US3752326A - Offshore oil and gas well drilling rig - Google Patents

Offshore oil and gas well drilling rig Download PDF

Info

Publication number
US3752326A
US3752326A US00222586A US3752326DA US3752326A US 3752326 A US3752326 A US 3752326A US 00222586 A US00222586 A US 00222586A US 3752326D A US3752326D A US 3752326DA US 3752326 A US3752326 A US 3752326A
Authority
US
United States
Prior art keywords
load
boom
drilling
drilling mast
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00222586A
Inventor
C Levingston
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LEVINGSTON SHIPBUILDING Co
Original Assignee
LEVINGSTON SHIPBUILDING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LEVINGSTON SHIPBUILDING Co filed Critical LEVINGSTON SHIPBUILDING Co
Application granted granted Critical
Publication of US3752326A publication Critical patent/US3752326A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail

Definitions

  • the inventive concept is the improvement in offshore oil and gas well drilling rigs which lies in the combination of the drilling derrick with a load boom assembly and a balance boom assembly.
  • the load boom and balance boom are mounted on the derrick of the rig for pivotal movement in a vertical plane containing the long axis of the mast and for rotation about the long axis of the mast.
  • the method of the invention includes the steps of erecting the load boom and balance boom and moving loads about the drilling platform onto and from another vessel with the load boom.
  • the combination of the load and balance boom assemblies with an offshore drilling derrick provides a structure for moving large loads about the drilling platform without the inconvenience and expense of additional cranes or use of a derrick barge with a crane thereon alongside the platform.
  • FIG. 1 is a side elevation view of the novel offshore oil and gas well drilling rig which includes a showing of the load boom assembly and balance boom assembly in the load-lifting attitude.
  • FIG. 2 is a side elevation view of the drilling platform in the drilling attitude, showing one spud of the plat form and showing the load boom and balance boom folded into the stowed position.
  • FIG. 3 is a top sectional view of the novel offshore oil and gas well drilling rig which includes a taken along line 3-3 of FIG. 1, showing the load boom and balance boom in the working position.
  • FIG. 4 is a side elevation sectional view of the boom support bearing which allows rotation of the load boom and balance boom about the long axis of the mast.
  • FIG. 5 is a side elevation view partially in section of the load sheave block in the load boom assembly.
  • FIG. 6 is a generally schematic side elevation view of the load sheave block of the load boom assembly.
  • FIG. 1 The structure generally designated by the numeral 10 is the drilling derrick, or mast, supported by an offshore platform, generally designated by the numeral 11.
  • the drilling derrick is shown in the load-moving configuration, with the balance boom 12 and the load boom 13 extended therefrom.
  • Balance boom 12 is suspended by balance boom cable 14 and load boom 13 is suspended by load boom cables 15.
  • Balance boom 12 and load boom 13 are raised to operating position, or lowered to stowed position by the lifting cables 73 and 74 and an auxiliary winch 17.
  • Lifting cable 73 passes over balance boom topping lift 16 and down through derrick 10 to auxiliary winch 17.
  • load boom 13 is raised or lowered by lifting cable 74 passing over the load boom topping lift 19, downwardly through derrick 10 and secured to auxiliary winch 17.
  • Balance boom 12 supports a balancing load 29 for counteracting the force moment of a load 26 to be lifted by load boom 13.
