method
KR200245125Y1 (en) A pier structure for engineering works
JP7037124B2 (en) Embankment reinforcement structure
CN114411695B (en) Underground cast-in-situ continuous wall construction method and connection structure thereof
US3306049A (en) Excavating method using prestressed loop girders
JPS5844802B2 (en) Ganpekino hokiyoukohou
CN115305924B (en) Prestress construction method for reducing deformation of deep foundation pit
JPH0351844B2 (en)
RU2745313C1 (en) Method for reconstruction of the way with pioneer fill with a shear filler
DE873978C (en) Fangedaemme, piers and similar structures according to the cellular construction and process for their production
SU1068572A1 (en) Method of machining concrete dam to rock foundation
KR100478987B1 (en) prestressed walltype pile and manufacturing method thereof and construction method of pile wall structure using the same pile
JPS6313487B2 (en)