US20220349143A1 - Cementitious slurries, methods, and assemblies for electrically grounding and corrosion-protecting a metallic structure - Google Patents
Cementitious slurries, methods, and assemblies for electrically grounding and corrosion-protecting a metallic structure Download PDFInfo
- Publication number
- US20220349143A1 US20220349143A1 US17/868,950 US202217868950A US2022349143A1 US 20220349143 A1 US20220349143 A1 US 20220349143A1 US 202217868950 A US202217868950 A US 202217868950A US 2022349143 A1 US2022349143 A1 US 2022349143A1
- Authority
- US
- United States
- Prior art keywords
- cementitious
- water
- gallons
- metallic structure
- surround
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/02—Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
- H02G9/025—Coverings therefor, e.g. tile
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G13/00—Installations of lightning conductors; Fastening thereof to supporting structure
- H02G13/40—Connection to earth
Definitions
- This document relates to metallic structures, such as metallic poles (e.g. utility poles) and/or anchor rods for guy wires. More specifically, this document relates to the electrical grounding of such structures, the protection of buried portions of such structures from corrosion, and the support of such structures.
- metallic poles e.g. utility poles
- anchor rods for guy wires. More specifically, this document relates to the electrical grounding of such structures, the protection of buried portions of such structures from corrosion, and the support of such structures.
- U.S. Pat. No. 10,262,773 discloses a method for protecting a conductive metal from corrosion, including coating the conductive metal with a water impermeable carbonaceous conductive material to protect the conductive metal from corrosion.
- an electrically grounded and corrosion-protected assembly includes a metallic structure. At least a portion of the metallic structure is buried in the earth. A water impermeable and electrically conductive cementitious surround is applied to at least a section of the portion that is buried in the earth. The surround is in direct contact with the section and is between the section and the earth.
- the surround has a top edge
- the assembly further includes a diverter positioned on the top edge and extending around the metallic structure.
- the diverter is shaped to direct water away from the metallic structure.
- the metallic structure is a pole. In some examples, the metallic structure is an anchor rod. In some examples, the metallic structure is a cladding on a non-metallic structure.
- the cementitious surround includes a cementitious matrix and a particulate carbonaceous material dispersed in the cementitious matrix.
- the cementitious matrix can include Portland cement.
- the particulate carbonaceous material can include calcined petroleum coke.
- the cementitious surround can include between 5 wt % and 70 wt % Portland cement, and between 30 wt % and 90 wt % calcined petroleum coke.
- the cementitious surround can include up to 50% slag.
- the surround has a compressive strength of at least 50 psi.
- the assembly further includes an electrically conductive and water impermeable jacket encasing the surround.
- the jacket can include a polymeric matrix, and a particulate carbonaceous material dispersed in the polymeric matrix.
- the assembly further includes an electrically conductive and water impermeable brace embedded in the surround and supporting the metallic structure.
- the brace can include a polymeric matrix, and a particulate carbonaceous material dispersed in the polymeric matrix.
- the surround holds the metallic structure in a generally vertical position.
- a method for electrically grounding and corrosion-protecting a metallic structure includes a) applying a cementitious product to at least a section of a metallic structure, wherein the cementitious product includes a cementitious matrix and a particulate carbonaceous material dispersed in the matrix; and b) curing the cementitious product to form a water impermeable and electrically conductive cementitious surround on the section.
- the method further includes, prior to step a), digging a hole in the earth for the metallic structure, wherein the hole is sized to leave a gap between the metallic structure and the earth, and lowering at least a bottom portion of the metallic structure into the hole.
- the section can be a section of the bottom portion.
- the cementitious product is a cementitious slurry.
- the method can further include combining a cementitious powder with water to form the cementitious slurry.
- the cementitious powder can be combined with the water in a ratio of less than or equal to 3 US gallons of water per 55 lb of cementitious powder.
- the cementitious powder can be combined with the water in a ratio of between about 1.5 and about 3.0 US gallons of water per 55 lb of cementitious powder.
- the method can further include applying the cementitious slurry to the hole before lowering at least the bottom portion of the metallic structure into the hole. Lowering the bottom portion of the metallic structure into the hole can force the slurry to fill the gap or the bottom portion of the pole.
- the cementitious product is a cementitious powder
- the method further includes adding water to the cementitious powder.
- the method further includes, prior to step a), applying a jacket to the section.
- the jacket can be sized to leave a gap around the section.
- the metallic structure is a pole or an anchor rod for a guy wire or a cladding on a non-metallic pole.
- the surround has a width of between about 0.5 inch and about 10 inches.
- the method further includes applying a diverter around a top edge of the surround, to direct water away from the metallic structure.
- the cementitious matrix includes Portland cement.
- the particulate carbonaceous material includes calcined petroleum coke.
- the cementitious surround includes between 5 wt % and 70 wt % Portland cement, and between 30 wt % and 90 wt % calcined petroleum coke.
- the cementitious surround can include up to 50% slag.
- the method further includes bracing the metallic structure with at least one brace.
- the brace can be electrically conductive and water impermeable.
- Bracing the metallic structure can include embedding the brace in the surround.
- a method for electrically grounding and corrosion-protecting a metallic structure includes: a) combining a cementitious powder with water to form a cementitious slurry, wherein the cementitious powder comprises a cement and a particulate carbonaceous material, and wherein the cementitious powder is combined with the water in a ratio of less than or equal to about 2.5 US gallons of water per 55 lb of cementitious powder; b) applying the cementitious slurry to at least a section of the metallic structure; and c) curing the cementitious slurry to form a water impermeable and electrically conductive cementitious surround on the section.
- the ratio is between about 2.5 US gallons of water and 1.5 US gallons of water per 55 lb of cementitious powder. In some examples, the ratio is about 2.5 US gallons of water per 55 lb of cementitious powder. In some examples, the ratio is about 2.0 US gallons of water per 55 lb of cementitious powder. In some examples, the ratio is about 1.8 US gallons of water per 55 lb of cementitious powder.
- the surround has a compressive strength of greater than or equal to about 50 psi. In some examples, the surround has a compressive strength of greater than or equal to about 2000 psi after 28 days of curing.
- the method further includes, prior to step a): digging a hole in the earth for the metallic structure, wherein the hole is sized to leave a gap between the metallic structure and the earth; and lowering at least a bottom portion of the metallic structure into the hole.
- the method may further include pouring the cementitious slurry in to the gap, to apply the cementitious slurry to the bottom portion of the metallic structure.
- the cement includes Portland cement.
- the particulate carbonaceous material includes calcined petroleum coke.
- the cementitious powder includes between about 20 wt % and about 80 wt % Portland cement, and between about 30 wt % and about 80 wt % calcined petroleum coke.
- an intermediate assembly that is curable to yield an electrically grounded and corrosion-protected assembly includes: a metallic structure, wherein at least a portion of the metallic structure is buried in the earth; and a cementitious slurry applied to at least a section of the portion that is buried in the earth, wherein the cementitious slurry includes a cementitious product and water, wherein the cementitious product includes a cement and a particulate carbonaceous material, and wherein the cementitious slurry includes less than or equal to about 2.5 US gallons of water per 55 lb of cementitious product.
- the cementitious slurry includes between about 2.5 US gallons of water and 1.5 US gallons of water per 55 lb of cementitious product. In some examples, the cementitious slurry includes about 2.5 US gallons of water per 55 lb of cementitious product. In some examples, the cementitious slurry includes about 2.0 US gallons of water per 55 lb of cementitious product.
- the metallic structure is a pole.
- the cement includes Portland cement.
- the particulate carbonaceous material includes calcined petroleum coke.
- the cementitious product includes between about 20 wt % and about 80 wt % Portland cement, and between about 30 wt % and about 80 wt % calcined petroleum coke.
- a cementitious slurry which curable to form a water impermeable and electrically conductive cementitious surround on a metallic structure, includes a cementitious product including between about 5 wt % and about 70 wt % Portland cement, and between about 30 wt % and about 90 wt % calcined petroleum coke; and water; wherein the cementitious slurry comprises less than or equal to about 2.5 US gallons of water per 55 lb of cementitious product.
- FIG. 1 is a partial and schematic cross-sectional view showing a cementitious slurry being applied to a bottom portion of a utility pole;
- FIG. 2 is a partial and schematic cross-sectional view showing a utility pole with a cementitious surround applied thereto;
- FIG. 3 is a partial and schematic cross-sectional view showing an anchor rod with a cementitious surround applied thereto;
- FIG. 4 is a perspective view of an example jacket usable with the cementitious surrounds described herein;
- FIG. 5 is a partial and schematic cross-sectional view showing the jacket of FIG. 4 applied to the anchor rod and cementitious surround of FIG. 3 ;
- FIG. 6 is a perspective view of an example brace usable with the cementitious surrounds described herein;
- FIG. 7 is a partial and schematic cross-sectional view showing the brace of FIG. 6 applied to the utility pole and cementitious surround of FIG. 2 ;
- FIG. 8 shows the experimental setup of Example 2.
- metallic structures can include poles (e.g. steel poles) such as utility poles or telecommunications poles or street lighting poles.
- metallic structures can include anchor rods for guy wires.
- metallic structures can include metallic parts of ancillary structures (e.g.
- the cementitious product can be used to facilitate installation of the metallic or ancillary structure (i.e. can set and support a metallic utility pole or metal-clad non-metallic utility pole, to hold the utility pole in a generally vertical position), provide electrical grounding to the metallic or ancillary structure, and protect the buried portion of the metallic structure (or the section thereof) from corrosion.
- the cementitious product can be applied to the metallic structure in situ.
- the bottom portion of a metallic utility pole can be placed in a hole that has been dug in the earth (e.g. into a hole dug for the utility pole using an auger).
- the cementitious product in slurry form or in powder form, can be poured around the bottom portion of the utility pole so that it is in direct contact with the utility pole.
- the cementitious product can cure in-situ around the bottom portion of the utility pole (e.g. the slurry can cure in-situ, or the powder can absorb environmental water (e.g. rain water) and then cure in-situ), so that the cementitious product is between the utility pole and the earth and can form a barrier between the utility pole and the earth.
- the cementitious product When cured, can form a surround around the bottom portion of the utility pole that (1) anchors the utility pole in the earth (i.e. holds up or helps to hold up or supports or sets the utility pole in a generally vertical position, so that a separate backfill material is not necessarily required); (2) is water impermeable to protect the bottom portion of the utility pole from corrosion; and (3) is electrically conductive to electrically ground the utility pole (e.g. to protect the utility pole from lightning strikes and powerline ground faults and prevent electrical fires).
