US20220349142A9 - Method and Device for Pre-Casting Conduit Holes in Building Foundations - Google Patents
Method and Device for Pre-Casting Conduit Holes in Building Foundations Download PDFInfo
- Publication number
- US20220349142A9 US20220349142A9 US17/027,678 US202017027678A US2022349142A9 US 20220349142 A9 US20220349142 A9 US 20220349142A9 US 202017027678 A US202017027678 A US 202017027678A US 2022349142 A9 US2022349142 A9 US 2022349142A9
- Authority
- US
- United States
- Prior art keywords
- conduit
- foundation
- molds
- concrete
- rubber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
- E02D5/182—Bulkheads or similar walls made solely of concrete in situ using formworks to separate sections
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61M—DEVICES FOR INTRODUCING MEDIA INTO, OR ONTO, THE BODY; DEVICES FOR TRANSDUCING BODY MEDIA OR FOR TAKING MEDIA FROM THE BODY; DEVICES FOR PRODUCING OR ENDING SLEEP OR STUPOR
- A61M60/00—Blood pumps; Devices for mechanical circulatory actuation; Balloon pumps for circulatory assistance
- A61M60/40—Details relating to driving
- A61M60/403—Details relating to driving for non-positive displacement blood pumps
- A61M60/408—Details relating to driving for non-positive displacement blood pumps the force acting on the blood contacting member being mechanical, e.g. transmitted by a shaft or cable
- A61M60/411—Details relating to driving for non-positive displacement blood pumps the force acting on the blood contacting member being mechanical, e.g. transmitted by a shaft or cable generated by an electromotor
- A61M60/414—Details relating to driving for non-positive displacement blood pumps the force acting on the blood contacting member being mechanical, e.g. transmitted by a shaft or cable generated by an electromotor transmitted by a rotating cable, e.g. for blood pumps mounted on a catheter
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61M—DEVICES FOR INTRODUCING MEDIA INTO, OR ONTO, THE BODY; DEVICES FOR TRANSDUCING BODY MEDIA OR FOR TAKING MEDIA FROM THE BODY; DEVICES FOR PRODUCING OR ENDING SLEEP OR STUPOR
- A61M60/00—Blood pumps; Devices for mechanical circulatory actuation; Balloon pumps for circulatory assistance
- A61M60/50—Details relating to control
- A61M60/508—Electronic control means, e.g. for feedback regulation
- A61M60/515—Regulation using real-time patient data
- A61M60/531—Regulation using real-time patient data using blood pressure data, e.g. from blood pressure sensors
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61M—DEVICES FOR INTRODUCING MEDIA INTO, OR ONTO, THE BODY; DEVICES FOR TRANSDUCING BODY MEDIA OR FOR TAKING MEDIA FROM THE BODY; DEVICES FOR PRODUCING OR ENDING SLEEP OR STUPOR
- A61M60/00—Blood pumps; Devices for mechanical circulatory actuation; Balloon pumps for circulatory assistance
- A61M60/80—Constructional details other than related to driving
- A61M60/802—Constructional details other than related to driving of non-positive displacement blood pumps
- A61M60/804—Impellers
- A61M60/806—Vanes or blades
- A61M60/808—Vanes or blades specially adapted for deformable impellers, e.g. expandable impellers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/66—Mould-pipes or other moulds
- E02D5/68—Mould-pipes or other moulds for making bulkheads or elements thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0001—Rubbers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0006—Plastics
- E02D2300/0007—PVC
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0006—Plastics
- E02D2300/0009—PE
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0006—Plastics
- E02D2300/0014—PU
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0046—Foams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0071—Wood
Definitions
- the invention relates to a device and method that pre-casts conduit holes in residential and commercial building foundations for immediate, or future use.
- conduits for power lines to main panel and subpanels may include, but are not limited to: conduits for power lines to main panel and subpanels, low voltage lines, cable lines, telephone lines, water supply lines, sewage lines, line sets condensers, heat pumps, power lines to condensers, generator lines, and pool equipment. These conduits typical range in diameter from 1.25′′ for water lines to 8′′ for sewage or septic lines. These conduits may range from 18′′ below grade, for power conduits, to 48′′ below grade for water conduits, to even further below grade for sewer or septic conduits. Building constructions may have multiple conduits on multiple different locations of the foundation.
- these openings for conduits are created after the rebar-enforced concrete foundation has set.
- the locations of the conduits are determined in the foundation, and a core drill, drills the appropriate size conduit holes into the foundation from the interior side to the exterior side. Costs for each conduit hole to be drilled can run high, adding significantly to building costs.
- the core drill is a heavy duty machine which must be bolted to the foundation wall, and supplied power and water for operation.
- the core drill utilizes diamond bits which are costly to replace. If the core drill encounters rebar within the foundation wall, it will significant shorten the life of the core drill bits.
- conduit seal which contains a plurality of links and a gasket.
- links compress the gasket to create a tight fitting between the concrete foundation and the conduit.
- some construction completes the conduit seal with sprayed foam or cement. Both of these methods will deteriorate or crack over time, resulting in a loose conduit connection.
- the subject invention discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of concrete molds installed around the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix; a plurality of lightweight conduit molds installed within the plurality of concrete molds at locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical bar, a cylindrical central ring surrounding the cylindrical bar, and a rubber surface on each end of the cylindrical bar; wherein the foundation concrete mix is poured in the plurality of concrete forms around the plurality of conduit molds and sets; wherein the plurality of concrete forms are removed, and the rubber surfaces on each end of each cylindrical bar are substantially flush with an interior and exterior wall of the building foundation; and removing the conduit mold from the building foundation to open a conduit hole, and installing a conduit within the conduit hole in the foundation wall.
- the subject invention discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of foundation concrete molds installed around a designated location of the building foundation, wherein the plurality of foundation concrete molds are configured to support a poured foundation concrete mix that will form the building foundation walls; a plurality of lightweight conduit molds installed within the plurality of foundation concrete molds in a unique order of locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; wherein the foundation concrete mix is poured in the plurality of foundation concrete forms around the plurality of conduit molds and sets; wherein the foundation concrete mix sets to form the building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds, wherein the plurality of foundation concrete forms are removed, and the rubber surfaces on each end of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; and removing the conduit mold from the building foundation to
- the subject invention discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of foundation concrete molds installed around a designated location of the building foundation, wherein the plurality of foundation concrete molds are configured to support a poured foundation concrete mix that will form the building foundation walls; a plurality of lightweight conduit molds installed within the plurality of foundation concrete molds in a unique order of locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; wherein the foundation concrete mix is poured in the plurality of foundation concrete forms around the plurality of conduit molds and sets; wherein the foundation concrete mix sets to form the building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds, wherein the plurality of foundation concrete forms are removed, and the rubber surfaces on each end of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; and removing the conduit mold from the building foundation to
- the subject invention discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of foundation concrete molds installed around a designated location of the building foundation, wherein the plurality of foundation concrete molds are configured to support a poured foundation concrete mix that will form the building foundation walls; a plurality of lightweight conduit molds installed within the plurality of foundation concrete molds in a unique order of locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; wherein the foundation concrete mix is poured in the plurality of foundation concrete forms around the plurality of conduit molds and sets; wherein the foundation concrete mix sets to form the building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds, wherein the plurality of foundation concrete forms are removed, and the rubber surfaces on each end of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; and removing the conduit mold from the building foundation to
- the subject invention also discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of concrete molds installed around a location of the building foundation for supporting pouring of a foundation concrete mix; a plurality of lightweight conduit molds installed within the plurality of concrete molds at locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical bar, a cylindrical central ring surrounding the cylindrical bar, and a rubber surface on each each of the cylindrical bar; wherein the foundation concrete is poured in the concrete forms around the plurality of conduit molds and sets; wherein the concrete forms are removed, and the rubber surfaces of each cylindrical bar are substantially flush with an interior and exterior wall of the building foundation; and removing the conduit mold from the foundation, and installing a conduit within the conduit hole in the foundation wall immediately, or for future use.
- the subject invention discloses a foundation construction system for configuring conduit holes in a building foundation, the system comprising: a plurality of foundation molds installed around a location for the building foundation, wherein the plurality of foundation molds are configured to support a poured concrete mix; a plurality of cylindrical molds installed within the plurality of foundation molds at locations designated for conduits within the building foundation; wherein each cylindrical mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; wherein the concrete mix is poured in the plurality of foundation forms around the plurality of cylindrical molds and sets; wherein the plurality of foundation forms are removed, and the rubber surfaces on each end of each cylindrical shape are substantially flush with an interior and exterior wall of the building foundation; and removing the cylindrical mold from the building foundation to open a conduit hole, and installing a conduit within the conduit hole in the foundation wall.
- the subject invention further discloses a method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of concrete molds around the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix; b) installing a plurality of lightweight conduit molds within the plurality of concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical bar, a cylindrical central ring surrounding the cylindrical bar, and a rubber surface on each end of the cylindrical bar; c) pouring the foundation concrete mix in the plurality of concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix; e) removing the plurality of concrete forms, wherein the rubber surfaces of each cylindrical bar are substantially flush with an interior and exterior wall of the building foundation; f) removing the conduit mold from the building foundation to open a conduit hole; and g) installing a conduit within the conduit hole in the building foundation.
- the subject invention also discloses a method for configuring conduit holes in a building foundation, the method comprising: a) installing a plurality of foundation molds around a location for the building foundation, wherein the plurality of foundation molds are configured to support a poured concrete mix; b) installing a plurality of cylindrical molds within the plurality of foundation molds at locations designated for conduits within the building foundation, wherein each cylindrical mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the concrete mix in the plurality of foundation forms around the plurality of cylindrical molds; d) setting the concrete mix; e) removing the plurality of foundation forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with an interior and exterior wall of the building foundation; f) removing the cylindrical mold from the building foundation to open a conduit hole; and g) installing a conduit within the conduit hole in the building foundation.
- the subject invention discloses a method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of concrete molds around a location of the building foundation for supporting pouring of a foundation concrete mix; b) installing a plurality of lightweight conduit molds within the plurality of concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical bar, a cylindrical central ring surrounding the cylindrical bar, and a rubber surface on each each of the cylindrical bar; c) pouring the foundation concrete mix in the concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix; e) removing the concrete forms, wherein the rubber surfaces of each cylindrical bar are substantially flush with an interior and exterior wall of the building foundation; f) removing the conduit mold from the building foundation to open a conduit hole; and g) installing a conduit within the conduit hole in the building foundation.
- a method for pre-casting conduit holes in a building foundation comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls ; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole; and g) installing a conduit within the conduit hole in the building foundation.
- a method for pre-casting conduit holes in a building foundation comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls ; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole without drilling; and g) installing a conduit within the conduit hole in the building foundation.
