US3716272A - Method of creating large diameter cylindrical cavities by solution mining - Google Patents

Method of creating large diameter cylindrical cavities by solution mining Download PDF

Info

Publication number
US3716272A
US3716272A US00148255A US3716272DA US3716272A US 3716272 A US3716272 A US 3716272A US 00148255 A US00148255 A US 00148255A US 3716272D A US3716272D A US 3716272DA US 3716272 A US3716272 A US 3716272A
Authority
US
United States
Prior art keywords
cavity
hole
floor level
roof
protective blanket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00148255A
Inventor
J Davis
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Consolidation Coal Co
ConocoPhillips Co
Original Assignee
Continental Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Continental Oil Co filed Critical Continental Oil Co
Application granted granted Critical
Publication of US3716272A publication Critical patent/US3716272A/en
Assigned to CONSOLIDATION COAL COMPANY, A CORP OF DE. reassignment CONSOLIDATION COAL COMPANY, A CORP OF DE. ASSIGNMENT OF ASSIGNORS INTEREST. SUBJECT TO LICENSE RECITED Assignors: CONOCO, INC.
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/28Dissolving minerals other than hydrocarbons, e.g. by an alkaline or acid leaching agent
    • E21B43/283Dissolving minerals other than hydrocarbons, e.g. by an alkaline or acid leaching agent in association with a fracturing process

Definitions

  • a fracture is generally formed between the injection well and the production well, and fluids are passed between each well along the fracture line dissolving the salt above and below the fracture.
  • This invention features a method for forming a large diameter cavity having substantially vertical walls rather than the inverted cone shape of the prior art cavities.
  • the cavity will, as a consequence, afford the maximum amount of mined material from a given location or the maximum amount of storage capacity if the cavity is intended for storage purposes such as, for example, propane.
  • the limiting cavity diameter can be substantially increased for a given cavity height.
  • the rate of mineral solution can be greatly increased, thus allowing a much greater volume to be mined per drill hole and decreasing the time required to mine the desired volume.
  • the total amount of soluble material that can be recovered per unit volume of solvent injected can be substantially increased.
  • a horizontal hydraulic fracture is then created at the floor level using fresh water.
  • the fracture is driven out to a radius desired for the cavity which could be as large as I00 feet.
  • the injection pipe is then raised an incremental distance abovc the hydraulic fracture, for example, four feet, and the protective blanket formed as previously described.
  • Solution fluid is then passed down the injection pipe and removed by the production pipe. Periodically, production may be stopped and the protective blanket reformed as previously described, or the protective blanket fiuid can be continuously injected down the pipe and the production stream monitored to determine the proper quantities of blanket fluid.
  • the solution will cause the cavity to form further and further away from the injection pipe, the protective blanket preventing the fresh water from dissolving any of the formation until the water reaches the sides of the cavity.
  • the injection pipe is again raised and the protective blanket reformed and the process repeated.
  • the injection pipe will be raised as many incremental units as needed to form the maximum height of the cavity or to mine all of the material.
  • FIG. 1 illustrates the relationship of the casing, the drilled hole, the injection pipe, the production pipe, and the fracture in a formation where a cavity is to be formed.
  • FIG. 2 illustrates the formation of the initial cavity.
  • FIG. 3 illustrates the completed cavity
  • a soluble formation 10 which could be by way of example sodium chloride or potash ore, has a hole 11 drilled therein.
  • a pipe 12 cases the hole 11 in the formation 13 down to the intended cavity roof l4.
  • Casing 12 may be cemented as illustrated at 15. Inserted within casing 12 is an injection pipe 20, and inserted coaxially within the injection pipe is a production pipe 21.
  • the floor, illustrated by dotted lines 22, is deepened at 23 to facilitate removal of the saturated solution, and the injection pipe 21 lowered into the deepened portion 23.
  • a fracture 24 is then formed using water under hydraulic pressure and extends out a distance desired for the radius of the cavity.
  • the produdtion pipe is then raised a first incremental distance 30 and a protective blanket is formed by passing a water insoluble material 31 down the casing until the material begins to flow up the injection pipe 20.
  • the water insoluble material must be of lower specific gravity than the water or solvent and should be substantially immiscible therewith in order to maintain a proper protective blanket, and may be, for example, hydrocarbon, LPG, or other suitable material.
  • the formation of the cavity begins by passing fresh water down the production pipe and into the formation in the direction of arrow 40 which will dissolve the formation.
  • the saturated solution being heavier, will fall to the bottom of the cavity where the solution will pass up pipe 21.
  • the water insoluble material will prevent the fresh water near the injection pipe from eroding away the area around the hole. Since the fresh water has'a specific gravity less than that of the saturated water, the fresh water will tend to stratify between the saturated solution and the protective blanket, causing the fresh water to move to the side of the cavity where the water will have maximum protection to dissolve the sides of the cavity.
  • the process of injection may be stopped and the water insoluble material again injected into the well as shown by material 42 until it again flows up the injection pipe and extending the protective blanket.
  • Solution mining is again commenced until a point in the formation of the cavity is reached as indicated, for example, by line 45 where the protective blanket process is again repeated. Increments 46 and 47 will then be required to extend the cavity to its maximum diameter.
  • the above process of rebuilding the protective blanket in stages can be repeated by continuously injecting the blanket fluid and monitoring the production stream for evidence of the fluid.
  • the injection pipe 20 is raised to a new position 50, and the process as above described is repeated extending the second increment out to the maximum diameter 51 of the cavity.
  • the maximum height of the cavity can eventually be reached by sufficient number of incremental positions of pipe 20 until the pipe is finally to the desired height 14 of the roof of the cavity. At this point the injection pipe 20 will be substantially even with the bottom of the casing 12.
  • a method for forming a subterranean cavity including the steps of drilling and casing a hole to the depth desired for the roof of the cavity, then deepening the hole to a depth to about 4 feet below the floor level, positioning a dual string of wash pipe with the injection string at the desired floor level and the production string at the bottom of the hole, the improvement comprising creating a horizontal hydraulic fracture at the floor level using fresh water and extending the fracture out a distance desired for the radius of the cavity, injecting a protective blanket over the roof of the cavity, and solution mining the cavity in incremental stages, maintaining the protective blanket for each incremental stage.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