- anchors the utility pole in the earth i.e. holds up or helps to hold up or supports or sets the utility pole in a generally vertical position, so that a separate backfill material is not necessarily required
- (2) is water impermeable to protect the bottom portion of the utility pole from corrosion
- (3) is electrically conductive to electrically ground the utility pole (e.g. to protect the utility pole from lightning strikes and powerline ground faults and prevent electrical fires).
- cementitious product refers to a product that has a cementitious matrix—i.e. a matrix that is a cement (e.g. Portland cement), or consists essentially of a cement, or is made up largely of a cement (i.e. at least 20% by weight of the matrix is a cement).
- a cementitious matrix i.e. a matrix that is a cement (e.g. Portland cement), or consists essentially of a cement, or is made up largely of a cement (i.e. at least 20% by weight of the matrix is a cement).
- Various components as described below, can be dispersed in (or otherwise mixed with) the cementitious matrix.
- cementitious product can refer to a dry product (also referred to herein as a ‘cementitious powder’), a wet product (also referred to herein as a ‘cementitious slurry’), or a solid product (also referred to herein as a ‘cementitious surround’ or simply as a ‘surround’).
- the term ‘electrically-conductive’ indicates that the cementitious surround has an electrical resistivity of less than or equal to 10,000 ohm ⁇ cm.
- the cementitious surround may have an electrical resistivity of less than 500 ohm ⁇ cm, or between 2.0 ohm ⁇ cm and 5.0 ohm ⁇ cm.
- the term ‘water-impermeable’ indicates that the surround has a water permeability of less than or equal to 10 ⁇ 5 cm/s.
- the surround may have a water permeability of 2.0 ⁇ 10 ⁇ 8 cm/s.
- the term ‘in situ’ indicates that cementitious product is applied to the metallic structure at the installation location of the metallic structure.
- the statement that ‘the cementitious product can be applied to the utility pole in situ’ indicates that the cementitious product can be applied to a bottom portion of the utility pole after a hole has been dug and the bottom end of the utility pole has been positioned in the hole.
- the cementitious products disclosed herein generally include a particulate carbonaceous material (e.g. calcined petroleum coke) dispersed in the cementitious matrix (e.g. Portland cement).
- the cementitious matrix may provide the product with water impermeability, to protect the buried portion (or a section of the buried portion) of the metallic structure from corrosion, and the particulate carbonaceous material may provide the product with electrical conductivity, to electrically ground the metallic structure.
- a cementitious powder can include a mixture of calcined petroleum coke, Portland cement, and optionally slag.
- the cementitious powder can include a mixture of 50 wt % calcined petroleum coke and 50 wt % Portland cement.
- the cementitious powder can include a mixture of between about 30 wt % and 90 wt % calcined petroleum coke, between about 5 wt % and 70 wt % Portland cement, and between about 1 wt % and 50 wt % slag.
- the cementitious powder can be combined with water to form a slurry, which can then be applied in direct contact to the metallic structure in situ (e.g. poured into a hole that has been dug for a utility pole) and allowed to cure.
- the cementitious powder can be combined with water in a ratio of less than or equal to about 3 US gallons of water per 55 lb of cementitious powder, for example between about 1.5 US gallons and 3.0 US gallons of water per 55 lb of cementitious powder.
- the cementitious powder can be combined with water in a ratio of about 2.0 US gallons of water per 55 lb of cementitious powder.
- This ratio may be particularly useful where the surround is formed on a utility pole.
- the cementitious powder can be combined with water in a ratio of about 2.5 US gallons of water per 55 lb of cementitious powder. This ratio may be particularly useful where the surround is formed on an anchor rod.
- Such cementitious slurries can be generally thick and have low slump.
- the initial step of combining with water can be omitted, and the cementitious powder can be applied in direct contact to the metallic structure in situ (e.g. poured into a hole that has been dug for a utility pole). Water can then be added to the cementitious powder in-situ, or the cementitious powder can be left and allowed to absorb environmental water (e.g. rainwater). The cementitious product can then be allowed to cure.
- the cementitious powder can be applied in direct contact to the metallic structure in situ (e.g. poured into a hole that has been dug for a utility pole).
- Water can then be added to the cementitious powder in-situ, or the cementitious powder can be left and allowed to absorb environmental water (e.g. rainwater).
- the cementitious product can then be allowed to cure.
- the cementitious products disclosed herein can in some examples have a generally low drying shrinkage, e.g. a drying shrinkage of less than or equal to about 0.20% after curing for 28 days, or a drying shrinkage of less than about 0.015% after curing for 28 days.
- the cementitious surround can be relatively strong — i.e. can have a compressive strength of greater than or equal to about 50 psi (i.e. greater than about 0.34 MPa).
- the compressive strength can be greater than 2000 psi (about 13.79 MPa), or about 4003 psi (about 27.6 MPa) or about 4350 psi (about 30 MPa), or about 914 psi (about 6.30 MPa), or about 624 psi (about 4.30 MPa), or about 348 psi (about 2.40 MPa), or about 174 psi (about 1.20 MPa), or about 65 psi (about 0.45 MPa) after curing (e.g. after 28 days of curing).
- an assembly is shown that includes a metallic (e.g. steel) utility pole 100 in situ.
- a portion (i.e. the bottom portion 102 ) of the utility pole has been lowered into a hole 104 that has been dug in the earth 106 (e.g. dug into the earth 106 with an auger or a hydrovac or any other technique that involves removal of soil to create a hole).
- the hole 104 can be sized to have a diameter that is slightly larger than the utility pole 100 , to leave a circumferential gap 108 between the utility pole 100 and the earth 106 .
- the gap 108 can have a width W of, for example, between 0.5 inch and 10 inches, or between 1 inch and 6 inches.
- a cementitious slurry 110 as described above can be applied to the bottom portion 102 of the utility pole 100 , for example by pouring the cementitious slurry into the gap 108 (although FIG. 1 shows the slurry 110 being poured from a pot, it may also be poured from a cement truck or other container).
- the cementitious slurry can first be applied to the hole, and the bottom portion of the utility pole can then be lowered into the hole and pressed into the slurry. If the bottom portion of the utility pole is closed as shown, this can cause the slurry to rise and fill the gap, or, if the bottom portion of the utility pole is open (not shown), the slurry can fill the bottom portion as well as the gap.
- a concrete vibrator can optionally be used to remove air trapped in the slurry.
- the slurry can then be left to cure, for example over a period of several days, to form the surround 112 , as shown in FIG. 2 .
- the surround 112 is between the bottom portion 102 of the utility pole 100 and the earth 106 and can form a barrier between the bottom portion 102 of the utility pole 100 and the earth 106 , is electrically conductive to allow the utility pole 100 to be electrically grounded, and is water impermeable to protect the utility pole 100 from corrosion.
- a cementitious powder can be applied to the utility pole 100 (e.g. by applying the cementitious powder to the gap 108 ). Water can then be added to the cementitious powder in-situ, or the cementitious powder can be left and allowed to absorb environmental water (e.g. rainwater). The cementitious product can then be allowed to cure.
- a diverter 114 in order to prevent water (e.g. rainwater) from pooling around the utility pole 100 , which can lead to corrosion, a diverter 114 can be installed or applied around the utility pole 100 , on the top edge of the surround 112 .
- the diverter 114 can be shaped to direct water away from the utility pole 100 .
- the diverter 114 can be formed from a grout or polymeric material that is troweled around the utility pole 100 .
- the diverter can optionally be or include an electrically conductive material.
- a grounding grid can optionally be installed around the utility pole, for safety.
- the assembly includes a metallic structure in the form of an anchor rod 300 for a guy wire 316 .
- the anchor rod 300 is shown in situ, with the anchor rod 300 lowered into a hole that has been dug in the earth 306 .
- the entire anchor rod 300 is buried.
- the hole is an auger hole dug into the earth 306 with an auger; in alternative examples, the hole can be a trench dug into the earth with a backhoe.
- the hole has a diameter that is slightly larger than the anchor rod 300 , to leave a circumferential gap (not shown) between the anchor rod 300 and the earth 306 .
- a cementitious slurry as described above has been poured into the hole, to fill the gap between the anchor rod 300 and the earth 306 , and the slurry has cured to form the surround 312 .
- a cementitious powder can be poured into the hole, to fill the gap between the anchor rod and the earth. Water can then be added to the cementitious powder in-situ, or the cementitious powder can be left and allowed to absorb environmental water (e.g. rainwater). The cementitious product can then be allowed to cure.
- an anchor 318 is mounted to the bottom portion 302 of the anchor rod 300 , to secure the anchor rod 300 in the earth.
- the anchor 318 is fully embedded in the surround 312 .
- the anchor can be either fully or partially outside of the surround 312 .
- the anchor can be of various configurations (e.g. a plate or a nut or another configuration).
- the assembly of FIG. 3 further includes a diverter 314 , similar to the diverter 114 of FIG. 2 .
- a jacket 420 can be used to encapsulate the surround 312 .
- the jacket 420 can be electrically conductive and water impermeable.
- the jacket can include a polymeric matrix, and a particulate carbonaceous material dispersed in the polymeric matrix. Such materials are described in U.S. Pat. No. 10,333,234 B2 (Sirola et al.), which is incorporated herein by reference in its entirety.
- the jacket 420 is in the form of a tube, which is formed in two pieces, 422 a , 422 b , which are positioned around the surround 312 .
- the jacket 420 can be used in various scenarios, but may be particularly useful in repair or retro-fit scenarios. For example, in situations where an anchor rod 300 is already installed in the earth 306 , it may be required to dig up the earth 306 around the anchor rod 300 for various reasons, leaving the anchor rod 300 exposed (i.e. leaving the entire anchor rod exposed, or leaving only a section of the anchor rod exposed) and in a relatively large hole (not shown) that may be too large to fill with the cementitious product (i.e. having a diameter larger than the original auger hole that was created for the anchor rod 300 ). In such situations, the jacket 420 can be positioned in the hole around anchor rod 300 (i.e.
- the jacket 420 can then be filled with the cementitious material, e.g. by pouring a cementitious slurry as described above into the jacket 420 , to fill the jacket 420 (or by pouring a cementitious powder into the jacket 420 ). The slurry can then cure to form the surround 312 , and the hole can be filled with earth 306 .
- the surround 312 can be on the entire buried portion of the anchor rod 312 , or on only a section of the buried portion of the anchor rod 312 (e.g. the top section).
- Jackets as described above can also be used with structures other than anchor rods, e.g. poles.
- one or more braces 624 a - d can be embedded in the surround 112 to further support the utility pole 100 , particularly during the period while the cementitious product is in the process of curing.
