US3614457A - Turbine overspeed trip anticipator - Google Patents

Turbine overspeed trip anticipator Download PDF

Info

Publication number
US3614457A
US3614457A US666526A US3614457DA US3614457A US 3614457 A US3614457 A US 3614457A US 666526 A US666526 A US 666526A US 3614457D A US3614457D A US 3614457DA US 3614457 A US3614457 A US 3614457A
Authority
US
United States
Prior art keywords
trip
speed
anticipator
turbine
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US666526A
Inventor
Markus A Eggenberger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Co filed Critical General Electric Co
Application granted granted Critical
Publication of US3614457A publication Critical patent/US3614457A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • F01D21/02Shutting-down responsive to overspeed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/20Devices dealing with sensing elements or final actuators or transmitting means between them, e.g. power-assisted
    • F01D17/22Devices dealing with sensing elements or final actuators or transmitting means between them, e.g. power-assisted the operation or power assistance being predominantly non-mechanical
    • F01D17/26Devices dealing with sensing elements or final actuators or transmitting means between them, e.g. power-assisted the operation or power assistance being predominantly non-mechanical fluid, e.g. hydraulic
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • F01D21/16Trip gear
    • F01D21/18Trip gear involving hydraulic means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
    • F01K7/22Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbines having inter-stage steam heating
    • F01K7/24Control or safety means specially adapted therefor
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D13/00Control of linear speed; Control of angular speed; Control of acceleration or deceleration, e.g. of a prime mover
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P23/00Arrangements or methods for the control of AC motors characterised by a control method other than vector control
    • H02P23/16Controlling the angular speed of one shaft

Definitions

  • ABSTRACT Turbine control system with conventional over- 415/10, l3, l6, 30, 32; 317/19 speed trip for stop valves and governor for control valves includes an additional trip device which temporarily closes stop [56] References Cited valves to anticipate overspeed tripping, but reopens them to UNITED STATES PATENTS prevent permanent tripping if the governor functions tobring 3,427,464 1/1969 Watson 290/40 overspeed under control.
  • This invention relates to an improved turbine control system for preventing dangerous overspeed of the turbine, and more particularly, the invention relates to a control system for anticipating and sometimes forestalling operation of the conventional overspeed emergency trip under conditions which would result in dangerous overspeed should the normal speed control system fail to control the turbine speed.
  • a conventional steam turbine-generator has two lines of defense against overspeed. There is normally a set of control valves" operated by the speed governor. Ahead of the control valves in series is a stop valve actuated by a simple, very reliable emergency governor, preferably called an overspeed trip. In a reheat steam turbine, the same speed governor and emergency governor may also actuate respectively a set of intercept valves" and reheat stop valves these having much the same control functions as the aforesaid control valves and stop valve.
  • the turbine is usually designed so that the overspeed trip must be manually reset by the operator and since this is undesirable for many reasons, including time required to put the turbine-generator back in service, the rules of design provide that the unit shall be capable of rejecting maximum guaranteed load without tripping the overspeed trip.
  • Other design rules which will be familiar to those skilled in the art, provide that the speed setting of the overspeed trip be a specified increment above the expected peak speed on loss of load. The above two rules necessarily mean that the turbine will be at a speed substantially above its normal operating speed at the time the overspeed trip is actuated should a need for it occur. Thereafter, the turbine reaches even greater overspeed before the closing of the stop and reheat stop valves reduce the steam flow to zero.
  • one object of the present invention is to provide a device which will anticipate imminent actuation of the overspeed trip and will act in its stead to prevent the turbine from exceeding a specified peak speed upon loss of load, should the control valves or intercept valves fail to control the speed.
  • Another object of the invention is to provide a device to close the stop valves at a speed lower than the overspeed trip setting, but to subsequently reopen the stop valves again should the normal speed-control system have functioned properly.
  • FIG. 1 is a simplified schematic diagram of a typical reheat turbine-generator powerplant and control system employing the invention
  • FIG. 2 is a simplified diagram showing the trip anticipator in its simplest form added to a conventional control system
  • FIG. 2a is a graph illustrating the operation of the device shown in FIG. 2,
  • FIG. 3 is a modified form of the invention illustrating an adaptive trip anticipator
  • FIG. 3a is a graph illustrating the operation of the device shown in FIG. 3, and
  • FIGS. 4 and 5 illustrate a modified form of the invention for an electrohydraulic control system.
  • the invention is practiced by providing speed responsive means to actuate the stop valves at a speed below the setting of the conventional overspeed trip, in such a manner that the stop valves may reopen should the normal speed-control system, using control valves and intercept valves, function properly.
  • a modified form of the invention adapts the trip anticipator speed setting in accordance with the load on the turbine to positively limit peak speed below that which would occur upon actuation of the overspeed trip.
  • the normal speed-control system comprises a speedresponsive device 12, which can be either mechanical or electrical, connected to actuate conventional mechanical-hydraulic or electrohydraulic relays l3, l4 actuating control valves 3 and intercept valve 7 respectively.
  • An emergency governor or overspeed trip 15 is a simple speed-responsive device, such as an oflcenter bolt" or similar known device which trips main stop valve 2 and reheat stop valve 6 through relays 16, 17 respectively. This may be done by dumping oil pressure from a line by means of a pilot valve and is well known in the art.
  • the trip anticipator 18 which is the subject of the present invention is also connected to actuate relays l6, 17 in a manner to cause the stop valve 2 and reheat stop valve 6 to close. This is accomplished through a separate automatically resetting type of control to the stop valve relay l6, 17 as indicated by the dotted lines 18a, 18b.
  • Trip anticipator 18 may employ a third speed-responsive device or it may be conveniently actuated by the main governor 12 as indicated by dotted line 19.
  • FIGS. 2 through 5 omit the reheat portion of the steam cycle and the portions of the control system which pertain to the reheat stop valve and intercept valve controlling the reheat steam.
  • the trip anticipator is not necessarily restricted to use in a reheat turbine, but it is shown in that environment in FIG. 1 because it is most useful in large-capacity turbinegenerator units which would normally employ reheat.
  • FIG. 2 an understanding of its operation is facilitated by examining the trip anticipator in its simplest form in FIG. 2, where the control elements have the same reference numbers as in FIG. 1, insofar as possible, although the figure is arranged in a slightly different manner.
  • Normal speed/load control is obtained by means of the speed governor 12 operating the control valves 3 through control valve relay 13.
  • This is achieved through a speed-goveming servomechanism shown generally as 20 comprising a pilot valve 2i, a single acting servopiston 27 with cylinder 22, and a restoring lever 23 attached to an adjustable fulcrum 24.
  • the stem 25 of pilot valve 21 is positioned up or down by the movements of speed governor 12 through a self-aligning link 26 to control the admission of hydraulic fluid from a pressure source to servomotor 22.
  • the resulting movement of the servopiston 27 causes lever 23 to position slidable sleeve 28 of the pilot valve.
  • FIG. 2 A simplified form of emergency overspeed trip is illustrated in FIG. 2 by means of a speed responsive offcenter bolt device connected to rotate with the high-pressure turbine shaft.
  • Device 15 is arranged to actuate a pivotable trip finger 30 so as to release stem 31 of a spring-loaded dump valve 32 in such a manner as to release oil pressure in conduit 33.
  • Means (not shown) are provided to manually reset dump valve 31 after it has tripped, as will be understood by those skilled in the art.
  • Stop valve relay 16 which is a hydraulic servomechanism arranged to control stop valve 2 in an offer! manner, is provided with two incoming hydraulic lines shown as a manual reset" line 34 and automatic reset line 35. Hydraulic pressure is required in both lines to hold stop valve 2 in an open position. Dumping of oil from line 34 necessitates manual resetting of stop valve relay to. However, dumping of oil pressure from line 35 and subsequent restoration of hydraulic pressure will cause the stop valve 2 to first close and then reopen.
  • the trip anticipator shown generally as 58, consists of a trip anticipator pilot valve 36 and a trip-anticipator relay 37.
  • Pilot valve 36 has a valve stem 38 which is positioned in accordance with turbine speed. This is conveniently accomplished by using the speed signal from the main governor l2 and arranging the pilot valve stem 38 so that it is an extension of pilot valve stem 25.
  • a supplementary speed-responsive means in addition to main governor 12 might be employed to position pilot valve stem 38.
  • Pilot valve sleeve 39 is adjustable and may be raised or lowered to determine the point at which hydraulic fluid in conduit 60 will be dumped to actuate the trip-anticipator relay 37, as should be apparent from the drawing. Downward movement of pilot valve stem 38 upon increase in speed causes fluid to be discharged from conduit 40 at the speed which is set using the adjustable sleeve 39.
  • Trip-anticipator relay 37 is in reality a pressure-actuated three-way valve and comprises a sleeve 41 and a spring-loaded stem 42.
  • An upper land 43 acts as a piston to hold stem 42 downward against the spring pressure in the position shown so that ports M and 45 communicate when the turbine is at a speed below that at which the trip anticipator is actuated.
  • stem 42 On loss of pressure in conduit 40, stem 42 will rise and discharge fluid from the automatic reset line 35 through port 45 of the relay 37.
  • fluid will not be discharged through port 44 of the relay 37, but hydraulic pressure will be maintained in the manual reset line 34 which is supplied by line 33 via the emergency dump valve 32.
  • FIG. 2 Operation of FIG. 2 will be described by reference to the graph of FIG. 2a, on which the percent of rated load prior to full loss of load is plotted as the abscissa and on which the percent of rated speed is plotted as the ordinate.
  • the dashed line 46 represents normal overspeed" which is the peak speed which will result if load as indicated on the abscissa is lost and the main governor l2 acts in the expected manner through servomechanism 20 to close the control valves 3 so as to limit the overspeed. It will be observed that if I00 percent load is being carried and is suddenly lost, the normal overspeed curve 46 indicates that approximately llO percent of rated speed will occur before the turbine speed levels off and starts decreasing.
  • Curve 47 illustrates the peak speed which will occur if the conventional overspeed trip is actuated at a speed setting indicated by dot-dash line 48 (assuming that the normal speed control through the control valves failed to function).