A method for forming a subterranean cavity including the steps of drilling and casing a hole to the depth desired for the roof of the cavity, then deepening the hole to a depth to about 4 feet below the floor level, positioning a dual string of wash pipe with the injection string at the desired floor level and the production string at the bottom of the hole, creating a horizontal hydraulic fracture at the floor level using fresh water and extending the fracture out a distance desired for the radius of the cavity, injecting a protective blanket over the roof of the cavity, and solution mining the cavity in incremental stages, maintaining the protective blanket for each incremental stage.

Description

United States Patent Davis, I1
Feb. 13, 1973 METHOD OF CREATING LARGE [75 Inventor: .1. Gilbert Davis III, l oiica City,
Okla.
[73] Assignee: Continental Oil Company, Ponca City, Okla.
[22] Filed: May 24, 1971 21 Appl. No.: 148,255
[52] US. Cl ..299/5 [51] Int. Cl. ..E2lb 43/28 [58] Field of Search ..299/4, 5
[56] References Cited UNITED STATES PATENTS 3,596,992 8/1971 Dietz ..299/5 3,632,171 1/1972 French et al. 299/5 3,574,402 4/1971 Davis et al.... 299/5 2,009,534 7/1935 Trump ...299/5 3,096,969 7/1963 Edmonds et al ..299/4 Primary Examiner-Ernest R. Purser Att0mey-Joseph C. Kotarski, Henry H. Huth, Robert B. Coleman, Jr. and William .1. Miller [5 7 ABSTRACT A method for forming a subterranean cavity including the steps of drilli and casing a hole to the depth desired for the root of the cavity, then deepening the hole to a depth to about 4 feet below the floor level, positioning a dual string of wash pipe with the injection string at the desired floor level and the production string at the bottom of the hole, creating a horizontal hydraulic fracture at the floor level using fresh water and extending the fracture out a distance desired for the radius of the cavity, injecting a protective blanket over the roof of the cavity, and solution mining the cavity in incremental stages, maintaining the protective blanket for each incremental stage.
3 Claims, 3 Drawing Figures PATENTEUFEH $716,272
"FIGURE-f IIIIIVI FIGURE .3
INVENTOR.
J. GILBERT DAVIS II ATTORNEY METHOD OF CREATING LARGE DIAMETER CYLINDRICAL CAVITIES BY SOLUTION MINING PRIOR ART Two wells are also commonly incorporated, such as that illustrated in the patent to Hendrix et al., US. Pat. No. 2,880,587.
In the two-well system, a fracture is generally formed between the injection well and the production well, and fluids are passed between each well along the fracture line dissolving the salt above and below the fracture.
It is also common practice as shown in the patent to Tracy, US. Pat. No. 1,960,932, to case a well, pass fluids down the outer casing, and draw the solution up an inner casing; however, the method shown by Tracy forms a cavern which resembles an inverted cone since the cavity is growing outward from the originally drilled hole and all solution is taking place on the cavity wall closest to the inlet pipe. The wall soon becomes semiprotected from the solvent by a layer of saturated brine and clay and other insoluble materials that settle out as the salt is dissolved.
OBJECTS AND FEATURES OF THE INVENTION This invention features a method for forming a large diameter cavity having substantially vertical walls rather than the inverted cone shape of the prior art cavities. The cavity will, as a consequence, afford the maximum amount of mined material from a given location or the maximum amount of storage capacity if the cavity is intended for storage purposes such as, for example, propane. Thus, the limiting cavity diameter can be substantially increased for a given cavity height. Furthermore, the rate of mineral solution can be greatly increased, thus allowing a much greater volume to be mined per drill hole and decreasing the time required to mine the desired volume. As a consequence to the above, the total amount of soluble material that can be recovered per unit volume of solvent injected can be substantially increased.
These and other features are accomplished by drilling a hold into a formation to a depth desired for the cavity floor. The hole thus drilled is then cased to a depth desired for the final roof of the cavity or for the maximum height of the material to be mined. The hole is then deepened about 4 feet below the desired floor level and a dual string of wash pipe is inserted into the drilled hole with the injection string terminating at the desired floor level and the production string terminating at the bottom of the hole (which was deepened four feet). A protective blanket of water insoluble material is then passed down the outside of the injection pipe and permitted to flow up the pipe indicating the area between the injection pipe and the drilled hole is full of water insoluble material. A 6 foot diameter cavity is then solution mined for use as a hydraulic fracture initiation notch as described in US. Pat. No. 3,574,402. Other forms of notching can be used, for example, mechanical notching tools. A horizontal hydraulic fracture is then created at the floor level using fresh water. The fracture is driven out to a radius desired for the cavity which could be as large as I00 feet. The injection pipe is then raised an incremental distance abovc the hydraulic fracture, for example, four feet, and the protective blanket formed as previously described. Solution fluid is then passed down the injection pipe and removed by the production pipe. Periodically, production may be stopped and the protective blanket reformed as previously described, or the protective blanket fiuid can be continuously injected down the pipe and the production stream monitored to determine the proper quantities of blanket fluid. The solution will cause the cavity to form further and further away from the injection pipe, the protective blanket preventing the fresh water from dissolving any of the formation until the water reaches the sides of the cavity.