- the braces 624 a - d can include a polymeric matrix, and a particulate carbonaceous material dispersed in the polymeric matrix. Such materials are described in U.S. Pat. No. 10,333,234 B2 (Sirola et al.), which is incorporated herein by reference in its entirety.
- the braces 624 a - d can be in the form of elongate bars or rods or blocks (e.g. 4 inch ⁇ 4 inch bars) that are cut to length to fit the gap between the utility pole 100 and the earth 106 .
- the bottom portion 102 of the utility pole 100 can be lowered into the hole 104 that has been dug in the earth 106 (e.g. dug into the earth 106 with an auger).
- the braces 624 a - 624 d can then be positioned in the gap, around the utility pole 100 , so that they are generally wedged between the utility pole 100 and the earth 106 .
- the cementitious slurry as described above can then be applied to the utility pole, enveloping the braces 624 a - 624 d .
- the slurry can then be left to cure, for example over a period of several days, to form the surround 112 with the braces 624 a - 624 d embedded therein, as shown in FIG. 7 .
- braces 624 a - 624 d are shown (i.e. two lower braces 624 a , 624 b , and two upper braces 624 c , 624 d ).
- another number of braces can be used, such as four lower braces and four upper braces.
- the metallic structures described herein can include metallic parts of ancillary structures (e.g. metal claddings on non-metallic structures such as wood poles).
- the ancillary structure can be a wood pole (e.g. utility pole), and the metallic structure can be a cladding on the bottom portion of the wood pole.
- the cladding can be, for example, a material such as a foil.
- the foil can be, for example, a copper foil or steel (e.g. galvanized steel) foil that is wrapped around the bottom portion of the wood pole.
- a wire can connect the cladding to a power system neutral of the utility pole.
- the bottom portion of the wood pole, together with the cladding, can be lowered into a hole that has been dug in the earth and a cementitious product (i.e. a slurry or a powder) can then be applied to the cladding and allowed to cure to form a surround, as described above.
- a cementitious product i.e. a slurry or a powder
- the entire metallic structure may be buried in the earth, and the surround may be on the entire metallic structure.
- the entire cladding may be buried in the earth and the surround may surround the entire cladding.
- the entire anchor rod may be buried in the earth and the surround may surround the entire anchor rod.
- the surround may in some examples be applied to only a section of the buried portion of the metallic structure.
- the surround may be applied to only the section of the anchor rod that is exposed when a trench is dug (e.g. the top 3 to 4 feet of the anchor rod).
- cementitious powders were tested for electrical resistivity following a modified ASTM G187-05 procedure: Standard Test Method for Measurement of Soil Resistivity using the Two Electrode Soil Box Method.
- Cementitious powder (10 g) was placed in a fixture in between 2 brass platens.
- An Instron was used to apply a force of 192 lbs/int to the fixture, and the resistivity of the sample (measured between the 2 brass platens) was measured using a rectifier. Results are shown in Tables 4 to 6.
- cementitious powders were then mixed with water (at various ratios set out below) to yield a cementitious slurry.
- Mixing was conducted using a drill with a grout mixing paddle until the slurry reached a smooth consistency.
- the slurry was then cured (as described below), and the cured product was tested for material properties, including water permeability, shrinkage, and compressive strength.
- Copper samples 34 inch ⁇ 3 inch rectangular strips having a thickness of 0.2 mm (0.008 inch) were connected to insulated wire, which was then connected to a rectifier. One strip was left bare and the second strip was encased in a 4 inch ⁇ 8 inch cementitious surround.
- the cementitious surround was made using a cementitious powder of the composition shown in Table 1.
- a cementitious slurry was made by adding 55 lbs of the cementitious powder to 3.3 US gallons of water and mixing, as described above.
- the copper samples were embedded in the slurry in a 4 inch ⁇ 8 inch PVC cylinder as described above, and the slurry was allowed to cure for 13 days (ambient temperature and humidity conditions) before demoulding.
- 800 regulated power supply
- 802 insulated positive wire
- 804 test container
- 806 steel rebar (cathodic)
- 808 bare metal (anodic)
- 810 insulated bond wire
- 812 metal encased in cementitious surround (anodic)
- 814 steel rebar (cathodic)
- 816 test container
- 818 insulated negative wire
- 820 siil.
- Galvanized steel samples were 1.75 inch ⁇ 3 ⁇ 4 inch rectangular sections having a thickness of 1 ⁇ 4 inch. Galvanizing met ASTM A123/A123M, and the samples had a zinc coating of at least 0.025 mm (0.001 inch). The sections were connected to insulated wire, which was then connected to the rectifier. One section was left bare and the second section was encased in a 4 inch ⁇ 8 inch cementitious surround. The cementitious surround was made as described above for steel. The experiment was conducted as described above for steel. Results are shown in Table 7.
- cementitious products disclosed herein can inhibit or prevent corrosion of metal including copper, steel, and galvanized steel.
Abstract
A method for electrically grounding and corrosion-protecting a metallic structure includes combining a cementitious powder with water to form a cementitious slurry, applying the cementitious slurry to at least a section of the metallic structure, and curing the cementitious slurry to form a water impermeable and electrically conductive cementitious surround on the section. The cementitious powder includes a cement and a particulate carbonaceous material. The cementitious powder is combined with the water in a ratio of less than or equal to about 2.5 US gallons of water per 55 lb of cementitious powder.
Description
- This application is a continuation of U.S. patent application Ser. No. 16/837,284 filed on Apr. 1, 2020, which claims the benefit of United States Provisional Patent Application No. 62/949,489, filed on Dec. 18, 2019, both of which are incorporated herein by reference in their entirety.
- This document relates to metallic structures, such as metallic poles (e.g. utility poles) and/or anchor rods for guy wires. More specifically, this document relates to the electrical grounding of such structures, the protection of buried portions of such structures from corrosion, and the support of such structures.
- U.S. Pat. No. 10,262,773 (Sirola et al.) discloses a method for protecting a conductive metal from corrosion, including coating the conductive metal with a water impermeable carbonaceous conductive material to protect the conductive metal from corrosion.
- This summary is intended to introduce the reader to the subject matter of the detailed description, and is not intended to define or delimit any invention.
- Electrically grounded and corrosion-protected assemblies are disclosed. According to some aspects, an electrically grounded and corrosion-protected assembly includes a metallic structure. At least a portion of the metallic structure is buried in the earth. A water impermeable and electrically conductive cementitious surround is applied to at least a section of the portion that is buried in the earth. The surround is in direct contact with the section and is between the section and the earth.
- In some examples, the surround has a top edge, and the assembly further includes a diverter positioned on the top edge and extending around the metallic structure. The diverter is shaped to direct water away from the metallic structure.
- In some examples, the metallic structure is a pole. In some examples, the metallic structure is an anchor rod. In some examples, the metallic structure is a cladding on a non-metallic structure.
- In some examples, the cementitious surround includes a cementitious matrix and a particulate carbonaceous material dispersed in the cementitious matrix. The cementitious matrix can include Portland cement. The particulate carbonaceous material can include calcined petroleum coke. The cementitious surround can include between 5 wt % and 70 wt % Portland cement, and between 30 wt % and 90 wt % calcined petroleum coke. The cementitious surround can include up to 50% slag.
- In some examples, the surround has a compressive strength of at least 50 psi.
- In some examples, the assembly further includes an electrically conductive and water impermeable jacket encasing the surround. The jacket can include a polymeric matrix, and a particulate carbonaceous material dispersed in the polymeric matrix.
- In some examples, the assembly further includes an electrically conductive and water impermeable brace embedded in the surround and supporting the metallic structure. The brace can include a polymeric matrix, and a particulate carbonaceous material dispersed in the polymeric matrix.
- In some examples, the surround holds the metallic structure in a generally vertical position.
- A method for electrically grounding and corrosion-protecting a metallic structure is also disclosed. According to some aspects, the method includes a) applying a cementitious product to at least a section of a metallic structure, wherein the cementitious product includes a cementitious matrix and a particulate carbonaceous material dispersed in the matrix; and b) curing the cementitious product to form a water impermeable and electrically conductive cementitious surround on the section.
- In some examples, the method further includes, prior to step a), digging a hole in the earth for the metallic structure, wherein the hole is sized to leave a gap between the metallic structure and the earth, and lowering at least a bottom portion of the metallic structure into the hole. The section can be a section of the bottom portion.
- In some examples, the cementitious product is a cementitious slurry. The method can further include combining a cementitious powder with water to form the cementitious slurry. The cementitious powder can be combined with the water in a ratio of less than or equal to 3 US gallons of water per 55 lb of cementitious powder. The cementitious powder can be combined with the water in a ratio of between about 1.5 and about 3.0 US gallons of water per 55 lb of cementitious powder. The method can further include applying the cementitious slurry to the hole before lowering at least the bottom portion of the metallic structure into the hole. Lowering the bottom portion of the metallic structure into the hole can force the slurry to fill the gap or the bottom portion of the pole.
- In some examples, the cementitious product is a cementitious powder, and the method further includes adding water to the cementitious powder.
- In some examples, the method further includes, prior to step a), applying a jacket to the section. The jacket can be sized to leave a gap around the section.
- In some examples, the metallic structure is a pole or an anchor rod for a guy wire or a cladding on a non-metallic pole.
- In some examples, the surround has a width of between about 0.5 inch and about 10 inches.
- In some examples, the method further includes applying a diverter around a top edge of the surround, to direct water away from the metallic structure.
- In some examples, the cementitious matrix includes Portland cement. In some examples, the particulate carbonaceous material includes calcined petroleum coke.
- In some examples, the cementitious surround includes between 5 wt % and 70 wt % Portland cement, and between 30 wt % and 90 wt % calcined petroleum coke. The cementitious surround can include up to 50% slag.
- In some examples, the method further includes bracing the metallic structure with at least one brace. The brace can be electrically conductive and water impermeable. Bracing the metallic structure can include embedding the brace in the surround.
- Methods for electrically grounding and corrosion-protecting a metallic structure are disclosed. According to some aspects, a method for electrically grounding and corrosion-protecting a metallic structure includes: a) combining a cementitious powder with water to form a cementitious slurry, wherein the cementitious powder comprises a cement and a particulate carbonaceous material, and wherein the cementitious powder is combined with the water in a ratio of less than or equal to about 2.5 US gallons of water per 55 lb of cementitious powder; b) applying the cementitious slurry to at least a section of the metallic structure; and c) curing the cementitious slurry to form a water impermeable and electrically conductive cementitious surround on the section.