  • Balancing load 29 may take the form of a tank containing water to provide a variable counteracting moment.
  • Balance boom 12 is joined to derrick 10 for both vertical pivotal movement and horizontal pivotal movement with respect to derrick 10.
  • Means connecting balance boom 12 to derrick 10 for vertical pivotal movement takes the form of balance boom pivot 18 and lifting cable 73.
  • Disconnecting cable 14 and activating auxiliary winch 17 to let out lifting cable 73 will result in balance boom 12 descending to the folded, or stowed, position, as shown in FIG. 2.
  • auxiliary winch 17 also will similarly control the attitude of load boom 13. Therefore, disconnecting cable 15 and letting out cable 74 by auxiliary winch 17 would result in a similar lowering of load boom 13 to the folded, or stowed, position, as shown in FIG. 2.
  • the numeral 20 refers to the drawworks winch which is utilized in the drilling attitude for connecting the travelling block 51 to the crown block 50, as shown in FIG. 2 and as will be further described hereafter.
  • Drawworks winch 20 is used in the load lifting attitude as the power source for lifting loads with load boom assembly 13.
  • drawworks winch 20 is connected to the drawworks line 21, which line is threaded through a series of pulleys 22, 23 and 24 and passes to the load sheave block 25.
  • load 26 takes the form of a section of spud 27.
  • sections 26 of spud 27 may be lifted from platform 11 or from another vessel, moved to a position of spud 27 and lowered into mating engagement therewith.
  • derrick 10 includes a lower portion 30 and an upper portion 31.
  • Upper portion 31 supports balance boom pivot 18 and a load boom pivot 28 which provide vertical pivotal movement for those booms.
  • Upper section 31 may also be rotated about its long axis with respect to lower section 30, thereby rotating balance boom 12 and load boom 13 therewith.
  • Pivots 18, 28 may also be supported from a unitary derrick (not shown) with suitable bearings (not shown) arranged to allow for rotation of load boom 13 and balance boom 12 about derrick 10.
  • support for upper section 31 is provided by annular bearing 40, detail of which is shown in FIG. 4.
  • Annular bearing 40 includes an inner annular member 41 surrounded by an outer annular member 42.
  • Inner annular member 41 may be supported by lower section 30 of derrick and outer annular member 42 supports upper section 13. interposed between inner member 41 and outer member 42 is a roller 43 to provide for relative rotation of inner member 41 and outer member 42.
  • Pivot housing 32 includes means for rotating upper section 31 with balance boom 12 and load boom 13 about the long axis of derrick 10 relative to lower section 30.
  • the means for rotating includes annular bearing 40 and a pivot drive wheel 33 supported by lower section 30 which may be rotated by any convenient drive means (not shown). As pivot drive wheel 33 is rotated, its arrangement in contact with outer annular member 42 will impart rotation to upper section 31 relative to lower section 30.
  • FIG. 2 shows derrick 10 in the drilling attitude.
  • Drawworks winch engages drawworks line 21 as in FIG. 1; but in FIG. 2, drawworks line 21 is led through crown block 50 and traveling block 51 to support a swivel 52, a kelley 53 and string of drill pipe 54.
  • derrick 10 functions as any other derrick in the drilling art, supporting the string of drill pipe 54 during drilling operations.
  • Auxiliary winch 17 may be utilized for any function normally associated with such devices during drilling procedures, such as lowering well tools (not shown) down the wellbore.
  • FIG-6 shows schematically the load sheave block generally designated by the numeral in FIG. 1.
