CN106638547A - Pile-forming method for cast-in-place pile in coral sand foundation - Google Patents

Pile-forming method for cast-in-place pile in coral sand foundation Download PDF

Info

Publication number
CN106638547A
CN106638547A CN201610903940.0A CN201610903940A CN106638547A CN 106638547 A CN106638547 A CN 106638547A CN 201610903940 A CN201610903940 A CN 201610903940A CN 106638547 A CN106638547 A CN 106638547A
Authority
CN
China
Prior art keywords
pile
grouting pipe
cast
stake holes
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610903940.0A
Other languages
Chinese (zh)
Other versions
CN106638547B (en
Inventor
刘汉龙
郑长杰
胡鼎
周航
王建平
楚剑
丁选明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201610903940.0A priority Critical patent/CN106638547B/en
Publication of CN106638547A publication Critical patent/CN106638547A/en
Application granted granted Critical
Publication of CN106638547B publication Critical patent/CN106638547B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Artificial Fish Reefs (AREA)

Abstract

The invention discloses a pile-forming method for a cast-in-place pile in a coral sand foundation. The method is characterized by comprising: reinforcing a piling position of a cast-in-place pile and the coral around by preliminary grouting, such that a column body isolated from the peripheral foundation and underwater is formed, then piling in the column body. The construction method is characterized in that after the grouting of certain depth is finished, a grouting pipe is lifted, and then the grouting process is repeated, such that reinforced areas of different depths are equal. According to the size of the area to be reinforced, single, three or a plurality of grouting pipes can be uniformly arranged symmetrically. The pile-forming method is easy to realize, simple and convenient to operate, low in cost, and capable of effectively reducing a side friction resistance caused by stressing and breaking of the coral sand and attenuation of a pile end bearing force, and is a good method for forming the cast-in-place pile on coral reef.

Description

The pile making method of bored concrete pile in a kind of coral sand ground
Technical field
The present invention relates to a kind of pile base construction method, more particularly to a kind of pile making method in coral reef sandy ground base.
Background technology
Coral reef is the Rock And Soil that the remains after the death of project cost consulting item colony are formed through very long geologic process, mainly Composition is calcium carbonate.China's Modern Coral Reefs are mainly distributed on the South China Sea Islands and northern littoral, the islands and reefs at the South Sea substantially by Coral reef is constituted.Coral reef is almost China in the unique land territory type in the South Sea, China at present the South Sea it is all of it is military, Fish-farming operation facility none all build on coral reef unexceptionally.
Pile foundation refers to the deep foundation being made up of the pile framing (abbreviation cushion cap) of stake and connection stake top or is connected with pile foundation by post Single-pile foundation.The classification of eucalyptus construction method mainly includes prefabricated pile and present walling pile.Prefabricated pile is made of in factory or job site Various materials, various forms of stakes (such as timber, concrete square pile, prestressed concrete pipe pile, piling bar), use sinking apparatus Stake is squeezed into, be pressed into or shaken in burying.Present walling pile is called bored concrete pile, the directly pore-forming on the ground of design stake position is referred to, in hole Interior placement or does not put reinforcing bar at steel reinforcement cage, after in hole concrete perfusion and pile.
Bored concrete pile has high capacity, settling amount little and more uniform and the characteristics of good antiseptic property, can apply to various Engineering geological condition and various types of engineerings.Grout pile length, pilespacing can be adjusted flexibly, and cost is low compared with piling bar, prefabricated pile.So And, substantial amounts of test and case history are proved:Coral reef sand has the characteristics such as broken, many spaces, high compression, after structure destruction It is difficult to recover, adds the impact of Seawater, cause pile side friction and end resistance to reduce even disappearing, bearing capacity may loses Lose.It is in nineteen sixty-eight, in Iranian Lavan oil platforms process of construction that people produce attention to the engineering properties of calcareous sand first In, the stake of diameter about 1m behind the good stratum of the degree of consolidation through about 8m, free-falling about 15m.In calcareous sand ground Pile, due to calcareous sand very little stress it is little Particle Breakage, therefore whether driven pile or bored concrete pile will occur, due to Disturbance to calcareous sand foundation soil, stake week calcareous sand Particle Breakage, stress relaxation, pile side friction and end resistance be all after pile Can weaken, reduce bearing capacity of pile foundation.Therefore, the pile foundation based on conventional foundation material is inapplicable in coral reef sand.
Bored concrete pile of constructing on coral island also has a difficult problem, be exactly on islands and reefs level of ground water it is higher, and coral reef sand Permeability is big, and underground water penetrates into quickly stake holes when drilling in coral sand, not only makes stake holes cave in, and has an effect on pouring for concrete Quality.The underground water in coral island area is seawater, unfavorable to pile quality with corrosivity.
The content of the invention
It is an object of the invention to the technology that coral reef sand is crushed for solving to be caused due to drilling on coral reef sand place is asked Topic, and because coral reef sand crushes the technical problem and underground water that cause the side friction and end resistance of bored concrete pile to reduce A kind of problem, there is provided pile making method of the cast-in-situ bored pile in coral reef sand.
The technical scheme adopted to realize the object of the invention is such, the construction of advanced bored concrete pile on a kind of coral reef Method, comprises the following steps:
1) drilling in advance:The stake position of cast-in-situ bored pile is preset on coral reef;One or more are crept on default stake position Advance borehole;A diameter of 10~20cm of the advance borehole;The depth of the advance borehole exceedes 1~2m of designing pile length;
2) Grouting Pipe is transferred:Grouting Pipe is put into the advance borehole, the default note of tube wall of Grouting Pipe lower end Grouting Pipe Slurry hole, Grouting Pipe distance from bottom 10~30cm of foot of hole.
3) mortar depositing construction:Slip casting pipe, the pumped slurry into Grouting Pipe are installed;Marginal not slurry pulls out Grouting Pipe on side, until note Slurry pipe takes out completely;The slurries of injection are selected from ordinary cement slurries, expansive cement mortar or high polymer material;Slurry infiltration is to super In malm around front drilling, after grout cures, slurries stabilization zone is formed;
4) pore-forming drilling:
Drill in described slurries stabilization zone, i.e., form stake holes in the center of described default stake position;Stake holes depth Reach the designing pile length of cast-in-situ bored pile;Because slurries have formed Jiang Gu areas, Qie Jianggu areas scope is more than stake holes scope, therefore bores Retaining wall measure need not be adopted during stake holes, Groundwater infiltration is there will not be in stake holes;
5) steel reinforcement cage is placed and catheter installation:Precast reinforced cage is put into in stake holes, 1~2 coagulation is placed in stake holes Native conduit;
6) filling concrete:By the tremie to concrete perfusion in stake holes, cast-in-situ bored pile is formed.
Advantages of the present invention and effect are:Coral reef sandy ground base adopts pretreatment, by high polymer or expansive mortar elder generation A range of stabilization zone is formed, then in stabilization zone bored pile again, it is therefore prevented that because calcareous sand Particle attrition causes pile foundation The loss of collateral resistance and end resistance, pile body bearing capacity is high.
Injection high polymer or expansive mortar, the stabilization zone of formation completely cuts off completely with surrounding seawater, can be in slurries stabilization zone Safe construction stake holes, underground sea water is not penetrated into, and pile quality is good.
The principle of the invention is easily understood, easy to operate, with low cost, can effectively improve pile side friction and stake bottom carries Power, is a kind of practical method of the economical and efficient of cast-in-situ bored pile on coral reef.
Description of the drawings
Fig. 1 advance drilling filling pile construction schematic diagrames
Fig. 2 Grouting Pipe position views
In figure:1-slurries pumping equipment;2-level of ground water;3-Grouting Pipe;4-injected hole;5-Jiang Gu areas;6-steel Muscle cage;7-bored concrete pile.
Specific embodiment
With reference to embodiment, the invention will be further described, but should not be construed above-mentioned subject area of the invention only It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used With means, various replacements and change are made, all should be included within the scope of the present invention.
The present embodiment discloses a kind of construction method of advanced bored concrete pile on coral reef, comprises the following steps:
1) drilling in advance:The stake position of cast-in-situ bored pile is preset on coral reef;Referring to a parts of Fig. 1, in default stake position It is upper to creep into one or more advance boreholes;If only 1 advance borehole, the hole position is in default Zhuan Wei centers (referring to the g portions of Fig. 2 Point).When required Jiang Gu areas cross-sectional area is larger, it is contemplated that many Grouting Pipe grouting and reinforcings, that is, multiple advance boreholes are needed, this Some holes surrounds default Zhuan Wei centers (referring to h the and i parts of Fig. 2).
A diameter of 10~20cm of the advance borehole;The depth of the advance borehole exceedes designing pile length (drill-pouring The stake of stake is long) 1~2m;
Preferably, during drilling, opening diameter is set to 110mm, is drilled into design hole depth.
2) Grouting Pipe is transferred:Grouting Pipe is put into the advance borehole, slip casting tube wall in Grouting Pipe lower end presets slip casting Hole, injected hole is staggered in quincunx, Grouting Pipe distance from bottom 10~30cm of foot of hole.
3) mortar depositing construction:Slip casting pipe, the pumped slurry into Grouting Pipe are installed;Marginal not slurry pulls out Grouting Pipe on side, until note Slurry pipe takes out completely;
In embodiment, such as shown in Fig. 1 (a), Grouting Pipe insertion drilling in advance, grouting equipment (1) is pumped by injected hole (4) Slurries
Until under 0.1~2MPa grouting pressures, flow rate of grouting≤0.4L/min continues to irrigate one hour;
Or during≤1L/min, continue to irrigate 90min;
Such as Fig. 1 (b), grouting pipe is lifted into certain distance, again repeatedly previous step, until Grouting Pipe is carried completely Go out.Slip casting should immediately clean slurries transfer pipeline after finishing, and prevent remaining slurry plugs.
The slurries of injection are selected from ordinary cement slurries, expansive cement mortar or high polymer material;Slurry infiltration is to advance drilling In malm around hole, after grout cures, slurries stabilization zone is formed, shown in such as Fig. 1 (c);
4) pore-forming drilling:
Drill in described slurries stabilization zone, i.e., form stake holes in the center of described default stake position;Such as Fig. 1 (d) Shown, stake holes depth reaches the designing pile length of cast-in-situ bored pile;Because slurries have formed Jiang Gu areas, Qie Jianggu areas scope is more than stake Hole scope, therefore retaining wall measure of need not adopt during stake holes is bored, Groundwater infiltration is there will not be in stake holes;In embodiment, Can be crept into using Drilling by inverse circulation, be not required to steel cylinder retaining wall.Top can select three wings cage type bit, and bottom can adopt rotary drill Head.Hole quality is guaranteed using layering drilling technology, it is light during perforate to press slow-speed to keep the guidance quality and stability of drilling tool, by not Appropriate slurries are pumped with stratum.It is drilled into drilling tool lift-off bottom hole 0.2m or so, up and down, low speed revolution, full pump after hole depth Amount punching, is fully ground bottom hole larger particles, treats to can be considered once to empty without larger particles in discharge slurries finishing, the time in the hole in >=20min, is measured till hole depth meets design requirement with plummet.
5) steel reinforcement cage is placed and catheter installation:As shown in Fig. 1 (e), precast reinforced cage is put into in stake holes, is put in stake holes Put 1~2 tremie;
6) filling concrete:By the tremie to concrete perfusion in stake holes, cast-in-situ bored pile is formed.As schemed Shown in 1 (f), construct concrete configuration requirement 5~20mm of coarse aggregate size, and sand factor >=38%, 18~22cm of slump, workability is good It is good.Once imbed concrete face in conduit bottom>12m, opening will continuously construct after filling, ensure in filling process depth of tremie control 2~ In the range of 6m, final concrete perfusion face is higher than on design stake top absolute altitude 1m.

Claims (1)

1. in a kind of coral sand ground bored concrete pile pile making method, it is characterised in that comprise the following steps:
1) drilling in advance:The stake position of cast-in-situ bored pile is preset on coral reef;One or more are crept on default stake position Advance borehole.A diameter of 10~20cm of the advance borehole;The depth of the advance borehole exceedes 1~2m of designing pile length;
2) Grouting Pipe is transferred:Grouting Pipe is put into the advance borehole, the default injected hole of tube wall of Grouting Pipe lower end Grouting Pipe, Grouting Pipe distance from bottom 10~30cm of foot of hole.
3) mortar depositing construction:Slip casting pipe, the pumped slurry into Grouting Pipe are installed;Marginal not slurry pulls out Grouting Pipe on side, until Grouting Pipe Take out completely;The slurries of injection are selected from ordinary cement slurries, expansive cement mortar or high polymer material;Slurry infiltration is to advance drilling In malm around hole, after grout cures, slurries stabilization zone is formed;
4) pore-forming drilling:
Drill in described slurries stabilization zone, i.e., form stake holes in the center of described default stake position;Stake holes depth reaches The designing pile length of cast-in-situ bored pile;Because slurries have formed Jiang Gu areas, Qie Jianggu areas scope is more than stake holes scope, therefore bores stake holes During need not adopt retaining wall measure, Groundwater infiltration is there will not be in stake holes;
5) steel reinforcement cage is placed and catheter installation:Precast reinforced cage is put into in stake holes, 1~2 concrete is placed in stake holes and is led Pipe;
6) filling concrete:By the tremie to concrete perfusion in stake holes, cast-in-situ bored pile is formed.
CN201610903940.0A 2016-10-17 2016-10-17 The pile making method of bored concrete pile in a kind of coral sand ground Active CN106638547B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610903940.0A CN106638547B (en) 2016-10-17 2016-10-17 The pile making method of bored concrete pile in a kind of coral sand ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610903940.0A CN106638547B (en) 2016-10-17 2016-10-17 The pile making method of bored concrete pile in a kind of coral sand ground

Publications (2)

Publication Number Publication Date
CN106638547A true CN106638547A (en) 2017-05-10
CN106638547B CN106638547B (en) 2019-11-01

Family

ID=58856439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610903940.0A Active CN106638547B (en) 2016-10-17 2016-10-17 The pile making method of bored concrete pile in a kind of coral sand ground

Country Status (1)

Country Link
CN (1) CN106638547B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811760A (en) * 2019-01-31 2019-05-28 山东科技大学 A kind of method that high polymer PFA reinforces South Sea coral sand ground
CN110143782A (en) * 2019-05-23 2019-08-20 湖北工业大学 A kind of South Sea calcareous sand high polymer compacted soil and preparation method
CN110565639A (en) * 2019-09-11 2019-12-13 中船第九设计研究院工程有限公司 Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation
CN111535307A (en) * 2020-05-22 2020-08-14 河北建设勘察研究院有限公司 Hole forming construction method for rotary drilling cast-in-place pile in reef limestone stratum
CN113090184A (en) * 2021-04-13 2021-07-09 三峡大学 Suction drill bit device for suction pore-forming in coral sand and construction method
CN113529721A (en) * 2021-07-15 2021-10-22 中国海洋大学 Combined drilling and grouting pipe for grouting reinforcement of island reef weak stratum and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1272574A (en) * 2000-04-03 2000-11-08 王光明 Immersed tube bored concrete composite pile construction method
CN101798810A (en) * 2009-02-20 2010-08-11 上海强劲基础工程有限公司 Cement-soil composite pile inserted into reinforced concrete core materials
CN202227336U (en) * 2011-09-09 2012-05-23 管自立 Rigid flexible composite foundation pile
CN203891012U (en) * 2014-06-03 2014-10-22 上海隧道工程股份有限公司 Novel filling pile with prearranged clay pile
CN104532855A (en) * 2014-12-31 2015-04-22 云南建工基础工程有限责任公司 Combined pile supporting structure in deep and thick peat soil layer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1272574A (en) * 2000-04-03 2000-11-08 王光明 Immersed tube bored concrete composite pile construction method
CN101798810A (en) * 2009-02-20 2010-08-11 上海强劲基础工程有限公司 Cement-soil composite pile inserted into reinforced concrete core materials
CN202227336U (en) * 2011-09-09 2012-05-23 管自立 Rigid flexible composite foundation pile
CN203891012U (en) * 2014-06-03 2014-10-22 上海隧道工程股份有限公司 Novel filling pile with prearranged clay pile
CN104532855A (en) * 2014-12-31 2015-04-22 云南建工基础工程有限责任公司 Combined pile supporting structure in deep and thick peat soil layer

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周杨等: "钙质砂土中的桩基础工程综述", 《水运工程》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811760A (en) * 2019-01-31 2019-05-28 山东科技大学 A kind of method that high polymer PFA reinforces South Sea coral sand ground
CN110143782A (en) * 2019-05-23 2019-08-20 湖北工业大学 A kind of South Sea calcareous sand high polymer compacted soil and preparation method
CN110565639A (en) * 2019-09-11 2019-12-13 中船第九设计研究院工程有限公司 Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation
CN110565639B (en) * 2019-09-11 2021-03-23 中船第九设计研究院工程有限公司 Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation
CN111535307A (en) * 2020-05-22 2020-08-14 河北建设勘察研究院有限公司 Hole forming construction method for rotary drilling cast-in-place pile in reef limestone stratum
CN113090184A (en) * 2021-04-13 2021-07-09 三峡大学 Suction drill bit device for suction pore-forming in coral sand and construction method
CN113529721A (en) * 2021-07-15 2021-10-22 中国海洋大学 Combined drilling and grouting pipe for grouting reinforcement of island reef weak stratum and construction method

Also Published As

Publication number Publication date
CN106638547B (en) 2019-11-01

Similar Documents

Publication Publication Date Title
CN106638547B (en) The pile making method of bored concrete pile in a kind of coral sand ground
CN105714772B (en) Karst area embedded rock pile pore-forming bores concrete dado method again
CN101429766B (en) Ground strengthened high pressure rotary spraying pile construction technique
KR930012067B1 (en) Process for compaction reinforcement grouting or for decompaction drainage and for construction of linear works and plane works in the soils
CN100501011C (en) Hole drilling mudjack pile construction method
CN101560764B (en) Method for calking exploratory hole by intermittent high-pressure rotary jet grouting
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN105821830A (en) Permeation increase siphon drainage system for low-permeability soil slope
CN104329020B (en) A kind of reinforced long spire embedding rock construction equipment and technique thereof
CN106677166A (en) Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode
Brown Practical considerations in the selection and use of continuous flight auger and drilled displacement piles
CN110485444B (en) Construction method for seepage prevention and reinforcement of deepwater cofferdam
KR101057487B1 (en) Grouting Method Using Enlarged Concrete Consolidation Grouting Apparatus
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
US3667236A (en) Method for treating subsurface soils
CN109440757A (en) A kind of foundation reinforcement method for karst region
CN206800431U (en) A kind of sealing bottom type caisson wall
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN205776216U (en) A kind of implantation equipment of rigid pile
CN106192987A (en) A kind of construction method that stake periphery is crushed geology reinforcing
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
US4981399A (en) Method and apparatus for increasing bearing capacity of soft soil and constructing cutoff wall
KR101057481B1 (en) Basic reinforcement expansion consolidation drawing method using basic reinforcement expansion consolidation drawing device
CN108867279B (en) Soft soil roadbed municipal road construction method
CN102383422A (en) Compacted expansion mini-type mortar pile pile-forming method and pile-forming device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant