US3548915A US832439A US3548915DA US3548915A US 3548915 A US3548915 A US 3548915A US 832439 A US832439 A US 832439A US 3548915D A US3548915D A US 3548915DA US 3548915 A US3548915 A US 3548915A
Authority
US
United States
Prior art keywords
beryllium
aluminum
charge
mold
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US832439A
Inventor
William J Richmond
Leonard B Griffiths
Vernon C Potter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Duracell Inc USA
Original Assignee
PR Mallory and Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PR Mallory and Co Inc filed Critical PR Mallory and Co Inc
Application granted granted Critical
Publication of US3548915A publication Critical patent/US3548915A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D21/00Casting non-ferrous metals or metallic compounds so far as their metallurgical properties are of importance for the casting procedure; Selection of compositions therefor
    • B22D21/002Castings of light metals
    • B22D21/007Castings of light metals with low melting point, e.g. Al 659 degrees C, Mg 650 degrees C
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C1/00Making non-ferrous alloys
    • C22C1/02Making non-ferrous alloys by melting

Definitions

  • a process for casting aluminum-beryllium alloys comprising, charging a crucible with an aluminum base alloy placed at the bottom of a crucible, placing thereon a charge of beryllium in which the beryllium is in discrete chunks, lumps or particles, evacuating the furnace chamber for example to remove oxygen and other impurities from the atmosphere, raising the temperature of the charge sufficient to melt the aluminum but insufficient to melt the beryllium, maintaining the aluminum molten for a time sufficient to effect substantially degassing of the aluminum, changing the vacuum to an atmosphere of inert gas at a pressure below atmospheric, raising the temperature of the charge sufficient to melt the beryllium for the particular Be-Al alloy composition being cast, and rapidly transferring the charge at a temperature at least approximately as low as the liquidus temperature into a mold and rapidly cooling said charge.
  • microstructure' obtained has .notalways been as fine as, desired and the aluminum matrix has sometimes contained undesirable impurities.
  • FIG. is a view of the aluminum-beryllium binary phase In order to achieve the procedure is utilized.
  • the mold to be used for casting is preferably preheated for example, a temperature within the range of about 700 F. to 1000' FL, is 800 F. for a period of time of about .5 to 3 hours, or longer. Furthermore. other temperatures and times may be used. Moreover this step maybe eliminated, depending upon the shape being-cast, the cast properties desired and other metallurgical variables. a f a
  • the inside of the mold preferably is coated with amorphous carbon. This may be done before or during the preheating, if preheating is carried out. This operation can be carried out for foregoing objects the following example with an acetylene torch adjusted to a reducing flame following description The remainder of the charge is aluminum or an alloy of alu' minum.
  • silicon and/or magnesium may be present as alloying elements in the aluminum.
  • One aluminum alloy which may be 'used contains about 0,5 to 1.5 percent magnesium and about 0.5 to L5 silicon with the balance being aluminum.
  • the aluminum to be used is preferably quite pure, most preferably having a purity of 99.9.9percent or higher with a maximum content of impurities other than alloying elements of about 0.0 1 percent total. It is to be emphasized that other alloying elements instead of, and/or in addition to magnesium and silicon may be desirable for certain properties and characteristics of the material. his to be understood that the process of the present invention is to include such additional alloying elements in the aluminum chargel It should also be pointed out that some beryllium will end up in solid solution within the aluminum matrix, for example 0.2 to 0.5 percent by weight of the aluminum. Y
  • the aluminum or aluminum alloy is preferably placed at the bottom of the crucible andthe beryllium on top. The reason for this will become apparent hereinafter.
  • the mold preferably afler preheating as described above is placed in a furnace which has. provisions for evacuations, preferably to as low as 150 microns and more preferably to as low as l00 microns, and below. Additionally, the furnace should preferably have provisions for-changing the evacuated system to a system utilizing an inert gassuch as argon, or helium (argon is preferred).
  • an inert gas such as argon, or helium (argon is preferred).
  • the melting crucible is preferably placed on a rotatable axis or other device inside the furnace whereby the crucible can be rotated from outside the furnace and molten metal poured or otherwise rapidly transferred into amold which is situated within the furnace, often below the crucible.
  • the furnace is evacuated, preferably to a pressure of below 150 microns, more preferably below 100 microns. It is believed that the evacuation removes oxygen and other impurities from the atmosphere. in addition, it is believed that the vacuum treatment also substantially degasses the aluminum matrix.
  • Heat is gradually applied, for example by means of an induction coil, or other type of heating such as electrical resistance heating. The heatis applied at a rate so that the aluminum is melted. After the aluminum is melted, it
  • the melting crucible which may be made of MgO, Ago, or otherrefractory oxide rather than expensive BeO, is charged with beryllium in small chunks, lumps or particles.
  • the size of the chunks is such that they will not pass through a one quarter inch mesh screen but will pass through three quarter inch mesh screen. However for many applications particulate material considerably smaller than one quarter inch may be used with good results.
  • the amount of Be in the charge is preferably above 40 per-. cent by weight, more preferably about 68 to '85 percent by weight. It is often desirable for the beryllium in the charge to have at least some of the following characteristics. For nuclear applications the cobalt is preferred to be very low, for examplebe below about 0.1 percent. Other impurity elements should usually be less than about 0.1 percent and the total 'ofthe other impurities should usually be not more than about I percent.
  • an.alloy containing about 0.5 to 1.5 percent magnesium in aluminum, together with beryllium chunks, lumps or particles may be processed through the furnace and the pressure determined at which sparking" takes place. Then aluminum alloys not containing magnesium may be processed and the pressure at which TSparking" occurred relied on to indicate when degassing has been substantially,
  • the vacuum is shut off and the chamber is filled with an inert gas such as argon or helium, preferably argon, to a pressure which is preferably at least about 5 inches of mercury below atmospheric to prevent additional evaporation of alloying elements, particularly magnesium and the furnace temperature is raised in order to melt the beryllium.
  • an inert gas such as argon or helium, preferably argon
  • the heating is continued until the beryllium has melted. For example, it can be observed through the furnace window when all the beryllium chunks have melted. For example, temperatures above about 1,200 C. preferably above about l,300 C. are usually sufficient to melt substantially all of the beryllium. In some cases if induction heating is used, it is believed that an electric field may be created around the melt by the heating coil.
  • the liquid is slowly cooled to the pouring temperature.
  • the pouring temperature must be below the liquidus temperature shown on the Al-Be phase diagram for the particular aiuminum-beryllium composition being used. It will be observed from FIG. 1 that Be contents of above 40 weight percent including 68 85 percent are on the Be side of the Be-Al eutectic point.
  • the pouring temperature may be to about 50 C. below the liquidus. This results in the formation of beryllium nuclei in the melt. As the temperature is lowered below the liquidus, a thermal arrest or a point where no change in temperature with time ocours, is observed.
  • the temperature may be observed for exampie, from a thermocouple placed in the melting crucible or with an optical pyrometenA pouring temperature of from about 1,] 85 to about l,2l C. has been found to be particularly effective for alloys within the 68 to 85 weight percent range.
  • the charge is poured or transferred quickly into the mold in order to obtain turbulance. For example, this can be done by rotating the crucible about its axis to pour the molten metal into a mold located therebelow, or by the use of pressure or vacuum to quickly transfer the molten metal into the mold. it is believed that this procedure results in a fine microstructure because as the liquidus temperature is reached a certain number of beryllium nuclei are formed in the melt and begin to grow dendrites. 1n the pouring and/or transferring and/or casting turbulence, the dendrite arms break off and form new nucleation sites. It is therefore desirable to pour and/or transfer as rapidly as possible and still avoid substantial amounts of metal splashing out of the mold. Thus a microstructure of fine Be grains in an aluminum matrix is obtained. For example, about .1 to .3 millimeter average diameter grain size may often be obtained.
  • the rate of cooling is dependent upon several variables including the conductivity of the mold and the thickness or mass of the mold.
  • Materials having a relatively high thermal conductivity should be used for the mold. Exemplary materials are as follows: copper, copper alloys such as brass, bronze, iron base materials including carbon and alloy steels, and graphite or other carbonaceous materials. In the shapes which are difficult to cast and which are subject to hot tearing, it is usually preferred to use graphite or other carbonaceous material for the mold and for any cores which would be used.
  • Themold alsorpreferably has relatively large thickness or mass. It has been found, for example, that M inch thick mold can be used to form castings 2 X 4 X /2 inch and a fine microstructure is obtained,'but the thicknessand mass will vary according to the shape and size of the casting, the cast properties desired and/or how fine a microstructure is desired. Castings having higher minimum dimensions than one-half inch have been successfully cast.
  • Aim if desired-additional heat dissipating features may be employed including for example water or other fluid heat extracting mediums upon or within the mold and/or fins or other sha es designed for heat dissipation.
  • platinum is added to the melt.
  • Rlatinum is believed, to increase the nucleation rate and thus aid intobtaining a fine grain struc-l ture.
  • the platinum may be added'jntheelemental form be after the entire charge the charge or, alternatively, it'ma has been melted for example by th use of a strand which is guided into the melt from outside .th e furnace.'
  • the amount of platinum added is for example front about 0.05 to about 0.5 percent by weight of the total charge preferably 0.1 to 0.4 percent by weight. If platinum is added to the charge, the pouring and/or transfer rate does nothave to be quite so rapid as if platinum were not to be used.
  • a method for casting aluminumberyllium alloys com: prising, charging a crucible with an aluminum or analuminum base alloy placed at the bottom 'of acrucible, placing thereon a charge of beryllium in which the beryllium is in discrete lumps, chunks or particles evacuating the furnace chamber,
  • content of the charge is above. at least about 40 percent by weight beryllium.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Description

United States Patent [72] inventors William .1. Richmond Reading; Leonard B. Griffitls, North Reading; Vernon C. Potter, West Concord, Mass. [2 1] Appl. No. 832,439 [22] Filed l l, 19.69
Continuation-impart of application Ser. No. mamas, .Pendi [45] Patented Dec. 22, 1970 [73] Assignee P. R. Mallory & Co. Inc.
Indianapolis, Ind. seemr flqe [54] NEW PROCEDURE FOR Cl-llLL CASTING BERYLLIUM COMPOSITE 15 Claims, 1 Drawing Fig.
[52] 11.8. CI 164/68, ,5/ 138; .64/58 [51] Int. Cl 022d 21/02 [50] Field oiSearch 75/138; 164/61, 68; 75/150 [56] References Cited UNITED STATES PATENTS 1,254,987 1/1918 Cooper 75113 8 1,333,965 3/1920 Fahrenwald... 75/138 2,399,104 4/1946 Cooper 75/ 1 38 3,049,421 8/1962 Allen et al. 75/ l 38X 3,337,334 8/1967 Fenn, Jr. et al. 75/150 3,485,681 12/ l 969 Greenewald, Jr l64/322X ABSTRACT: A process for casting aluminum-beryllium alloys comprising, charging a crucible with an aluminum base alloy placed at the bottom of a crucible, placing thereon a charge of beryllium in which the beryllium is in discrete chunks, lumps or particles, evacuating the furnace chamber for example to remove oxygen and other impurities from the atmosphere, raising the temperature of the charge sufficient to melt the aluminum but insufficient to melt the beryllium, maintaining the aluminum molten for a time sufficient to effect substantially degassing of the aluminum, changing the vacuum to an atmosphere of inert gas at a pressure below atmospheric, raising the temperature of the charge sufficient to melt the beryllium for the particular Be-Al alloy composition being cast, and rapidly transferring the charge at a temperature at least approximately as low as the liquidus temperature into a mold and rapidly cooling said charge.
ATOMIC PER CENT BERYLLIUM PATENIED mm mm ALUMlNUM-BERYLLIUM PHASE DIAGRAM WEIGHT PER CENT BERYLLIUM O u 9T0 L O m H V m 8 w L. L O II 7 L n O m L L h 5 H w m M L M O. W L 4 M O- 3 I O H e 5 H B m m L. M O 2 V. W m L m- 5 2 II I mw %5 m 0 NWO O \J K 0 O O. O 0 O0 0 O O O 0 o 0 O N M m w mm 6 5 4 w 0 dmnEmwEzwp ATOMIC PER CENT BERYLLIUM INVENTORS WILLIAM J. RICHMOND LEONARD B. GRIFFITHS VERNON C POTTER ATTORNEY diagram.
- NEW PROCEDURE-FOR CHILL INC BERYLLI coMi-osrre This application is a continuation-in-part of application Ser.
No. 793,398, filed Jan. 23, 1969. g I
Several processes for casting Be-Al alloys have been reported comprising heatinga charge ofberylliumchunks and aluminum alloy chunks in the presence of a fluxing agent selected from the group consisting of alkali and alkaline earth halides to a temperature above the melting point of beryllium. The flux destroys the beryllium oxide film and enables the casting of a microstructure of beryllium grains interspersed within an aluminum or aluminum alloy matrix.
However, under some casting conditions, particularly where the atmosphere has high humidity, it has been found that some porosity has been observed in the castings.
Furthermore, it would be advantageous to avoid the flux because of its corrosive nature, including its tendency to attack, crucibles, the fumes it creates on volatilization and to avoid the cost outlay for the flux material.
Because of the corrosive nature of the flux, beryllium oxide crucibles are preferred which are expensive. t
Furthermore the microstructure' obtained has .notalways been as fine as, desired and the aluminum matrix has sometimes contained undesirable impurities.
It is therefore an object of the present invention to provide a process which avoidsiinpurities in the aluminum matrix.
It is still another object of the presentinvention to provide a process which avoids the use of a halide flux,
It is still another object of the present invention to provide a process which permits the use of crucibles less expensive than beryllium oxide crucibles. I
it is still another object of the presentinvention to provide a process which results in a very fine as-cast microstructure.
Other objects will appear from the and drawing in which;
The FIG. is a view of the aluminum-beryllium binary phase In order to achieve the procedure is utilized.
The mold to be used for casting is preferably preheated for example, a temperature within the range of about 700 F. to 1000' FL, is 800 F. for a period of time of about .5 to 3 hours, or longer. Furthermore. other temperatures and times may be used. Moreover this step maybe eliminated, depending upon the shape being-cast, the cast properties desired and other metallurgical variables. a f a The inside of the mold preferably is coated with amorphous carbon. This may be done before or during the preheating, if preheating is carried out. This operation can be carried out for foregoing objects the following example with an acetylene torch adjusted to a reducing flame following description The remainder of the charge is aluminum or an alloy of alu' minum. For example, silicon and/or magnesium may be present as alloying elements in the aluminum. One aluminum alloy which may be 'used contains about 0,5 to 1.5 percent magnesium and about 0.5 to L5 silicon with the balance being aluminum. The aluminum to be used is preferably quite pure, most preferably having a purity of 99.9.9percent or higher with a maximum content of impurities other than alloying elements of about 0.0 1 percent total. It is to be emphasized that other alloying elements instead of, and/or in addition to magnesium and silicon may be desirable for certain properties and characteristics of the material. his to be understood that the process of the present invention is to include such additional alloying elements in the aluminum chargel It should also be pointed out that some beryllium will end up in solid solution within the aluminum matrix, for example 0.2 to 0.5 percent by weight of the aluminum. Y
in charging the aluminum or aluminum alloy is preferably placed at the bottom of the crucible andthe beryllium on top. The reason for this will become apparent hereinafter.
The mold preferably afler preheating as described above is placed in a furnace which has. provisions for evacuations, preferably to as low as 150 microns and more preferably to as low as l00 microns, and below. Additionally, the furnace should preferably have provisions for-changing the evacuated system to a system utilizing an inert gassuch as argon, or helium (argon is preferred).
The melting crucible is preferably placed on a rotatable axis or other device inside the furnace whereby the crucible can be rotated from outside the furnace and molten metal poured or otherwise rapidly transferred into amold which is situated within the furnace, often below the crucible. After placing the mold in the furnace, the furnace is evacuated, preferably to a pressure of below 150 microns, more preferably below 100 microns. It is believed that the evacuation removes oxygen and other impurities from the atmosphere. in addition, it is believed that the vacuum treatment also substantially degasses the aluminum matrix. Heat is gradually applied, for example by means of an induction coil, or other type of heating such as electrical resistance heating. The heatis applied at a rate so that the aluminum is melted. After the aluminum is melted, it
or by spraying the mold with an amorphous-carbon.-lt is often advantageous to reheat the mold at-for example 20 to 30 minutes at elevated temperature for example about 700-80 The melting crucible, which may be made of MgO, Ago, or otherrefractory oxide rather than expensive BeO, is charged with beryllium in small chunks, lumps or particles. Preferably the size of the chunks is such that they will not pass through a one quarter inch mesh screen but will pass through three quarter inch mesh screen. However for many applications particulate material considerably smaller than one quarter inch may be used with good results.
The amount of Be in the charge is preferably above 40 per-. cent by weight, more preferably about 68 to '85 percent by weight. It is often desirable for the beryllium in the charge to have at least some of the following characteristics. For nuclear applications the cobalt is preferred to be very low, for examplebe below about 0.1 percent. Other impurity elements should usually be less than about 0.1 percent and the total 'ofthe other impurities should usually be not more than about I percent.
is believed that the vacuum degasses the molten aluminum alloy to a substantial extent. The beryllium remains substan- The sparking can be observed, for example, through a window in the furnace. g
If desired, in order to observe the pressure at which degassing'is completed, an.alloy containing about 0.5 to 1.5 percent magnesium in aluminum, together with beryllium chunks, lumps or particles may be processed through the furnace and the pressure determined at which sparking" takes place. Then aluminum alloys not containing magnesium may be processed and the pressure at which TSparking" occurred relied on to indicate when degassing has been substantially,
completed. For example, in one 'fumace a pressure of about? 450 microns signifies the point where the degassing has taken place. However, it is apparent that the pressure at which degassing has taken place will depend on such variables as the construction of a particular furnace, the type of vacuum pump used, etc.
After the degassing operation has been concluded, the vacuum is shut off and the chamber is filled with an inert gas such as argon or helium, preferably argon, to a pressure which is preferably at least about 5 inches of mercury below atmospheric to prevent additional evaporation of alloying elements, particularly magnesium and the furnace temperature is raised in order to melt the beryllium. The heating is continued until the beryllium has melted. For example, it can be observed through the furnace window when all the beryllium chunks have melted. For example, temperatures above about 1,200 C. preferably above about l,300 C. are usually sufficient to melt substantially all of the beryllium. In some cases if induction heating is used, it is believed that an electric field may be created around the melt by the heating coil. It is believed that the melt and therefore the beryllium does not melt quickly. If this problem exists it can be solved by turning the heating coil off so that there is no longer an upward force acting on theberyllium and the beryllium can go down into the aluminum and be melted.
After beryllium has melted, the liquid is slowly cooled to the pouring temperature. The pouring temperature must be below the liquidus temperature shown on the Al-Be phase diagram for the particular aiuminum-beryllium composition being used. It will be observed from FIG. 1 that Be contents of above 40 weight percent including 68 85 percent are on the Be side of the Be-Al eutectic point. For example, the pouring temperature may be to about 50 C. below the liquidus. This results in the formation of beryllium nuclei in the melt. As the temperature is lowered below the liquidus, a thermal arrest or a point where no change in temperature with time ocours, is observed. The temperature may be observed for exampie, from a thermocouple placed in the melting crucible or with an optical pyrometenA pouring temperature of from about 1,] 85 to about l,2l C. has been found to be particularly effective for alloys within the 68 to 85 weight percent range.
After the pouring temperature is reached, the charge is poured or transferred quickly into the mold in order to obtain turbulance. For example, this can be done by rotating the crucible about its axis to pour the molten metal into a mold located therebelow, or by the use of pressure or vacuum to quickly transfer the molten metal into the mold. it is believed that this procedure results in a fine microstructure because as the liquidus temperature is reached a certain number of beryllium nuclei are formed in the melt and begin to grow dendrites. 1n the pouring and/or transferring and/or casting turbulence, the dendrite arms break off and form new nucleation sites. It is therefore desirable to pour and/or transfer as rapidly as possible and still avoid substantial amounts of metal splashing out of the mold. Thus a microstructure of fine Be grains in an aluminum matrix is obtained. For example, about .1 to .3 millimeter average diameter grain size may often be obtained.
It is important that the casting is cooled very rapidly. The rate of cooling is dependent upon several variables including the conductivity of the mold and the thickness or mass of the mold. Materials having a relatively high thermal conductivity should be used for the mold. Exemplary materials are as follows: copper, copper alloys such as brass, bronze, iron base materials including carbon and alloy steels, and graphite or other carbonaceous materials. In the shapes which are difficult to cast and which are subject to hot tearing, it is usually preferred to use graphite or other carbonaceous material for the mold and for any cores which would be used.
Themold alsorpreferably has relatively large thickness or mass. It has been found, for example, that M inch thick mold can be used to form castings 2 X 4 X /2 inch and a fine microstructure is obtained,'but the thicknessand mass will vary according to the shape and size of the casting, the cast properties desired and/or how fine a microstructure is desired. Castings having higher minimum dimensions than one-half inch have been successfully cast.
Aim if desired-additional heat dissipating features may be employed including for example water or other fluid heat extracting mediums upon or within the mold and/or fins or other sha es designed for heat dissipation.
ieldstrengths (0.2 percent offset yields) of about 18.000
to about 26,000 p.s.i. and ultimate tensile strengths of about 28,000 to about 40,000 psi. have been obtained, with the higher values being obtained with more rapidpouring and/or transferrates. I
According to another embodiment;of the invention platinum is added to the melt. Rlatinum is believed, to increase the nucleation rate and thus aid intobtaining a fine grain struc-l ture. The platinum may be added'jntheelemental form be after the entire charge the charge or, alternatively, it'ma has been melted for example by th use of a strand which is guided into the melt from outside .th e furnace.' The amount of platinum added is for example front about 0.05 to about 0.5 percent by weight of the total charge preferably 0.1 to 0.4 percent by weight. If platinum is added to the charge, the pouring and/or transfer rate does nothave to be quite so rapid as if platinum were not to be used.
l. A method for casting aluminumberyllium alloys com: prising, charging a crucible with an aluminum or analuminum base alloy placed at the bottom 'of acrucible, placing thereon a charge of beryllium in which the beryllium is in discrete lumps, chunks or particles evacuating the furnace chamber,
raising the temperature of the charge sufficient to melt the.
content of the charge is above. at least about 40 percent by weight beryllium.
3. A method according to claim 1 in which during the degassing visible evolution of the particles occurs.
4. A method according to claim 1 in which the molten charge is up to 50 C. below the liquidus prior to transferring the charge to a mold.
5. Amethod according to claim lin which the aluminum charge also contains an element selected from the group consisting of magnesium, silicon and mixtures thereof.-
6 A method according to claim l'in which the mold is preheated. I i g 7,. A method according to claim 1 in which an addition of platinum is present in the molten charge at the time of transferring the charge to a mold.
8. A method according to claim -l in which the furnace is evacuated at least as low as 150 microns.
9. A method according to claim 1 in which the inert gas atmosphere is at least 5 incheszof mercury below atmospheric.
10. A method according to claim 8 in which the charge is heated to a temperature above about l,2000 C.
11. A method according to'claim 3 in which inception of sparking is used to determine the point when the atmosphere of the furnace is changed from a vacuum to an inert gas.
12. A method according to claim 10 in which the charge is heated to a temperature above about l,300 C;
13. A method according to'claim'3 in which the charge. contains magnesium. Y I
14. A method according to claim'l2 in which the charge is cooled to a temperature'of about l,l to l,2l5 C. prior to transferring the charge to a mold.
IS. A method according to claim 2 in which the-beryllium content is about 68 to about 85 percent by weight.
US832439A 1969-06-11 1969-06-11 New procedure for chill casting beryllium composite Expired - Lifetime US3548915A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US83243969A 1969-06-11 1969-06-11

Publications (1)

Publication Number Publication Date
US3548915A true US3548915A (en) 1970-12-22

Family

ID=25261652

Family Applications (1)

Application Number Title Priority Date Filing Date
US832439A Expired - Lifetime US3548915A (en) 1969-06-11 1969-06-11 New procedure for chill casting beryllium composite

Country Status (1)

Country Link
US (1) US3548915A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3808671A (en) * 1972-01-11 1974-05-07 Mallory & Co Inc P R Method of making hollow cast articles from metal alloys having long freezing ranges
US5994777A (en) * 1997-10-20 1999-11-30 Micron Technology, Inc. Method and support structure for air bridge wiring of an integrated circuit
US6042658A (en) * 1991-10-02 2000-03-28 Brush Wellman, Inc. Aluminum-beryllium actuator armset
US6312534B1 (en) * 1994-04-01 2001-11-06 Brush Wellman, Inc. High strength cast aluminum-beryllium alloys containing magnesium
US20020037603A1 (en) * 2000-08-16 2002-03-28 Eldridge Jerome M. Microelectronic device package with conductive elements and associated method of manufacture
US6509590B1 (en) 1998-07-20 2003-01-21 Micron Technology, Inc. Aluminum-beryllium alloys for air bridges
US6620638B1 (en) 2002-06-05 2003-09-16 Micron Technology, Inc. Testing of multi-chip electronic modules
US6670719B2 (en) 1999-08-25 2003-12-30 Micron Technology, Inc. Microelectronic device package filled with liquid or pressurized gas and associated method of manufacture
US6686654B2 (en) 2001-08-31 2004-02-03 Micron Technology, Inc. Multiple chip stack structure and cooling system
US6747347B2 (en) 2001-08-30 2004-06-08 Micron Technology, Inc. Multi-chip electronic package and cooling system
US20040113385A1 (en) * 2002-11-28 2004-06-17 Shimano, Inc. Bicycle electronic control device with a reset function
US6995470B2 (en) 2000-05-31 2006-02-07 Micron Technology, Inc. Multilevel copper interconnects with low-k dielectrics and air gaps
US20060046322A1 (en) * 2004-08-31 2006-03-02 Micron Technology, Inc. Integrated circuit cooling and insulating device and method
US7067421B2 (en) 2000-05-31 2006-06-27 Micron Technology, Inc. Multilevel copper interconnect with double passivation
US7262505B2 (en) 2000-01-18 2007-08-28 Micron Technology, Inc. Selective electroless-plated copper metallization
US7335965B2 (en) 1999-08-25 2008-02-26 Micron Technology, Inc. Packaging of electronic chips with air-bridge structures
US7402516B2 (en) 2000-01-18 2008-07-22 Micron Technology, Inc. Method for making integrated circuits
US7465608B1 (en) 2001-08-17 2008-12-16 Micron Technology, Inc. Three-dimensional multichip module
US8779596B2 (en) 2000-01-18 2014-07-15 Micron Technology, Inc. Structures and methods to enhance copper metallization

Cited By (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3808671A (en) * 1972-01-11 1974-05-07 Mallory & Co Inc P R Method of making hollow cast articles from metal alloys having long freezing ranges
US6042658A (en) * 1991-10-02 2000-03-28 Brush Wellman, Inc. Aluminum-beryllium actuator armset
US6312534B1 (en) * 1994-04-01 2001-11-06 Brush Wellman, Inc. High strength cast aluminum-beryllium alloys containing magnesium
US5994777A (en) * 1997-10-20 1999-11-30 Micron Technology, Inc. Method and support structure for air bridge wiring of an integrated circuit
US6509590B1 (en) 1998-07-20 2003-01-21 Micron Technology, Inc. Aluminum-beryllium alloys for air bridges
US6717191B2 (en) 1998-07-20 2004-04-06 Micron Technology, Inc. Aluminum-beryllium alloys for air bridges
US20030127741A1 (en) * 1998-07-20 2003-07-10 Micron Technology, Inc. Aluminum-beryllium alloys for air bridges
US6943090B2 (en) 1998-07-20 2005-09-13 Micron Technology, Inc. Aluminum-beryllium alloys for air bridges
US20040192020A1 (en) * 1998-07-20 2004-09-30 Micron Technology, Inc. Aluminum-beryllium alloys for air bridges
US6670719B2 (en) 1999-08-25 2003-12-30 Micron Technology, Inc. Microelectronic device package filled with liquid or pressurized gas and associated method of manufacture
US6909171B2 (en) 1999-08-25 2005-06-21 Micron Technology, Inc. Microelectronic device package filled with liquid or pressurized gas and associated method of manufacture
US7387912B2 (en) 1999-08-25 2008-06-17 Micron Technology, Inc. Packaging of electronic chips with air-bridge structures
US7335965B2 (en) 1999-08-25 2008-02-26 Micron Technology, Inc. Packaging of electronic chips with air-bridge structures
US7262505B2 (en) 2000-01-18 2007-08-28 Micron Technology, Inc. Selective electroless-plated copper metallization
US8779596B2 (en) 2000-01-18 2014-07-15 Micron Technology, Inc. Structures and methods to enhance copper metallization
US7402516B2 (en) 2000-01-18 2008-07-22 Micron Technology, Inc. Method for making integrated circuits
US7091611B2 (en) 2000-05-31 2006-08-15 Micron Technology, Inc. Multilevel copper interconnects with low-k dielectrics and air gaps
US7067421B2 (en) 2000-05-31 2006-06-27 Micron Technology, Inc. Multilevel copper interconnect with double passivation
US6995470B2 (en) 2000-05-31 2006-02-07 Micron Technology, Inc. Multilevel copper interconnects with low-k dielectrics and air gaps
US6709968B1 (en) 2000-08-16 2004-03-23 Micron Technology, Inc. Microelectronic device with package with conductive elements and associated method of manufacture
US20020037603A1 (en) * 2000-08-16 2002-03-28 Eldridge Jerome M. Microelectronic device package with conductive elements and associated method of manufacture
US6614092B2 (en) * 2000-08-16 2003-09-02 Micron Technology, Inc. Microelectronic device package with conductive elements and associated method of manufacture
US7465608B1 (en) 2001-08-17 2008-12-16 Micron Technology, Inc. Three-dimensional multichip module
US6747347B2 (en) 2001-08-30 2004-06-08 Micron Technology, Inc. Multi-chip electronic package and cooling system
US20060103015A1 (en) * 2001-08-30 2006-05-18 Farrar Paul A Multi-chip electronic package and cooling system
US6975027B2 (en) 2001-08-30 2005-12-13 Micron Technology, Inc. Multi-chip electronic package and cooling system
US20040207061A1 (en) * 2001-08-30 2004-10-21 Farrar Paul A. Multi-chip electronic package and cooling system
US7626252B2 (en) 2001-08-30 2009-12-01 Micron Technology, Inc. Multi-chip electronic package and cooling system
US6686654B2 (en) 2001-08-31 2004-02-03 Micron Technology, Inc. Multiple chip stack structure and cooling system
US6861287B2 (en) 2001-08-31 2005-03-01 Micron Technology, Inc. Multiple chip stack structure and cooling system
US20040063248A1 (en) * 2001-08-31 2004-04-01 Farrar Paul A. Multiple chip stack structure and cooling system
US6620638B1 (en) 2002-06-05 2003-09-16 Micron Technology, Inc. Testing of multi-chip electronic modules
US20040113385A1 (en) * 2002-11-28 2004-06-17 Shimano, Inc. Bicycle electronic control device with a reset function
US7300821B2 (en) 2004-08-31 2007-11-27 Micron Technology, Inc. Integrated circuit cooling and insulating device and method
US7304380B2 (en) 2004-08-31 2007-12-04 Micron Technology, Inc. Integrated circuit cooling and insulating device and method
US20060249837A1 (en) * 2004-08-31 2006-11-09 Micron Technology, Inc. Integrated circuit cooling and insulating device and method
US20080048314A1 (en) * 2004-08-31 2008-02-28 Micron Technology, Inc. Integrated circuit cooling and insulating device and method
US20080057629A1 (en) * 2004-08-31 2008-03-06 Micron Technology, Inc. Integrated circuit cooling and insulating device and method
US20060046322A1 (en) * 2004-08-31 2006-03-02 Micron Technology, Inc. Integrated circuit cooling and insulating device and method
US7485497B2 (en) 2004-08-31 2009-02-03 Micron Technology, Inc. Integrated circuit cooling and insulating device and method
US7492042B2 (en) 2004-08-31 2009-02-17 Micron Technology, Inc. Integrated circuit cooling and insulating device and method

Similar Documents

Publication Publication Date Title
US3548915A (en) New procedure for chill casting beryllium composite
US3548948A (en) Procedure for chill casting beryllium composite
US2548897A (en) Process for melting hafnium, zirconium, and titanium metals
Munitz et al. Supercooling effects in Cu-10 Wt Pct Co alloys solidified at different cooling rates
JP3003914B2 (en) Method for producing copper alloy containing active metal
JPS6137351B2 (en)
US3529958A (en) Method for the formation of an alloy composed of metals reactive in their elemental form with a melting container
US5174811A (en) Method for treating rare earth-transition metal scrap
US3672879A (en) Tini cast product
US3470936A (en) Method for producing high purity copper castings
US3501291A (en) Method for introducing lithium into high melting alloys and steels
JPH0639635B2 (en) Electroslag remelting method for copper and copper alloys
US3676114A (en) Improvement in the process relating to alloys containing platinum group metals
US4014689A (en) Method of fabricating a contact material for high-power vacuum circuit breakers
US1955726A (en) Method of melting copper to produce dense castings low in oxygen
US3508914A (en) Methods of forming and purifying nickel-titanium containing alloys
US4375371A (en) Method for induction melting
US3544312A (en) Alloying method
US4161398A (en) Method for electroslag remelting of a copper-nickel alloy
EP0688879B1 (en) High vacuum apparatus member and vacuum apparatus
US3008821A (en) Method of melting and alloying metals
US4014688A (en) Contact material for high-power vacuum circuit breakers
US3679394A (en) Method for casting high ti content alloys
EP0142584B1 (en) Process for producing alloys
JPS641230B2 (en)