- a method for pre-casting conduit holes in a building foundation comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls ; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole without vibrating the building foundation; and g) installing a conduit within the conduit hole in
- a method for pre-casting conduit holes in a building foundation comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls ; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole without either vibrating, drilling, hammering, or chiseling the building
- a method for pre-casting conduit holes in a building foundation comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole without either vibrating,
- a method for pre-casting conduit holes in a building foundation comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation; b) configuring the plurality of concrete molds to support a poured foundation concrete mix that will form the building foundation walls; c) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds in a unique order of locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; d) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; e) setting the foundation concrete mix to form the building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds; f) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; g) removing the conduit mold from the building foundation to open
- the conduit mold may be removed from the foundation wall through drilling.
- the conduit mold may be removed from the foundation wall through melting with an acetone based solution.
- the conduit mold may remain in the foundation wall indefinitely without substantially destabilizing the foundation wall.
- the conduit hole may be used as a conduit from the group of lines consisting of power lines, low voltage lines, cable lines, telephone lines, water supply, sewage, line sets condensers, and heat pumps.
- the rubber ends of the conduit mold provide a substantially water tight seal on the the foundation until the mold is removed.
- the conduit mold may be composed of a material selected from the group of consisting of high density Styrofoam, Polystyrene Foam (both EPS and XPS), Polystyrene Plastic, Polystyrene Film, Polyisocyanurate ISO, Polyvinyl Chloride(PVC), Chlorinated Polyvinyl Chloride (CPVC), Unplasticide Polyvinyl Chloride(UPVC), Natural Isoprene, Ethylene Propylene Diene (EPDM), Nitrile Rubber (NBR), Styrene Butadiene Rubber (SBR), Silicone Rubber, Butyl Rubber, Polybutadiene, Aflas, Hypalon Rubber, Epichlorohydrin Rubber, Polyurethane, Polyethylene, lightweight solid wood, plywood, and fire retardant foams.
- PVC Polyvinyl Chloride
- CPVC Chlorinated Polyvinyl Chloride
- UPVC Unplasticide Polyvinyl Chloride
- the cylindrical bar of the conduit mold comprises diameters of 1.5′′ to 58′′.
- the cylindrical bar of the conduit mold comprises lengths of 4′′ to 48′′.
- the term “substantially” is defined as at least close to (and can include) a given value or state, as understood by a person of ordinary skill in the art. In one embodiment, the term “substantially” refers to ranges within 10%, preferably within 5%, more preferably within 1%, and most preferably within 0.1% of the given value or state being specified.
- FIG. 1 illustrates a perspective view of a lightweight conduit mold for creating pre-cast holes in a building foundation.
- FIG. 2 illustrates another perspective view of the lightweight conduit mold for creating pre-cast holes in a building foundation.
- FIG. 3 illustrates a top view of the lightweight conduit mold for creating pre-cast holes in a building foundation.
- FIG. 4 illustrates marked positions in the foundation for placing lightweight conduit molds in advance of pouring the concrete over the concrete forms.
- FIG. 5 illustrates marked positions in the foundation for placing lightweight conduit molds in advance of pouring the concrete over the concrete forms.
- FIG. 6 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms.
- FIG. 7 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms.
- FIG. 8 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms.
- FIG. 9 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms.
- FIG. 10 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms.
- FIG. 11 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms.
- FIG. 12 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms.
- FIG. 13 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms.
- FIG. 14 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms.
- FIG. 15 illustrates a perspective view of a cast building foundation with installed lightweight conduit molds.
- FIG. 16 illustrates a perspective view of a cast building foundation with installed lightweight conduit molds.
- FIG. 17 illustrates a perspective view of an installed lightweight conduit mold being drilled out of a cast building foundation.
- FIG. 18 illustrates a perspective view of an installed lightweight conduit mold and a hole from a removed lightweight conduit mold in a building foundation.
- FIG. 19 illustrates a perspective view of installed lightweight conduit molds and holes from a removed lightweight conduit molds in a building foundation.
- FIG. 20 illustrates a perspective view of installed lightweight conduit molds and holes from a removed lightweight conduit molds in a building foundation.
- FIG. 21 illustrates a perspective view of installed lightweight conduit molds and holes from a removed lightweight conduit molds in a building foundation.
- FIG. 22 illustrates a perspective view of multiple conduits inserted into a building foundation through holes from removed lightweight conduit molds and a lightweight conduit mold remaining installed in the foundation until later use.
- FIG. 23 illustrates a perspective view of multiple conduits inserted into a building foundation through holes from removed lightweight conduit molds
- FIG. 24 illustrates a perspective view of multiple conduits inserted into a building foundation through holes from removed lightweight conduit molds.
- FIG. 25 illustrates a perspective view of multiple conduits inserted into a building foundation through holes from removed lightweight conduit molds.
- the subject invention discloses a method of constructing multiple conduits 1 in a residential and commercial building foundations 2 that eliminates the process of core drilling to produce conduits 1 after the foundation 2 has been poured and set. This process also creates optional openings 3 with insulated, water tight, fire retardant locations for possible future connections at a fraction of the cost of core drilling. Multiple watertight uninterrupted openings 3 from the interior of the foundation 2 to the exterior of the foundation 2 can be constructed using the subject method. These openings 3 can be used to install power and fluid conduits 1 for the building.
- the positions 4 of the conduits 1 in the foundation 2 are determined in advance of pouring the concrete.
- multiple conduits 1 may be at locations at different positions of the foundation 2 , as needed by the specific building construction.
- each conduit mold 5 is installed before the foundation concrete is poured.
- each conduit mold 5 is comprised of a unitary cylinder 6 , a ring 7 with a larger diameter centered on the mold 5 , and two thick rubber ends 8 on each side of the unitary cylinder 6 .
- each conduit mold 5 secures the mold to concrete forms 9 during the concrete pour.
- the rubber ends 8 also provide a watertight seal on each end of the conduit mold 5 after the foundation 2 has cured.
- each pre-installed conduit mold 5 As the foundation concrete is poured, it surrounds each pre-installed conduit mold 5 .
- the larger rings 7 of each conduit mold 5 lock it into the foundation 2 concrete at the pre-installed location 4 , as the concrete cures and sets.
- the concrete forms 9 are removed, and the rubber ends 8 of the conduit mold 5 are flush with the interior and exterior walls of the foundation 2 .
- the rubber ends 8 provide a water tight seal on the conduit mold 5 in the foundation until the hole 3 is exposed for use.
- the installed conduit mold 5 is drilled or melted out of the foundation 2 wall with an acetone based solution.
- the desired conduits 1 can then be installed in the remaining hole 3 and secured with whichever preferred method.
- conduit holes 3 are drilled, and the mold 5 is removed, a cylindrical conduit 1 in placed within the resulting hole 3 .
- a watertight seal is created around the conduit 1 using a link seal which contains a plurality of links and a gasket. As the link seal is tightened, the links compress the gasket to create a tight fitting between the concrete foundation 2 and the conduit 1 .
- the conduit mold 5 may be left in the foundation wall indefinitely without any repercussions.
- the lightweight conduit mold 5 may be primarily composed of high density Styrofoam®, or other lightweight material that does not react with concrete, such as: Polystyrene Foam (both EPS and XPS), Polystyrene Plastic, Polystyrene Film, Polyisocyanurate ISO, Polyvinyl Chloride(PVC), Chlorinated Polyvinyl Chloride (CPVC), Unplasticide Polyvinyl Chloride(UPVC), Natural Isoprene, Ethylene Propylene Diene (EPDM), Nitrile Rubber (NBR), Styrene Butadiene Rubber (SBR), Silicone Rubber, Butyl Rubber, Polybutadiene, Aflas, Hypalon Rubber, Epichlorohydrin Rubber, Polyurethane, Polyethylene, lightweight solid wood, or plywood.
- the lightweight conduit mold may be composed of fire resistant foam.
- the diameters of the lightweight conduit mold 5 range from 1.5′′ to 58′′. In further embodiments of the subject invention the lengths of the lightweight conduit mold 5 range from 4′′ to 48′′.
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Heart & Thoracic Surgery (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Anesthesiology (AREA)
- Cardiology (AREA)
- Biomedical Technology (AREA)
- Hematology (AREA)
- Animal Behavior & Ethology (AREA)
- General Health & Medical Sciences (AREA)
- Public Health (AREA)
- Veterinary Medicine (AREA)
- Architecture (AREA)
- Medical Informatics (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
- This application claims priority to and the benefit of U.S. Provisional Patent Application No. 62/902,985 filed on Sep. 20, 2019, the contents of which are incorporated herein by reference.
- The invention relates to a device and method that pre-casts conduit holes in residential and commercial building foundations for immediate, or future use.
- Residential and commercial building foundations require multiple watertight openings from the interior of the foundation to the exterior of the foundation, below grade, to permit the uninterrupted passage of various power and fluid conduits. These conduits may include, but are not limited to: conduits for power lines to main panel and subpanels, low voltage lines, cable lines, telephone lines, water supply lines, sewage lines, line sets condensers, heat pumps, power lines to condensers, generator lines, and pool equipment. These conduits typical range in diameter from 1.25″ for water lines to 8″ for sewage or septic lines. These conduits may range from 18″ below grade, for power conduits, to 48″ below grade for water conduits, to even further below grade for sewer or septic conduits. Building constructions may have multiple conduits on multiple different locations of the foundation.
- In typical building construction, these openings for conduits are created after the rebar-enforced concrete foundation has set. The locations of the conduits are determined in the foundation, and a core drill, drills the appropriate size conduit holes into the foundation from the interior side to the exterior side. Costs for each conduit hole to be drilled can run high, adding significantly to building costs.
- Furthermore, use of the core drill to drill foundation conduit holes is cumbersome. The core drill is a heavy duty machine which must be bolted to the foundation wall, and supplied power and water for operation. The core drill utilizes diamond bits which are costly to replace. If the core drill encounters rebar within the foundation wall, it will significant shorten the life of the core drill bits.
- Once the conduit holes are drilled, a cylindrical conduit is placed within the hole. A watertight seal is created around the conduit using a link seal which contains a plurality of links and a gasket. As you tighten the link seal, the links compress the gasket to create a tight fitting between the concrete foundation and the conduit. To save on costs, some construction completes the conduit seal with sprayed foam or cement. Both of these methods will deteriorate or crack over time, resulting in a loose conduit connection.
- It is an object of the present invention to overcome or substantially ameliorate at least some of the disadvantages of conventional construction techniques through the development of a pre-cast mold for creating conduit holes in building foundations.
- There are additional features of the invention that will be described hereinafter and which will form the subject matter of the claims appended hereto. In this respect, before explaining at least one embodiment of the invention in detail, it is to be understood that the invention is not limited in its application to the details of construction and to the arrangements of the components set forth in the following description or illustrated in the drawings. The invention is capable of other embodiments and of being practiced and carried out in various ways. Also, it is to be understood that the phraseology and terminology employed herein are for the purpose of the description and should not be regarded as limiting.
- The subject invention discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of concrete molds installed around the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix; a plurality of lightweight conduit molds installed within the plurality of concrete molds at locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical bar, a cylindrical central ring surrounding the cylindrical bar, and a rubber surface on each end of the cylindrical bar; wherein the foundation concrete mix is poured in the plurality of concrete forms around the plurality of conduit molds and sets; wherein the plurality of concrete forms are removed, and the rubber surfaces on each end of each cylindrical bar are substantially flush with an interior and exterior wall of the building foundation; and removing the conduit mold from the building foundation to open a conduit hole, and installing a conduit within the conduit hole in the foundation wall.
- The subject invention discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of foundation concrete molds installed around a designated location of the building foundation, wherein the plurality of foundation concrete molds are configured to support a poured foundation concrete mix that will form the building foundation walls; a plurality of lightweight conduit molds installed within the plurality of foundation concrete molds in a unique order of locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; wherein the foundation concrete mix is poured in the plurality of foundation concrete forms around the plurality of conduit molds and sets; wherein the foundation concrete mix sets to form the building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds, wherein the plurality of foundation concrete forms are removed, and the rubber surfaces on each end of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; and removing the conduit mold from the building foundation to open a conduit hole without either vibrating, drilling, hammering, or chiseling the building foundation or the foundation walls, and installing a conduit within the conduit hole in the foundation wall.
- The subject invention discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of foundation concrete molds installed around a designated location of the building foundation, wherein the plurality of foundation concrete molds are configured to support a poured foundation concrete mix that will form the building foundation walls; a plurality of lightweight conduit molds installed within the plurality of foundation concrete molds in a unique order of locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; wherein the foundation concrete mix is poured in the plurality of foundation concrete forms around the plurality of conduit molds and sets; wherein the foundation concrete mix sets to form the building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds, wherein the plurality of foundation concrete forms are removed, and the rubber surfaces on each end of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; and removing the conduit mold from the building foundation to open a conduit hole without drilling the building foundation or the foundation walls, and installing a conduit within the conduit hole in the foundation wall.
- The subject invention discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of foundation concrete molds installed around a designated location of the building foundation, wherein the plurality of foundation concrete molds are configured to support a poured foundation concrete mix that will form the building foundation walls; a plurality of lightweight conduit molds installed within the plurality of foundation concrete molds in a unique order of locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; wherein the foundation concrete mix is poured in the plurality of foundation concrete forms around the plurality of conduit molds and sets; wherein the foundation concrete mix sets to form the building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds, wherein the plurality of foundation concrete forms are removed, and the rubber surfaces on each end of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; and removing the conduit mold from the building foundation to open a conduit hole without vibrating the building foundation or the foundation walls, and installing a conduit within the conduit hole in the foundation wall.
- The subject invention also discloses a construction system for pre-casting conduit holes in a building foundation, the system comprising: a plurality of concrete molds installed around a location of the building foundation for supporting pouring of a foundation concrete mix; a plurality of lightweight conduit molds installed within the plurality of concrete molds at locations designated for conduits within the building foundation; wherein each conduit mold comprises a unitary cylindrical bar, a cylindrical central ring surrounding the cylindrical bar, and a rubber surface on each each of the cylindrical bar; wherein the foundation concrete is poured in the concrete forms around the plurality of conduit molds and sets; wherein the concrete forms are removed, and the rubber surfaces of each cylindrical bar are substantially flush with an interior and exterior wall of the building foundation; and removing the conduit mold from the foundation, and installing a conduit within the conduit hole in the foundation wall immediately, or for future use.
- The subject invention discloses a foundation construction system for configuring conduit holes in a building foundation, the system comprising: a plurality of foundation molds installed around a location for the building foundation, wherein the plurality of foundation molds are configured to support a poured concrete mix; a plurality of cylindrical molds installed within the plurality of foundation molds at locations designated for conduits within the building foundation; wherein each cylindrical mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; wherein the concrete mix is poured in the plurality of foundation forms around the plurality of cylindrical molds and sets; wherein the plurality of foundation forms are removed, and the rubber surfaces on each end of each cylindrical shape are substantially flush with an interior and exterior wall of the building foundation; and removing the cylindrical mold from the building foundation to open a conduit hole, and installing a conduit within the conduit hole in the foundation wall.
- The subject invention further discloses a method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of concrete molds around the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix; b) installing a plurality of lightweight conduit molds within the plurality of concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical bar, a cylindrical central ring surrounding the cylindrical bar, and a rubber surface on each end of the cylindrical bar; c) pouring the foundation concrete mix in the plurality of concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix; e) removing the plurality of concrete forms, wherein the rubber surfaces of each cylindrical bar are substantially flush with an interior and exterior wall of the building foundation; f) removing the conduit mold from the building foundation to open a conduit hole; and g) installing a conduit within the conduit hole in the building foundation.
- The subject invention also discloses a method for configuring conduit holes in a building foundation, the method comprising: a) installing a plurality of foundation molds around a location for the building foundation, wherein the plurality of foundation molds are configured to support a poured concrete mix; b) installing a plurality of cylindrical molds within the plurality of foundation molds at locations designated for conduits within the building foundation, wherein each cylindrical mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the concrete mix in the plurality of foundation forms around the plurality of cylindrical molds; d) setting the concrete mix; e) removing the plurality of foundation forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with an interior and exterior wall of the building foundation; f) removing the cylindrical mold from the building foundation to open a conduit hole; and g) installing a conduit within the conduit hole in the building foundation.
- The subject invention discloses a method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of concrete molds around a location of the building foundation for supporting pouring of a foundation concrete mix; b) installing a plurality of lightweight conduit molds within the plurality of concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical bar, a cylindrical central ring surrounding the cylindrical bar, and a rubber surface on each each of the cylindrical bar; c) pouring the foundation concrete mix in the concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix; e) removing the concrete forms, wherein the rubber surfaces of each cylindrical bar are substantially flush with an interior and exterior wall of the building foundation; f) removing the conduit mold from the building foundation to open a conduit hole; and g) installing a conduit within the conduit hole in the building foundation.
- A method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls ; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole; and g) installing a conduit within the conduit hole in the building foundation.
- A method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls ; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole without drilling; and g) installing a conduit within the conduit hole in the building foundation.
- A method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls ; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole without vibrating the building foundation; and g) installing a conduit within the conduit hole in the building foundation.
- A method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls ; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole without either vibrating, drilling, hammering, or chiseling the building foundation or the foundation walls; and g) installing a conduit within the conduit hole in the building foundation.
- A method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation, wherein the plurality of concrete molds are configured to support a poured foundation concrete mix to form the building foundation walls; b) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds at locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; c) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; d) setting the foundation concrete mix to form building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds; e) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; f) removing the conduit mold from the building foundation to open a conduit hole without either vibrating, drilling, hammering, or chiseling the building foundation or the foundation walls; and g) installing a conduit within the conduit hole in the building foundation.
- A method for pre-casting conduit holes in a building foundation, the method comprising: a) installing a plurality of foundation concrete molds around a designated location of the building foundation; b) configuring the plurality of concrete molds to support a poured foundation concrete mix that will form the building foundation walls; c) installing a plurality of lightweight conduit molds within the plurality of foundation concrete molds in a unique order of locations designated for conduits within the building foundation, wherein each conduit mold comprises a unitary cylindrical shape, a cylindrical central ring surrounding the cylindrical shape, and a rubber surface on each end of the cylindrical shape; d) pouring the foundation concrete mix in the plurality of foundation concrete forms around the plurality of conduit molds; e) setting the foundation concrete mix to form the building foundation walls and simultaneously form the conduit holes at each of the plurality of concrete molds; f) removing the plurality of foundation concrete forms, wherein the rubber surfaces of each cylindrical shape are substantially flush with interior and exterior surfaces of the building foundation walls; g) removing the conduit mold from the building foundation to open a conduit hole without either vibrating, drilling, hammering, or chiseling the building foundation or the foundation walls; and h) installing a conduit within the conduit hole in the building foundation.
- In embodiments of the subject invention, the conduit mold may be removed from the foundation wall through drilling.
- In further embodiments of the subject invention, the conduit mold may be removed from the foundation wall through melting with an acetone based solution.
- In other embodiments of the subject invention, the conduit mold may remain in the foundation wall indefinitely without substantially destabilizing the foundation wall.
- In additional embodiments of the subject invention, the conduit hole may be used as a conduit from the group of lines consisting of power lines, low voltage lines, cable lines, telephone lines, water supply, sewage, line sets condensers, and heat pumps.
- In embodiments of the subject invention, the rubber ends of the conduit mold provide a substantially water tight seal on the the foundation until the mold is removed.
- In further embodiments of the subject invention, the conduit mold may be composed of a material selected from the group of consisting of high density Styrofoam, Polystyrene Foam (both EPS and XPS), Polystyrene Plastic, Polystyrene Film, Polyisocyanurate ISO, Polyvinyl Chloride(PVC), Chlorinated Polyvinyl Chloride (CPVC), Unplasticide Polyvinyl Chloride(UPVC), Natural Isoprene, Ethylene Propylene Diene (EPDM), Nitrile Rubber (NBR), Styrene Butadiene Rubber (SBR), Silicone Rubber, Butyl Rubber, Polybutadiene, Aflas, Hypalon Rubber, Epichlorohydrin Rubber, Polyurethane, Polyethylene, lightweight solid wood, plywood, and fire retardant foams.
- In other embodiments of the subject invention, the cylindrical bar of the conduit mold comprises diameters of 1.5″ to 58″.
- In additional embodiments of the subject invention, the cylindrical bar of the conduit mold comprises lengths of 4″ to 48″.
- In embodiments of the subject invention, the term “substantially” is defined as at least close to (and can include) a given value or state, as understood by a person of ordinary skill in the art. In one embodiment, the term “substantially” refers to ranges within 10%, preferably within 5%, more preferably within 1%, and most preferably within 0.1% of the given value or state being specified.
- There has thus been outlined, rather broadly, the more important features of the invention in order that the detailed description thereof that follows may be better understood, and in order that the present contribution to the art may be better appreciated. There are additional features of the invention that will be described hereinafter and which will form the subject matter of the claims appended hereto.
- These together with other objects of the invention, along with the various features of novelty, which characterize the invention, are pointed out with particularity in the claims annexed to and forming a part of this disclosure.
- Advantages of the present invention will be apparent from the following detailed description of embodiments thereof, which description should be considered in conjunction with the accompanying drawings, in which:
-
FIG. 1 illustrates a perspective view of a lightweight conduit mold for creating pre-cast holes in a building foundation. -
FIG. 2 illustrates another perspective view of the lightweight conduit mold for creating pre-cast holes in a building foundation. -
FIG. 3 illustrates a top view of the lightweight conduit mold for creating pre-cast holes in a building foundation. -
FIG. 4 illustrates marked positions in the foundation for placing lightweight conduit molds in advance of pouring the concrete over the concrete forms. -
FIG. 5 illustrates marked positions in the foundation for placing lightweight conduit molds in advance of pouring the concrete over the concrete forms. -
FIG. 6 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms. -
FIG. 7 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms. -
FIG. 8 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms. -
FIG. 9 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms. -
FIG. 10 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms. -
FIG. 11 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms. -
FIG. 12 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms. -
FIG. 13 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms. -
FIG. 14 illustrates lightweight conduit molds attached to the concrete forms in pre-determined positions in advance of pouring the concrete over the conduit molds and the concrete forms. -
FIG. 15 illustrates a perspective view of a cast building foundation with installed lightweight conduit molds. -
FIG. 16 illustrates a perspective view of a cast building foundation with installed lightweight conduit molds. -
FIG. 17 illustrates a perspective view of an installed lightweight conduit mold being drilled out of a cast building foundation. -
FIG. 18 illustrates a perspective view of an installed lightweight conduit mold and a hole from a removed lightweight conduit mold in a building foundation. -
FIG. 19 illustrates a perspective view of installed lightweight conduit molds and holes from a removed lightweight conduit molds in a building foundation. -
FIG. 20 illustrates a perspective view of installed lightweight conduit molds and holes from a removed lightweight conduit molds in a building foundation. -
FIG. 21 illustrates a perspective view of installed lightweight conduit molds and holes from a removed lightweight conduit molds in a building foundation. -
FIG. 22 illustrates a perspective view of multiple conduits inserted into a building foundation through holes from removed lightweight conduit molds and a lightweight conduit mold remaining installed in the foundation until later use. -
FIG. 23 illustrates a perspective view of multiple conduits inserted into a building foundation through holes from removed lightweight conduit molds -
FIG. 24 illustrates a perspective view of multiple conduits inserted into a building foundation through holes from removed lightweight conduit molds. -
FIG. 25 illustrates a perspective view of multiple conduits inserted into a building foundation through holes from removed lightweight conduit molds. - While several variations of the present invention have been illustrated by way of example in particular embodiments, it is apparent that further embodiments could be developed within the spirit and scope of the present invention, or the inventive concept thereof. However, it is to be expressly understood that such modifications and adaptations are within the spirit and scope of the present invention, and are inclusive, but not limited to the following appended claims as set forth.
- The subject invention discloses a method of constructing
multiple conduits 1 in a residential andcommercial building foundations 2 that eliminates the process of core drilling to produceconduits 1 after thefoundation 2 has been poured and set. This process also createsoptional openings 3 with insulated, water tight, fire retardant locations for possible future connections at a fraction of the cost of core drilling. Multiple watertightuninterrupted openings 3 from the interior of thefoundation 2 to the exterior of thefoundation 2 can be constructed using the subject method. Theseopenings 3 can be used to install power andfluid conduits 1 for the building. - In the subject method, as illustrated in
FIGS. 4 and 5 , thepositions 4 of theconduits 1 in thefoundation 2 are determined in advance of pouring the concrete. In embodiments of the subject invention,multiple conduits 1 may be at locations at different positions of thefoundation 2, as needed by the specific building construction. - At each selected
conduit location 4, as illustrated inFIGS. 6-14 , alightweight conduit mold 5 is installed before the foundation concrete is poured. As illustrated inFIGS. 1-3 , eachconduit mold 5 is comprised of aunitary cylinder 6, aring 7 with a larger diameter centered on themold 5, and two thick rubber ends 8 on each side of theunitary cylinder 6. - The rubber ends 8 of each
conduit mold 5 secure the mold toconcrete forms 9 during the concrete pour. The rubber ends 8 also provide a watertight seal on each end of theconduit mold 5 after thefoundation 2 has cured. - As the foundation concrete is poured, it surrounds each
pre-installed conduit mold 5. The larger rings 7 of eachconduit mold 5 lock it into thefoundation 2 concrete at thepre-installed location 4, as the concrete cures and sets. - As illustrated in
FIGS. 15 and 16 , once the foundation concrete has set, theconcrete forms 9 are removed, and the rubber ends 8 of theconduit mold 5 are flush with the interior and exterior walls of thefoundation 2. The rubber ends 8 provide a water tight seal on theconduit mold 5 in the foundation until thehole 3 is exposed for use. - As illustrated in
FIG. 17 , when aconduit 1 is ready to be installed, the installedconduit mold 5 is drilled or melted out of thefoundation 2 wall with an acetone based solution. The desiredconduits 1 can then be installed in the remaininghole 3 and secured with whichever preferred method. - As illustrated in
FIGS. 22-25 , once the conduit holes 3 are drilled, and themold 5 is removed, acylindrical conduit 1 in placed within the resultinghole 3. A watertight seal is created around theconduit 1 using a link seal which contains a plurality of links and a gasket. As the link seal is tightened, the links compress the gasket to create a tight fitting between theconcrete foundation 2 and theconduit 1. - As illustrated in
FIGS. 21 and 22 , if ahole 3 is not needed in thefoundation 2 at amold 5location 4, theconduit mold 5 may be left in the foundation wall indefinitely without any repercussions. - In embodiments of the subject invention, the
lightweight conduit mold 5 may be primarily composed of high density Styrofoam®, or other lightweight material that does not react with concrete, such as: Polystyrene Foam (both EPS and XPS), Polystyrene Plastic, Polystyrene Film, Polyisocyanurate ISO, Polyvinyl Chloride(PVC), Chlorinated Polyvinyl Chloride (CPVC), Unplasticide Polyvinyl Chloride(UPVC), Natural Isoprene, Ethylene Propylene Diene (EPDM), Nitrile Rubber (NBR), Styrene Butadiene Rubber (SBR), Silicone Rubber, Butyl Rubber, Polybutadiene, Aflas, Hypalon Rubber, Epichlorohydrin Rubber, Polyurethane, Polyethylene, lightweight solid wood, or plywood. In another embodiment of the subject invention, the lightweight conduit mold may be composed of fire resistant foam. - In embodiments of the subject invention the diameters of the
lightweight conduit mold 5 range from 1.5″ to 58″. In further embodiments of the subject invention the lengths of thelightweight conduit mold 5 range from 4″ to 48″.
Claims (18)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US17/027,678 US11560726B2 (en) | 2019-09-20 | 2020-09-21 | Method and device for pre-casting conduit holes in building foundations |
US18/100,963 US20230287643A1 (en) | 2019-09-20 | 2023-01-24 | Method and Device for Pre-Casting Conduit Holes in Building Foundations |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201962902985P | 2019-09-20 | 2019-09-20 | |
US17/027,678 US11560726B2 (en) | 2019-09-20 | 2020-09-21 | Method and device for pre-casting conduit holes in building foundations |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US18/100,963 Continuation US20230287643A1 (en) | 2019-09-20 | 2023-01-24 | Method and Device for Pre-Casting Conduit Holes in Building Foundations |
Publications (3)
Publication Number | Publication Date |
---|---|
US20210087770A1 US20210087770A1 (en) | 2021-03-25 |
US20220349142A9 true US20220349142A9 (en) | 2022-11-03 |
US11560726B2 US11560726B2 (en) | 2023-01-24 |
Family
ID=82595767
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/027,678 Active US11560726B2 (en) | 2019-09-20 | 2020-09-21 | Method and device for pre-casting conduit holes in building foundations |
US18/100,963 Pending US20230287643A1 (en) | 2019-09-20 | 2023-01-24 | Method and Device for Pre-Casting Conduit Holes in Building Foundations |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US18/100,963 Pending US20230287643A1 (en) | 2019-09-20 | 2023-01-24 | Method and Device for Pre-Casting Conduit Holes in Building Foundations |
Country Status (1)
Country | Link |
---|---|
US (2) | US11560726B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11560726B2 (en) * | 2019-09-20 | 2023-01-24 | Tommaso Conti | Method and device for pre-casting conduit holes in building foundations |
KR102484226B1 (en) * | 2022-08-25 | 2023-01-04 | 박노수 | FUEL CYLINDER CONNECTION PART OF GAS STORCH CAPABLE OF BUTANE GAS AND ISobUTANE GAS |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3523552A (en) * | 1967-01-30 | 1970-08-11 | John F Ogden | Passageway forming sleeve |
US4159099A (en) * | 1977-05-09 | 1979-06-26 | Maguire James V | Sleeve assembly for forming openings in molded structures |
US4623170A (en) * | 1983-06-02 | 1986-11-18 | Cornwall Kenneth R | Coupling |
US4619087A (en) * | 1985-05-01 | 1986-10-28 | Gerold Harbeke | Barrier-embedded pipe-coupling apparatus and method |
US5405119A (en) * | 1994-03-07 | 1995-04-11 | Maguire; James V. | Sleeve assembly for forming openings in molded structures |
JP3683727B2 (en) * | 1998-04-17 | 2005-08-17 | 未来工業株式会社 | How to close the penetration |
US20040016190A1 (en) * | 2002-07-26 | 2004-01-29 | Radke Duwayne C. | Modular device to create a passage through a partition |
US20080073480A1 (en) * | 2006-09-25 | 2008-03-27 | Neal Lesmeister | Reusable footing form accessories |
KR200469370Y1 (en) * | 2012-04-24 | 2013-10-08 | 경일프라스틱산업 (주) | The pipe sleeve |
KR101317440B1 (en) * | 2013-04-11 | 2013-10-18 | 김윤수 | Apparatus for fixing penentation sleve and method for installation for the same |
KR101713091B1 (en) * | 2014-06-05 | 2017-03-07 | 군산대학교산학협력단 | Module for opening of drain pipe |
US11560726B2 (en) * | 2019-09-20 | 2023-01-24 | Tommaso Conti | Method and device for pre-casting conduit holes in building foundations |
-
2020
- 2020-09-21 US US17/027,678 patent/US11560726B2/en active Active
-
2023
- 2023-01-24 US US18/100,963 patent/US20230287643A1/en active Pending
Also Published As
Publication number | Publication date |
---|---|
US11560726B2 (en) | 2023-01-24 |
US20210087770A1 (en) | 2021-03-25 |
US20230287643A1 (en) | 2023-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20230287643A1 (en) | Method and Device for Pre-Casting Conduit Holes in Building Foundations | |
US5386669A (en) | Corrosion resistant leakproof plastic manhole system | |
JP5339498B2 (en) | Method of fixing shear reinforcement | |
CN109162296A (en) | Single side formwork system and the construction method poured using system progress exterior wall | |
CN106638697A (en) | