US3670813A - Pontoon structures in man-made lake for arctic operations - Google Patents

Pontoon structures in man-made lake for arctic operations Download PDF

Info

Publication number
US3670813A
US3670813A US59402A US3670813DA US3670813A US 3670813 A US3670813 A US 3670813A US 59402 A US59402 A US 59402A US 3670813D A US3670813D A US 3670813DA US 3670813 A US3670813 A US 3670813A
Authority
US
United States
Prior art keywords
barge
permafrost
liquid
lake
placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US59402A
Inventor
Floyd R Duncan
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pan American Petroleum Corp
Original Assignee
Pan American Petroleum Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pan American Petroleum Corp filed Critical Pan American Petroleum Corp
Application granted granted Critical
Publication of US3670813A publication Critical patent/US3670813A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/02Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B2211/00Applications
    • B63B2211/06Operation in ice-infested waters
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S166/00Wells
    • Y10S166/901Wells in frozen terrain

Definitions

  • This invention relates to a system for supporting surface installations or equipment on top of a permafrost zone in the Arctic. It relates especially to a system utilizing a man-made lake to support such surface installations.
  • such special means usually consists of using gravel pads or piles or combinations of these where piles are placed deep in the permafrost so that at the time of maximum thawing there is adequate piling penetration in the unthawed or unaltered permafrost to provide continuing support.
  • the present invention discloses another manner of supporting surface installations and which in some cases may be superior and useable when more conventional means of support would fail or be more costly to install and maintain.
  • a man-made lake usually of water, is created at the location at which it is desired to support a surface installation.
  • a barge is placed on the lake, with optional access by means of a pontoon bridge. This barge is of sufficient size to support any installation or facility selected to be placed on it. Further, the barge is made sufficiently strong so that it' can withstand the ice forces in winter.
  • the lake is'made so that the water depth is sufficient to buoyantly support the barge during periods of thaw and to hydraulically dampen any upward or downward heaving action of the permafrost beneath the lake itself. Water is added to or taken from the lake to maintain a desired level therein, and thereby maintain a prescribed absolute elevation for the surface installation where such a feature is important to the installation.
  • FIG. 1 illustrates a view, partly in cross-section, of a manmade lake carved out of the permafrost and on which is shown a barge carrying a derrick, a casing and other facilities.
  • FIG. 2 is similar to FIG. 1 except that the lake is made by dikes above the surface.
  • FIG. 1 shows a barge supported by a body of water 12 which is made by excavating a cavity in permafrost zone 14.
  • the area of the body of water 12 is sufficient to accommodate a barge 10 of selected size.
  • the size of the barge l0 depends upon the services it is to perform.
  • the depth of the body of water 12 is sufficient to maintain the barge 10 in a floating position during periods of thaw and also is sufficiently deep to minimize and dampen any upward or downward heaving action of the permafrost beneath the created lake.
  • a typical thickness or depth of water is about 6 to 10 feet. The depth should be slightly more than the depth of the normal thaw line of the permafrost, but of course being deep enough to support the barge to be placed thereon.
  • barge 10 In addition to barge 10 being of sufficient size to provide proper buoyancy for its load, it must also be built strong enough to withstand the forces of ice when the lake freezes in the winter.
  • a pump 16 is provided for pumping water from a source not shown into the lake through pipe l8 to offset surface subsidence. If the level in the lake rises too much, water can be pumped out through line 18 so as to main tain the proper level.
  • Barge 10 is shown in a position above a well bore 20.
  • This well bore has casing 22 mounted therein.
  • the upper end of casing 22 is shown supported from dezrrick 24 by constant tensioning means 26 which are not usually essential but would be helpful in some situations such as if the level of water in the lake should vary.
  • the derrick 24 can be used for drilling a well but is ordinarily removed after the well is completed; although it may be desirable to leave the derrick there for future workover operations.
  • the barge facility can also be useful for producing operations.
  • a producing string 28 can be mounted inside casing 22 in a conventional manner.
  • the upper end of tubing 28 is connected to a treating facility 30.
  • the outlet of treating facility 30 is to a discharge line 32 which goes to a gathering facility not shown.
  • the barge 10 can also be used to support any other facility such as living quarters with or without borehole 20 and its accompanying producing facilities.
  • anchors 36 are connected to winches 38 on the barge by anchor lines 40.
  • the excavated lake will normally fill with water naturally from the surrounding thawing permafrost. As the lake fills, the barge will eventually be buoyantly supported by the water. The surface of the lake will seek the level of the surrounding ground water in the thawed permafrost. The barge is then anchored as described above.
  • a levee-type lake is shown in FIG. 12.
  • the lake 42 is shown as being held by levees or dams 44. If the dams or levees or the bottom of the lake are exceptionally permeable it may be necessary to place an impermeable barrier over these areas.
  • Such an impermeable area may be an impermeable asphalt sheet designated in the drawing as reference numeral 46.
  • Barge l placed in a lake as shown in FIG. 2 would function quite similarly as a barge in the embodiment of FIG. 1. in either type lake, access to the barge can be by pontoon bridge 48 as illustrated in FIG. 2.
  • a method of supporting an installation at a selected location in the permafrost area which comprises:
  • a method as defined in claim 5 including the steps of placing an oil treating facility on said barge and then treating said produced oil on said oil treating facility.
  • a method as defined in claim 1 including the step of making the lake a minimum depth of about 6 feet to minimize thawing of the permafrost immediately below the lake.
  • a method of supporting a barge at a selected location in an area of permafrost which comprises:
  • a method as defined in claim 9 including the additional steps of:
  • a method as defined in claim 9 including the steps of placing an oil treating facility on said barge and then treating said produced oil on said oil treating facility.
  • a method as defined in claim 9 which includes the steps of maintaining a selected level of said body of liquid by adding liquid thereto or removing liquid as required.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The surface of the ground in the Arctic is unstable due to settling of the permafrost during thawing periods and to uneven heaving when extreme temperature changes occur within the permafrost zone. Extraction of hot fluids from deep subsurface wells drilled through the permafrost and other sources of heat emission such as from surface installations aggravate and add to the permafrost instability. This causes problems with foundations for surface installations. These problems are relieved by the use of a man-made lake to buoyantly support a surface installation such as a drilling rig, oil treating facilities, etc. The barge supporting the surface installation must be water-tight during periods of thaw and must be of sufficient strength to withstand ice forces in the winter.

Description

United States Patent Duncan [451 June 20, 1972 [72] Inventor: Floyd R. Duncan, Tulsa, Okla.
[73] Assignee: Pan American Petroleum Corporation,
Tulsa, Okla.
221 Filed: July 30,1970
[21] Appl.No.: 59,402
Hendrick ..6l/.5 X
26 TO GATHERING FACILITIES TREATING FACILITIES OTHER PUBLICATIONS Muller, Permafrost or Permanently Frozen Ground and Related Engineering Problems, J. W. Edwards, 1nc. Ann Arbor, Michigan, 1947, pp. 130, 176, 177.
Primary Examiner-David .I. Williamowsky Assistant Examiner-David H. Corbin Attorney-Paul F. Hawley and John D. Gassett ABSTRACT The surface of the ground in the Arctic is unstable due to settling of the pennafrost during thawing periods and to uneven heaving when extreme temperature changes occur within the pennafrost zone. Extraction of hot fluids from deep subsurface wells drilled through the permafrost and other sources of heat emission such as from surface installations aggravate and add to the permafrost instability. This causes problems with foundations for surface installations. These problems are relieved by the use of a man-made lake to buoyantly support a surface installation such as a drilling rig, oil treating facilities, etc. The barge supporting the surface installation must be water-tight during periods of thaw and must be of sufficient strength to withstand ice forces in the winter.
12 Claims, 2 Drawing Figures l8 WATER SUPPLY OR WITHDRAWAL PIITENTEDmzo I972 3.670.813"
' SHEET 2 or 2 PERMAFROST WATER SUPPLY OR WITHDRAWAL FIG.2
TREATING FACILITIES TO GATHERING FACILITIES INVENTOR- FLOYD R. DUNCAN A TTORNE Y PONTOON STRUCTURES'IN MAN-MADE LAKE FOR ARCTIC OPERATIONS BACKGROUND OF THE INVENTION 1 Field of the Invention This invention relates to a system for supporting surface installations or equipment on top of a permafrost zone in the Arctic. It relates especially to a system utilizing a man-made lake to support such surface installations.
2. Setting of the Invention The search for oil and gas has led man to all comers of the earth. One of the recent such far comers is the Arctic North and especially the North Slope of Alaska. One of the biggest problems facing operation in areas covered by permafrost is the obtaining of a stable foundation upon which to place various surface facilities. The surface of permafrost is subject to widely changing states of conditions within a yearly period. For example, in the summer, it is common for the upper 4 or 5 feet to melt; this leaves the surface in more or less a marsh or swampy condition. Thus facilities that were set on the surface when the permafrost was rigidly frozen would ordinarily sink deep into the permafrost during seasons of thawing or even in winter if there is a substantial emission of heat attendant to surface or subsurface installations. The surface is also subjected to uneven heaving during extreme cold periods in the winter. Thus whenever equipment of any size, e.g., drilling derricks, installation facilities, warehouses, living quarters, etc., is to be used in the Arctic North there must be special means provided to support them in a stable fashion. At the present time such special means usually consists of using gravel pads or piles or combinations of these where piles are placed deep in the permafrost so that at the time of maximum thawing there is adequate piling penetration in the unthawed or unaltered permafrost to provide continuing support. The present invention discloses another manner of supporting surface installations and which in some cases may be superior and useable when more conventional means of support would fail or be more costly to install and maintain.
BRIEF DESCRIPTION OF THE INVENTION A man-made lake, usually of water, is created at the location at which it is desired to support a surface installation. A barge is placed on the lake, with optional access by means of a pontoon bridge. This barge is of sufficient size to support any installation or facility selected to be placed on it. Further, the barge is made sufficiently strong so that it' can withstand the ice forces in winter. The lake is'made so that the water depth is sufficient to buoyantly support the barge during periods of thaw and to hydraulically dampen any upward or downward heaving action of the permafrost beneath the lake itself. Water is added to or taken from the lake to maintain a desired level therein, and thereby maintain a prescribed absolute elevation for the surface installation where such a feature is important to the installation.