To raise the height of the cavity or to continue mining, the injection pipe is again raised and the protective blanket reformed and the process repeated. The injection pipe will be raised as many incremental units as needed to form the maximum height of the cavity or to mine all of the material.
' BRIEF DESCRIPTION OF THE DRAWING Referring to the drawing,
FIG. 1 illustrates the relationship of the casing, the drilled hole, the injection pipe, the production pipe, and the fracture in a formation where a cavity is to be formed.
FIG. 2 illustrates the formation of the initial cavity.
FIG. 3 illustrates the completed cavity.
SPECIFIC DESCRIPTION OF THE FIGURES Referring to FIG. 1, a soluble formation 10, which could be by way of example sodium chloride or potash ore, has a hole 11 drilled therein. A pipe 12 cases the hole 11 in the formation 13 down to the intended cavity roof l4. Casing 12 may be cemented as illustrated at 15. Inserted within casing 12 is an injection pipe 20, and inserted coaxially within the injection pipe is a production pipe 21. The floor, illustrated by dotted lines 22, is deepened at 23 to facilitate removal of the saturated solution, and the injection pipe 21 lowered into the deepened portion 23. A fracture 24 is then formed using water under hydraulic pressure and extends out a distance desired for the radius of the cavity.
Referring to FIG. 2 the produdtion pipe is then raised a first incremental distance 30 and a protective blanket is formed by passing a water insoluble material 31 down the casing until the material begins to flow up the injection pipe 20. The water insoluble material must be of lower specific gravity than the water or solvent and should be substantially immiscible therewith in order to maintain a proper protective blanket, and may be, for example, hydrocarbon, LPG, or other suitable material. The formation of the cavity begins by passing fresh water down the production pipe and into the formation in the direction of arrow 40 which will dissolve the formation. The saturated solution, being heavier, will fall to the bottom of the cavity where the solution will pass up pipe 21. The water insoluble material will prevent the fresh water near the injection pipe from eroding away the area around the hole. Since the fresh water has'a specific gravity less than that of the saturated water, the fresh water will tend to stratify between the saturated solution and the protective blanket, causing the fresh water to move to the side of the cavity where the water will have maximum protection to dissolve the sides of the cavity.
After a period of time as indicated by the dotted lines 41, the process of injection may be stopped and the water insoluble material again injected into the well as shown by material 42 until it again flows up the injection pipe and extending the protective blanket. Solution mining is again commenced until a point in the formation of the cavity is reached as indicated, for example, by line 45 where the protective blanket process is again repeated. Increments 46 and 47 will then be required to extend the cavity to its maximum diameter.
The above process of rebuilding the protective blanket in stages can be repeated by continuously injecting the blanket fluid and monitoring the production stream for evidence of the fluid.
Referring to FIG. 3, when the cavity reaches its maximum diameter, the injection pipe 20 is raised to a new position 50, and the process as above described is repeated extending the second increment out to the maximum diameter 51 of the cavity.
The maximum height of the cavity can eventually be reached by sufficient number of incremental positions of pipe 20 until the pipe is finally to the desired height 14 of the roof of the cavity. At this point the injection pipe 20 will be substantially even with the bottom of the casing 12.
The process is again repeated until the cavity roof is extended out to the maximum diameter of the cavity.
It is obvious that the shorter the increments that are selected, the more nearly straight will be the side walls. The ideal increments for solution mining the maximum product with the minimum water or solvent usage will depend upon the particular mineral being mined and the solvents used.
It is further obvious that changes and modifications can be made in the increment distances selected, the solvents, the blanket protection material, and in the number of sequential extensions of the blanket protection and still be within the spirit and scope of this invention.
lclaim:
l. A method for forming a subterranean cavity including the steps of drilling and casing a hole to the depth desired for the roof of the cavity, then deepening the hole to a depth to about 4 feet below the floor level, positioning a dual string of wash pipe with the injection string at the desired floor level and the production string at the bottom of the hole, the improvement comprising creating a horizontal hydraulic fracture at the floor level using fresh water and extending the fracture out a distance desired for the radius of the cavity, injecting a protective blanket over the roof of the cavity, and solution mining the cavity in incremental stages, maintaining the protective blanket for each incremental stage.
2. A method as described in claim 1 wherein said protective blanket is continuously injected over the roof of the cavity while said solution mining is taking place.
3. A method as described in claim 1 wherein said solution mining of the cavity during each incremental stage is performed in sequences of a. inserting a protective blanket over the roof of the cavity, b. solution mining the cavity to a greater diameter,
and c. repeating steps a and b until the desired diameter of the cavity is reached.

