US2843913A - Method of forming a liquid conveying duct - Google Patents
Method of forming a liquid conveying duct Download PDFInfo
- Publication number
- US2843913A US2843913A US595667A US59566756A US2843913A US 2843913 A US2843913 A US 2843913A US 595667 A US595667 A US 595667A US 59566756 A US59566756 A US 59566756A US 2843913 A US2843913 A US 2843913A
- Authority
- US
- United States
- Prior art keywords
- channel
- duct
- concrete
- dirt
- forming
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/038—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being made in situ
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F9/00—Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
Definitions
- This invention relates to a method for making embedded concrete ducts for conveying water or other liquid.
- An object of this invention is to provide an improved method for making concrete ducts whereby the duct may in the formative stage thereof, use the ditch or channel in the earth as an outer form, with an inner form of sheet metal material suspended between the vertical walls of the ditch or channel.
- Another object of this invention is to provide an improved method for making a concrete duct wherein the initially formed open channel is filled with dirt, and the top or cover is then poured.
- the dirt is removed by the placer method, that is, water is forced under pressure into the duct from one end and the water loosens the dirt which flows as mud from the open end of the duct.
- a further object of this invention is to provide a concrete duct with compressible joints between the duct sec tions, the joint elements having anchor rods adapted to be embedded in the abutting ends of the duct sections.
- Figure 1 is a vertical section of a form constructed according to an embodiment of this invention to produce an embedded concrete duct.
- Fig. 2 is a fragmentary vertical section through the form structure.
- Fig. 3 is a fragmentary sectional View taken on line 3-3 of Fig. 1.
- Fig. 4 is a fragmentary vertical section taken on line 4-4 of Fig. 1.
- Fig. 5 is a fragmentary sectional view taken on line 5-5 of Fig. 4.
- Fig. 6 is a vertical section taken substantially on line 6--6 of Fig. 2.
- Fig. 7 is a vertical section taken through the channel chute duct after the initial pouring of the concrete has set with the channel chute member filled with dirt.
- Fig. 8 is a vertical section through the completed duct with the bore or channel filled with dirt.
- Fig. 9 is a perspective view of one of the gaskets between adjacent duct sections.
- Fig. 10 is a fragmentary longitudinal section showing the manner in which the dirt is removed from the completed duct by the placer method.
- the numeral designates generally a channel which is formed in the ground.
- the channel 15 is formed with a horizontal fiat bottom wall 16 and vertical side Walls 17.
- the channel 15 is formed of a depth substantially greater than the depth of the concrete duct which is to be formed in the channel so that when the duct has been completed this duct may be "ice covered with dirt.
- the channel 15 forms the outer concrete form and an inner U-shaped form 18 is adapted to be suspended in the channel 15.
- the U-shaped form member 18 is provided at its upper edges with rolled edges 19 and the form member 18 is suspended within. the channel 15 by means of a plurality of suspension rods 20.
- the suspension rods 20 have a ball member 21 at the lower ends which engage in a ball socket 22 fixed by fastening means 23 to the inner concave side of the form member 18.
- the socket member 21 is formed with a slot or opening 24 so that the ball member 21 may be inserted Within the socket member 22 from one side thereof.
- the suspension rod 20 is threaded as indicated at 25 from a point extending downwardly from the upper end thereof and a pair of nuts 26 and 27 having handles 28 and 29, respectively, are threaded on the threads 25 of rod 20.
- the rod 20 loosely engages through an apertured ear 38 which projects from a sleeve 31 which is secured in adjusted position on an outer tubular member 32 by means of a set screw 33.v
- the tubular member 32 forms one part of a pair of longitudinally extensible supporting members with an internal member 34 threaded into the external member 32.
- the external or tubular member 32 is provided with nuts faces 35 and the internal member 34 is provided with nut faces 36.
- the outer end of the tubular member 32 is provided with a ground piercing point 37 and the outer end of the inner member 34 is provided with a ground piercing point 38.
