US2427604A - Construction of hollow articles in reinforced concrete - Google Patents

Construction of hollow articles in reinforced concrete Download PDF

Info

Publication number
US2427604A
US2427604A US494367A US49436743A US2427604A US 2427604 A US2427604 A US 2427604A US 494367 A US494367 A US 494367A US 49436743 A US49436743 A US 49436743A US 2427604 A US2427604 A US 2427604A
Authority
US
United States
Prior art keywords
bulkheads
vessel
casting
reinforced concrete
hull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US494367A
Inventor
Holter Alfred
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US2427604A publication Critical patent/US2427604A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/02Hulls assembled from prefabricated sub-units
    • B63B3/04Hulls assembled from prefabricated sub-units with permanently-connected sub-units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B5/00Hulls characterised by their construction of non-metallic material
    • B63B5/14Hulls characterised by their construction of non-metallic material made predominantly of concrete, e.g. reinforced
    • B63B5/16Hulls characterised by their construction of non-metallic material made predominantly of concrete, e.g. reinforced monolithic
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B2231/00Material used for some parts or elements, or for particular purposes
    • B63B2231/60Concretes
    • B63B2231/64Reinforced or armoured concretes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining
    • Y10T29/49828Progressively advancing of work assembly station or assembled portion of work
    • Y10T29/49829Advancing work to successive stations [i.e., assembly line]

Definitions

  • the chief object of the present invention is to evolve a new or improved method of making reinforced concrete articles of a more or less rectangular section particularly such articles for example, as barges or pontoons which are required to have a somewhat squat or shallow form in transverse section.
  • a method of constructing a hollow article of reinforced concrete comprises the steps of casting part of the wall of the article on a horizontally disposed casting form or forms, mounting the partly formed article for swinging or pivotal movement, and then swinging or pivoting the same over into another position and casting another part or the remainder of the Wall of the article on another horizontally disposed casting form or forms.
  • the bow and stern shall be constructed separately and subsequently united to the main or cargo carrying part constructed in accordance with the above method. Furthermore, it is preferred that during the initial casting stages the vessel shall occupy a position in which it lies on one side, the vessel being moved into a normal position for completion of the casting operation.
  • one side of the main or cargo carrying part of the vessel is first cast on a horizontally arranged form, and the bulkheads erected and stringers inserted, the bulkheads and stringers having been ore-cast.
  • the opposite side or the vessel is cast on with the aid of suitable built up shuttering and when the concrete has been given sufficient time to harden and set, thepartly completed hull is then swung on to a further horizontally arranged form on which the bottom of the vessel is cast, and united with the already cast sides, bulkheads, and stringers.
  • the deck of the vessel is finally cast on to the partly completed hull, and the bow and stem which have been pre-cast as individual units are then united to the central or cargo carrying part of the hull.
  • the vessel is then ready for launching and from the point of view of economy. of space it is preferred that launching shall take place sideways down a suitably arranged inclined slipway.
  • Figure 1 is a sectional end elevation illustrating the construction of a reinforced concrete shallow draft barge in accordance with the invention.
  • Figure 2 is a plan view of the same.
  • Figure 3 is a side elevation, the bow and stern having been placed position and united to the central or cargo carrying part of the hull;
  • Fig. 4 is a detail view showing reinforcement projecting from the edges of the pre-cast bulk head.
  • Fig. 5 is an unassembled view showing in detail portions of a pre-cast stringer and a pre-cast bulkhead; with reinforcement projecting there. from, together with a mat-like slab reinforcement for the side, bottom, or deck of the hull.
  • Fig. 6 isan unassembled enlarged detail of the cast'ellated edges J6 of Fig, 3, showing the rein"- forcement projecting therefrom and adapted to be interlocked and embedded in concrete.
  • a suitable construction yard for the manufac ture of barges constructed in accordance with the invention would be alongside a water front and comprise a launching slope I, at the top of which slope at an appropriate elevation above sealev'e'l, would be constructed a reinforced concrete base having two casting forms 2 and 3 permanently erected thereon.
  • the inner casting form 2, re mote from the water, might be relatively narrow but suitable for casting a side 4 of the barge, while the other or outer form 3 situated at the top of the launching slope l is wider and shaped appropriately for casting the bottom'fi of the barge.
  • a shallow recess or pit 6 for the mounting on a suitable base 1 of a series of swingable or pivotal transfer members 8 to be used in swinging or pivoting the partly completed hull from the position in which it rests on the form 2, into a position in which it rests on the form 3.
  • the various operations may :be conveniently carried out in four stages, and the method adopted is to construct the hull in three sections namely, a middle or cargo carrying section, and two end sections constituting the bow and stem.
  • the method of construction forming the subject of the present invention is applicableto the construction of the centre section, the general structure of the end sections being hereinafter described.
  • the part of the hull so far east is swung or pivoted over from the first to the second stage position with the assistance of the pivotal transfer members 8.
  • the members or arms 8 are introduced between the stringers l and are then arranged angularly across the bulkheads 9.
  • the arms 8 may then be bolted or otherwise secured to the bulkheads.
  • the lower ends of the arms 8 may then be connected to the bearing members ll which are rotatable on the shaft 12.
  • hawsers l3 are provided attached to the upper ends of the members 8, and passing over pulleys [4 to a suitable winding gear I5, it is preferred that the swinging movement of the partly completed hull shall be effected with the aid of an overhead gantry which can be moved along to any position on the waterfront where a partially completed hull is ready for moving into the second stage position.
  • Figures 1 and 2 show the hull on one side and in position on the form 2, and in the second stage position in which the hull rests on form 3, the two positions being indicated by full lines, the intermediate position through which the hull passes being indicated by chain dotted lines.
  • a final fourth position is also indicated by chain dotted lines in which the hull has been jacked up into an inclined position ready for launching.
  • suitable longitudinal reinforcement material is laid on the form 3, and the requisite amount of concrete applied to the form 3 to construct the bottom of the barge.
  • the deck of the barge is finally concreted after the erection of suitable shuttering and the placing in positionof suitable reinforcement.
  • the reinforcing material placed to be embedded in concrete to form an added element of the structure is suitably united to reinforcement protruding from the adjacent edges of previously cast parts of the structure.
  • the bow and stem which have been cast as separate units, are then connected to the side walls 4 and H, and bottom and deck portions, as by interconnection of their reinforcing elements in any of the manners well known in the reinforced concrete art, the side walls at their 4 ends and also the ends of the bow and the stern, being formed with interengaging castellated edges l6 as shown clearly in Figs. 3 and 6, to form a sort of wave-form space between the castellated edges for receiving connecting cement or concrete.
  • the hull which is now substantially complete is then ready for launching down the inclined slipway I, and to enable the hull to be launched sideways, down the slipway, it is raised into the inclined position shown in Figure 1, a temporary triangular slipway path and a launching skid having been placed in position beneath the hull in line with the launching slope. The hull is then launched sideways down the slipway into the water.
  • the members 8, after the hull has been swung into the second stage position, are disconnected from the bulkheads.
  • the arms 8 are then detached from the bearing members ll after which these arms may be withdrawn from positions between the stringers I0. Thereafter the arms 8 may be attached to the bulkheads for another hull that has been partly cast on the form 2.
  • the method is therefore such that two barges can be under construction on the forms 2 and 3, the sides of the first barge being constructed and bulkheads and stringers erected while the bottom and deck of the barge resting on form 3 are being formed. In this way neither of the casting forms 2 or 3, will be vacant for more than a short period of time, thus expediting manufacture.
  • a method of constructing a reinforced concrete vessel on two horizontally disposed casting forms which comprises, arranging bulkheads and stringers on the first casting form, casting a side wall for the vessel on the first casting form so as to join the bulkheads, lifting bodily and swingin the bulkheads along with the cast side wall through approximately and into a position where the side wall of the vessel is upright and adjacent the second horizontal casting form, and casting a bottom for the vessel joined to said side wall and to the bulkheads and stringers.
  • a method of constructing a reinforced concrete vessel in two stages on horizontally disposed casting forms which comprises erecting a framework of pro-cast reinforced concrete bulkheads and stringers on a first form, placing in position reinforcing material for incorporation in the sides of the vessel, uniting said reinforcing material to the reinforcing material of the bulkheads, casting on the sides of the vessel when the framework is lying on its side On said first form, swinging the partially completed hull through an angle of substantially ninety degrees into a position in which it rests in an upright position on a second form, placing in position reinforcing material for the bottom and deck of the vessel and uniting it to the framework, and casting the bottom and deck onto the last mentioned reinforcing material.
  • a method of constructing a reinforced concrete vessel which comprises, placing pre-cast bulkheads in a substantially vertical position, casting two opposite sides of the vessel in a substantially horizontal position with one side spaced from and substantially parallel to the other side and with one side united with the upper portions of the bulkheads and the other side united with the lower ends of said bulkheads, swinging the assembly of sides and bulkheads through an angle of substantially 90 degrees, and casting onto said sides and bulkheads a bottom for said vessel.
  • a method of constructing a reinforced concrete vessel which comprises, placing pre-cast reinforced concrete bulkheads in a substantially vertical position with reinforcement protruding from the ends of the bulkheads, placing in a substantially horizontal position adjacent the upper and lower ends respectively of said bulkheads reinforcing material for two opposite sides of the vessel, attaching the reinforcement of the bulkheads to the reinforcement for the sides, casting the sides, swinging the partially completed hull through an angle of 90 so that it rests with its sides upright, placing in position reinforcing material for the bottom of the vessel, uniting said bottom reinforcement to the reinforcement of the sides and bulkheads, and casting the bottom on to said botton reinforcement.
  • a method of constructing a reinforced concrete vessel which comprises, placing pre-cast reinforced concrete bulkheads in a substantially vertical position with the reinforcement protruding from the ends of the bulkheads, placing in a substantially horizontal position adjacent the upper and lower ends respectively of said bulkheads reinforcing material for two opposite sides of the vessel, attaching the reinforcement of the bulkheads to the reinforcement for the sides, casting the sides, swinging the thus partially completed hull through an angle of 90 so that it rests with its sides upright, placing in position reinforcing material for the bottom and deck of the vessel, unitin said bottom and deck reinforcement to the reinforcement of the sides and bulkheads, and casting the bottom and deck on to said bottom and deck reinforcement respectively.
  • a method of constructing a reinforced concrete vessel which comprises, placing pre-cast bulkheads in a substantially vertical position, casting two opposite sides of the vessel in a substantially horizontal position with one side spaced from and substantially parallel to the other side and with one side united with the upper portions of the bulkheads and the other side united with the lower ends of said bulkheads, swinging the assembly of sides and bulkheads through an angle of substantially 90 degrees, and casting on to said sides and bulkheads a bottom and a deck.
  • a method of constructing a reinforced concrete vessel which comprises, placing pre-cast bulkheads in a substantially vertical position, casting two opposite sides of the vessel in a substantially horizontal position with one side spaced from and substantially parallel to the other side and with one side united with the upper portions of the bulkheads and the other side united with the lower ends of said bulkheads, lifting and swinging the assembly of sides and bulkheads through an angle of substantially 90 degrees, casting onto said sides and bulkheads a bottom for said vessel, and uniting a pre-cast bow and a pre-cast stern to the thus partially completed vessel.
  • a method of constructing a reinforced concrete vessel which comprises, placing pre-cast reinforced concrete bulkheads in a substantially vertical position with the reinforcement protruding from the ends of the bulkheads, placing in a substantially horizontal position adjacent the upper and lower ends respectively of said bulkheads reinforcing material for two opposite sides of the vessel, attaching the reinforcement of the bulkheads to the reinforcement for the sides, casting the sides, lifting and swingin the thus partially completed hull through an angle of so that it rests with its sides upright, placing in position reinforcing material for the bottom of the vessel, uniting said bottom reinforcement to the reinforcement of the sides and bulkheads, casting the bottom onto said bottom reinforcement, and uniting a pre-cast bow and a Dre-cast stern to the thus partially completed vessel.
  • a method of constructing a concrete vessel as claimed in claim 3 wherein the sides of the vessel are cast with castellated ends and a precast bow and a precast stern with castellated ends are placed in position adjacent said side ends and are united therewith by pouring concrete to unite the castellated ends of the sides with the bow and stern respectively.
  • a method of constructing a reinforced concrete vessel on two horizontally disposed casting forms which comprises, arranging bulkheads on the first casting form, casting a side wall for the vessel on the first casting form so as to join the bulkheads, lifting bodily and swinging the bulkheads along with the cast side Wall into a position where the side wall of the vessel is upright and adjacent the second horizontal casting form, and casting a bottom for the vessel joined to said side wall and bulkheads.
  • a method of constructing a reinforced concrete vessel on two horizontally disposed casting forms which comprises, arranging hull framing members on the first casting form, casting a side wall for the vessel on the first casting form so as to join the hull framing members, lifting bodily and swinging the hull framing members along with the cast side wall into a position where the side wall of the vessel is upright and adjacent the second horizontal casting form, and casting a bottom for the vessel joined to said side wall and hull framing members.

Description

Sept. 16, 1947. A. HOLTER 2,427,604
CONSTRUCTION OF HOLLOW ARTICLES IN REINFORCED CONCRETE Filed July 12, 1943 a Sheets-Sheet 1 I n venlor A. HOLTER 2,427,604 CONSTRUCTION OF HOLLOW ARTICLES IN REINFORCED CONCRETE Sept. 16, 1947.
Filed July 12, 1943 3 Shets-Sheet s Inventor a C C llalllllnLl III} Patented Sept. 16, 1 947 CONSTRUCTION OF HoL ovv ARTICLES IN REINFORCED CONCRETE Alfred Holter, Chelsea, London, England Applicationluly 12, 1943;Seria'l No. 4,94 ,367 In Great Britain January 13, 1943 11 Claims. (01. 11 145) This invention relates to the construction of hollow articles in reinforced concrete, particularly reinforced concrete vessels such as barges and pontoons. s
The chief object of the present invention is to evolve a new or improved method of making reinforced concrete articles of a more or less rectangular section particularly such articles for example, as barges or pontoons which are required to have a somewhat squat or shallow form in transverse section. I
According to the present invention a method of constructing a hollow article of reinforced concrete comprises the steps of casting part of the wall of the article on a horizontally disposed casting form or forms, mounting the partly formed article for swinging or pivotal movement, and then swinging or pivoting the same over into another position and casting another part or the remainder of the Wall of the article on another horizontally disposed casting form or forms.
As applied to the construction of a vessel such as a barge or pontoon, it is preferred that the bow and stern shall be constructed separately and subsequently united to the main or cargo carrying part constructed in accordance with the above method. Furthermore, it is preferred that during the initial casting stages the vessel shall occupy a position in which it lies on one side, the vessel being moved into a normal position for completion of the casting operation.
In the case of a vessel having internally arranged bulkheads and longitudinally arranged stringers, one side of the main or cargo carrying part of the vessel is first cast on a horizontally arranged form, and the bulkheads erected and stringers inserted, the bulkheads and stringers having been ore-cast. After the bulkheads and stringers have been placed in position, the opposite side or the vessel is cast on with the aid of suitable built up shuttering and when the concrete has been given sufficient time to harden and set, thepartly completed hull is then swung on to a further horizontally arranged form on which the bottom of the vessel is cast, and united with the already cast sides, bulkheads, and stringers. The deck of the vessel is finally cast on to the partly completed hull, and the bow and stem which have been pre-cast as individual units are then united to the central or cargo carrying part of the hull. The vessel is then ready for launching and from the point of view of economy. of space it is preferred that launching shall take place sideways down a suitably arranged inclined slipway.
In order that the said invention may be clearly understood and readily carried into effect, the same will now be further described with reference to the accompanying drawings, inwhich: I
Figure 1 is a sectional end elevation illustrating the construction of a reinforced concrete shallow draft barge in accordance with the invention.
Figure 2 is a plan view of the same. i
Figure 3 is a side elevation, the bow and stern having been placed position and united to the central or cargo carrying part of the hull;
Fig. 4 is a detail view showing reinforcement projecting from the edges of the pre-cast bulk head.
Fig. 5 is an unassembled view showing in detail portions of a pre-cast stringer and a pre-cast bulkhead; with reinforcement projecting there. from, together with a mat-like slab reinforcement for the side, bottom, or deck of the hull. I
Fig. 6 isan unassembled enlarged detail of the cast'ellated edges J6 of Fig, 3, showing the rein"- forcement projecting therefrom and adapted to be interlocked and embedded in concrete.
A suitable construction yard for the manufac ture of barges constructed in accordance with the invention would be alongside a water front and comprise a launching slope I, at the top of which slope at an appropriate elevation above sealev'e'l, would be constructed a reinforced concrete base having two casting forms 2 and 3 permanently erected thereon. The inner casting form 2, re mote from the water, might be relatively narrow but suitable for casting a side 4 of the barge, while the other or outer form 3 situated at the top of the launching slope l is wider and shaped appropriately for casting the bottom'fi of the barge.
Intermediate the forms 2 and 3 is a shallow recess or pit 6 for the mounting on a suitable base 1 of a series of swingable or pivotal transfer members 8 to be used in swinging or pivoting the partly completed hull from the position in which it rests on the form 2, into a position in which it rests on the form 3.
The various operations may :be conveniently carried out in four stages, and the method adopted is to construct the hull in three sections namely, a middle or cargo carrying section, and two end sections constituting the bow and stem. The method of construction forming the subject of the present invention is applicableto the construction of the centre section, the general structure of the end sections being hereinafter described. M
In the first stage, after appropriate reinforceinents 28 which maybe prepared in ready made mat-like form (see Fig. 5), have been placed in position on the casting form 2, precast bulkheads 9 are transported and placed in position on the form by suitable overhead gantries or other hoisting gear, the bulkheads being connected together by longitudinally arranged precast stringers [0. The bulkheads are constructed with their reinforcements 2| protruding at the edges thereof, as shown in Figs. 4 and 5, and after such reinforcement 2| has been connected with the reinforcement 20 for the side wall 4, and like reinforcement for the oppositely arranged side wall II, which reinforcement has likewise been placed in position, both side walls 4 and II may be concreted in.
The particular details of arrangement of the reinforcement in the hull framing members and hull slab, and the particular manner of connecting the reinforcing elements of the various members together, as by twisting and bending the bars into interlocking engagement, may follow the conventional practice in the art of assembling reinforced concrete structures.
When in the first stage the concrete has set sufiiciently for example, after two or three days hardening, the part of the hull so far east is swung or pivoted over from the first to the second stage position with the assistance of the pivotal transfer members 8. The members or arms 8 are introduced between the stringers l and are then arranged angularly across the bulkheads 9. The arms 8 may then be bolted or otherwise secured to the bulkheads. The lower ends of the arms 8 may then be connected to the bearing members ll which are rotatable on the shaft 12.
Although in the arrangement shown, hawsers l3 are provided attached to the upper ends of the members 8, and passing over pulleys [4 to a suitable winding gear I5, it is preferred that the swinging movement of the partly completed hull shall be effected with the aid of an overhead gantry which can be moved along to any position on the waterfront where a partially completed hull is ready for moving into the second stage position.
Figures 1 and 2 show the hull on one side and in position on the form 2, and in the second stage position in which the hull rests on form 3, the two positions being indicated by full lines, the intermediate position through which the hull passes being indicated by chain dotted lines. A final fourth position is also indicated by chain dotted lines in which the hull has been jacked up into an inclined position ready for launching.
After the partially completed hull has been swung from the first stage position into the second stage position, suitable longitudinal reinforcement material is laid on the form 3, and the requisite amount of concrete applied to the form 3 to construct the bottom of the barge. The deck of the barge is finally concreted after the erection of suitable shuttering and the placing in positionof suitable reinforcement. As is conventional in the art of reinforced concrete, the reinforcing material placed to be embedded in concrete to form an added element of the structure is suitably united to reinforcement protruding from the adjacent edges of previously cast parts of the structure.
The bow and stem which have been cast as separate units, are then connected to the side walls 4 and H, and bottom and deck portions, as by interconnection of their reinforcing elements in any of the manners well known in the reinforced concrete art, the side walls at their 4 ends and also the ends of the bow and the stern, being formed with interengaging castellated edges l6 as shown clearly in Figs. 3 and 6, to form a sort of wave-form space between the castellated edges for receiving connecting cement or concrete.
The hull which is now substantially complete is then ready for launching down the inclined slipway I, and to enable the hull to be launched sideways, down the slipway, it is raised into the inclined position shown in Figure 1, a temporary triangular slipway path and a launching skid having been placed in position beneath the hull in line with the launching slope. The hull is then launched sideways down the slipway into the water.
It will be appreciated from the foregoing description that the members 8, after the hull has been swung into the second stage position, are disconnected from the bulkheads. The arms 8 are then detached from the bearing members ll after which these arms may be withdrawn from positions between the stringers I0. Thereafter the arms 8 may be attached to the bulkheads for another hull that has been partly cast on the form 2. The method is therefore such that two barges can be under construction on the forms 2 and 3, the sides of the first barge being constructed and bulkheads and stringers erected while the bottom and deck of the barge resting on form 3 are being formed. In this way neither of the casting forms 2 or 3, will be vacant for more than a short period of time, thus expediting manufacture.
I claim:
1. A method of constructing a reinforced concrete vessel on two horizontally disposed casting forms which comprises, arranging bulkheads and stringers on the first casting form, casting a side wall for the vessel on the first casting form so as to join the bulkheads, lifting bodily and swingin the bulkheads along with the cast side wall through approximately and into a position where the side wall of the vessel is upright and adjacent the second horizontal casting form, and casting a bottom for the vessel joined to said side wall and to the bulkheads and stringers.
2. A method of constructing a reinforced concrete vessel in two stages on horizontally disposed casting forms which comprises erecting a framework of pro-cast reinforced concrete bulkheads and stringers on a first form, placing in position reinforcing material for incorporation in the sides of the vessel, uniting said reinforcing material to the reinforcing material of the bulkheads, casting on the sides of the vessel when the framework is lying on its side On said first form, swinging the partially completed hull through an angle of substantially ninety degrees into a position in which it rests in an upright position on a second form, placing in position reinforcing material for the bottom and deck of the vessel and uniting it to the framework, and casting the bottom and deck onto the last mentioned reinforcing material.
3. A method of constructing a reinforced concrete vessel which comprises, placing pre-cast bulkheads in a substantially vertical position, casting two opposite sides of the vessel in a substantially horizontal position with one side spaced from and substantially parallel to the other side and with one side united with the upper portions of the bulkheads and the other side united with the lower ends of said bulkheads, swinging the assembly of sides and bulkheads through an angle of substantially 90 degrees, and casting onto said sides and bulkheads a bottom for said vessel.
4. A method of constructing a reinforced concrete vessel which comprises, placing pre-cast reinforced concrete bulkheads in a substantially vertical position with reinforcement protruding from the ends of the bulkheads, placing in a substantially horizontal position adjacent the upper and lower ends respectively of said bulkheads reinforcing material for two opposite sides of the vessel, attaching the reinforcement of the bulkheads to the reinforcement for the sides, casting the sides, swinging the partially completed hull through an angle of 90 so that it rests with its sides upright, placing in position reinforcing material for the bottom of the vessel, uniting said bottom reinforcement to the reinforcement of the sides and bulkheads, and casting the bottom on to said botton reinforcement.
5. A method of constructing a reinforced concrete vessel which comprises, placing pre-cast reinforced concrete bulkheads in a substantially vertical position with the reinforcement protruding from the ends of the bulkheads, placing in a substantially horizontal position adjacent the upper and lower ends respectively of said bulkheads reinforcing material for two opposite sides of the vessel, attaching the reinforcement of the bulkheads to the reinforcement for the sides, casting the sides, swinging the thus partially completed hull through an angle of 90 so that it rests with its sides upright, placing in position reinforcing material for the bottom and deck of the vessel, unitin said bottom and deck reinforcement to the reinforcement of the sides and bulkheads, and casting the bottom and deck on to said bottom and deck reinforcement respectively.
6. A method of constructing a reinforced concrete vessel which comprises, placing pre-cast bulkheads in a substantially vertical position, casting two opposite sides of the vessel in a substantially horizontal position with one side spaced from and substantially parallel to the other side and with one side united with the upper portions of the bulkheads and the other side united with the lower ends of said bulkheads, swinging the assembly of sides and bulkheads through an angle of substantially 90 degrees, and casting on to said sides and bulkheads a bottom and a deck.
7. A method of constructing a reinforced concrete vessel which comprises, placing pre-cast bulkheads in a substantially vertical position, casting two opposite sides of the vessel in a substantially horizontal position with one side spaced from and substantially parallel to the other side and with one side united with the upper portions of the bulkheads and the other side united with the lower ends of said bulkheads, lifting and swinging the assembly of sides and bulkheads through an angle of substantially 90 degrees, casting onto said sides and bulkheads a bottom for said vessel, and uniting a pre-cast bow and a pre-cast stern to the thus partially completed vessel.
8. A method of constructing a reinforced concrete vessel which comprises, placing pre-cast reinforced concrete bulkheads in a substantially vertical position with the reinforcement protruding from the ends of the bulkheads, placing in a substantially horizontal position adjacent the upper and lower ends respectively of said bulkheads reinforcing material for two opposite sides of the vessel, attaching the reinforcement of the bulkheads to the reinforcement for the sides, casting the sides, lifting and swingin the thus partially completed hull through an angle of so that it rests with its sides upright, placing in position reinforcing material for the bottom of the vessel, uniting said bottom reinforcement to the reinforcement of the sides and bulkheads, casting the bottom onto said bottom reinforcement, and uniting a pre-cast bow and a Dre-cast stern to the thus partially completed vessel.
9. A method of constructing a concrete vessel as claimed in claim 3 wherein the sides of the vessel are cast with castellated ends and a precast bow and a precast stern with castellated ends are placed in position adjacent said side ends and are united therewith by pouring concrete to unite the castellated ends of the sides with the bow and stern respectively.
10. A method of constructing a reinforced concrete vessel on two horizontally disposed casting forms which comprises, arranging bulkheads on the first casting form, casting a side wall for the vessel on the first casting form so as to join the bulkheads, lifting bodily and swinging the bulkheads along with the cast side Wall into a position where the side wall of the vessel is upright and adjacent the second horizontal casting form, and casting a bottom for the vessel joined to said side wall and bulkheads.
11. A method of constructing a reinforced concrete vessel on two horizontally disposed casting forms which comprises, arranging hull framing members on the first casting form, casting a side wall for the vessel on the first casting form so as to join the hull framing members, lifting bodily and swinging the hull framing members along with the cast side wall into a position where the side wall of the vessel is upright and adjacent the second horizontal casting form, and casting a bottom for the vessel joined to said side wall and hull framing members.
ALFRED HOLTER.
REFERENCES CITED The following references are of record in the file of this patent:
UNITED STATES PATENTS Number Name Date 1,258,175 Alfsen Mar. 5, 1918 1,342,408 Janni June 1, 1920 1,345,013 Kastengren June 29, 1920 1,356,064 Guerini Oct. 19, 1920 FOREIGN PATENTS Number Country Date 115,664 Great Britain May 13, 1918
US494367A 1943-01-13 1943-07-12 Construction of hollow articles in reinforced concrete Expired - Lifetime US2427604A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB2427604X 1943-01-13

Publications (1)

Publication Number Publication Date
US2427604A true US2427604A (en) 1947-09-16

Family

ID=10906637

Family Applications (1)

Application Number Title Priority Date Filing Date
US494367A Expired - Lifetime US2427604A (en) 1943-01-13 1943-07-12 Construction of hollow articles in reinforced concrete

Country Status (1)

Country Link
US (1) US2427604A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2735169A (en) * 1956-02-21 Positive suspension
US3694533A (en) * 1970-06-23 1972-09-26 Paul S Kelsey Method for making slab-faced and headed panels including corners or returns
US4068609A (en) * 1975-11-10 1978-01-17 Hoetker Jr Carl H Mooring anchor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB115664A (en) * 1900-01-01
US1258175A (en) * 1917-05-10 1918-03-05 Harald Alfsen Method of building and launching floating craft.
US1342408A (en) * 1920-06-01 Alfredo carlo jaztni
US1345013A (en) * 1918-04-17 1920-06-29 Concrete Craft Corp Reinforced-concrete-ship mold
US1356064A (en) * 1918-05-28 1920-10-19 Annibale A Guerini Construction of concrete ships

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB115664A (en) * 1900-01-01
US1342408A (en) * 1920-06-01 Alfredo carlo jaztni
US1258175A (en) * 1917-05-10 1918-03-05 Harald Alfsen Method of building and launching floating craft.
US1345013A (en) * 1918-04-17 1920-06-29 Concrete Craft Corp Reinforced-concrete-ship mold
US1356064A (en) * 1918-05-28 1920-10-19 Annibale A Guerini Construction of concrete ships

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2735169A (en) * 1956-02-21 Positive suspension
US3694533A (en) * 1970-06-23 1972-09-26 Paul S Kelsey Method for making slab-faced and headed panels including corners or returns
US4068609A (en) * 1975-11-10 1978-01-17 Hoetker Jr Carl H Mooring anchor

Similar Documents

Publication Publication Date Title
US3036539A (en) Pontoon structure
US2427604A (en) Construction of hollow articles in reinforced concrete
US4018180A (en) System for building and launching ships
US2018865A (en) Boat
JPH11140893A (en) Manufacture and launching method for sinking box
US2341008A (en) Reinforced concrete ship
US2371964A (en) Prefabricated vessel construction
US2364522A (en) Process of and equipment for building concrete ships
US1278111A (en) Method of constructing reinforced-concrete hulls for boats, &c.
JP2668184B2 (en) How to launch a submerged box
US1489967A (en) Reenforced concrete and steel ship construction and method of making the same
US1324744A (en) Method of constrtjctiitg monolithic vessels
US3324814A (en) Prestressed concrete hull and method of making the same
US1353107A (en) Mode of constructing reinforced-concrete ships, barges, floating structures, and thelike
US1380693A (en) Composite ship
US1510163A (en) Reenforced concrete and steel construction
US1297143A (en) Concrete-ship mold.
GB118307A (en) Improvements in or connected with the Construction of Ships or Vessels of Reinforced Concrete.
US1376325A (en) Floating dry-dock
JPH039251B2 (en)
US1342408A (en) Alfredo carlo jaztni
DE948034C (en) Floating dock made up of individual, self-floating sections
GB120745A (en) Improvements in Reinforced Concrete Construction of Ships, Floating Docks, Pontoons and the like.
US3680514A (en) Method of constructing a ship{40 s hull
US1373267A (en) Method of building reinforced-concrete ships