US3387589A - Multiple boiler control system - Google Patents

Multiple boiler control system Download PDF

Info

Publication number
US3387589A
US3387589A US578772A US57877266A US3387589A US 3387589 A US3387589 A US 3387589A US 578772 A US578772 A US 578772A US 57877266 A US57877266 A US 57877266A US 3387589 A US3387589 A US 3387589A
Authority
US
United States
Prior art keywords
relay
boiler
contact
boilers
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US578772A
Inventor
Chan William
George L Steffes
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vapor Corp
Original Assignee
Vapor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vapor Corp filed Critical Vapor Corp
Priority to US578772A priority Critical patent/US3387589A/en
Application granted granted Critical
Publication of US3387589A publication Critical patent/US3387589A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B35/00Control systems for steam boilers
    • F22B35/008Control systems for two or more steam generators

Definitions

  • This invention relates in general to a boiler system, and more particularly to a control for use with a series of boilers connected to a single output for adding or subtracting boilers to the line in response to load requirements, although other uses and purposes may be apparent to those skilled in the art.
  • the control system of the present invention is especially suitable for controlling the operation of a plurality of boilers all having their outputs connected to a common header where each boiler may have a capacity of about 100 to 300 boiler horsepower so that boilers in the system may be added or subtracted in response to load requirements thereby eliminating the need for having a single boiler of large capacity or a system whereby all boilers are on the line at the same time. Further, the control system of the present invention is such that one of the boilers may be modulated between low and high fire conditions depending upon load requirements. Pressure responsive switches are employed in the common header for the boilers to sense the need to add or subtract boilers from the line depending upon load requirements, and to optionally modulate one of the boilers bet-ween high and low fire conditions again depending upon load requirements.
  • the control system operates to add and subtract the boilers on a timed basis which can be adjusted according to need.
  • the system contemplates controlling a series of boilers of the 100 to 300 boiler horsepower capacity, it should be appreciated that a combination of any number of boilers of the same or varying capacity may be controlled by the system of the present invention where all of the boilers are connected into the common header or the same output line. Further, the system is especially useful where the boiler capacity needs range from a very small capacity to a large capacity, such as from 100 to 1500 boiler horsepower.
  • Another object of this invention resides in the provision of a control system for automatically handling the firing of a series of boilers connected to a common header in response to the load requirements.
  • Still another object of this invention is in the provision of a control system for handling the adding or subtracting of boilers on a time basis to a common header, wherein the timed basis may be adjusted according to needs of the system.
  • FIG. 1 is a block diagram of the control system according to the invention.
  • FIG. 2 is a diagrammatic view of the master pressure control which determines whether a boiler need be added or subtracted from the system;
  • FIG. 3 is a schematic diagram of a modulating control for a boiler as connected into the modulating pressure control for the system of the invention.
  • FIG. 4 is a schematic electrical diagram of the master control according to one embodiment of the invention for illustrating the invention where three boilers in a system are programmed to be added or subtracted in accordance with the load requirements.
  • While the present invention may be applied to any system of boilers, it is illustrated herein applicable to a system of four boilers where the first boiler is always on the line except when the entire system is shut down and the other three boilers are programmed to be automatically added or subtracted to the line depending upon load requirements.
  • the output of all boilers will be connected to a common header or output 9, FIG. 1, wherein a pressure sensitive master control switch 10 and a pressure sensitive modulating pressure control switch 11 will be located.
  • a master control 12 receives signals from the master pressure control switch It and modulating pressure control switch 11 for controlling operation of boilers 1 to 4 indicated respectively by the numerals 13, 14, 15 and 16.
  • Both pressure sensitive switches 10* and 11 will be suitably mounted in the common header 9 for the boilers to determine the load requirements of the line and thereby maintain a maximum and minimum power supply from the boilers consistent with the requirements. While the boiler number 1 will always be in operation, boilers 2, 3 and 4 may be added or subtracted according to need if these boilers are otherwise ready although the system could be programmed so that more than one boiler or no boiler would be in continual operation and the remaining boilers in readiness for operation.
  • the master pressure conrtol switch 10 which operates to add or subtract boilers from the line, would have a low pressure switch 17 and a high pressure switch 18 both operated by a pressure sensing element 19, wherein the low pressure switch 17 would close at a predetermined pressure such as p.s.i. and remain closed as long as the pressure is no greater than 175 p.s.i., and thereafter operate a circuit to cause another'boiler to be placed on the line to raise the pressure, and the high pressure switch 18 would close in response to a predetermined pressure, such as 200 p.s.i. and remain closed as long as the pressure is 200 p.s.i. or greater, and cause operation of a circuit to remove a boiler from the line to lower the pressure.
  • the upper and lower pressure limits may be adjusted to the needs on the line. Thus, no boiler would be added or subtrated as long as the pressure is between 175 and 200 p.s.i.
  • the modulating pressure control 11 would operate to modulate one of the boilers on the line in accordance with present pressure limits, such as where the boiler would operate at high fire condition at 178 p.s.i. and at low fire condition at 198 p.s.i. and modulate between high and low fire condition between 178 and 198 p.s.i.
  • the modulating pressure control 11 includes a variable potentiometer 20 having a resistance 21 over which a wiper 22 moves responsive to the pressure in the header to change the balance in a bridge circuit that also in- G cludes a variable potentiometer 23 and magnet coils 24 and 25, the latter of which operate a switch arm 26 into contact with one of the contacts 27 or 28 or in a neutral position.
  • the contacts 27 and 28 by engagement with the switch arm 26 cause actuation of a reversible motor 29 which is mechanically connected to the boiler controls of a boiler to modulate the boiler between low and high fire conditions.
  • Limit switche 3t ⁇ and 31 are provided to prevent continued operation of the motor at extreme limits even though the switch arm 26 is in contact with one of the contacts 27 and 23.