- One end of each form member 18 is provided with a U-shaped coupling member 39 within which the adjacent end of an adjacent form member 18 is adapted to slidably engage.
- a flexible gasket assembly generally indicated at 40, comprising a compressible expansion joint between sections of the duct, and adapted to be positioned in the ditch prior to the pouring of the concrete.
- the gasket assembly 40 includes a resilient gasket member 41 having a U-shaped opening 42 of a size similar to the size of the form member 18.
- the gasket 41 has disposed on opposite faces thereof weights 43 and 44 and the weights 43 and 44 have projecting horizontally and right-angularly therefrom anchoring rods 45 and 46, respectively. These anchoring rods 45 and 46 are adapted to project into the channel 15 so as to become embedded in the concrete, which is poured on the outer side of the form member 18.
- the form member 18 has chains 47 extending thereacross, which are secured to the upper edges 19 of the form member 18, and the chains 47 include an eye or guide 48 through which the rod 24) loosely engages. These chains 47 provide a means whereby the form member 18 will be held with the straight sides thereof vertical after the manner shown in Fig. 1.
- the concrete is poured into the channel 15, as shown in Fig. 7, to the level of the upper edge of the form member 18.
- This concrete forms a Ushaped or channel-shaped duct 49, and at the points where the gasket assemblies 40 are positioned, the upper horizontal portion 50 of each gasket assembly 40 will project above the upper edges of the channel members 49.
- the height of the projection 50 is such that when the top wall or cover is poured the outer edge of the gasket assembly 40 will be flush with the upper surface of the cover :or top wall.
- the channel in the channel member 49 after the concrete has become set and form 18 removed, is then filled with dirt, as indicated at 51. The dirt is leveled off at the outer edges of the channel mernber 49.
- a layer of concrete indicated at 52 is poured on top of the channel member 49 and on top of the dirt 51.
- the concrete duct is at this time completed, but is filled with the dirt 51.
- This dirt is then removed by the method as shown in Fig. 10. This method is'similar to the method used in placer mining where a water nozzle 53 is projected into the duct and the water under pressure is directed against the dirt 51 so as to turn this dirt into fluid mud. The mud will then flow out of the duct into a suitable sump which may be provided at one end of the duct.
- this form 18 may be loosened and partially lifted by turning nut 26 which is the upper nut, so as to pull rod 20 upwardly. In this manner the inner form 18 can be easily loosened and at least partially removed from the set concrete Without injury to the form.
- the method of forming a concrete duct which includes forming a channel in the ground with a horizontal bottom and vertical sides, suspending a plurality of channel shaped inner forms in the channel, positioning yieldahle gaskets between said forms, each gasket having a central opening therein dimensioned to conform to the di1nensions of said forms pouring concrete in the channel to the level of the upper edge of the inner form, removing the inner form when the concrete has set, filling the channel shaped duct with dirt to the level of the upper edge thereof, forming a fiat top Wall on the upper edge of the channel-shaped duct with the top wall hearing against the dirt in the duct, and discharging water under pressure into the duct to transform the dirt to mud, and Washing the mud from the duct.
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
July 22, 1958 c. 1.. BARRON METHOD OF FORMING A LIQUID CONVEYING DUCT Filed July s, 1956 2 Sheets-Sheet l n PM FE m 5 w t/ Cur ATTORNEYS July 22, 1958 c. L. BARRON METHOD OF FORMING A LIQUID CONVEYING DUCT Filed July 5. 1956 2 Sheets-Sheet 2 4 h warlllim'bylllwkls'm .50 m m a B l w 7 r a C ATTORNEYS.
United States Patent METHOD OF FORMING A LIQUID CONVEYING DUCT Curtis L. Barron, Sacramento, Calif.
Application July 3, 1956, Serial No. 595,667
2 Claims. (Cl. 25-155) This invention relates to a method for making embedded concrete ducts for conveying water or other liquid.
An object of this invention is to provide an improved method for making concrete ducts whereby the duct may in the formative stage thereof, use the ditch or channel in the earth as an outer form, with an inner form of sheet metal material suspended between the vertical walls of the ditch or channel.
Another object of this invention is to provide an improved method for making a concrete duct wherein the initially formed open channel is filled with dirt, and the top or cover is then poured. When the concrete forming the top or cover has set the dirt is removed by the placer method, that is, water is forced under pressure into the duct from one end and the water loosens the dirt which flows as mud from the open end of the duct.
A further object of this invention is to provide a concrete duct with compressible joints between the duct sec tions, the joint elements having anchor rods adapted to be embedded in the abutting ends of the duct sections.
With the foregoing and other objects in View which will appear as the description proceeds, the invention consists of certain novel details of construction and combinations of parts, hereinafter more fully described and pointed out in the claims, it being understood that changes may be made in the construction and arrangements of parts without departing from the spirit of the invention as claimed.
Referring to the drawings:
Figure 1 is a vertical section of a form constructed according to an embodiment of this invention to produce an embedded concrete duct.
Fig. 2 is a fragmentary vertical section through the form structure.
Fig. 3 is a fragmentary sectional View taken on line 3-3 of Fig. 1. v
Fig. 4 is a fragmentary vertical section taken on line 4-4 of Fig. 1.
Fig. 5 is a fragmentary sectional view taken on line 5-5 of Fig. 4.
Fig. 6 is a vertical section taken substantially on line 6--6 of Fig. 2.
Fig. 7 is a vertical section taken through the channel chute duct after the initial pouring of the concrete has set with the channel chute member filled with dirt.
Fig. 8 is a vertical section through the completed duct with the bore or channel filled with dirt.
Fig. 9 is a perspective view of one of the gaskets between adjacent duct sections.
Fig. 10 is a fragmentary longitudinal section showing the manner in which the dirt is removed from the completed duct by the placer method.
Referring to the drawings, the numeral designates generally a channel which is formed in the ground. The channel 15 is formed with a horizontal fiat bottom wall 16 and vertical side Walls 17. The channel 15 is formed of a depth substantially greater than the depth of the concrete duct which is to be formed in the channel so that when the duct has been completed this duct may be "ice covered with dirt. The channel 15 forms the outer concrete form and an inner U-shaped form 18 is adapted to be suspended in the channel 15. The U-shaped form member 18 is provided at its upper edges with rolled edges 19 and the form member 18 is suspended within. the channel 15 by means of a plurality of suspension rods 20. The suspension rods 20 have a ball member 21 at the lower ends which engage in a ball socket 22 fixed by fastening means 23 to the inner concave side of the form member 18. The socket member 21 is formed with a slot or opening 24 so that the ball member 21 may be inserted Within the socket member 22 from one side thereof. The suspension rod 20 is threaded as indicated at 25 from a point extending downwardly from the upper end thereof and a pair of nuts 26 and 27 having handles 28 and 29, respectively, are threaded on the threads 25 of rod 20. The rod 20 loosely engages through an apertured ear 38 which projects from a sleeve 31 which is secured in adjusted position on an outer tubular member 32 by means of a set screw 33.v The tubular member 32 forms one part of a pair of longitudinally extensible supporting members with an internal member 34 threaded into the external member 32. The external or tubular member 32 is provided with nuts faces 35 and the internal member 34 is provided with nut faces 36. The outer end of the tubular member 32 is provided with a ground piercing point 37 and the outer end of the inner member 34 is provided with a ground piercing point 38. One end of each form member 18 is provided with a U-shaped coupling member 39 within which the adjacent end of an adjacent form member 18 is adapted to slidably engage. At predetermined points along the length of the channel 15 there is positioned a flexible gasket assembly generally indicated at 40, comprising a compressible expansion joint between sections of the duct, and adapted to be positioned in the ditch prior to the pouring of the concrete. The gasket assembly 40 includes a resilient gasket member 41 having a U-shaped opening 42 of a size similar to the size of the form member 18. The gasket 41 has disposed on opposite faces thereof weights 43 and 44 and the weights 43 and 44 have projecting horizontally and right-angularly therefrom anchoring rods 45 and 46, respectively. These anchoring rods 45 and 46 are adapted to project into the channel 15 so as to become embedded in the concrete, which is poured on the outer side of the form member 18. The form member 18 has chains 47 extending thereacross, which are secured to the upper edges 19 of the form member 18, and the chains 47 include an eye or guide 48 through which the rod 24) loosely engages. These chains 47 provide a means whereby the form member 18 will be held with the straight sides thereof vertical after the manner shown in Fig. 1.
In the first step effecting the supporting of the inner form 18 within the channel 15, the concrete is poured into the channel 15, as shown in Fig. 7, to the level of the upper edge of the form member 18. This concrete forms a Ushaped or channel-shaped duct 49, and at the points where the gasket assemblies 40 are positioned, the upper horizontal portion 50 of each gasket assembly 40 will project above the upper edges of the channel members 49. The height of the projection 50 is such that when the top wall or cover is poured the outer edge of the gasket assembly 40 will be flush with the upper surface of the cover :or top wall. The channel in the channel member 49, after the concrete has become set and form 18 removed, is then filled with dirt, as indicated at 51. The dirt is leveled off at the outer edges of the channel mernber 49. At this time a layer of concrete indicated at 52, is poured on top of the channel member 49 and on top of the dirt 51. The concrete duct is at this time completed, but is filled with the dirt 51. This dirt is then removed by the method as shown in Fig. 10. This method is'similar to the method used in placer mining where a water nozzle 53 is projected into the duct and the water under pressure is directed against the dirt 51 so as to turn this dirt into fluid mud. The mud will then flow out of the duct into a suitable sump which may be provided at one end of the duct.
After the channel member 49 has set with the form 18 still disposed therein, this form 18 may be loosened and partially lifted by turning nut 26 which is the upper nut, so as to pull rod 20 upwardly. In this manner the inner form 18 can be easily loosened and at least partially removed from the set concrete Without injury to the form.
What is claimed is:
1. The method of forming a concrete duct which ineludes forming a channel in the ground with a horizontal bottom and vertical sides, suspending a plurality of channel shaped inner forms in the channel, positioning yieldable gaskets between adjacent forms, each gasket having an opening therein conforming in dimensions to the dimensions of said forms pouring concrete in the channel to the level of the upper edge of the inner form, removing the inner form when the concrete has set, filling the channel shaped duct with dirt to the level of the upper edge thereof, forming a flat top wall on the upper edge of the channel-shaped duct with the top Wall bearing against the dirt in the duct, and removing the dirt by the placer method.
2. The method of forming a concrete duct which includes forming a channel in the ground with a horizontal bottom and vertical sides, suspending a plurality of channel shaped inner forms in the channel, positioning yieldahle gaskets between said forms, each gasket having a central opening therein dimensioned to conform to the di1nensions of said forms pouring concrete in the channel to the level of the upper edge of the inner form, removing the inner form when the concrete has set, filling the channel shaped duct with dirt to the level of the upper edge thereof, forming a fiat top Wall on the upper edge of the channel-shaped duct with the top wall hearing against the dirt in the duct, and discharging water under pressure into the duct to transform the dirt to mud, and Washing the mud from the duct.
References Cited in the file of this patent UNITED STATES PATENTS 1,008,264 Hill Nov. 7, 1911 1,148,246 Marvin July 27, 1915 1,722,038 Daugherty July 23, 1929 1,942,489 Pfefferle Jan. 9, 1934 1,988,900 Heltzel Jan. 22, 1935 2,116,746 \Vells May 10, 1938 2,365,550 Heltzel Dec. 19, 1944 2,575,247 Carter Nov. 13, 195] 2,616,149 Waller Nov. 4, 1952 2,705,360 Leonhardt Apr. 5, 1955
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US595667A US2843913A (en) | 1956-07-03 | 1956-07-03 | Method of forming a liquid conveying duct |
US659309A US2969615A (en) | 1956-07-03 | 1957-05-15 | Expansion gasket for liquid conveyors |
US659310A US2917804A (en) | 1956-07-03 | 1957-05-15 | Apparatus for forming a liquid conveyor duct |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US595667A US2843913A (en) | 1956-07-03 | 1956-07-03 | Method of forming a liquid conveying duct |
Publications (1)
Publication Number | Publication Date |
---|---|
US2843913A true US2843913A (en) | 1958-07-22 |
Family
ID=24384172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US595667A Expired - Lifetime US2843913A (en) | 1956-07-03 | 1956-07-03 | Method of forming a liquid conveying duct |
Country Status (1)
Country | Link |
---|---|
US (1) | US2843913A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3205550A (en) * | 1963-06-18 | 1965-09-14 | Floyd E Martin | Pipe forming machine |
US3313321A (en) * | 1963-05-10 | 1967-04-11 | Rensulate Corp | Insulated underground conduit |
EP0463083A1 (en) * | 1989-03-17 | 1992-01-02 | Casting Co. Construction | Method and apparatus for forming a trench |
EP0463092A1 (en) * | 1989-03-17 | 1992-01-02 | Casting Co. Construction | Apparatus for forming a trench |
US5326190A (en) * | 1992-10-16 | 1994-07-05 | Construction Casting Company | Method and apparatus for stabilizing a trench form during construction |
US5326189A (en) * | 1992-10-16 | 1994-07-05 | Construction Casting Company | Method and apparatus for forming a trench with grates or solid covers |
US5443327A (en) * | 1994-02-15 | 1995-08-22 | Neenah Foundry Company | Method and apparatus for forming a lined trench |
US20080193217A1 (en) * | 2007-02-13 | 2008-08-14 | Akkala Steven M | Trench grate assembly with debris chute |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1008264A (en) * | 1910-09-22 | 1911-11-07 | Peter W Hill | Mold for concrete. |
US1148246A (en) * | 1914-07-02 | 1915-07-27 | Robert S Marvin | Apparatus for constructing hollow reinforced-concrete walls. |
US1722038A (en) * | 1927-03-17 | 1929-07-23 | Monolithic Form Device Company | Form for use in constructing monolithic sewers and the like |
US1942489A (en) * | 1932-08-23 | 1934-01-09 | S R Dresser Mfg Co | Gasket |
US1988900A (en) * | 1931-01-08 | 1935-01-22 | John N Heltzel | Removable expansion joint form |
US2116746A (en) * | 1936-03-20 | 1938-05-10 | Johns Manville | Gasket |
US2365550A (en) * | 1934-01-24 | 1944-12-19 | John N Heltzel | Expansion joint |
US2575247A (en) * | 1946-05-18 | 1951-11-13 | John E Carter | Sealed joint for concrete slab road pavement |
US2616149A (en) * | 1941-01-09 | 1952-11-04 | Bowen Colthurst & Partners Ltd | Method of molding in situ concrete arched structures |
US2705360A (en) * | 1952-04-17 | 1955-04-05 | Leonhardt Fritz | Method of prestressing units with serration |
-
1956
- 1956-07-03 US US595667A patent/US2843913A/en not_active Expired - Lifetime
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1008264A (en) * | 1910-09-22 | 1911-11-07 | Peter W Hill | Mold for concrete. |
US1148246A (en) * | 1914-07-02 | 1915-07-27 | Robert S Marvin | Apparatus for constructing hollow reinforced-concrete walls. |
US1722038A (en) * | 1927-03-17 | 1929-07-23 | Monolithic Form Device Company | Form for use in constructing monolithic sewers and the like |
US1988900A (en) * | 1931-01-08 | 1935-01-22 | John N Heltzel | Removable expansion joint form |
US1942489A (en) * | 1932-08-23 | 1934-01-09 | S R Dresser Mfg Co | Gasket |
US2365550A (en) * | 1934-01-24 | 1944-12-19 | John N Heltzel | Expansion joint |
US2116746A (en) * | 1936-03-20 | 1938-05-10 | Johns Manville | Gasket |
US2616149A (en) * | 1941-01-09 | 1952-11-04 | Bowen Colthurst & Partners Ltd | Method of molding in situ concrete arched structures |
US2575247A (en) * | 1946-05-18 | 1951-11-13 | John E Carter | Sealed joint for concrete slab road pavement |
US2705360A (en) * | 1952-04-17 | 1955-04-05 | Leonhardt Fritz | Method of prestressing units with serration |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3313321A (en) * | 1963-05-10 | 1967-04-11 | Rensulate Corp | Insulated underground conduit |
US3205550A (en) * | 1963-06-18 | 1965-09-14 | Floyd E Martin | Pipe forming machine |
EP0463083A1 (en) * | 1989-03-17 | 1992-01-02 | Casting Co. Construction | Method and apparatus for forming a trench |
EP0463092A1 (en) * | 1989-03-17 | 1992-01-02 | Casting Co. Construction | Apparatus for forming a trench |
EP0463092A4 (en) * | 1989-03-17 | 1992-11-19 | John V. Beamer | Apparatus for forming a trench |
EP0463083A4 (en) * | 1989-03-17 | 1992-12-09 | John V. Beamer | Method and apparatus for forming a trench |
US5326190A (en) * | 1992-10-16 | 1994-07-05 | Construction Casting Company | Method and apparatus for stabilizing a trench form during construction |
US5326189A (en) * | 1992-10-16 | 1994-07-05 | Construction Casting Company | Method and apparatus for forming a trench with grates or solid covers |
US5443327A (en) * | 1994-02-15 | 1995-08-22 | Neenah Foundry Company | Method and apparatus for forming a lined trench |
US20080193217A1 (en) * | 2007-02-13 | 2008-08-14 | Akkala Steven M | Trench grate assembly with debris chute |
US8292541B2 (en) | 2007-02-13 | 2012-10-23 | Neenah Foundry Company | Trench grate assembly with debris chute |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2917804A (en) | Apparatus for forming a liquid conveyor duct | |
US3815368A (en) | Method for installing concrete anchor piles in situ | |
US2843913A (en) | Method of forming a liquid conveying duct | |
US1940545A (en) | Concrete anchoring device | |
US1994072A (en) | Cementing plug | |
US3894375A (en) | Pole base | |
DE3338030A1 (en) | Device for connecting a sewer pipe to a sewer shaft | |
US2851135A (en) | Anchor for use in earth and the like | |
US20160010297A1 (en) | Pilaster repair device and method for repairing seawalls | |
US20120042605A1 (en) | Removable Support Cage For Top Of Drilled Pier | |
US2411011A (en) | Means and method of grouting | |
US3690388A (en) | Installation of sand drains | |
KR0148168B1 (en) | Woorking method of underground foundation wall | |
JP2767021B2 (en) | Open caisson laying method | |
JP2006265941A (en) | Construction method making utilizing casing | |
SU43841A1 (en) | The method of construction of concrete and reinforced concrete hydraulic structures | |
JPS6133068Y2 (en) | ||
US2585192A (en) | Concrete structure and grouting assembly | |
DE1808988A1 (en) | Device and method for manipulating the same for the transport of reinforced concrete bodies, in particular of reinforced concrete prefabricated garages | |
DE621902C (en) | Process for the production of concrete bodies under water | |
JPH0444517A (en) | Reinforcing method of bedrock | |
DE638744C (en) | Two-part, suction tube-free filter well and process for its manufacture | |
DE649132C (en) | Method and device for the production of a foot broadening in the case of Ortpfaehlen | |
US972699A (en) | Mold for fence-posts. | |
JPS5914553Y2 (en) | gutter block |