BRIEF DESCRIPTION OF THE DRAWINGS v Various objectives and a better understanding can be had of the invention by the following description of the drawings.
FIG. 1 illustrates a view, partly in cross-section, of a manmade lake carved out of the permafrost and on which is shown a barge carrying a derrick, a casing and other facilities.
FIG. 2 is similar to FIG. 1 except that the lake is made by dikes above the surface.
DETAILED DESCRIPTION OF THE INVENTION Attention is first directed to FIG. 1 which shows a barge supported by a body of water 12 which is made by excavating a cavity in permafrost zone 14. The area of the body of water 12 is sufficient to accommodate a barge 10 of selected size. The size of the barge l0 depends upon the services it is to perform. The depth of the body of water 12 is sufficient to maintain the barge 10 in a floating position during periods of thaw and also is sufficiently deep to minimize and dampen any upward or downward heaving action of the permafrost beneath the created lake. A typical thickness or depth of water is about 6 to 10 feet. The depth should be slightly more than the depth of the normal thaw line of the permafrost, but of course being deep enough to support the barge to be placed thereon.
In addition to barge 10 being of sufficient size to provide proper buoyancy for its load, it must also be built strong enough to withstand the forces of ice when the lake freezes in the winter.
It is ordinarily desired to maintain the level of water 12 fairly constant, particularly where several subsurface wells and associated well head facilities are supported and served by the barge facility. Thus a pump 16 is provided for pumping water from a source not shown into the lake through pipe l8 to offset surface subsidence. If the level in the lake rises too much, water can be pumped out through line 18 so as to main tain the proper level. I
Barge 10 is shown in a position above a well bore 20. This well bore has casing 22 mounted therein. The upper end of casing 22 is shown supported from dezrrick 24 by constant tensioning means 26 which are not usually essential but would be helpful in some situations such as if the level of water in the lake should vary. The derrick 24 can be used for drilling a well but is ordinarily removed after the well is completed; although it may be desirable to leave the derrick there for future workover operations.
. The barge facility can also be useful for producing operations. For example, a producing string 28 can be mounted inside casing 22 in a conventional manner. The upper end of tubing 28 is connected to a treating facility 30. The outlet of treating facility 30 is to a discharge line 32 which goes to a gathering facility not shown. The barge 10 can also be used to support any other facility such as living quarters with or without borehole 20 and its accompanying producing facilities.
When using the barge to support a casing it is important that the barge be maintained in a more or less fixed position. Thus anchors 36 are connected to winches 38 on the barge by anchor lines 40.
I shall now discuss briefly one method of creating the lake and placing a barge thereon. I prefer to create a lake by excavating permafrost in its frozen state in the winter. I make the excavation deep enough with sufficient area to accommodate the barge which is to be placed on the lake to be created. While the ground is frozen, I slide the barge into the excavation and let it come to rest on the bottom thereof. The barge will preferably be on skids. When the thaw comes the excavated lake will normally fill with water naturally from the surrounding thawing permafrost. As the lake fills, the barge will eventually be buoyantly supported by the water. The surface of the lake will seek the level of the surrounding ground water in the thawed permafrost. The barge is then anchored as described above.
As stated above it is normally desirable that the lake be created by excavation as this is usually more economical and the maintenance of the proper amount of water is easier. However in some instances it may be desirable to build the manmade lake with leveesrln some cases it may even be desirable to build the lake by a combination of excavations and levees. A levee-type lake is shown in FIG. 12. There the lake 42 is shown as being held by levees or dams 44. If the dams or levees or the bottom of the lake are exceptionally permeable it may be necessary to place an impermeable barrier over these areas. Such an impermeable area may be an impermeable asphalt sheet designated in the drawing as reference numeral 46. There are many ingenious ways in which the seepage of water through any artificial restraining walls and their resulting deterioration can be minimized by usage of impermeable barriers such as by relatively low-cost pliable thin films, membranes, natural clays, bentonitic materials as would appear justifiable by the physical circumstances encountered. However, it is to be understood that some movement of waters into and out of the lake can be tolerated without incun-ing excessive corrective costs. This movement of water might occasionally be a problem in the embodiment of H6. 2 but will probably seldom if ever be a problem in the embodiment of FIG. 1.
Barge l placed in a lake as shown in FIG. 2 would function quite similarly as a barge in the embodiment of FIG. 1. in either type lake, access to the barge can be by pontoon bridge 48 as illustrated in FIG. 2.
While the above embodiments of the invention have been described with considerable detail, it is to be understood that various modifications of the device can be made without departing from the spirit or the scope of the invention.
I claim:
1. A method of supporting an installation at a selected location in the permafrost area which comprises:
constructing a lake-retaining means at the selected location in said pennafrost area;
filling said lake-retaining means with a liquid to form a body of said liquid, the depth and volume of said liquid being sufficient to buoyantly support a barge and to dampen any upward or downward heaving action of the permafrost beneath said body of said liquid;
placing a floating barge on said body of liquid;
placing the installation to be supported on said barge;
maintaining said barge in a relatively fixed position.
2. A method as defined in claim 1 wherein said lake retaining means is made by excavating permafrost.
3. A method as defined in claim 1 in which said lake retaining means is made by building a retaining wall above the natural surface of the permafrost.
4. A method as defined in claim 1 including the additional steps of:
drilling a well from said barge;
placing casing in said well bore.
5. A method as defined in claim 1 in which said lake retaining means is made by a combination of digging an excavation and building a levee around such excavation.
6. A method as defined in claim 5 including the steps of placing an oil treating facility on said barge and then treating said produced oil on said oil treating facility.
7. A method as defined in claim 1 in which said liquid is water and including the steps of maintaining a selected level of said liquid by adding liquid thereto or removing liquid as required.
8. A method as defined in claim 1 including the step of making the lake a minimum depth of about 6 feet to minimize thawing of the permafrost immediately below the lake.
9. A method of supporting a barge at a selected location in an area of permafrost which comprises:
constructing a lake at the selected location by excavating a cavity in said pemiafrost when frozen;
sliding a barge onto the bottom of the resulting cavity while the exposed permafrost is still frozen;
leaving the barge in the cavity while allowing the surrounding permafrost to thaw and provide a body of liquid in the cavity, the depth and volume of said liquid being sufficient to buoyantly support said barge;
then maintaining said barge in a relatively fixed position.
10. A method as defined in claim 9 including the additional steps of:
drilling a well from said barge;
placing casing in said well.
11. A method as defined in claim 9 including the steps of placing an oil treating facility on said barge and then treating said produced oil on said oil treating facility.
12. A method as defined in claim 9 which includes the steps of maintaining a selected level of said body of liquid by adding liquid thereto or removing liquid as required.