Claims (3)

1. A method for forming a subterranean cavity including the steps of drilling and casing a hole to the depth desired for the roof of the cavity, then deepening the hole to a depth to about 4 feet below the floor level, positioning a dual string of wash pipe with the injection string at the desired floor level and the production string at the bottom of the hole, the improvement comprising creating a horizontal hydraulic fracture at the floor level using fresh water and extending the fracture out a distance desired for the radius of the cavity, injecting a protective blanket over the roof of the cavity, and solution mining the cavity in incremental stages, maintaining the protective blanket for each incremental stage.
1. A method for forming a subterranean cavity including the steps of drilling and casing a hole to the depth desired for the roof of the cavity, then deepening the hole to a depth to about 4 feet below the floor level, positioning a dual string of wash pipe with the injection string at the desired floor level and the production string at the bottom of the hole, the improvement comprising creating a horizontal hydraulic fracture at the floor level using fresh water and extending the fracture out a distance desired for the radius of the cavity, injecting a protective blanket over the roof of the cavity, and solution mining the cavity in incremental stages, maintaining the protective blanket for each incremental stage.
2. A method as described in claim 1 wherein said protective blanket is continuously injected over the roof of the cavity while said solution mining is taking place.
US00148255A 1971-05-24 1971-05-24 Method of creating large diameter cylindrical cavities by solution mining Expired - Lifetime US3716272A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US14825571A 1971-05-24 1971-05-24

Publications (1)

Publication Number Publication Date
US3716272A true US3716272A (en) 1973-02-13

Family

ID=22524975

Family Applications (1)

Application Number Title Priority Date Filing Date
US00148255A Expired - Lifetime US3716272A (en) 1971-05-24 1971-05-24 Method of creating large diameter cylindrical cavities by solution mining

Country Status (2)

Country Link
US (1) US3716272A (en)
CA (1) CA943456A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4290650A (en) * 1979-08-03 1981-09-22 Ppg Industries Canada Ltd. Subterranean cavity chimney development for connecting solution mined cavities
US5431482A (en) * 1993-10-13 1995-07-11 Sandia Corporation Horizontal natural gas storage caverns and methods for producing same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2009534A (en) * 1933-08-12 1935-07-30 Edward N Trump System for mining a soluble
US3096969A (en) * 1961-05-26 1963-07-09 Pittsburgh Plate Glass Co Recovery of potassium chloride
US3574402A (en) * 1969-03-18 1971-04-13 Continental Oil Co Fracture initiation by dissolving a soluble formation
US3596992A (en) * 1969-07-02 1971-08-03 Shell Oil Co Method for recovering salt from a subsurface earth formation
US3632171A (en) * 1970-02-04 1972-01-04 Allied Chem Method of controlling growth of brine wells

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2009534A (en) * 1933-08-12 1935-07-30 Edward N Trump System for mining a soluble
US3096969A (en) * 1961-05-26 1963-07-09 Pittsburgh Plate Glass Co Recovery of potassium chloride
US3574402A (en) * 1969-03-18 1971-04-13 Continental Oil Co Fracture initiation by dissolving a soluble formation
US3596992A (en) * 1969-07-02 1971-08-03 Shell Oil Co Method for recovering salt from a subsurface earth formation
US3632171A (en) * 1970-02-04 1972-01-04 Allied Chem Method of controlling growth of brine wells

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4290650A (en) * 1979-08-03 1981-09-22 Ppg Industries Canada Ltd. Subterranean cavity chimney development for connecting solution mined cavities
US5431482A (en) * 1993-10-13 1995-07-11 Sandia Corporation Horizontal natural gas storage caverns and methods for producing same

Also Published As

Publication number Publication date
CA943456A (en) 1974-03-12

Similar Documents

Publication Publication Date Title
US3014423A (en) Apparatus for drilling boreholes with explosive charges
US4221433A (en) Retrogressively in-situ ore body chemical mining system and method
US6688702B1 (en) Borehole mining method
US2970645A (en) Producing multiple fractures in a well
US2787455A (en) Method for developing cavities in salt or other soluble rock
US3387888A (en) Fracturing method in solution mining
US3277654A (en) Underground storage caverns and method of making the same and of storing fluids therein
US4488834A (en) Method for using salt deposits for storage
US3852967A (en) Method of filling subterranean voids with a particulate material
US20210025241A1 (en) Deep human-made cavern construction
US3439953A (en) Apparatus for and method of mining a subterranean ore deposit
US4458947A (en) Mining method
US3058521A (en) Method of initiating fractures in earth formations
US20110315379A1 (en) Producing hydrocarbon material from a layer of oil sand
US3612608A (en) Process to establish communication between wells in mineral formations
US3018095A (en) Method of hydraulic fracturing in underground formations
US2966346A (en) Process for removal of minerals from sub-surface stratum by liquefaction
US4596490A (en) Underground storage chambers and methods therefore
US3374633A (en) Underground storage and method of forming the same
US3716272A (en) Method of creating large diameter cylindrical cavities by solution mining
US3632171A (en) Method of controlling growth of brine wells
US20110315397A1 (en) Producing hydrocarbon material from a layer of oil sand
RU2754232C1 (en) Method for constructing an underground tunnel reservoir in a rock salt reservoir of limited capacity
US3574402A (en) Fracture initiation by dissolving a soluble formation
US3442553A (en) Slurry mining of carnallite

Legal Events

Date Code Title Description
AS Assignment

Owner name: CONSOLIDATION COAL COMPANY, A CORP OF DE.

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST. SUBJECT TO LICENSE RECITED;ASSIGNOR:CONOCO, INC.;REEL/FRAME:004923/0180

Effective date: 19870227