US2844205A - Method for completing and servicing a well - Google Patents
Method for completing and servicing a well Download PDFInfo
- Publication number
- US2844205A US2844205A US554214A US55421455A US2844205A US 2844205 A US2844205 A US 2844205A US 554214 A US554214 A US 554214A US 55421455 A US55421455 A US 55421455A US 2844205 A US2844205 A US 2844205A
- Authority
- US
- United States
- Prior art keywords
- tubing
- casing
- well
- pressure
- interval
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
Definitions
- the present invention is directed to a method for completing and servicing a well. More particularly, the invention is concerned with a method for testing a well without pulling the pipe from the well. In its more specific aspects, the invention is concerned with a method for testing a well drilled through a plurality of productive intervals without pulling the pipe from the well.
- the present invention may be briefly described as a method for completing and servicing a Well drilled in the earth to penetrate a plurality of productive intervals and having a casing arranged therein penetrated in a selected of said intervals to provide first perforations.
- a tubing string is lowered in the well having a retrievable pressure recorder arranged therein until the lower end of the tubing is positioned for production at least through the rst perforations in the casing.
- the annular space between the tubing and casing is closed such that pressure is exerted in the tubing and on the pressure recorder.
- the pressure recorder is retrieved from the well while the tubing is maintained in position whereby the productivity of a selected interval is indicated by the pressure recorded on the pressure recorder.
- Production is obtained from the well from the selected interval as indicated by the pressure. If pressure is shown by the pressure recorder, then the well is produced until production becomes uneconomical. If no or insuicient pressure is shown by the pressure recorder for commercial production of well fluids then the rst perforations are sealed by introducing cement through the tubing into the first perforations to seal same. Thereafter the casing is reperforated to provide second perforations in one of the intervals and the pressure recorder is lowered again in the well and pressure exerted therein from the second perforations. The pressure recorder is again retrieved to determine whether or not production may be had from the second perforations and production is obtained through the second perforations as indicated by the pressure.
- the casing may be reperforated in an interval vertically displaced from the perforated and sealed interval or the casing may be reperforated in the perforated and sealed interval or to perforate more of the productive interval in the same' zone which was originally perforated.
- the present invention is quite advantageous in that it eliminates unnecessary raising and lowering of the pipe, known in the industry as round trips. ln other words, a round trip is the running in of a well pipe in the well and then pulling same out of the well for replacement "ice of a tool or a section of pipe.
- a round trip is the running in of a well pipe in the well and then pulling same out of the well for replacement "ice of a tool or a section of pipe.
- drill stein tests are usually made to evaluate the producing zone. Not infrequently it is necessary to repair a primary cement job, which is cement set around the casing in the well bore, or to perforate more of a productive interval than originally perforated or to reperforate the same interval or to fracture or to acidize a productive interval.
- Figs. 1 to 7 represent a sequential stepwise mode of practicing the invention
- Figs. 4a, 4b, and 5a illustrate a modified mode of practicing the invention taken in conjunction with Figs. 1 to 7.
- numeral 11 designates a well bore drilled from the earths surface, not shown, to penetrate a plurality of productive formations 12 and 13 separated by non-productive formation 14. Formations 12 and 13 may be sands, strata, zones, or intervals in a productive formation while non-productive formation 14 may be a non-productive interval, stratum or zone in a productive or non-productive formation.
- a casing 15 is cemented ⁇ in the well bore 11 with a primary cement job 16 and a tubing string 17 is run into the well casing 15 provided adjacent its lower end with packer 18 in inoperative position.
- a pressure recorder device 19 Arranged in the lower end of the tubing 17 is a pressure recorder device 19 which is provided with a sealing means 20 to allow a seal between the interior wall of the tubing 17 and the interior wall of the pressure recorder 19.
- the pressure recorder 19 is a suitable wire line pressure recorder, such as described in U. S. Patent 2,189,919, issued Feb. 13, 1940, in the name of Thomas V. Moore. Other pressure recording instruments available in the industry may be used such as illustrated on page 2720 of the 1952-53 Composite Catalog of Oil Field & Pipeline Equipment.
- bulletin No. 316 printed in the United States of America and may be set by right hand rotation of the tubular string 17 to position the upper packer slips on the tapered member of the packer and in gripping Contact with the inner surface of the well casing 15. Subsequent application of weight, resulting from lowering the tubing string 17 to be Supported by the packer slip Contact with the well casing 15, causes deformation of the rubber packing element to form a seal in the annulus between the tubing string 17 and the well casing 15.
- Fig. 1 The example shown in Fig. 1 is in the running in position, the pressure recorder device being arranged in the tubing at the well head.
- Fig. 2 the packer 18 is in operative position to close the annulus A between the tubing 17 and the casing 15.
- the lower open end 22 of the tubing 17 is arranged immediately above the productive interval 13 in which perforations generally indicated by the numeral 23 had previously been formed such as by lowering a gun perforator through the casing 15 and firing same.
- valve 21 In the running in position, as illustrated in Fig. l, the valve 21 may be in the closed position to maintain the interior of the tubing 17 free of well fluids while in Fig. 2 the valve 21 is opened t0 allow fluid pressure to be exerted in the tubing 17 and on the: pressure recorder 19, the packer 18 being expanded into sealing position to close the annulus A. Thus fluids may pass up through the tubing 17 and the pressure thereof exerted on the recorder 19.
- cement is flowed down the tubing 17 into the casing 15, the packer 18 being collapsed to allow circulation down the tubing 17 and up the annulus A.
- cement such as cement yslurry 27, is deposited in the casing and in the perforations 23 to seal the perforations and to form the plugs or buttons 28 therein.
- the excess cement slurry 27 is removed from the casing 15 by circulating a washing liquid, such as water, mud, and the like, down the annulus A and causing the excess cement slurry to flow up the tubing 17 and thence from the well.
- the tubing 17 is raised such that its lower end 22 is above the interval or zone 12.
- the packer 18 is expanded to seal off the annulus A and a perforator which may be a bullet gun or shaped charged perforator 29 attached to wire line 26 is lowered through the tubing 17 and positioned in the casing 15 adjacent the interval 12.
- the perforator is operated or fired to form perforations 30 thro-ugh the casing and into the interval 12 and to allow production therefrom.
- the gun perforator 29 is withdrawn on wire line 26 as shown in Fig. 5 and the pressure recorder device 19 as shown in Fig. 6 is lowered on wire line 26 and again positioned in the tubing 17 as shown ⁇ in Fig. 7.
- the sequence of operations, as illustrated in Figs. 2 to 6, inclusive, may then be repeated until a commercial productive interval is located.
- the pressure differential from the intervals 13 and 12 is into the well casing 15 and the pressure is exerted on the recorder device 19 with the flow of uids.
- This pressure differential into the well bore may be obtained by swabbing, circulation, or by reducing the hydrostatic column of iiuid in the well to cause ow into the well bore.
- tubing 17 is initially arranged in the well casing 15 as illustrated in Figs. 5, 6, and 7, and it is desired to cement off the perforations 23.
- a tubular extension member such as 35, is lowered on wire line 26 through the tubing 17 until it extends from the lower open end of the tubing 22 into the region of the casing 15 adjacent the perforations 23.
- the tubular extension member 35 has a fishing head 36 and packing 37 and is designed to be supported, anchored and/or sealed in a landing nipple, such as 38, as illustratcd at page 4063 of the Composite Catalog mentioned supra.
- the packer 18 is in the collapsed position and a cement slurry is introduced down the tubing 17 and deposited as a body 27 adjacent the perfo-rations 23 to form plugs or buttons 28 therein.
- the cement slurry employed in Figs. 4 and 4a may suitably be a modified cement, such as described in the Salathiel Patent No. 2,582,459. Other modified cements may suitably be employed.
- a gun perforator such as 29, which may be of the bullet gun or shaped charge type is lowered on the wire line 26 through the open end 22 of the tubing 17 and then fired to form perforations 30 in the casing 15 and in the formation 12.
- the steps are the same as shown in Figs. 6 and 7, the perforator 29 having been withdrawn from the tubing 17 by wire line 26.
- a new method for testing selected intervals in an oil and/ or gas well without requiring round trips.
- This method involves running the tubing with the valve closed, as described in Fig. l, to a depth just above the perforated interval to be tested.
- the packer is set and the valve is opened to allow the test to be made.
- the pressure recorder device is retrieved on a wire line. If the pressure recorder device indicates the zone to be non-productive, a squeeze cementing operation may be performed by depositing cement in the casing through the tubing and closing off the casing and exerting pressure through the tubing suflicient to squeeze the cement through the perforations.
- the cementing operation may be performed, if the well is indicated to be productive, after the interval or zone has become depleted or production therefrom has declined due to water and/or gasinvasion. Regardless of when the cenienting operation is performed, the excess cement is washed out, either as shown in Fig. 4 or in Figs. 4a and 4b, the packer reset and a zone reperforated using a tubing type perforating gun or perforator of the mechanical type which is lowered through the tubing. The pressure recorder is run into the hole again, pressure differential into the casing is provided by swabbing or reducing the hydrostatic head to cause iiuid to flow through the second perforations and the operation repeated until a satisfactory test is obtained.
- a method for completing and servicing a well drilled in the earth to penetrate a plurality of productive intervals and having a casing arranged therein perforated in one of said intervals, said casing containing a hydrostatic column of well liuids sufficient to prevent flow into the perforated casing and in which round trips of tubing are avoided which comprises lowering a tubing string in said well casing having a retrievable pressure recorder arranged therein until the lower end of the tubing is positioned for production from at least said perforated interval, the passageway through the tubing being closed at a level above the pressure recorder, whereby the tubing is free of said well fluids, closing the annular space between the tubing and casing and opening the passageway through the tubing, adjusting the pressure in the well such that pressure from Said perforated interval is eX- erted in said tubing and on said pressure recorder, retrieving said pressure recorder while maintaining the tubing in position whereby the productivity of said perforated interval is indicated by the pressure recorded on
- a method for completing and servicing a well drilled in the earth to penetrate a plurality of productive intervals and having a casing arranged therein perforated in a selected of said intervals to provide first perforations, said casing containing a hydrostatic column of well fluids suicient to prevent ow into the perforated casing and in which round trips of tubing are avoided which comprises lowering a tubing string in said well casing having a retrievable pressure recorder arranged therein until the lower end of the tubing is positioned for production at least through said first perforations, the passageway through the tubing being closed at a level above the pressure recorder, whereby the tubing is free of said well fluids, closing the annular space between the tubing and casing and opening the passageway through the tubing, adjusting the pressure in the well such that pressure is exerted in said tubing and on said pressure recorder, retrieving said pressure recorder while maintaining the tubing in position whereby the productivity of said selected interval is indicated by the pressure recorded on said pressure recorder, obtaining
Description
FIPS-@1i OR Q9844a205 July 22, 1958 c. M. CARoTHERs 2,844,205
METHOD FOR COMPLETING AND SERVICING A WELL Filed Dec. 20. 1955 2 Sheets-Sheet 1 IN V EN TOR.
Campbell M. Carat/refs,
.. ....fdu .X Ll.. Vi, ...\...a\....
Il. lilmm Q.. ...da ...7.
N. (u. n.5.
July 22, 1958 c. M. cARoTHERs 2,844,205
METHOD FOR COMPLETING AND SERVICING A WELL 2 Sheets-Sheet 2 Filed Dec. 20, 1955 F/G. 4b.
F/G. 4o.
INVENTOR. Campbe/l M. Corot/1ers, BY Ann-n. a,
United States Patent O METHOD FOR COMPLETING AND SERVICING A WELL Campbell M. Carothers, Los Angeles, Calif., assignonby mesne assignments, to Esso Research and Engineering Company, Elizabeth, N. Il., a corporation of Delaware Application December 20, 1955, Serial No. 554,214
1s claims. (ci. 16s-4.)
The present invention is directed to a method for completing and servicing a well. More particularly, the invention is concerned with a method for testing a well without pulling the pipe from the well. In its more specific aspects, the invention is concerned with a method for testing a well drilled through a plurality of productive intervals without pulling the pipe from the well.
The present invention may be briefly described as a method for completing and servicing a Well drilled in the earth to penetrate a plurality of productive intervals and having a casing arranged therein penetrated in a selected of said intervals to provide first perforations. In the present invention a tubing string is lowered in the well having a retrievable pressure recorder arranged therein until the lower end of the tubing is positioned for production at least through the rst perforations in the casing. The annular space between the tubing and casing is closed such that pressure is exerted in the tubing and on the pressure recorder. The pressure recorder is retrieved from the well while the tubing is maintained in position whereby the productivity of a selected interval is indicated by the pressure recorded on the pressure recorder. Production is obtained from the well from the selected interval as indicated by the pressure. If pressure is shown by the pressure recorder, then the well is produced until production becomes uneconomical. If no or insuicient pressure is shown by the pressure recorder for commercial production of well fluids then the rst perforations are sealed by introducing cement through the tubing into the first perforations to seal same. Thereafter the casing is reperforated to provide second perforations in one of the intervals and the pressure recorder is lowered again in the well and pressure exerted therein from the second perforations. The pressure recorder is again retrieved to determine whether or not production may be had from the second perforations and production is obtained through the second perforations as indicated by the pressure.
In accordance with the present invention, the casing may be reperforated in an interval vertically displaced from the perforated and sealed interval or the casing may be reperforated in the perforated and sealed interval or to perforate more of the productive interval in the same' zone which was originally perforated.
The tubing string is lowered in the well casing to position its lower end above the plurality of intervals or it is lowered to position its lower end above the perforated interval. The tubing string may be lowered to position its lower end above the perforated interval and then the tubing is raised after sealing the perforated interval and before reperforating the casing to position its lower end above an interval vertically displaced from the perforated and sealed interval.
The present invention is quite advantageous in that it eliminates unnecessary raising and lowering of the pipe, known in the industry as round trips. ln other words, a round trip is the running in of a well pipe in the well and then pulling same out of the well for replacement "ice of a tool or a section of pipe. In the present invention during completion operations in oil and/or gas wells and the like after the production casing is set, drill stein tests are usually made to evaluate the producing zone. Not infrequently it is necessary to repair a primary cement job, which is cement set around the casing in the well bore, or to perforate more of a productive interval than originally perforated or to reperforate the same interval or to fracture or to acidize a productive interval. Sometimes a combination of any or all of these operations is required which would mean running the pipe in the well and pulling same out of the well many times. Present methods of drill stem testing do not provide a means of cementing and reperforating with the formation testing tool in the well. Thus, it is necessary to pull the formation test tool and then conduct the cementing operation, repull the cementing tools and then reperforate the cemented casing. It will be apparent that considerable rig time is consumed during the numerous round trips of the pipe.
In accordance with the present invention, round trips of pipe are eliminated and wells are completed and serviced while formations are tested selectively without removing the tubing string from the well. Thus the invention is quite advantageous and useful in reducing the amount of time consumed in testing and completing wells and thus allowing the wells to be completed and serviced more cheaply than heretofore. Also, by maintaining the tubing in the well, improved results are obtained in that there is less damage to producing formations than that caused by pulling pipe, tubing, and tools from the well using a fluid foreign to formation fluids inside of the casing to control formation pressure.
The present invention may be further illustrated by reference to the drawing in which:
Figs. 1 to 7 represent a sequential stepwise mode of practicing the invention, and
Figs. 4a, 4b, and 5a illustrate a modified mode of practicing the invention taken in conjunction with Figs. 1 to 7.
Referring now to Figs. l to 7, in which identical numerals will be employed to designate identical parts, numeral 11 designates a well bore drilled from the earths surface, not shown, to penetrate a plurality of productive formations 12 and 13 separated by non-productive formation 14. Formations 12 and 13 may be sands, strata, zones, or intervals in a productive formation while non-productive formation 14 may be a non-productive interval, stratum or zone in a productive or non-productive formation.
A casing 15 is cemented` in the well bore 11 with a primary cement job 16 and a tubing string 17 is run into the well casing 15 provided adjacent its lower end with packer 18 in inoperative position. Arranged in the lower end of the tubing 17 is a pressure recorder device 19 which is provided with a sealing means 20 to allow a seal between the interior wall of the tubing 17 and the interior wall of the pressure recorder 19. The pressure recorder 19 is a suitable wire line pressure recorder, such as described in U. S. Patent 2,189,919, issued Feb. 13, 1940, in the name of Thomas V. Moore. Other pressure recording instruments available in the industry may be used such as illustrated on page 2720 of the 1952-53 Composite Catalog of Oil Field & Pipeline Equipment.
A valve, such as 21, is arranged in the tubing 17. This valve may be a valve or closure member as described in patent application Serial No. 554,215 tiled December 20, 1955, for James E. Willingham, Jr.
bulletin No. 316 printed in the United States of America and may be set by right hand rotation of the tubular string 17 to position the upper packer slips on the tapered member of the packer and in gripping Contact with the inner surface of the well casing 15. Subsequent application of weight, resulting from lowering the tubing string 17 to be Supported by the packer slip Contact with the well casing 15, causes deformation of the rubber packing element to form a seal in the annulus between the tubing string 17 and the well casing 15.
The example shown in Fig. 1 is in the running in position, the pressure recorder device being arranged in the tubing at the well head. In Fig. 2 the packer 18 is in operative position to close the annulus A between the tubing 17 and the casing 15. The lower open end 22 of the tubing 17 is arranged immediately above the productive interval 13 in which perforations generally indicated by the numeral 23 had previously been formed such as by lowering a gun perforator through the casing 15 and firing same. v
In the running in position, as illustrated in Fig. l, the valve 21 may be in the closed position to maintain the interior of the tubing 17 free of well fluids while in Fig. 2 the valve 21 is opened t0 allow fluid pressure to be exerted in the tubing 17 and on the: pressure recorder 19, the packer 18 being expanded into sealing position to close the annulus A. Thus fluids may pass up through the tubing 17 and the pressure thereof exerted on the recorder 19.
After the pressure has been exerted on the recorder 19, it is retrieved from the well by engaging the fishing head 24 thereof with a wire line fishing tool 25 attached to the lower end of wire line 26 and pulling the recorder device 19 from the tubing 17, the valve 21 being of a type to allow the recorder 19 to be retrieved from the tubing. The removal of the pressure recorder is shown more clearly in Fig. 3.
After the pressure recorder has been removed as shown in Fig. 3, cement is flowed down the tubing 17 into the casing 15, the packer 18 being collapsed to allow circulation down the tubing 17 and up the annulus A. Cement, such as cement yslurry 27, is deposited in the casing and in the perforations 23 to seal the perforations and to form the plugs or buttons 28 therein. Thereafter the excess cement slurry 27 is removed from the casing 15 by circulating a washing liquid, such as water, mud, and the like, down the annulus A and causing the excess cement slurry to flow up the tubing 17 and thence from the well.
After the plugs 28 have been formed to seal off the perforations 23 and to seal the zone 13 from the casing, the tubing 17 is raised such that its lower end 22 is above the interval or zone 12. The packer 18 is expanded to seal off the annulus A and a perforator which may be a bullet gun or shaped charged perforator 29 attached to wire line 26 is lowered through the tubing 17 and positioned in the casing 15 adjacent the interval 12. The perforator is operated or fired to form perforations 30 thro-ugh the casing and into the interval 12 and to allow production therefrom.
Thereafter the gun perforator 29 is withdrawn on wire line 26 as shown in Fig. 5 and the pressure recorder device 19 as shown in Fig. 6 is lowered on wire line 26 and again positioned in the tubing 17 as shown `in Fig. 7. The sequence of operations, as illustrated in Figs. 2 to 6, inclusive, may then be repeated until a commercial productive interval is located. Thus, in Figs. 2 and 7, the pressure differential from the intervals 13 and 12 is into the well casing 15 and the pressure is exerted on the recorder device 19 with the flow of uids. This pressure differential into the well bore may be obtained by swabbing, circulation, or by reducing the hydrostatic column of iiuid in the well to cause ow into the well bore.
In accordance with the present invention, it is possible CII to arrange the lower open end 22 of the tubing 17 initially above the intervals 12, 13, and 14 and to conduct operations, such as illustrated in Figs. 4 to 5, without raising the tubing.
Referring now to Figs. 4a, 4b, and 5a, the tubing 17 is initially arranged in the well casing 15 as illustrated in Figs. 5, 6, and 7, and it is desired to cement off the perforations 23. To conduct such operations with tubing 22 in the position as shown in Figs. 4a, 4b, and Fig. 5a, a tubular extension member, such as 35, is lowered on wire line 26 through the tubing 17 until it extends from the lower open end of the tubing 22 into the region of the casing 15 adjacent the perforations 23. The tubular extension member 35 has a fishing head 36 and packing 37 and is designed to be supported, anchored and/or sealed in a landing nipple, such as 38, as illustratcd at page 4063 of the Composite Catalog mentioned supra. As shown in Fig. 4a, the packer 18 is in the collapsed position and a cement slurry is introduced down the tubing 17 and deposited as a body 27 adjacent the perfo-rations 23 to form plugs or buttons 28 therein. The cement slurry employed in Figs. 4 and 4a may suitably be a modified cement, such as described in the Salathiel Patent No. 2,582,459. Other modified cements may suitably be employed.
After the buttons or plugs 28 have been formed in the perforations 23 to seal off the formation or zone 13, excess cement slurry is circulated from the casing 15 by circulating fluid, such as water or mud, down the annulus A and up through the tubular extension member 35 and thence through the tubing 17 to the wellhead.
Thereafter, as shown in Fig. 5a, the packer 18 is expanded to seal off the annulus A and a gun perforator, such as 29, which may be of the bullet gun or shaped charge type is lowered on the wire line 26 through the open end 22 of the tubing 17 and then fired to form perforations 30 in the casing 15 and in the formation 12. Thereafter the steps are the same as shown in Figs. 6 and 7, the perforator 29 having been withdrawn from the tubing 17 by wire line 26.
From the foregoing description taken with the drawing, it will be seen that a method has been provided for testing and completing oil and/or gas wells and the like without requiring the removal of the tubing string from the well. In fact, as shown in conjunction with Figs. 1 to 7, and Figs. 4a, 4b, and 5a, such operations may be conducted without moving the tubing after the running in operation. While it is possible to place the tubing in the well and then run the recorder device on a wire line as shown in Fig. 6, instead of running it into the well when the tubing is run in, as shown in Fig. l, the operation as described with respect to Fig. 1 eliminates one wire line running operation and, therefore, is to be preferred.
Thus, in accordance with the present invention, a new method is provided for testing selected intervals in an oil and/ or gas well without requiring round trips. This method involves running the tubing with the valve closed, as described in Fig. l, to a depth just above the perforated interval to be tested. The packer is set and the valve is opened to allow the test to be made. After the test has been made the pressure recorder device is retrieved on a wire line. If the pressure recorder device indicates the zone to be non-productive, a squeeze cementing operation may be performed by depositing cement in the casing through the tubing and closing off the casing and exerting pressure through the tubing suflicient to squeeze the cement through the perforations. The cementing operation may be performed, if the well is indicated to be productive, after the interval or zone has become depleted or production therefrom has declined due to water and/or gasinvasion. Regardless of when the cenienting operation is performed, the excess cement is washed out, either as shown in Fig. 4 or in Figs. 4a and 4b, the packer reset and a zone reperforated using a tubing type perforating gun or perforator of the mechanical type which is lowered through the tubing. The pressure recorder is run into the hole again, pressure differential into the casing is provided by swabbing or reducing the hydrostatic head to cause iiuid to flow through the second perforations and the operation repeated until a satisfactory test is obtained.
The nature and objects of the present invention having been completely described and illustrated, what I wish to claim as new and useful and to secure by Letters Patent 1s:
1. A method for completing and servicing a well drilled in the earth to penetrate a plurality of productive intervals and having a casing arranged therein perforated in one of said intervals, said casing containing a hydrostatic column of well liuids sufficient to prevent flow into the perforated casing and in which round trips of tubing are avoided, which comprises lowering a tubing string in said well casing having a retrievable pressure recorder arranged therein until the lower end of the tubing is positioned for production from at least said perforated interval, the passageway through the tubing being closed at a level above the pressure recorder, whereby the tubing is free of said well fluids, closing the annular space between the tubing and casing and opening the passageway through the tubing, adjusting the pressure in the well such that pressure from Said perforated interval is eX- erted in said tubing and on said pressure recorder, retrieving said pressure recorder while maintaining the tubing in position whereby the productivity of said perforated interval is indicated by the pressure recorded on said pressure recorder, and then obtaining production from said perforated interval as indicated by the pressure on said pressure recorder.
2. A method for completing and servicing a well drilled in the earth to penetrate a plurality of productive intervals and having a casing arranged therein perforated in a selected of said intervals to provide first perforations, said casing containing a hydrostatic column of well fluids suicient to prevent ow into the perforated casing and in which round trips of tubing are avoided, which comprises lowering a tubing string in said well casing having a retrievable pressure recorder arranged therein until the lower end of the tubing is positioned for production at least through said first perforations, the passageway through the tubing being closed at a level above the pressure recorder, whereby the tubing is free of said well fluids, closing the annular space between the tubing and casing and opening the passageway through the tubing, adjusting the pressure in the well such that pressure is exerted in said tubing and on said pressure recorder, retrieving said pressure recorder while maintaining the tubing in position whereby the productivity of said selected interval is indicated by the pressure recorded on said pressure recorder, obtaining production from said selected interval as indicated by the pressure thereof, sealing said first perforations in said casing, reperforating the casing to provide second perforations in one of said intervals, arranging the pressure recorder in the lower end of the tubing, exerting pressure in said tubing and on said pressure recorder through the second perforations, again retrieving said pressure recorder from the tubing whereby productivity is indicated by the pressure recorded on said pressure recorder, and then obtaining production through the second perforations.
3. A method in accordance with claim 2 in which the casing is reperforated in an interval vertically displaced from the perforated and sealed interval.
4. A method in accordance with claim 2 in which the casing is reperforated in the perforated and sealed interval.
5. A method in accordance with claim 2 in which the tubing string is lowered in the casing to position its lower end above the plurality of intervals.
,6. A method in accordance with claim 2 in which the tubing string is lowered to position its lower end above the perforated interval.
7. A method in accordance with claim 2 in which the tubing string is lowered to position its lower end above the perforated interval and the tubing is raised, after sealing the perforated interval and before reperforating the casing, to position its lower end above an interval vertically displaced from the perforated and sealed interval.
8. A method for completing and servicing a well drilled in the earth to penetrate a plurality of productive intervals and having a casing arranged therein perforated in a selected of said intervals to provide first perforations, said casing containing a hydrostatic column of well uids suflicient to prevent flow into the perforated casing and in which round trips of tubing are avoided, which comprises lowering a tubing string in said well casing having a retrievable pressure recorder arranged therein until the lower end of the tubing is positioned for production through said first perforations, the passageway through the tubing being closed at a level above the pressure recorder,whereby the tubing is free of said well fluids, closing the annular space between the tubing and casing and opening the passageway through the tubing, adjusting the pressure in the well such that pressure is exerted in said tubing and on said pressure recorder, retrieving said pressure recorder while maintaining the tubing in position whereby the productivity of said selected interval is indicated by the pressure recorded on said pressure recorder, obtaining production from said selected interval as indicated by the pressure on said pressure recorder, owing a cement slurry through the tubing to deposit same in the rst perforations, sealing said casing in said perforated interval with said cement slurry, lowering a perforator through the tubing and reperforating the casing to provide second perforations in one of said intervals, lowering the pressure-recorder in the tubing and arranging the pressure recorder in the lower end of the tubing, reducing the pressure in the casing to provide a pressure differential into the casing, exerting pressure in said tubing and on said pressure recorder through the second perforations, again retrieving said pressure recorder from the tubing whereby the productivity of the reperforated interval is indicated by the pressure reorded on said pressure recorder, and obtaining production through the second perforations.
9. A method in accordance with claim 8 in which the casing is reperforated in an interval vertically displaced from the perforated and sealed interval.
10. A method in accordance with claim 8 in which the casing is reperforated in the perforated and sealed interval.
11. A method in accordance with claim 8 in which the tubing string is lowered in the casing to position its lower end above the plurality of intervals. l
12. A method in accordance with claim 8 in which the tubing string is lowered to posiiton its lower end above the perforated interval.
13. A method in accordance with claim 8 in which the tubing string is lowered to position its lower end above the perforated interval and the tubing is raised, after sealing the perforated interval and before reperforating the casing, to position its lower end above an interval vertically displaced from the perforated and sealed interval.
References Cited in the le of this patent UNITED STATES PATENTS Tausch Aug. 28, 1956
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US554214A US2844205A (en) | 1955-12-20 | 1955-12-20 | Method for completing and servicing a well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US554214A US2844205A (en) | 1955-12-20 | 1955-12-20 | Method for completing and servicing a well |
Publications (1)
Publication Number | Publication Date |
---|---|
US2844205A true US2844205A (en) | 1958-07-22 |
Family
ID=24212492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US554214A Expired - Lifetime US2844205A (en) | 1955-12-20 | 1955-12-20 | Method for completing and servicing a well |
Country Status (1)
Country | Link |
---|---|
US (1) | US2844205A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2994380A (en) * | 1958-05-05 | 1961-08-01 | Jersey Prod Res Co | Plural completion of wells |
US3104715A (en) * | 1963-09-24 | Treating liquid device for gas wells | ||
US3126960A (en) * | 1964-03-31 | Method for the completion of a well bore | ||
US3216497A (en) * | 1962-12-20 | 1965-11-09 | Pan American Petroleum Corp | Gravel-packing method |
USRE32336E (en) * | 1980-10-06 | 1987-01-27 | Schlumberger Technology Corporation | Method and apparatus for conducting logging or perforating operations in a borehole |
US4690214A (en) * | 1983-04-07 | 1987-09-01 | Institut Francais Du Petrole | Method and a device for carrying out measurements and/or operations in a well |
US20070029086A1 (en) * | 2005-08-02 | 2007-02-08 | Halliburton Energy Services, Inc. | Methods of forming packs in a plurality of perforations in a casing of a wellbore |
US20070284116A1 (en) * | 2006-06-13 | 2007-12-13 | Precision Energy Services, Inc. | System and Method for Releasing and Retrieving Memory Tool with Wireline in Well Pipe |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2212044A (en) * | 1939-07-24 | 1940-08-20 | Howard W Stepp | Method and apparatus for perforating well casings |
US2347746A (en) * | 1941-01-17 | 1944-05-02 | Phillips Petroleum Co | Method of measuring fluid flow |
US2693856A (en) * | 1952-04-01 | 1954-11-09 | Standard Oil Dev Co | Well completion method |
US2749989A (en) * | 1951-10-31 | 1956-06-12 | Exxon Research Engineering Co | Method and means of completing a well |
US2760578A (en) * | 1954-03-11 | 1956-08-28 | Exxon Research Engineering Co | Method for completion in a plurality of hydrocarbon productive strata |
-
1955
- 1955-12-20 US US554214A patent/US2844205A/en not_active Expired - Lifetime
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2212044A (en) * | 1939-07-24 | 1940-08-20 | Howard W Stepp | Method and apparatus for perforating well casings |
US2347746A (en) * | 1941-01-17 | 1944-05-02 | Phillips Petroleum Co | Method of measuring fluid flow |
US2749989A (en) * | 1951-10-31 | 1956-06-12 | Exxon Research Engineering Co | Method and means of completing a well |
US2693856A (en) * | 1952-04-01 | 1954-11-09 | Standard Oil Dev Co | Well completion method |
US2760578A (en) * | 1954-03-11 | 1956-08-28 | Exxon Research Engineering Co | Method for completion in a plurality of hydrocarbon productive strata |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3104715A (en) * | 1963-09-24 | Treating liquid device for gas wells | ||
US3126960A (en) * | 1964-03-31 | Method for the completion of a well bore | ||
US2994380A (en) * | 1958-05-05 | 1961-08-01 | Jersey Prod Res Co | Plural completion of wells |
US3216497A (en) * | 1962-12-20 | 1965-11-09 | Pan American Petroleum Corp | Gravel-packing method |
USRE32336E (en) * | 1980-10-06 | 1987-01-27 | Schlumberger Technology Corporation | Method and apparatus for conducting logging or perforating operations in a borehole |
US4690214A (en) * | 1983-04-07 | 1987-09-01 | Institut Francais Du Petrole | Method and a device for carrying out measurements and/or operations in a well |
US20070029086A1 (en) * | 2005-08-02 | 2007-02-08 | Halliburton Energy Services, Inc. | Methods of forming packs in a plurality of perforations in a casing of a wellbore |
US7296625B2 (en) * | 2005-08-02 | 2007-11-20 | Halliburton Energy Services, Inc. | Methods of forming packs in a plurality of perforations in a casing of a wellbore |
US20070284116A1 (en) * | 2006-06-13 | 2007-12-13 | Precision Energy Services, Inc. | System and Method for Releasing and Retrieving Memory Tool with Wireline in Well Pipe |
US7537061B2 (en) * | 2006-06-13 | 2009-05-26 | Precision Energy Services, Inc. | System and method for releasing and retrieving memory tool with wireline in well pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2105104C (en) | Methods of perforating and testing wells using coiled tubing | |
US3277962A (en) | Gravel packing method | |
US2812025A (en) | Expansible liner | |
US2749989A (en) | Method and means of completing a well | |
US5282509A (en) | Method for cleaning cement plug from wellbore liner | |
US2043225A (en) | Method and apparatus for testing the productivity of the formation in wells | |
US2776013A (en) | Apparatus for completion in a plurality of hydrocarbon productive strata | |
US3441095A (en) | Retrievable through drill pipe formation fluid sampler | |
US4423625A (en) | Pressure transient method of rapidly determining permeability, thickness and skin effect in producing wells | |
US3455387A (en) | Well completion technique and apparatus for use therewith | |
US3251416A (en) | Method for improving permeability | |
US3482629A (en) | Method for the sand control of a well | |
US2783026A (en) | Method for fracturing formations | |
US2844205A (en) | Method for completing and servicing a well | |
US3032108A (en) | Well packer apparatus | |
US3268004A (en) | Apparatus for improving the permeability of subterranean formations | |
US20060108115A1 (en) | System and method for fracturing and gravel packing a wellbore | |
US3427653A (en) | Methods for drill stem testing | |
US2836246A (en) | Method of removing liquid from well bore hole | |
US3428128A (en) | Method and apparatus for use in gravel packing wells | |
US3329205A (en) | Thermal production process for oil wells and method of equipping such wells | |
US3384170A (en) | Well-bore sampling device and process for its use | |
US2762440A (en) | Apparatus for cementing wells | |
US3130782A (en) | Cementing of wells | |
US2846876A (en) | Well testing device |