- In some examples, the ratio is between about 2.5 US gallons of water and 1.5 US gallons of water per 55 lb of cementitious powder. In some examples, the ratio is about 2.5 US gallons of water per 55 lb of cementitious powder. In some examples, the ratio is about 2.0 US gallons of water per 55 lb of cementitious powder. In some examples, the ratio is about 1.8 US gallons of water per 55 lb of cementitious powder.
- In some examples, the surround has a compressive strength of greater than or equal to about 50 psi. In some examples, the surround has a compressive strength of greater than or equal to about 2000 psi after 28 days of curing.
- In some examples, the method further includes, prior to step a): digging a hole in the earth for the metallic structure, wherein the hole is sized to leave a gap between the metallic structure and the earth; and lowering at least a bottom portion of the metallic structure into the hole. The method may further include pouring the cementitious slurry in to the gap, to apply the cementitious slurry to the bottom portion of the metallic structure.
- In some examples, the cement includes Portland cement. In some examples, the particulate carbonaceous material includes calcined petroleum coke. In some examples, the cementitious powder includes between about 20 wt % and about 80 wt % Portland cement, and between about 30 wt % and about 80 wt % calcined petroleum coke.
- Intermediate assemblies, which are curable to yield an electrically grounded and corrosion-protected assembly, are further disclosed. According to some aspects, an intermediate assembly that is curable to yield an electrically grounded and corrosion-protected assembly includes: a metallic structure, wherein at least a portion of the metallic structure is buried in the earth; and a cementitious slurry applied to at least a section of the portion that is buried in the earth, wherein the cementitious slurry includes a cementitious product and water, wherein the cementitious product includes a cement and a particulate carbonaceous material, and wherein the cementitious slurry includes less than or equal to about 2.5 US gallons of water per 55 lb of cementitious product.
- In some examples, the cementitious slurry includes between about 2.5 US gallons of water and 1.5 US gallons of water per 55 lb of cementitious product. In some examples, the cementitious slurry includes about 2.5 US gallons of water per 55 lb of cementitious product. In some examples, the cementitious slurry includes about 2.0 US gallons of water per 55 lb of cementitious product.
- In some examples, the metallic structure is a pole.
- In some examples, the cement includes Portland cement. In some examples, the particulate carbonaceous material includes calcined petroleum coke. In some examples, the cementitious product includes between about 20 wt % and about 80 wt % Portland cement, and between about 30 wt % and about 80 wt % calcined petroleum coke.
- Cementitious slurries are further disclosed. According to some aspects, a cementitious slurry, which curable to form a water impermeable and electrically conductive cementitious surround on a metallic structure, includes a cementitious product including between about 5 wt % and about 70 wt % Portland cement, and between about 30 wt % and about 90 wt % calcined petroleum coke; and water; wherein the cementitious slurry comprises less than or equal to about 2.5 US gallons of water per 55 lb of cementitious product.
- The drawings included herewith are for illustrating various examples of articles, methods, and apparatuses of the present specification and are not intended to limit the scope of what is taught in any way. In the drawings:
-
FIG. 1 is a partial and schematic cross-sectional view showing a cementitious slurry being applied to a bottom portion of a utility pole; and -
FIG. 2 is a partial and schematic cross-sectional view showing a utility pole with a cementitious surround applied thereto; -
FIG. 3 is a partial and schematic cross-sectional view showing an anchor rod with a cementitious surround applied thereto; -
FIG. 4 is a perspective view of an example jacket usable with the cementitious surrounds described herein; -
FIG. 5 is a partial and schematic cross-sectional view showing the jacket ofFIG. 4 applied to the anchor rod and cementitious surround ofFIG. 3 ; -
FIG. 6 is a perspective view of an example brace usable with the cementitious surrounds described herein; -
FIG. 7 is a partial and schematic cross-sectional view showing the brace ofFIG. 6 applied to the utility pole and cementitious surround ofFIG. 2 ; and -
FIG. 8 shows the experimental setup of Example 2. - Various apparatuses or processes or compositions will be described below to provide an example of an embodiment of the claimed subject matter. No embodiment described below limits any claim and any claim may cover processes or apparatuses or compositions that differ from those described below. The claims are not limited to apparatuses or processes or compositions having all of the features of any one apparatus or process or composition described below or to features common to multiple or all of the apparatuses or processes or compositions described below. It is possible that an apparatus or process or composition described below is not an embodiment of any exclusive right granted by issuance of this patent application. Any subject matter described below and for which an exclusive right is not granted by issuance of this patent application may be the subject matter of another protective instrument, for example, a continuing patent application, and the applicants, inventors or owners do not intend to abandon, disclaim or dedicate to the public any such subject matter by its disclosure in this document.
- Disclosed herein is a cementitious product that, when in its cured state, forms a water impermeable and electrically conductive surround for buried portions (e.g. bottom portions) of metallic structures, or for sections of such buried portions. Such structures can include those used in the electrical power distribution and transmission industry, or in the telecommunications industry, or in the street lighting industry, or in various other industries. For example, metallic structures can include poles (e.g. steel poles) such as utility poles or telecommunications poles or street lighting poles. For further example, metallic structures can include anchor rods for guy wires. For further example, metallic structures can include metallic parts of ancillary structures (e.g. metal claddings on non-metallic structures such as concrete poles or composite poles or wood poles). The cementitious product can be used to facilitate installation of the metallic or ancillary structure (i.e. can set and support a metallic utility pole or metal-clad non-metallic utility pole, to hold the utility pole in a generally vertical position), provide electrical grounding to the metallic or ancillary structure, and protect the buried portion of the metallic structure (or the section thereof) from corrosion.
- The cementitious product can be applied to the metallic structure in situ. For example, the bottom portion of a metallic utility pole can be placed in a hole that has been dug in the earth (e.g. into a hole dug for the utility pole using an auger). The cementitious product, in slurry form or in powder form, can be poured around the bottom portion of the utility pole so that it is in direct contact with the utility pole. The cementitious product can cure in-situ around the bottom portion of the utility pole (e.g. the slurry can cure in-situ, or the powder can absorb environmental water (e.g. rain water) and then cure in-situ), so that the cementitious product is between the utility pole and the earth and can form a barrier between the utility pole and the earth. When cured, the cementitious product can form a surround around the bottom portion of the utility pole that (1) anchors the utility pole in the earth (i.e. holds up or helps to hold up or supports or sets the utility pole in a generally vertical position, so that a separate backfill material is not necessarily required); (2) is water impermeable to protect the bottom portion of the utility pole from corrosion; and (3) is electrically conductive to electrically ground the utility pole (e.g. to protect the utility pole from lightning strikes and powerline ground faults and prevent electrical fires).
- As used herein, the term ‘cementitious product’ refers to a product that has a cementitious matrix—i.e. a matrix that is a cement (e.g. Portland cement), or consists essentially of a cement, or is made up largely of a cement (i.e. at least 20% by weight of the matrix is a cement). Various components, as described below, can be dispersed in (or otherwise mixed with) the cementitious matrix. The term ‘cementitious product’ can refer to a dry product (also referred to herein as a ‘cementitious powder’), a wet product (also referred to herein as a ‘cementitious slurry’), or a solid product (also referred to herein as a ‘cementitious surround’ or simply as a ‘surround’).
- As used herein, the term ‘electrically-conductive’ indicates that the cementitious surround has an electrical resistivity of less than or equal to 10,000 ohm·cm. For example, the cementitious surround may have an electrical resistivity of less than 500 ohm·cm, or between 2.0 ohm·cm and 5.0 ohm·cm.
- As used herein, the term ‘water-impermeable’ indicates that the surround has a water permeability of less than or equal to 10−5 cm/s. For example, the surround may have a water permeability of 2.0×10−8 cm/s.
- As used herein, the term ‘in situ’ indicates that cementitious product is applied to the metallic structure at the installation location of the metallic structure. For example, the statement that ‘the cementitious product can be applied to the utility pole in situ’ indicates that the cementitious product can be applied to a bottom portion of the utility pole after a hole has been dug and the bottom end of the utility pole has been positioned in the hole.
- The cementitious products disclosed herein generally include a particulate carbonaceous material (e.g. calcined petroleum coke) dispersed in the cementitious matrix (e.g. Portland cement). When cured, the cementitious matrix may provide the product with water impermeability, to protect the buried portion (or a section of the buried portion) of the metallic structure from corrosion, and the particulate carbonaceous material may provide the product with electrical conductivity, to electrically ground the metallic structure. For example, a cementitious powder can include a mixture of calcined petroleum coke, Portland cement, and optionally slag. In some examples, the cementitious powder can include a mixture of 50 wt % calcined petroleum coke and 50 wt % Portland cement. In other examples, the cementitious powder can include a mixture of between about 30 wt % and 90 wt % calcined petroleum coke, between about 5 wt % and 70 wt % Portland cement, and between about 1 wt % and 50 wt % slag.
- In order to form the cementitious surround, the cementitious powder can be combined with water to form a slurry, which can then be applied in direct contact to the metallic structure in situ (e.g. poured into a hole that has been dug for a utility pole) and allowed to cure. In some examples, the cementitious powder can be combined with water in a ratio of less than or equal to about 3 US gallons of water per 55 lb of cementitious powder, for example between about 1.5 US gallons and 3.0 US gallons of water per 55 lb of cementitious powder. In one particular example, the cementitious powder can be combined with water in a ratio of about 2.0 US gallons of water per 55 lb of cementitious powder. This ratio may be particularly useful where the surround is formed on a utility pole. In another example, the cementitious powder can be combined with water in a ratio of about 2.5 US gallons of water per 55 lb of cementitious powder. This ratio may be particularly useful where the surround is formed on an anchor rod. Such cementitious slurries can be generally thick and have low slump.
- Alternatively, the initial step of combining with water can be omitted, and the cementitious powder can be applied in direct contact to the metallic structure in situ (e.g. poured into a hole that has been dug for a utility pole). Water can then be added to the cementitious powder in-situ, or the cementitious powder can be left and allowed to absorb environmental water (e.g. rainwater). The cementitious product can then be allowed to cure.
- The cementitious products disclosed herein can in some examples have a generally low drying shrinkage, e.g. a drying shrinkage of less than or equal to about 0.20% after curing for 28 days, or a drying shrinkage of less than about 0.015% after curing for 28 days.
- After curing, the cementitious surround can be relatively strong — i.e. can have a compressive strength of greater than or equal to about 50 psi (i.e. greater than about 0.34 MPa). For example, the compressive strength can be greater than 2000 psi (about 13.79 MPa), or about 4003 psi (about 27.6 MPa) or about 4350 psi (about 30 MPa), or about 914 psi (about 6.30 MPa), or about 624 psi (about 4.30 MPa), or about 348 psi (about 2.40 MPa), or about 174 psi (about 1.20 MPa), or about 65 psi (about 0.45 MPa) after curing (e.g. after 28 days of curing).
- Referring now to
FIG. 1 , an assembly is shown that includes a metallic (e.g. steel)utility pole 100 in situ. A portion (i.e. the bottom portion 102) of the utility pole has been lowered into ahole 104 that has been dug in the earth 106 (e.g. dug into theearth 106 with an auger or a hydrovac or any other technique that involves removal of soil to create a hole). Thehole 104 can be sized to have a diameter that is slightly larger than theutility pole 100, to leave acircumferential gap 108 between theutility pole 100 and theearth 106. Thegap 108 can have a width W of, for example, between 0.5 inch and 10 inches, or between 1 inch and 6 inches. With the utility pole in this position, acementitious slurry 110 as described above can be applied to thebottom portion 102 of theutility pole 100, for example by pouring the cementitious slurry into the gap 108 (althoughFIG. 1 shows theslurry 110 being poured from a pot, it may also be poured from a cement truck or other container). Alternatively, the cementitious slurry can first be applied to the hole, and the bottom portion of the utility pole can then be lowered into the hole and pressed into the slurry. If the bottom portion of the utility pole is closed as shown, this can cause the slurry to rise and fill the gap, or, if the bottom portion of the utility pole is open (not shown), the slurry can fill the bottom portion as well as the gap. A concrete vibrator can optionally be used to remove air trapped in the slurry. The slurry can then be left to cure, for example over a period of several days, to form thesurround 112, as shown inFIG. 2 . As mentioned above, thesurround 112 is between thebottom portion 102 of theutility pole 100 and theearth 106 and can form a barrier between thebottom portion 102 of theutility pole 100 and theearth 106, is electrically conductive to allow theutility pole 100 to be electrically grounded, and is water impermeable to protect theutility pole 100 from corrosion. - As mentioned above, instead of applying a cementitious slurry to the
utility pole 100, a cementitious powder can be applied to the utility pole 100 (e.g. by applying the cementitious powder to the gap 108). Water can then be added to the cementitious powder in-situ, or the cementitious powder can be left and allowed to absorb environmental water (e.g. rainwater). The cementitious product can then be allowed to cure. - Referring to
FIG. 2 , in order to prevent water (e.g. rainwater) from pooling around theutility pole 100, which can lead to corrosion, adiverter 114 can be installed or applied around theutility pole 100, on the top edge of thesurround 112. Thediverter 114 can be shaped to direct water away from theutility pole 100. Thediverter 114 can be formed from a grout or polymeric material that is troweled around theutility pole 100. The diverter can optionally be or include an electrically conductive material. - A grounding grid can optionally be installed around the utility pole, for safety.
- Referring to
FIG. 3 , another example is shown, in which the assembly includes a metallic structure in the form of ananchor rod 300 for aguy wire 316. Theanchor rod 300 is shown in situ, with theanchor rod 300 lowered into a hole that has been dug in theearth 306. In the example shown, theentire anchor rod 300 is buried. In the example shown, the hole is an auger hole dug into theearth 306 with an auger; in alternative examples, the hole can be a trench dug into the earth with a backhoe. The hole has a diameter that is slightly larger than theanchor rod 300, to leave a circumferential gap (not shown) between theanchor rod 300 and theearth 306. A cementitious slurry as described above has been poured into the hole, to fill the gap between theanchor rod 300 and theearth 306, and the slurry has cured to form thesurround 312. Alternatively, a cementitious powder can be poured into the hole, to fill the gap between the anchor rod and the earth. Water can then be added to the cementitious powder in-situ, or the cementitious powder can be left and allowed to absorb environmental water (e.g. rainwater). The cementitious product can then be allowed to cure. - In the example shown, an
anchor 318 is mounted to thebottom portion 302 of theanchor rod 300, to secure theanchor rod 300 in the earth. In the example shown, theanchor 318 is fully embedded in thesurround 312. In alternative examples, the anchor can be either fully or partially outside of thesurround 312. The anchor can be of various configurations (e.g. a plate or a nut or another configuration). - In the example shown, the assembly of
FIG. 3 further includes adiverter 314, similar to thediverter 114 ofFIG. 2 . - Referring now to
FIGS. 4 and 5 (where features that are like those ofFIG. 3 are referred to with the same reference numerals as inFIG. 3 ), in some examples, ajacket 420 can be used to encapsulate thesurround 312. Thejacket 420 can be electrically conductive and water impermeable. For example, the jacket can include a polymeric matrix, and a particulate carbonaceous material dispersed in the polymeric matrix. Such materials are described in U.S. Pat. No. 10,333,234 B2 (Sirola et al.), which is incorporated herein by reference in its entirety. In the example shown, thejacket 420 is in the form of a tube, which is formed in two pieces, 422 a, 422 b, which are positioned around thesurround 312. - The
jacket 420 can be used in various scenarios, but may be particularly useful in repair or retro-fit scenarios. For example, in situations where ananchor rod 300 is already installed in theearth 306, it may be required to dig up theearth 306 around theanchor rod 300 for various reasons, leaving theanchor rod 300 exposed (i.e. leaving the entire anchor rod exposed, or leaving only a section of the anchor rod exposed) and in a relatively large hole (not shown) that may be too large to fill with the cementitious product (i.e. having a diameter larger than the original auger hole that was created for the anchor rod 300). In such situations, thejacket 420 can be positioned in the hole around anchor rod 300 (i.e. either around theentire anchor rod 300, or around only the exposed section of the anchor rod 300) and secured in place (e.g. using a fastener such as a zip tie). Thejacket 420 can then be filled with the cementitious material, e.g. by pouring a cementitious slurry as described above into thejacket 420, to fill the jacket 420 (or by pouring a cementitious powder into the jacket 420). The slurry can then cure to form thesurround 312, and the hole can be filled withearth 306. In such examples, depending on how deep the hole around theanchor rod 312 has been dug, thesurround 312 can be on the entire buried portion of theanchor rod 312, or on only a section of the buried portion of the anchor rod 312 (e.g. the top section). - Jackets as described above can also be used with structures other than anchor rods, e.g. poles.
- Referring now to
FIGS. 6 and 7 (where features that are like those ofFIGS. 1 and 2 are referred to with the same reference numerals as inFIGS. 1 and 2 ), in some examples, one or more braces 624 a-d (only one of which is shown inFIG. 6 ) can be embedded in thesurround 112 to further support theutility pole 100, particularly during the period while the cementitious product is in the process of curing. The braces 624 a-d can include a polymeric matrix, and a particulate carbonaceous material dispersed in the polymeric matrix. Such materials are described in U.S. Pat. No. 10,333,234 B2 (Sirola et al.), which is incorporated herein by reference in its entirety. The braces 624 a-d can be in the form of elongate bars or rods or blocks (e.g. 4 inch×4 inch bars) that are cut to length to fit the gap between theutility pole 100 and theearth 106. To install the braces 624 a-d, thebottom portion 102 of theutility pole 100 can be lowered into thehole 104 that has been dug in the earth 106 (e.g. dug into theearth 106 with an auger). The braces 624 a-624 d can then be positioned in the gap, around theutility pole 100, so that they are generally wedged between theutility pole 100 and theearth 106. The cementitious slurry as described above can then be applied to the utility pole, enveloping the braces 624 a-624 d. The slurry can then be left to cure, for example over a period of several days, to form thesurround 112 with the braces 624 a-624 d embedded therein, as shown inFIG. 7 . - In
FIG. 7 , four braces 624 a-624 d are shown (i.e. twolower braces upper braces - As mentioned above, the metallic structures described herein can include metallic parts of ancillary structures (e.g. metal claddings on non-metallic structures such as wood poles). In one particular example (not shown), the ancillary structure can be a wood pole (e.g. utility pole), and the metallic structure can be a cladding on the bottom portion of the wood pole. The cladding can be, for example, a material such as a foil. The foil can be, for example, a copper foil or steel (e.g. galvanized steel) foil that is wrapped around the bottom portion of the wood pole. A wire can connect the cladding to a power system neutral of the utility pole. The bottom portion of the wood pole, together with the cladding, can be lowered into a hole that has been dug in the earth and a cementitious product (i.e. a slurry or a powder) can then be applied to the cladding and allowed to cure to form a surround, as described above.
- While the above description refers to portions of the metallic structures (e.g. bottom portions) being buried in the earth and the surround being on such buried portions, it is possible that the entire metallic structure may be buried in the earth, and the surround may be on the entire metallic structure. For example, in the case of a metallic cladding on a wood pole, the entire cladding may be buried in the earth and the surround may surround the entire cladding. For further example, in the case of an anchor rod, the entire anchor rod may be buried in the earth and the surround may surround the entire anchor rod. Furthermore, the surround may in some examples be applied to only a section of the buried portion of the metallic structure. For example, in the case of repair to an anchor rod, the surround may be applied to only the section of the anchor rod that is exposed when a trench is dug (e.g. the top 3 to 4 feet of the anchor rod).
- While the above description provides examples of one or more processes or apparatuses or compositions, it will be appreciated that other processes or apparatuses or compositions may be within the scope of the accompanying claims.
- To the extent any amendments, characterizations, or other assertions previously made (in this or in any related patent applications or patents, including any parent, sibling, or child) with respect to any art, prior or otherwise, could be construed as a disclaimer of any subject matter supported by the present disclosure of this application, Applicant hereby rescinds and retracts such disclaimer. Applicant also respectfully submits that any prior art previously considered in any related patent applications or patents, including any parent, sibling, or child, may need to be re-visited.
- Various cementitious powders were made, as shown in Tables 1 to 3. The powders were prepared by blending the components in a pneumatic blender. The powders were stored in 55 lb bags.
-
TABLE 1 Composition of Cementitious Powder 1 Component Weight % Particulate carbonaceous material: 50.0 CC60 Calcined Petroleum Coke (Oxbow Calcining LLC) Portland Cement 50.0 (Contempra Type GUL Portland Limestone Cement, St Mary’s Cement) -
TABLE 2 Composition of Cementitious Powder 2 Component Weight % Particulate carbonaceous material: 70.0 CC60 Calcined Petroleum Coke (Oxbow Calcining LLC) Portland Cement 30.0 (Contempra Type GUL Portland Limestone Cement, St Mary’s Cement) -
TABLE 3 Composition of Cementitious Powder 3 Component Weight % Particulate carbonaceous material: 80.0 CC60 Calcined Petroleum Coke (Oxbow Calcining LLC) Portland Cement 20.0 (Contempra Type GUL Portland Limestone Cement, St Mary’s Cement) - The cementitious powders were tested for electrical resistivity following a modified ASTM G187-05 procedure: Standard Test Method for Measurement of Soil Resistivity using the Two Electrode Soil Box Method. Cementitious powder (10 g) was placed in a fixture in between 2 brass platens. An Instron was used to apply a force of 192 lbs/int to the fixture, and the resistivity of the sample (measured between the 2 brass platens) was measured using a rectifier. Results are shown in Tables 4 to 6.
- The cementitious powders were then mixed with water (at various ratios set out below) to yield a cementitious slurry. Mixing was conducted using a drill with a grout mixing paddle until the slurry reached a smooth consistency. The slurry was then cured (as described below), and the cured product was tested for material properties, including water permeability, shrinkage, and compressive strength.
- For water permeability tests, 551 b of cementitious powder was combined with 3 US gallons of water. The cementitious slurry was then poured into 4 inch×8 inch PVC cylinders in 2 even layers. Each layer was rodded to remove entrained air. Lids were sealed on the cylinders and the material was allowed to cure for 28 days in the cylinder (ambient temperature and humidity conditions) before being demoulded and tested for water permeability. Water permeability tests followed ASTM D5084: Hydraulic Conductivity of Saturated Porous Materials using a Flexible Wall Permeameter—Constant Volume. The demoulded samples were placed into the permeameter and subjected to an effective stress of 2.6 psi, and the permeability rate of water through the material was calculated. Results are shown in Tables 4 to 6.
- For shrinkage tests, 551 b of cementitious powder was combined with 3 US gallons of water. Shrinkage tests followed ASTM C157: Length Change of Hardened Hydraulic-Cement Mortar and Concrete. The cementitious slurry was cast into prisms for linear shrinkage testing. Prism specimens were wet cured in lime saturated water for 28 days, followed by 28 days of air storage in a humidity and temperature controlled drying room. Shrinkage was measured after demoulding, after 28 days of wet curing, and after 4, 7, 14 and 28 days of air storage. Results (shown in Tables 4 to 6) show the shrinkage after 28 days of air storage.
- For compressive strength tests, up to three water ratios were tested: 55 lb of cementitious powder combined with 1.8 US gallons of water, 55 lb of cementitious powder combined with 2.5 US gallons of water, and 55 lb of cementitious powder combined with 3.0 US gallons of water. Each cementitious slurry was poured into 4 inch×8 inch PVC cylinders in 2 even layers. Each layer was rodded to remove entrained air. Lids were sealed on the cylinders and the material was allowed to cure for 28 days in the cylinder (ambient temperature and humidity conditions) before being demoulded and tested for compressive strength. Compressive strength tests followed CAN/CSA A.23.2-14. After demoulding the samples were placed in between 2 plates. Force was applied until the material fractured. The amount of force required to fracture the material is the recorded compressive strength. Results are shown in Tables 4 to 6.
-
TABLE 4 Properties of Cured Surround Material 1 Property Value (average) Permeability to Water (n = 2) 2.0 × 10−8 cm/sec Shrinkage (n = 3) 0.015% Electrical Resistivity (n = 5) 2.8-5.0 Ω · cm Compressive Strength 1.8 US gallons of water/bag (n = 2) 7005 psi (48.3 MPa) 2.5 US gallons of water/bag (n = 2) 4569 psi (34.5 MPa) 3.0 US gallons of water/bag (n = 2) 4003 psi (27.6 MPa) -
TABLE 5 Properties of Cured Surround Material 2 Property Value (average) Permeability to Water (n = 4) 1.85 × 10−7 cm/sec Electrical Resistivity (n = 8) 0.5-2.0 Ω · cm Compressive Strength 3.0 US gallons of water/bag (n = 2) 914 psi (6.30 MPa) -
TABLE 6 Properties of Cured Surround Material 3 Property Value (average) Permeability to Water (n = 4) 1.46 × 10−6 cm/sec Electrical Resistivity (n = 6) 0.4-3.0 Ω · cm Compressive Strength 3.0 US gallons of water/bag (n = 2) 348 psi (2.40 MPa) - Cementitious products were tested for their ability to protect copper, steel, and galvanized steel structures from corrosion.
- Copper:
- Copper samples (34 inch×3 inch rectangular strips having a thickness of 0.2 mm (0.008 inch)) were connected to insulated wire, which was then connected to a rectifier. One strip was left bare and the second strip was encased in a 4 inch×8 inch cementitious surround.
- The cementitious surround was made using a cementitious powder of the composition shown in Table 1. A cementitious slurry was made by adding 55 lbs of the cementitious powder to 3.3 US gallons of water and mixing, as described above. The copper samples were embedded in the slurry in a 4 inch×8 inch PVC cylinder as described above, and the slurry was allowed to cure for 13 days (ambient temperature and humidity conditions) before demoulding.
- Both samples (i.e. bare strip and encased strip) were buried in topsoil. Sodium sulfate (20 g) was added to the soil and water was regularly added to ensure the soil was wet and salty (to simulate worst case conditions). Samples were connected to the rectifier in series, and 3 mA was applied to each sample for 60 days. The experimental setup is shown in
FIG. 8 . InFIG. 8 , the following reference numerals are used: 800—regulated power supply; 802—insulated positive wire; 804—test container; 806—steel rebar (cathodic); 808—bare metal (anodic); 810—insulated bond wire; 812—metal encased in cementitious surround (anodic); 814—steel rebar (cathodic); 816—test container; 818—insulated negative wire; 820—soil. - The samples were then removed from the soil. The encased strip was removed from the cementitious surround. Both copper strips were then weighed. Results are shown in Table 7.
- Steel:
- Steel samples (1.75 inch×¾ inch rectangular sections having a thickness of 1/4 inch) were connected to insulated wire, which was then connected to a rectifier. One section was left bare and the second section was encased in a 4 inch×8 inch cementitious surround. The cementitious surround was made as described above for copper; however the slurry was cured for 28 days.
- Both samples (i.e. bare section and encased section) were buried in topsoil. Sodium sulfate (20 g) was added to the soil and water was regularly added to ensure the soil was wet and salty. Samples were connected to the rectifier in series, and 3 mA was applied to each sample for 30 days. The experimental setup was the same as shown in
FIG. 8 . - The samples were then removed from the soil. The encased section was removed from the cementitious surround. Both steel sections were then weighed. Results are shown in Table 7.
- Galvanized Steel:
- Galvanized steel samples were 1.75 inch×¾ inch rectangular sections having a thickness of ¼ inch. Galvanizing met ASTM A123/A123M, and the samples had a zinc coating of at least 0.025 mm (0.001 inch). The sections were connected to insulated wire, which was then connected to the rectifier. One section was left bare and the second section was encased in a 4 inch×8 inch cementitious surround. The cementitious surround was made as described above for steel. The experiment was conducted as described above for steel. Results are shown in Table 7.
- The results indicate that the cementitious products disclosed herein can inhibit or prevent corrosion of metal including copper, steel, and galvanized steel.
-
TABLE 7 Electrical Corrosion Resistance of Various Metals Percentage of Sample Consumed after 30 days or 60 days Sample (%) Copper without Cementitious Surround 94.80 (in direct contact with soil) Copper Encased in Cementitious Surround 0.00 Steel without Cementitious Surround 5.79 (in direct contact with soil) Steel Encased in Cementitious Surround 0.00 Galvanized Steel without Cementitious Surround 7.70 (in direct contact with soil) Galvanized steel Encased in Cementitious 0.00 Surround
Claims (21)
1. A method for electrically grounding and corrosion-protecting a metallic structure, comprising:
a) combining a cementitious powder with water to form a cementitious slurry, wherein the cementitious powder comprises a cement and a particulate carbonaceous material, and wherein the cementitious powder is combined with the water in a ratio of less than or equal to about 2.5 US gallons of water per 55 lb of cementitious powder;
b) applying the cementitious slurry to at least a section of the metallic structure; and
c) curing the cementitious slurry to form a water impermeable and electrically conductive cementitious surround on the section.
2. The method of claim 1 , wherein the ratio is between about 2.5 US gallons of water and 1.5 US gallons of water per 55 lb of cementitious powder.
3. The method of claim 1 , wherein the ratio is about 2.5 US gallons of water per 55 lb of cementitious powder.
4. The assembly of claim 1 , wherein the ratio is about 2.0 US gallons of water per 55 lb of cementitious powder.
5. The assembly of claim 1 , wherein the ratio is about 1.8 US gallons of water per 55 lb of cementitious powder.
6. The method of claim 1 , wherein the surround has a compressive strength of greater than or equal to about 50 psi.
7. The method of claim 1 , wherein the surround has a compressive strength of greater than or equal to about 2000 psi after 28 days of curing.
8. The method of claim 1 , further comprising, prior to step a):
digging a hole in the earth for the metallic structure, wherein the hole is sized to leave a gap between the metallic structure and the earth; and
lowering at least a bottom portion of the metallic structure into the hole.
9. The method of claim 8 , further comprising pouring the cementitious slurry in to the gap, to apply the cementitious slurry to the bottom portion of the metallic structure.
10. The method of claim 1 , wherein the cement comprises Portland cement.
11. The method of claim 1 , wherein the particulate carbonaceous material comprises calcined petroleum coke.
12. The method of claim 1 , wherein the cementitious powder comprises between about 20 wt % and about 80 wt % Portland cement, and between about 30 wt % and about 80 wt % calcined petroleum coke.
13. An intermediate assembly that is curable to yield an electrically grounded and corrosion-protected assembly, comprising:
a metallic structure, wherein at least a portion of the metallic structure is buried in the earth; and
a cementitious slurry applied to at least a section of the portion that is buried in the earth, wherein the cementitious slurry comprises a cementitious product and water, wherein the cementitious product comprises a cement and a particulate carbonaceous material, and wherein the cementitious slurry comprises less than or equal to about 2.5 US gallons of water per 55 lb of cementitious product.
14. The intermediate assembly of claim 13 , wherein the cementitious slurry comprises between about 2.5 US gallons of water and 1.5 US gallons of water per 55 lb of cementitious product.
15. The intermediate assembly of claim 13 , wherein the cementitious slurry comprises about 2.5 US gallons of water per 55 lb of cementitious product.
16. The intermediate assembly of claim 13 , wherein the cementitious slurry comprises about 2.0 US gallons of water per 55 lb of cementitious product.
