US20230077079A1 - Mud Flow Measurement System for Wellheads - Google Patents

Mud Flow Measurement System for Wellheads Download PDF

Info

Publication number
US20230077079A1
US20230077079A1 US17/403,249 US202117403249A US2023077079A1 US 20230077079 A1 US20230077079 A1 US 20230077079A1 US 202117403249 A US202117403249 A US 202117403249A US 2023077079 A1 US2023077079 A1 US 2023077079A1
Authority
US
United States
Prior art keywords
drilling mud
unscreened
density
mud
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US17/403,249
Other versions
US11603724B1 (en
Inventor
Joel David Bell
Zaki Din Husain
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bell Technologies LLC
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US17/403,249 priority Critical patent/US11603724B1/en
Assigned to Bell Technologies, LLC reassignment Bell Technologies, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BELL, JOEL DAVID, HUSAIN, ZAKI DIN
Publication of US20230077079A1 publication Critical patent/US20230077079A1/en
Application granted granted Critical
Publication of US11603724B1 publication Critical patent/US11603724B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions

Definitions

  • the invention relates generally to devices and methods for measuring the volume and/or flow rate and density of drilling mud from a wellhead.
  • Drilling mud typically consists of a mixture of water and/or oil with insoluble solids, salts, minerals and other additives.
  • drilling mud is flowed down the drilling string and returned up through the annulus along with drill cuttings.
  • the mud flows into one or more shakers and/or screens for removal of cuttings and heavy debris and ultimately to a mud pit wherein it is stored for re-use.
  • the density and flow rate of the screened mud is often measured as it moves through the system so that changes can be made to the composition of the mud.
  • the flow of mud leaving the wellbore can fluctuate greatly as a result of mud flow system kicks.
  • Kicks are caused by unintended flow of formation fluids into a wellbore. These are characterized by a significant increase in pressure differential which is followed by pressure drop. The flow rates following the pressure drop can be so low that they are difficult to measure with any accuracy using conventional technology.
  • Early kick detection is an important focus for preventing “loss of well control” events which could lead to an uncontrolled flow of formation fluids from a wellhead.
  • U.S. Pat. No. 9,291,486 (“Method and System for Measuring Fluid Flow in Bell Nipples Using Pressure Measurement”) issued to Singfield describes a system wherein drilling mud flow is measured using pressure transducers within the annulus proximate the wellhead. Flow rate is inferred from the detected pressure. Density of the drilling mud is determined separately by siphoning off a fraction of the mud being supplied to the wellbore and measuring the density of this siphoned portion with a Coriolis meter. This system is not effective for measuring the density of unscreened drilling mud exiting the wellbore.
  • measurement systems such as this determine the density of a flow of screened mud and not the density of mud exiting the wellbore which contains cuttings and other solids. All measurements (density, pressure, flow rate) of the mud are of either mud which is being supplied to the wellbore or which has exited the wellbore and then been passed through shakers and screens to remove cuttings and other debris. Therefore, these measurements have limited value in early kick detection.
  • the invention provides a system for measurement of flow rate and density of a drilling mud flow exiting a wellbore.
  • flow rate and density are measured at the wellhead itself.
  • a mud measurement system is described which determines both mud flow rate and mud density at or near the wellhead.
  • Locations which are at or near the wellhead are considered to be locations between the exit of the wellbore and before screening or filtering of cuttings and other solids from the drilling mud.
  • locations at or near the wellbore are locations after the exit of the wellbore which are before any portion of drilling mud is diverted from the main flow.
  • Direct mud flow measurement at or near the exit of the wellbore allows better detection of potentially dangerous upcoming kicks in the drilling system which will permit operators to take action to avoid said possible kick.
  • Sharp increases or fluctuations in flow rate or volume or other early kick predictors can be detected in this mud flow which might not be easily measured or timely measured by flow meters or other devices which measure mud flow rate or volume after the drilling mud has passed through shakers or screens, such as mud pit volume totalizers.
  • described embodiments of the invention permit detection of very low flow rates indicative of a pressure drop following a significant increase in pressure differential.
  • detection components of the mud measurement system are incorporated into a riser assembly which is secured to the wellhead.
  • the riser assembly includes a riser and a torus wedge flowmeter.
  • the torus wedge flowmeter is used to detect flow rate for mud leaving the wellbore.
  • Density of drilling mud exiting the wellbore is detected using high and low pressure diaphragm seals on the riser with associated high range and low range differential pressure transmitters.
  • the diaphragm seals may include various known types of pressure sensors/transducers whose pressure sensing capability does not deteriorate over time due to deposits of solids from the returning mud with cuttings in the pressure sensing ports.
  • the pressure sensor at each pressure port is referred to simply as a diaphragm seal pressure sensor or diaphragm seal.
  • Mud flow rate and density are determined by an associated flow computer which is operably associated with the torus wedge flowmeter as well as the high and low range pressure transmitters of the riser.
  • the flow computer is a programmable logic controller which is programmed to calculate flow rates from upstream and downstream pressure transducers or taps associated with the torus wedge meter.
  • the flow computer can determine density based upon readings provided from the diaphragm seals.
  • the torus wedge flowmeter is preferably adapted to detect both a high and a low range of flow rate.
  • a first pair of pressure seals is configured to detect low flow rates which are rates of flow below a predetermined level.
  • a second pair of pressure seals is configured to detect high flow rates which are above a predetermined level. This configuration allows for accurate measurement of flow rates during and following a mud system kick.
  • the density detection arrangement preferably also allows for measurement of both high and low density ranges.
  • the invention provides systems and methods for measuring parameters of flows of unscreened, unfiltered drilling mud which contains cuttings and other solids and materials which have entered the drilling mud within the wellbore.
  • FIG. 1 is a schematic view of an exemplary wellbore drilling arrangement which incorporates a mud measurement system in accordance with the present invention.
  • FIG. 2 is a side, cross-sectional view of portions of the wellhead which incorporate elements of the mud measurement system.
  • FIG. 3 is a schematic view of electrical elements of the present invention.
  • FIG. 1 depicts an exemplary drilling arrangement in which a wellbore 10 is being drilled into the earth 12 using a drill string 14 and top drive 16 which are suspended by a traveling block 18 from a derrick 20 in a manner known in the art.
  • a wellhead 22 defines the opening of the wellbore.
  • the wellhead 22 is typically topped with one or more blowout preventers (not shown).
  • a riser assembly 24 extends upwardly from the wellhead 22 to upper decking 26 .
  • a diverter line 28 communicates drilling mud exiting the annulus 30 of the wellbore 10 to shakers 32 and mud pit 34 .
  • the terms “unscreened drilling mud” or “unscreened mud” as used herein will refer to drilling mud which has exited a wellbore and which has not passed through any shakers or screens to remove drill cuttings or other solids.
  • FIG. 2 is a side, cross-sectional view of an exemplary riser assembly 24 which is constructed in accordance with the present invention.
  • a bore 36 is defined within the riser assembly 24 , and the drill string 14 is shown disposed within the bore 36 .
  • the riser assembly 24 may be affixed to the wellhead 22 using bolts or other connectors 37 .
  • a torus wedge meter 38 is mounted to the upper end of the riser 25 of the riser assembly 24 .
  • the torus wedge meter 38 in general operates using principles described in U.S. Pat. No. 7,357,040 (“Torus Wedge Flow Meter”), U.S. Pat. No. 10,444,044 (“Flow Measurement Systems and Methods”) or U.S. Pat. No. 10,054,472 (“Fluid Flow Meter”). Each of these patents are owned by the applicant and are herein incorporated by reference in their entirety.
  • the torus wedge meter 38 presents a flow restriction 40 which creates a pressure drop for fluid passing through the torus wedge meter 38 .
  • Measurement of fluid pressure upstream of the flow restriction 40 is compared to measurement of pressure either downstream or at the flow restriction 40 which will allow flow rate to be calculated.
  • An outlet flange 42 is secured to the upper end of the torus wedge meter 38 and leads upwardly toward the upper decking 26 and mud diversion line 28 which will take exhausted mud to debris screens and shakers 32 and to mud pit 34 .
  • Upstream lateral openings 44 and 46 are disposed through the riser body 48 .
  • the upstream lateral openings 44 , 46 are provided with pressure transducers or taps 50 , 52 respectively which are capable of measuring the fluid pressure of drilling mud entering the torus wedge meter 38 .
  • Downstream lateral openings 54 , 56 are disposed through the body of the torus wedge meter 38 and are also provided with pressure transducers, 58 , 60 respectively, which are capable of measuring the fluid pressure of drilling mud passing through the flow restriction 40 .
  • the mud measurement system of the present invention includes a mechanism for detecting and measuring the density of unscreened drilling mud which is flowing from the wellbore 10 .
  • Flow conduits 62 , 64 are in fluid communication with the bore 36 of the riser assembly 24 .
  • Flow conduit 62 is provided with a low-pressure diaphragm seal 66 and low-pressure transmitter 68 .
  • Flow conduit 64 is provided with a high-pressure diaphragm seal 70 and high-pressure transmitter 72 .
  • the differential pressure transmitters 68 , 72 detect fluid pressure and are used for measurement of density of drilling mud returning uphole and emerging from the wellhead.
  • a flow computer 74 is shown in FIG. 3 .
  • the flow computer 74 is a programmable logic controller which is programmed to conduct calculations to determine pressure differentials based upon measured pressures. As illustrated by FIG. 3 , the flow computer 74 is operably connected using wired or wireless connection to pressure taps 50 , 52 , 58 and 60 for flow rate determination as well as pressure transmitters 68 , 72 for determination of drilling mud density.
  • drilling mud flows upwardly from the annulus 30 into the bore 36 of the riser assembly 34 as illustrated by arrow 76 in FIG. 2 .
  • Mud will flow into the flow conduits 62 , 64 and contact the diaphragms 66 , 70 to provide an indication of mud density (i.e., weight-loaded measured density).
  • Differential pressure transmitters 68 , 72 provide this information to the flow computer 74 from which density of the drilling mud is determined.
  • the torus wedge meter 38 is preferably adapted to measure both high and low ranges of fluid pressure. By establishing two ranges of flow rates for measurement, the system will be able to measure rates more accurately.
  • the upstream pressure tap 50 and downstream pressure tap 58 are adapted as a pair to measure a lower range of pressures, 0-200 psi, for example. While the pair of upstream tap 52 and downstream tap 60 is adapted to measure a higher range of pressures, such as from 200 psi upward.
  • flow alarm limits are programmed into the flow computer 74 so that operators can be alerted to flow rates which exceed expected limits. Too high a flow rate might indicate a mud kick while a very low flow rate might also be indicative of a kick which has just occurred.
  • the flow computer 74 preferably uses dual ranges of measurement for density.
  • the diaphragm seal 66 is tuned to detect lower range of density while diaphragm seal 70 is adapted to detect a higher range of density.
  • the upper and lower ranges are preferably separated by a predetermined measurement point.
  • the diaphragm seal 66 might measure flow densities which are 10 kg/m 3 or below while the diaphragm seal 70 measures flow densities which are above 10 kg/m 3 .
  • the measurement devices may be placed at other locations within the drilling mud flow system between the annulus 30 of the wellbore 10 and the shakers 32 . They might be placed, for example, above the upper decking 26 so long as the parameters of the exiting drilling mud are measured before solids are screened or remove from the mud.

Abstract

A mud flow measurement apparatus is described which is capable of measuring mud flow rate and density at or near the wellhead during a drilling operation. A riser assembly includes a torus wedge meter and density detection elements which are interconnected with a flow computer. Flow parameters are measured for unscreened drilling mud exiting a wellbore.

Description

    BACKGROUND OF THE INVENTION 1. Field of the Invention
  • The invention relates generally to devices and methods for measuring the volume and/or flow rate and density of drilling mud from a wellhead.
  • 2. Description of the Related Art
  • During drilling of a hydrocarbon production wellbore drilling mud is used to lubricate the bit and remove cuttings from the well bottom. Drilling mud typically consists of a mixture of water and/or oil with insoluble solids, salts, minerals and other additives. During drilling, drilling mud is flowed down the drilling string and returned up through the annulus along with drill cuttings. Upon leaving the wellbore, the mud flows into one or more shakers and/or screens for removal of cuttings and heavy debris and ultimately to a mud pit wherein it is stored for re-use. The density and flow rate of the screened mud is often measured as it moves through the system so that changes can be made to the composition of the mud.
  • The flow of mud leaving the wellbore can fluctuate greatly as a result of mud flow system kicks. Kicks are caused by unintended flow of formation fluids into a wellbore. These are characterized by a significant increase in pressure differential which is followed by pressure drop. The flow rates following the pressure drop can be so low that they are difficult to measure with any accuracy using conventional technology. Early kick detection is an important focus for preventing “loss of well control” events which could lead to an uncontrolled flow of formation fluids from a wellhead.
  • U.S. Pat. No. 9,291,486 (“Method and System for Measuring Fluid Flow in Bell Nipples Using Pressure Measurement”) issued to Singfield describes a system wherein drilling mud flow is measured using pressure transducers within the annulus proximate the wellhead. Flow rate is inferred from the detected pressure. Density of the drilling mud is determined separately by siphoning off a fraction of the mud being supplied to the wellbore and measuring the density of this siphoned portion with a Coriolis meter. This system is not effective for measuring the density of unscreened drilling mud exiting the wellbore. Notably, measurement systems such as this determine the density of a flow of screened mud and not the density of mud exiting the wellbore which contains cuttings and other solids. All measurements (density, pressure, flow rate) of the mud are of either mud which is being supplied to the wellbore or which has exited the wellbore and then been passed through shakers and screens to remove cuttings and other debris. Therefore, these measurements have limited value in early kick detection.
  • SUMMARY OF THE INVENTION
  • The invention provides a system for measurement of flow rate and density of a drilling mud flow exiting a wellbore. In preferred embodiments, flow rate and density are measured at the wellhead itself. A mud measurement system is described which determines both mud flow rate and mud density at or near the wellhead. Locations which are at or near the wellhead are considered to be locations between the exit of the wellbore and before screening or filtering of cuttings and other solids from the drilling mud. Preferably also, locations at or near the wellbore are locations after the exit of the wellbore which are before any portion of drilling mud is diverted from the main flow.
  • Direct mud flow measurement at or near the exit of the wellbore allows better detection of potentially dangerous upcoming kicks in the drilling system which will permit operators to take action to avoid said possible kick. Sharp increases or fluctuations in flow rate or volume or other early kick predictors can be detected in this mud flow which might not be easily measured or timely measured by flow meters or other devices which measure mud flow rate or volume after the drilling mud has passed through shakers or screens, such as mud pit volume totalizers. Additionally, described embodiments of the invention permit detection of very low flow rates indicative of a pressure drop following a significant increase in pressure differential.
  • In a described embodiment, detection components of the mud measurement system are incorporated into a riser assembly which is secured to the wellhead. The riser assembly includes a riser and a torus wedge flowmeter. The torus wedge flowmeter is used to detect flow rate for mud leaving the wellbore. Density of drilling mud exiting the wellbore is detected using high and low pressure diaphragm seals on the riser with associated high range and low range differential pressure transmitters. The diaphragm seals may include various known types of pressure sensors/transducers whose pressure sensing capability does not deteriorate over time due to deposits of solids from the returning mud with cuttings in the pressure sensing ports. Herein, however, the pressure sensor at each pressure port is referred to simply as a diaphragm seal pressure sensor or diaphragm seal.
  • Mud flow rate and density are determined by an associated flow computer which is operably associated with the torus wedge flowmeter as well as the high and low range pressure transmitters of the riser. The flow computer is a programmable logic controller which is programmed to calculate flow rates from upstream and downstream pressure transducers or taps associated with the torus wedge meter. In addition, the flow computer can determine density based upon readings provided from the diaphragm seals.
  • The torus wedge flowmeter is preferably adapted to detect both a high and a low range of flow rate. In a described embodiment, a first pair of pressure seals is configured to detect low flow rates which are rates of flow below a predetermined level. A second pair of pressure seals is configured to detect high flow rates which are above a predetermined level. This configuration allows for accurate measurement of flow rates during and following a mud system kick. The density detection arrangement preferably also allows for measurement of both high and low density ranges.
  • The invention provides systems and methods for measuring parameters of flows of unscreened, unfiltered drilling mud which contains cuttings and other solids and materials which have entered the drilling mud within the wellbore.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • For a thorough understanding of the present invention, reference is made to the following detailed description of the preferred embodiments, taken in conjunction with the accompanying drawings, wherein like reference numerals designate like or similar elements throughout the several figures of the drawings and wherein:
  • FIG. 1 is a schematic view of an exemplary wellbore drilling arrangement which incorporates a mud measurement system in accordance with the present invention.
  • FIG. 2 is a side, cross-sectional view of portions of the wellhead which incorporate elements of the mud measurement system.
  • FIG. 3 is a schematic view of electrical elements of the present invention.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • FIG. 1 depicts an exemplary drilling arrangement in which a wellbore 10 is being drilled into the earth 12 using a drill string 14 and top drive 16 which are suspended by a traveling block 18 from a derrick 20 in a manner known in the art. A wellhead 22 defines the opening of the wellbore. The wellhead 22 is typically topped with one or more blowout preventers (not shown). A riser assembly 24 extends upwardly from the wellhead 22 to upper decking 26. At the upper decking 26 a diverter line 28 communicates drilling mud exiting the annulus 30 of the wellbore 10 to shakers 32 and mud pit 34. The terms “unscreened drilling mud” or “unscreened mud” as used herein will refer to drilling mud which has exited a wellbore and which has not passed through any shakers or screens to remove drill cuttings or other solids.
  • FIG. 2 is a side, cross-sectional view of an exemplary riser assembly 24 which is constructed in accordance with the present invention. A bore 36 is defined within the riser assembly 24, and the drill string 14 is shown disposed within the bore 36. The riser assembly 24 may be affixed to the wellhead 22 using bolts or other connectors 37.