  • Load sheave block 25 includes means for moving a load radially of the longitudinal axis of derrick 10, which means includes radial positioning line 60 in the form of a continuous closed loop supported by a positioning line pulley 61 at one end of the loop with the other end of the loop wrapped on a power driven drum (not shown).
  • Drawworks line 21 is shown in the load supporting attitude, threaded through load pulley 62, 63, 64.
  • the arrow directed downwardly from load pulley 63 indicates the direction of force of a load suspended from load sheave block 25.
  • Load sheave brackets 65, 66 support load pulleys 62, 64 respectively.
  • Support wheels 67, 68 support load sheave bracket 65 and, in the same manner, support wheel 69, 70 support load sheave bracket 66 and provide means for radial movement of load sheave block 25 along support beams 71, 72, as shown in FIG. 5.
  • load sheave block 25 is driven to the left or right, as shown in FIG. 6, by the force imparted to positioning line 60 by the power driven drum (not shown).
  • An alternate method of moving the load radially to the long axis of the mast or derrick is to use lifting line 74 extended over load boom topping lift 19 and connected to auxiliary winch 17 to raise and lower the outer end of load boom 13.
  • the inventor's presently preferred embodiment of the method of the invention includes errecting load boom assembly 13 and balance boom assembly 12 on derrick 10 to the load-lifting attitude, as shown in FIG. 1. Thereafter, a load, such as spud section 26, is suspended from load boom assembly 13 and moved to a position adjacent the top of spud 27. Spud section 26 is then attached to the upper portion of spud 27. Spud 27 may then be extended downwardly through platform 1 l and other sections added until the sea bottom is contacted and platform 11 is jacked up above the surface 34 of the water.
  • a load such as spud section 26
  • Spud section 26 is then attached to the upper portion of spud 27.
  • Spud 27 may then be extended downwardly through platform 1 l and other sections added until the sea bottom is contacted and platform 11 is jacked up above the surface 34 of the water.
  • the inventors presently preferred embodiment of the apparatus can be utilized on a drilling platform to move heavy objects, such as blow-out preventer stacks, well heads and machinery packages.
  • Also, it can be used for setting well structures supporting the well head independent of the drilling platform, and for carrying out pile driving operations.
  • An offshore oil and gas well drilling rig comprising, in combination an offshore drilling platform a drilling mast supported by said offshore drilling platform and having an upper section and a lower section the upper section of said drilling mast being rotatably disposed on the lower section thereof a draw-works including a draw-works winch and an auxiliary winch disposed on said offshore platform at the foot of the lower section of said drilling mast a crown block mounted on the upper portion of said drilling mast adjacent the top thereof a pair of pivot supports secured to the lower end of the upper section of said drilling mast and oppositely disposed with respect to one another a load boom having its inner end pivotally connected to one of said pivot supports a balance boom having its inner end pivotally connected to the other of said pivot supports a load sheave block carried by said load boom a suitably operated positioning line connected to said load sheave block for horizontally moving the latter along said load boom a load boom topping lift mounted adjacent the upper extremity of the upper section of said drilling mast 6 a lifting cable connected to said load boom, trained works winch over said load boom topping

Abstract

An offshore drilling platform and drilling rig mounted thereon having a load boom assembly and a balance boom assembly mounted for pivotal movement on the derrick of the drilling rig. The boom assemblies are erected into load bearing position to move loads about the platform.

Description

United States Patent [191 Levingston Aug. 14, 1973 OFFSHORE OIL AND GAS WELL DRILLING RIG [75] inventor: Clarence W. Levingston, Orange,
Tex.
[73] Assignee: Levingston Shipbuilding Company,
Orange, Tex.
22 Filed: Feb. 1, 1972 [21] Appl. No.: 222,586
[52] US. Cl 212/47, 212/48, 212/46 R [51] Int. Cl. B66c 23/00 [58] Field of Search 212/47, 48, 49, 56,
212/58, 46 R, 46 A, 46 B, 57, 64; 214/25; 175/85 [56] References Cited UNITED STATES PATENTS 7/1960 Guier 2l4/2.5 11/1950 Woolslayer et a1. 214/2.5 4/1954 Favre et a1. 212/46 R FOREIGN PATENTS OR APPLICATIONS 635,162 2/1962 Italy 212/64 558,318 6/1957 Belgium 212/64 1,093,679 12/1967 Great Britain 212/64 1,183,609 3/1970 Great Britain 212/46 Primary Examiner-Even C. Blunk Assistant Examiner- Merle F. Maffei Attorney-Paul E. Harris. Lee R. Larkin and Larry B. Phillips et a1.
[57] ABSTRACT 2 Claims, 6 Drawing Figures minnows 14 ms 3 752' 32s sum 1 OF 3 PATENTS!) NR 14 813 SHEET 2 0F 3 .liimh.
PAIENTED MN; I 4 I973 SHEET 3 OF 3 OFFSHORE OIL AND GAS WELL DRILLING RIG BACKGROUND OF THE INVENTION 1. Field of the Invention The field of the invention is offshore drilling rigs and methods for their use.
2. Description of the Prior Art As is well known in the art of drilling offshore oil and gas wells, the process of erecting a drilling platform over an offshore drilling site is an expensive and time consuming one. It has been found to be particularly advantageous to elevate the drilling platform above the surface of the body of water under which the well is to be drilled. Elevating the platform above the surface of the water reduces lateral stresses on the structure from wave action.
Problems have been experienced, however, with towing such rigs from port to the drilling site. With spuds as long as 400 feet carried in a raised position above the drilling platform, the rigs tend to be unstable in the floating state. Attempts have been made to solve this problem by transporting the drilling rig with the spuds disassembled and carried on top of the drilling platform or on another vessel, but this necessitates the use of a derrick barge or the construction of one or more cranes on the structure of the platform itself to assist in assembling the spuds. The use of derrick barges and the construction of cranes on the platform is a source of great expense, but they have been widely used to avoid the problem of instability while the rigs are being transported from one location to another.
SUMMARY OF THE INVENTION The inventive concept is the improvement in offshore oil and gas well drilling rigs which lies in the combination of the drilling derrick with a load boom assembly and a balance boom assembly. The load boom and balance boom are mounted on the derrick of the rig for pivotal movement in a vertical plane containing the long axis of the mast and for rotation about the long axis of the mast.
The method of the invention includes the steps of erecting the load boom and balance boom and moving loads about the drilling platform onto and from another vessel with the load boom.
The combination of the load and balance boom assemblies with an offshore drilling derrick provides a structure for moving large loads about the drilling platform without the inconvenience and expense of additional cranes or use of a derrick barge with a crane thereon alongside the platform.
BRIEF DESCRIPTION OF THE DRAWINGS The inventors presently preferred embodiment of the invention is shown in the drawings, in which:
FIG. 1 is a side elevation view of the novel offshore oil and gas well drilling rig which includes a showing of the load boom assembly and balance boom assembly in the load-lifting attitude.
FIG. 2 is a side elevation view of the drilling platform in the drilling attitude, showing one spud of the plat form and showing the load boom and balance boom folded into the stowed position.
FIG. 3 is a top sectional view of the novel offshore oil and gas well drilling rig which includes a taken along line 3-3 of FIG. 1, showing the load boom and balance boom in the working position.
FIG. 4 is a side elevation sectional view of the boom support bearing which allows rotation of the load boom and balance boom about the long axis of the mast.
FIG. 5 is a side elevation view partially in section of the load sheave block in the load boom assembly.
FIG. 6 is a generally schematic side elevation view of the load sheave block of the load boom assembly.