  • Curve 48 is cross-hatched to indicate the margin of tripping which normally occurs with this type of governor, and it is also curved to illustrate the delay in tripping which takes place due to acceleration effects on the trip device at large load losses.
  • Customary requirements applicable to large turbine-generators require that speed setting 48 of the overspeed trip be higher than the normal overspeed curve 46 by a specified in- .crement so that loss of load will not result in actuating the overspeed trip.
  • trip-anticipator setting 49 shown in dot-dash lines
  • trip-anticipator peak-speed curve 50 shown in dashed lines.
  • the trip-anticipator setting 49 is adjusted by means of the pilot valve sleeve 39 in such a manner that the peak-speed curve 56) resulting therefrom will terminate at a desired peak speed upon loss of full load, in this case I20 percent of rated speed. It will be observed that the trip-anticipator setting curve 39 lies below curve 48 and trip anticipation will occur before the conventional overspeed trip mechanism is put into play.
  • the overspeed trip will be actuated in the usual manner, causing the stop valve and reheat stop valve to remain closed. In this case, fluid will also be dumped from the manual reset lines 34, 340 by means of the overspeed trip pilot valve 32.
  • the peak turbine speed will not go any higher than curve 50. Without a trip-ancitipator device, peak speed would reach the values indicated by curve 47, which would result in an excessive overspeed for the turbine.
  • FIG. 3 and the accompanying graph, FIG. 3a illustrate a modification, wherein the trip-anticipator speed setting is caused to be adaptive to reflect the load being carried by the turbine.
  • the setting of the trip-anticipator pilot valve sleeve is caused to reduce the trip-anticipator speed setting at high values of turbine load. In this manner, anticipated closing of the stop valves will take place even earlier and in some cases even before the turbine reaches its normal overspeed corresponding to this load level.
  • Pilot valve sleeve 39 of the trip-anticipator pilot valve 36 is positioned by means of a lever 51 fulcrumed at 52 when it moves upward sufficiently to hit an abutment 53 on the pilot valve sleeve stem.
  • lever 51 is below abutment 53, the sleeve 39 is held in a fixed position by spring 54 in accordance with aspeed adjustment depicted by nut 55.
  • lever 51 is raised by means of an extension 56 on the servomotor piston 27 at a point determined by the adjusting screw 57.
  • a dash pot 58 serves as a memory device to hold the right-hand end of lever 51 in an elevated position for a few seconds in the event that extension 56 is suddenly withdrawn to a downward position, as would be the case in a sudden increase of speed upon loss of load.
  • FIG. 3a of the graph will illustrate the operation of the modification shown in FIG. 3 with the adaptive trip-anticipator setting.
  • the reference numbers correspond to those on the graph of FIG. 2a with the following exceptions.
  • Curve 5 illustrates the speed setting at which the trip-anticipator pilot valve is actuated to dump hydraulic fluid from line 40.
  • the corresponding peak speed which would be reached by the turbine is illustrated by curve 60.
  • Point 61 the trip-anticipator speed setting is gradually lowered as the load increases, at a rate which results in a flat peak-speed curve portion 62. This results in limiting turbine overspeed to a selected valve.
  • Point 61 on the graph is determined by the setting of adjustment screw 57 which, in turn, determines the point at which lever Sll commences to be raised.
  • the slope of curve 59 beyond point 61 is, of course, determined by the mechanical advantage of lever 31, and is predetermined so that a flat peak-speed curve at 62 results.
  • the elements in FIG. 3 are shown as positioned at a load of approximately 85 percent when adjusting screw 57 just touches lever 53. Subsequent increase in load will raise the pilot valve sleeve 39 to lower the setting at which subsequent increase in speed will cause the trip anticipator to function.
  • FIGS. 4 and 5 illustrate a modification of the invention, in simplified form, for use on an electrohydraulic control system of the type more fully described in Us. Pat. No. 3,097,488 issued to M. A. Eggenberger et al. on July 16, 1963. The portions of the control for the reheat portion of the steam cycle are omitted for simplicity.
  • FIG. 4 in so far as it differs from the preceding figures, illustrates an electrohydraulic control for the steam control valves 3 comprising a speed control 70 and a load control 75.
  • the speed signal is obtained from a toothed wheel 72 on the turbine shaft which initiates pulses in a speed sensor 73 as before.
  • the actual speed is compared with a desired or reference speed set with knob 74 and the resulting error signal, after suitable modification, is supplied to the load control unit 75.
  • There a desired load demand or load reference signal is superimposed on the speed signal so as to control the valves through relays vI3, in accordance with a conventional control system.
  • an additional speed sensor '77 supplies a speed signal to the trip anticipator 78.
  • the trip-anticipator speed setting is adjusted as desired with knob 79, this being analogous to the setting obtained with the pilot valve sleeve 39 in FIG. 2.
  • Actuation of the trip anticipator dumps fluid from the automatic reset line leading to the stop valve relay to as before. This is a different type of tripping action than is obtained by the overspeed trip 15 when dumping fluid from the manual reset line 81. Reestablishment of pressure in line 86 ⁇ will cause the stop valve 2 to automatically reopen, whereas manual resetting is necessary when fluid is dumped from line 81.
  • FIG. 5 of the drawing shows a simplified form of electrical trip-anticipator actuator.
  • a trigger amplifier 82 is arranged to actuate a solenoid dump valve 83 to dump fluid from the automatic reset line 80 when the summed voltage at the input to the trigger amplifier becomes negative.
  • Dump valve 83 is analogous to valve 37 in FIG. 2.
  • An adjustable positive bias voltage is applied to line 84 by means of the trip-anticipator speed setting knob 79.
  • a counterbalancing, increasingly negative voltage is applied to line 35 as the turbine speed increases.
  • the positive voltage on line 841 exceeds the negative voltage on line 85 by a selected amount, in accordance with the setting of knob 79.
  • the trigger amplifier will be actuated if the turbine overspeeds to such an extent that the negative voltage exceeds the positive bias and trips the dump valve 83. The action is thus the same as that of the mechanical-hydraulic system shown in FIG. 2 and its operation is as shown in FIG. 2a.
  • an additional input voltage to the trigger amplifier 82 is provided which, above a certain load, applies an increasingly negative voltage on line 86 as the load increases. This reduces the trip-anticipator setting above a selected load as indicated in FIG. 3".
  • the electrohydraulic version reduces the trip-anticipator setting in accordance with the load demand or load reference signal setting on the load control unit 75.
  • the load reference is increased by turning knob 76, an increasingly negative voltage is applied on line 87. This voltage is blocked by Zener diode 88, until the load setting exceeds a predetermined value, here about 70 percent load, after which the voltage on lead 86 becomes increasing negative and serves to lower the degree of overspeed at which the trip anticipator is actuated.
  • One of the accessory devices on the electrohydraulic control may include means to suddenly reduce the load reference signal, such as a relay 89.
  • a relay 89 To prevent the negative signal on line 86 from dropping suddenly to zero, an RC circuit 90 delays the sudden loss of the signal, acting in a similar manner to the dash pot 58 of FIG. 3.
  • overspeed trip-anticipator means arranged to close said second valve means at a selected trip-anticipator speed setting below the overspeed trip setting of the emergency speed-governing means and to reopen said second valve means if the turbine speed thereafter falls below said tripanticipator speed setting without having first exceeded the overspeed trip setting of the emergency speed governing means
  • first governing means having first speed-responsive means and normally controlling said first valve means
  • second governing means having second speed-responsive means and controlling said second valve means so as to close the second valves at an overspeed trip setting
  • third governing means connected to temporarily close said second valve means in response to a trip-anticipator speed setting lower than the overspeed tri speed setting whereby closing of the second valves y the secon governing means is anticipated by the third governing means should the first governing means fail to control speed.
  • reheat steam turbine-generator powerplant having a high-pressure turbine and an intermediate-pressure turbine employing reheated steam, the combination of:
  • main stop valve and main control valves connected in series to control the flow of high-pressure steam to the highpressure turbine
  • reheat stop valve and intercept valves connected in series to control the flow of reheated steam to the intermediate pressure turbine
  • main governing means connected to control admission of steam through said control valves and intercept valves in response to turbine speed, emergency governor means connected to close said main stop valve and said reheat stop valve at an overspeed trip setting,
  • trip-anticipator means connected to temporarily close the main stop valve and the reheat stop valve upon reaching a selected trip-anticipator speed setting lower than the overspeed trip speed setting and to reopen said stop valves if the overspeed trip setting is not attained.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Control Of Turbines (AREA)

Abstract

Turbine control system with conventional overspeed trip for stop valves and governor for control valves includes an additional trip device which temporarily closes stop valves to anticipate overspeed tripping, but reopens them to prevent permanent tripping if the governor functions to bring overspeed under control. 1CROSS REFERENCE

Description

United States Patent 72 Inventor Markus A. Eggenberger 3,060,692 10/1902 11dw;11'I;I1.I............... 60/73 Schenectady,N.Y. 3,094,041 6/1963 Wagner 137/36 X [211 App]. No. 666,526 3,097,488 7/1963 Eggenberger 60/73 [22] Filed June 21, 1967 3,097,490 7/1963 Callan 60/73 [45] Patented Oct. 19, 1971 3,198,954 8/1965 Eggenberger 290/40 [73] Assignee General Electric Company 3,211,957 10/1965 Carson 137/31 X Continuation-impart of application Ser. No. FOREIGN PATENTS 1965 555,541 7/1932 Germany..................... 60/105 Primary Examiner-Clarence R. Gordon TURFINE R F TRIP ANTICWATOR Attorneys-William C. Crutcher, Frank L. Neuhauser, Oscar 9 Claims, 7 Drawing Flgs- B. Waddell and Melvin M. Goldenberg 521 u.s.c1 2110 40, 60/73, 60/105, 317/19, 317/31, 415/10, 415/32 [51] Int. Cl 1 1 "02p 9/04 [50] Field oi Search 137/21, 22,
24, 27, 26, 1 35, 36160/73, 290/40; ABSTRACT: Turbine control system with conventional over- 415/10, l3, l6, 30, 32; 317/19 speed trip for stop valves and governor for control valves includes an additional trip device which temporarily closes stop [56] References Cited valves to anticipate overspeed tripping, but reopens them to UNITED STATES PATENTS prevent permanent tripping if the governor functions tobring 3,427,464 1/1969 Watson 290/40 overspeed under control.
VALVE I I l" SPEED 1 4 1 /CONTROL 9 11) TEAM 15 I 18' Low GENERATOR |2 S E PBESSUR; GE NERATO R OVET SSEED TURBINE 3 TURBINE TURBINE l I V TRIP CONTROL ANTICIPATOR -f T;
1 INTERCEPT I L VALVE "SE 'T CONDE R L 18b -10 I R H AT REHEATER V 17 STOP VALVE l PATENTEDucnsmn 3.614.457
SHEET 10F 4 L f lau g r A SPEED A A 4 4 /CONTROL H STEAM l5 Ha I RM GENERATOR |2 g g g MPBESSQRE GENERATOR OVERSPEED T RBI E WP 9Y CONT Rm u N TURBI E TRIP v ANTICIPATOR V VALVES LOAD I L. I '-r-- R g 5 L 8 b- CONDENSE Io REHEATER n STOP VALVE 29 REHEAT STOP l VALVE TOLV. RELAY CONTROL VALVE RELAY AUTOMATIC R MANUAL RESET STOP VALVE RELAY TURBINE INVENTOR MARKUS A. EGGENBERGER,
BY 116M LIIC ATTnDnL-v /o LOAD PRIOR TO FULL LOSS OF LOAD INVENTORI MARKUS A. EGGENBERGER,
BY c/Ai HIS ATTORNEY.
TURBINE OVERSPEED TRIP ANTICIPA'IOR CROSS REFERENCE CROSS REFERENCE TO RELATED APPLICATIONS This application is a continuation-in-part of my abandoned application Ser. No. 468,887 filed July I, l965 and assigned to the present assignee.
BACKGROUND OF THE INVENTION This invention relates to an improved turbine control system for preventing dangerous overspeed of the turbine, and more particularly, the invention relates to a control system for anticipating and sometimes forestalling operation of the conventional overspeed emergency trip under conditions which would result in dangerous overspeed should the normal speed control system fail to control the turbine speed.
Improvements in large-capacity turbine-generators have resulted in greater difficulties in controlling speed upon loss of load, due to the greater entrained steam energy and higher power density relative to the inertia of the rotating parts. Faster-closing stop valves have contributed substantially to reducing the emergency speed rise during closing of these valves. However, improvements in stop-valve-closing speeds are being fully exploited and additional anticipatory measures are required to prevent overspeed.
Another approach has been to anticipate overspeed by closing the valves under condition of power-load unbalance. One such arrangement is disclosed in US. Pat. No. 3,198,954 granted Aug. 3, 1965 to M. A. Eggenberger and P. H. Troutman, and assigned to the assignee of the present application.
A conventional steam turbine-generator has two lines of defense against overspeed. There is normally a set of control valves" operated by the speed governor. Ahead of the control valves in series is a stop valve actuated by a simple, very reliable emergency governor, preferably called an overspeed trip. In a reheat steam turbine, the same speed governor and emergency governor may also actuate respectively a set of intercept valves" and reheat stop valves these having much the same control functions as the aforesaid control valves and stop valve.
The turbine is usually designed so that the overspeed trip must be manually reset by the operator and since this is undesirable for many reasons, including time required to put the turbine-generator back in service, the rules of design provide that the unit shall be capable of rejecting maximum guaranteed load without tripping the overspeed trip. Other design rules, which will be familiar to those skilled in the art, provide that the speed setting of the overspeed trip be a specified increment above the expected peak speed on loss of load. The above two rules necessarily mean that the turbine will be at a speed substantially above its normal operating speed at the time the overspeed trip is actuated should a need for it occur. Thereafter, the turbine reaches even greater overspeed before the closing of the stop and reheat stop valves reduce the steam flow to zero.
The greater the load which is being carried before load is lost, the more rapidly will the rotor accelerate because of the larger unbalance of torques on the rotors.
Accordingly, one object of the present invention is to provide a device which will anticipate imminent actuation of the overspeed trip and will act in its stead to prevent the turbine from exceeding a specified peak speed upon loss of load, should the control valves or intercept valves fail to control the speed.
Another object of the invention is to provide a device to close the stop valves at a speed lower than the overspeed trip setting, but to subsequently reopen the stop valves again should the normal speed-control system have functioned properly.
Still another object of the invention is to provide an improved overspeed trip anticipator which is adaptive in accordance with the conditions of load prevailing on the turbinegenerator just prior to loss of load. Yet another object of the invention is to provide an improved device for limiting peak speed to a selected value without causing the overspeed trip to function while at the same time protecting the turbine against failure of the conventional overspeed system.
The subject matter of the invention is particularly pointed out and distinctly claimed in the concluding portion of the specification.
The invention, however, both as to organization and method of practice, together with further objects and advantages thereof, may best be understood by reference to the following description taken in connection with the accompanying drawing in which:
FIG. 1 is a simplified schematic diagram of a typical reheat turbine-generator powerplant and control system employing the invention,
FIG. 2 is a simplified diagram showing the trip anticipator in its simplest form added to a conventional control system,
FIG. 2a is a graph illustrating the operation of the device shown in FIG. 2,
FIG. 3 is a modified form of the invention illustrating an adaptive trip anticipator,
FIG. 3a is a graph illustrating the operation of the device shown in FIG. 3, and
FIGS. 4 and 5 illustrate a modified form of the invention for an electrohydraulic control system.
SUMMARY OF THE INVENTION Briefly stated, the invention is practiced by providing speed responsive means to actuate the stop valves at a speed below the setting of the conventional overspeed trip, in such a manner that the stop valves may reopen should the normal speed-control system, using control valves and intercept valves, function properly. A modified form of the invention adapts the trip anticipator speed setting in accordance with the load on the turbine to positively limit peak speed below that which would occur upon actuation of the overspeed trip.
DESCRIPTION OF MECHANICAL-HYDRAULIC TRIP ANTICIPATOR Referring now to FIG. I of the drawing, the steam flows from steam generator 1 through main stop valve 2, a set of control valves 3, high-pressure turbines 4, and is reheated in reheater 5. The steam then flows throughreheat stop valve 6, intercept valve 7, intennediate-pressure turbine 8, low-pressure turbine 9 to condenser 10. Turbines 4, 8, 9 drive a load such as generator II.
The normal speed-control system comprises a speedresponsive device 12, which can be either mechanical or electrical, connected to actuate conventional mechanical-hydraulic or electrohydraulic relays l3, l4 actuating control valves 3 and intercept valve 7 respectively.
An emergency governor or overspeed trip 15 is a simple speed-responsive device, such as an oflcenter bolt" or similar known device which trips main stop valve 2 and reheat stop valve 6 through relays 16, 17 respectively. This may be done by dumping oil pressure from a line by means of a pilot valve and is well known in the art.
The trip anticipator 18 which is the subject of the present invention is also connected to actuate relays l6, 17 in a manner to cause the stop valve 2 and reheat stop valve 6 to close. This is accomplished through a separate automatically resetting type of control to the stop valve relay l6, 17 as indicated by the dotted lines 18a, 18b. Trip anticipator 18 may employ a third speed-responsive device or it may be conveniently actuated by the main governor 12 as indicated by dotted line 19.
In order to simplify the description of the trip anticipator and its relation to the conventional turbine-generator control system, FIGS. 2 through 5 omit the reheat portion of the steam cycle and the portions of the control system which pertain to the reheat stop valve and intercept valve controlling the reheat steam. The trip anticipator is not necessarily restricted to use in a reheat turbine, but it is shown in that environment in FIG. 1 because it is most useful in large-capacity turbinegenerator units which would normally employ reheat. However, an understanding of its operation is facilitated by examining the trip anticipator in its simplest form in FIG. 2, where the control elements have the same reference numbers as in FIG. 1, insofar as possible, although the figure is arranged in a slightly different manner.
Normal speed/load control is obtained by means of the speed governor 12 operating the control valves 3 through control valve relay 13. This is achieved through a speed-goveming servomechanism shown generally as 20 comprising a pilot valve 2i, a single acting servopiston 27 with cylinder 22, and a restoring lever 23 attached to an adjustable fulcrum 24. The stem 25 of pilot valve 21 is positioned up or down by the movements of speed governor 12 through a self-aligning link 26 to control the admission of hydraulic fluid from a pressure source to servomotor 22. The resulting movement of the servopiston 27 causes lever 23 to position slidable sleeve 28 of the pilot valve. Thus the movements of servopiston 27 correspond with the position of the speed governor, but the force and the stroke is greatly multiplied. Adjustment in accordance with desired load is accomplished by moving the adjustable fulcrum 24. The movements of servopiston 27 may also be communicated to the intercept valve relay (see FIG. 1) as indicated by the dot-dash line 29.
