US3381482A - Marine drilling structure - Google Patents

Marine drilling structure Download PDF

Info

Publication number
US3381482A
US3381482A US550704A US55070466A US3381482A US 3381482 A US3381482 A US 3381482A US 550704 A US550704 A US 550704A US 55070466 A US55070466 A US 55070466A US 3381482 A US3381482 A US 3381482A
Authority
US
United States
Prior art keywords
section
extensible
sections
marine
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US550704A
Inventor
William F Manning
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Oil Corp
Original Assignee
Mobil Oil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mobil Oil Corp filed Critical Mobil Oil Corp
Priority to US550704A priority Critical patent/US3381482A/en
Application granted granted Critical
Publication of US3381482A publication Critical patent/US3381482A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures

Definitions

  • ABSTRACT OF THE DESCLOSURE This specification discloses a marine structure, designed to serve primarily as an offshore drilling platform, comprising a submerged bottom-supported lower portion, an upper portion supported above the surface of a body of water over the lower portion, and an extensible interconnecting portion buoyantly supporting the upper portion above the surface of the body of water and constrained by the bottom-supported lower portion.
  • the bottom-supported lower portion of the marine structure is assembled at the site from prefabricated vertical sections while the upper portion, prior to installation, functions as a derrick barge for installing the vertical sections of the lower portion.
  • This invention relates to a versatile marine structure for drilling or Working over exploratory and production wells in subaqueo-us formations of the continental shelves. More particularly, the invention relates to the design of a bottom-supported platform structure, comprising prefabricated sections which can be assembled at an offshore site so that the marine structure can be utilized over a wide variation of water depths.
  • While floating drilling vessels have the advantage of maximum mobility, they are not as suitable as bottomsupported structures in areas subject to frequent violent storms.
  • the jack-up type of platform is comparatively expensive relative to the template type; but due to range of water depths over which a single jack-up platform can operate, and the relative ease of moving the jack-up platform to a new location, this type of structure is desirable.
  • drilling templates have been built for specific water depths, give or take a few feet, since they are not adaptable for use at, say, fifty feet more or less than the design depth.
  • a jack-up is generally a self-erecting unit and does not require the services of derrick barges to set it in place at the drilling site. Derrick barges are necessary with prior art templates to at least place the superstructure, including the drilling deck, on the template, once it has been erected on location. The drilling rig and the necessary auxiliary equipment must also be lifted onto the superstructure before drilling can proceed.
  • FIGURE 1 is a side elevational view of a marine structure of the present invention erected in relatively deep water for drilling or working over a sub aqueous well;
  • FIGURE 2 is a top plan view of the marine structure shown in FIGURE 1, illustrating more clearly the arrangement of the above-surface deck with respect to the bottom-supported submerged portion of the structure;
  • FIGURE 3 is a side elevational view of the derrick barge-superstructure floating in the water prior to being mounted atop the bottom-supported structure as shown in FIGURES 1 and 2;
  • FIGURE 4 is a cross-sectional view of one of the upper tower sections of the bottom-supported portion of the marine structure taken through line 44 of FIG- URE l.
  • the marine structure of the present invention consists of a bottom-supported completely submerged portion, a completely above-surface superstructure portion, and a partially submerged extensible portion for connecting the above and below surface portions.
  • the bottom-supported submerged portion is assembled at a proposed offshore location or site from a number of prefabricated sections that can be towed to the site.
  • the bottom-supported submerged portion of the marine structure is prefabricated and, as assembled, has a base foundation section with controled buoyancy pontoon footings supporting a spacer section thereabove and one or more upper tower sections atop the spacer section.
  • a plurality of slidable columns each consisting in part of a tubular section, form the extensible interconnecting portion of the marine drilling structure, extending from the base foundation section through the spacer section and the upper tower sections, in which they are vertical 1y guided, to a level above the surface of the body of water.
  • the columns also are designed as prefabricated subassemblies or short lengths which can be assembled at the site.
  • the upper ends of the columns, as assembled, are adapted to support the above-surface superstructure portion thereon.
  • each of the slidable tubular sections within the base foundation and spacer sections, is a tank or chamber section of the respective column, the buoyancy of which is also controllable.
  • the column tank sections are used to adjust the height of the columns between a completely submerged position and a position in which the upper ends of the tubular sections extend above the surface of the body of water to support the superstructure portion above the surface.
  • the superstructure of the marine drilling structure which is designed as a derrick barge for placing the spacer section and the upper tower sections in position on the base foundation section, comprises a buoyant hull and has a turntable with a pair of adjustable stiff-legged cranes thereon forming a derrick for performing the usual functions of a derrick barge during installation and of a drilling rig thereafter.
  • the assembly of the prefabricated marine structure is accomplished at the site with the assistance of tugs and the barge-superstructure portion only, eliminating the need for supplementary derrick barges.
  • the base foundation section, the spacer section, and each of the upper tower sections are first floated to the location.
  • the base foundation section is then partially submerged by the controlled flooding of the pontoon footings that provided the original buoyancy therefor.
  • the spacer section is lifted by the derrick, on the barge-superstructure, and set on top of the base foundation section where it is rigidly fixed in place, i.e., by a system of anchor chains, bolting, to the base foundation section beneath. Since the upper end of the base foundation section is just above the surface of the water at this time, divers are not needed to connect the sections.
  • the combined base foundation and spacer sections are then submerged further until just the uppermost end of the spacer section is above the surface of the water.
  • One of the upper tower sections is then lifted up out of the water by the derrick on the barge-superstructure and is set on the upper end of the spacer section where it is fixed in place.