  • the motor winding 32 may be considered the low fire winding while the winding 33 may be considered the high fire winding, wherein operation of the motor through the winding 32 causes the controls to move toward low fire position while operation of the motor through the winding 33 causes the controls to move toward high fire position.
  • the variable potentiometer 23 is operated by the motor, wherein it includes a wiper 34 movable back and forth on a resistance 35 in response to operation of the motor 29. Thus, as the motor is operated through the potentiometer 23, the bridge circuit is being re-balanced.
  • each boiler capable of modulation will include modulating control circuitry as shown in FIG. 3 responsive to the modulating pressure control 11, although the circuitry will be arranged so that only one boiler will be responsive to the modulating pressure control at any one time, and that normaliy being the last boiler on the line.
  • the master control 12 for the illustrated embodiment of the invention operates to add or substract boilers from the line depending upon the load requirements, and includes control power terminals 36 for connecting the circuitry to suitable power and a main control switch 37 that must be in the on position to condition the master control 12 for operation.
  • the low pressure switch 17 is shown in closed position, while the high pressure switch 18 is shown in open position although their conditions are dictated by the pressure in the header.
  • each boiler is provided with a control switch to determine whether it is in readiness for operation, and this must be in the on position for any particular boiler to operate in the line.
  • Boiler ready relays 38, 39, 4t ⁇ and 41 are respectively provided for boilers 1 to 4, and must receive a signal from the control switches of these boilers and be energized if the boiler is ready for operation. Therefore, if a boiler ready relay is not energized for any one boiler, that boiler cannot be programmed into the system, yet the system will function as will be hereinafter seen.
  • Energization of boiler ready relay 38 closes contacts 38a and 381:, while energization of boiler ready relay 39 closes contacts 39a and 39b and 390.
  • Energization of boiler ready relay 4t)- closes contacts 40a, 40b and 480, while energization of boiler ready relay 41 closes contacts 41a 41b and 41c.
  • the stepper switch includes and add coil 42 and a subtract coil 43, the add coil being energized through the closed low pressure switch 17 to program another boiler into the system while the subtract coil is energized during closing of the high pressure switch 18 to subtract or remove a boiler from the system.
  • the master control 12 is capable to programming boilers 2, 3 and 4 in and out of the system, while boiler 1 is always maintained in the system although any number of boilers may be included. Further, boilers 2, 3 and 4 must have their boiler ready relays energized in order to be capable of being programmed in and out of the system. However, as already mentioned, it is not necessary to have each of the boilers 2, 3 and 4 ready for progrrnming into and out of the system in order to permit proper operation of the master control 12.
  • the circuitry will operate as follows when the master pressure control it) detects a pressure in the common header beiow 175 psi. which will cause closing of the low pressure switch 17.
  • This closure energizes a low pressure relay 44 through the closed boiler ready relay contact 390, and after a predetermined delay the timer relay 45.
  • a typical time setting of this relay might be three seconds and prevents calling a boiler unit on the line because of a temporary drop in pressure.
  • Energization of the timer relay 45 closes contact 45a, while energization of the low pressure relay 44 closes the contact 44a, the latter of which functions as a safety to prevent adding of a boiler unless the low pressure switch 17 is closed.
  • Closing of the contact 45a causes energization of a timer relay 46 after a predetermined time delay.
  • a typical setting for this relay is 120 seconds which defines the timing rate at which boilers can be added.
  • Encrgization of the timer relay 46 closes contact 460, thereby causing energization of the stepper switch add coil 42, and after a predetermined time delay energization of a timer relay 47.
  • a typical time setting for relay 47 is 3 seconds. This time delay permits the stepper switch add coil 42 sufficient time to advance the stepper switch before opening of contact 47a by energization of relay 47 that causes deenergization of the timer relay 46 and opening of contact 46a that causes deenergization of the add coil 42 and timer relay 47.
  • Energization of the stepping switch add coil 42 which causes advancing of the stepper switch one step also closes stepper switch contact 42a that energizes stepper relay 48 closing contact 48a which through previously closed contact 3% energizes fire boiler relay 49.
  • Contact 49a is closed by operation of the relay 49, and through previously closed boiler ready relay contact 390 causes energization of an automatic relay 50.
  • Contact 4% is also opened during energization of the relay 49 to prevent operation of a stepper override add relay 51.
  • the stepper relay 48 also causes closing of contact 4812 and opening of contact 48c, while the automatic relay 50 also closes contacts 50a and 50b and opens contact 50c.
  • fire boiler relay 49 causes opening of contact 490 to prevent operation of a stepper override subtract relay 64.
  • An automatic relay 52 is energized through the closed contact 38b of the boiler number 1 after it is put into operation, thereby opening contact 52a and preventing the stepper switch from advancing prematurely.
  • the low pressure relay 44 will remain energized holding contact 44a closed and timer relay 45 will remain energized holding contact 45a closed to again initiate the timing cycle of timer relay 46.
  • the contact 460 will be closed to start the time delay cycle of the timer relay 47 and to advance the stepper switch by energizing the stepper switch add coil 42.
  • Energization of the stepper switch add coil 42 to the next position now closes the stepper switch contact 42b to energize the stepper relay 53 and opens stepper switch contact 42a that deenergizes relay 48, opening contacts 48a and 48b and closing contact 480.
  • Closed contact 48c holds automatic relay 50 energized during the high pressure cycle. Opening contact 48a deenergizes fire boiler relay 49 which in turn opens contact 490 and closes contacts 49b and 490. Energization of the stepper relay 53 closes contact 53a to energize the fire boiler relay 54, closes contact 53b in the subtract circuit, and opens contact 530. The relay 54 causes closing of contact 54a, and opening of contacts 541; and 540 in the override circuits. Closing of contact 540: energizes the automatic relay 55 through previously closed contact 40c to close contacts 55a and 55b, while opening normally closed contact 550. Closing of contact 55a holds the automatic relay 55. Now the second programmed boiler (number 3) is on the line and in operation.
  • the low pressure relay 44 and the time cycle for the timer relay 45 remain energized through the previously closed contacts 41a and the normally closed contact 580 of the automatic relay 58 of boiler number 4.
  • the closed contact 45a thereby energizes the timing cycle of the timer relay 46.
  • the contact 46a is closed to start the time delay period of the relay 47 and energize the stepper switch add coil 42 to advance the stepper switch to the next position.
  • the contact 47a is opened to deenergize the relay 46 and prevent operation of the override add circuit.
  • the stepper switch add coil 42 in the next position closes the contact 420 to energize the stepper relay 56 which in turn closes contacts 56a and 56b, while opening contact 560, and opens stepper switch contact 42b that deenergizes relay 53, the latter causing opening of contacts 53a and 53b and closing of contact 53c.
  • Closed contact 530 holds automatic relay 55 energized during the high pressure cycle.
  • Opening contact 53a deenergizes fire boiler relay 54 which in turn opens contact 54:: and closes contacts 54b and 540.
  • Closing of contact 56a energizes the fire boiler relay 57 through previously closed contact 41b to close contact 57a, and open contacts 57b and 57:: in the override circuit.
  • Closing of contact 570 energizes automatic relay 58 through previously closed contact 41c, thereby closing contacts 58a and 5817 while opening contact 58c. Closing of contact 58a holds the relay 58. Now all boilers are on the line and in operation.
  • the automatic relays 50, 52, 55 and 58 are energized to maintain the normally closed contacts 500, 52a, 55c and 580 open, thereby opening all circuits to the stepper switch add coil 42, preventing the stepper from seeking more boilers to put on the sys tern.
  • the automatic relay 58 is held in through the closed contact 410 of the boiler ready relay 41 of boiler number 4, and the closed contact 59a of the high pressure relay 59, the latter of which is maintained in energized form through the normally closed contact 61b of a timer relay 51 in the subtract" circuit.
  • the automatic relays do not have the parallel circuit established when adding boilers since the low pressure relay i deenergized thereby opening the low pressure relay contact 44a.
  • the circiut through the normally closed contact 560 of the stepper relay 56 is open since this relay is energized at this time with the stepper in the fourth position. But, the relays 53 and 48 are deenergized these becoming energized when the stepper is in the third and second positions, respectively.
  • Sensing of a high pressure in the line causes closure of the high pressure switch 18 thereby energizing a timer relay 61 after a predetermined time delay which may be typically 3 seconds.
  • the time delay period of relay 61 serves to prevent a boiler from being removed because of a momentary high pressure surge, and thus when the time delay expires, contact 61a closes thereby energizing the time cycle for a timer relay 62.
  • This time cycle may typically be 10 seconds to dictate how fast the boilers can be removed from the system.
  • Setting of relay 61 also opens normally closed contact 61b to energize high pressure relay 59 and open contact 59a causing deenergization of automatic relay 53 and removal of boiler number 4 from the system in 3 seconds.
  • stepper relay 53 Opening normally closed contact 530 while closing contacts 53a and 5317. If the high pressure switch 18 continues to be closed because of high steam pressure, the stepper will step every 10 seconds and remove the remaining programmed boilers until all programmed boilers are removed from the load.
  • the additional boilers may be programmed in and out of the line even when one of the boilers 2, 3 or 4 is down and not ready to be used in the system.
  • boiler ready relay 40 would not be energized, and contacts 40a, 40b and 400 would remain open. Open contacts 40b and 40c would prevent energization of fire boiler relay 54 and automatic relay 55.
  • the low pressure relay 44 would energize through the normally closed contact 580 and the closed boiler relay contact 41a to close the contact 44a a following the time delay of timer relay 45, the contact 45a would close.
  • stepper switch contact 42b By advancing of the stepper switch would cause energization of the stepper relay 53.
  • closure of contact 53a would not energize the fire boiler relay 54 because the boiler ready relay contact 4% would be open. This would therefore leave the contact 54]) in closed position and allow the stepper override add coil 51 to be energized before expiration of the time delay of relay 47 to step the stepper switch up into the next position and thereby place boiler number 4 on the line.
  • Energization of the stepper override add coil 51 would close contact 51a to bypass the timing of relay 46 and immediately energize stepper add coil 42 to upstep the stepper switch and add the next boiler.
  • the high pressure relay 61 upon receiving a signal to remove a boiler from the line through high pressure switch 18, after boiler number 4 has been removed, the high pressure relay 61 would be energized after a time delay. Closing of contact 61a would cause operation of the stepper override subtract relay 64 since the fire boiler relay 54 would not be energized to open contact 540, thereby overstepping the position of boiler number 3 and moving to the position of boiler number 2 to remove it from the line. Energization of the stepper override subtract coil 64 causes closing of the contacts 64a and 64b to directly operate the timer relay 63 and stepper switch subtract coil 43 and bypass the time delay of relay 62.
  • any number of programmed boilers may be provided with the system of the present invention wherein each of the boiler may be of different capacities, and the time cycles for adding and subtracting of the boilers may be varied depending upon the needs of the system.
  • a boiler system including a plurality of boilers in a line each having their outputs connected to a common header and a control system, wherein manual controls are provided for starting and stopping the first of said boilers and automatic controls are provided for starting and stopping the other boilers by said control system, said control system comprising a first pressure responsive switch responsive to the pressure in said header having high and low pressure contacts closing respectively at predetermined high and low pressure settings, circuit means connected to said contacts: and to said boiler controls of said other boilers for starting and stopping and adding or subtracting the other boilers respectively to and from the system one at a time in response to the pressure in the header and the closing of one of said contacts, and a second pressure responsive switch responsive to the pressure in said header for modulating the operation of the last boiler of the line connected to said header between high and low fire conditions to maintain the header pressure between the high and low pressure settings of said first pressure responsive switch.
  • circuit means includes a stepper switch connected .to the controls of the boilers and responsive to said add and subtract circuits to upstep or downstep to add or subtract boilers to the header.
  • circuit means includes a stepper override add circuit and a stepper override subtract circuit to bypass a non-operative boiler when adding or subtracting boilers from the header.