A simplified form of emergency overspeed trip is illustrated in FIG. 2 by means of a speed responsive offcenter bolt device connected to rotate with the high-pressure turbine shaft. Device 15 is arranged to actuate a pivotable trip finger 30 so as to release stem 31 of a spring-loaded dump valve 32 in such a manner as to release oil pressure in conduit 33. Means (not shown) are provided to manually reset dump valve 31 after it has tripped, as will be understood by those skilled in the art.
Stop valve relay 16 which is a hydraulic servomechanism arranged to control stop valve 2 in an offer! manner, is provided with two incoming hydraulic lines shown as a manual reset" line 34 and automatic reset line 35. Hydraulic pressure is required in both lines to hold stop valve 2 in an open position. Dumping of oil from line 34 necessitates manual resetting of stop valve relay to. However, dumping of oil pressure from line 35 and subsequent restoration of hydraulic pressure will cause the stop valve 2 to first close and then reopen.
It will be understood that the foregoing description of the conventional speed-governing system through the control valves and the emergency overspeed trip system with the stop valve is described in very simple schematic form and that many other devices such as load limit, speed-regulation adjustment, and various other adjusting features would be necessary in an actual steam turbine control system.
The trip anticipator, shown generally as 58, consists of a trip anticipator pilot valve 36 and a trip-anticipator relay 37. Pilot valve 36 has a valve stem 38 which is positioned in accordance with turbine speed. This is conveniently accomplished by using the speed signal from the main governor l2 and arranging the pilot valve stem 38 so that it is an extension of pilot valve stem 25. However, it will be obvious that a supplementary speed-responsive means in addition to main governor 12 might be employed to position pilot valve stem 38.
Pilot valve sleeve 39 is adjustable and may be raised or lowered to determine the point at which hydraulic fluid in conduit 60 will be dumped to actuate the trip-anticipator relay 37, as should be apparent from the drawing. Downward movement of pilot valve stem 38 upon increase in speed causes fluid to be discharged from conduit 40 at the speed which is set using the adjustable sleeve 39.
Trip-anticipator relay 37 is in reality a pressure-actuated three-way valve and comprises a sleeve 41 and a spring-loaded stem 42. An upper land 43 acts as a piston to hold stem 42 downward against the spring pressure in the position shown so that ports M and 45 communicate when the turbine is at a speed below that at which the trip anticipator is actuated. On loss of pressure in conduit 40, stem 42 will rise and discharge fluid from the automatic reset line 35 through port 45 of the relay 37. On the other hand, fluid will not be discharged through port 44 of the relay 37, but hydraulic pressure will be maintained in the manual reset line 34 which is supplied by line 33 via the emergency dump valve 32.
Operation of FIG. 2 will be described by reference to the graph of FIG. 2a, on which the percent of rated load prior to full loss of load is plotted as the abscissa and on which the percent of rated speed is plotted as the ordinate. The dashed line 46 represents normal overspeed" which is the peak speed which will result if load as indicated on the abscissa is lost and the main governor l2 acts in the expected manner through servomechanism 20 to close the control valves 3 so as to limit the overspeed. It will be observed that if I00 percent load is being carried and is suddenly lost, the normal overspeed curve 46 indicates that approximately llO percent of rated speed will occur before the turbine speed levels off and starts decreasing.
Curve 47 illustrates the peak speed which will occur if the conventional overspeed trip is actuated at a speed setting indicated by dot-dash line 48 (assuming that the normal speed control through the control valves failed to function). Curve 48 is cross-hatched to indicate the margin of tripping which normally occurs with this type of governor, and it is also curved to illustrate the delay in tripping which takes place due to acceleration effects on the trip device at large load losses. Customary requirements applicable to large turbine-generators require that speed setting 48 of the overspeed trip be higher than the normal overspeed curve 46 by a specified in- .crement so that loss of load will not result in actuating the overspeed trip. It will be observed that if full load is lost and if the control valves fail for some reason to control turbine overspeed in accordance with curve 46, then the overspeed trip will be actuated and the peak speed, as indicated by curve 47, will result in excessive speeds of the turbine.
Superimposed on the graph of FIG. 2a is a third set of curves in accordance with the present invention, designated as the trip-anticipator setting 49, shown in dot-dash lines, and the trip-anticipator peak-speed curve 50 shown in dashed lines. The trip-anticipator setting 49 is adjusted by means of the pilot valve sleeve 39 in such a manner that the peak-speed curve 56) resulting therefrom will terminate at a desired peak speed upon loss of full load, in this case I20 percent of rated speed. It will be observed that the trip-anticipator setting curve 39 lies below curve 48 and trip anticipation will occur before the conventional overspeed trip mechanism is put into play.
Referring back to FIG. 2, assume that full load is being carried and that full load is suddenly lost and that, for some reason, the control valves fail to control turbine overspeed in the expected manner shown by curve 46 on FIG. 2a. Lowering of pilot valve stem 38 will cause hydraulic fluid to be discharged from conduit 40, causing pilot valve stem 42 of the trip-anticipator relay 37 to rise. Fluid is dumped from the automatic reset line 35 which causes stop valve relay 16 to close stop valve 2. Similarly, fluid will also be dumped from the automatic reset line 35a leading to the reheat stop valve, causing it to close also.
Assume now that speed is brought under control before the turbine reaches the overspeed trip setting (curve 48 of FIG. 2a), decrease in speed will cause anticipator pilot valve stem 38 to rise and reestablish fluid pressure in conduit 40, causing the trip-anticipator relay stem 42 to resume its position shown in FIG. 2. This action reestablishes fluid pressure in line 35 and causes the stop valve relay 16 to reopen stop valves 2. The foregoing action has taken place without dumping of oil pressure from the manual reset lines 34 or tripping of the emergency governor pilot valve 32. The control over the turbine is reestablished in terms of the control valves 3, therefore, without actuating the overspeed trip.
If, on the other hand, the normal speed-goveming system does not function, and the speed continues to rise. the overspeed trip will be actuated in the usual manner, causing the stop valve and reheat stop valve to remain closed. In this case, fluid will also be dumped from the manual reset lines 34, 340 by means of the overspeed trip pilot valve 32. However, it should be particularly noted that since the closing of the stop valves was anticipated and carried out at an earlier period in time, the peak turbine speed will not go any higher than curve 50. Without a trip-ancitipator device, peak speed would reach the values indicated by curve 47, which would result in an excessive overspeed for the turbine.
In the arrangement previously described in connection with FIGS. 2 and 2a, it was observed that the trip-anticipator setting 49 was fixed as determined by the setting of pilot valve sleeve 39 on the trip-anticipator pilot valve. FIG. 3 and the accompanying graph, FIG. 3a, illustrate a modification, wherein the trip-anticipator speed setting is caused to be adaptive to reflect the load being carried by the turbine. Here the setting of the trip-anticipator pilot valve sleeve is caused to reduce the trip-anticipator speed setting at high values of turbine load. In this manner, anticipated closing of the stop valves will take place even earlier and in some cases even before the turbine reaches its normal overspeed corresponding to this load level.
In FIG. 3, the same elements are indicated by the same reference numerals as in FIG. 2, with the following exceptions.
Pilot valve sleeve 39 of the trip-anticipator pilot valve 36 is positioned by means of a lever 51 fulcrumed at 52 when it moves upward sufficiently to hit an abutment 53 on the pilot valve sleeve stem. When lever 51 is below abutment 53, the sleeve 39 is held in a fixed position by spring 54 in accordance with aspeed adjustment depicted by nut 55.
Theright-hand end of lever 51 is raised by means of an extension 56 on the servomotor piston 27 at a point determined by the adjusting screw 57.
A dash pot 58 serves as a memory device to hold the right-hand end of lever 51 in an elevated position for a few seconds in the event that extension 56 is suddenly withdrawn to a downward position, as would be the case in a sudden increase of speed upon loss of load.
As will be known to those skilled in the art, the position of servomotor piston 27 when the turbine-generator is synchronized and carrying load with other turbine-generators will be proportional to the load being carried at rated speed. On the other hand, when load is lost, the servomotor piston 27 will descend rapidly because of the increase in speed.
Reference to FIG. 3a of the graph will illustrate the operation of the modification shown in FIG. 3 with the adaptive trip-anticipator setting. The reference numbers correspond to those on the graph of FIG. 2a with the following exceptions.
Curve 5) illustrates the speed setting at which the trip-anticipator pilot valve is actuated to dump hydraulic fluid from line 40. The corresponding peak speed which would be reached by the turbine is illustrated by curve 60. It will be noticed that at point 61, the trip-anticipator speed setting is gradually lowered as the load increases, at a rate which results in a flat peak-speed curve portion 62. This results in limiting turbine overspeed to a selected valve. Point 61 on the graph is determined by the setting of adjustment screw 57 which, in turn, determines the point at which lever Sll commences to be raised. The slope of curve 59 beyond point 61 is, of course, determined by the mechanical advantage of lever 31, and is predetermined so that a flat peak-speed curve at 62 results. The elements in FIG. 3 are shown as positioned at a load of approximately 85 percent when adjusting screw 57 just touches lever 53. Subsequent increase in load will raise the pilot valve sleeve 39 to lower the setting at which subsequent increase in speed will cause the trip anticipator to function.
The operation of the modification shown in FIGS. 3 and 3a is the same as previously described with respect to action of the trip anticipator at low values of load. Above the setting of 85 percent load in the example shown, the turbine steam-control valves will be opened to such an extent that lever 51 will be raised by the extension 56 on the servomotor piston to lower the trip-anticipator speed setting. Upon loss of load, the extension 56 will be withdrawn, but dashpot 58 will hold lever 51 in an elevated position long enough for trip-anticipator pilot valve 36 to dump fluid from conduit 40. This will evacuate the automatic reset lines 35, 35a as before and cause the stop valves to close. Restoration of fluid pressure in lines 35, 35a will reopen the stop valves should the control valves and intercept valves function in the expected manner. In any event, however, the turbine peak speed will not exceed that indicated as on curve portion 62 in FIG. 3a, because tripping of the conventional overspeed trip has been anticipated, and the stop valves have already been closed when overspeed tripping occurs. At very high values of load where the trip-anticipator setting crosses the normal overspeed curve, the stop valves will always close, but they will reopen if the normal speedgoverning system functions properly without actuating the overspeed trip.
DESCRIPTION OF ELECTROHYDRAULIC TRIP ANTICIPATOR As indicated previously, the trip anticipator is adaptable for use either with a mechanical or an electrical turbine control system and can receive its speed signal from an independent speed-responsive device. FIGS. 4 and 5 illustrate a modification of the invention, in simplified form, for use on an electrohydraulic control system of the type more fully described in Us. Pat. No. 3,097,488 issued to M. A. Eggenberger et al. on July 16, 1963. The portions of the control for the reheat portion of the steam cycle are omitted for simplicity.
FIG. 4, in so far as it differs from the preceding figures, illustrates an electrohydraulic control for the steam control valves 3 comprising a speed control 70 and a load control 75. The speed signal is obtained from a toothed wheel 72 on the turbine shaft which initiates pulses in a speed sensor 73 as before. The actual speed is compared with a desired or reference speed set with knob 74 and the resulting error signal, after suitable modification, is supplied to the load control unit 75. There a desired load demand or load reference signal is superimposed on the speed signal so as to control the valves through relays vI3, in accordance with a conventional control system.
According to the present invention, an additional speed sensor '77 supplies a speed signal to the trip anticipator 78. The trip-anticipator speed setting is adjusted as desired with knob 79, this being analogous to the setting obtained with the pilot valve sleeve 39 in FIG. 2. Actuation of the trip anticipator dumps fluid from the automatic reset line leading to the stop valve relay to as before. This is a different type of tripping action than is obtained by the overspeed trip 15 when dumping fluid from the manual reset line 81. Reestablishment of pressure in line 86} will cause the stop valve 2 to automatically reopen, whereas manual resetting is necessary when fluid is dumped from line 81.
Reference to FIG. 5 of the drawing shows a simplified form of electrical trip-anticipator actuator. A trigger amplifier 82 is arranged to actuate a solenoid dump valve 83 to dump fluid from the automatic reset line 80 when the summed voltage at the input to the trigger amplifier becomes negative. Dump valve 83 is analogous to valve 37 in FIG. 2.
An adjustable positive bias voltage is applied to line 84 by means of the trip-anticipator speed setting knob 79. A counterbalancing, increasingly negative voltage is applied to line 35 as the turbine speed increases. At rated speed, the positive voltage on line 841 exceeds the negative voltage on line 85 by a selected amount, in accordance with the setting of knob 79. To this extent, the trigger amplifier will be actuated if the turbine overspeeds to such an extent that the negative voltage exceeds the positive bias and trips the dump valve 83. The action is thus the same as that of the mechanical-hydraulic system shown in FIG. 2 and its operation is as shown in FIG. 2a.
In order to provide the additional load adaptive feature described in the mechanical-hydraulic version of FIG. 3 and the operation of FIG. 3a, an additional input voltage to the trigger amplifier 82 is provided which, above a certain load, applies an increasingly negative voltage on line 86 as the load increases. This reduces the trip-anticipator setting above a selected load as indicated in FIG. 3".
Although the FIG. 3 mechanical-hydraulic arrangement reduced the trip-anticipator setting in accordance with actual load on the turbine (as imposed by the position of stop 57 in FIG. 3), the electrohydraulic version reduces the trip-anticipator setting in accordance with the load demand or load reference signal setting on the load control unit 75. As the load reference is increased by turning knob 76, an increasingly negative voltage is applied on line 87. This voltage is blocked by Zener diode 88, until the load setting exceeds a predetermined value, here about 70 percent load, after which the voltage on lead 86 becomes increasing negative and serves to lower the degree of overspeed at which the trip anticipator is actuated.
One of the accessory devices on the electrohydraulic control may include means to suddenly reduce the load reference signal, such as a relay 89. To prevent the negative signal on line 86 from dropping suddenly to zero, an RC circuit 90 delays the sudden loss of the signal, acting in a similar manner to the dash pot 58 of FIG. 3.
Thus it will be seen that means have been provided which anticipate overspeed tripping by closing the stop valves in a time sufficient to prevent a peak speed exceeding a desired amount. If the normal speed-goveming system functions as it should, then the stop valves will reopen. If the normal speedgoverning system does not function, then the stop valves will already be closed when the conventional overspeed trip mechanism is actuated.
The additional modification of an adaptive trip-anticipator setting to lower the setting at high values of actual load or load demand is useful for very large capacity turbine-generator units in which the high-power density could result in excessive overspeeds if the conventional emergency overspeed trip were the only device used to control overspeed in the event of failure of the normal speed-goveming system.
What is claimed as new and desired to secure by Letters Patent of the United States is:
1. in a turbine of the type having first and second valve means connected in series controlling the flow of motive fluid thereto and having normal speed-governing means actuating said first valve means and also having emergency speedgoverning means arranged to close the second valve means at an overspeed trip setting, the improvement comprising:
overspeed trip-anticipator means arranged to close said second valve means at a selected trip-anticipator speed setting below the overspeed trip setting of the emergency speed-governing means and to reopen said second valve means if the turbine speed thereafter falls below said tripanticipator speed setting without having first exceeded the overspeed trip setting of the emergency speed governing means, and
means arranged to reduce the trip-anticipator speed setting above a selected turbine load.
2. The combination according to claim 1 wherein said means arranged to reduce the trip-anticipator speed setting are load responsive.
3. The combination according to claim 1 wherein said means arranged to reduce the trip-anticipator speed setting are responsive to turbine load setting.
4. In a turbine of the type having first and second valve means connected in series to control the flow of motive fluid thereto, the combination of:
first governing means having first speed-responsive means and normally controlling said first valve means,
second governing means having second speed-responsive means and controlling said second valve means so as to close the second valves at an overspeed trip setting,
third governing means connected to temporarily close said second valve means in response to a trip-anticipator speed setting lower than the overspeed tri speed setting whereby closing of the second valves y the secon governing means is anticipated by the third governing means should the first governing means fail to control speed.
means arranged to reduce the trip-anticipator speed setting above a selected turbine load, and
means for temporarily retaining said trip-anticipator speed setting upon sudden loss of load.
5. The combination according to claim 4 wherein said second governing means dumps hydraulic fluid to cause the second valves to close and wherein said third governing means comprises relay means arranged to dump hydraulic fluid from a second line upon increase in speed and to reestablish hydraulic pressure in the second line upon decrease in speed, said second line being also connected to actuate the second valves.
6. The combination according to claim 4 wherein said third governing means employs a third independent speed-responsive means.
7. In a reheat steam turbine-generator powerplant having a high-pressure turbine and an intermediate-pressure turbine employing reheated steam, the combination of:
main stop valve and main control valves connected in series to control the flow of high-pressure steam to the highpressure turbine,
reheat stop valve and intercept valves connected in series to control the flow of reheated steam to the intermediate pressure turbine,
main governing means connected to control admission of steam through said control valves and intercept valves in response to turbine speed, emergency governor means connected to close said main stop valve and said reheat stop valve at an overspeed trip setting,
trip-anticipator means connected to temporarily close the main stop valve and the reheat stop valve upon reaching a selected trip-anticipator speed setting lower than the overspeed trip speed setting and to reopen said stop valves if the overspeed trip setting is not attained.
means arranged to reduce the trip-anticipator speed setting above a selected turbine load, and
means to retain the trip-anticipator speed setting temporarily upon sudden loss of load.
8. The combination according to claim 7 wherein said trip anticipator is actuated in response to a speed indication from said main governing means.
9. The combination according to claim 7 wherein said trip anticipator is actuated in response to a speed indication from an independent electrical speed responsive means.

Claims (9)

1. In a turbine of the type having first and second valve means connected in series controlling the flow of motive fluid thereto and having normal speed-governing means actuating said first valve means and also having emergency speed-governing means arranged to close the second valve means at an overspeed trip setting, the improvement comprising: overspeed trip-anticipator means arranged to close said second valve means at a selected trip-anticipator speed setting below the overspeed trip setting of the emergency speed-governing means and to reopen said second valve means if the turbine speed thereafter falls below said trip-anticipator speed setting without having first exceeded the overspeed trip setting of the emergency speed governing means, and means arranged to reduce the trip-anticipator speed setting above a selected turbine load.
2. The combination according to claim 1 wherein said means arranged to reduce the trip-anticipator speed setting are load responsive.
3. The combination according to claim 1 wherein said means arranged to reduce the trip-anticipator speed setting are responsive to turbine load setting.
4. In a turbine of the type having first and second valve means connected in series to control the flow of motive fluid thereto, the combination of: first governing means having first speed-responsive means and normally controlling said first valve means, second governing means having second speed-responsive means and controlling said second valve means so as to close the second valves at an overspeed trip setting, third governing means connected to temporarily close said second valve means in response to a trip-anticipator speed setting lower than the overspeed trip speed setting, whereby closing of the second valves by the second governing means is anticipated by the third governing means should the first governing means fail to control speed. means arranged to reduce the trip-anticipator speed setting above a selected turbine load, and means for temporarily retaining said trip-anticipator speed setting upon sudden loss of load.
5. The combination according to claim 4 wherein said second governing means dumps hydraulic fluid to cause the second valves to close and wherein said third governing means comprises relay means arranged to dump hydraulic fluid from a second line upon increase in speed and to reestablish hydraulic pressure in the second line upon decrease in speed, said second line being also connected to actuate the second valves.
6. The combination according to claim 4 wherein said third governing means employs a third independent speed-responsive means.
7. In a reheat steam turbine-generator powerplant having a high-pressure turbine and an intermediate-pressure turbine employing reheated steam, the combination of: main stop valve and main control valves connected in series to control the flow of high-pressure steam to the high-pressure turbine, reheat stop valve and intercept valves connected in series to control the flow of reheated steam to the intermediate pressure turbine, main governing means connected to control admission of steam through said control valves and intercept valves in response to turbine speed, emergency governor means connected to close said main stop valve and said reheat stop valve at an overspeed trip setting, trip-anticipator means connected to temporarily close the main stop valve and the reheAt stop valve upon reaching a selected trip-anticipator speed setting lower than the overspeed trip speed setting and to reopen said stop valves if the overspeed trip setting is not attained. means arranged to reduce the trip-anticipator speed setting above a selected turbine load, and means to retain the trip-anticipator speed setting temporarily upon sudden loss of load.
8. The combination according to claim 7 wherein said trip anticipator is actuated in response to a speed indication from said main governing means.
9. The combination according to claim 7 wherein said trip anticipator is actuated in response to a speed indication from an independent electrical speed responsive means.
US666526A 1965-07-01 1967-06-21 Turbine overspeed trip anticipator Expired - Lifetime US3614457A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US46888765A 1965-07-01 1965-07-01
US66652667A 1967-06-21 1967-06-21

Publications (1)

Publication Number Publication Date
US3614457A true US3614457A (en) 1971-10-19

Family

ID=27042583

Family Applications (1)

Application Number Title Priority Date Filing Date
US666526A Expired - Lifetime US3614457A (en) 1965-07-01 1967-06-21 Turbine overspeed trip anticipator

Country Status (1)

Country Link
US (1) US3614457A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3800534A (en) * 1972-03-27 1974-04-02 Sundstrand Corp Auxiliary hydraulic power supply
US3826094A (en) * 1971-10-14 1974-07-30 Westinghouse Electric Corp System and method for operating a steam turbine with independent overspeed protection especially adapted for a nuclear reactor powered steam turbine
US3836822A (en) * 1972-03-22 1974-09-17 Kraftwerk Union Ag Control apparatus for temporarily reducing turbine torque
US3928976A (en) * 1974-06-06 1975-12-30 Westinghouse Electric Corp Electrohydraulic emergency trip system for a turbine power plant
US3928975A (en) * 1974-06-06 1975-12-30 Westinghouse Electric Corp Electrical system for electrohydraulic emergency trip system
US3928977A (en) * 1974-06-06 1975-12-30 Westinghouse Electric Corp Electrohydraulic on-line testable trip system for turbine power plant
US3931714A (en) * 1974-06-06 1976-01-13 Westinghouse Electric Corporation Electrohydraulic emergency trip system and method for a turbine power plate
US3955359A (en) * 1973-06-20 1976-05-11 Westinghouse Electric Corporation Bearing temperature system failure detection apparatus suitable for use in power plants and like apparatus
US3956637A (en) * 1972-12-20 1976-05-11 Hitachi, Ltd. Intercept valve controlling method and system for use in a heat power plant
US4071870A (en) * 1974-05-31 1978-01-31 Bbc Brown, Boveri & Company Limited Apparatus to generate minimally delayed instructions for turbine valves in the event of power system short circuits
US4227093A (en) * 1973-08-24 1980-10-07 Westinghouse Electric Corp. Systems and method for organizing computer programs for operating a steam turbine with digital computer control
US4695221A (en) * 1985-12-04 1987-09-22 Rotoflow Corporation Turbine shutdown control system
US4929148A (en) * 1988-12-27 1990-05-29 General Electric Company Turbine trip throttle valve control system
US20060042265A1 (en) * 2004-08-30 2006-03-02 Dmitry Drob Turbine overspeed protection
US20070013365A1 (en) * 2005-07-01 2007-01-18 Ics Triplex Technology Ltd. Turbo machinery speed monitor
US20110232297A1 (en) * 2010-03-23 2011-09-29 General Electric Company Method and system for testing an overspeed protection system of a powerplant machine
US20120151922A1 (en) * 2010-12-17 2012-06-21 Alstom Technology Ltd Steam turbine overspeed protection method and system
US20150135721A1 (en) * 2012-07-12 2015-05-21 Siemens Aktiengesellschaft Method for supporting a mains frequency
US20150159504A1 (en) * 2013-12-05 2015-06-11 General Electric Company System and method for preventing an emergency over-speed condition in a rotating machine
US20160298486A1 (en) * 2013-11-19 2016-10-13 Turbomeca Turbine engine and control method
WO2017213160A1 (en) * 2016-06-10 2017-12-14 株式会社荏原エリオット Main stop valve
US20210293156A1 (en) * 2016-06-21 2021-09-23 General Electric Company Turbine control valves dynamic interaction

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE555541C (en) * 1929-10-15 1932-07-27 Siemens Schuckertwerke Akt Ges Control device for steam turbines with double protection against overspeed
US3060692A (en) * 1958-07-18 1962-10-30 English Electric Co Ltd Control gear for steam turbines
US3094041A (en) * 1960-10-07 1963-06-18 Laval Steam Turbine Co Servomechanism
US3097488A (en) * 1961-11-03 1963-07-16 Gen Electric Turbine control system
US3097490A (en) * 1963-07-16 Callan
US3198954A (en) * 1961-11-03 1965-08-03 Gen Electric Overspeed anticipation device
US3211957A (en) * 1963-03-29 1965-10-12 Gen Electric Protective device for a prime mover having an overspeed governor
US3427464A (en) * 1964-08-13 1969-02-11 Parsons & Co Ltd C A Speed governing systems for steam turbines

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3097490A (en) * 1963-07-16 Callan
DE555541C (en) * 1929-10-15 1932-07-27 Siemens Schuckertwerke Akt Ges Control device for steam turbines with double protection against overspeed
US3060692A (en) * 1958-07-18 1962-10-30 English Electric Co Ltd Control gear for steam turbines
US3094041A (en) * 1960-10-07 1963-06-18 Laval Steam Turbine Co Servomechanism
US3097488A (en) * 1961-11-03 1963-07-16 Gen Electric Turbine control system
US3198954A (en) * 1961-11-03 1965-08-03 Gen Electric Overspeed anticipation device
US3211957A (en) * 1963-03-29 1965-10-12 Gen Electric Protective device for a prime mover having an overspeed governor
US3427464A (en) * 1964-08-13 1969-02-11 Parsons & Co Ltd C A Speed governing systems for steam turbines

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3826094A (en) * 1971-10-14 1974-07-30 Westinghouse Electric Corp System and method for operating a steam turbine with independent overspeed protection especially adapted for a nuclear reactor powered steam turbine
US3836822A (en) * 1972-03-22 1974-09-17 Kraftwerk Union Ag Control apparatus for temporarily reducing turbine torque
US3800534A (en) * 1972-03-27 1974-04-02 Sundstrand Corp Auxiliary hydraulic power supply
US3956637A (en) * 1972-12-20 1976-05-11 Hitachi, Ltd. Intercept valve controlling method and system for use in a heat power plant
US3955359A (en) * 1973-06-20 1976-05-11 Westinghouse Electric Corporation Bearing temperature system failure detection apparatus suitable for use in power plants and like apparatus
US4227093A (en) * 1973-08-24 1980-10-07 Westinghouse Electric Corp. Systems and method for organizing computer programs for operating a steam turbine with digital computer control
US4071870A (en) * 1974-05-31 1978-01-31 Bbc Brown, Boveri & Company Limited Apparatus to generate minimally delayed instructions for turbine valves in the event of power system short circuits
US3928976A (en) * 1974-06-06 1975-12-30 Westinghouse Electric Corp Electrohydraulic emergency trip system for a turbine power plant
US3928975A (en) * 1974-06-06 1975-12-30 Westinghouse Electric Corp Electrical system for electrohydraulic emergency trip system
US3928977A (en) * 1974-06-06 1975-12-30 Westinghouse Electric Corp Electrohydraulic on-line testable trip system for turbine power plant
US3931714A (en) * 1974-06-06 1976-01-13 Westinghouse Electric Corporation Electrohydraulic emergency trip system and method for a turbine power plate
US4695221A (en) * 1985-12-04 1987-09-22 Rotoflow Corporation Turbine shutdown control system
US4929148A (en) * 1988-12-27 1990-05-29 General Electric Company Turbine trip throttle valve control system
US20060042265A1 (en) * 2004-08-30 2006-03-02 Dmitry Drob Turbine overspeed protection
US7194865B2 (en) * 2004-08-30 2007-03-27 Compressor Controls Corporation Turbine overspeed protection
US20070013365A1 (en) * 2005-07-01 2007-01-18 Ics Triplex Technology Ltd. Turbo machinery speed monitor
US7355828B2 (en) * 2005-07-01 2008-04-08 Ics Triplex Technology Ltd Turbo machinery speed monitor
US8756939B2 (en) * 2010-03-23 2014-06-24 General Electric Company Method and system for testing an overspeed protection system of a powerplant machine
US20110232297A1 (en) * 2010-03-23 2011-09-29 General Electric Company Method and system for testing an overspeed protection system of a powerplant machine
US20120151922A1 (en) * 2010-12-17 2012-06-21 Alstom Technology Ltd Steam turbine overspeed protection method and system
US20150135721A1 (en) * 2012-07-12 2015-05-21 Siemens Aktiengesellschaft Method for supporting a mains frequency
US20160298486A1 (en) * 2013-11-19 2016-10-13 Turbomeca Turbine engine and control method
US10190438B2 (en) * 2013-11-19 2019-01-29 Safran Helicopter Engines Turbine engine and control method
US20150159504A1 (en) * 2013-12-05 2015-06-11 General Electric Company System and method for preventing an emergency over-speed condition in a rotating machine
US10233771B2 (en) * 2013-12-05 2019-03-19 General Electric Company System and method for preventing an emergency over-speed condition in a rotating machine
WO2017213160A1 (en) * 2016-06-10 2017-12-14 株式会社荏原エリオット Main stop valve
US20210293156A1 (en) * 2016-06-21 2021-09-23 General Electric Company Turbine control valves dynamic interaction

Similar Documents

Publication Publication Date Title
US3614457A (en) Turbine overspeed trip anticipator
US3243596A (en) Gas turbine power system stabilizer
US2926680A (en) Emergency governing system for a steam turbine
JPS6411828B2 (en)
US3427464A (en) Speed governing systems for steam turbines
JPH06193405A (en) Turbomachinery and steam turbine
US1950594A (en) Load responsive control
US3718837A (en) Control system for an extraction turbine system
US2830441A (en) Hydraulic servo-mechanism for a steam turbine intercept valve
US2504640A (en) Reheat turbine control
US3849666A (en) Method for employment of fast turbine valving
JPH0565805A (en) Control method for steam turbine and control device thereof
US3342194A (en) Emergency governor exerciser system
US2824716A (en) Mechanism for limiting runaway speed of adjustable blade turbines
US3060692A (en) Control gear for steam turbines
US1934631A (en) Maximum and minimum load limiting device for prime movers
US3757130A (en) Overspeed preventive apparatus for engines
US2863289A (en) Hydraulic servo-mechanism for steam turbine intercept valve
US2409024A (en) Steam turbine control mechanism
US2561719A (en) Regulating device with speed adjusting mechanism for power engines
US3433209A (en) Engine overspeed control
JP2854665B2 (en) Steam turbine controller
US3027137A (en) Control mechanism for operating steam turbines under partial load with full arc admission
US2265929A (en) Prime mover control system
US3611039A (en) Apparatus for preventing overspeed of elastic fluid turbine driven generators