  • the partially assembled marine structure consisting of the base foundation section, the spacer section, and one upper tower section all fixed together, is further submerged until only the uppermost end of the upper tower section is above the surface.
  • Another upper tower section is lifted into place on the upper end of the first upper tower section by the derrick on the barge-superstructure and is fixed in relation thereto by workmen.
  • each of the spacer and tower sections may be hollow and interconnected, and through the connected conduits in the base foundation Section may be connected to the pontoon footings of the base foundation, for providing a fluid passageway for later controlling the buoyancy of the foundation without long exterior lines extending all the way from a compressor on the deck of the barge-superstructure portion to the pontoon footings far beneath the surface.
  • Each of the subassemblies, or short lengths, of the extensible columns is fixed within the base foundation, spacer, and upper tower sections so that they can be connected together to form the complete columns of the extensible interconnecting portion as the sections of the bottom-supported portion of the marine structure are assembled at the side.
  • the extensible columns when the marine structure is assembled, each slides in a plurality of coaxial circular guides, at least one of which is fixed in each tower section for each extensible column.
  • the short lengths of the extensible columns, preassembled in the respective tower sections can be tack welded in the guides of the respective tower sections to hold them securely fixed.
  • the tack welds can easily be broken later by a hammer blow or a cutting torch.
  • the interiors of the base foundation and spacer sections do not have column guides therein, and the lower ends of the extensible columns therein, including the buoyancy tanks, depend on the circular guides in the upper sections, after the columns are assembled in the marine structure, for restricting the entire lengths of each of the columns to a vertical movement within the marine structure.
  • the separate lower end sections of the extensible columns are fixed within the base foundation and spacer sections by spars spanning the interiors of the last-mentioned sections and tack welded in place or by removable chains extending between the lengths of the extensible columns and the framework making up the sections. If the weight of a section, and the included short lengths of the columns, exceed the capacity of the derrick being used, the sections of the bottom-supported portion can be assembled without the lengths of columns being fixed therein. Instead, as soon as one of the prefabricated sections is set on a lower one already partially submerged, during assembly at the site, the derrick would pick up the appropriate length of each of the columns and insert them into the upper most section.
  • the lengths of the columns are connected rigidly together above the surface as in the case of the sections of the bottom-supported portion of the marine structure.
  • the short lengths of the extensible columns can be rigidly connected together by welding before the respective joints are submerged or can be bolted together at terminal flanges, or by any other appropriate method.
  • the buoyancy tanks on the bottom length of each of the columns are partially flooded to lower the partially assembled columns into the water as the sections of the columns are added.
  • the extensible column portion After the lower bottom-supported portion and the included extensible interconnecting portion of the marine structure have been completely assembled and the lower bottom-supported portion lowered to the bottom, the extensible column portion being submerged until at least the upper end thereof is below the draft of the hull of the portion, the barge-superstructure portion is floated over the uppermost tower section, and the extensible columns are raised by increasing the buoyancy of the tank sections on the bottom of the columns, until the columns are lifted into contact with the barge-superstructure portion. After bolting or Otherwise rigidly fastening the upper ends of each of the columns to the lower surface of the barge-superstructure portion, the columns are further raised until the barge-superstructure is at the desired level completely above the water surface.
  • the barge-superstructure portion may be held in this position regardless of the equipment set on the working deck thereof by increasing the positive buoyancy of the tank sections of the extensible columns while limiting the upward movement of the columns by positive stop means coacting between the columns and the bottom-supported submerged portion of the marine structure.
  • the extensible columns may be bolted or welded in place once the platform has been lifted to the desired height.
  • short jack-up legs may be mounted thereon, the lower ends of the jack-up legs coacting with the upper ends of the columns.
  • the marine drilling structure consists of a lower submerged, bottom-supported portion 10, an upper barge-superstructure portion 12, and an extensible interconnecting portion 14.
  • the submerged, bottom-supported portion 10 of the marine structure has been built up of prefabricated sections or subasseinblies so that it can be used in six hundred feet of water and includes a base foundation section 16, a spacer section 18, and five upper tower sections 20.
  • the construction at the base foundation section 16 is that of an open peripheral framework 22 substantially forming a truncated triangular based pyramid, and pontoon footings 24, fixed to framework 22 at each of the triangular corners thereof to control the depth of submergence of the base foundation section 16.
  • the triangular base of the base foundation section 16 is approximately three hundred feet on a side.
  • the base foundation section 16 would be approximately one hundred and seventy feet high.
  • the spacer section 18 is constructed of an open peripheral framework forming a column of triangular cross section one hundred and sixty feet tall, in this example.
  • Vertical support columns 26, at the apexes of the triangular spacer section, are hollow so as to provide buoyancy in the section during transport and for forming flow passages to the pontoon footings 24 by means of interconnecting hollow struts (not specifically shown) in the base foundation section 16.
  • each of the vertical support columns 26 have circumferential flanges therearound ⁇ not shown) for mating with opposing flanges on the abutting portion of the lowest of the upper tower section 2t"; and base foundation in beneath, respectively, so that the sections can be securely fastened together.
  • Each of the upper tower sections it) is also an open framework construction of supporting struts forming a column of triangular cross section.
  • each of these upper tower sections 24) consists of hollow vertical support columns 28, at each apex of the triangular tower section 2%), interconnected by peripheral struts 3d and internal struts 32.
  • the internal struts 32 in turn, form, adjacent each apex of the triangle, a boxed in framework within which a circular guide member 34 can be welded.
  • These guide members 34 serve to align vertically the columns of the extensible interconnecting portion 14 while constraining them against lateral movement.
  • the guide members 34 can also be used to hold short lengths of column, prior to assembly, in conjunction with removable stops fixed on the lengths of the columns.
  • the upper and lower ends of each of the vertical support columns 28 have circumferential flanges 36 for bolting to the above and below upper tower sections 20 or to the spacer section 18 to fixedly assemble the submerged bottom-supported portion of the marine structure.
  • the upper tower section 2% are each, in this example, fifty feet tall, allowing the submerged bottomsupported portion iii of the marine drilling structure to be built up to within a relatively short distance of the surface 38 of the body of water in which the structure is to be used at a particular time.
  • the assembled extensible interconnecting portion 14 of the marine drilling structure consists of three parallei tubular sections 4t? extending through the circular guides 34 of the upper tower sections and terminating at their lower ends in large diameter buoyancy tank sections 42 contained within the open framework constrictions of the base foundation section 16 and the spacer section 13.
  • the barge-superstructure portion 12 has a drilling derrick mounted thereon consisting of a pair of stiff-legged cranes 46 fixed on a turntable 48 with a crown block 52 hung from a bridging member 50 between the top of the cranes 4-6.
  • the cranes 45 are affixed in the attitude shown in phantom as 46 in FIGURE 3 when the barge-superstructure portion 12 is used to assemble the spacer section 26 and the upper tower sections 28 on the base foundation section 16.
  • the barge-superstructure portion 12 When the usefulness of the barge-superstructure portion 12, as a derrick barge, is over, and the submerged bottom-supported portion 10 has been. firmly settled on the marine bottom 47, the barge-superstructure portion 12. is floated over the submerged bottom-supported portion it) and the extensible interconnecting portion 14 (completely submerged as shown in phantom in FIG- URE l) whereupon the buoyancy tank sections 42 of the extensible column portion 14 are evacuated of water and filled with air to drive the columns of the extensible interconnecting portion li iupward from the submerged position.
  • the tubular sections of the extensible interconnecting portion 14 contact the barge-superstructure portion 12, and lift the portion 12 out of the water, they are fastened in place by bolting or welding, or any other appropriate manner.
  • the buoyancy of the tank sections 42 then is increased to raise the barge-superstructure portion 12 as far out of the water as permitted by the chains 44 to avoid contact with the waves on the surface 38 of the body of water at high tide.
  • the bargesuperstructure portion 12 has been raised forty feet above the surface 38 of the water. This is a height normally used in the Gulf of Mexico, but may not be high enough in other areas.
  • a mudline suspension with a subsea wellhead should be utilized along with blowout preventers mounted near the bottom, for'drilling, connected by a remote-controlled, quick-disconnect marine riser extending to the above-surface deck on the barge-superstructure portion 12.
  • a marine structure for drilling or working over wells in subaqueous formations from an offshore site comprising: a lower portion supported on a marine bottom, fully submerged beneath said surface of said body of water; an upper portion supported fully above the surface of a body of water; and a partially submerged extensible interconnecting portion buoyantly supporting said upper portion above said surface of said body of water while being constrained within said lower portion; said lower portion of said marine structure comprising a base foundation section of open framework construction and having footing means of adjustable buoyancy, and at least one upper tower section of open framework construction supported on said base foundation section for extending the height of said lower portion, depending on the water depth at said offshore site; means for rigidly fixing said at least one tower section on said base foundation section; and guide means within said at least one tower section for constraining said extensible interconnecting portion against lateral movement while permitting vertical movement of said extensible interconnecting portion; and said extensible interconnecting portion having horizontally spaced upper tubular sections for supporting said upper portion thereon, and an adjustably buoyant tank section
  • said upper portion consists of a barge-superstructure having a buoyant hull, adapted to function as a derrick barge prior to the assembly and installation of said bottomsupported lower port-ion and said extensible interconnecting portion at said offshore site, and as the superstructure of said marine structure after the installation of said bottom-supported lower portion and said extensible interconnecting portion of said marine structure at said offshore site; and derrick means on said barge-superstructure, means for adjusting said derrick means between a first position in which said derrick means is utilized to install said lower and extensible interconnecting portions at a marine site, and a second position in which said derrick means is utilized as a drilling or workover rig.
  • said base foundation section and said at least one tower section are each of triangular cross-sectional area and said extensible interconnecting portion consists of three parallel tubular sections each having a buoyant tank section connected thereto, each of said tubular sections being vertically slidable just within an apex of said at least one triangularly shaped tower section.
  • a method for assembling and installing a marine structure for drilling or working over wells in subaqueous formations at an offshore site said marine structure comprising a lower portion adapted to be submerged beneath the surface of a body of water and supported on a marine bottom; an upper portion adapted to be buoyantly supported above the surface of a body of water; and an extensible interconnecting portion adapted to support buoyantly said upper portion above a surface of a body of water while being partially submerged and constrained within said lower portion when said lower portion is submerged and supported on said marine bottom; said lower portion having a base foundation section with footing means of adjustable buoyancy, and at least one upper tower section for adjusting the height of said lower portion with respect to the water depth at an offshore site; means for rigidly fixing said at least one tower section above and in relation to said base foundation section; and means within said at least one tower section for constraining said extensible interconnecting portion against lateral movement while permitting vertical movement of said extensible interconnecting portion; and said extensible interconnecting portion having adjustable buoyant means for
  • a method for assembling and installing a marine structure as recited in claim 6 wherein there are a plurality of available tower sections for said marine structure including the following additional step:

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Description

y 1968 w. FNMANNING 3,381,482
MARINE DRILLING STRUCTURE Filed May 17, 1966 l 24 47 6OO INVENTOR FIG. I WILLIAM F. MANNING ATTORNEY United States Patent 3,381,482 MARHNE DRILLING STRUCTURE William F. Manning, Springdaie, (Jenn, assignor to Mobil Oil tCorporation, a corporation of New York Filed May 17, 1966, Ser. No. 550,704 3 tlllairns. ((Il. til-46.5)
ABSTRACT OF THE DESCLOSURE This specification discloses a marine structure, designed to serve primarily as an offshore drilling platform, comprising a submerged bottom-supported lower portion, an upper portion supported above the surface of a body of water over the lower portion, and an extensible interconnecting portion buoyantly supporting the upper portion above the surface of the body of water and constrained by the bottom-supported lower portion. The bottom-supported lower portion of the marine structure is assembled at the site from prefabricated vertical sections while the upper portion, prior to installation, functions as a derrick barge for installing the vertical sections of the lower portion.
This invention relates to a versatile marine structure for drilling or Working over exploratory and production wells in subaqueo-us formations of the continental shelves. More particularly, the invention relates to the design of a bottom-supported platform structure, comprising prefabricated sections which can be assembled at an offshore site so that the marine structure can be utilized over a wide variation of water depths.
Exploration and production efforts in the oil and gas industry are being extended to remote offshore areas throughout the world as the more accessible and desirable acreage is leased. In the recent drive to tap hydrocarbon deposits beneath the continental shelves, leases have been obtained in such remote offshore areas .as the West Coast of Africa and the coasts of Australia. A single lease may contain areas in which the water depth varies over several hundred feet, due to the sharp incline of the marine bottom or the size of the lease in remote areas. In some of the largely untested remote areas, leases may be obtained for only $100 or $200 an acre, resulting in the obtaining of. very large tracts covering a range of three to four hundred feet or more in depth. In water from thirty-five to three hundred feet in depth, the bottom-supported platform has found success. In water over three hundred feet, the floating drilling vessel is usually utilized, due to the almost exponentially rising costs of a bottom-supported platform as the water depth increases.
While floating drilling vessels have the advantage of maximum mobility, they are not as suitable as bottomsupported structures in areas subject to frequent violent storms. Of the more stable bottom-supported structures, the jack-up type of platform is comparatively expensive relative to the template type; but due to range of water depths over which a single jack-up platform can operate, and the relative ease of moving the jack-up platform to a new location, this type of structure is desirable. To date, drilling templates have been built for specific water depths, give or take a few feet, since they are not adaptable for use at, say, fifty feet more or less than the design depth. Furthermore, a jack-up is generally a self-erecting unit and does not require the services of derrick barges to set it in place at the drilling site. Derrick barges are necessary with prior art templates to at least place the superstructure, including the drilling deck, on the template, once it has been erected on location. The drilling rig and the necessary auxiliary equipment must also be lifted onto the superstructure before drilling can proceed.
Since most of the major oil companies do not own their own drilling platforms and rigs, and must rent them at a per diem rate of, for example, for a deep water jack-up or a self-contained floating transparent platform, as high as $8500 at this time, it is obviously advantageous to keep any marine drilling structure which is under contract in use at all times. Furthermore, it is a practice in this competitive industry to obtain the services of these marine structures far in advance, by contracts extending for several years, and therefore it is not usually possible to rent a marine drilling platform on short notice or over a short indeterminate duration. During a drilling program, particularly at a remote lease, a specific platform may remain idle for days because of its unadaptability to the water depth at which drilling is being conducted at the moment. At the above-cited per diem rates, any unproductive time at the drilling site becomes an important economic consideration.
Accordingly, it is an object of the present invention to provide a mobile bottom-supported marine structure which can be used for drilling and maintaining subaqueous wells over the wide range of water depths of the continental shelves.
It is another object of the invention to provide a marine drilling structure combining the attributes of a jack-up platform and a drilling template.
It is a further object of the invention to provide a marine drilling structure which can utilize the drilling platform thereof as a derrick barge for setting the supporting portions of the structure and which can be elevated out of the Water atop the supporting portions without a supplementary derrick barge when the supporting portions have been set in place.
Other objects and advantages of the invention will be readily apparent from the following description, when taken in conjunction with the accompanying drawings that illustrate useful embodiments in accordance with this in vention:
FIGURE 1 is a side elevational view of a marine structure of the present invention erected in relatively deep water for drilling or working over a sub aqueous well;
FIGURE 2 is a top plan view of the marine structure shown in FIGURE 1, illustrating more clearly the arrangement of the above-surface deck with respect to the bottom-supported submerged portion of the structure;
FIGURE 3 is a side elevational view of the derrick barge-superstructure floating in the water prior to being mounted atop the bottom-supported structure as shown in FIGURES 1 and 2; and
FIGURE 4 is a cross-sectional view of one of the upper tower sections of the bottom-supported portion of the marine structure taken through line 44 of FIG- URE l.
The marine structure of the present invention consists of a bottom-supported completely submerged portion, a completely above-surface superstructure portion, and a partially submerged extensible portion for connecting the above and below surface portions. The bottom-supported submerged portion is assembled at a proposed offshore location or site from a number of prefabricated sections that can be towed to the site.
The bottom-supported submerged portion of the marine structure is prefabricated and, as assembled, has a base foundation section with controled buoyancy pontoon footings supporting a spacer section thereabove and one or more upper tower sections atop the spacer section. A plurality of slidable columns, each consisting in part of a tubular section, form the extensible interconnecting portion of the marine drilling structure, extending from the base foundation section through the spacer section and the upper tower sections, in which they are vertical 1y guided, to a level above the surface of the body of water. The columns also are designed as prefabricated subassemblies or short lengths which can be assembled at the site. The upper ends of the columns, as assembled, are adapted to support the above-surface superstructure portion thereon. At the lower ends of each of the slidable tubular sections, within the base foundation and spacer sections, is a tank or chamber section of the respective column, the buoyancy of which is also controllable. The column tank sections are used to adjust the height of the columns between a completely submerged position and a position in which the upper ends of the tubular sections extend above the surface of the body of water to support the superstructure portion above the surface. The superstructure of the marine drilling structure, which is designed as a derrick barge for placing the spacer section and the upper tower sections in position on the base foundation section, comprises a buoyant hull and has a turntable with a pair of adjustable stiff-legged cranes thereon forming a derrick for performing the usual functions of a derrick barge during installation and of a drilling rig thereafter.
The assembly of the prefabricated marine structure is accomplished at the site with the assistance of tugs and the barge-superstructure portion only, eliminating the need for supplementary derrick barges. The base foundation section, the spacer section, and each of the upper tower sections are first floated to the location. The base foundation section is then partially submerged by the controlled flooding of the pontoon footings that provided the original buoyancy therefor. Subsequently, the spacer section is lifted by the derrick, on the barge-superstructure, and set on top of the base foundation section where it is rigidly fixed in place, i.e., by a system of anchor chains, bolting, to the base foundation section beneath. Since the upper end of the base foundation section is just above the surface of the water at this time, divers are not needed to connect the sections. The combined base foundation and spacer sections are then submerged further until just the uppermost end of the spacer section is above the surface of the water. One of the upper tower sections is then lifted up out of the water by the derrick on the barge-superstructure and is set on the upper end of the spacer section where it is fixed in place. The partially assembled marine structure, consisting of the base foundation section, the spacer section, and one upper tower section all fixed together, is further submerged until only the uppermost end of the upper tower section is above the surface. Another upper tower section is lifted into place on the upper end of the first upper tower section by the derrick on the barge-superstructure and is fixed in relation thereto by workmen. This procedure is repeated until all of the necessary upper tower sections are assembled in place, after which the assembled portion of the structure is settled onto the marine bottom. If it is desirable, the vertical corner sup port columns of each of the spacer and tower sections may be hollow and interconnected, and through the connected conduits in the base foundation Section may be connected to the pontoon footings of the base foundation, for providing a fluid passageway for later controlling the buoyancy of the foundation without long exterior lines extending all the way from a compressor on the deck of the barge-superstructure portion to the pontoon footings far beneath the surface.
Each of the subassemblies, or short lengths, of the extensible columns is fixed within the base foundation, spacer, and upper tower sections so that they can be connected together to form the complete columns of the extensible interconnecting portion as the sections of the bottom-supported portion of the marine structure are assembled at the side. The extensible columns, when the marine structure is assembled, each slides in a plurality of coaxial circular guides, at least one of which is fixed in each tower section for each extensible column. For
purposes of handling, the short lengths of the extensible columns, preassembled in the respective tower sections, can be tack welded in the guides of the respective tower sections to hold them securely fixed. The tack welds can easily be broken later by a hammer blow or a cutting torch. The interiors of the base foundation and spacer sections do not have column guides therein, and the lower ends of the extensible columns therein, including the buoyancy tanks, depend on the circular guides in the upper sections, after the columns are assembled in the marine structure, for restricting the entire lengths of each of the columns to a vertical movement within the marine structure. During assembly, the separate lower end sections of the extensible columns are fixed within the base foundation and spacer sections by spars spanning the interiors of the last-mentioned sections and tack welded in place or by removable chains extending between the lengths of the extensible columns and the framework making up the sections. If the weight of a section, and the included short lengths of the columns, exceed the capacity of the derrick being used, the sections of the bottom-supported portion can be assembled without the lengths of columns being fixed therein. Instead, as soon as one of the prefabricated sections is set on a lower one already partially submerged, during assembly at the site, the derrick would pick up the appropriate length of each of the columns and insert them into the upper most section. The lengths of the columns are connected rigidly together above the surface as in the case of the sections of the bottom-supported portion of the marine structure. The short lengths of the extensible columns can be rigidly connected together by welding before the respective joints are submerged or can be bolted together at terminal flanges, or by any other appropriate method. The buoyancy tanks on the bottom length of each of the columns are partially flooded to lower the partially assembled columns into the water as the sections of the columns are added.
After the lower bottom-supported portion and the included extensible interconnecting portion of the marine structure have been completely assembled and the lower bottom-supported portion lowered to the bottom, the extensible column portion being submerged until at least the upper end thereof is below the draft of the hull of the portion, the barge-superstructure portion is floated over the uppermost tower section, and the extensible columns are raised by increasing the buoyancy of the tank sections on the bottom of the columns, until the columns are lifted into contact with the barge-superstructure portion. After bolting or Otherwise rigidly fastening the upper ends of each of the columns to the lower surface of the barge-superstructure portion, the columns are further raised until the barge-superstructure is at the desired level completely above the water surface. The barge-superstructure portion may be held in this position regardless of the equipment set on the working deck thereof by increasing the positive buoyancy of the tank sections of the extensible columns while limiting the upward movement of the columns by positive stop means coacting between the columns and the bottom-supported submerged portion of the marine structure. Alternatively the extensible columns may be bolted or welded in place once the platform has been lifted to the desired height. To be able to adjust closely the height of the barge-superstructure with respect to the surface of the water at a particular site, short jack-up legs may be mounted thereon, the lower ends of the jack-up legs coacting with the upper ends of the columns.
Now looking to FIGURE 1, the marine drilling structure consists of a lower submerged, bottom-supported portion 10, an upper barge-superstructure portion 12, and an extensible interconnecting portion 14. As shown, as an exemplary illustration in the drawings, the submerged, bottom-supported portion 10 of the marine structure has been built up of prefabricated sections or subasseinblies so that it can be used in six hundred feet of water and includes a base foundation section 16, a spacer section 18, and five upper tower sections 20. The construction at the base foundation section 16 is that of an open peripheral framework 22 substantially forming a truncated triangular based pyramid, and pontoon footings 24, fixed to framework 22 at each of the triangular corners thereof to control the depth of submergence of the base foundation section 16. As shown, for six hundred feet of water, the triangular base of the base foundation section 16 is approximately three hundred feet on a side. The base foundation section 16 would be approximately one hundred and seventy feet high.
To be secured to the upper end of the base foundation section 16, the spacer section 18 is constructed of an open peripheral framework forming a column of triangular cross section one hundred and sixty feet tall, in this example. Vertical support columns 26, at the apexes of the triangular spacer section, are hollow so as to provide buoyancy in the section during transport and for forming flow passages to the pontoon footings 24 by means of interconnecting hollow struts (not specifically shown) in the base foundation section 16. The upper and lower ends of each of the vertical support columns 26 have circumferential flanges therearound {not shown) for mating with opposing flanges on the abutting portion of the lowest of the upper tower section 2t"; and base foundation in beneath, respectively, so that the sections can be securely fastened together.
Each of the upper tower sections it) is also an open framework construction of supporting struts forming a column of triangular cross section. As shown in FIG- URE 4, each of these upper tower sections 24) consists of hollow vertical support columns 28, at each apex of the triangular tower section 2%), interconnected by peripheral struts 3d and internal struts 32. The internal struts 32, in turn, form, adjacent each apex of the triangle, a boxed in framework within which a circular guide member 34 can be welded. These guide members 34 serve to align vertically the columns of the extensible interconnecting portion 14 while constraining them against lateral movement. The guide members 34 can also be used to hold short lengths of column, prior to assembly, in conjunction with removable stops fixed on the lengths of the columns. The upper and lower ends of each of the vertical support columns 28 have circumferential flanges 36 for bolting to the above and below upper tower sections 20 or to the spacer section 18 to fixedly assemble the submerged bottom-supported portion of the marine structure. The upper tower section 2% are each, in this example, fifty feet tall, allowing the submerged bottomsupported portion iii of the marine drilling structure to be built up to within a relatively short distance of the surface 38 of the body of water in which the structure is to be used at a particular time. Even narrower upper tower sections may be utilized if it is desirable to fix closely the distance between the surface 38 and the upper end of the submerged bottom-supported portion iii of the marine structure. interconnections between the aligned hollow support columns 28, at the apexes of the tower sections 2%}, the hollow support columns 26 of the spacer section 18, and hollow struts of the base foundation section 16 provide a means for controlling the buoyancy of the pontoon footings 24 from the barge-superstructure portion 12 with only relatively short flexible lines between the above-surface barge-superstructure portion 12 and the upper end of the submerged bottom-supported portion it? of the marine structure.
The assembled extensible interconnecting portion 14 of the marine drilling structure consists of three parallei tubular sections 4t? extending through the circular guides 34 of the upper tower sections and terminating at their lower ends in large diameter buoyancy tank sections 42 contained within the open framework constrictions of the base foundation section 16 and the spacer section 13.
Chains 44 are attached between points on the base foundation section 16 and each of the buoyancy tank sections 4-2 to limit the upward travel of the extensible interconnecting portion 14 The barge-superstructure portion 12, as shown in FIG- URES 1 and 3, has a drilling derrick mounted thereon consisting of a pair of stiff-legged cranes 46 fixed on a turntable 48 with a crown block 52 hung from a bridging member 50 between the top of the cranes 4-6. The cranes 45 are affixed in the attitude shown in phantom as 46 in FIGURE 3 when the barge-superstructure portion 12 is used to assemble the spacer section 26 and the upper tower sections 28 on the base foundation section 16.
When the usefulness of the barge-superstructure portion 12, as a derrick barge, is over, and the submerged bottom-supported portion 10 has been. firmly settled on the marine bottom 47, the barge-superstructure portion 12. is floated over the submerged bottom-supported portion it) and the extensible interconnecting portion 14 (completely submerged as shown in phantom in FIG- URE l) whereupon the buoyancy tank sections 42 of the extensible column portion 14 are evacuated of water and filled with air to drive the columns of the extensible interconnecting portion li iupward from the submerged position. As the tubular sections of the extensible interconnecting portion 14 contact the barge-superstructure portion 12, and lift the portion 12 out of the water, they are fastened in place by bolting or welding, or any other appropriate manner. The buoyancy of the tank sections 42 then is increased to raise the barge-superstructure portion 12 as far out of the water as permitted by the chains 44 to avoid contact with the waves on the surface 38 of the body of water at high tide. In the particular instance shown, the bargesuperstructure portion 12 has been raised forty feet above the surface 38 of the water. This is a height normally used in the Gulf of Mexico, but may not be high enough in other areas.
When a violent storm threatens the marine structure, it may be necessary to release it from the subaqueous bottom 47 to prevent the seven hundred-foot structure from collapsing under the strains caused by the violent surface conditions. The buoyancy of at least the pontoon footings 24 is increased to permit the entire structure to float just off the bottom and form an extremely stable spar buoy type of floating unit with a five hundred fiftyto live hundred eighty-foot draft, not being susceptible to the extent of dfamage that a fixed positioned structure would be in violent storms. Due to the possibility that the structure may have to be floated, in case of violent storms, it is necessary that the drilling equipment: to be used with the present invention be the type normally utilized in floating drilling operations rather than the type conventially utilized with fixed bottom-supported platforms. By this it is meant that a mudline suspension with a subsea wellhead should be utilized along with blowout preventers mounted near the bottom, for'drilling, connected by a remote-controlled, quick-disconnect marine riser extending to the above-surface deck on the barge-superstructure portion 12. By the use of this equipment rather than having the blowout preventers on the drilling deck as usually is done with fixed platforms, some lateral movement of the entire marine structure can be tolerated after the structure has been raised off the marine bottom and the marine riser is disconnected, without any damage being inflicted on the subaqueous well being drilled.
Although the present invention has been described in connection with details of the specific embodiment thereof, it is understood that such details are not intended to limit the scope of the invention. The terms and expressions employed are used in a descriptive and not a limiting sense and there is no intention of excluding such equivalents, in the invention described, as fall within the scope of the claims. Now having described the method and'apparatus herein disclosed, reference should be had to the claims which follow.
What is claimed is:
1. A marine structure for drilling or working over wells in subaqueous formations from an offshore site, said marine structure comprising: a lower portion supported on a marine bottom, fully submerged beneath said surface of said body of water; an upper portion supported fully above the surface of a body of water; and a partially submerged extensible interconnecting portion buoyantly supporting said upper portion above said surface of said body of water while being constrained within said lower portion; said lower portion of said marine structure comprising a base foundation section of open framework construction and having footing means of adjustable buoyancy, and at least one upper tower section of open framework construction supported on said base foundation section for extending the height of said lower portion, depending on the water depth at said offshore site; means for rigidly fixing said at least one tower section on said base foundation section; and guide means within said at least one tower section for constraining said extensible interconnecting portion against lateral movement while permitting vertical movement of said extensible interconnecting portion; and said extensible interconnecting portion having horizontally spaced upper tubular sections for supporting said upper portion thereon, and an adjustably buoyant tank section on the lower end of each of said upper tubular sections, said tank section being contained within an open framework including said base foundation section, said tubular sections of said extensible interconnecting portion being constrained by said guide means in said at least one tower section.
2. The marine structure of claim 1 wherein said upper portion consists of a barge-superstructure having a buoyant hull, adapted to function as a derrick barge prior to the assembly and installation of said bottomsupported lower port-ion and said extensible interconnecting portion at said offshore site, and as the superstructure of said marine structure after the installation of said bottom-supported lower portion and said extensible interconnecting portion of said marine structure at said offshore site; and derrick means on said barge-superstructure, means for adjusting said derrick means between a first position in which said derrick means is utilized to install said lower and extensible interconnecting portions at a marine site, and a second position in which said derrick means is utilized as a drilling or workover rig.
3. The marine structure of claim 1 wherein at least one buoyant tank section of said extensible interconnecting portion is of a larger cross-sectional area than one of said tubular sections.
4. The marine structure of claim 1 wherein there is means coacting between said base foundation section of said lower bottom-supported portion and said extensible interconnecting portion to limit the upward vertical movement of said extensible interconnecting portion with respect to said lower bottom-supported portion in opposition to the buoyancy of said extensible inter-connecting portion.
5. The marine structure of claim 1 wherein said base foundation section and said at least one tower section are each of triangular cross-sectional area and said extensible interconnecting portion consists of three parallel tubular sections each having a buoyant tank section connected thereto, each of said tubular sections being vertically slidable just within an apex of said at least one triangularly shaped tower section.
6. A method for assembling and installing a marine structure for drilling or working over wells in subaqueous formations at an offshore site, said marine structure comprising a lower portion adapted to be submerged beneath the surface of a body of water and supported on a marine bottom; an upper portion adapted to be buoyantly supported above the surface of a body of water; and an extensible interconnecting portion adapted to support buoyantly said upper portion above a surface of a body of water while being partially submerged and constrained within said lower portion when said lower portion is submerged and supported on said marine bottom; said lower portion having a base foundation section with footing means of adjustable buoyancy, and at least one upper tower section for adjusting the height of said lower portion with respect to the water depth at an offshore site; means for rigidly fixing said at least one tower section above and in relation to said base foundation section; and means within said at least one tower section for constraining said extensible interconnecting portion against lateral movement while permitting vertical movement of said extensible interconnecting portion; and said extensible interconnecting portion having adjustable buoyant means for adjusting the vertical buoyant positioning thereof, including the following steps:
(a) adjusting the buoyancy of at least said footings at said offshore site to submerge said base foundation section of said lower portion until only the upper end thereof is above the surface;
(b) lifting at least one upper section of said lower portion above said upper end of said base foundation section above said surface and setting said at least one upper section on said upper end of said base foundation section;
(c) rigidly fixing said at least one upper section of said lower portion on said upper end of said base foundation section while only said upper end of said base foundation is above said surface;
(d) assembling said extensible interconnecting portion Within said lower portion by rigidly connecting subassemblies thereof together;
(e) adjusting the buoyancy of said extensible interconnecting portion during the assembly thereof so that only the very upper end of said column portion, already assembled, is above the surface when connecting an upper subassembly thereto;
(f) readjusting the buoyancy of the assembled lower portion to support said lower portion on the marine bottom at said offshore site;
(g) readjusting the buoyancy of the assembled extensible interconnecting portion to lower the upper end of said extensible interconnecting portion below the surface at least a distance equal to the draft of said upper portion floating on said surface;
(h) floating said upper above-surface portion of said marine structure over said assembled lower portion and said assembled extensible interconnecting portion; and
(i) increasing the buoyancy of said assembled extensible interconnecting portion to raise said extensible interconnecting portion into engagement with said portion and subsequently to buoy said upper portion to a spaced distance above the surface of said body of water.
7. A method for assembling and installing a marine structure as recited in claim 6 wherein said upper portion consists of buoyant barge-superstructure adapted to function as a derrick barge prior to the assembly and installation of said lower bottom-supported portion and said extensible interconnecting portion at said offshore site, and as the superstructure of said marine structure after the assembly installation of said lower bottom-supported portion and said extensible interconnecting portion; and derrick means on said barge-superstructure adjustable between a first position in which said derrick means is utilized to assemble said lower portion and extensible interconnecting portion, and a second position in which said derrick means is utilized as a drilling or workover rig, including the following additional steps:
(j) adjusting said derrick means on said barge-superstructure to position said derrick means in said first position;
(k) floating said barge-superstructure to said offshore site; and
(l) utilizing said derrick means in said first position thereof to lift said at least one upper section of said lower portion above said surface and set said at least one upper section on said partially submerged base foundation section.
8. A method for assembling and installing a marine structure as recited in claim 6 wherein there are a plurality of available tower sections for said marine structure, including the following additional step:
(In) assembling enough additional tower sections above said base foundation section to extend said lower portion so that it will terminate at a predetermined distance beneath the surface of said body of water at said offshore site when said lower portion is submerged and supported on the marine bottom.
References Cited UNITED STATES PATENTS 2,865,179 12/1958 McNeill 61-465 10 2,960,833 11/1960 Hayward G l-46.5
JACOB SHAPIRO, Primary Examiner.
UNITED STATES PATENT OFFICE CERTIFICATE OF CORRECTION Patent No. 3,3811482 May 7 1968 William F. Manning It is certified that error appears in the above identified patent and that said Letters Patent are hereby corrected as shown below:
Column 2, line 64, "controled" should read controlled Column 4 line 28 "upper most" should read uppermost line 44*, after "the", third' occurrence insert barge-superstructure Column 5, line 50,"section" should read sections line 74, "constrictions" should read constructions Column 6, line 47, "dfamage" should read damage same line 47, "fixed" should read fixedly Column 7, line 28, "section being" should read sections being Signed and sealed this 23rd day of September 1969.
(SEAL) Attest:
WILLIAM E. sCIIUYLER, JR.
Commissioner of Patents Edward M. Fletcher, Jr.
Attesting Officer
US550704A 1966-05-17 1966-05-17 Marine drilling structure Expired - Lifetime US3381482A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US550704A US3381482A (en) 1966-05-17 1966-05-17 Marine drilling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US550704A US3381482A (en) 1966-05-17 1966-05-17 Marine drilling structure

Publications (1)

Publication Number Publication Date
US3381482A true US3381482A (en) 1968-05-07

Family

ID=24198271

Family Applications (1)

Application Number Title Priority Date Filing Date
US550704A Expired - Lifetime US3381482A (en) 1966-05-17 1966-05-17 Marine drilling structure

Country Status (1)

Country Link
US (1) US3381482A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3585801A (en) * 1970-02-20 1971-06-22 Brown & Root Offshore tower
US4064669A (en) * 1973-05-16 1977-12-27 Kjeld Vik Stationary supporting structure
US4094162A (en) * 1977-06-21 1978-06-13 Brown & Root, Inc. Method for installing an offshore tower
DE2855752A1 (en) * 1978-07-19 1980-02-07 Petroleo Brasileiro Sa LIFT DRILLING ISLAND FOR SEA HOLES
WO1981003157A1 (en) * 1980-05-02 1981-11-12 Global Marine Inc Submerged buoyant offshore drilling and production tower
US4511287A (en) * 1980-05-02 1985-04-16 Global Marine, Inc. Submerged buoyant offshore drilling and production tower
US20090301475A1 (en) * 2008-06-05 2009-12-10 Neil Alex Korneff Heat and moisture exchange unit

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2865179A (en) * 1953-09-28 1958-12-23 Shell Dev Offshore drilling structure
US2960833A (en) * 1955-11-10 1960-11-22 John T Hayward Marine foundation structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2865179A (en) * 1953-09-28 1958-12-23 Shell Dev Offshore drilling structure
US2960833A (en) * 1955-11-10 1960-11-22 John T Hayward Marine foundation structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3585801A (en) * 1970-02-20 1971-06-22 Brown & Root Offshore tower
US4064669A (en) * 1973-05-16 1977-12-27 Kjeld Vik Stationary supporting structure
US4094162A (en) * 1977-06-21 1978-06-13 Brown & Root, Inc. Method for installing an offshore tower
DE2855752A1 (en) * 1978-07-19 1980-02-07 Petroleo Brasileiro Sa LIFT DRILLING ISLAND FOR SEA HOLES
WO1981003157A1 (en) * 1980-05-02 1981-11-12 Global Marine Inc Submerged buoyant offshore drilling and production tower
US4511287A (en) * 1980-05-02 1985-04-16 Global Marine, Inc. Submerged buoyant offshore drilling and production tower
US20090301475A1 (en) * 2008-06-05 2009-12-10 Neil Alex Korneff Heat and moisture exchange unit

Similar Documents

Publication Publication Date Title
US4161376A (en) Offshore fixed platform and method of erecting the same
US3575005A (en) Method and apparatus for offshore operations
US3412564A (en) Sub-sea working and drilling apparatus
US3433024A (en) Versatile marine structure
US2422168A (en) Marine tower and method of placing same
US4492270A (en) Method of installing and using offshore well development and production platforms
US4062313A (en) Installation of vertically moored platforms
US3976021A (en) Installation of vertically moored platform
US3736756A (en) Method and apparatus for assembling an offshore structure
US3996754A (en) Mobile marine drilling unit
US3793840A (en) Mobile, arctic drilling and production platform
US2429952A (en) Underwater foundation and method of erecting the same
US3528254A (en) Offshore platform structure and construction method
US3094847A (en) Offshore platform structure
US3852969A (en) Offshore platform structures
EP0518709B1 (en) Method for installing a marine structure
US2657540A (en) Method of erecting and positioning marine structures
US2236682A (en) Marine foundation and method of construction
US4002038A (en) Method and apparatus for rapid erection of offshore towers
US5669735A (en) Offshore production platform and method of installation thereof
US5775846A (en) Offshore production platform and method of installing the same
US4505615A (en) Method of supporting a shallow water drilling barge
US3381482A (en) Marine drilling structure
US2580911A (en) Foundation structure for derricks
US3362170A (en) Triangular based offshore platform