US3373805A - Steam lifting of heavy crudes - Google Patents

Steam lifting of heavy crudes Download PDF

Info

Publication number
US3373805A
US3373805A US495809A US49580965A US3373805A US 3373805 A US3373805 A US 3373805A US 495809 A US495809 A US 495809A US 49580965 A US49580965 A US 49580965A US 3373805 A US3373805 A US 3373805A
Authority
US
United States
Prior art keywords
steam
tubing
gas
well
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US495809A
Inventor
Thomas C Boberg
Jr Roe Clyde Allen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Upstream Research Co
Original Assignee
Exxon Production Research Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxon Production Research Co filed Critical Exxon Production Research Co
Priority to US495809A priority Critical patent/US3373805A/en
Application granted granted Critical
Publication of US3373805A publication Critical patent/US3373805A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling, insulating arrangements for boreholes or wells, e.g. for use in permafrost zones

Definitions

  • This invention relates to the production of viscous petroleum crudes.
  • a method and apparatus are provided for lifting viscous oil from the bottom of a wellbore to the surface of the earth. More particularly, the invention relates to improvements in the use of steam as a lifting medium for the production of viscous crudes.
  • a major problem in the production of viscous crude is the loss of etficiency which results from an unusually pronounced pressure gradient which develops in the production tubing due to the flow resistance caused by viscous friction.
  • the high pressure drop in the production tubing leads to a reduced formation pressure drawdown and consequent low rates of oil production from the reservoir.
  • the invention is based in part upon a discovery that the downflowing steam must be thermally isolated from the wellbore walls, and from the upflowing mixture of steam condensate and formation fluids. Accordingly, two tubing strings are required; one for the downflowing steam and the other to contain the upflowing mixture. A dead gas space is maintained between the tubing strings from each other and from the surrounding earth, to prevent excessive condensation of the injected steam. It is essential in most wells to provide tubing strings having substantially different diameters. The steam is injected through the smaller diameter string and the produced fluids are lifted through the larger diameter string.
  • a mixture of steam and non-condensable gas is a particularly useful lifting medium in some circumstancesfor example, where the produced fluids contain a low proportion of formation gas.
  • the process is initiated by first circulating hot water down the injection tubing and up the production tubing. Once the well has been warmed substantially say, 50 to 60 F., gas is injected down the annulus and into the production string through gas lift valves in the conventional manner for initiating production from gas lift wells. The circulation of hot water through the tubing strings is continued, in combination with gas lift by gas injection down the annulus. Heat input to the steam generator is gradually increased until the hot water circulation is replaced by steam circulation. Gas injection is then gradually discontinued and the well is thereby converted to steam lift,
  • steam lift is combined with steam stimulation.
  • Steam injection rates normally required for stimulation greatly exceed the injection rates required for steam lifting.
  • steam is injected through the larger of the two tubing strings.
  • both tubing strings of the well completion assembly may also be utilized for the injection of steam.
  • a typical stimulation program requires the injection of steam at 10,000- 50,000 lbs. per hour for 1-8 weeks, followed by a production cycle lasting from 3 to 20 times as long as the injection period, depending upon reservoir conditions and the flow rates of the produced fluids. Converting back to steam lift, after having stimulated the well by injecting steam through both tubing strings, requires no intermediate steps; the production string is simply disconnected from the steam boiler output and again diverted to separation facilities for the normal processing of produced fluids.
  • FIGURE 1 represents a vertical cross-section of the earth, showing a suitable well completion assembly for use in accordance with the invention.
  • FIGURE 2 also represents a vertical cross-section of the earth, showing an alternate well completion assembly for use in accordance with the invention.
  • FIGURE 3 is a horizontal cross-section along line 33 of FIGURE 2, which illustrates a suitable tubing-casing geometry for use in accordance with the invention.
  • FIGURE 4 illustrates a determination of the oil production rate which can be achieved in accordance with one embodiment of the invention, as applied to a specific reservoir
  • FIGURE 5 is a graphic comparison of the oil viscosity as a function of depth for a conventional gas lift well with that for a well using the method of this invention, as applied to a specific reservoir.
  • FIGURE 6 is a horizontal cross-section of a preferred tubing-casing geometry for use in accordance with the invention.
  • the illustrated completion assembly includes injection tubing string 11 equipped with a thermal expansion joint 12; and production tubing 13, equipped with a thermal expansion joint 14.
  • spacing members 15 which bridge the annulus are mounted on the tubing strings in order to reduce convection within the annulus and hence minimize heat transfer from one tubing string to the other, and between the tubing strings and the casing.
  • the spacing members are provided with one or more openings or ports 17 to permit the passage of injected gas during the start-up procedure.
  • Ports 17 are preferably provided with check valves or equivalent means to reduce convection currents after the injection of gas has ceased.
  • check valve is shown schematically at 17.
  • Production tubing 13 is equipped with a series of valves 18, ejectors or the like, similarly as are used in conventional gas lift equipment.
  • a thermal packer 19 is provided near the lower end of the tubing strings in order to contain formation fluids and injected steam therebelow.
  • a flexible, heat-resistant hose 20 connects tubing 11 and 13 to allow for unequal thermal expansion of the two tubing strings.
  • a check valve 21 is located in a lower portion of tubing 13 to prevent the injection of fluids into the formation during start-up.
  • check valve 21 is equipped with means for permitting reverse flow, whenever desired, for example, in the use of both tubing strings for steam stimulation of the reservoir.
  • FIGURE 2 shows an alternate well completion assembly for use in practicing the invention, which includes injection tubing 31 equipped with a thermal expansion joint 32; and production tubing 33 equipped with a thermal expansion joint 34.
  • a heat-resistant packer 35 is installed, for thermal efficiency, to confine the produced fluids and injected steam to the lower portion of the borehole.
  • Centralizer baffles 36 are installed at various intervals of depth to thermally isolate the tubing strings from each other and from casing 37, and to minimize convective currents in the dead gas space. Openings 38 in the central-izer baflles are provided for the passage of injected gas during start-up.
  • a plurality of pressure-actuated valves 39 are spaced along production tubing 33 to permit an initial start-up procedure as previously described.
  • a low-cost alternative to the completions in FIGURES 1 and 2 would be a completion which consists of two tubing strings hanging free in the casing, omitting the packer, gas lift valves, expansion joints, and centralizer beffles. Gas would be injected at a low rate into the annulus to keep liquid out of the annulus and maintain insulation. This completion would not be as thermally efficient as the two described above and would necessitate having boiler pressure in excess of static downhole formation pressure for start-up.
  • FIGURE 3 illustrates the relative diameters of the casing and the two tubing strings of the embodiment of FIGURE 2.
  • the purpose of unequal tubing diameters is twofold: (1) The smaller tubing is the injection tubing, thereby reducing the radiating area which reduces heat losses; and (2) the smaller injection tubing allows a larger production tubing, thereby increasing the production capabilities of the well.
  • the diameter of the production tubing is preferably at least 20% greater than the injection tubing diameter and may be greater or more.
  • the data plotted in FIGURE 4 represents an example of the invention involving the production of oil having a gravity of 10 API at 60 F., from a depth of 3700 ft.
  • the dead oil has a viscosity of 16,000 cp. at 100 F. and cp. at 210 F.
  • the productivity index (bbls./day/ p.s.i.) of the well is 1.2 and the reservoir pressure is 1600 p.s.i.a.
  • the formation is producing water-free oil containing 68 s.c.f. of gas per barrel.
  • the formation curve represents the oil production rate of the formation plotted as a function of bottom hole pressure.
  • the tubing curve is a plot of the rates at which oil can be lifted through a four-inch tubing, in accordance with the invention, by the injection of 300 bbls./ day of steam (expressed as liquid at 60 F.) through a two-inch tubing, as a function of bottom hole pressure.
  • the intersection of the two curves corresponds to a bottom hole pressure of 680 p.s.i.a. and an oil production rate of 1120 bbls./ day.
  • This production rate is achieved with a wellhead pressure of 200 p.s.i.a.
  • Steam lifting in accordance with the invention is not always superior to gas lifting, nor is it always superior to the use of a conventional pump. Steam lifting is particularly suited, however, for the production of oil having an API gravity below 15 from a well having a static bottom hole pressure in excess of about 8.00 p.s.i.a and a productivity index of about 3 ⁇ bbls/day/psi. These parameters have been empirically correlated to provide a generalized guide for determining whether the method of the invention is well-suited for use in specific situations, as follows:
  • the productivity index of the well can be greatly increased by the use of steam stimulation, preferably in combination with steam lift.
  • steam stimulation preferably in combination with steam lift.
  • the injection of steam into the reservoir at a rate of 50,000 lbs/hr. for 25 days results in a 1000 bbl./ day peak increase in the rate of oil production.
  • FIGURE 5 is a comparison of the viscosity profiles obtained during steam lifting and during a normal gas lift operation, as applied to the same reservoir and the same well completion assembly as described in connection with FIGURE 4. As shown, steam lifting achieves about a thousandfold reduction in crude viscosity over that obtained with gas lift. This reduction in viscosity is the principal advantage which the present invention has over gas lift or pumping.
  • FIGURE 6 the tubing-casing geometry of a preferred well-completion assembly is shown. Steam is injected through tubing 41, and fluids are produced through tubing 42. In this embodiment, neither tubing string is centralized within the casing. In this configuration, it is possible to maximize the combined cross-sections of the tubing strings, within the limits of casing 43, while at the same time maintaining a sufficient dead gas space between the tubing strings, and also between the casing and each tubing string.
  • the steam injection tubing should be sized as small as possible, consistent with the requirement that the necessary steam injection rate be maintained with a reasonable pressure drop from the wellhead to bottomhole. Having thus selected the injection tubing size, the space remaining within the casing diameter must be sufficiently large to permit the use of a production tubing string substantially larger than the injection tubing.
  • a wide range of steam quality is suitable for use in accordance with the present invention, although it is to be expected that each well and each reservoir may require a different steam quality for optimum results. It is within the scope of the invention to employ superheated steam, dry saturated steam, or wet saturated steam having a quality in the range of about SO-100%.
  • a water-wetting agent is included with the injected steam.
  • the wetting agent further reduces friction losses in the production tubing since these losses occur mainly near the tubing wall and are therefore more dependent upon the water properties than upon the oil properties.
  • Suitable water-wetting agents include anionic and nonionic surfactants. Specific examples are the ethoxylated dioctyl ester of succinic acid, sodium dioctyl sulfosuccinate, and isopropyl naphthalene sodium sulfonate. They should be injected in amounts ranging from 0.001 pound to 0.01 pound per pound of injected steam.
  • steam may be replaced as the lifting medium by a mixture of steam with a hydrocarbon vapor, including propane, butane, naphtha, kerosene, or other lightpetroleum fractions.
  • a hydrocarbon vapor including propane, butane, naphtha, kerosene, or other lightpetroleum fractions.
  • the steam may be replaced altogether by a hydrocarbon vaporfor example, one or more of the above-named hydrocarbons.
  • a particularly preferred scheme for utilizing the method of the invention to produce offshore wells involves the drilling of several wells from a single, centrally located platform.
  • the drilling of a seven-spot pattern may include a single straight hole bottomed substantially directly below the platform, surrounded by six deviated wells.
  • the platform carries steam generators, Water-treating equipment, gas compressors, heat exchangers, separators, storage tanks, and manifolds, plus the necessary instrumenta tion.
  • the steam generators are operated continuously at full load, while the steam is distributed to each well for stimulation and for steam lift purposes.
  • the water-treating equipment preferably comprises an ion-exchanger, regenerated using softened downflow from the steam generators. Fuel requirements are supplied solely from the gas produced with the oil, thus eliminating the necessity of supplying gas from extraneous sources.
  • a method for initiating the steam lifting of a viscous crude to the surface of the earth from a substantial depth within a wellbore which comprises circulating hot Water within said borehole to the depth of said crude, in contact with said crude, and then back to the surface of the earth through a separately confined path, thereafter injecting gas down said borehole in a third path, commingling said gas with the upfiowing stream of hot water at successively greater depths within said borehole, then gradually increasing the temperature of said hot water until the hot water is replaced by steam, and then gradually discontinuing the injection of gas, whereby steam lifting is accomplished.
  • a method for producing viscous crude from a porous subterranean reservoir which comprises drilling a well into the reservoir from the surface of the earth, completing the well with two laterally spaced-apart tubing strings, injecting steam into the well through one of said tubing strings, whereby the steam is commingled with fluids produced from the reservoir, flowing the commingled fluids to the surface through the other of said tubing strings, and periodically stimulating the well by injecting steam into the well through both of said tubing strings, thereby forcing the steam to penetrate the reservoir a substantial distance from the wellbore, then resuming production from the Well at a stimulated rate.
  • a method for lifting viscous crude to the surface of the earth from a substantial depth within a borehole which comprises circulating steam containing a water wetting agent through said borehole in contact with the crude and back to the surface of the earth whereby the petroleum is entrained and lifted with the steam and steam condensate, wherein the downfiowing stream is thermally isolated from the upfiowing stream, and each of said streams is thermally isolated from the wellbore wall.
  • a well completion for steam lifting comprising first and second tubing strings, a plurality of spacing members engaging said strings to minimize heat transfer, and a plurality of valves vertically spaced along said second tubing string for providing fluid communication between the annulus and the inside of said second tubing string, wherein said spacing members are equipped with check valves permitting downflow to the substantial exclusion of upward flow.
  • the method which comprises drilling a first wellbore substantially directly below the surface location, drilling a plurality of additional wellbores surrounding said first wellbore, said additional wellbores being deviated to a point of completion within the oil-bearing reservoir at a distance from said first Well substantially greater than the surface distance between wells, completing each well with two laterally spaced apart tubing strings, injecting steam into each well through one of said tubing strings, whereby the steam is commingled with fluids produced from the reservoir, flowing the commingled fluids to the surface through the other of said tubing strings, and periodically stimulating each well in succession by injecting steam into the well through the production string, thereby forcing steam to penetrate the reservoir a substantial distance from the wellbore, then resuming production from each said well at a stimulated rate.
  • a combined gas lift-steam lift method for producing petroleum from a subterranean reservoir which comprises injecting gas into a wellbore in a first path to initiate the flow of petroleum through a second path and injecting steam through a third path in the wellbore and introducing the injected steam into the second path to increase the .flow of petroleum within the second path.
  • first path is the annulus of the wellbore
  • second path is a tubing string
  • third path is a tubing string of substantially smaller diameter than the second path.
  • a well completion for gas and steam lifting petroleum from a wellbore which comprises a tubing string for the production of petroleum; at least one gas lift valve disposed on the first tubing string and providing an entry for gas into the tubing string from the annulus between 7 8 the wellbore and the first tubing string; a second tubing 1,439,560 12/1922 Lee 166-40 string in fluid communication with the first tubing string 1,565,574 12/1925 Larsen 166-40 for the introduction of steam; and at least one perforated 2,828,821 4/ 1958 Waterman 166-57 spacing member engaging the first and second tubing 3,177,940 4/1965 Ten Brink 166-45 X string to minimize heat transfer and to permit the flow 5 3,302,713 2/1967 Ahearn et al 166-9 of gas within the annulus.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Description

arch 19, 1968 T. c. BOBERG ET AL 3,373,805
STEAM LIFTING OF HEAVY CRUDES 2 Sheets-Sheet 1 Filed Oct. 14, 1965 RECOVERY FIG. 2 TROE CLYDE ALLEN, JR. 8
RECOVERY HOMAS c. BOBERG INVENTORS BY g ,2A M
ATTORNEY Marh1901968 ERG ETAL 3,373,805
STEAM LIFTING OF HEAVY CRUDES 2 Shee ts-Sheet 2 Filed Oct. 14, 1965 \QJRMATION G W B U BOTTOM HOLE PRESSURE-PSIA /-GAS LIFT IIHI -STEAM LIFT Fm I Ikmmo OIL VISCOSITY-CF ROE CLYDE ALLEN, JR. 8: THOMAS C. BOBERG V RS ATTORNEY United States Patent C) ABSTRACT OF THE DISCLOSURE A combined gas lift-steam lift assembly and method for producing petroleum wherein the flow of petroleum is initiated by lifting the petroleum with natural gas and steam is injected into the production tubing to continue and increase the flow of petroleum.
This invention relates to the production of viscous petroleum crudes. A method and apparatus are provided for lifting viscous oil from the bottom of a wellbore to the surface of the earth. More particularly, the invention relates to improvements in the use of steam as a lifting medium for the production of viscous crudes.
A major problem in the production of viscous crude is the loss of etficiency which results from an unusually pronounced pressure gradient which develops in the production tubing due to the flow resistance caused by viscous friction. The high pressure drop in the production tubing leads to a reduced formation pressure drawdown and consequent low rates of oil production from the reservoir.
It has been recognized for many years that the application of heat is a possible solution to the problem, since the viscosity of most heavy crudes is sharply reduced by only moderate heating. Although moderate heating is sufficient, the practical success of any heating scheme is heavily dependent upon the need to provide an effective vertical distribution of the heat throughout the entire length of the wellbore.
It has been proposed to substitute steam in a conventional gas-lift operation. It can readily be shown, however, that the mere substitution of steam for gas in a conventional operation is ineffective due to permature steam condensation, The condensation problem would be acute not merely during the initial stages, but would soon cause a failure of the process even if the wellbore were initially heated to the temperature of steam in equilibrium with condensate.
Accordingly, it is an object of the present invention to utilize steam effectively in the lifting of viscous crudes. It is a further object of the invention to provide a procedure for utilizing steam in the lifting of viscous crudes to accomplish moderate heating of the full length of the wellbore. Friction losses due to viscous flow up the production tubing string are substanially reduced, thereby permitting increased formation drawdown pressures and increased rates of oil recovery.
It is a further object of the invention to provide a novel wellbore completion assembly which is particularly suited to the use of steam-lifting procedures. Still further, it is an object of the invention to provide a novel procedure for initiating steam lift.
The invention is based in part upon a discovery that the downflowing steam must be thermally isolated from the wellbore walls, and from the upflowing mixture of steam condensate and formation fluids. Accordingly, two tubing strings are required; one for the downflowing steam and the other to contain the upflowing mixture. A dead gas space is maintained between the tubing strings from each other and from the surrounding earth, to prevent excessive condensation of the injected steam. It is essential in most wells to provide tubing strings having substantially different diameters. The steam is injected through the smaller diameter string and the produced fluids are lifted through the larger diameter string.
, A mixture of steam and non-condensable gas is a particularly useful lifting medium in some circumstancesfor example, where the produced fluids contain a low proportion of formation gas.
Since the method of the invention subjects the wellbore equipment to high temperatures, a warming-up period is frequently necessary to avoid extreme thermal stresses in the well casing and cement. In accordance with one embodiment, the process is initiated by first circulating hot water down the injection tubing and up the production tubing. Once the well has been warmed substantially say, 50 to 60 F., gas is injected down the annulus and into the production string through gas lift valves in the conventional manner for initiating production from gas lift wells. The circulation of hot water through the tubing strings is continued, in combination with gas lift by gas injection down the annulus. Heat input to the steam generator is gradually increased until the hot water circulation is replaced by steam circulation. Gas injection is then gradually discontinued and the well is thereby converted to steam lift,
In accordance with a further embodiment of the invention, steam lift is combined with steam stimulation. Steam injection rates normally required for stimulation greatly exceed the injection rates required for steam lifting. Accordingly, for'the purpose of stimulation, steam is injected through the larger of the two tubing strings. However, both tubing strings of the well completion assembly may also be utilized for the injection of steam. A typical stimulation program requires the injection of steam at 10,000- 50,000 lbs. per hour for 1-8 weeks, followed by a production cycle lasting from 3 to 20 times as long as the injection period, depending upon reservoir conditions and the flow rates of the produced fluids. Converting back to steam lift, after having stimulated the well by injecting steam through both tubing strings, requires no intermediate steps; the production string is simply disconnected from the steam boiler output and again diverted to separation facilities for the normal processing of produced fluids.
Actually, a thermally stimulated well sometimes needs little or no artificial lif.ing for an initial period of several days or weeks, due to the oil viscosity reduction and increased productivity resulting from steam injection. A continued flow of steam through the injection tubing at a minimum rate may be desirable, however, from the standpoint of keeping the injection tubing hot in order to facilitate a transition back to steam lift. A more detailed explanation of steam stimulation procedures is found in a copending application of Thomas C. Boberg, U.S. Ser. No. 178,399, filed Mar. 8, 1962, and now abandoned.
FIGURE 1 represents a vertical cross-section of the earth, showing a suitable well completion assembly for use in accordance with the invention.
FIGURE 2 also represents a vertical cross-section of the earth, showing an alternate well completion assembly for use in accordance with the invention.
FIGURE 3 is a horizontal cross-section along line 33 of FIGURE 2, which illustrates a suitable tubing-casing geometry for use in accordance with the invention.
FIGURE 4 illustrates a determination of the oil production rate which can be achieved in accordance with one embodiment of the invention, as applied to a specific reservoir,
FIGURE 5 is a graphic comparison of the oil viscosity as a function of depth for a conventional gas lift well with that for a well using the method of this invention, as applied to a specific reservoir.
FIGURE 6 is a horizontal cross-section of a preferred tubing-casing geometry for use in accordance with the invention.
Referring to FIGURE 1, the illustrated completion assembly includes injection tubing string 11 equipped with a thermal expansion joint 12; and production tubing 13, equipped with a thermal expansion joint 14. At various depths within the borehole, spacing members 15 which bridge the annulus are mounted on the tubing strings in order to reduce convection within the annulus and hence minimize heat transfer from one tubing string to the other, and between the tubing strings and the casing. The spacing members are provided with one or more openings or ports 17 to permit the passage of injected gas during the start-up procedure. Ports 17 are preferably provided with check valves or equivalent means to reduce convection currents after the injection of gas has ceased. One such check valve is shown schematically at 17. Production tubing 13 is equipped with a series of valves 18, ejectors or the like, similarly as are used in conventional gas lift equipment. A thermal packer 19 is provided near the lower end of the tubing strings in order to contain formation fluids and injected steam therebelow. A flexible, heat-resistant hose 20 connects tubing 11 and 13 to allow for unequal thermal expansion of the two tubing strings. A check valve 21 is located in a lower portion of tubing 13 to prevent the injection of fluids into the formation during start-up. In accordance with a further embodiment, check valve 21 is equipped with means for permitting reverse flow, whenever desired, for example, in the use of both tubing strings for steam stimulation of the reservoir.
In operation, steam is injected through tubing 11 and into production tubing 13 at an upwardly directed angle. This geometry minimizes the erosive effect that entrained steam condensate droplets have as they impinge on the tubing wall opposite the point of entry.
FIGURE 2 shows an alternate well completion assembly for use in practicing the invention, which includes injection tubing 31 equipped with a thermal expansion joint 32; and production tubing 33 equipped with a thermal expansion joint 34. A heat-resistant packer 35 is installed, for thermal efficiency, to confine the produced fluids and injected steam to the lower portion of the borehole. Centralizer baffles 36 are installed at various intervals of depth to thermally isolate the tubing strings from each other and from casing 37, and to minimize convective currents in the dead gas space. Openings 38 in the central-izer baflles are provided for the passage of injected gas during start-up. Similarly as in the embodiment of FIGURE 1, a plurality of pressure-actuated valves 39 are spaced along production tubing 33 to permit an initial start-up procedure as previously described.
A low-cost alternative to the completions in FIGURES 1 and 2 would be a completion which consists of two tubing strings hanging free in the casing, omitting the packer, gas lift valves, expansion joints, and centralizer beffles. Gas would be injected at a low rate into the annulus to keep liquid out of the annulus and maintain insulation. This completion would not be as thermally efficient as the two described above and would necessitate having boiler pressure in excess of static downhole formation pressure for start-up.
FIGURE 3 illustrates the relative diameters of the casing and the two tubing strings of the embodiment of FIGURE 2. The purpose of unequal tubing diameters is twofold: (1) The smaller tubing is the injection tubing, thereby reducing the radiating area which reduces heat losses; and (2) the smaller injection tubing allows a larger production tubing, thereby increasing the production capabilities of the well. The diameter of the production tubing is preferably at least 20% greater than the injection tubing diameter and may be greater or more.
The data plotted in FIGURE 4 represents an example of the invention involving the production of oil having a gravity of 10 API at 60 F., from a depth of 3700 ft. The dead oil has a viscosity of 16,000 cp. at 100 F. and cp. at 210 F. The productivity index (bbls./day/ p.s.i.) of the well is 1.2 and the reservoir pressure is 1600 p.s.i.a. The formation is producing water-free oil containing 68 s.c.f. of gas per barrel.
The formation curve represents the oil production rate of the formation plotted as a function of bottom hole pressure. The tubing curve is a plot of the rates at which oil can be lifted through a four-inch tubing, in accordance with the invention, by the injection of 300 bbls./ day of steam (expressed as liquid at 60 F.) through a two-inch tubing, as a function of bottom hole pressure. The intersection of the two curves corresponds to a bottom hole pressure of 680 p.s.i.a. and an oil production rate of 1120 bbls./ day. This production rate is achieved with a wellhead pressure of 200 p.s.i.a. This represents a 55% increase over the production rate which can be obtained under similar circumstances with conventional gas lift, injecting at one million s.c.f./day.
Steam lifting in accordance with the invention is not always superior to gas lifting, nor is it always superior to the use of a conventional pump. Steam lifting is particularly suited, however, for the production of oil having an API gravity below 15 from a well having a static bottom hole pressure in excess of about 8.00 p.s.i.a and a productivity index of about 3 \bbls/day/psi. These parameters have been empirically correlated to provide a generalized guide for determining whether the method of the invention is well-suited for use in specific situations, as follows:
J(P500)250 (API) where J :productivity index, bbls./ day/p.s.i. P=static formation pressure, p.s.i.a. API=gravity of crude, API degrees This correlation holds best for wells in the 2000-5000 ft. depth range. A similar correlation can readily be determined for other wells. It is to be understood that this relationship does not account for all circumstances which may affect the efficiency of the process, but it is nevertheless a very useful approximation.
In the above example illustrated by FIGURE 4, the productivity index of the well can be greatly increased by the use of steam stimulation, preferably in combination with steam lift. For example, the injection of steam into the reservoir at a rate of 50,000 lbs/hr. for 25 days results in a 1000 bbl./ day peak increase in the rate of oil production.
FIGURE 5 is a comparison of the viscosity profiles obtained during steam lifting and during a normal gas lift operation, as applied to the same reservoir and the same well completion assembly as described in connection with FIGURE 4. As shown, steam lifting achieves about a thousandfold reduction in crude viscosity over that obtained with gas lift. This reduction in viscosity is the principal advantage which the present invention has over gas lift or pumping.
In FIGURE 6, the tubing-casing geometry of a preferred well-completion assembly is shown. Steam is injected through tubing 41, and fluids are produced through tubing 42. In this embodiment, neither tubing string is centralized within the casing. In this configuration, it is possible to maximize the combined cross-sections of the tubing strings, within the limits of casing 43, while at the same time maintaining a sufficient dead gas space between the tubing strings, and also between the casing and each tubing string.
In general, the steam injection tubing should be sized as small as possible, consistent with the requirement that the necessary steam injection rate be maintained with a reasonable pressure drop from the wellhead to bottomhole. Having thus selected the injection tubing size, the space remaining within the casing diameter must be sufficiently large to permit the use of a production tubing string substantially larger than the injection tubing.
A wide range of steam quality is suitable for use in accordance with the present invention, although it is to be expected that each well and each reservoir may require a different steam quality for optimum results. It is within the scope of the invention to employ superheated steam, dry saturated steam, or wet saturated steam having a quality in the range of about SO-100%.
In accordance with a further embodiment of the invention, a water-wetting agent is included with the injected steam. The wetting agent further reduces friction losses in the production tubing since these losses occur mainly near the tubing wall and are therefore more dependent upon the water properties than upon the oil properties. Suitable water-wetting agents include anionic and nonionic surfactants. Specific examples are the ethoxylated dioctyl ester of succinic acid, sodium dioctyl sulfosuccinate, and isopropyl naphthalene sodium sulfonate. They should be injected in amounts ranging from 0.001 pound to 0.01 pound per pound of injected steam.
In accordance with a further embodiment of the invention, steam may be replaced as the lifting medium by a mixture of steam with a hydrocarbon vapor, including propane, butane, naphtha, kerosene, or other lightpetroleum fractions. When using such mixtures it is essential, as with steam alone, to minimize heat transfer between the downflowing and upfiowing streams, and to minimize heat transfer between each tubing string and the wellbore wall. Similarly, the steam may be replaced altogether by a hydrocarbon vaporfor example, one or more of the above-named hydrocarbons.
A particularly preferred scheme for utilizing the method of the invention to produce offshore wells involves the drilling of several wells from a single, centrally located platform. For example, the drilling of a seven-spot pattern may include a single straight hole bottomed substantially directly below the platform, surrounded by six deviated wells. In addition to the wellhead equipment, the platform carries steam generators, Water-treating equipment, gas compressors, heat exchangers, separators, storage tanks, and manifolds, plus the necessary instrumenta tion. The steam generators are operated continuously at full load, while the steam is distributed to each well for stimulation and for steam lift purposes. In the case of a seven-spot pattern, for example, only one well at a time may require stimulation, while the remaining six wells are receiving steam for lift purposes. The water-treating equipment preferably comprises an ion-exchanger, regenerated using softened downflow from the steam generators. Fuel requirements are supplied solely from the gas produced with the oil, thus eliminating the necessity of supplying gas from extraneous sources.
What is claimed is:
1. A method for initiating the steam lifting of a viscous crude to the surface of the earth from a substantial depth within a wellbore which comprises circulating hot Water within said borehole to the depth of said crude, in contact with said crude, and then back to the surface of the earth through a separately confined path, thereafter injecting gas down said borehole in a third path, commingling said gas with the upfiowing stream of hot water at successively greater depths within said borehole, then gradually increasing the temperature of said hot water until the hot water is replaced by steam, and then gradually discontinuing the injection of gas, whereby steam lifting is accomplished.
2. A method as defined by claim 1 wherein said downflowing steam is confined to a path of substantially smaller diameter than said upfiowing path.
3. A method for producing viscous crude from a porous subterranean reservoir which comprises drilling a well into the reservoir from the surface of the earth, completing the well with two laterally spaced-apart tubing strings, injecting steam into the well through one of said tubing strings, whereby the steam is commingled with fluids produced from the reservoir, flowing the commingled fluids to the surface through the other of said tubing strings, and periodically stimulating the well by injecting steam into the well through both of said tubing strings, thereby forcing the steam to penetrate the reservoir a substantial distance from the wellbore, then resuming production from the Well at a stimulated rate.
4. A method for lifting viscous crude to the surface of the earth from a substantial depth within a borehole which comprises circulating steam containing a water wetting agent through said borehole in contact with the crude and back to the surface of the earth whereby the petroleum is entrained and lifted with the steam and steam condensate, wherein the downfiowing stream is thermally isolated from the upfiowing stream, and each of said streams is thermally isolated from the wellbore wall.
5. A method as defined by claim 4 wherein said downflowing stream is confined to a substantially smaller diameter than said upfiowing stream.
6. A well completion for steam lifting comprising first and second tubing strings, a plurality of spacing members engaging said strings to minimize heat transfer, and a plurality of valves vertically spaced along said second tubing string for providing fluid communication between the annulus and the inside of said second tubing string, wherein said spacing members are equipped with check valves permitting downflow to the substantial exclusion of upward flow.
7. In the production of oil from offshore locations, the method which comprises drilling a first wellbore substantially directly below the surface location, drilling a plurality of additional wellbores surrounding said first wellbore, said additional wellbores being deviated to a point of completion within the oil-bearing reservoir at a distance from said first Well substantially greater than the surface distance between wells, completing each well with two laterally spaced apart tubing strings, injecting steam into each well through one of said tubing strings, whereby the steam is commingled with fluids produced from the reservoir, flowing the commingled fluids to the surface through the other of said tubing strings, and periodically stimulating each well in succession by injecting steam into the well through the production string, thereby forcing steam to penetrate the reservoir a substantial distance from the wellbore, then resuming production from each said well at a stimulated rate.
8. A combined gas lift-steam lift method for producing petroleum from a subterranean reservoir which comprises injecting gas into a wellbore in a first path to initiate the flow of petroleum through a second path and injecting steam through a third path in the wellbore and introducing the injected steam into the second path to increase the .flow of petroleum within the second path.
9. The method as defined by claim 8 wherein the first path is the annulus of the wellbore, the second path is a tubing string and the third path is a tubing string of substantially smaller diameter than the second path.
10. A well completion for gas and steam lifting petroleum from a wellbore which comprises a tubing string for the production of petroleum; at least one gas lift valve disposed on the first tubing string and providing an entry for gas into the tubing string from the annulus between 7 8 the wellbore and the first tubing string; a second tubing 1,439,560 12/1922 Lee 166-40 string in fluid communication with the first tubing string 1,565,574 12/1925 Larsen 166-40 for the introduction of steam; and at least one perforated 2,828,821 4/ 1958 Waterman 166-57 spacing member engaging the first and second tubing 3,177,940 4/1965 Ten Brink 166-45 X string to minimize heat transfer and to permit the flow 5 3,302,713 2/1967 Ahearn et al 166-9 of gas within the annulus. 3,312,281 4/ 1967 Belknap 166-40 11. The well completion as defined in claim 10 further including at least one check valve in the spacing member OTHER REFERENCES to permit the downward flow of gas through the member Miller, E C G qifi Method of Flowing OH wells, and to substantlauy P upward 10 US. Department of Commerce, Bureau of Mines, Bulletin 32 3O References Cited 19 (pp and 31) UNITED STATES PATENTS STEPHEN J. NOVOSAD, Primary Examiner.
971,612 10/1910 Holliday 166-45
US495809A 1965-10-14 1965-10-14 Steam lifting of heavy crudes Expired - Lifetime US3373805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US495809A US3373805A (en) 1965-10-14 1965-10-14 Steam lifting of heavy crudes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US495809A US3373805A (en) 1965-10-14 1965-10-14 Steam lifting of heavy crudes

Publications (1)

Publication Number Publication Date
US3373805A true US3373805A (en) 1968-03-19

Family

ID=23970066

Family Applications (1)

Application Number Title Priority Date Filing Date
US495809A Expired - Lifetime US3373805A (en) 1965-10-14 1965-10-14 Steam lifting of heavy crudes

Country Status (1)

Country Link
US (1) US3373805A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3455384A (en) * 1966-07-14 1969-07-15 Phillips Petroleum Co Method of controlling steam injection into a reservoir in the production of hydrocarbons
US3463231A (en) * 1968-02-12 1969-08-26 Chevron Res Generation and use of foamed well circulation fluids
US3520367A (en) * 1968-10-28 1970-07-14 Phillips Petroleum Co Method of producing oil using steam condensate trapped in storage zone
US3674092A (en) * 1970-07-23 1972-07-04 Cities Service Oil Co Process for reducing heat loss during in situ thermal recovery
US3952802A (en) * 1974-12-11 1976-04-27 In Situ Technology, Inc. Method and apparatus for in situ gasification of coal and the commercial products derived therefrom
FR2545533A2 (en) * 1983-05-06 1984-11-09 Chaudot Gerard INSTALLATION FOR THE PRODUCTION OF HYDROCARBON DEPOSITS WITH REINJECTION OF EFFLUENTS IN THE STORAGE OR IN THE WELL OR WELLS AND METHOD FOR THE IMPLEMENTATION OF SAID INSTALLATION
US4523644A (en) * 1978-08-14 1985-06-18 Dismukes Newton B Thermal oil recovery method
US5085275A (en) * 1990-04-23 1992-02-04 S-Cal Research Corporation Process for conserving steam quality in deep steam injection wells
US20080120076A1 (en) * 2005-09-15 2008-05-22 Schlumberger Technology Corporation Gas reservoir evaluation and assessment tool method and apparatus and program storage device
US20090084545A1 (en) * 2007-08-01 2009-04-02 Schlumberger Technology Corporation Method for managing production from a hydrocarbon producing reservoir in real-time
US20120234556A1 (en) * 2009-12-03 2012-09-20 Hallundbaek Joergen Downhole artificial lifting system
US20130112408A1 (en) * 2011-11-08 2013-05-09 John A Oxtoby Ported packer
US20140124203A1 (en) * 2012-11-02 2014-05-08 Trimeteor Oil and Gas Corporation Method and apparatus for the downhole injection of superheated steam
EP2739813A4 (en) * 2011-08-05 2015-10-21 Petrohawk Properties Lp System and method for quantifying stimulated rock quality in a wellbore
US20160076345A1 (en) * 2014-09-16 2016-03-17 Husky Oil Operations Limited Produced water steam generation process using produced water boiler with gas turbine
US20170145800A1 (en) * 2014-06-24 2017-05-25 Maersk Olie Og Gas A/S Enhanced recovery method and apparatus

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US971612A (en) * 1910-05-14 1910-10-04 William C Holliday Apparatus for forcing fluids from wells.
US1439560A (en) * 1921-06-18 1922-12-19 Robert E Lee Method for cleaning and treating oil and gas wells
US1565574A (en) * 1924-06-27 1925-12-15 Larsen Charles Well-cleaning process
US2828821A (en) * 1954-02-03 1958-04-01 Russell R Waterman Oil well apparatus
US3177940A (en) * 1962-03-27 1965-04-13 Texaco Inc Method for obtaining fresh water from brine
US3302713A (en) * 1965-07-06 1967-02-07 Exxon Production Research Co Surfactant-waterflooding process
US3312281A (en) * 1964-06-04 1967-04-04 Phillips Petroleum Co Oil production with steam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US971612A (en) * 1910-05-14 1910-10-04 William C Holliday Apparatus for forcing fluids from wells.
US1439560A (en) * 1921-06-18 1922-12-19 Robert E Lee Method for cleaning and treating oil and gas wells
US1565574A (en) * 1924-06-27 1925-12-15 Larsen Charles Well-cleaning process
US2828821A (en) * 1954-02-03 1958-04-01 Russell R Waterman Oil well apparatus
US3177940A (en) * 1962-03-27 1965-04-13 Texaco Inc Method for obtaining fresh water from brine
US3312281A (en) * 1964-06-04 1967-04-04 Phillips Petroleum Co Oil production with steam
US3302713A (en) * 1965-07-06 1967-02-07 Exxon Production Research Co Surfactant-waterflooding process

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3455384A (en) * 1966-07-14 1969-07-15 Phillips Petroleum Co Method of controlling steam injection into a reservoir in the production of hydrocarbons
US3463231A (en) * 1968-02-12 1969-08-26 Chevron Res Generation and use of foamed well circulation fluids
US3520367A (en) * 1968-10-28 1970-07-14 Phillips Petroleum Co Method of producing oil using steam condensate trapped in storage zone
US3674092A (en) * 1970-07-23 1972-07-04 Cities Service Oil Co Process for reducing heat loss during in situ thermal recovery
US3952802A (en) * 1974-12-11 1976-04-27 In Situ Technology, Inc. Method and apparatus for in situ gasification of coal and the commercial products derived therefrom
US4523644A (en) * 1978-08-14 1985-06-18 Dismukes Newton B Thermal oil recovery method
FR2545533A2 (en) * 1983-05-06 1984-11-09 Chaudot Gerard INSTALLATION FOR THE PRODUCTION OF HYDROCARBON DEPOSITS WITH REINJECTION OF EFFLUENTS IN THE STORAGE OR IN THE WELL OR WELLS AND METHOD FOR THE IMPLEMENTATION OF SAID INSTALLATION
EP0172971A1 (en) * 1983-05-06 1986-03-05 Gérard Chaudot Production of hydrocarbon formations with reinjection of effluents into the formation
US5085275A (en) * 1990-04-23 1992-02-04 S-Cal Research Corporation Process for conserving steam quality in deep steam injection wells
US8145463B2 (en) 2005-09-15 2012-03-27 Schlumberger Technology Corporation Gas reservoir evaluation and assessment tool method and apparatus and program storage device
US20080120076A1 (en) * 2005-09-15 2008-05-22 Schlumberger Technology Corporation Gas reservoir evaluation and assessment tool method and apparatus and program storage device
US8244509B2 (en) * 2007-08-01 2012-08-14 Schlumberger Technology Corporation Method for managing production from a hydrocarbon producing reservoir in real-time
US20090084545A1 (en) * 2007-08-01 2009-04-02 Schlumberger Technology Corporation Method for managing production from a hydrocarbon producing reservoir in real-time
US20120234556A1 (en) * 2009-12-03 2012-09-20 Hallundbaek Joergen Downhole artificial lifting system
US9267363B2 (en) * 2009-12-03 2016-02-23 Welltec A/S Downhole artificial lifting system
EP2739813A4 (en) * 2011-08-05 2015-10-21 Petrohawk Properties Lp System and method for quantifying stimulated rock quality in a wellbore
US9574433B2 (en) 2011-08-05 2017-02-21 Petrohawk Properties, Lp System and method for quantifying stimulated rock quality in a wellbore
AU2012294775B2 (en) * 2011-08-05 2017-08-31 Petrohawk Properties, Lp System and method for quantifying stimulated rock quality in a wellbore
US10534109B2 (en) 2011-08-05 2020-01-14 Petrohawk Properties, Lp System and method for quantifying stimulated rock quality in a wellbore
US20130112408A1 (en) * 2011-11-08 2013-05-09 John A Oxtoby Ported packer
US20140124203A1 (en) * 2012-11-02 2014-05-08 Trimeteor Oil and Gas Corporation Method and apparatus for the downhole injection of superheated steam
US9353611B2 (en) * 2012-11-02 2016-05-31 Trimeteor Oil & Gas Corp. Method and apparatus for the downhole injection of superheated steam
US20170145800A1 (en) * 2014-06-24 2017-05-25 Maersk Olie Og Gas A/S Enhanced recovery method and apparatus
US20160076345A1 (en) * 2014-09-16 2016-03-17 Husky Oil Operations Limited Produced water steam generation process using produced water boiler with gas turbine

Similar Documents

Publication Publication Date Title
US3373805A (en) Steam lifting of heavy crudes
US4390067A (en) Method of treating reservoirs containing very viscous crude oil or bitumen
US4116275A (en) Recovery of hydrocarbons by in situ thermal extraction
US4640352A (en) In-situ steam drive oil recovery process
US4127170A (en) Viscous oil recovery method
US5273111A (en) Laterally and vertically staggered horizontal well hydrocarbon recovery method
US3554285A (en) Production and upgrading of heavy viscous oils
US3515213A (en) Shale oil recovery process using heated oil-miscible fluids
US3653438A (en) Method for recovery of petroleum deposits
US4896725A (en) In-well heat exchange method for improved recovery of subterranean fluids with poor flowability
US4078608A (en) Thermal oil recovery method
US5289881A (en) Horizontal well completion
US5085275A (en) Process for conserving steam quality in deep steam injection wells
US4265310A (en) Fracture preheat oil recovery process
US3948323A (en) Thermal injection process for recovery of heavy viscous petroleum
US4466485A (en) Viscous oil recovery method
US5607018A (en) Viscid oil well completion
US4262745A (en) Steam stimulation process for recovering heavy oil
US3412794A (en) Production of oil by steam flood
US3441083A (en) Method of recovering hydrocarbon fluids from a subterranean formation
US5215149A (en) Single horizontal well conduction assisted steam drive process for removing viscous hydrocarbonaceous fluids
US4612989A (en) Combined replacement drive process for oil recovery
EA010677B1 (en) Hydrocarbon recovery from impermeable oil shales
US3272261A (en) Process for recovery of oil
US3796262A (en) Method for recovering oil from subterranean reservoirs