DESCRIPTION OF THE PREFERRED EMBODIMENT The inventors presently preferred embodiment of the invention is shown in FIG. 1. The structure generally designated by the numeral 10 is the drilling derrick, or mast, supported by an offshore platform, generally designated by the numeral 11. The drilling derrick is shown in the load-moving configuration, with the balance boom 12 and the load boom 13 extended therefrom. Balance boom 12 is suspended by balance boom cable 14 and load boom 13 is suspended by load boom cables 15. Balance boom 12 and load boom 13 are raised to operating position, or lowered to stowed position by the lifting cables 73 and 74 and an auxiliary winch 17. Lifting cable 73 passes over balance boom topping lift 16 and down through derrick 10 to auxiliary winch 17. Similary, load boom 13 is raised or lowered by lifting cable 74 passing over the load boom topping lift 19, downwardly through derrick 10 and secured to auxiliary winch 17. Balance boom 12 supports a balancing load 29 for counteracting the force moment of a load 26 to be lifted by load boom 13.
Balancing load 29 may take the form of a tank containing water to provide a variable counteracting moment.
Balance boom 12 is joined to derrick 10 for both vertical pivotal movement and horizontal pivotal movement with respect to derrick 10. Means connecting balance boom 12 to derrick 10 for vertical pivotal movement takes the form of balance boom pivot 18 and lifting cable 73. Disconnecting cable 14 and activating auxiliary winch 17 to let out lifting cable 73 will result in balance boom 12 descending to the folded, or stowed, position, as shown in FIG. 2. It is contemplated that auxiliary winch 17 also will similarly control the attitude of load boom 13. Therefore, disconnecting cable 15 and letting out cable 74 by auxiliary winch 17 would result in a similar lowering of load boom 13 to the folded, or stowed, position, as shown in FIG. 2. The numeral 20 refers to the drawworks winch which is utilized in the drilling attitude for connecting the travelling block 51 to the crown block 50, as shown in FIG. 2 and as will be further described hereafter. Drawworks winch 20 is used in the load lifting attitude as the power source for lifting loads with load boom assembly 13. In the load-lifting attitude, drawworks winch 20 is connected to the drawworks line 21, which line is threaded through a series of pulleys 22, 23 and 24 and passes to the load sheave block 25. Thus, winding drawworks line 21 about drawworks winch 20 will result in shortening of drawworks line 21 and lifting of load 26 thereby. For purposes of illustration, load 26 takes the form of a section of spud 27. In this illustration, sections 26 of spud 27 may be lifted from platform 11 or from another vessel, moved to a position of spud 27 and lowered into mating engagement therewith.
In the embodiment shown in FIG. 1, derrick 10 includes a lower portion 30 and an upper portion 31. Upper portion 31 supports balance boom pivot 18 and a load boom pivot 28 which provide vertical pivotal movement for those booms. Upper section 31 may also be rotated about its long axis with respect to lower section 30, thereby rotating balance boom 12 and load boom 13 therewith. Pivots 18, 28 may also be supported from a unitary derrick (not shown) with suitable bearings (not shown) arranged to allow for rotation of load boom 13 and balance boom 12 about derrick 10. In FIG. 1, support for upper section 31 is provided by annular bearing 40, detail of which is shown in FIG. 4. Annular bearing 40 includes an inner annular member 41 surrounded by an outer annular member 42. Inner annular member 41 may be supported by lower section 30 of derrick and outer annular member 42 supports upper section 13. interposed between inner member 41 and outer member 42 is a roller 43 to provide for relative rotation of inner member 41 and outer member 42.
As shown in FIG. 3, upper section 31 is supported at its lowermost portion by a pivot housing 32. Pivot housing 32 includes means for rotating upper section 31 with balance boom 12 and load boom 13 about the long axis of derrick 10 relative to lower section 30. The means for rotating includes annular bearing 40 and a pivot drive wheel 33 supported by lower section 30 which may be rotated by any convenient drive means (not shown). As pivot drive wheel 33 is rotated, its arrangement in contact with outer annular member 42 will impart rotation to upper section 31 relative to lower section 30.
FIG. 2 shows derrick 10 in the drilling attitude. Drawworks winch engages drawworks line 21 as in FIG. 1; but in FIG. 2, drawworks line 21 is led through crown block 50 and traveling block 51 to support a swivel 52, a kelley 53 and string of drill pipe 54. In the drilling attitude, as shown in FIG. 2, derrick 10 functions as any other derrick in the drilling art, supporting the string of drill pipe 54 during drilling operations. Auxiliary winch 17 may be utilized for any function normally associated with such devices during drilling procedures, such as lowering well tools (not shown) down the wellbore.
FIG-6 shows schematically the load sheave block generally designated by the numeral in FIG. 1. Load sheave block 25 includes means for moving a load radially of the longitudinal axis of derrick 10, which means includes radial positioning line 60 in the form of a continuous closed loop supported by a positioning line pulley 61 at one end of the loop with the other end of the loop wrapped on a power driven drum (not shown). Drawworks line 21 is shown in the load supporting attitude, threaded through load pulley 62, 63, 64. The arrow directed downwardly from load pulley 63 indicates the direction of force of a load suspended from load sheave block 25. Load sheave brackets 65, 66 support load pulleys 62, 64 respectively. Support wheels 67, 68 support load sheave bracket 65 and, in the same manner, support wheel 69, 70 support load sheave bracket 66 and provide means for radial movement of load sheave block 25 along support beams 71, 72, as shown in FIG. 5. In FIG. 6, load sheave block 25 is driven to the left or right, as shown in FIG. 6, by the force imparted to positioning line 60 by the power driven drum (not shown).
An alternate method of moving the load radially to the long axis of the mast or derrick, is to use lifting line 74 extended over load boom topping lift 19 and connected to auxiliary winch 17 to raise and lower the outer end of load boom 13.
The inventor's presently preferred embodiment of the method of the invention includes errecting load boom assembly 13 and balance boom assembly 12 on derrick 10 to the load-lifting attitude, as shown in FIG. 1. Thereafter, a load, such as spud section 26, is suspended from load boom assembly 13 and moved to a position adjacent the top of spud 27. Spud section 26 is then attached to the upper portion of spud 27. Spud 27 may then be extended downwardly through platform 1 l and other sections added until the sea bottom is contacted and platform 11 is jacked up above the surface 34 of the water.
Additionally, the inventors presently preferred embodiment of the apparatus can be utilized on a drilling platform to move heavy objects, such as blow-out preventer stacks, well heads and machinery packages.
Also, it can be used for setting well structures supporting the well head independent of the drilling platform, and for carrying out pile driving operations.
Thus it can be seen that an improved apparatus and method for its use in connection with drilling an offshore well has been shown. Further modifications and alternative embodiments of the invention will be apparent to those skilled in the art in view of this description. Accordingly, this description is to be construed as illustrative only and is for the purpose of teaching those skilled in the art the manner of carrying out the invention. It is to be understood that the form of the invention herewith shown and described is to be taken as the presently preferred embodiment. Various changes may be made in the shape, size and arrangement of parts.
For example, equivalent elements or materials may be substituted for those illustrated and described herein, parts may be reversed and certain features of the invention may be utilized independently of the use of other features, all as would be apparent to one skilled in the art after having the benefit of this description of the invention.
I claim: 1. An offshore oil and gas well drilling rig comprising, in combination an offshore drilling platform a drilling mast supported by said offshore drilling platform and having an upper section and a lower section the upper section of said drilling mast being rotatably disposed on the lower section thereof a draw-works including a draw-works winch and an auxiliary winch disposed on said offshore platform at the foot of the lower section of said drilling mast a crown block mounted on the upper portion of said drilling mast adjacent the top thereof a pair of pivot supports secured to the lower end of the upper section of said drilling mast and oppositely disposed with respect to one another a load boom having its inner end pivotally connected to one of said pivot supports a balance boom having its inner end pivotally connected to the other of said pivot supports a load sheave block carried by said load boom a suitably operated positioning line connected to said load sheave block for horizontally moving the latter along said load boom a load boom topping lift mounted adjacent the upper extremity of the upper section of said drilling mast 6 a lifting cable connected to said load boom, trained works winch over said load boom topping lift, and directed said draw-works line being passed around said crown downwardly through said drilling mast for attachblock and downwardly through said drilling mast to ment to said auxiliary winch carry a travelling block, swivel and kelly or alternaa balance boom topping lift mounted adjacent the 5 tively upper extremity of the upper section of said drilling said draw-works line being directly attached to said mast load sheave block for raising and lowering the load a lifting cable connected to said balance boom, carried thereby.
trained over said balance boom topping lift, and di- 2. The combination of claim 1 wherein the pivotally rected downwardly through said drilling mast for 10 mounted load boom and balance boom are movable attachment to said auxiliary winch and between full horizontal and full vertical positions. a draw-works line connected at one end to said draw-

Claims (2)

1. An offshore oil and gas well drilling rig comprising, in combination an offshore drilling platform a drilling mast supported by said offshore drilling platform and having an upper section and a lower section the upper section of said drilling mast being rotatably disposed on the lower section thereof a draw-works including a draw-works winch and an auxiliary winch disposed on said offshore platform at the foot of the lower section of said drilling mast a crown block mounted on the upper portion of said drilling mast adjacent the top thereof a pair of pivot supports secured to the lower end of the upper section of said drilling mast and oppositely disposed with respect to one another a load boom having its inner end pivotally connected to one of said pivot supports a balance boom having its inner end pivotally connected to the other of said pivot supports a load sheave block carried by said load boom a suitably operated positioning line connected to said load sheave block for horizontally moving the latter along said load boom a load boom topping lift mounted adjacent the upper extremity of the upper section of said drilling mast a lifting cable connected to said load boom, trained over said load boom topping lift, and directed downwardly through said drilling mast for attachment to said auxiliary winch a balance boom topping lift mounted adjacent the upper extremity of the upper section of said drilling mast a lifting cable connected to said balance boom, trained over said balance boom topping lift, and directed downwardly through said drilling mast for attachment to said auxiliary winch and a draw-works line connected at one end to said draw-works winch said draw-works line being passed around said crown block and downwardly through said drilling mast to carry a travelling block, swivel and kelly or alternatively said draw-works line being directly attached to said load sheave block for raising and lowering the load carried thereby.
2. The combination of claim 1 wherein the pivotally mounted load boom and balance boom are movable between full horizontal and full vertical positions.
US00222586A 1972-02-01 1972-02-01 Offshore oil and gas well drilling rig Expired - Lifetime US3752326A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US22258672A 1972-02-01 1972-02-01

Publications (1)

Publication Number Publication Date
US3752326A true US3752326A (en) 1973-08-14

Family

ID=22832829

Family Applications (1)

Application Number Title Priority Date Filing Date
US00222586A Expired - Lifetime US3752326A (en) 1972-02-01 1972-02-01 Offshore oil and gas well drilling rig

Country Status (1)

Country Link
US (1) US3752326A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4074818A (en) * 1976-03-05 1978-02-21 Ray Louis F Loading/unloading crane with buoyant counterweight system
US4113112A (en) * 1976-08-13 1978-09-12 Ray Louis F Constant balance crane
US4220246A (en) * 1978-06-15 1980-09-02 Ray Louis F Sheave adjustable balance crane
US4480757A (en) * 1982-01-28 1984-11-06 Amca International Corporation Collapsible frame support for pivotal boom on a portable crane
EP0166701A1 (en) * 1984-06-13 1986-01-02 Carmelo Fiumefreddo Auxiliary safety sistem for tower rotating crane
US20090314922A1 (en) * 2008-06-19 2009-12-24 General Electric Company Frame support for wind turbine
US20100139069A1 (en) * 2008-06-19 2010-06-10 Jeffrey Michael Daniels Method For Repairing A Generator Frame
US20110017511A1 (en) * 2009-07-23 2011-01-27 Payne Michael L Offshore drilling system
CN104787673A (en) * 2015-03-19 2015-07-22 张同茂 Gantry crane having main beam with suspension cable type structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE558318A (en) *
US2531930A (en) * 1947-12-02 1950-11-28 Moore Corp Lee C Well drilling structure provided with a drill pipe hoist
US2676388A (en) * 1948-04-20 1954-04-27 Faure Andre Method for erecting tower cranes
US2946464A (en) * 1956-07-11 1960-07-26 William C Guier Apparatus for handling stands of pipe
GB1093679A (en) * 1965-10-27 1967-12-06 Hilgers Ag Climbing tower crane
GB1183609A (en) * 1966-05-25 1970-03-11 Edilmac S P A Tower Cranes

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE558318A (en) *
US2531930A (en) * 1947-12-02 1950-11-28 Moore Corp Lee C Well drilling structure provided with a drill pipe hoist
US2676388A (en) * 1948-04-20 1954-04-27 Faure Andre Method for erecting tower cranes
US2946464A (en) * 1956-07-11 1960-07-26 William C Guier Apparatus for handling stands of pipe
GB1093679A (en) * 1965-10-27 1967-12-06 Hilgers Ag Climbing tower crane
GB1183609A (en) * 1966-05-25 1970-03-11 Edilmac S P A Tower Cranes

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4074818A (en) * 1976-03-05 1978-02-21 Ray Louis F Loading/unloading crane with buoyant counterweight system
US4113112A (en) * 1976-08-13 1978-09-12 Ray Louis F Constant balance crane
US4220246A (en) * 1978-06-15 1980-09-02 Ray Louis F Sheave adjustable balance crane
US4480757A (en) * 1982-01-28 1984-11-06 Amca International Corporation Collapsible frame support for pivotal boom on a portable crane
EP0166701A1 (en) * 1984-06-13 1986-01-02 Carmelo Fiumefreddo Auxiliary safety sistem for tower rotating crane
US20100139069A1 (en) * 2008-06-19 2010-06-10 Jeffrey Michael Daniels Method For Repairing A Generator Frame
US20090314922A1 (en) * 2008-06-19 2009-12-24 General Electric Company Frame support for wind turbine
US8113480B2 (en) * 2008-06-19 2012-02-14 General Electric Company Frame support for wind turbine
US8510943B2 (en) 2008-06-19 2013-08-20 General Electric Company Method for repairing a generator frame
CN101608604B (en) * 2008-06-19 2015-09-09 通用电气公司 For the frame support of wind turbine
US20110017511A1 (en) * 2009-07-23 2011-01-27 Payne Michael L Offshore drilling system
US8342249B2 (en) 2009-07-23 2013-01-01 Bp Corporation North America Inc. Offshore drilling system
CN104787673A (en) * 2015-03-19 2015-07-22 张同茂 Gantry crane having main beam with suspension cable type structure

Similar Documents

Publication Publication Date Title
US10612323B2 (en) Simultaneous tubular handling system
US6068066A (en) Hydraulic drilling rig
US7469754B2 (en) Apparatus for slant drilling
JP2993763B2 (en) A device that supports a driven rig directly off center of the oil well
US4489526A (en) Drill rig elevating floor structure
US4371046A (en) Apparatus for and method of drilling a hole into the ground
US4109800A (en) Multi-stage well-drilling mast assembly
CN107709694B (en) Drilling device, handling system, method for independent operation
EP0048076A1 (en) Mobile crane structure
US2946464A (en) Apparatus for handling stands of pipe
US3189093A (en) Well drilling platform
US3851770A (en) Pivoted well drilling mast and separate tower
EP2423148A1 (en) Hoisting crane and vessel with such a crane
US3752326A (en) Offshore oil and gas well drilling rig
US6491174B1 (en) Inverted pedestal crane
CN106223865B (en) Mast folding-back rotary drilling rig and method with drilling rod movable mast
US4061233A (en) Drilling rigs
US4381060A (en) Ring supported mobile tower crane
US2959015A (en) Method and apparatus for removing marine drilling rigs
CN108868601B (en) Rotary drilling rig with backward folded winch auxiliary mast
US4653656A (en) Double center luffing crane
US2975601A (en) Handling of equipment laterally of a well location
US20220371697A1 (en) Hoist apparatus for mobile offshore platform
CN112096312B (en) Traveling block hook device for drilling ship or floating drilling platform
JPH03119284A (en) Down-the-hole drilling excavator