Description

June 11, 1968 W. CHAN ET AL MULTIPLE BOILER CONTROL SYSTEM 2 Sheets-Sheet 1 Filed Sept. 12, 1966 1 l I l l l l MOM 1477176 PZISSUEEC'ONTBUL men-e P2555?! CPA/73d Z 4 M M r u N a z m n L A l m M u. a m/ E y/= 7: 2f 07- M444 63414 June 11, 1968 w. CHAN ET AL MULTIPLE BOILER CONTROL SYSTEM 2 Sheets-Sheet 2 Filed Sept. 12, 1936 2122211 05 MAL/AM 63 /4 a? @vea: 1 672-9225 3% A. war
United States Patent 3,387,589 MULTIPLE BOILER CONTRGL SYSTEM William Chan, Brookfield, and George L. Steiies, Elk Grove, Ill., assignors to Vapor Corporation, Chicago, 11]., a corporation of Delaware Filed Sept. 12, 1966, Ser. No. 573,772 4 Claims. (Ci. 122-1) ABSTRACT OF THE DISCLOSURE Multiple boiler control system for controlling the operation of a series of boilers connected to a common header and including a master pressure responsive switch responsive to the pressure in the header and having high and low pressure contacts for adding or subtracting boilers to the system, and a modulating pressure responsive switch responsive to the pressure in the header for modulating the operation of one of the boilers on the line between high and low fire conditions.
This invention relates in general to a boiler system, and more particularly to a control for use with a series of boilers connected to a single output for adding or subtracting boilers to the line in response to load requirements, although other uses and purposes may be apparent to those skilled in the art.
The control system of the present invention is especially suitable for controlling the operation of a plurality of boilers all having their outputs connected to a common header where each boiler may have a capacity of about 100 to 300 boiler horsepower so that boilers in the system may be added or subtracted in response to load requirements thereby eliminating the need for having a single boiler of large capacity or a system whereby all boilers are on the line at the same time. Further, the control system of the present invention is such that one of the boilers may be modulated between low and high fire conditions depending upon load requirements. Pressure responsive switches are employed in the common header for the boilers to sense the need to add or subtract boilers from the line depending upon load requirements, and to optionally modulate one of the boilers bet-ween high and low fire conditions again depending upon load requirements. The control system operates to add and subtract the boilers on a timed basis which can be adjusted according to need. Although the system contemplates controlling a series of boilers of the 100 to 300 boiler horsepower capacity, it should be appreciated that a combination of any number of boilers of the same or varying capacity may be controlled by the system of the present invention where all of the boilers are connected into the common header or the same output line. Further, the system is especially useful where the boiler capacity needs range from a very small capacity to a large capacity, such as from 100 to 1500 boiler horsepower.
It is therefore an object of the present invention to provide a control system for adding or subtracting boilers from a series of boilers that are connected to a common header or output line.
Another object of this invention resides in the provision of a control system for automatically handling the firing of a series of boilers connected to a common header in response to the load requirements.
Still another object of this invention is in the provision of a control system for handling the adding or subtracting of boilers on a time basis to a common header, wherein the timed basis may be adjusted according to needs of the system.
Other objects, features and advantages of the invention Patented June 11, 1968 will be apparent from the following detailed disclosure, taken in conjunction with the accompanying sheets of drawings, wherein like reference numerals refer to like parts, in which:
FIG. 1 is a block diagram of the control system according to the invention;
FIG. 2 is a diagrammatic view of the master pressure control which determines whether a boiler need be added or subtracted from the system;
FIG. 3 is a schematic diagram of a modulating control for a boiler as connected into the modulating pressure control for the system of the invention; and
FIG. 4 is a schematic electrical diagram of the master control according to one embodiment of the invention for illustrating the invention where three boilers in a system are programmed to be added or subtracted in accordance with the load requirements.
While the present invention may be applied to any system of boilers, it is illustrated herein applicable to a system of four boilers where the first boiler is always on the line except when the entire system is shut down and the other three boilers are programmed to be automatically added or subtracted to the line depending upon load requirements. Thus, the output of all boilers will be connected to a common header or output 9, FIG. 1, wherein a pressure sensitive master control switch 10 and a pressure sensitive modulating pressure control switch 11 will be located. A master control 12 receives signals from the master pressure control switch It and modulating pressure control switch 11 for controlling operation of boilers 1 to 4 indicated respectively by the numerals 13, 14, 15 and 16. Both pressure sensitive switches 10* and 11 will be suitably mounted in the common header 9 for the boilers to determine the load requirements of the line and thereby maintain a maximum and minimum power supply from the boilers consistent with the requirements. While the boiler number 1 will always be in operation, boilers 2, 3 and 4 may be added or subtracted according to need if these boilers are otherwise ready although the system could be programmed so that more than one boiler or no boiler would be in continual operation and the remaining boilers in readiness for operation.
As an example of operation, the master pressure conrtol switch 10, which operates to add or subtract boilers from the line, would have a low pressure switch 17 and a high pressure switch 18 both operated by a pressure sensing element 19, wherein the low pressure switch 17 would close at a predetermined pressure such as p.s.i. and remain closed as long as the pressure is no greater than 175 p.s.i., and thereafter operate a circuit to cause another'boiler to be placed on the line to raise the pressure, and the high pressure switch 18 would close in response to a predetermined pressure, such as 200 p.s.i. and remain closed as long as the pressure is 200 p.s.i. or greater, and cause operation of a circuit to remove a boiler from the line to lower the pressure. The upper and lower pressure limits may be adjusted to the needs on the line. Thus, no boiler would be added or subtrated as long as the pressure is between 175 and 200 p.s.i.
Within the range of 175 to 200 p.s.i., the modulating pressure control 11 would operate to modulate one of the boilers on the line in accordance with present pressure limits, such as where the boiler would operate at high fire condition at 178 p.s.i. and at low fire condition at 198 p.s.i. and modulate between high and low fire condition between 178 and 198 p.s.i.
The modulating pressure control 11 includes a variable potentiometer 20 having a resistance 21 over which a wiper 22 moves responsive to the pressure in the header to change the balance in a bridge circuit that also in- G cludes a variable potentiometer 23 and magnet coils 24 and 25, the latter of which operate a switch arm 26 into contact with one of the contacts 27 or 28 or in a neutral position. The contacts 27 and 28 by engagement with the switch arm 26 cause actuation of a reversible motor 29 which is mechanically connected to the boiler controls of a boiler to modulate the boiler between low and high fire conditions. Limit switche 3t} and 31 are provided to prevent continued operation of the motor at extreme limits even though the switch arm 26 is in contact with one of the contacts 27 and 23. For illustrative purposes, the motor winding 32 may be considered the low fire winding while the winding 33 may be considered the high fire winding, wherein operation of the motor through the winding 32 causes the controls to move toward low fire position while operation of the motor through the winding 33 causes the controls to move toward high fire position. The variable potentiometer 23 is operated by the motor, wherein it includes a wiper 34 movable back and forth on a resistance 35 in response to operation of the motor 29. Thus, as the motor is operated through the potentiometer 23, the bridge circuit is being re-balanced.
In operation, as the resistance of the circuit in series with one or the coils 24 and is reduced by movement of the wiper 22, the current flow through the one coil will increase thereby increasing its magnetic field strength and pulling the switch arm 26 towards it to close one of the contacts 27 or 28. When the one contact is closed, the motor 29 is energized to rotate in one direction to accordingly move the boiler controls toward lower or higher fire conditions. While the motor rotates, the wiper 34 of the balance potentiometer 23 moves across the resistance to re-balance the bridge circuit and stop further rotation until a change in steam pressure once again causes the pressure responsive poteniometer to unbalance the bridge circuit. It will be understood that each boiler capable of modulation will include modulating control circuitry as shown in FIG. 3 responsive to the modulating pressure control 11, although the circuitry will be arranged so that only one boiler will be responsive to the modulating pressure control at any one time, and that normaliy being the last boiler on the line.
Referring now to FIG. 4, the master control 12 for the illustrated embodiment of the invention operates to add or substract boilers from the line depending upon the load requirements, and includes control power terminals 36 for connecting the circuitry to suitable power and a main control switch 37 that must be in the on position to condition the master control 12 for operation. The low pressure switch 17 is shown in closed position, while the high pressure switch 18 is shown in open position although their conditions are dictated by the pressure in the header. Further, each boiler is provided with a control switch to determine whether it is in readiness for operation, and this must be in the on position for any particular boiler to operate in the line. Boiler ready relays 38, 39, 4t} and 41 are respectively provided for boilers 1 to 4, and must receive a signal from the control switches of these boilers and be energized if the boiler is ready for operation. Therefore, if a boiler ready relay is not energized for any one boiler, that boiler cannot be programmed into the system, yet the system will function as will be hereinafter seen. Energization of boiler ready relay 38 closes contacts 38a and 381:, while energization of boiler ready relay 39 closes contacts 39a and 39b and 390. Energization of boiler ready relay 4t)- closes contacts 40a, 40b and 480, while energization of boiler ready relay 41 closes contacts 41a 41b and 41c.
Should the pressure in the main header 9 drop below the setting of the low pressure switch 17, which in the illustrated example is 175 p.s.i., closing of the low pressure switch will operate a stepper switch in the master control to add a boiler to the line for the purpose of bringing the pressure up above the lower limit that causes the low pressure switch 17 to close. Similarly, assuming there is a boiler in the system in operation that can be subtracted, that boiler will be subtracted or removed from the line through the master control circuitry upon closing of the high pressure switch 18 that would be caused when the pressure in the line reaches 20% psi. or the high pressure setting of that switch. The stepper switch includes and add coil 42 and a subtract coil 43, the add coil being energized through the closed low pressure switch 17 to program another boiler into the system while the subtract coil is energized during closing of the high pressure switch 18 to subtract or remove a boiler from the system. As above explained, the master control 12 is capable to programming boilers 2, 3 and 4 in and out of the system, while boiler 1 is always maintained in the system although any number of boilers may be included. Further, boilers 2, 3 and 4 must have their boiler ready relays energized in order to be capable of being programmed in and out of the system. However, as already mentioned, it is not necessary to have each of the boilers 2, 3 and 4 ready for progrrnming into and out of the system in order to permit proper operation of the master control 12.
Assuming that all of the boiler ready relays are energized, the circuitry will operate as follows when the master pressure control it) detects a pressure in the common header beiow 175 psi. which will cause closing of the low pressure switch 17. This closure energizes a low pressure relay 44 through the closed boiler ready relay contact 390, and after a predetermined delay the timer relay 45. For purposes of illustration, a typical time setting of this relay might be three seconds and prevents calling a boiler unit on the line because of a temporary drop in pressure. Energization of the timer relay 45 closes contact 45a, while energization of the low pressure relay 44 closes the contact 44a, the latter of which functions as a safety to prevent adding of a boiler unless the low pressure switch 17 is closed. Closing of the contact 45a causes energization of a timer relay 46 after a predetermined time delay. A typical setting for this relay is 120 seconds which defines the timing rate at which boilers can be added. Encrgization of the timer relay 46 closes contact 460, thereby causing energization of the stepper switch add coil 42, and after a predetermined time delay energization of a timer relay 47. A typical time setting for relay 47 is 3 seconds. This time delay permits the stepper switch add coil 42 sufficient time to advance the stepper switch before opening of contact 47a by energization of relay 47 that causes deenergization of the timer relay 46 and opening of contact 46a that causes deenergization of the add coil 42 and timer relay 47.
Energization of the stepping switch add coil 42 which causes advancing of the stepper switch one step also closes stepper switch contact 42a that energizes stepper relay 48 closing contact 48a which through previously closed contact 3% energizes fire boiler relay 49. Contact 49a is closed by operation of the relay 49, and through previously closed boiler ready relay contact 390 causes energization of an automatic relay 50. Contact 4% is also opened during energization of the relay 49 to prevent operation of a stepper override add relay 51. The stepper relay 48 also causes closing of contact 4812 and opening of contact 48c, while the automatic relay 50 also closes contacts 50a and 50b and opens contact 50c.
' Closing of contact 50a holds the automatic relay 50.
Further, the fire boiler relay 49 causes opening of contact 490 to prevent operation of a stepper override subtract relay 64.
An automatic relay 52 is energized through the closed contact 38b of the boiler number 1 after it is put into operation, thereby opening contact 52a and preventing the stepper switch from advancing prematurely.
Should the low pressure switch 17 remain closed because of the pressure in the common header subsequent to the firing of boiler number 2, the low pressure relay 44 will remain energized holding contact 44a closed and timer relay 45 will remain energized holding contact 45a closed to again initiate the timing cycle of timer relay 46. At the expiration of the time delay of the relay 46, the contact 460 will be closed to start the time delay cycle of the timer relay 47 and to advance the stepper switch by energizing the stepper switch add coil 42. Energization of the stepper switch add coil 42 to the next position now closes the stepper switch contact 42b to energize the stepper relay 53 and opens stepper switch contact 42a that deenergizes relay 48, opening contacts 48a and 48b and closing contact 480. Closed contact 48c holds automatic relay 50 energized during the high pressure cycle. Opening contact 48a deenergizes fire boiler relay 49 which in turn opens contact 490 and closes contacts 49b and 490. Energization of the stepper relay 53 closes contact 53a to energize the fire boiler relay 54, closes contact 53b in the subtract circuit, and opens contact 530. The relay 54 causes closing of contact 54a, and opening of contacts 541; and 540 in the override circuits. Closing of contact 540: energizes the automatic relay 55 through previously closed contact 40c to close contacts 55a and 55b, while opening normally closed contact 550. Closing of contact 55a holds the automatic relay 55. Now the second programmed boiler (number 3) is on the line and in operation.
Should the pressure in the line still stand below the minimum setting to maintain the low pressure switch 17 closed, the low pressure relay 44 and the time cycle for the timer relay 45 remain energized through the previously closed contacts 41a and the normally closed contact 580 of the automatic relay 58 of boiler number 4. The closed contact 45a thereby energizes the timing cycle of the timer relay 46. At the expiration of the time delay of relay 46, the contact 46a is closed to start the time delay period of the relay 47 and energize the stepper switch add coil 42 to advance the stepper switch to the next position. At the expiration of the time delay of relay 47, the contact 47a is opened to deenergize the relay 46 and prevent operation of the override add circuit. The stepper switch add coil 42 in the next position closes the contact 420 to energize the stepper relay 56 which in turn closes contacts 56a and 56b, while opening contact 560, and opens stepper switch contact 42b that deenergizes relay 53, the latter causing opening of contacts 53a and 53b and closing of contact 53c. Closed contact 530 holds automatic relay 55 energized during the high pressure cycle. Opening contact 53a deenergizes fire boiler relay 54 which in turn opens contact 54:: and closes contacts 54b and 540. Closing of contact 56a energizes the fire boiler relay 57 through previously closed contact 41b to close contact 57a, and open contacts 57b and 57:: in the override circuit. Closing of contact 570 energizes automatic relay 58 through previously closed contact 41c, thereby closing contacts 58a and 5817 while opening contact 58c. Closing of contact 58a holds the relay 58. Now all boilers are on the line and in operation.
With all boilers operating, the automatic relays 50, 52, 55 and 58 are energized to maintain the normally closed contacts 500, 52a, 55c and 580 open, thereby opening all circuits to the stepper switch add coil 42, preventing the stepper from seeking more boilers to put on the sys tern. Thus, the automatic relay 58 is held in through the closed contact 410 of the boiler ready relay 41 of boiler number 4, and the closed contact 59a of the high pressure relay 59, the latter of which is maintained in energized form through the normally closed contact 61b of a timer relay 51 in the subtract" circuit. The automatic relays do not have the parallel circuit established when adding boilers since the low pressure relay i deenergized thereby opening the low pressure relay contact 44a. Further, the circiut through the normally closed contact 560 of the stepper relay 56 is open since this relay is energized at this time with the stepper in the fourth position. But, the relays 53 and 48 are deenergized these becoming energized when the stepper is in the third and second positions, respectively.
Sensing of a high pressure in the line causes closure of the high pressure switch 18 thereby energizing a timer relay 61 after a predetermined time delay which may be typically 3 seconds. The time delay period of relay 61 serves to prevent a boiler from being removed because of a momentary high pressure surge, and thus when the time delay expires, contact 61a closes thereby energizing the time cycle for a timer relay 62. This time cycle may typically be 10 seconds to dictate how fast the boilers can be removed from the system. Setting of relay 61 also opens normally closed contact 61b to energize high pressure relay 59 and open contact 59a causing deenergization of automatic relay 53 and removal of boiler number 4 from the system in 3 seconds. When the timing of relay 62 expires, it will close contact 62a and contact 621) energizing the stepper switch subtract coil 43 causing the stepper to backstep one position and to energize the timer relay 63-starting its 3 seconds time cycle. Relay 63 opens contact 63a after 3 seconds, deenergizing relay 62, thereby opening the circuit to the stepper switch subtract coil 43 and prohibiting the stepper from taking another backstep until another cycle is accomplished as above. When the stepper back steps one position, its contact 420 opens while contact 42b closes. Opening of contact 42c deenergizes the stepper relay 56 opening contact 56a to deenergize the fire boiler relay 57 and thereby opening contact 57a. Closing of contact 421) energizes the stepper relay 53 opening normally closed contact 530 while closing contacts 53a and 5317. If the high pressure switch 18 continues to be closed because of high steam pressure, the stepper will step every 10 seconds and remove the remaining programmed boilers until all programmed boilers are removed from the load.
In the system illustrated, the additional boilers may be programmed in and out of the line even when one of the boilers 2, 3 or 4 is down and not ready to be used in the system. For example, if boiler number 3 were not to be used, its boiler ready relay 40 would not be energized, and contacts 40a, 40b and 400 would remain open. Open contacts 40b and 40c would prevent energization of fire boiler relay 54 and automatic relay 55. Assuming that boilers 2 and 4 are ready with boiler 2 on the line and a low pressure condition is sensed by the low pressure switch 17, the low pressure relay 44 would energize through the normally closed contact 580 and the closed boiler relay contact 41a to close the contact 44a a following the time delay of timer relay 45, the contact 45a would close. This would cause, after the predetermined time delay, energization of relay 46 which would close contact 46a causing the stepper switch ad coil 42 to be energized to upstep the stepper switch, and after the time delay, energization of the relay 47. Closing of stepper switch contact 42b by advancing of the stepper switch would cause energization of the stepper relay 53. However, closure of contact 53a would not energize the fire boiler relay 54 because the boiler ready relay contact 4% would be open. This would therefore leave the contact 54]) in closed position and allow the stepper override add coil 51 to be energized before expiration of the time delay of relay 47 to step the stepper switch up into the next position and thereby place boiler number 4 on the line. Energization of the stepper override add coil 51 would close contact 51a to bypass the timing of relay 46 and immediately energize stepper add coil 42 to upstep the stepper switch and add the next boiler.
Similarly, upon receiving a signal to remove a boiler from the line through high pressure switch 18, after boiler number 4 has been removed, the high pressure relay 61 would be energized after a time delay. Closing of contact 61a would cause operation of the stepper override subtract relay 64 since the fire boiler relay 54 would not be energized to open contact 540, thereby overstepping the position of boiler number 3 and moving to the position of boiler number 2 to remove it from the line. Energization of the stepper override subtract coil 64 causes closing of the contacts 64a and 64b to directly operate the timer relay 63 and stepper switch subtract coil 43 and bypass the time delay of relay 62.
It should be appreciated that any number of programmed boilers may be provided with the system of the present invention wherein each of the boiler may be of different capacities, and the time cycles for adding and subtracting of the boilers may be varied depending upon the needs of the system.
It will be understood that modifications and variations may be effected without departing from the scope of the novel concepts of the present invention, but it is understood that this application is to be limited only by the scope of the appended claims.
The invention is hereby claimed as follows:
1. A boiler system including a plurality of boilers in a line each having their outputs connected to a common header and a control system, wherein manual controls are provided for starting and stopping the first of said boilers and automatic controls are provided for starting and stopping the other boilers by said control system, said control system comprising a first pressure responsive switch responsive to the pressure in said header having high and low pressure contacts closing respectively at predetermined high and low pressure settings, circuit means connected to said contacts: and to said boiler controls of said other boilers for starting and stopping and adding or subtracting the other boilers respectively to and from the system one at a time in response to the pressure in the header and the closing of one of said contacts, and a second pressure responsive switch responsive to the pressure in said header for modulating the operation of the last boiler of the line connected to said header between high and low fire conditions to maintain the header pressure between the high and low pressure settings of said first pressure responsive switch.
2. The combination as defined by claim 1, wherein said circuit means includes a stepper switch connected .to the controls of the boilers and responsive to said add and subtract circuits to upstep or downstep to add or subtract boilers to the header.
3. The combination as defined in claim 2, wherein said circuit means includes a stepper override add circuit and a stepper override subtract circuit to bypass a non-operative boiler when adding or subtracting boilers from the header.
4. A boiler system as defined by claim 1, wherein said circuit means includes add circuit means connected to said low pressure contact for starting and adding a boiler to the system when the pressure is such to close the low pressure contact and subtract circuit means connected to said high pressure contact for stopping and subtracting a boiler from the system when the pressure is such to close the high pressure contact.
References Cited UNITED STATES PATENTS 1,544,310 6/1925 Gibson 122-448 2,073,072 3/1937 Pontow et a1. 122--448 2,780,206 2/1957 Rocque et al. 122-448 KENNETH W. SPRAGUE, Primary Examiner.
US578772A 1966-09-12 1966-09-12 Multiple boiler control system Expired - Lifetime US3387589A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US578772A US3387589A (en) 1966-09-12 1966-09-12 Multiple boiler control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US578772A US3387589A (en) 1966-09-12 1966-09-12 Multiple boiler control system

Publications (1)

Publication Number Publication Date
US3387589A true US3387589A (en) 1968-06-11

Family

ID=24314254

Family Applications (1)

Application Number Title Priority Date Filing Date
US578772A Expired - Lifetime US3387589A (en) 1966-09-12 1966-09-12 Multiple boiler control system

Country Status (1)

Country Link
US (1) US3387589A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3576177A (en) * 1969-11-10 1971-04-27 Raypak Inc Multiple-boiler temperature control system having boiler sequencing, reverse order firing, and individual boiler modulation with outdoor temperature reset
FR2501337A1 (en) * 1981-03-06 1982-09-10 Clayton Manufacturing Co DEVICE FOR CONTROLLING A STEAM OR HOT WATER PRODUCTION PLANT WITH MULTIPLE GENERATORS
US4421068A (en) * 1982-07-06 1983-12-20 Measurex Corporation Optimization of steam distribution
JPS60122803A (en) * 1984-10-11 1985-07-01 三浦工業株式会社 Automatic number control system of boiler
US4557686A (en) * 1984-07-16 1985-12-10 Phillips Petroleum Company Control of the flow of fuel to multiple burners
US4598668A (en) * 1985-01-09 1986-07-08 Energy Systems And Service Corp. Apparatus for efficiently controlling the operation of parallel boiler units
US4860696A (en) * 1986-12-08 1989-08-29 Ebara Corporation Apparatus for controlling boiler system
US20050230490A1 (en) * 2004-03-25 2005-10-20 Pouchak Michael A Multi-stage boiler staging and modulation control methods and controllers
US20080216771A1 (en) * 2007-03-09 2008-09-11 Lochinvar Corporation Control System For Modulating Water Heater
US20100132916A1 (en) * 2008-11-28 2010-06-03 Clean Burn, Inc. Supplemental Transport Heater for Tanker Trailers
US20110162593A1 (en) * 2008-08-25 2011-07-07 Miura Co., Ltd. Control program, controller, and boiler system
US20120006285A1 (en) * 2010-07-09 2012-01-12 Miura Co., Ltd. Controller and boiler system
US20130048745A1 (en) * 2007-01-26 2013-02-28 Thermodynamic Process Control, Llc Modulation control of hydronic systems
US20150204537A1 (en) * 2013-02-22 2015-07-23 Miura Co., Ltd. Boiler system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1544310A (en) * 1921-09-09 1925-06-30 George H Gibson Combustion regulation
US2073072A (en) * 1934-02-13 1937-03-09 Pontow Werner Regulating apparatus
US2780206A (en) * 1953-06-23 1957-02-05 Vapor Heating Corp Multiple boiler control system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1544310A (en) * 1921-09-09 1925-06-30 George H Gibson Combustion regulation
US2073072A (en) * 1934-02-13 1937-03-09 Pontow Werner Regulating apparatus
US2780206A (en) * 1953-06-23 1957-02-05 Vapor Heating Corp Multiple boiler control system

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3576177A (en) * 1969-11-10 1971-04-27 Raypak Inc Multiple-boiler temperature control system having boiler sequencing, reverse order firing, and individual boiler modulation with outdoor temperature reset
FR2501337A1 (en) * 1981-03-06 1982-09-10 Clayton Manufacturing Co DEVICE FOR CONTROLLING A STEAM OR HOT WATER PRODUCTION PLANT WITH MULTIPLE GENERATORS
EP0073813A1 (en) * 1981-03-06 1983-03-16 Clayton Manufacturing Co Control apparatus for use in multiple steam generator or multiple hot water generator installations.
EP0073813A4 (en) * 1981-03-06 1984-11-05 Clayton Manufacturing Co Control apparatus for use in multiple steam generator or multiple hot water generator installations.
US4421068A (en) * 1982-07-06 1983-12-20 Measurex Corporation Optimization of steam distribution
US4557686A (en) * 1984-07-16 1985-12-10 Phillips Petroleum Company Control of the flow of fuel to multiple burners
JPS60122803A (en) * 1984-10-11 1985-07-01 三浦工業株式会社 Automatic number control system of boiler
JPS633201B2 (en) * 1984-10-11 1988-01-22 Miura Kogyo Kk
US4598668A (en) * 1985-01-09 1986-07-08 Energy Systems And Service Corp. Apparatus for efficiently controlling the operation of parallel boiler units
US4860696A (en) * 1986-12-08 1989-08-29 Ebara Corporation Apparatus for controlling boiler system
US20050230490A1 (en) * 2004-03-25 2005-10-20 Pouchak Michael A Multi-stage boiler staging and modulation control methods and controllers
US7819334B2 (en) * 2004-03-25 2010-10-26 Honeywell International Inc. Multi-stage boiler staging and modulation control methods and controllers
US9863646B2 (en) * 2007-01-26 2018-01-09 David E. Johnson, Jr. Modulation control of hydronic systems
US20130048745A1 (en) * 2007-01-26 2013-02-28 Thermodynamic Process Control, Llc Modulation control of hydronic systems
US20090064944A1 (en) * 2007-03-09 2009-03-12 Lochinvar Corporation Control System For Modulating Water Heater
US20100004786A1 (en) * 2007-03-09 2010-01-07 Lochinvar Corporation Control System For Modulating Water Heater
US10955169B2 (en) 2007-03-09 2021-03-23 Lochinvar, Llc Control system for modulating water heater
US8186312B2 (en) 2007-03-09 2012-05-29 Lochinvar, Llc Control system for modulating water heater
US8186313B2 (en) 2007-03-09 2012-05-29 Lochinvar, Llc Control system for modulating water heater
US10247446B2 (en) 2007-03-09 2019-04-02 Lochinvar, Llc Control system for modulating water heater
US20080216771A1 (en) * 2007-03-09 2008-09-11 Lochinvar Corporation Control System For Modulating Water Heater
US9097431B2 (en) 2007-03-09 2015-08-04 Lochinvar, Llc Control system for modulating water heater
US20110162593A1 (en) * 2008-08-25 2011-07-07 Miura Co., Ltd. Control program, controller, and boiler system
US9568187B2 (en) * 2008-08-25 2017-02-14 Miura Co., Ltd. Control program, controller, and boiler system
US20100132916A1 (en) * 2008-11-28 2010-06-03 Clean Burn, Inc. Supplemental Transport Heater for Tanker Trailers
US8888011B2 (en) * 2010-07-09 2014-11-18 Miura Co., Ltd. Controller and boiler system
US20120006285A1 (en) * 2010-07-09 2012-01-12 Miura Co., Ltd. Controller and boiler system
US9618197B2 (en) * 2013-02-22 2017-04-11 Miura Co., Ltd. Boiler system
US20150204537A1 (en) * 2013-02-22 2015-07-23 Miura Co., Ltd. Boiler system

Similar Documents

Publication Publication Date Title
US3387589A (en) Multiple boiler control system
US4306853A (en) Direct ignition gas burner control system with diode steering circuitry
US3503433A (en) Controlled recompression evaporator with regulated heating,feed and discharge
US5223821A (en) Triac power switching and testing system
US3952809A (en) Series to parallel transfer circuit for initiator string
GB2028998A (en) Improvements in or relating to flame monitors
US2189846A (en) Automatic relay control system
US3071713A (en) Automatic rate of rise-responsive fire protection circuit
US3663831A (en) Control circuit for lubricating apparatus
US3266551A (en) Combustion control system
US2865444A (en) Control apparatus
US2785317A (en) Automatic changeover apparatus
US2280766A (en) Control system
US2659534A (en) Thermostatic control device and burner system
US1149150A (en) System of control.
US2904737A (en) Plugging control system
US2129526A (en) Control system and apparatus for heating
USRE22224E (en) Control system
US2471872A (en) Controlling system for condition regulators
US3049021A (en) Power drive apparatus
US1901397A (en) Driving mechanism for valves and other devices
SU1116190A1 (en) Power-generating unit automatic control system
US2168175A (en) Synchronizing system
US2975624A (en) Washing machines
SU571791A1 (en) Automatic regulation system