Claims (12)

1. A method of supporting an installation at a selected location in the permafrost area which comprises: constructing a lake-retaining means at the selected location in said permafrost area; filling said lake-retaining means with a liquid to form a body of said liquid, the depth and volume of said liquid being sufficient to buoyantly support a barge and to dampen any upward or downward heaving action of the permafrost beneath said body of said liquid; placing a floating barge on said body of liquid; placing the installation to be supported on said barge; maintaining said barge in a relatively fixed position.
2. A method as defined in claim 1 wherein said lake retaining means is made by excavating permafrost.
3. A method as defined in claim 1 in which said lake retaining means is made by building a retaining wall above the natural surface of the permafrost.
4. A method as defined in claim 1 including the additional steps of: drilling a well from said barge; placing casing in said well bore.
5. A method as defined in claim 1 in which said lake retaining means is made by a combination of digging an excavation and building a levee around such excavation.
6. A method as defined in claim 5 including the steps of placing an oil treating facility on said barge and then treating said produced oil on said oil treating facility.
7. A method as defined in claim 1 in which said liquid is water and including the steps of maintaining a selected level of said liquid by adding liquid thereto or removing liquid as required.
8. A method aS defined in claim 1 including the step of making the lake a minimum depth of about 6 feet to minimize thawing of the permafrost immediately below the lake.
9. A method of supporting a barge at a selected location in an area of permafrost which comprises: constructing a lake at the selected location by excavating a cavity in said permafrost when frozen; sliding a barge onto the bottom of the resulting cavity while the exposed permafrost is still frozen; leaving the barge in the cavity while allowing the surrounding permafrost to thaw and provide a body of liquid in the cavity, the depth and volume of said liquid being sufficient to buoyantly support said barge; then maintaining said barge in a relatively fixed position.
10. A method as defined in claim 9 including the additional steps of: drilling a well from said barge; placing casing in said well.
11. A method as defined in claim 9 including the steps of placing an oil treating facility on said barge and then treating said produced oil on said oil treating facility.
12. A method as defined in claim 9 which includes the steps of maintaining a selected level of said body of liquid by adding liquid thereto or removing liquid as required.
US59402A 1970-07-30 1970-07-30 Pontoon structures in man-made lake for arctic operations Expired - Lifetime US3670813A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US5940270A 1970-07-30 1970-07-30

Publications (1)

Publication Number Publication Date
US3670813A true US3670813A (en) 1972-06-20

Family

ID=22022716

Family Applications (1)

Application Number Title Priority Date Filing Date
US59402A Expired - Lifetime US3670813A (en) 1970-07-30 1970-07-30 Pontoon structures in man-made lake for arctic operations

Country Status (1)

Country Link
US (1) US3670813A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3845631A (en) * 1970-08-26 1974-11-05 G Malan Dam building system
US6745852B2 (en) 2002-05-08 2004-06-08 Anadarko Petroleum Corporation Platform for drilling oil and gas wells in arctic, inaccessible, or environmentally sensitive locations
WO2014146213A1 (en) * 2013-03-18 2014-09-25 中集海洋工程研究院有限公司 Split-type drilling ship and method for manufacturing split-type drilling ship

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US234185A (en) * 1880-11-09 Storage-tank
US367547A (en) * 1887-08-02 poetsch
US3015360A (en) * 1957-08-19 1962-01-02 Shell Oil Co Method and apparatus for underwater drilling
US3377810A (en) * 1966-02-09 1968-04-16 Ernest W. Crumley Pumping apparatus for drydock and caisson
US3394550A (en) * 1966-09-28 1968-07-30 Chevron Res Method of water harvesting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US234185A (en) * 1880-11-09 Storage-tank
US367547A (en) * 1887-08-02 poetsch
US3015360A (en) * 1957-08-19 1962-01-02 Shell Oil Co Method and apparatus for underwater drilling
US3377810A (en) * 1966-02-09 1968-04-16 Ernest W. Crumley Pumping apparatus for drydock and caisson
US3394550A (en) * 1966-09-28 1968-07-30 Chevron Res Method of water harvesting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Muller, Permafrost or Permanently Frozen Ground and Related Engineering Problems, J. W. Edwards, Inc. Ann Arbor, Michigan, 1947, pp. 130, 176, 177. *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3845631A (en) * 1970-08-26 1974-11-05 G Malan Dam building system
US6745852B2 (en) 2002-05-08 2004-06-08 Anadarko Petroleum Corporation Platform for drilling oil and gas wells in arctic, inaccessible, or environmentally sensitive locations
US20100143044A1 (en) * 2002-05-08 2010-06-10 Kadaster Ali G Method and System for Building Modular Structures from Which Oil and Gas Wells are Drilled
WO2014146213A1 (en) * 2013-03-18 2014-09-25 中集海洋工程研究院有限公司 Split-type drilling ship and method for manufacturing split-type drilling ship

Similar Documents

Publication Publication Date Title
US3630037A (en) Arctic piles
Grantz Immersed tunnel settlements. Part 1: nature of settlements
US4676695A (en) Method for preventing thaw settlement along offshore artic pipelines
US4326818A (en) Techniques for the storage of water
CN106638547A (en) Pile-forming method for cast-in-place pile in coral sand foundation
US4094149A (en) Offshore structure in frigid environment
Le et al. Prototype testing for the partial removal and re-penetration of the mooring dolphin platform with multi-bucket foundations
US3670813A (en) Pontoon structures in man-made lake for arctic operations
Ischy et al. AN INTRODUCTION TO ALLUVIAL GROUTING.
US3518840A (en) Method of and apparatus for connecting a pipeline across an obstruction
US3998061A (en) Formation of cavities in the bed of a sheet of water
Newman et al. Sinking a jacked caisson within the London Basin geological sequence for the Thames Water Ring Main extension
Moore et al. Hydraulic uplift of the base of a deep excavation in Oxford Clay
US3785158A (en) Hydraulic engineering installations
US3675430A (en) Arctic construction and drilling
US4205928A (en) Offshore structure in frigid environment
Ward et al. The use of simple relief wells in reducing water pressure beneath a trench excavation.
Troughton The design and performance of foundations for the Canary Wharf development in London Docklands
Kennard et al. SELSET RESERVOIR: DESIGN AND CONSTRUCTION.
Rowe The potentially latent dominance of groundwater in ground engineering
Anderson Secant piles support access shafts for tunnel crossing in difficult geologic conditions
Mansur et al. Dewatering Cofferdam for construction of Olmsted locks
Ho Control of Seepage Pressures beneath Cut-and-Cover Excavation in Varved Glacial Silt
Asthana et al. Foundation Treatment of Dams
JPS6213449B2 (en)