US3477236A - Surface to subsea guidance system - Google Patents

Surface to subsea guidance system Download PDF

Info

Publication number
US3477236A
US3477236A US775590A US3477236DA US3477236A US 3477236 A US3477236 A US 3477236A US 775590 A US775590 A US 775590A US 3477236D A US3477236D A US 3477236DA US 3477236 A US3477236 A US 3477236A
Authority
US
United States
Prior art keywords
cable
float
module
subsea
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US775590A
Inventor
Bill S Burrus
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cameron Solutions Inc
Original Assignee
Combustion Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Combustion Engineering Inc filed Critical Combustion Engineering Inc
Application granted granted Critical
Publication of US3477236A publication Critical patent/US3477236A/en
Assigned to NATIONAL TANK COMPANY reassignment NATIONAL TANK COMPANY ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: COMBUSTION ENGINEERING, INC., A CORP OF DE.
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/10Guide posts, e.g. releasable; Attaching guide lines to underwater guide bases

Definitions

  • the present invention relates to structural guidance of structures between the surface and subsea locations. More particularly, the invention relates to landing oil well production equipment on a subsea base structure and guiding it to the surface for adjustment, repair, replacement, etc.
  • Drilling subsea locations is a dynamically developing art. Completing these oil Wells drilled is feasible at increasingly deeper subsea locations.
  • the basic processing of produced fluids at the wellhead is only now being contemplated. At present, the produced fluids are conducted to the surface where the processing equipment, normally located at the wellhead on shore installations, is mounted on surface platforms.
  • Equipment is being developed for basic wellhead processing at subsea locations. This structure is made up in packages adapted to be mounted on base structures at the subsea location of wellheads. Positive guidance of these packages is demanded in order to land and orient them on their base structures as Well as remove them to the surface for workover.
  • Another object is to provide a cable system for guidance which is permanently mounted at the subsea location and which can be retracted to a location below navigation and wave action.
  • Another object is to provide a retracting mechanism which is automatic and which can be readily repaired.
  • the invention contemplates a float retained within a housing structure at a subsea location.
  • a cable is attached to the float and passes over a system of pulleys and up to a buoyant structure.
  • the float at the upper limit of its travel within the housing, tethers the buoyant structure to a subsea location.
  • FIG. 1 is a sectioned elevation of a subsea oil wellhead with a guidance system embodying the present invention being engaged for extension to the surface;
  • FIG. 2 is the structure of FIG. 1 showing the guidance system extended and the guided structure transferred to the surface;
  • FIG. 3 is the structure of FIG. 2 with the transferred structure buoyed higher than in FIG. 2;
  • FIG. 4 is the structure of FIG. 3 with the transferred structure removed from the guidance system and the system buoyed at the surface;
  • FIGS. 5 and 6 are sectioned elevations of one float and pulley arrangement of the guidance system illustrating the float in the two extreme positions at each end of its range of travel;
  • FIGS. 7-9 show, in elevation, the sequence of operations to replace a broken cable of the guidance system.
  • FIGS. 10 and 11 show, in elevation, a communication cable utilizing the float and pulley system of FIGS. 1-9.
  • FIGS. 1-4 are to be considered together in their depiction of the complete cycle of operation of the structure in which the invention is embodied. Understanding begins with the fact that a body of water 1 is over a bottom 2 and has a surface 3. The location of petroleum products dictated the drilling and completion of a well, evidenced by a conductor, or connector, pipe 4.
  • Pipe 4 is the external evidence of the completed Well at this subsea location. It is a presently accepted technique to mount a support framework 5 to this pipe, below the wellhead structure not shown here. It is specifically planned to have landing sockets on the framework 5 in which the lower ends of the legs of a base for module 6 of production equipment will be mounted. None of this connecting equipment need be illustrated here. For the present purpose, it is only necessary to regard the upper surface of support framework 5 as a base for module 6. This module 6 is a removable structure to be transferred between base 5 and surface 3 by use of the guidance system in which the present invention is embodied.
  • the present invention is embodied in the guide system for module 6 as the module is transferred from the location illustrated in FIG. 1 to the location illustrated in FIGS. 2, 3 and 4.
  • a cable 10 is extended from base 5 to surface 3 and has a sliding connection with the module 6 to guide it during transfer.
  • cable 10 connects float 11 with buoyant frame 12. Between these two connections, cable 10 passes over a pulley block on float 11 and a pulley block on base 5. Frame 12 is pulled to the surface 3 and float 11 travels downward to the position shown in FIGS. 2, 3 and 4. Module 6 can then be released from its connections to base 5 and transferred to surface 3, guided by sliding engagement with cable 10.
  • FIG. 1 When the transferable module 6 is mounted on base 5 and is operating, the guide system is positioned as illustrated in FIG. 1. Buoyant frame 12 is urged downward to a position safely below significant wave action and navigation. A float 13 is shown to demonstrate how frame 12 may be maintained buoyant while tethered by cable 10. A diver 14 is shown, descending to attach hoisting tackle 15 to frame 12 so it may be lifted to the surface as shown in FIG. 2. Obviously, a trolling arrangement to snare frame 12 can be used as an alternate means to make the connection between tackle 15 and frame 12.
  • FIG. 2 discloses the frame 12 hoisted above the surface and the module 6 guided by cable 10. Ballast tanks 20 are filled with gas to float module 6 to the surface. For certain service operations, it may not be desirable to float module 6 higher than this position.
  • FIG. 3 discloses how lower tanks 21 may be filled with gas to float the module higher on the surface. This position may be desirable for particular service demands.
  • FIG. 4 discloses how the module may be disconnected from the guide cables and towed to another location for extensive service. While awaiting a module to guide back to base 5, frame 12 may be retained near the surface 3 by a float 22 large enough to so buoy frame 12.
  • FIGS. 5 and 6 disclose in great detail how the cable is controlled.
  • float 11 is attached to one end and frame 12 is attached to the other.
  • the float 11 has a predetermined range of vertical travel and frame 12 also has a range of travel.
  • housing 30 which can be given the form of the vertical tube disclosed in FIGS. 5 and 6. Housing 30 is mounted in its vertical position near the base 5. Actually, in FIGS. 5 and 6, the housing is connected to the base 5 although the concept of the invention is not so limited.
  • Float 11 raises and lowers in tubular housing 30, limited by the closure 31 as the top and the closure 32 as the bottom.
  • Pulley block 33 is mounted on the lower end of float 11 and a similar block 34 is mounted on the bottom closure 32.
  • These blocks are formed of a series of pulleys, arranged side-by-side. Cable 10 is passed over them in sequence to form multiple passes 35 between the two sets of pulleys.
  • the end of cable 10 attached to the float 11 is held on a bracket 36 by any conventional arrangement.
  • the cable then extends over the pulleys and out aperture 37 near the bottom of the housing.
  • a pulley 38 then leads the cable up a guide tube 39.
  • Guide tube 39 is generally cylindrical in form and mounted parallel housing 11. This is the structure which is the destination of the transferred module. Cable 10 extends the length of this tube 39 as disclosed in FIGS. 5 and 6 and a protuberance from module 6 slides on cable 10 to be guided down into the tube.
  • a funnel formation 40 is mounted on the upper end of tube 39 to catch the guided pin 41 of module 6.
  • a vertical slit is formed through the funnel 40 and down a length of tube 39 to accommodate the connection 42 which attaches pin 41 to module 6.
  • pin 41 and the bore of tube 39 having a fairly close fit, the module 6 is oriented with a fair degree of precision with respect to base 5.
  • the connections not shown here lock the two together for subsequent functioning of the module at the wellhead.
  • module 6 may have more than one pin 41 with a bore through which cable 10 passes. All such pins may land in tube 39 to positively orient module 6 guided to its place on base 5.
  • FIG. 5 shows the float 11 in its upper position. As can be observed in FIG. 1, frame 12 is then urged to its lowermost position.
  • FIG. 6 shows float 11 in its lowermost position. Frame 12 is in its uppermost position. In FIG. 5, module 6 is locked to base 5.
  • FIG. 6 module 6 is disengaged from tube 39 and base 5 and on its guided way to the surface.
  • FIG. 8 discloses that diver 14 has gained access to the bracket 36 and disconnected cable 10 from the float. The broken cable is then pulled through aperture 50 trailing replacement cable 10' through tube 39 and over the pulleys until it can be connected to bracket 36.
  • FIG. 9 discloses the reel 51 removed to the top of the frame 12.
  • the end of cable 10 is connected to frame 12, replacing cable 10 completely.
  • the broken pieces of cable 10 have been discarded.
  • FIGS. 10 and 11 disclose an arrangement employing a float and pulley system similar to that of FIGS. 1-9 to establish communication at the surface with module 6.
  • module 6 When module 6 is in position on its base 5 it is desirable to service it periodically in some way.
  • a battery may be used in the module for power. It is desirable to ascertain the level of power available from the battery and recharge it. When it is desirable to unlock the module from its base and inject gas into its tanks, it is desirable to cause these actions to take place from the surface. A communication link between the module and the surface is very desirable.
  • FIGS. 10 and 11 a terminal station is indicated at 60.
  • a similar terminal fixture is indicated at 61, mounted on frame 12. Between these terminals, a cable 62 is extended, controlled by a float and pulley system on the module 6.
  • float 63 is at its uppermost position, frame 12 being at its retracted position below the hazards near the surface 3.
  • terminal fixture 61 has been brought to the surface 3 after having been disconnected from frame 12. From a boat 64, power is fed down to module 6, or other desired action caused through the communication afforded by cable 62.
  • terminal 61 would simply be brought with it. Then module 6 could be signalled to unlock from. base 5 and the buoyancy could be increased by injecting gas into the tanks of the module as desired. Conceivably these actions could result in a completely automated transfer of the module 6 to the surface.
  • the present invention facilitates transfer of equipment between surface and subsea locations.
  • the equipment is given positive guidance through sliding engagement with one or core cables.
  • the cadle or cables are in place at the subsea location, combined with a float and pulley system which extends the cable to the surface location and retracts the cable beneath navigation and wave activity.
  • the system also makes practical the use of tackle with a relatively low capacity. After all, with only the force of the float system to overcome, tackle 15 can be rela tively light.
  • the module 6 is buoyed to the surface with its tanks.
  • the cable system is basically all that is drawn to the surface with the tackle. There is not a great deal of additional strain on the tackle as the module is guided to the surface.
  • the invention provides a positive orientation structure at the subsea location which coacts with the guidance cable. This combination brings the equipment to its working subsea location accurately so it can be readily locked in position on a base.
  • the transfer system is usually at a depth which militates against marine growth which would foul its moving components. Also, the arrangement provides ready access for replacement of broken cable.
  • the float and pulley system is adaptable to provide an efficient communication link with the surface.
  • a cable for signals and various power mediums can be arranged on the pulley and float system to provide complete communication and control from the surface to the module at its subsea location.
  • a subsea guide system for structures passed between the surface and a subsea location including:
  • a cable and pulley system attached to the float to permit an end of' the cable a range of travel from a predetermined vertical distance above the base to the surface, the cable acting as a guide for structures passed between the surface and the base structure, and
  • buoyant frame attached to the end of the cable moving over the range of travel, whereby a connection can be made to the frame with which the frame can be pulled to the surface.
  • a landing and retrieval system for subsea structures including:
  • a removable structure arranged to be positioned on the base structure and having an orienting member arranged to be inserted into the guide tube to desirably position and orient the removable structure on the base structure
  • buoyant guide frame attached to one end of the cable
  • a communications cable and pulley system attached to the said further float to control the travel of one end of the cable over a range from a predetermined vertical distance above the structure to the surface
  • terminals at each end of the cable for connection between the structure and sources of communication and utilities at the surface.
  • a subsea guide system for structures passed between the surface and a subsea location including:
  • a cable and pulley system mounted near the base structure and arranged to provide an end of the cable with a range of travel from a predetermined vertical distance above the base to the surface, the cable acting as a guide for structures passed between the surface and the base structure,

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Description

INVENTOR. BILL S. BURRUS ATTORNEY B. s. 'BURRUS SYSTEM 5 Sheets-Sheet Nov. 11, 1969 SURFACE TO SUBSFJA GUIDANCE Original Filed Sept. 28, 1967 NOV. 11, 1969 B. 5 BURRUS SURFACE TO SUBSEA GUIDANCE SYSTEM 5 Sheets-Sheet 2 Original Filed Sepc. 28, 196? PROCESS INVENTOR. BILL s.
4% Ki /l ATTORNEY Nov. 11, 1969 5 Sheets-Sheet Original Filed Sept 28, 1967 q 1 T w x W w .h 1: F i w m INVENTOR.
I B/LL S. BURRUS BY I a1 A/MQ ATTORNEY B. S. BURRUS SURFACE TOSUBSE'A GUIDANCE SYSTEM Nov. 11, 1969 5 Sheets-Sheet 4 Original Filed Sept. 28, 1967 INVENTOR. BILL 5. EUR US fizz ATTORNEY NOV. 11, 1969 B, s BURRUS SURFACE "IO SUBSEA GUIDANCE SYSTEM 5 SheetsSheet Original Filed Sept. 28,-1967 INVENTOR.
, v I BILL 5 EUR us dz 241 ATTORNEY United States Fatent G 3,477,236 SURFACE T SUBSEA GUIDANCE SYSTEM Bill S. Burrus, Tulsa, Okla., assignor to Combustion Engineering, Inc., New York, N.Y., a corporation of Delaware Continuation of application Ser. No. 671,365, Sept. 28,
1967. This application Nov. 12, 1968, Ser. No. 775,590 Int. Cl. B6311 35/04; E21b 33/035, 43/01 U.S. Cl. 61-465 8 Claims ABSTRACT OF THE DISCLOSURE A cable is attached to a float and pulley system at a subsea location for extension to the surface to act as a guide for structures passed between the surface and the subsea location.
This application is a continuation of Ser. No. 671,365 filed Sept. 28, 1967 and now abandoned.
BACKGROUND OF THE INVENTION Field of the invention The present invention relates to structural guidance of structures between the surface and subsea locations. More particularly, the invention relates to landing oil well production equipment on a subsea base structure and guiding it to the surface for adjustment, repair, replacement, etc.
Description of the prior art Drilling subsea locations is a dynamically developing art. Completing these oil Wells drilled is feasible at increasingly deeper subsea locations. However, the basic processing of produced fluids at the wellhead is only now being contemplated. At present, the produced fluids are conducted to the surface where the processing equipment, normally located at the wellhead on shore installations, is mounted on surface platforms.
Equipment is being developed for basic wellhead processing at subsea locations. This structure is made up in packages adapted to be mounted on base structures at the subsea location of wellheads. Positive guidance of these packages is demanded in order to land and orient them on their base structures as Well as remove them to the surface for workover.
At present the art literally offers the oil industry only a team of divers whose members can but grope through the darkness of the ocean depths, manually guiding cranelowered equipment to its subsea location. Temporary anchors and cables attached to the subsea location at the time of transfer offer a clumsy, indefinite guide for the equipment.
Summary of the invention It is a principal object of this invention to positively guide structures in their transfer between the surface and a subsea location.
Another object is to provide a cable system for guidance which is permanently mounted at the subsea location and which can be retracted to a location below navigation and wave action.
Another object is to provide a retracting mechanism which is automatic and which can be readily repaired.
The invention contemplates a float retained within a housing structure at a subsea location. A cable is attached to the float and passes over a system of pulleys and up to a buoyant structure. The float, at the upper limit of its travel within the housing, tethers the buoyant structure to a subsea location.
When the buoyant structure is pulled to the surface, the float is pulled toward its lower limit of travel. The cable then becomes operative as a guide for structures transferred between the surface and the subsea location. Any number of these cables and float-pulley combinations required for precise orientation and guidance of the transferred structure may be employed under the basic concept.
Other objects, advantages and features of this invention will become apparent to one skilled in the art upon consideration of the written specification, appended claims, and attached drawings, wherein:
FIG. 1 is a sectioned elevation of a subsea oil wellhead with a guidance system embodying the present invention being engaged for extension to the surface;
FIG. 2 is the structure of FIG. 1 showing the guidance system extended and the guided structure transferred to the surface;
FIG. 3 is the structure of FIG. 2 with the transferred structure buoyed higher than in FIG. 2;
FIG. 4 is the structure of FIG. 3 with the transferred structure removed from the guidance system and the system buoyed at the surface;
FIGS. 5 and 6 are sectioned elevations of one float and pulley arrangement of the guidance system illustrating the float in the two extreme positions at each end of its range of travel;
FIGS. 7-9 show, in elevation, the sequence of operations to replace a broken cable of the guidance system; and
FIGS. 10 and 11 show, in elevation, a communication cable utilizing the float and pulley system of FIGS. 1-9.
REDUCTION TO PRACTICE FIGS. 1-4 are to be considered together in their depiction of the complete cycle of operation of the structure in which the invention is embodied. Understanding begins with the fact that a body of water 1 is over a bottom 2 and has a surface 3. The location of petroleum products dictated the drilling and completion of a well, evidenced by a conductor, or connector, pipe 4.
Pipe 4 is the external evidence of the completed Well at this subsea location. It is a presently accepted technique to mount a support framework 5 to this pipe, below the wellhead structure not shown here. It is specifically planned to have landing sockets on the framework 5 in which the lower ends of the legs of a base for module 6 of production equipment will be mounted. None of this connecting equipment need be illustrated here. For the present purpose, it is only necessary to regard the upper surface of support framework 5 as a base for module 6. This module 6 is a removable structure to be transferred between base 5 and surface 3 by use of the guidance system in which the present invention is embodied.
The present invention is embodied in the guide system for module 6 as the module is transferred from the location illustrated in FIG. 1 to the location illustrated in FIGS. 2, 3 and 4. Basically, a cable 10 is extended from base 5 to surface 3 and has a sliding connection with the module 6 to guide it during transfer.
Of course, more than one cable 10 may be very desirable. Probably four such cables would be desired, one for each corner of a square module. However, the operation of one cable and its relation to the module will give a full teaching of the invention.
In FIG. 1, cable 10 connects float 11 with buoyant frame 12. Between these two connections, cable 10 passes over a pulley block on float 11 and a pulley block on base 5. Frame 12 is pulled to the surface 3 and float 11 travels downward to the position shown in FIGS. 2, 3 and 4. Module 6 can then be released from its connections to base 5 and transferred to surface 3, guided by sliding engagement with cable 10.
When the transferable module 6 is mounted on base 5 and is operating, the guide system is positioned as illustrated in FIG. 1. Buoyant frame 12 is urged downward to a position safely below significant wave action and navigation. A float 13 is shown to demonstrate how frame 12 may be maintained buoyant while tethered by cable 10. A diver 14 is shown, descending to attach hoisting tackle 15 to frame 12 so it may be lifted to the surface as shown in FIG. 2. Obviously, a trolling arrangement to snare frame 12 can be used as an alternate means to make the connection between tackle 15 and frame 12.
FIG. 2 discloses the frame 12 hoisted above the surface and the module 6 guided by cable 10. Ballast tanks 20 are filled with gas to float module 6 to the surface. For certain service operations, it may not be desirable to float module 6 higher than this position.
FIG. 3 discloses how lower tanks 21 may be filled with gas to float the module higher on the surface. This position may be desirable for particular service demands.
FIG. 4 discloses how the module may be disconnected from the guide cables and towed to another location for extensive service. While awaiting a module to guide back to base 5, frame 12 may be retained near the surface 3 by a float 22 large enough to so buoy frame 12.
FLOAT-PULLEY SYSTEM FIGS. 5 and 6 disclose in great detail how the cable is controlled. As pointed out, float 11 is attached to one end and frame 12 is attached to the other. The float 11 has a predetermined range of vertical travel and frame 12 also has a range of travel.
The range of travel for float 11 is fixed by the dimensions of housing 30 which can be given the form of the vertical tube disclosed in FIGS. 5 and 6. Housing 30 is mounted in its vertical position near the base 5. Actually, in FIGS. 5 and 6, the housing is connected to the base 5 although the concept of the invention is not so limited.
Float 11 raises and lowers in tubular housing 30, limited by the closure 31 as the top and the closure 32 as the bottom. Pulley block 33 is mounted on the lower end of float 11 and a similar block 34 is mounted on the bottom closure 32. These blocks are formed of a series of pulleys, arranged side-by-side. Cable 10 is passed over them in sequence to form multiple passes 35 between the two sets of pulleys.
The end of cable 10 attached to the float 11 is held on a bracket 36 by any conventional arrangement. The cable then extends over the pulleys and out aperture 37 near the bottom of the housing. A pulley 38 then leads the cable up a guide tube 39.
Guide tube 39 is generally cylindrical in form and mounted parallel housing 11. This is the structure which is the destination of the transferred module. Cable 10 extends the length of this tube 39 as disclosed in FIGS. 5 and 6 and a protuberance from module 6 slides on cable 10 to be guided down into the tube.
A funnel formation 40 is mounted on the upper end of tube 39 to catch the guided pin 41 of module 6. A vertical slit is formed through the funnel 40 and down a length of tube 39 to accommodate the connection 42 which attaches pin 41 to module 6. With pin 41 and the bore of tube 39 having a fairly close fit, the module 6 is oriented with a fair degree of precision with respect to base 5. When the module 6 is thus landed on base 5 the connections not shown here lock the two together for subsequent functioning of the module at the wellhead.
Of course, module 6 may have more than one pin 41 with a bore through which cable 10 passes. All such pins may land in tube 39 to positively orient module 6 guided to its place on base 5. FIG. 5 shows the float 11 in its upper position. As can be observed in FIG. 1, frame 12 is then urged to its lowermost position. FIG. 6 shows float 11 in its lowermost position. Frame 12 is in its uppermost position. In FIG. 5, module 6 is locked to base 5. In
4 FIG. 6 module 6 is disengaged from tube 39 and base 5 and on its guided way to the surface.
CABLE REPLACEMENT ment. Diver 14 has taken a reel 51 of replacement cable to the subsea location and connected one end to the broken end of cable 10.
FIG. 8 discloses that diver 14 has gained access to the bracket 36 and disconnected cable 10 from the float. The broken cable is then pulled through aperture 50 trailing replacement cable 10' through tube 39 and over the pulleys until it can be connected to bracket 36.
FIG. 9 discloses the reel 51 removed to the top of the frame 12. The end of cable 10 is connected to frame 12, replacing cable 10 completely. The broken pieces of cable 10 have been discarded.
SUBSEA TO SURFACE COMMUNICATION FIGS. 10 and 11 disclose an arrangement employing a float and pulley system similar to that of FIGS. 1-9 to establish communication at the surface with module 6. When module 6 is in position on its base 5 it is desirable to service it periodically in some way.
A battery may be used in the module for power. It is desirable to ascertain the level of power available from the battery and recharge it. When it is desirable to unlock the module from its base and inject gas into its tanks, it is desirable to cause these actions to take place from the surface. A communication link between the module and the surface is very desirable.
In FIGS. 10 and 11 a terminal station is indicated at 60. A similar terminal fixture is indicated at 61, mounted on frame 12. Between these terminals, a cable 62 is extended, controlled by a float and pulley system on the module 6.
The foregoing float and pulley system teaches how the cable 62 can be controlled. In FIG. 10 float 63 is at its uppermost position, frame 12 being at its retracted position below the hazards near the surface 3. In FIG. 11, terminal fixture 61 has been brought to the surface 3 after having been disconnected from frame 12. From a boat 64, power is fed down to module 6, or other desired action caused through the communication afforded by cable 62.
It is visualized that if frame 12 is brought to surface 3, terminal 61 would simply be brought with it. Then module 6 could be signalled to unlock from. base 5 and the buoyancy could be increased by injecting gas into the tanks of the module as desired. Conceivably these actions could result in a completely automated transfer of the module 6 to the surface.
CONCLUSIONS The present invention facilitates transfer of equipment between surface and subsea locations. In facilitating transfer, the equipment is given positive guidance through sliding engagement with one or core cables. The cadle or cables, are in place at the subsea location, combined with a float and pulley system which extends the cable to the surface location and retracts the cable beneath navigation and wave activity.
When the guidance cable is extended to the surface, and while it is retained by tackle 15, the wave action on the boat carrying the tackle is erratic. However, with the float 11 applying a consistent tension on the cable, the cable is not constantly slacking and jerking while acting as a guide. The stability of the guidance system greatly increases the ease and efficiency of the transfer between subsea and surface locations.
The system also makes practical the use of tackle with a relatively low capacity. After all, with only the force of the float system to overcome, tackle 15 can be rela tively light. The module 6 is buoyed to the surface with its tanks. The cable system is basically all that is drawn to the surface with the tackle. There is not a great deal of additional strain on the tackle as the module is guided to the surface.
Additionally, the invention provides a positive orientation structure at the subsea location which coacts with the guidance cable. This combination brings the equipment to its working subsea location accurately so it can be readily locked in position on a base.
The transfer system is usually at a depth which militates against marine growth which would foul its moving components. Also, the arrangement provides ready access for replacement of broken cable.
Finally, the float and pulley system is adaptable to provide an efficient communication link with the surface. A cable for signals and various power mediums can be arranged on the pulley and float system to provide complete communication and control from the surface to the module at its subsea location.
From the foregoing it will be seen that this invention is one well adapted to attain all of the ends and objects hereinabove set forth, together with other advantages which are obvious and which are inherent to the apparatus.
It will be understood that certain features and subcombinations are of utility and may be employed without reference to other features and subcombinations. This is contemplated by and is within the scope of the claims.
As many possible embodiments may be made of the invention without departing from the scope thereof, it is to be understood that all matter herein set forth or shown in the accompanying drawings is to be interpreted as illustrative and not in a limiting sense.
The invention having been described, What is claimed is:
1. A subsea guide system for structures passed between the surface and a subsea location, including:
a base structure mounted at a subsea location,
a float guided between two vertical locations near the base structure,
a cable and pulley system attached to the float to permit an end of' the cable a range of travel from a predetermined vertical distance above the base to the surface, the cable acting as a guide for structures passed between the surface and the base structure, and
a buoyant frame attached to the end of the cable moving over the range of travel, whereby a connection can be made to the frame with which the frame can be pulled to the surface.
2. The system of claim 1, including a guide tube mounted at the subsea location and arranged to direct the cable vertically as the cable travels over the subsea to surface range of travel.
3. The system of claim 1, including a housing for the float with which to establish the two vertical locations between which the float is guided by the housing.
4. The system of claim 1, including a pulley system of multiple pulley groups, one group attached to the float and the other attached near the base with the cable running over the pulleys in series.
5. A landing and retrieval system for subsea structures, including:
a base structure permanently mounted at a subsea location,
a guide tube mounted on the base structure,
a removable structure arranged to be positioned on the base structure and having an orienting member arranged to be inserted into the guide tube to desirably position and orient the removable structure on the base structure,
a cable extending through the guide tube,
"a buoyant guide frame attached to one end of the cable,
and a system of pulleys and a float attached to the other end of the cable to urge the guide frame to a predetermined distance from the base and maintain the guide frame at that position.
6. The system of claim 5, including a funnel struc ture mounted on the top of the guide tube to receive a guide protuberance of the removable structure with a veftical slot in the side of the guide tube to receive the guide protuberance support from the removable structure as the structure is landed on the base structure.
.7. The system of claim 5, including a communication system including:
a further float mounted on the removable structure at the subsea location with which communication from the surface is desirable,
means for guiding the said further float between two vertical locations,
a communications cable and pulley system attached to the said further float to control the travel of one end of the cable over a range from a predetermined vertical distance above the structure to the surface, and
terminals at each end of the cable for connection between the structure and sources of communication and utilities at the surface.
'8. A subsea guide system for structures passed between the surface and a subsea location, including:
a base structure mounted at a subsea location,
a cable and pulley system mounted near the base structure and arranged to provide an end of the cable with a range of travel from a predetermined vertical distance above the base to the surface, the cable acting as a guide for structures passed between the surface and the base structure,
means connected to the cable and pulley system and arranged to apply a force to the system directed to return the moving end of the cable to the lower end of its range,
and a buoyant frame attached to the end of the cable moving over the range of travel, whereby a connection can be made to the frame with which the frame can be pulled to the surface.
References Cited UNITED STATES PATENTS 3,050,138 8/1962 Outwin et al -7 3,143,171 8/1964 Otteman et al. 1757 X 3,293,867 12/1966 Dean 61-723 3,358,753 12/1967 Haeber 166--6 JACOB SHAPIRO, Primary Examiner US. Cl. X.R.
US775590A 1968-11-12 1968-11-12 Surface to subsea guidance system Expired - Lifetime US3477236A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US77559068A 1968-11-12 1968-11-12

Publications (1)

Publication Number Publication Date
US3477236A true US3477236A (en) 1969-11-11

Family

ID=25104875

Family Applications (1)

Application Number Title Priority Date Filing Date
US775590A Expired - Lifetime US3477236A (en) 1968-11-12 1968-11-12 Surface to subsea guidance system

Country Status (1)

Country Link
US (1) US3477236A (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3641777A (en) * 1969-07-15 1972-02-15 Taylor Diving & Salvage Co Method and apparatus for working on submerged conduit means
US4358219A (en) * 1982-02-08 1982-11-09 Texaco Development Corporation Method for confining an uncontrolled flow of hydrocarbon liquids
US4367796A (en) * 1980-11-21 1983-01-11 Global Marine, Inc. Blowout preventer and guideline handling
US4421436A (en) * 1982-07-06 1983-12-20 Texaco Development Corporation Tension leg platform system
WO2008125286A1 (en) * 2007-04-11 2008-10-23 Openhydro Group Limited A method of installing a submerged tidal hydroelectric turbine
US20090278357A1 (en) * 2006-07-14 2009-11-12 Herbert Williams Tidal flow hydroelectric turbine
US20100025998A1 (en) * 2006-07-14 2010-02-04 Openhydro Group Limited Submerged hydroelectric turbines having buoyancy chambers
US20100026002A1 (en) * 2006-07-14 2010-02-04 Openhydro Group Limited hydroelectric turbine
US20100068037A1 (en) * 2006-07-14 2010-03-18 Openhydro Group Limited Turbines having a debris release chute
US20100172698A1 (en) * 2007-04-11 2010-07-08 Openhydro Group Limited System and method for the deployment of a hydroelectric turbine
US20100295388A1 (en) * 2007-12-12 2010-11-25 Openhydro Group Limited Hydroelectric turbine generator component
US20110018274A1 (en) * 2008-02-05 2011-01-27 Openhydro Group Limited hydroelectric turbine with floating rotor
US20110088253A1 (en) * 2008-04-17 2011-04-21 Openhydro Group Limited turbine installation method
US20110110770A1 (en) * 2008-04-22 2011-05-12 Openhydro Group Limited Hydroelectric turbine having a magnetic bearing
US20110297389A1 (en) * 2008-12-17 2011-12-08 Subsea Technologies Limited Subsea system
US8690526B2 (en) 2008-12-18 2014-04-08 Openhydro Ip Limited Hydroelectric turbine with passive braking
US8872371B2 (en) 2009-04-17 2014-10-28 OpenHydro IP Liminted Enhanced method of controlling the output of a hydroelectric turbine generator
US8933598B2 (en) 2009-09-29 2015-01-13 Openhydro Ip Limited Hydroelectric turbine with coil cooling
US9054512B2 (en) 2008-12-19 2015-06-09 Openhydro Ip Limited Method of installing a hydroelectric turbine generator
US9234492B2 (en) 2010-12-23 2016-01-12 Openhydro Ip Limited Hydroelectric turbine testing method
US9236725B2 (en) 2009-09-29 2016-01-12 Openhydro Ip Limited Hydroelectric turbine cabling system
US9473046B2 (en) 2009-09-29 2016-10-18 Openhydro Ip Limited Electrical power conversion system and method
US9765647B2 (en) 2010-11-09 2017-09-19 Openhydro Ip Limited Hydroelectric turbine recovery system and a method therefor
US20180065714A1 (en) * 2015-05-12 2018-03-08 Fredrik VON HELAND System for transporting objects to ocean structures
US20190136486A1 (en) * 2016-06-14 2019-05-09 Fundación Tecnalia Research & Innovation Assembly and Method for Installing a Subsea Cable

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3050138A (en) * 1960-07-08 1962-08-21 Shell Oil Co Guide system for underwater wells
US3143171A (en) * 1961-04-11 1964-08-04 Shell Oil Co Underwater well guide system
US3293867A (en) * 1963-09-26 1966-12-27 Mobil Oil Corp Method and apparatus for marking, relocating, and re-establishing contact with a submarine wellhead
US3358753A (en) * 1965-12-30 1967-12-19 Shell Oil Co Underwater flowline installation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3050138A (en) * 1960-07-08 1962-08-21 Shell Oil Co Guide system for underwater wells
US3143171A (en) * 1961-04-11 1964-08-04 Shell Oil Co Underwater well guide system
US3293867A (en) * 1963-09-26 1966-12-27 Mobil Oil Corp Method and apparatus for marking, relocating, and re-establishing contact with a submarine wellhead
US3358753A (en) * 1965-12-30 1967-12-19 Shell Oil Co Underwater flowline installation

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3641777A (en) * 1969-07-15 1972-02-15 Taylor Diving & Salvage Co Method and apparatus for working on submerged conduit means
US4367796A (en) * 1980-11-21 1983-01-11 Global Marine, Inc. Blowout preventer and guideline handling
US4358219A (en) * 1982-02-08 1982-11-09 Texaco Development Corporation Method for confining an uncontrolled flow of hydrocarbon liquids
US4421436A (en) * 1982-07-06 1983-12-20 Texaco Development Corporation Tension leg platform system
US8864439B2 (en) 2006-07-14 2014-10-21 Openhydro Ip Limited Tidal flow hydroelectric turbine
US20090278357A1 (en) * 2006-07-14 2009-11-12 Herbert Williams Tidal flow hydroelectric turbine
US20100025998A1 (en) * 2006-07-14 2010-02-04 Openhydro Group Limited Submerged hydroelectric turbines having buoyancy chambers
US20100026002A1 (en) * 2006-07-14 2010-02-04 Openhydro Group Limited hydroelectric turbine
US20100068037A1 (en) * 2006-07-14 2010-03-18 Openhydro Group Limited Turbines having a debris release chute
US8596964B2 (en) 2006-07-14 2013-12-03 Openhydro Group Limited Turbines having a debris release chute
US8466595B2 (en) 2006-07-14 2013-06-18 Openhydro Group Limited Hydroelectric turbine
US8308422B2 (en) 2006-07-14 2012-11-13 Openhydro Group Limited Submerged hydroelectric turbines having buoyancy chambers
AU2008238282B2 (en) * 2007-04-11 2012-11-01 Openhydro Group Limited A method of installing a submerged tidal hydroelectric turbine
WO2008125286A1 (en) * 2007-04-11 2008-10-23 Openhydro Group Limited A method of installing a submerged tidal hydroelectric turbine
US9284709B2 (en) 2007-04-11 2016-03-15 Openhydro Group Limited Method of installing a hydroelectric turbine
US20100172698A1 (en) * 2007-04-11 2010-07-08 Openhydro Group Limited System and method for the deployment of a hydroelectric turbine
JP2010523887A (en) * 2007-04-11 2010-07-15 オープンハイドロ グループ リミテッド Hydropower turbine deployment system and method
CN101657633B (en) * 2007-04-11 2012-10-10 欧鹏海德洛集团有限公司 A method of installing a hydroelectric turbine
US20100232885A1 (en) * 2007-04-11 2010-09-16 Openhydro Group Limited Method of installing a hydroelectric turbine
US20100295388A1 (en) * 2007-12-12 2010-11-25 Openhydro Group Limited Hydroelectric turbine generator component
US8754540B2 (en) 2008-02-05 2014-06-17 James Ives Hydroelectric turbine with floating rotor
US20110018274A1 (en) * 2008-02-05 2011-01-27 Openhydro Group Limited hydroelectric turbine with floating rotor
US20110088253A1 (en) * 2008-04-17 2011-04-21 Openhydro Group Limited turbine installation method
US8784005B2 (en) 2008-04-17 2014-07-22 Openhydro Group Limited Turbine installation method
US20110110770A1 (en) * 2008-04-22 2011-05-12 Openhydro Group Limited Hydroelectric turbine having a magnetic bearing
US20110297389A1 (en) * 2008-12-17 2011-12-08 Subsea Technologies Limited Subsea system
US9045971B2 (en) * 2008-12-17 2015-06-02 Subsea Technologies Group Limited Subsea system
US8690526B2 (en) 2008-12-18 2014-04-08 Openhydro Ip Limited Hydroelectric turbine with passive braking
US9054512B2 (en) 2008-12-19 2015-06-09 Openhydro Ip Limited Method of installing a hydroelectric turbine generator
US8872371B2 (en) 2009-04-17 2014-10-28 OpenHydro IP Liminted Enhanced method of controlling the output of a hydroelectric turbine generator
US8933598B2 (en) 2009-09-29 2015-01-13 Openhydro Ip Limited Hydroelectric turbine with coil cooling
US9236725B2 (en) 2009-09-29 2016-01-12 Openhydro Ip Limited Hydroelectric turbine cabling system
US9473046B2 (en) 2009-09-29 2016-10-18 Openhydro Ip Limited Electrical power conversion system and method
US9765647B2 (en) 2010-11-09 2017-09-19 Openhydro Ip Limited Hydroelectric turbine recovery system and a method therefor
US9234492B2 (en) 2010-12-23 2016-01-12 Openhydro Ip Limited Hydroelectric turbine testing method
US20180065714A1 (en) * 2015-05-12 2018-03-08 Fredrik VON HELAND System for transporting objects to ocean structures
US20190136486A1 (en) * 2016-06-14 2019-05-09 Fundación Tecnalia Research & Innovation Assembly and Method for Installing a Subsea Cable
US10954652B2 (en) * 2016-06-14 2021-03-23 Fundación Tecnalia Research & Innovation Assembly and method for installing a subsea cable

Similar Documents

Publication Publication Date Title
US3477236A (en) Surface to subsea guidance system
US4511287A (en) Submerged buoyant offshore drilling and production tower
US2476309A (en) Apparatus for subaqueous geologic prospecting
US3592014A (en) Pipe-connecting system for the remote connection of pipe ends
US3987638A (en) Subsea structure and method for installing the structure and recovering the structure from the sea floor
US3626701A (en) Emergent installation for drilling and production at great depth at sea
US4615646A (en) Flowline connection means
US3701261A (en) Apparatus for providing offshore installation
US3736756A (en) Method and apparatus for assembling an offshore structure
US3612177A (en) Deep water production system
JPS61290194A (en) Buoy
GB1303594A (en)
US4039025A (en) Apparatus for anchoring an offshore structure
US3179176A (en) Method and apparatus for carrying out operations at underwater installations
US3589133A (en) Method of and means for mounting equipment at a subsea location
CA1304588C (en) Method of installing a template on the seafloor
US4604001A (en) Jackdown tension leg platform
US4260291A (en) Installation of an offshore structure
EP0039589A2 (en) Submerged buoyant offshore drilling and production tower and apparatus and method for installing same
US3513911A (en) Offshore well workover method
GB1200066A (en) Method of drilling underwater wells
US3503442A (en) Marine conductor pipe connecting method
US3754404A (en) Method for bending and laying pipe under water
DE1925912A1 (en) Method and apparatus for establishing a connection between a watercraft and a wellhead assembly located at a considerable depth of water
US3186487A (en) Underwater well guide system

Legal Events

Date Code Title Description
AS Assignment

Owner name: NATIONAL TANK COMPANY, OKLAHOMA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:COMBUSTION ENGINEERING, INC., A CORP OF DE.;REEL/FRAME:004561/0890

Effective date: 19860210

Owner name: NATIONAL TANK COMPANY, 5330 EAST 31ST STREET, TULS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:COMBUSTION ENGINEERING, INC., A CORP OF DE.;REEL/FRAME:004561/0890

Effective date: 19860210