  • A torus wedge meter 38 is mounted to the upper end of the riser 25 of the riser assembly 24. The torus wedge meter 38 in general operates using principles described in U.S. Pat. No. 7,357,040 (“Torus Wedge Flow Meter”), U.S. Pat. No. 10,444,044 (“Flow Measurement Systems and Methods”) or U.S. Pat. No. 10,054,472 (“Fluid Flow Meter”). Each of these patents are owned by the applicant and are herein incorporated by reference in their entirety. In general, the torus wedge meter 38 presents a flow restriction 40 which creates a pressure drop for fluid passing through the torus wedge meter 38. Measurement of fluid pressure upstream of the flow restriction 40 is compared to measurement of pressure either downstream or at the flow restriction 40 which will allow flow rate to be calculated. An outlet flange 42 is secured to the upper end of the torus wedge meter 38 and leads upwardly toward the upper decking 26 and mud diversion line 28 which will take exhausted mud to debris screens and shakers 32 and to mud pit 34.
  • Upstream lateral openings 44 and 46 are disposed through the riser body 48. The upstream lateral openings 44, 46 are provided with pressure transducers or taps 50, 52 respectively which are capable of measuring the fluid pressure of drilling mud entering the torus wedge meter 38. Downstream lateral openings 54, 56 are disposed through the body of the torus wedge meter 38 and are also provided with pressure transducers, 58, 60 respectively, which are capable of measuring the fluid pressure of drilling mud passing through the flow restriction 40.
  • In preferred embodiments, the mud measurement system of the present invention includes a mechanism for detecting and measuring the density of unscreened drilling mud which is flowing from the wellbore 10. Flow conduits 62, 64 are in fluid communication with the bore 36 of the riser assembly 24. Flow conduit 62 is provided with a low-pressure diaphragm seal 66 and low-pressure transmitter 68. Flow conduit 64 is provided with a high-pressure diaphragm seal 70 and high-pressure transmitter 72. The differential pressure transmitters 68, 72 detect fluid pressure and are used for measurement of density of drilling mud returning uphole and emerging from the wellhead.
  • A flow computer 74 is shown in FIG. 3 . The flow computer 74 is a programmable logic controller which is programmed to conduct calculations to determine pressure differentials based upon measured pressures. As illustrated by FIG. 3 , the flow computer 74 is operably connected using wired or wireless connection to pressure taps 50, 52, 58 and 60 for flow rate determination as well as pressure transmitters 68, 72 for determination of drilling mud density.
  • In operation during a drilling operation, drilling mud flows upwardly from the annulus 30 into the bore 36 of the riser assembly 34 as illustrated by arrow 76 in FIG. 2 . Mud will flow into the flow conduits 62, 64 and contact the diaphragms 66, 70 to provide an indication of mud density (i.e., weight-loaded measured density). Differential pressure transmitters 68, 72 provide this information to the flow computer 74 from which density of the drilling mud is determined.
  • The torus wedge meter 38 is preferably adapted to measure both high and low ranges of fluid pressure. By establishing two ranges of flow rates for measurement, the system will be able to measure rates more accurately. Via flow computer programming, the upstream pressure tap 50 and downstream pressure tap 58 are adapted as a pair to measure a lower range of pressures, 0-200 psi, for example. While the pair of upstream tap 52 and downstream tap 60 is adapted to measure a higher range of pressures, such as from 200 psi upward. Preferably, flow alarm limits are programmed into the flow computer 74 so that operators can be alerted to flow rates which exceed expected limits. Too high a flow rate might indicate a mud kick while a very low flow rate might also be indicative of a kick which has just occurred.
  • Similarly, the flow computer 74 preferably uses dual ranges of measurement for density. The diaphragm seal 66 is tuned to detect lower range of density while diaphragm seal 70 is adapted to detect a higher range of density. The upper and lower ranges are preferably separated by a predetermined measurement point. For example, the diaphragm seal 66 might measure flow densities which are 10 kg/m3 or below while the diaphragm seal 70 measures flow densities which are above 10 kg/m3.
  • It is noted that the measurement devices (wedge meter 38, diaphragm seals 66, 70) may be placed at other locations within the drilling mud flow system between the annulus 30 of the wellbore 10 and the shakers 32. They might be placed, for example, above the upper decking 26 so long as the parameters of the exiting drilling mud are measured before solids are screened or remove from the mud.

Claims (13)

1. A system for measurement of drilling mud flow parameters of unscreened drilling mud exiting a wellbore comprising:
a torus wedge meter operable to detect the flow rate of unscreened drilling mud passing through the torus wedge meter upon exiting the wellbore;
a flow computer operably interconnected with the torus wedge meter for determination of flow rate;
a first diaphragm seal is associated with the riser for detection of a density for unscreened drilling mud in a range below a predetermined measurement point; and
a second diaphragm seal is associated with the riser for detection of a density for unscreened drilling mud in a range above the predetermined measurement point.
2. The system of claim 1 wherein the torus wedge meter is incorporated into a riser assembly which is operably associated with the wellbore to receive the unscreened drilling mud which exits the wellbore.
3. The system of claim 2 further comprising:
a density measurement diaphragm seal associated with the riser assembly to detect density of the unscreened drilling mud;
a differential pressure transmitter operably associated with the diaphragm seal; and
the diaphragm seal and differential pressure transmitter detecting a density for the drilling mud flowing within the bore.
4. The system of claim 1 wherein the torus wedge meter is adapted to separately detect a low flow rate, which is a flow rate below a predetermined flow rate level, and a high flow rate, which is above the predetermined flow rate level, for unscreened drilling mud.
5. (canceled)
6. A mud flow measurement apparatus for use with a wellhead, comprising:
a riser assembly for operable association with the wellhead, the riser assembly having a bore for flow of unscreened drilling mud exiting the wellhead;
a torus wedge meter within the riser assembly for detection of a differential pressure in unscreened drilling mud flowing within the bore;
a first diaphragm seal is associated with the riser for detection of a density for unscreened drilling mud in a range below a predetermined measurement point; and
a second diaphragm seal is associated with the riser for detection of a density for unscreened drilling mud in a range above the predetermined measurement point.
7. The mud flow measurement apparatus of claim 6 further comprising a flow computer operably interconnected with the torus wedge meter for receipt of a signal from the torus wedge meter indicative of the detected differential pressure and to determine a flow rate from the detected differential pressure.
8. The mud flow measurement apparatus of claim 6 further comprising:
a density measurement diaphragm seal associated with the riser to detect density of the unscreened drilling mud;
a differential pressure transmitter operably associated with the diaphragm seal to provide a signal indicative of the density to the flow computer; and
the diaphragm seal and differential pressure transmitter detecting a density for the drilling mud flowing within the bore.
9. The mud flow measurement apparatus of claim 6 wherein the torus wedge meter is adapted to separately detect a low flow rate and a high flow rate for unscreened drilling mud.
10. (canceled)
11. A method of measuring flow parameters for unscreened drilling mud exiting a wellbore, the method comprising:
flowing the unscreened drilling mud through a torus wedge meter;
detecting a flow rate for the unscreened drilling mud with the torus wedge meter;
detecting a density of the unscreened mud with:
a first diaphragm seal which detects density in a range below a predetermined point, and
a second diaphragm seal which detects density in a range above the predetermined point.
12. (canceled)
13. The method of claim 12 wherein density of the unscreened drilling mud is detected by:
flowing the unscreened drilling mud through a riser assembly which is attached to the wellhead; and
detecting loading on said first and second diaphragm seals associated with the riser assembly to measure density.
US17/403,249 2021-08-16 2021-08-16 Mud flow measurement system for wellheads Active US11603724B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US17/403,249 US11603724B1 (en) 2021-08-16 2021-08-16 Mud flow measurement system for wellheads

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US17/403,249 US11603724B1 (en) 2021-08-16 2021-08-16 Mud flow measurement system for wellheads

Publications (2)

Publication Number Publication Date
US20230077079A1 true US20230077079A1 (en) 2023-03-09
US11603724B1 US11603724B1 (en) 2023-03-14

Family

ID=85385244

Family Applications (1)

Application Number Title Priority Date Filing Date
US17/403,249 Active US11603724B1 (en) 2021-08-16 2021-08-16 Mud flow measurement system for wellheads

Country Status (1)

Country Link
US (1) US11603724B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4274283A (en) * 1978-10-16 1981-06-23 Exxon Production Research Company Apparatus and method for measuring fluid gel strength
US20070034018A1 (en) * 2005-08-13 2007-02-15 Bell Joel D Torus wedge flow meter
US20170211345A1 (en) * 2014-09-29 2017-07-27 Statoil Petroleum As Estimating cuttings removal
US20180045001A1 (en) * 2015-03-02 2018-02-15 Schlumberger Technology Corporation Bell nipple
US20180187498A1 (en) * 2017-01-03 2018-07-05 General Electric Company Systems and methods for early well kick detection
US20190145198A1 (en) * 2016-05-12 2019-05-16 Enhanced Drilling A.S. System and Methods for Controlled Mud Cap Drilling

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2011334590B2 (en) 2010-11-24 2016-06-16 Mezurx Pty Ltd Method and system for measuring fluid flow in bell nipples using pressure measurements
US10054472B1 (en) 2017-01-31 2018-08-21 Joel David Bell Fluid flow meter
US10444044B2 (en) 2017-01-31 2019-10-15 Joel David Bell Flow measurement systems and methods
US10794741B2 (en) 2018-10-06 2020-10-06 Bell Technologies, LLC Flow measurement insert and system for use with orifice fitting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4274283A (en) * 1978-10-16 1981-06-23 Exxon Production Research Company Apparatus and method for measuring fluid gel strength
US20070034018A1 (en) * 2005-08-13 2007-02-15 Bell Joel D Torus wedge flow meter
US20170211345A1 (en) * 2014-09-29 2017-07-27 Statoil Petroleum As Estimating cuttings removal
US20180045001A1 (en) * 2015-03-02 2018-02-15 Schlumberger Technology Corporation Bell nipple
US20190145198A1 (en) * 2016-05-12 2019-05-16 Enhanced Drilling A.S. System and Methods for Controlled Mud Cap Drilling
US20180187498A1 (en) * 2017-01-03 2018-07-05 General Electric Company Systems and methods for early well kick detection

Also Published As

Publication number Publication date
US11603724B1 (en) 2023-03-14

Similar Documents

Publication Publication Date Title
US20150211362A1 (en) Systems and methods for monitoring drilling fluid conditions
CN102822445B (en) Formation fluid in Dynamic Annular Pressure control system determination well is utilized to control the method for event
US20120037361A1 (en) Arrangement and method for detecting fluid influx and/or loss in a well bore
KR102083816B1 (en) Apparatuses and methods for determining wellbore influx condition using qualitative indications
ES2244554T3 (en) FLUID HANDLING SYSTEM IN CLOSED CIRCUIT FOR WELL PERFORATION.
US6357536B1 (en) Method and apparatus for measuring fluid density and determining hole cleaning problems
US6585044B2 (en) Method, system and tool for reservoir evaluation and well testing during drilling operations
US11739601B2 (en) Apparatus and method for early kick detection and loss of drilling mud in oilwell drilling operations
US7694558B2 (en) Downhole washout detection system and method
US20230125603A1 (en) A method and apparatus for managing a flow out from a wellbore during drilling
Johnson et al. Advancing deepwater kick detection
EP1936112B1 (en) Method, system and tool for reservoir evaluation and well testing during drilling operations
WO2017069765A1 (en) Extraction cleaner and gas system check
US11603724B1 (en) Mud flow measurement system for wellheads
US10473501B2 (en) Multiphase vortex flow meter
US11230897B2 (en) System and method for intelligent flow control system for production cementing returns
WO2018185245A1 (en) Drilling fluid monitoring system
CN114352271A (en) Method for prejudging well kick and well leakage
SU1677292A1 (en) Device for detection of gas phase in mud during drilling
CN110685674A (en) Shaft overflow detection system and detection method
CN106703727A (en) Drilling and completion fluid return device capable of quickly sensing stack height of rock cuttings
GB2545666A (en) A Drilling fluid monitoring system and method
Stewart et al. Drilling mud flow measurement

Legal Events

Date Code Title Description
AS Assignment

Owner name: BELL TECHNOLOGIES, LLC, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BELL, JOEL DAVID;HUSAIN, ZAKI DIN;SIGNING DATES FROM 20210728 TO 20210806;REEL/FRAME:057191/0406

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO SMALL (ORIGINAL EVENT CODE: SMAL); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

STCF Information on status: patent grant

Free format text: PATENTED CASE