US34692A - Improvement in methods of laying stone - Google Patents
Improvement in methods of laying stone Download PDFInfo
- Publication number
- US34692A US34692A US34692DA US34692A US 34692 A US34692 A US 34692A US 34692D A US34692D A US 34692DA US 34692 A US34692 A US 34692A
- Authority
- US
- United States
- Prior art keywords
- stone
- laid
- improvement
- methods
- stones
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004575 stone Substances 0.000 title description 27
- 238000000034 method Methods 0.000 title description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 16
- 238000010276 construction Methods 0.000 description 3
- 239000002184 metal Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/002—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
- E21B19/004—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform
- E21B19/006—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform including heave compensators
Definitions
- My present invention consists in an improved method, to be hereinafter described, of laying stone-work or masonry under water.
- Fig. l represents a stone pier in the course of construction.
- the site having been determined from lines and marks on shore is surrounded by piles A, placed at convenient distances apart.' These are connected and secured in position by a frame-Work B, on which a platform may be laid when required.
- the stones are dressed to the required size and form, and their joints matched by laying them on 'a platform on shore in the positions they are intended to occupy in the pier when laid, and the stones are marked.
- Central lines, both longitudinal and transverse, are marked on the frame B,
- each stone weighted at their lower ends at a, and are provided each with a pin c, the position of which in planes passing longitudinally through the rod at right angles to each other is indicated at the top of the rod.
- the workman under water as he places each stone inserts the point c of one of the rods in a hole t', (two or more of the rods being applied to a stone.)
- Fig. 6 whichv is a straight square rod with metal slides m, which are free to move along it. Each slide has a point o projecting down from it.
- Onestonebeingin place two of these points o at one end of the rod are placed in two of the holes parallel to one side of the stone, Vand the next stone is brought up against the one last laid.
- the Workman knows that it is in line with the one already laid. This I only use to assist, but do not depend on it for making accurate Work.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Revetment (AREA)
Description
' UNITED STATES PATET OFFICE.
IMPROVEMENT lN METHODS OF LAYING STONE, &c., UNDER WATER.
Specification forming part of Letters Patent No. 34,692, dated March 18, 1862.
To all whom it may concern:
Be it known that I, VILLIAM P. PARROTT, of Boston, in the county ofSuffolk and State of Massachusetts, have invented certain Improvements in the Construction of Masonry Under Water, of which the following is a full, clear, and exact description, reference being had to the accompanying drawings, making part of this specification, in which-l Figure 1 represents a stone pier in the course of construction beneath the water, and this figure, together with Figs. 2, 3, 4, 5, and 6, the apparatus which I employ in carrying out my invention.
My present invention consists in an improved method, to be hereinafter described, of laying stone-work or masonry under water.
This work has been done either by the use of a coffer-dam, which is tedious and expensive to construct, and difficult to maintain, or by means of a diving-bell, or the use of submarine armor. The workman arranged each stone in position as it was sent down to him, the accuracy with which the stones were laid, and consequently the strength and durability ofthe work, depending on the skill and faithfulness of this man,
who was working frequently at a considerable depth under water, and exposed to the inconveniences of tides or currents or turbid water; whereas by my improved method the engineer or person superintending the work above water may know and determine the position of cach stone as it is'laid.
That others skilled in the art may understand and use my invention, I will proceed to describe the manner in which I have carried it out.
In the said drawings, Fig. l represents a stone pier in the course of construction. The site having been determined from lines and marks on shore is surrounded by piles A, placed at convenient distances apart.' These are connected and secured in position by a frame-Work B, on which a platform may be laid when required. The stones are dressed to the required size and form, and their joints matched by laying them on 'a platform on shore in the positions they are intended to occupy in the pier when laid, and the stones are marked. Central lines, both longitudinal and transverse, are marked on the frame B,
or on rods or the platform attached thereto, which lines are determined either by instruments or bypermanent marks and ranges on shore. From these lines the position of each stone as laid on shore is transferred to the frame or platform over the pier. The stonesk are now carried and lowered into position beneath these marks, the workman under water setting each stone according to the marks and direct-ions above water and detaching the lewis therefrom. He is guided in his operations, and the superintendent above is informed of the position of the stone, and if it is properly laid, in the following manner: Each stone, when dressed and arranged on land, has a hole 'L' drilled in its upper surface near each corner or at a fixed and predetermined distance froin each edge. Guide-rods O, one of which is shown detached in Fig. 2, of a sufficient length to reach Well above the surface of the water and stout enough to resist the action of the tide or a current, are
weighted at their lower ends at a, and are provided each with a pin c, the position of which in planes passing longitudinally through the rod at right angles to each other is indicated at the top of the rod. The workman under water as he places each stone inserts the point c of one of the rods in a hole t', (two or more of the rods being applied to a stone.) The rods now being set vertical by those above water, either by plummet or level, the position ofthe stone is indicated, and may be fixed to correspond with the marks above by orders or signals given to the workman below.
In leveling the stones, particularly the irst course Gr, Fig. l, I use a level E, Fig. 4, simi- -lar to an ordinary masons level, except that it is weighted and has its staff sufficiently long to reachabove water. Its position as regards the vertical is indicated by a plumbbob swinging in a hole b near the top or by a spirit-level. A stone which is thus shown not to be level may be adjusted in position (if on a yielding bed) by a heavy rammer F, Fig. 3.
For occasionally testing the level of the courses as the work progresses I use a staff I-I, Fig. 5, which is weighted at its lower end f, and is marked with a scale gn With ythis I compare the height of different parts of each course with the frame B or with marks on the piles A which have been leveled. I also use this rod in the same way to level the bed I before the first course of stones is laid.
The first course G of stones having been properly laid and leveled on its bed I, the succeeding courses K andLmay be laid more rapidly. The stones being dressed to a uniform thickness, generally, only require to be adjusted horizontally by the rods C.
To assistthe Workman under Water in placing the stones I sometimes use a guide-rule N, Fig. 6, whichv is a straight square rod with metal slides m, which are free to move along it. Each slide has a point o projecting down from it. Onestonebeingin place, two of these points o at one end of the rod are placed in two of the holes parallel to one side of the stone, Vand the next stone is brought up against the one last laid. When the other two points o fall into the holes on one side of the stone which is being placed, the Workman knows that it is in line with the one already laid. This I only use to assist, but do not depend on it for making accurate Work.
As the piles A and frame B are liable to be moved by the current or by vessels striking them, the marks by which the stones are to be use of the guide-rods and level the work mayV be kept in line and level with certainty and proceed rapidly and any error be -quickly detected and corrected, and I have by the above-described method laid a handsome and durable Wall or pier almost as rapidly as if above water.
What I claim as my invention, and desire to secure by Letters Patent, is-f The above method, substantially as described, of laying stone Wall or masonry under water.
' WM.` P. PARROTT. Witnesses:
Trios. R.'ROAOH,
P. E. TESCHEMACHER.
Publications (1)
Publication Number | Publication Date |
---|---|
US34692A true US34692A (en) | 1862-03-18 |
Family
ID=2104274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US34692D Expired - Lifetime US34692A (en) | Improvement in methods of laying stone |
Country Status (1)
Country | Link |
---|---|
US (1) | US34692A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5730721A (en) * | 1996-01-25 | 1998-03-24 | Vesture Corporation | Medical applicator and method |
US5962011A (en) * | 1993-12-06 | 1999-10-05 | Schering-Plough Healthcare Products, Inc. | Device for delivery of dermatological ingredients |
WO2000074616A1 (en) * | 1999-06-02 | 2000-12-14 | Tano Robert S | Multipurpose first-aid bandage |
-
0
- US US34692D patent/US34692A/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5962011A (en) * | 1993-12-06 | 1999-10-05 | Schering-Plough Healthcare Products, Inc. | Device for delivery of dermatological ingredients |
US5730721A (en) * | 1996-01-25 | 1998-03-24 | Vesture Corporation | Medical applicator and method |
WO2000074616A1 (en) * | 1999-06-02 | 2000-12-14 | Tano Robert S | Multipurpose first-aid bandage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Rankine | A manual of civil engineering | |
CN104120656B (en) | Method for automatically controlling bridge high pier construction perpendicularity | |
CN105507325B (en) | A kind of steady stake locating platform | |
CN109238254A (en) | A kind of hole stake cultellation method | |
CN109440838A (en) | Drilled pile hole quality detection method | |
CN109443327A (en) | A kind of distribution method of SURVEYING CONTROL NETWORK | |
US34692A (en) | Improvement in methods of laying stone | |
CN103884324A (en) | Guide direction measurement method for underground pipeline jacking and traversing construction | |
US1074439A (en) | Measuring-scale. | |
CN105973201A (en) | Device and method for measuring gradient of edge slope by fishing rod type gradient ruler from opening line position of edge slope | |
US419711A (en) | Grading and leveling instrument | |
US37650A (en) | Improvement in apparatus for obtaining profiles of submarine beds | |
EP0558567B1 (en) | A method for aligning a feeding beam in a rock drilling equipment and a rock drilling equipment and a measuring device | |
CN106638535A (en) | Foundation pit construction field monitoring device and method | |
US3171210A (en) | Means for and methods of grading trenches and laying pipe therein | |
US1010007A (en) | Measuring instrument. | |
JP6937660B2 (en) | Level staff for leveling | |
CN113188510B (en) | Construction method for new triangular elevation measurement in large-area deep foundation pit | |
Matthews | Roman Aqueducts: Technical Aspects of their Construction | |
RU2823944C1 (en) | Method of monitoring vertical displacements and deformations during construction of metro tunnels | |
US1026579A (en) | Engineer's slope-rod. | |
US1219430A (en) | Instrument for use in topography. | |
Walker et al. | Setting Out Of Engineering Structures | |
Lubbers | Planning and Building Aqueducts of Ancient Rome without the Use of Surveying Instruments | |
Kossuth | THE MONT CENIS TUNNEL |