17. The intermediate assembly of claim 13 , wherein the metallic structure is a pole.
18. The intermediate assembly of claim 13 , wherein the cement comprises Portland cement.
19. The intermediate assembly of claim 13 , wherein the particulate carbonaceous material comprises calcined petroleum coke.
20. The intermediate assembly of claim 13 , wherein the cementitious product comprises between about 20 wt % and about 80 wt % Portland cement, and between about 30 wt % and about 80 wt % calcined petroleum coke.
21. A cementitious slurry curable to form a water impermeable and electrically conductive cementitious surround on a metallic structure, the cementitious slurry comprising:
a cementitious product comprising between about 5 wt % and about 70 wt % Portland cement, and between about 30 wt % and about 90 wt % calcined petroleum coke; and
water;
wherein the cementitious slurry comprises less than or equal to about 2.5 US gallons of water per 55 lb of cementitious product.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US17/868,950 US20220349143A1 (en) | 2019-12-18 | 2022-07-20 | Cementitious slurries, methods, and assemblies for electrically grounding and corrosion-protecting a metallic structure |
US18/331,984 US20230313483A1 (en) | 2019-12-18 | 2023-06-09 | Methods and assemblies for electrically grounding and corrosion-protecting a metallic structure |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201962949489P | 2019-12-18 | 2019-12-18 | |
US16/837,284 US11421392B2 (en) | 2019-12-18 | 2020-04-01 | Metallic structure with water impermeable and electrically conductive cementitous surround |
US17/868,950 US20220349143A1 (en) | 2019-12-18 | 2022-07-20 | Cementitious slurries, methods, and assemblies for electrically grounding and corrosion-protecting a metallic structure |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/837,284 Continuation US11421392B2 (en) | 2019-12-18 | 2020-04-01 | Metallic structure with water impermeable and electrically conductive cementitous surround |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US18/331,984 Continuation-In-Part US20230313483A1 (en) | 2019-12-18 | 2023-06-09 | Methods and assemblies for electrically grounding and corrosion-protecting a metallic structure |
Publications (1)
Publication Number | Publication Date |
---|---|
US20220349143A1 true US20220349143A1 (en) | 2022-11-03 |
Family
ID=76433055
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/837,284 Active 2040-11-07 US11421392B2 (en) | 2019-12-18 | 2020-04-01 | Metallic structure with water impermeable and electrically conductive cementitous surround |
US17/868,950 Pending US20220349143A1 (en) | 2019-12-18 | 2022-07-20 | Cementitious slurries, methods, and assemblies for electrically grounding and corrosion-protecting a metallic structure |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/837,284 Active 2040-11-07 US11421392B2 (en) | 2019-12-18 | 2020-04-01 | Metallic structure with water impermeable and electrically conductive cementitous surround |
Country Status (2)
Country | Link |
---|---|
US (2) | US11421392B2 (en) |
CA (1) | CA3092850A1 (en) |
Family Cites Families (104)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1661712A (en) | 1924-07-31 | 1928-03-06 | Line Material Co | Electrical appliance |
US2207134A (en) * | 1938-11-30 | 1940-07-09 | Phelps Dodge Copper Prod | Ground rod and method of making the same |
US2196172A (en) | 1938-12-22 | 1940-04-09 | Florence Pipe Foundry & Machin | Protective coating of metal pipe and the like |
US2495466A (en) | 1947-07-31 | 1950-01-24 | Dow Chemical Co | Packaged magnesium anode with cemented backfill |
US2553654A (en) | 1948-03-20 | 1951-05-22 | Union Carbide & Carbon Corp | Ground electrode and backfill |
US3072558A (en) | 1961-02-13 | 1963-01-08 | Dow Chemical Co | Composite anode |
US3243753A (en) | 1962-11-13 | 1966-03-29 | Kohler Fred | Resistance element |
US3334040A (en) | 1963-10-02 | 1967-08-01 | Pittsburgh Plate Glass Co | Bonding electrically conductive elements |
GB1108692A (en) | 1964-04-17 | 1968-04-03 | Gordon Ian Russell | Method for installing cathodic protection against corrosion |
US3927163A (en) | 1969-01-21 | 1975-12-16 | Gabriel Willis Associates | Altering the properties of concrete by altering the quality or geometry of the intergranular contact of filler materials |
US3573427A (en) | 1969-07-30 | 1971-04-06 | Us Army | Electrically conductive asphaltic concrete |
US3917781A (en) | 1969-12-19 | 1975-11-04 | Lester H Gabriel | Altering the properties of concrete by altering the quality or geometry of the intergranular contact of filler materials |
US3725699A (en) | 1971-01-19 | 1973-04-03 | Westinghouse Air Brake Co | Train detection system for railroad grade crossing |
US3716649A (en) | 1971-03-16 | 1973-02-13 | Allegheny Ludlum Ind Inc | Grounding rod and coupler therefor |
US3725669A (en) | 1971-12-14 | 1973-04-03 | J Tatum | Deep anode bed for cathodic protection |
US3941918A (en) | 1973-01-22 | 1976-03-02 | Canadian Porcelain Company Limited | Electrical insulator including an insulation shell having hardware members secured thereto by cement containing graphite fibers |
GB1445611A (en) | 1973-02-07 | 1976-08-11 | Marconi Co Ltd | Electrically conducting arrangements |
US4017569A (en) | 1973-11-28 | 1977-04-12 | Southwire Company | Anode vibrator and press |
GB1424162A (en) | 1974-01-18 | 1976-02-11 | Sibirsk Nii Energetiki | Elektroconductive material |
US3876819A (en) | 1974-08-22 | 1975-04-08 | Allegheny Ludlum Ind Inc | Grounding rod |
US4069870A (en) | 1976-06-28 | 1978-01-24 | Union Oil Company Of California | Method of cementing well casing using a high temperature cement system |
US4018715A (en) | 1976-06-29 | 1977-04-19 | Tatum Joe F | Ground electrode backfill composition |
US4175021A (en) | 1978-03-06 | 1979-11-20 | C. E. Equipment Co., Inc. | Apparatus for preventing end effect in anodes |
US4170532A (en) | 1978-04-11 | 1979-10-09 | C. E. Equipment, Inc. | Deep well platinized anode carrier for cathodic protection system |
US4192963A (en) | 1979-01-02 | 1980-03-11 | Battelle Memorial Institute | Grounding electrode and method of reducing the electrical resistance of soils |
US4367168A (en) | 1979-03-26 | 1983-01-04 | E-B Industries, Inc. | Electrically conductive composition, process for making an article using same |
US4400259A (en) | 1981-08-18 | 1983-08-23 | Matcor, Inc. | Deep anode assembly |
US4407676A (en) | 1981-11-25 | 1983-10-04 | Restrepo Jose M | Fiber-reinforced cement and process |
US4414030A (en) | 1981-11-25 | 1983-11-08 | Restrepo Jose M | Fiber-reinforced cement, and process |
US4442903A (en) | 1982-06-17 | 1984-04-17 | Schutt William R | System for installing continuous anode in deep bore hole |
CA1179211A (en) | 1982-11-12 | 1984-12-11 | Dilip K. Tailor | Heat shrinkable covering and method for applying same |
IT1170053B (en) | 1983-12-23 | 1987-06-03 | Oronzio De Nora Sa | PRE-PACKED DISPERSER ANODE WITH BACKFILL IN FLEXIBLE STRUCTURE FOR CATHODIC PROTECTION WITH IMPRESSED CURRENTS |
FR2561668B1 (en) | 1984-03-26 | 1989-12-29 | Dacral Sa | ANTI-CORROSION COATING COMPOSITION, METHOD FOR ITS IMPLEMENTATION AND COATED HARDWARE ELEMENTS |
US5070597A (en) | 1985-07-19 | 1991-12-10 | Raychem Corporation | Tubular article |
US4710644A (en) | 1985-10-30 | 1987-12-01 | Corrpro Companies, Inc. | Replaceable deep anode system |
US4818439A (en) | 1986-01-30 | 1989-04-04 | Sunbeam Corporation | PTC compositions containing low molecular weight polymer molecules for reduced annealing |
US5143649A (en) | 1985-12-06 | 1992-09-01 | Sunbeam Corporation | PTC compositions containing low molecular weight polymer molecules for reduced annealing |
US5055166A (en) | 1986-12-29 | 1991-10-08 | Matcor, Inc. | Surface mounted cathodic protection anode and method of use |
US4786388A (en) | 1987-09-14 | 1988-11-22 | Cathodic Engineering Equipment Company | Ground electrode backfill composition, anode bed and apparatus |
US4871395A (en) | 1987-09-17 | 1989-10-03 | Associated Universities, Inc. | High temperature lightweight foamed cements |
US4908157A (en) | 1988-05-26 | 1990-03-13 | The United States Of America As Represented By The Department Of Energy | Electrically conductive polymer concrete coatings |
DE3826926A1 (en) | 1988-08-09 | 1990-02-15 | Heraeus Elektroden | ANODE FOR CATHODIC CORROSION PROTECTION |
US5139634A (en) | 1989-05-22 | 1992-08-18 | Colorado Interstate Gas Company | Method of use of dual bed cathodic protection system with automatic controls |
US5026468A (en) | 1989-05-22 | 1991-06-25 | Colorado Interstate Gas Company | Dual bed cathodic protection system with automatic controls |
FR2651492B1 (en) | 1989-09-06 | 1993-06-18 | Saint Gobain Rech | PROCESS AND PRODUCTS OBTAINED BY MIXING CEMENT AND REINFORCING FIBERS. |
US5098771A (en) | 1989-07-27 | 1992-03-24 | Hyperion Catalysis International | Conductive coatings and inks |
US5040599A (en) | 1989-12-04 | 1991-08-20 | Phillips Petroleum Company | Cathodic protection |
US5476612A (en) | 1989-12-30 | 1995-12-19 | Zipperling Kessler & Co., (Gmbh & Co.). | Process for making antistatic or electrically conductive polymer compositions |
US5080773A (en) | 1990-05-11 | 1992-01-14 | Cathodic Engineering Equipment Co., Inc. | Ground electrode backfill |
US5026508A (en) | 1990-05-11 | 1991-06-25 | Cathodic Engineering Equipment Co., Inc. | Ground electrode backfill composition, anode bed |
GB9102904D0 (en) | 1991-02-12 | 1991-03-27 | Ici America Inc | Modified cementitious composition |
JP3056276B2 (en) | 1991-02-13 | 2000-06-26 | 旭電機株式会社 | Grounding resistance reducing material |
JPH06508178A (en) | 1991-04-15 | 1994-09-14 | エヌ・ヴェ・レイケム・ソシエテ・アノニム | Method for electrically protecting metal objects, grounding electrodes and compositions for grounding electrodes for carrying out the method |
US5164058A (en) | 1991-06-14 | 1992-11-17 | Foam Enterprises, Inc. | Anode protector |
US5174871A (en) | 1991-06-27 | 1992-12-29 | Interprovincial Corrosion Control Company Limited | Method for providing cathodic protection of underground structures |
US5370783A (en) | 1991-08-01 | 1994-12-06 | Corrpro Companies, Inc. | Electrode |
US5550176A (en) | 1992-04-17 | 1996-08-27 | Ucar Carbon Technology Corporation | Room temperature setting carbonaceous cement with increased electrical conductivity and flexural strength |
US5413689A (en) | 1992-06-12 | 1995-05-09 | Moltech Invent S.A. | Carbon containing body or mass useful as cell component |
US5207530A (en) | 1992-07-29 | 1993-05-04 | Halliburton Company | Underground compressed natural gas storage and service system |
GB9312431D0 (en) | 1993-06-16 | 1993-07-28 | Aston Material Services Ltd | Improvements in and relating to protecting reinforced concrete |
US6303017B1 (en) | 1993-06-16 | 2001-10-16 | Aston Material Services Limited | Cathodic protection of reinforced concrete |
US5547311A (en) | 1993-10-01 | 1996-08-20 | Kenda; William P. | Cathodic protection, leak detection, and thermal remediation system |
US5447564A (en) | 1994-02-16 | 1995-09-05 | National Research Council Of Canada | Conductive cement-based compositions |
CH688475A5 (en) | 1994-06-24 | 1997-10-15 | Elfinco Sa | Building material electrically conductive. |
US5700398A (en) | 1994-12-14 | 1997-12-23 | International Business Machines Corporation | Composition containing a polymer and conductive filler and use thereof |
EP0767523A3 (en) | 1995-10-02 | 1997-07-23 | Minnesota Mining & Mfg | Improved covering device |
US5677367A (en) | 1995-08-15 | 1997-10-14 | Savin; Ronald R. | Graphite-containing compositions |
GB9520587D0 (en) | 1995-10-09 | 1995-12-13 | Raychem Sa Nv | Grounding electrode |
US5976419A (en) | 1998-06-09 | 1999-11-02 | Geotech Chemical Company | Method for applying a coating that acts as an electrolytic barrier and a cathodic corrosion prevention system |
US6121543A (en) | 1998-07-06 | 2000-09-19 | Hallmark; Clayton L. | Groundbed electrode with graphite containing cement |
GB9823654D0 (en) | 1998-10-29 | 1998-12-23 | Fosroc International Ltd | Connector for use in cathodic protection and method of use |
US6193443B1 (en) | 1998-10-30 | 2001-02-27 | Adrien R. Trudeau | Anode installation apparatus and method |
US6461424B1 (en) | 2001-02-21 | 2002-10-08 | Wisconsin Electric Power Company | Electrically conductive concrete and controlled low-strength materials |
US20040099982A1 (en) | 2002-08-19 | 2004-05-27 | Sirola D. Brien | Conductive concrete compositions and methods of manufacturing same |
US7578910B2 (en) | 2002-08-19 | 2009-08-25 | Sae Inc. | Deep well anodes for electrical grounding |
US7186321B2 (en) | 2002-12-16 | 2007-03-06 | Benham Roger A | Cathodic protection system for metallic structures |
US6821336B1 (en) | 2003-08-15 | 2004-11-23 | Wisconsin Electric Power Co. | Electrically conductive concrete and controlled low strength materials having carbon fibers |
JP2007508439A (en) | 2003-10-27 | 2007-04-05 | ポリワン コーポレイション | Cathodic protective coating containing carbonaceous conductive media |
GB0327000D0 (en) | 2003-11-20 | 2003-12-24 | Tyco Electronics Raychem Gmbh | Heat shrink jointing |
US7794626B2 (en) | 2004-02-04 | 2010-09-14 | Polyone Corporation | Cathodic protection compounds |
US7312261B2 (en) | 2004-05-11 | 2007-12-25 | International Business Machines Corporation | Thermal interface adhesive and rework |
JP2006302677A (en) | 2005-04-21 | 2006-11-02 | Sankosha Corp | Grounding apparatus and method of installing the same |
KR100757673B1 (en) | 2005-10-18 | 2007-09-10 | 한국전력공사 | a ground rod and connection sleeve filled with compound of electric comduction |
KR100648059B1 (en) | 2005-10-25 | 2006-11-27 | 김귀연 | The constitution and method making of the stainless covered wire |
US20100159148A1 (en) | 2006-08-11 | 2010-06-24 | Cantech Industrial Research Corporation | Surface coating compositions |
US7745528B2 (en) | 2006-10-06 | 2010-06-29 | The Trustees Of Princeton University | Functional graphene-rubber nanocomposites |
US8081415B2 (en) | 2009-04-16 | 2011-12-20 | Paige Electric Company, L.P. | Grounding assembly |
WO2011149463A1 (en) | 2010-05-27 | 2011-12-01 | Prysmian Power Cables And Systems Usa, Llc | Electrical cable with semi-conductive outer layer distinguishable from jacket |
KR101089543B1 (en) | 2010-06-16 | 2011-12-05 | 대원전기 주식회사 | Arch-type utility pole underbracing having a function of earthing with a conductive concrete layer on the botton surface |
US9252503B2 (en) | 2010-07-09 | 2016-02-02 | Paige Electric Company, Lp | Grounding device having a grounding plate and an insulated connecting wire |
WO2013033562A2 (en) | 2011-08-31 | 2013-03-07 | Jorma Virtanen | Composition for corrosion prevention |
EP2788418A2 (en) | 2011-12-08 | 2014-10-15 | Nanoridge Materials, Incorporated | Nano-enhanced elastomers |
US20140251793A1 (en) | 2013-03-07 | 2014-09-11 | Sae Inc. | Cathodic protection current distribution method and apparatus for corrosion control of reinforcing steel in concrete structures |
WO2014186452A1 (en) | 2013-05-14 | 2014-11-20 | Ilhan Aksay | Graphene dispersions |
NZ714626A (en) | 2013-06-26 | 2023-03-31 | Intelli Particle Pty Ltd | Electrothermic compositions |
US20150028247A1 (en) | 2013-07-23 | 2015-01-29 | Sabic Innovative Plastics Ip B.V. | Rigid foam and associated article and method |
WO2015021559A1 (en) | 2013-08-16 | 2015-02-19 | Shore Acres Enterprises Inc. (D/B/A Sae Inc.) | Corrosion protection of buried metallic conductors |
CA2940604C (en) | 2014-02-28 | 2021-07-20 | Prysmian S.P.A. | Electrical cables with strength elements |
US10398138B2 (en) | 2014-04-08 | 2019-09-03 | Lampman Wildlife Management Services Limited | Wildlife exclusion composition and assembly |
US10280580B1 (en) | 2016-03-04 | 2019-05-07 | Usa Intellectual Property Holding, Inc. | Anti-corrosion structure anchor |
JP6918492B2 (en) | 2016-12-28 | 2021-08-11 | Toyo Tire株式会社 | How to manufacture rubber wet masterbatch |
US10333234B2 (en) | 2017-08-14 | 2019-06-25 | Shore Acres Enterprises Inc. | Corrosion-protective jacket for electrode |
US11121482B2 (en) | 2017-10-04 | 2021-09-14 | Shore Acres Enterprises Inc. | Electrically-conductive corrosion-protective covering |
CA3147064A1 (en) * | 2019-08-06 | 2021-02-11 | Glxt Holdings, Llc | Systems and methods for electrical earthing systems |
-
2020
- 2020-04-01 US US16/837,284 patent/US11421392B2/en active Active
- 2020-04-01 CA CA3092850A patent/CA3092850A1/en active Pending
-
2022
- 2022-07-20 US US17/868,950 patent/US20220349143A1/en active Pending
Also Published As
Publication number | Publication date |
---|---|
CA3092850A1 (en) | 2021-06-18 |
US11421392B2 (en) | 2022-08-23 |
US20210189677A1 (en) | 2021-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Anagnostopoulos | Laboratory study of an injected granular soil with polymer grouts | |
US7578910B2 (en) | Deep well anodes for electrical grounding | |
O’Reilly et al. | Evaluation of multiple corrosion protection systems for reinforced concrete bridge decks | |
Illampas et al. | Validation of the repair effectiveness of clay-based grout injections by lateral load testing of an adobe model building | |
Silva | Repair of earth constructions by means of grout injection | |
CA1166529A (en) | Articles protected against corrosion and method for protecting articles against corrosion | |
US2495466A (en) | Packaged magnesium anode with cemented backfill | |
US11421392B2 (en) | Metallic structure with water impermeable and electrically conductive cementitous surround | |
Qian1a et al. | Behaviour of micropiles in collapsible loess under tension or compression load | |
US20230313483A1 (en) | Methods and assemblies for electrically grounding and corrosion-protecting a metallic structure | |
KR100313599B1 (en) | Latex modified concrete composition for bridge surface | |
CN110294620B (en) | Low-thermal-resistance high-thermal-conductivity power cable fireproof gel material and preparation method thereof | |
CN105064411B (en) | Method for building post-pouring expansion reinforcing band of wallboard of underground structure | |
JP4976073B2 (en) | Repair method for underground filler and earth structure | |
Saranya et al. | Strength and Durability performance of ferrocement panels with the influence of corrosion inhibitor | |
Lim et al. | Preliminary grounding performance of bentonite mixed concrete encased steel cage under high soil resistivity condition | |
CA2573739A1 (en) | Deep well anodes for electrical grounding | |
Naderi | Effect of different constituent materials on the properties of plastic concrete | |
Rachmawati et al. | Agriculture land development using shell husk as recycle aggregate | |
Kim et al. | Estimation on the field application for in-site recycling of the wastes soil from preboring | |
KR100451092B1 (en) | Lightweight fill method applying lightweight fill materials using waste styrofoam beads | |
KR100462529B1 (en) | Lightweight fill method applying lightweight fill materials using waste styrofoam beads | |
CN113423893B (en) | Building foundation system | |
US20060005967A1 (en) | Deep well anodes for electrical grounding | |
CN110512658B (en) | Loess pipe ditch waterproof construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SHORE ACRES ENTERPRISES INC., ONTARIO Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SIROLA, BRIEN TODD;BERNI, CHRISTOPHER PAUL;SIROLA, DONALD BRIEN;AND OTHERS;SIGNING DATES FROM 20200921 TO 20200923;REEL/FRAME:060757/0401 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |