US2760578A - Method for completion in a plurality of hydrocarbon productive strata - Google Patents

Method for completion in a plurality of hydrocarbon productive strata Download PDF

Info

Publication number
US2760578A
US2760578A US484329A US48432955A US2760578A US 2760578 A US2760578 A US 2760578A US 484329 A US484329 A US 484329A US 48432955 A US48432955 A US 48432955A US 2760578 A US2760578 A US 2760578A
Authority
US
United States
Prior art keywords
stratum
casing
strata
flow
tubing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US484329A
Inventor
Gilbert H Tausch
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Technology and Engineering Co
Original Assignee
Exxon Research and Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US415489A external-priority patent/US2776013A/en
Application filed by Exxon Research and Engineering Co filed Critical Exxon Research and Engineering Co
Priority to US484329A priority Critical patent/US2760578A/en
Application granted granted Critical
Publication of US2760578A publication Critical patent/US2760578A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/134Bridging plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well

Definitions

  • the present invention is directed to method and apparatus for use in completion in a plurality of hydrocarbon productive strata. More particularly the invention has to do with dual completion in a plurality of hydrocarbon strata in which the tubing string is permanently located in a cased well. In its more specific aspects, the invention is directed to completion in a plurality of formations in which the tubing string is permanently afiixed in the well casing at a particular point above hydrocarbon productive strata and completion operations are conducted through the tubing string.
  • the invention may be briefly described as involving apparatus for use in completion in a'plurality of hydrocarbon productive strata and adapted to be connected to a tubing string which is permanently arranged in a well casing.
  • the apparatus comprises a tubular member having a port fluidly communicating the interior of the tubular member with the exterior thereof. At least one bypass nipple is arranged in the tubular member.
  • the tubular member has arranged on the exterior thereof first and second spaced apart packing members which are arranged above and below the bypass nipple.
  • a removable flow tube is arranged in the tubular member for separately directing flow through the tubing string and through the port.
  • a packing member is carried by the flow tube for packing oil at least a portion of the space between the flow tube and the tubular member.
  • the tubular member is adapted to be located in a casing above a second hydrocarbon productive stratum and below or adjacent a first hydrocarbon productive stratum.
  • the removable flow tube may be open-ended to allow free flow through the flow tube or the flow tube may be open on a first end and closed on a second end and provided with at least one lateral port for flow through the flow tube.
  • the fiow tube may be of a sufiicient length to extend a substantial distance below the open end of the tubular member.
  • the flow tube may also be provided with valve means for closing and opening the port in the tubular member.
  • the tubular member or the fiow tube may carry a packing member to pack off the space between the flow tube and the tubular member or specifically pack off the space between the flow tube and the by-pass nipple, dependiugon the type of flow tube which is employed.
  • the tubular member is provided with means adjacent an upper end for supporting the flow tube.
  • This supporting means may be a landing nipple, latching dogs, pipe slips and any other means well known to the artfor supporting one member inside of a pipe and thelike;
  • the invention also contemplates a method for producing hydrocarbons from a plurality of hydrocarbon productive strata pierced by a Well in which hydrocarbon production is simultaneously had from two of said-strata.
  • the tubing string is permanently arranged in the casing in the well with its open lower end below a first of said strata but above a second stratum.
  • the first stratum may suitably be a large hydrocarbon reservoir while the second stratum may be the first or one of a series of smaller reservoirs from which hydrocarbons may be obtained.
  • hydrocarbons are separately flowed through separate perforations in the casing from the first and second hydrocarbon productive strata with one path of flow being through the tubing and the second path of flow being through the casing.
  • the flow of hydrocarbon is continued until the amount of hydrocarbon produced from the second stratum becomes uneconomical due to depletion and/or production or large amounts of undesirable fluids, such as, in the case Where a stratum originally produced oil, by encroachment of gas and/ or water.
  • the flow from the first and second strata is then discontinued and a body of low water loss fluid cement is located adjacent the second stratum in the casing.
  • the cement is squeezed into the perforations by imposing pressure on same to form a filter cake in the perforations and seal oil said second stratum from the casing.
  • Excess fluid cement is then removed from the casing by reverse circulation and perforations are then made in the casing adjacent a third hydrocarbon productive stratum lower down in the well or vertically displaced from the second stratum. Thereafter hydrocarbons are again flowed from the first stratum and hydrocarbons are obtained from the third stratum.
  • FIG. 1 to 7 illustrate a stepwise arrangement of apparatus and a preferred mode of practicing the invention.
  • Figs. 8 to 11, inclusive illustrate an arrangement of apparatus for employing the present invention using gas lift.
  • numeral 11 designates a well in which a casing 12 has been arranged and which has been cemented in place with cement 13.
  • a tubular member 14- is attached to and forms part of a tubing string 15, the tubular member 14 being attached to the tubing string 15 by means of a suitable threaded connection 16.
  • the tubular member 14 is provided with ports 17 which allow fluid communication from the interior of the tubular member 14 to the annulus A between the casing 12 and the tubular member 14.
  • Forming part of the tubular member 14 is a section 18 of larger internal diameter than the tubular member 14, the purpose of the section 18 being described in more detail hereinafter.
  • the tubular member 14 is provided with by-pass nipples 19 which allow communication through passageways 20 with the annulus A. Spaced on each side of the by-pass nipple 19 are packers 21 and 22 which serve to isolate a hydrocarbon productive stratum 23 which is in communication With the annulus A by means of perforations 24 which have been formed in the casing 12 by firing gun perforator 7t) lowered on wire line 71 as shown.
  • the tubular mem-- ber 14 has arranged in it adjacent its upper end a landing nipple 25 and is provided adjacent the lower open end 26 with a constriction 27, the purpose of which will be described further hereinafter.
  • the casing 12 extends through a hydrocarbon productive stratum 28 and a third hydrocarbon productive stratum 29.
  • the tubular member 14- has arranged in it a straight flow tube 30 which has been landed with its upper endin the landing nipple 25and is supported by the same, the straight flow tube 30 having been lowered into the tubing 15 and into the tubular member 14 by means of a wire line, i
  • the flow tube 30 carries a packing member 33 adjacent its lower end which suitably may also be a chevron packing to provide a seal between the tubular member 14 and the flow tube 30 in effect closing the annulus A.
  • a tubular member 14 has arranged in it a slightly different type of fiow tube 40 which has a closed lower end 41 with at least one lateral port 42 which is in fluid communication with passageway 20.
  • the flow tube 40 like flow tube 30, has an upper end carrying a fishing head 31 and is provided with chevron packing 32.
  • the lower end of the flow tube 48 carries a packing member, such as chevron packing 43, which serves to provide a seal between the by-pass nipple 19 and the flow tube 40 but still allows for passage through the passageway 20 to the interior of the flow tube 40.
  • a different type of flow tube 50 which is similar to flow tube 30 is employed in the tubular member 14.
  • the flow tube 50 is identical to flow tube 30 but has a suflicient length to extend a substantial distance below the open end 26 of the tubular member 14.
  • flow tube 50 is provided with a fishing neck 31 and chevron packing 32 to seal with the landing nipple 25.
  • Flow tube 50 carries a packing 51 which serves to seal off the by-pass nipple 19 including the passageways 20.
  • a flow tube 60 is arranged in the tubular member 14 and, like flow tubes 30, 40 and 50, is landed in landing nipple 25 and is provided with packing 32.
  • the flow tube 60 is provided with a shoulder 61 and a slidable annular member 62 which serves to close the port 17 when the slidable annular member 62 is in a first position.
  • the slidable annular member 62 is normally urged in the first position by means of a biasing member, such as a coil spring 63, which bears frictionally against the annular member 62 and the shoulder 61.
  • flow tube 60 is provided with a fishing head or neck 31 for lowering and raising the flow tube from the tubular member by means of a wire line. It is to be noted also that the flow tube 60 extends a substantial distance below the open end 26 of the tubular member 14, the purpose of which will be described hereinafter.
  • a gun perforator such as a small gun perforator 70
  • FIG. 8 and 9 it will be seen that the apparatus is identical to the apparatus of Figs. 2 and 3 with the exception that the tubing 15 is provided with gas lift mandrels 80, 81, and 82.
  • the gas lift mandrels 8t 81 and 82 each are provided with a port 83, 84 and 85, respectively, which communicate the interior of the tubing with the annulus A.
  • the ports 83, 84 and 85 are closed by equipping the mandrels 80, 81 and 82 with dummy wire line gas lift valves.
  • the dummy wire line gas lift valves 86, 87 and 88 serve to close the ports 83, 84 and 85.
  • other means besides dummy valves may be used for closing these ports, such as a slidable valve which may be opened as desired or any other means.
  • the operation is identical to the operation of Figs. 2 and 3 as has been described.
  • Fig. 10 in the flow tube, such as 30, is provided with an annular valve means 62, such as described in Figs. 5 and 6, to close the port 17, the space between the flow tube 30 and the mandrel 14 being closed by packing 33 as has been described.
  • annulus A closed 0E due to the closing of the port 17 by the annular valve member 62 flow can only be had from the stratum 28 through perforations 35, up through flow tube 30 into mandrel 14 and tubing 15, gas being introduced into the tubing 15 through ports 83, 84 and by gas lift valves 90, 91 and '92.
  • the gas lift valves 90, 91 and 92 are conventional equipment and are described in the Composite Catalogue on page 1059 of the 19524953 edition. Since the operation of such gas lift valve is well known and is also described in the Composite Catalogue supra, further description thereof will not be given.
  • a flow tube such as 40
  • annular valve means such as 62
  • the gas lift valves 90, 91 and 92 are employed to lift artificially hydrocarbons from the stratum 23 through perforations 24, the flow being as described with respect to stratum 23 as shown by the arrows and as also indicated in Fig. 3'with the flow from the stratum or formation 28 through the perforations 35 being shut off by virtue of closing the port 17 by the annular valve member 62.
  • the present invention operates in the following manner:
  • tubular member 14 has been attached to the tubing string 15 and has been lowered in the well until the lower end 26 is below the oil stratum 23 but is a substantial distance above oil stratum 28 and 29.
  • the well is under control by means of having been closed in or provided with a column of heavy fluid, such as drilling mud. r
  • a flow tube such as flow tube 30, has been landed in'landing nipple 25 and the well has been brought in by swabbing and the like, perforations 35 having been formed in the stratum 28 by lowering a tubing gun perforator of the well known type through the tubing 15 and tubing member 14 on a wire line, such as shown in Fig. 7, and operated to cause the perforations 35.
  • flow may be had from the stratum 23 and the stratum 28, the flow from the stratum 23'being through the bypass nipple 19 and passageway 20 into the annuhis A, and thence through the ports 17 into the annulus A and up the annulus A to the surface; flow from the stratum 28 being through the open end 26 of the tubular member 14 and up through the flow tube 30, the tubular member 14 and up the tubing string 15 to the surface.
  • the well has been brought in after forming perforations 35 and after a flow tube 40 has been landed in the landing nipple 25.
  • the flow from stratum 23 is through perforations 24 and passageway in by-pass nipple 19 into the lateral passageway 42 of flow tube 40 and thence up flow tube 40 into the tubular member 14 and up the tubing 15 to the surface.
  • the flow from stratum 28 is through the perforations 35, up the open end 26 of the tubular member 14, thence through the annulus A and through port 17 into the annulus A and up the annulus A through the casing.
  • the stratum 28 may be sealed off and production had from a lower stratum in the well.
  • flow tubes such as 30 and 46 as the case may be, are pulled and replaced by a flow tube, such as 50, which is of a suificient length to extend a substantial distance below the open end 26.
  • flow nipples 19 have been scaled ed and that flow may be had down through the tubing 15 to the tubular member 14, flow tube 50 and thence up the open end 26 of the tubular member into annulus A and through port 17 into annulus A.
  • a body of low water loss fluid cement such as described by Salathiel in U. S. Patent 2,582,459 or any other low water loss cement such as oil-emulsion cements and other low water loss cements available on the market, are deposited adjacent the perforation s in stratum 28 through the flow tube 56 by being flowed down through the tubing 15, tubular member 14 and flow tube 54 ⁇ .
  • a braden-head squeeze is then put on the body of cement 55 to cause filter cake 56 to form in the perforations 35 to seal the perforations. If the cementing job is for plugging off the stratum 28 from production a flow tube 5d having a length as shown by the full lines in Fig.
  • Figs. 5 and 6 illustrate an apparatus employed when a high pressure squeeze is to be used in sealing off the perforations 35 in stratum 28.
  • a body of cement 55 is deposited through the flow tube 60 with the flow tube being set in the position shown by the full lines or in the position as shown by the dotted lines, the determination of which will depend on whether or not the stratum 28 is to be sealed completely and production had only from stratum 23 or if it is desired to have production from stratum 23 and stratum 29.
  • the apparatus such as in Figs.
  • the excess fluid cement 55 is circulated out by flowing fluid down'through the annulus A through the port 17, fluid pressure serving to compress the spring 63 and to cause annular member 62 to move down into section 13 which is of larger internal diameter than tubular member l tand to open the port 17 allowing fluid to pass from port 17 into annulus A, down throughthe open end 26 and up through the flow tube 60 into tubular member 14 and up the tubing string 15.
  • the flow tube 60 is withdrawn by means of a wire line, such as 71', and a gun perforator, such as '70, from the perforations '72.
  • production may be had from the stratum 29, such as illustrated with respect to Figs. 2 and 3.
  • the operation may be conducted from two hydrocarbon productive strata where one may be a gas producing stratum and the other an oil producing stratum.
  • one may be a gas producing stratum and the other an oil producing stratum.
  • the gas stratum producing through the casing may be desirable to have the gas stratum producing through the casing and the oil stratum producing through the tubing.
  • the stratum is a high pressure gas stratum, it may be more desirable to produce same through the tubing whereas a low pres sure oil stratum may be allowed to produce through the casing.
  • a high pressure fluid well is desired to be produced through the tubing while the low pressure fluid would be produced through the casing.
  • the tubing string may be used as a preferred high pressure flow channel and the casing string as a preferred low pressure flow channel.
  • the present invention is quite useful in allowing the completion and production from two zones simultaneously. It is possible with the apparatus and method of the present invention to change direction of flow of either the upper or lower completion interval through the tubing interval. With the present invention it is possible to or through the casing to prolong the flowing life of the complete where a'large reservoir overlies a number of small reservoirs or strata. The lower reservoirs may then be depleted individually using the aforedescribed technique. In the present invention it is-possible to produce from the two zones or intervals at the same time and obtain the full allowance of oil and/or gas production from each zone or interval.
  • the invention is also useful, especially the embodiment of Figs. 4 to 6, in removing sand and other debris from the well.
  • the invention is also quite useful when other fluid material is employed for treating a well or for injecting into a formation, such as injecting acid, acid gel, and other materials, such as plastic and the like, in a well.
  • a method for obtaining hydrocarbons from a plurality of hydrocarbon productive strata pierced by a well in which hydrocarbon production is simultaneously had from two of said strata and in which a tubing string is permanently arranged in a casing in said well with its open lower end below a first of said strata but above a second stratum in a series of hydrocarbon productive strata which comprises separately flowing hydrocarbons through separate perforations in said casing from said first and second hydrocarbon productive strata with one path of flow through said tubing and a second path of flow through said casing until the amount of hydrocarbon produced from said second stratum becomes uneconomical, discontinuing the flow from said first and second strata, isolating said first stratum from said tubing and from the annulus between said tubing and said casing, locating a body of a low water loss fluid cement adjacent said second stratum in said casing, squeezing cementinto said perforations in said second stratum to' form a filter cake and seal said second stratum, removing excess fluid cement from
  • a method for obtaining hydrocarbons from a plurality of hydrocarbon productive strata pierced by a well in which hydrocarbon production is simultaneously had from two of said strata and in which a tubing string is permanently arranged in a casing in said well with its open lower end below a first of said strata but above a second stratum in a series of hydrocarbon productive strata which comprises separately flowing hydrocarbons through separate perforations in said casing from said first and second hydrocarbon productive strata with one path of flow through said tubing and a second path of flow through said casing until the amount of hydrocarbon produced from said second stratum becomes uneconomical, discontinuing the flow from said first and second strata, isolating said first stratum from said tubing and from the annulus between said tubing in said casing, locating a body of a low water loss fluid cement adjacent said second stratum in said casing, squeezing cement into said perforations in said second stratum to form a filter cake and seal said second stratum, removing excess fluid cement from said casing by
  • a method for obtaining hydrocarbons from a plurality of hydrocarbon productive strata pierced by a well in which hydrocarbon production is simultaneously had from two of said strata and in which a tubing string is permanently arranged in a casing in said well below a first of said strata but above a second stratum in a series of hydrocarbon productive strata which comprises.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Description

1956 G. H. TAUSCH METHOD FOR COMPLETION IN A PLURALITY OF HYDROCARBON PRODUCTIVE STRATA Original Filed March 11, 1954 3 Sheets-Sheet l w v m H ili II: II. llllllllllllllllillllIlllt INVENTOR. Gilbert H. Tausc/r,
Armmvgr g- 28, 1956 G. H. TAUSCH METHOD FOR COMPLETION IN A PLURALITY OF HYDROCARBON PRODUCTIVE STRATA Original Filed March 11, 1954 3 Sheets-Sheet 2 6 5 m 518m a ishiiiiawiinmilimiiik H IN V EN TOR.
Gilbert /1'. Tausch,
n u r FIG. 5.
.4 TTORA/E X 8, 1956 G. H. TAUSCH METHOD FOR COMPLETION IN A PLURALITY I OF HYDROCARBON PRODUCTIVE STRATA Ongmal Filed March 11, 1954 3 Sheets-Sheet 3 FIG. IN VEN TOR.
'Gi/ber/ H. Tauscll,
II- ili II! iilillllli-ililliiiii illl- II A tram/Ex aten 2,760,573 Patented Aug. 28, 1956 METHDD FOR CGMPLETIGN IN A PL 1 signments, to Esso Research and Engineering Company, Elizabeth, N. ill, a corporation of Delaware Original application March 11, 1954, Serial No. 415,489. Divided and this application January 27, 1955, Serial No. 484,329
8 Claims. (Cl. 166-45) The present invention is directed to method and apparatus for use in completion in a plurality of hydrocarbon productive strata. More particularly the invention has to do with dual completion in a plurality of hydrocarbon strata in which the tubing string is permanently located in a cased well. In its more specific aspects, the invention is directed to completion in a plurality of formations in which the tubing string is permanently afiixed in the well casing at a particular point above hydrocarbon productive strata and completion operations are conducted through the tubing string.
=This application is a division of U. S. Serial No. 415,489, filed March 11, 1954, for Gilbert H. Tausoh and entitled Method and Apparatus for Completion in a Plurality of Hydrocarbon Productive Strata.
The invention may be briefly described as involving apparatus for use in completion in a'plurality of hydrocarbon productive strata and adapted to be connected to a tubing string which is permanently arranged in a well casing. The apparatus comprises a tubular member having a port fluidly communicating the interior of the tubular member with the exterior thereof. At least one bypass nipple is arranged in the tubular member. The tubular member has arranged on the exterior thereof first and second spaced apart packing members which are arranged above and below the bypass nipple. A removable flow tube is arranged in the tubular member for separately directing flow through the tubing string and through the port. A packing member is carried by the flow tube for packing oil at least a portion of the space between the flow tube and the tubular member. The tubular member is adapted to be located in a casing above a second hydrocarbon productive stratum and below or adjacent a first hydrocarbon productive stratum.
The removable flow tube may be open-ended to allow free flow through the flow tube or the flow tube may be open on a first end and closed on a second end and provided with at least one lateral port for flow through the flow tube. The fiow tube may be of a sufiicient length to extend a substantial distance below the open end of the tubular member. The flow tube may also be provided with valve means for closing and opening the port in the tubular member.
The tubular member or the fiow tube may carry a packing member to pack off the space between the flow tube and the tubular member or specifically pack off the space between the flow tube and the by-pass nipple, dependiugon the type of flow tube which is employed.
The tubular member is provided with means adjacent an upper end for supporting the flow tube. This supporting means may be a landing nipple, latching dogs, pipe slips and any other means well known to the artfor supporting one member inside of a pipe and thelike;
The invention also contemplates a method for producing hydrocarbons from a plurality of hydrocarbon productive strata pierced by a Well in which hydrocarbon production is simultaneously had from two of said-strata. In the particular invention, the tubing string is permanently arranged in the casing in the well with its open lower end below a first of said strata but above a second stratum. The first stratum may suitably be a large hydrocarbon reservoir while the second stratum may be the first or one of a series of smaller reservoirs from which hydrocarbons may be obtained. In the invention, hydrocarbons are separately flowed through separate perforations in the casing from the first and second hydrocarbon productive strata with one path of flow being through the tubing and the second path of flow being through the casing. The flow of hydrocarbon is continued until the amount of hydrocarbon produced from the second stratum becomes uneconomical due to depletion and/or production or large amounts of undesirable fluids, such as, in the case Where a stratum originally produced oil, by encroachment of gas and/ or water. The flow from the first and second strata is then discontinued and a body of low water loss fluid cement is located adjacent the second stratum in the casing. The cement is squeezed into the perforations by imposing pressure on same to form a filter cake in the perforations and seal oil said second stratum from the casing. Excess fluid cement is then removed from the casing by reverse circulation and perforations are then made in the casing adjacent a third hydrocarbon productive stratum lower down in the well or vertically displaced from the second stratum. Thereafter hydrocarbons are again flowed from the first stratum and hydrocarbons are obtained from the third stratum. v
The present invention will be further illustrated by refcrence to the drawing in which Figs. 1 to 7 illustrate a stepwise arrangement of apparatus and a preferred mode of practicing the invention; and
Figs. 8 to 11, inclusive, illustrate an arrangement of apparatus for employing the present invention using gas lift.
Referring now to the drawing, in which identical numerals will be employed to designate identical parts, and especially to Fig. 1, numeral 11 designates a well in which a casing 12 has been arranged and which has been cemented in place with cement 13. A tubular member 14- is attached to and forms part of a tubing string 15, the tubular member 14 being attached to the tubing string 15 by means of a suitable threaded connection 16. The tubular member 14 is provided with ports 17 which allow fluid communication from the interior of the tubular member 14 to the annulus A between the casing 12 and the tubular member 14. Forming part of the tubular member 14 is a section 18 of larger internal diameter than the tubular member 14, the purpose of the section 18 being described in more detail hereinafter. The tubular member 14 is provided with by-pass nipples 19 which allow communication through passageways 20 with the annulus A. Spaced on each side of the by-pass nipple 19 are packers 21 and 22 which serve to isolate a hydrocarbon productive stratum 23 which is in communication With the annulus A by means of perforations 24 which have been formed in the casing 12 by firing gun perforator 7t) lowered on wire line 71 as shown. The tubular mem-- ber 14 has arranged in it adjacent its upper end a landing nipple 25 and is provided adjacent the lower open end 26 with a constriction 27, the purpose of which will be described further hereinafter.
It is to be noted that the casing 12 extends through a hydrocarbon productive stratum 28 anda third hydrocarbon productive stratum 29.
Referring now to Fig. 2, it is to benoted that the tubular member 14- has arranged in it a straight flow tube 30 which has been landed with its upper endin the landing nipple 25and is supported by the same, the straight flow tube 30 having been lowered into the tubing 15 and into the tubular member 14 by means of a wire line, i
not shown, connected to a fishing head or spear 31 on the upper end of the flow tube 36. It is to be noted that the flow tube 30 and landing nipple 25 are provided with a chevron packing 32 to provide a seal.
It is to be noted further that the flow tube 30 carries a packing member 33 adjacent its lower end which suitably may also be a chevron packing to provide a seal between the tubular member 14 and the flow tube 30 in effect closing the annulus A.
Referring now to Fig. 3, a tubular member 14 has arranged in it a slightly different type of fiow tube 40 which has a closed lower end 41 with at least one lateral port 42 which is in fluid communication with passageway 20. The flow tube 40, like flow tube 30, has an upper end carrying a fishing head 31 and is provided with chevron packing 32. The lower end of the flow tube 48 carries a packing member, such as chevron packing 43, which serves to provide a seal between the by-pass nipple 19 and the flow tube 40 but still allows for passage through the passageway 20 to the interior of the flow tube 40.
Referring now to Fig. 4, a different type of flow tube 50, which is similar to flow tube 30 is employed in the tubular member 14. The flow tube 50 is identical to flow tube 30 but has a suflicient length to extend a substantial distance below the open end 26 of the tubular member 14. Like flow tubes 30 and 40, flow tube 50 is provided with a fishing neck 31 and chevron packing 32 to seal with the landing nipple 25. Flow tube 50 carries a packing 51 which serves to seal off the by-pass nipple 19 including the passageways 20.
Referring now to Figs. and 6, it will be seen that a flow tube 60 is arranged in the tubular member 14 and, like flow tubes 30, 40 and 50, is landed in landing nipple 25 and is provided with packing 32. The flow tube 60 is provided with a shoulder 61 and a slidable annular member 62 which serves to close the port 17 when the slidable annular member 62 is in a first position. The slidable annular member 62 is normally urged in the first position by means of a biasing member, such as a coil spring 63, which bears frictionally against the annular member 62 and the shoulder 61. Like the other flow tubes, flow tube 60 is provided with a fishing head or neck 31 for lowering and raising the flow tube from the tubular member by means of a wire line. It is to be noted also that the flow tube 60 extends a substantial distance below the open end 26 of the tubular member 14, the purpose of which will be described hereinafter.
Referring now to Fig. 7, it will be noted that the flow water drive, it may be desirable to place production from tube 60 has been pulled from the tubular member 14 a and a gun perforator, such as a small gun perforator 70,
is lowered through the tubular member 14 by means of.
a wire line 71 and operated to cause perforations 72 in the casing 12 to penetrate the stratum or sand 29 to allow production to be had therefrom.
Referring now to Figs. 8 and 9, it will be seen that the apparatus is identical to the apparatus of Figs. 2 and 3 with the exception that the tubing 15 is provided with gas lift mandrels 80, 81, and 82. The gas lift mandrels 8t 81 and 82 each are provided with a port 83, 84 and 85, respectively, which communicate the interior of the tubing with the annulus A.
In the embodiments of Figs. 8 and 9, the ports 83, 84 and 85 are closed by equipping the mandrels 80, 81 and 82 with dummy wire line gas lift valves. In short, the dummy wire line gas lift valves 86, 87 and 88 serve to close the ports 83, 84 and 85. It will be apparent that other means besides dummy valves may be used for closing these ports, such as a slidable valve which may be opened as desired or any other means. In the embodiment and mode of Figs. 8 and 9, the operation is identical to the operation of Figs. 2 and 3 as has been described.
When the strata or reservoirs 23 and 28 no longer may be produced by the pressure in the strata due to gas or these strata on artificial lift, such as by gas lift. Under these conditions, the dummy valves 86, 87 and 88 in the mandrels 80, 81 and 82 will be replaced by wire line gas lift valves 90, 91 and 92 and the casing annulus A pressured up with gas to serve as a gas lift gas reservoir or flow path to allow artificial lift of the producing interval as will be described.
In Fig. 10 in the flow tube, such as 30, is provided with an annular valve means 62, such as described in Figs. 5 and 6, to close the port 17, the space between the flow tube 30 and the mandrel 14 being closed by packing 33 as has been described. With the annulus A closed 0E due to the closing of the port 17 by the annular valve member 62, flow can only be had from the stratum 28 through perforations 35, up through flow tube 30 into mandrel 14 and tubing 15, gas being introduced into the tubing 15 through ports 83, 84 and by gas lift valves 90, 91 and '92. The gas lift valves 90, 91 and 92 are conventional equipment and are described in the Composite Catalogue on page 1059 of the 19524953 edition. Since the operation of such gas lift valve is well known and is also described in the Composite Catalogue supra, further description thereof will not be given.
When it is desired to produce from the stratum 23 employing'artificial lift, a flow tube, such as 40, is provided with annular valve means, such as 62, to close the port 17 and the gas lift valves 90, 91 and 92 are employed to lift artificially hydrocarbons from the stratum 23 through perforations 24, the flow being as described with respect to stratum 23 as shown by the arrows and as also indicated in Fig. 3'with the flow from the stratum or formation 28 through the perforations 35 being shut off by virtue of closing the port 17 by the annular valve member 62.
After the formation or stratum, such as 28, may no longer produce commercial quantities of oil, it may be do; sirable to seal off stratum 28 and then perform operations as have been described with respect to Figs. 4 to 7 and recomplete in another zone or reservoir or strata as the base may be.
With the apparatus of Figs. 8 to 11, as has been described, it is possible to produce by artificial lift from one stratum for a 15-day producing period in one month and for a lS-day producing period in another month, making a total of 30 production days in two months and then change the flow tube, as has been described, and produce from another stratum for another 30-day period divided in two calendar months to conform to proratiou regulations. Thus a flow tube need be replaced or changed only once every 30 days.
The present invention operates in the following manner:
Referring again to the drawing and to Fig. 1,,it will be noted that the tubular member 14 has been attached to the tubing string 15 and has been lowered in the well until the lower end 26 is below the oil stratum 23 but is a substantial distance above oil stratum 28 and 29. Under the conditions of Fig. 1, the well is under control by means of having been closed in or provided with a column of heavy fluid, such as drilling mud. r
In Fig. 2 a flow tube, such as flow tube 30, has been landed in'landing nipple 25 and the well has been brought in by swabbing and the like, perforations 35 having been formed in the stratum 28 by lowering a tubing gun perforator of the well known type through the tubing 15 and tubing member 14 on a wire line, such as shown in Fig. 7, and operated to cause the perforations 35. After the well has been brought in and with the flow tube, such as 30, in place, flow may be had from the stratum 23 and the stratum 28, the flow from the stratum 23'being through the bypass nipple 19 and passageway 20 into the annuhis A, and thence through the ports 17 into the annulus A and up the annulus A to the surface; flow from the stratum 28 being through the open end 26 of the tubular member 14 and up through the flow tube 30, the tubular member 14 and up the tubing string 15 to the surface.
In the embodiment and mode of Fig. 3 the well has been brought in after forming perforations 35 and after a flow tube 40 has been landed in the landing nipple 25. In this particular instance, the flow from stratum 23 is through perforations 24 and passageway in by-pass nipple 19 into the lateral passageway 42 of flow tube 40 and thence up flow tube 40 into the tubular member 14 and up the tubing 15 to the surface. The flow from stratum 28 is through the perforations 35, up the open end 26 of the tubular member 14, thence through the annulus A and through port 17 into the annulus A and up the annulus A through the casing.
After the stratum 28 has ceased to produce economical amounts of hydrocarbon due to water and/or gas encroachment or for other reasons and stratum 23 is still productive, the stratum 28 may be sealed off and production had from a lower stratum in the well. In these particular instances, flow tubes, such as 30 and 46 as the case may be, are pulled and replaced by a flow tube, such as 50, which is of a suificient length to extend a substantial distance below the open end 26. It will be noted in this instance that the flow nipples 19 have been scaled ed and that flow may be had down through the tubing 15 to the tubular member 14, flow tube 50 and thence up the open end 26 of the tubular member into annulus A and through port 17 into annulus A.
in this operation when the stratum 28 is to be sealed, a body of low water loss fluid cement such as described by Salathiel in U. S. Patent 2,582,459 or any other low water loss cement such as oil-emulsion cements and other low water loss cements available on the market, are deposited adjacent the perforation s in stratum 28 through the flow tube 56 by being flowed down through the tubing 15, tubular member 14 and flow tube 54}. A braden-head squeeze is then put on the body of cement 55 to cause filter cake 56 to form in the perforations 35 to seal the perforations. If the cementing job is for plugging off the stratum 28 from production a flow tube 5d having a length as shown by the full lines in Fig. 4 will be employed without excess fluid cement being reversed out by How down the tubing 15, tubular member 14 and flow tube 56 and up the annulus A into the annulus A except as shown by the arrows. However, if it is desired to recomplete in stratum 29, then the flow tube 56 will have a length, such as shown by the dotted lines, to reverse out all of the body of fluid cement 55 remaining in the casing 12 after forming the filter cake 56 in the perforations 35. Thereafter a gun perforator may be employed, such as shown in Figs. i and 7, to form perforations '72 in the casing 12 and stream 29 and production had therefrom, such as shown in Figs. 2 and 3.
Figs. 5 and 6 illustrate an apparatus employed when a high pressure squeeze is to be used in sealing off the perforations 35 in stratum 28. Like the Fig. 4, a body of cement 55 is deposited through the flow tube 60 with the flow tube being set in the position shown by the full lines or in the position as shown by the dotted lines, the determination of which will depend on whether or not the stratum 28 is to be sealed completely and production had only from stratum 23 or if it is desired to have production from stratum 23 and stratum 29. In any event, the apparatus, such as in Figs. 5 and 6, will be be used with the ports 17 closed by the annular valve member 62, pressure being imposed down through the tubular member i and flow tube 6:3 with fluid escaping out in the stratum 23 and cement forming a filter cake, such as 560 in the perforations 35.
In the operation as described with respect to Fig. 6, the excess fluid cement 55 is circulated out by flowing fluid down'through the annulus A through the port 17, fluid pressure serving to compress the spring 63 and to cause annular member 62 to move down into section 13 which is of larger internal diameter than tubular member l tand to open the port 17 allowing fluid to pass from port 17 into annulus A, down throughthe open end 26 and up through the flow tube 60 into tubular member 14 and up the tubing string 15. Thereafter, as shown in Fig. 7, the flow tube 60 is withdrawn by means of a wire line, such as 71', and a gun perforator, such as '70, from the perforations '72. Thereafter production may be had from the stratum 29, such as illustrated with respect to Figs. 2 and 3.
It is contemplated that the operation may be conducted from two hydrocarbon productive strata where one may be a gas producing stratum and the other an oil producing stratum. In those instances it may be desirable to have the gas stratum producing through the casing and the oil stratum producing through the tubing. Where the stratum is a high pressure gas stratum, it may be more desirable to produce same through the tubing whereas a low pres sure oil stratum may be allowed to produce through the casing. In general, a high pressure fluid well is desired to be produced through the tubing while the low pressure fluid would be produced through the casing. The tubing string may be used as a preferred high pressure flow channel and the casing string as a preferred low pressure flow channel.
The present invention is quite useful in allowing the completion and production from two zones simultaneously. It is possible with the apparatus and method of the present invention to change direction of flow of either the upper or lower completion interval through the tubing interval. With the present invention it is possible to or through the casing to prolong the flowing life of the complete where a'large reservoir overlies a number of small reservoirs or strata. The lower reservoirs may then be depleted individually using the aforedescribed technique. In the present invention it is-possible to produce from the two zones or intervals at the same time and obtain the full allowance of oil and/or gas production from each zone or interval.
While I have illustrated the present invention by sealing off a first of a series of strata and going to the next of the series of strata and producing from same, it is possible, in accordance with the present invention, to perforate in a lower of a series of strata and produce from same along with production from the large reservoir and then seal oil the lower stratum and go up the hole to another stratum vertically spaced from the exhausted oil stratum. In short, my invention is susceptible to many modifications and use.
The invention is also useful, especially the embodiment of Figs. 4 to 6, in removing sand and other debris from the well. The invention is also quite useful when other fluid material is employed for treating a well or for injecting into a formation, such as injecting acid, acid gel, and other materials, such as plastic and the like, in a well.
The nature and objects of the present invention having been completely described and illustrated, what I wish to claim as new and useful and to secure by Letters Patent is:
l. A method for obtaining hydrocarbons from a plurality of hydrocarbon productive strata pierced by a well in which hydrocarbon production is simultaneously had from two of said strata and in which a tubing string is permanently arranged in a casing in said well with its open lower end below a first of said strata but above a second stratum in a series of hydrocarbon productive strata which comprises separately flowing hydrocarbons through separate perforations in said casing from said first and second hydrocarbon productive strata with one path of flow through said tubing and a second path of flow through said casing until the amount of hydrocarbon produced from said second stratum becomes uneconomical, discontinuing the flow from said first and second strata, isolating said first stratum from said tubing and from the annulus between said tubing and said casing, locating a body of a low water loss fluid cement adjacent said second stratum in said casing, squeezing cementinto said perforations in said second stratum to' form a filter cake and seal said second stratum, removing excess fluid cement from said casing, forming perforations in said casing adjacent a third hydrocarbon productive stratum, and separately flowing hydrocarbon again from said first stratum and from said third stratum.
2. A method in accordance with claim 1 in which the cement is squeezed by imposing high pressure through the tubing.
3. A method in accordance with claim 1 in which the cement is squeezed by imposing pressure on the tubing and casing not in excess of the casing strength. I
4. A method for obtaining hydrocarbons from a plurality of hydrocarbon productive strata pierced by a well in which hydrocarbon production is simultaneously had from two of said strata and in which a tubing string is permanently arranged in a casing in said well with its open lower end below a first of said strata but above a second stratum in a series of hydrocarbon productive strata which comprises separately flowing hydrocarbons through separate perforations in said casing from said first and second hydrocarbon productive strata with one path of flow through said tubing and a second path of flow through said casing until the amount of hydrocarbon produced from said second stratum becomes uneconomical, discontinuing the flow from said first and second strata, isolating said first stratum from said tubing and from the annulus between said tubing in said casing, locating a body of a low water loss fluid cement adjacent said second stratum in said casing, squeezing cement into said perforations in said second stratum to form a filter cake and seal said second stratum, removing excess fluid cement from said casing by flowing a fluid down the annulus between the casing and tubing and thence into the body of fluid cement in the casing and upwardly through a path of flow from the body of fluid cement into the tubing, forming perforations in said casing adjacent a third hydrocarbon productive stratum, and separately flowing hydrocarbon again from said first stratum and from said third stratum.
5. A method in accordance with claim 4 in which the cement is squeezed by imposing high pressure through the tubing.
6. A method in accordance with claim 4 in which the cement is squeezed by imposing pressure on the tubing and casing not in excess of the casing strength.
7. A method for obtaining hydrocarbons from a plurality of hydrocarbon productive strata pierced by a well in which hydrocarbon production is simultaneously had from two of said strata and in which a tubing string is permanently arranged in a casing in said well below a first of said strata but above a second stratum ina series of hydrocarbon productive strata which comprises separately flowinghydrocarb'ons through separate perforations in said casing from said first and second hydrocarbon productive strata with one path of flow through said tubing and a secondip'ath of flow through said casing. until the amount of hydrocarbon produced from said second stratum becomes uneconomical, discontinuing the flow from said first and second strata, isolating said first stratum from said tubing and from the annulus between said tubing and said casing, locating a body of a low water loss fluid cement adjacent said second stratum in said casing, squeezing cement into said perforations in said second stratum to form a filter cake and seal said second stratum, removing excess fluid cement from said casing, forming perforations in said casing adjacent a third hydrocarbon productive stratum, and then flowing hydrocarbon again from said first stratum.
8. A method for obtaining hydrocarbons from a plurality of hydrocarbon productive strata pierced by a well in which hydrocarbon production is simultaneously had from two of said strata and in which a tubing string is permanently arranged in a casing in said well below a first of said strata but above a second stratum in a series of hydrocarbon productive strata which comprises. separately flowing hydrocarbons through separate perforations in said casing from said first and second hydrocarbon productive strata with one path of flow through said tubing and a second path of flow through said casing until the amount of hydrocarbon produced from said second stratum becomes uneconomical, discontinuing the flow from said first and second strata, isolating said first stratum from said tubing and from the annulus between said tubing and said casing, locating a body of a low water loss fluid cement adjacent said second stratum in said casing, squeezing cement into said perforations in said second stratum to form a filter cake and seal said second stratum, removing excess fluid cement from said casing by flowing a fluid down the annulus between the casing and tubing and thence into the body of fluid cement in the casing and upwardly through a path of flow fromthe body of fluid cement into the tubing, forming perforations in said casing adjacent a third hydrocarbon productive stratum, and then flowing hydrocarbon again from said first stratum.
References Cited in the file of this patent UNITED STATES PATENTS 2,403,987 Lewis July 16, 1946 2,537,066 Lewis Jan. 9, 1951 2,607,425 Taylor Aug. 19, 1952

Claims (1)

1. A METHOD FOR OBTAINING HYDROCARBONS FROM A PLURALITY OF HYDROCARBON PRODUCTIVE STRATA PIERCED BY A WELL IN WHICH HYDROCARBON PRODUCTION IS SIMULTANEOUSLY HAD FROM TWO OF SAID STRATA AND IN WHICH A TUBING STRING IS PERMANENTLY ARRANGED IN A CASING IN SAID WELL WITH ITS OPEN LOWER END BELOW A FIRST OF SAID STRATA BUT ABOVE A SECOND STRATUM IN A SERIES OF HYDROCARBON PRODUCTIVE STRATA WHICH COMPRISES SEPARATELY FLOWING HYDROCARBONS THROUGH SEPARATE PERFORAATIONS IN SAID CASING FROM SAID FIRST AND SECOND HYDROCARBON PRODUCTIVE STRATA WITH ONE PATH OF FLOW THROUGH SAID TUBING AND A SECOND PATH OF FLOW THROUGH SAID CASTING UNTIL THE AMOUNT OF HYDROCARBON PRODUCED FROM SAID SECOND STRATUM BECOMES UNECONOMICAL, DISCONTINUING THE FLOW FROM SAID FIRST AND SECOND STRATA, ISOLATING SAID FIRST STRADUM FROM SAID TUBING AND FROM THE ANNULUS BETWEEN SAID TUBING AND SAID CASING, LOCATING A BODY OF A LOW WATER LOSS FLUID CEMENT ADJACENT SAID SECOND STRATUM IN SAID CASING, SQUEEZING CEMENT INTO SAID PERFORATIONS IN SAID SECOND STRATUM TO FORM A FILTER
US484329A 1954-03-11 1955-01-27 Method for completion in a plurality of hydrocarbon productive strata Expired - Lifetime US2760578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US484329A US2760578A (en) 1954-03-11 1955-01-27 Method for completion in a plurality of hydrocarbon productive strata

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US415489A US2776013A (en) 1954-03-11 1954-03-11 Apparatus for completion in a plurality of hydrocarbon productive strata
US484329A US2760578A (en) 1954-03-11 1955-01-27 Method for completion in a plurality of hydrocarbon productive strata

Publications (1)

Publication Number Publication Date
US2760578A true US2760578A (en) 1956-08-28

Family

ID=27022993

Family Applications (1)

Application Number Title Priority Date Filing Date
US484329A Expired - Lifetime US2760578A (en) 1954-03-11 1955-01-27 Method for completion in a plurality of hydrocarbon productive strata

Country Status (1)

Country Link
US (1) US2760578A (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2822048A (en) * 1956-06-04 1958-02-04 Exxon Research Engineering Co Permanent well completion apparatus
US2837165A (en) * 1954-10-04 1958-06-03 Exxon Research Engineering Co Permanent well completion apparatus
US2839142A (en) * 1954-05-05 1958-06-17 Exxon Research Engineering Co Permanent well completion method
US2844205A (en) * 1955-12-20 1958-07-22 Exxon Research Engineering Co Method for completing and servicing a well
US2846876A (en) * 1955-12-20 1958-08-12 Exxon Research Engineering Co Well testing device
US2869645A (en) * 1954-12-08 1959-01-20 Richfield Oil Corp Apparatus for controlling the flow of fluids in a multi-strata well
US2886108A (en) * 1956-05-02 1959-05-12 Phillips Petroleum Co Oil well production
US2906343A (en) * 1958-04-16 1959-09-29 Jersey Prod Res Co Permanent well completion apparatus
US2911048A (en) * 1954-10-07 1959-11-03 Jersey Prod Res Co Apparatus for working over and servicing wells
US2935131A (en) * 1957-06-05 1960-05-03 Jersey Prod Res Co Method and apparatus for completing a well in a plurality of zones
US2982357A (en) * 1958-03-03 1961-05-02 Jersey Prod Res Co Permanent well completion apparatus
US2994380A (en) * 1958-05-05 1961-08-01 Jersey Prod Res Co Plural completion of wells
US3003563A (en) * 1956-06-04 1961-10-10 Jersey Prod Res Co Permanent well completion apparatus
US3011549A (en) * 1956-09-04 1961-12-05 Otis Eng Co Workover of permanently completed wells
US3032104A (en) * 1959-10-07 1962-05-01 Jersey Prod Res Co Completion and working over of wells
US3032117A (en) * 1958-04-16 1962-05-01 Jersey Prod Res Co Permanent well completion apparatus
US3035642A (en) * 1957-08-09 1962-05-22 Page Oil Tools Inc Apparatus for controlling the flow of production fluid from a well
US3036634A (en) * 1959-10-07 1962-05-29 Jersey Prod Res Co Completion of wells in a plurality of formations
US3050121A (en) * 1957-04-22 1962-08-21 Us Industries Inc Well apparatus and method
US3050116A (en) * 1958-05-26 1962-08-21 Phillips Petroleum Co Multiple zone production by in situ combustion
US3095038A (en) * 1960-10-24 1963-06-25 Jersey Prod Res Co Plural completion of wells
US3157233A (en) * 1956-06-20 1964-11-17 Otis Eng Co Apparatus for controlling flow within a well
US3258069A (en) * 1963-02-07 1966-06-28 Shell Oil Co Method for producing a source of energy from an overpressured formation
US3280914A (en) * 1956-06-20 1966-10-25 Otis Engineering Corp Of Delaw Method for controlling flow within a well
US4573529A (en) * 1984-03-12 1986-03-04 Aker Oil Tools, Inc. High flow injection anchor

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2403987A (en) * 1940-12-18 1946-07-16 E C Will Well flowing apparatus
US2537066A (en) * 1944-07-24 1951-01-09 James O Lewis Apparatus for controlling fluid producing formations
US2607425A (en) * 1947-09-26 1952-08-19 Mcgaffey Taylor Corp Well cementing tool

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2403987A (en) * 1940-12-18 1946-07-16 E C Will Well flowing apparatus
US2537066A (en) * 1944-07-24 1951-01-09 James O Lewis Apparatus for controlling fluid producing formations
US2607425A (en) * 1947-09-26 1952-08-19 Mcgaffey Taylor Corp Well cementing tool

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2839142A (en) * 1954-05-05 1958-06-17 Exxon Research Engineering Co Permanent well completion method
US2837165A (en) * 1954-10-04 1958-06-03 Exxon Research Engineering Co Permanent well completion apparatus
US2911048A (en) * 1954-10-07 1959-11-03 Jersey Prod Res Co Apparatus for working over and servicing wells
US2869645A (en) * 1954-12-08 1959-01-20 Richfield Oil Corp Apparatus for controlling the flow of fluids in a multi-strata well
US2844205A (en) * 1955-12-20 1958-07-22 Exxon Research Engineering Co Method for completing and servicing a well
US2846876A (en) * 1955-12-20 1958-08-12 Exxon Research Engineering Co Well testing device
US2886108A (en) * 1956-05-02 1959-05-12 Phillips Petroleum Co Oil well production
US3003563A (en) * 1956-06-04 1961-10-10 Jersey Prod Res Co Permanent well completion apparatus
US2822048A (en) * 1956-06-04 1958-02-04 Exxon Research Engineering Co Permanent well completion apparatus
US3280914A (en) * 1956-06-20 1966-10-25 Otis Engineering Corp Of Delaw Method for controlling flow within a well
US3157233A (en) * 1956-06-20 1964-11-17 Otis Eng Co Apparatus for controlling flow within a well
US3011549A (en) * 1956-09-04 1961-12-05 Otis Eng Co Workover of permanently completed wells
US3050121A (en) * 1957-04-22 1962-08-21 Us Industries Inc Well apparatus and method
US2935131A (en) * 1957-06-05 1960-05-03 Jersey Prod Res Co Method and apparatus for completing a well in a plurality of zones
US3035642A (en) * 1957-08-09 1962-05-22 Page Oil Tools Inc Apparatus for controlling the flow of production fluid from a well
US2982357A (en) * 1958-03-03 1961-05-02 Jersey Prod Res Co Permanent well completion apparatus
US3032117A (en) * 1958-04-16 1962-05-01 Jersey Prod Res Co Permanent well completion apparatus
US2906343A (en) * 1958-04-16 1959-09-29 Jersey Prod Res Co Permanent well completion apparatus
US2994380A (en) * 1958-05-05 1961-08-01 Jersey Prod Res Co Plural completion of wells
US3050116A (en) * 1958-05-26 1962-08-21 Phillips Petroleum Co Multiple zone production by in situ combustion
US3036634A (en) * 1959-10-07 1962-05-29 Jersey Prod Res Co Completion of wells in a plurality of formations
US3032104A (en) * 1959-10-07 1962-05-01 Jersey Prod Res Co Completion and working over of wells
US3095038A (en) * 1960-10-24 1963-06-25 Jersey Prod Res Co Plural completion of wells
US3258069A (en) * 1963-02-07 1966-06-28 Shell Oil Co Method for producing a source of energy from an overpressured formation
US4573529A (en) * 1984-03-12 1986-03-04 Aker Oil Tools, Inc. High flow injection anchor

Similar Documents

Publication Publication Date Title
US2760578A (en) Method for completion in a plurality of hydrocarbon productive strata
US2776013A (en) Apparatus for completion in a plurality of hydrocarbon productive strata
US2749989A (en) Method and means of completing a well
US3963076A (en) Method and apparatus for gravel packing well bores
US3637010A (en) Apparatus for gravel-packing inclined wells
US3277962A (en) Gravel packing method
US2537066A (en) Apparatus for controlling fluid producing formations
US5375661A (en) Well completion method
US3952804A (en) Sand control for treating wells with ultra high-pressure zones
US3174546A (en) Method for selectively sealing-off formations
CA1081608A (en) Selective wellbore isolation using buoyant ball sealers
US3050121A (en) Well apparatus and method
US2693854A (en) Formation of zones of high permeability in low permeability formations
US20100012318A1 (en) Completion assembly
US2973039A (en) Multiple zone fluid circulating apparatus
US3901318A (en) Method and apparatus for packing gravel in a subterranean well
US3593797A (en) Method and apparatus for consolidating a subsurface earth formation
US3224267A (en) Well completion apparatus
US2935131A (en) Method and apparatus for completing a well in a plurality of zones
US2782860A (en) Apparatus for well workover operations
US3430701A (en) Treating inhomogeneous subterranean formations
US2798558A (en) Well completion apparatus
US7478674B2 (en) System and method for fracturing and gravel packing a wellbore
US2297308A (en) Well bottom assembly for graveling
US2938584A (en) Method and apparatus for completing and servicing wells