US2602321A - Method of constructing a prefabricated bridge structure - Google Patents

Method of constructing a prefabricated bridge structure Download PDF

Info

Publication number
US2602321A
US2602321A US736311A US73631147A US2602321A US 2602321 A US2602321 A US 2602321A US 736311 A US736311 A US 736311A US 73631147 A US73631147 A US 73631147A US 2602321 A US2602321 A US 2602321A
Authority
US
United States
Prior art keywords
piling
cap
bridge
grout
members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US736311A
Inventor
John E Blair
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US736311A priority Critical patent/US2602321A/en
Application granted granted Critical
Publication of US2602321A publication Critical patent/US2602321A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Definitions

  • the present invention relates to a procedure which provides precast concrete piling in which metal attaching structures have been embedded insuch a manner that certain parts thereof are exposed so that the cap for thepiling may be affixed thereto after the piling has been cut off near thedesired elevation, and the stringers for the bridge then affixed to the caps, and the procedure furthermore provides for an arrangement whereby a cement grout can be injected between the top of the piling and the cap therefor so as to insure a uniform supporting area.
  • Another object of the invention is to provide a means and method whereby a precast concrete piling and cap construction may be amxed together by welding angle irons to metal strips which are embedded in the piling and then connecting the cap construction to the angle irons, and also a means and method which permits the injection of cement grout through openings in the cap so as to fill in above the uneven surface comprising the top of the piling.
  • Still another object of the invention is to provide an arrangement whereby a cement grout introduced through an opening in a precast concrete cap may be confined above the top of a supporting precast concrete piling and pressure maintained thereon while the grout is setting so tion is considered in connection with the accompanying drawings, wherein:
  • Fig. 1 is a transverse view of a bridge structure constructed in accordance with the invention and illustrating the cap, stringers and bridge floor as having been welded in position on top of the precast piling.
  • Fig. 2 is a broken detail view taken at right angles to the arrangement shown in Fig. 1 and illustrating how the fioor is ailixed to the stringers, the stringers to the cap, the cap to the piling,
  • Fig. 3 is a view similar to Fig. 1, showing in enlarged detail the space between the top of the piling and the cap before it is filled with grout.
  • Fig. 1 several precast concrete'piles 2 are shown as having been driven into position. It is of course impossible to drive all of the pilings which are to support the bridge structure into the earth at the same distance and also the top of each piling cannot be cut oii exactly but only at approximately the same elevation as any other piling.
  • Fig. 3 shows the upper end 8 of the'cement 4 of the piling as having been cut off rather unevenly inany suitable manner.
  • the next step to then position the cap 6 across a number of the piling in order to form the base or foundation for the rest of the bridge.
  • the cap 6, as seen in Fig. 2, also has angle irons 9 cast along its corners with the concrete so as to facilitate the attaching of the cap to the piling.
  • the attaching members ID are in the form of angle iron pieces and have been positioned against the side II of the piling 2 and against the metallic corner pieces, as the angles 9, which extend along the base 12 of the cap 6. These angle irons are then welded to the angles 9 by the beads [5 of welding material as seen in Fig. 3.
  • attaching members welded to 'both the piling and the cap, determine the position of the cap and as seen in Fig. 1 the cap extends transversely across the substantially horizontally extending surfaces of the angles it at the tops of the pilings and in substantially the same horizontal plane which plane can be termed a reference elevation above the concrete top of each piling.
  • Fig. 1 and Fig. 3 show in detail the arrangement for introducing a cement grout through openings such as 22 extending vertically through the cap and leading into the space 2! between the top of the piling and bottom l2.
  • any load applied to the cap will be uniformly transmitted to the top of the piling.
  • the next step in the construction of the bridge would be the position of the longitudinal bridge stringers 49, a number 01 which are shown in Fig. 1.
  • Such stringers are usually in the form of I or H beams and they will be arranged longitudinally of the bridge and crossing a number of the caps
  • the upper angle irons or attaching members 9 on the cap will receive and support these stringers 55 so that they may be welded thereto as seen in Fig. 3 by the beads iii of the welding material.
  • the floor of the bridge indicated generally at may also be made up of precast concrete slabs 55 which may have the same type of angle irons cast therewith in the form of the attaching members particularly on the lower edges thereof. As these slabs are positioned on the stringers so, they may be welded in place by the beads 53 of the welding material as seen in Fig. '3. Fig. 1
  • the particular advantage of the present invention resides in the fact that all of the, portions thereof may be prefabricated and the entire bridge can be assembled in a minimum of time with a minimum of expense.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

J E. BLAIR July 8, 1952 METHOD OF CONSTRUCTING A PREFABRICATED BRIDGE STRUCTURE Filed March 21. 1947 INF. a
Jorm E. BLAIR.
INVENTOR.
ATTORNEYS Patented July 8, 1952 METHOD OF CONSTRUCTING A PREFAB- RICATED BRIDGE STRUCTURE John E. Blair, Bryan, Tex.
Application March 21, 1947,Serial No. 736,311
1 Claim. 1
'I?he invention relates to a supporting structure and particularly to the arrangement and assembly of a bridge.
Considerable difiiculty has been encountered in constructing highway bridges of concrete unless the entire bridge, including the footing, is cast as a unitary structure. The difiiculty arises in providing a connection between thepiling, the caps therefor, and the supporting stringers for the bridge. This difficulty arises due to the fact that it is difficult to arrange a uniform level supporting structure for the bridge on top of the piling where concrete piling has been driven. With wooden piling and timbers, of course the wood can be out and fitted, but such a procedure is impossible with concrete precast structures.
as to insure that the load will be evenly and uniformly distributed from the cap to the piling. Other and further objects of the invention will be readily apparent when the following descrip- The present invention relates to a procedure which provides precast concrete piling in which metal attaching structures have been embedded insuch a manner that certain parts thereof are exposed so that the cap for thepiling may be affixed thereto after the piling has been cut off near thedesired elevation, and the stringers for the bridge then affixed to the caps, and the procedure furthermore provides for an arrangement whereby a cement grout can be injected between the top of the piling and the cap therefor so as to insure a uniform supporting area.
It is one of the objects of the invention to provide concrete piling havingmetal attaching members embedded therein in such amanner that they are partly exposed so that means connecting the piling and caps may be welded thereto.
It is another object of the invention to provide concrete piling and a cap therefor in which angle irons or other structural members have been partially embedded so that they are also partially exposedin order that like members may be welded thereto so that thecap may be connected to such like members.
Another object of the invention is to provide a means and method whereby a precast concrete piling and cap construction may be amxed together by welding angle irons to metal strips which are embedded in the piling and then connecting the cap construction to the angle irons, and also a means and method which permits the injection of cement grout through openings in the cap so as to fill in above the uneven surface comprising the top of the piling.
Still another object of the invention is to provide an arrangement whereby a cement grout introduced through an opening in a precast concrete cap may be confined above the top of a supporting precast concrete piling and pressure maintained thereon while the grout is setting so tion is considered in connection with the accompanying drawings, wherein:
Fig. 1 is a transverse view of a bridge structure constructed in accordance with the invention and illustrating the cap, stringers and bridge floor as having been welded in position on top of the precast piling.
Fig. 2 is a broken detail view taken at right angles to the arrangement shown in Fig. 1 and illustrating how the fioor is ailixed to the stringers, the stringers to the cap, the cap to the piling,
and how the cement grout is confined about the head of the piling.
Fig. 3 is a view similar to Fig. 1, showing in enlarged detail the space between the top of the piling and the cap before it is filled with grout.
In Fig. 1 several precast concrete'piles 2 are shown as having been driven into position. It is of course impossible to drive all of the pilings which are to support the bridge structure into the earth at the same distance and also the top of each piling cannot be cut oii exactly but only at approximately the same elevation as any other piling.
The particular piling here illustrated are seen in detail in Figures 2 and 3, where the body 4 of concrete has been faced along each corner with angle irons 5 or any other suitable structural steel members. These members 5 are used for attaching other portions of the bridge to the piling, for instance, such as the members 10 to which the cross-piece or can 6 shown in the various figures of the drawing may be connected.
Fig. 3 shows the upper end 8 of the'cement 4 of the piling as having been cut off rather unevenly inany suitable manner.
After the pilings have been driven and cut off, the next step to then position the cap 6 across a number of the piling in order to form the base or foundation for the rest of the bridge. The cap 6, as seen in Fig. 2, also has angle irons 9 cast along its corners with the concrete so as to facilitate the attaching of the cap to the piling.
In Fig.1 the attaching members ID are in the form of angle iron pieces and have been positioned against the side II of the piling 2 and against the metallic corner pieces, as the angles 9, which extend along the base 12 of the cap 6. These angle irons are then welded to the angles 9 by the beads [5 of welding material as seen in Fig. 3.
These attaching members, welded to 'both the piling and the cap, determine the position of the cap and as seen in Fig. 1 the cap extends transversely across the substantially horizontally extending surfaces of the angles it at the tops of the pilings and in substantially the same horizontal plane which plane can be termed a reference elevation above the concrete top of each piling.
:It is not intended, however, that these attaching members it shall carry the load of the bridge and the trafiic, and in order to transmit such weight from the bridge to the piling. Fig. 1 and Fig. 3 show in detail the arrangement for introducing a cement grout through openings such as 22 extending vertically through the cap and leading into the space 2! between the top of the piling and bottom l2.
Concrete grout will be forced'under pressure through openings 29 into the space 2! so as to provide a supporting surface on the top of the piling. The angle irons It! of course close the space 25 on two sides of the piling While the other two sides would normally remain open. In order therefore to close the two opposite sides of the space 2! and form a complete closure into which the cement grout 25 may be forced under pressure, the invention contemplates another pair of angle irons or other suitable members 32 which will be temporarily positioned as seen in Fig. 2 in dotted lines. These two members 32 canbe suitably held in position by a through bolt They are placed preferably at the same elevation as the angles it so that the two angles 12 and the two angles 39 form a complete enclosure. 1t known of course that cement grout tends to shrink somewhat while setting and with this in view, it is intend-ed that pressure maybe applied to the grout through the opening 22 after it has been introduced. For instance this may be done by inserting an iron bar to which a load can be applied in order to hold the grout under pressure in the space 86. I
After these operations have been performed, any load applied to the cap will be uniformly transmitted to the top of the piling.
The next step in the construction of the bridge would be the position of the longitudinal bridge stringers 49, a number 01 which are shown in Fig. 1. Such stringers are usually in the form of I or H beams and they will be arranged longitudinally of the bridge and crossing a number of the caps The upper angle irons or attaching members 9 on the cap will receive and support these stringers 55 so that they may be welded thereto as seen in Fig. 3 by the beads iii of the welding material.
The floor of the bridge indicated generally at may also be made up of precast concrete slabs 55 which may have the same type of angle irons cast therewith in the form of the attaching members particularly on the lower edges thereof. As these slabs are positioned on the stringers so, they may be welded in place by the beads 53 of the welding material as seen in Fig. '3. Fig. 1
shows these slabs 5! as being of substantial length, namely, the width of the bridge, and as having a guard curb portion 55 at the end so that when all of these guards 55 are taken together, they form an upstanding edge on the bridge.
The particular advantage of the present invention resides in the fact that all of the, portions thereof may be prefabricated and the entire bridge can be assembled in a minimum of time with a minimum of expense.
' In order to form a suitable supporting cap on the piling heretofore it has been necessary to build a form about the top of the piling which is usually up in the air a considerable distance taching metal means to the metal portions at the tops of the piles to present substantially horizontally extending surfaces at substantially the reference elevation, disposing perforated, precast caps having exposed metal portions embedded therein to be supported by the piles with the cap metal portions bearing upon the substantially horizontally extending surfaces of the 7 metal means and with the perforations of the cap disposed over the piles, connecting the cap metal portions anol'the inetal'rneans, completing the enclosure of the spaces at the tops of the piles and below the caps, inserting a grout material through the perforations to fill the spaces, and applying pressure to the grout to insure that a supporting grout surface is provided on the piles for the caps when the grout hardens.
JOHN E. BLAIR.
REFERENQES orrEn The following references are of record in the file of thispatent:
UNITED STATES PATENTS Number Name Date 918,378 Sunderland Mar. 23, 19GB 918,699 Ransoine Apr. 20, 1909 1,303,741 Thomas May 13, 1919 1,472,603 Lally Oct. 30, 1923 1,515,257 Krasnow Nov. 11, 1924 2,050,935 Dresser Aug. 11; 1936 2,287,210 Wellborn et al. June 23,1942
UTE-IE3, REFEI-ZE'L ECES Engineering News-Record, April 18, 1946, pages 82 and 83.
US736311A 1947-03-21 1947-03-21 Method of constructing a prefabricated bridge structure Expired - Lifetime US2602321A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US736311A US2602321A (en) 1947-03-21 1947-03-21 Method of constructing a prefabricated bridge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US736311A US2602321A (en) 1947-03-21 1947-03-21 Method of constructing a prefabricated bridge structure

Publications (1)

Publication Number Publication Date
US2602321A true US2602321A (en) 1952-07-08

Family

ID=24959384

Family Applications (1)

Application Number Title Priority Date Filing Date
US736311A Expired - Lifetime US2602321A (en) 1947-03-21 1947-03-21 Method of constructing a prefabricated bridge structure

Country Status (1)

Country Link
US (1) US2602321A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3138899A (en) * 1959-10-15 1964-06-30 Homer M Hadley Structurally integrated composite members
US3295276A (en) * 1964-02-10 1967-01-03 Stanley Rene Inc J Bridge
US3349527A (en) * 1964-08-06 1967-10-31 Brunspile Corp Multi-level building construction including a combination pile and column
US3794433A (en) * 1971-07-08 1974-02-26 Schupack Ass Segmental precast concrete post-tensioned overpass bridges with cantilevered abutment
US3833960A (en) * 1972-08-23 1974-09-10 W Herth Process for the construction of underpasses and an abutment for use therein
US3843988A (en) * 1971-07-19 1974-10-29 Hess H Method for excavating an underpass beneath an existing roadway
US3906687A (en) * 1973-10-09 1975-09-23 Morris Schupack Segmental precast concrete post-tensioned overpass bridges with cantilevered abutment
FR2418838A1 (en) * 1978-03-02 1979-09-28 Doris Dev Richesse Sous Marine Jetty type platform for shallow water - uses prefabricated grillage decks spanning piers of triple column form with head and tow beams
US4290716A (en) * 1979-04-06 1981-09-22 Compagnie Generale Pour Les Developpements Operationnels Des Richesses Sous Marines "C. G. Doris" Platform resting on the bottom of a body of water, and method of manufacturing the same
US4977636A (en) * 1989-08-30 1990-12-18 King John B Pile supported bridge assembly
US5771518A (en) * 1989-06-16 1998-06-30 Roberts; Michael Lee Precast concrete bridge structure and associated rapid assembly methods
US20030061672A1 (en) * 1998-05-06 2003-04-03 Eustace Nicholas J. Bridge construction method and composite girder for use in same
US20050262651A1 (en) * 2002-05-24 2005-12-01 Snead Edwin D Method of moving a component underneath a bridge assembly with a cable

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US916378A (en) * 1908-02-15 1909-03-23 James C Sunderland Corner-plate for concrete piers, &c.
US918699A (en) * 1906-12-31 1909-04-20 Ernest Leslie Ransome Concrete building construction.
US1303741A (en) * 1919-05-13 Beintorced-cohcrete bridge construction
US1472603A (en) * 1923-09-25 1923-10-30 Lally John Cap for building columns
US1515257A (en) * 1922-08-29 1924-11-11 Krasnow Harry Metal building structure
US2050935A (en) * 1935-02-19 1936-08-11 George L Dresser Metallic flooring
US2287210A (en) * 1939-11-14 1942-06-23 Arvin S Wellborn Bridge construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1303741A (en) * 1919-05-13 Beintorced-cohcrete bridge construction
US918699A (en) * 1906-12-31 1909-04-20 Ernest Leslie Ransome Concrete building construction.
US916378A (en) * 1908-02-15 1909-03-23 James C Sunderland Corner-plate for concrete piers, &c.
US1515257A (en) * 1922-08-29 1924-11-11 Krasnow Harry Metal building structure
US1472603A (en) * 1923-09-25 1923-10-30 Lally John Cap for building columns
US2050935A (en) * 1935-02-19 1936-08-11 George L Dresser Metallic flooring
US2287210A (en) * 1939-11-14 1942-06-23 Arvin S Wellborn Bridge construction

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3138899A (en) * 1959-10-15 1964-06-30 Homer M Hadley Structurally integrated composite members
US3295276A (en) * 1964-02-10 1967-01-03 Stanley Rene Inc J Bridge
US3349527A (en) * 1964-08-06 1967-10-31 Brunspile Corp Multi-level building construction including a combination pile and column
US3794433A (en) * 1971-07-08 1974-02-26 Schupack Ass Segmental precast concrete post-tensioned overpass bridges with cantilevered abutment
US3843988A (en) * 1971-07-19 1974-10-29 Hess H Method for excavating an underpass beneath an existing roadway
US3833960A (en) * 1972-08-23 1974-09-10 W Herth Process for the construction of underpasses and an abutment for use therein
US3906687A (en) * 1973-10-09 1975-09-23 Morris Schupack Segmental precast concrete post-tensioned overpass bridges with cantilevered abutment
FR2418838A1 (en) * 1978-03-02 1979-09-28 Doris Dev Richesse Sous Marine Jetty type platform for shallow water - uses prefabricated grillage decks spanning piers of triple column form with head and tow beams
US4290716A (en) * 1979-04-06 1981-09-22 Compagnie Generale Pour Les Developpements Operationnels Des Richesses Sous Marines "C. G. Doris" Platform resting on the bottom of a body of water, and method of manufacturing the same
US5771518A (en) * 1989-06-16 1998-06-30 Roberts; Michael Lee Precast concrete bridge structure and associated rapid assembly methods
US4977636A (en) * 1989-08-30 1990-12-18 King John B Pile supported bridge assembly
US20030061672A1 (en) * 1998-05-06 2003-04-03 Eustace Nicholas J. Bridge construction method and composite girder for use in same
US20050262651A1 (en) * 2002-05-24 2005-12-01 Snead Edwin D Method of moving a component underneath a bridge assembly with a cable
US7013520B1 (en) * 2002-05-24 2006-03-21 Snead Edwin Desteiguer Method for positioning a pile cap underneath an existing elevated bridge assembly
US7363671B2 (en) 2002-05-24 2008-04-29 Snead Edwin Desteiguer Method of moving a component underneath a bridge assembly with a cable

Similar Documents

Publication Publication Date Title
US2602321A (en) Method of constructing a prefabricated bridge structure
DE69913977T2 (en) METHOD FOR PRODUCING A PANEL BOTTOM AND A PANEL BOTTOM
JP4703233B2 (en) Building foundation reinforcement method and structure
US3352120A (en) Reinforced concrete pile
US5383319A (en) Method of erecting a foundation structure for a building substructure
GB2235235A (en) Forming structures in ground
US1895985A (en) Construction of retaining walls
JPH0475966B2 (en)
US952645A (en) Reinforced-concrete sectional sea-wall.
KR102413915B1 (en) Noise barrier construction system using block module
JPH08177059A (en) Footing block, and integrated method for constructing continuous footing employing footing block
JPH0237442B2 (en) DOROKAKUFUKUKOHO
US1539033A (en) Method of and means for reenforcing wall foundations
JPH0721196B2 (en) Reverse construction method of underground structure
JP2504578B2 (en) Steel frame construction method
JPS58143020A (en) Slope protection work
EP1482098B1 (en) Water-impermeable cellar and method of its construction
KR960016755B1 (en) Working method and working apparatus of underground structure
JPS6117636A (en) Fortification of ground bearing capacity using water-absorptive expandible concrete
US2179429A (en) Cofferdam construction
JPS621930A (en) Foundation structure of underground structure
JPH0243848B2 (en)
JPH0813494A (en) Fixing method of earth retaining wall and timbering
US1658154A (en) Wall
JPS5938438A (en) Building and civil engineering method and concrete block subjected thereto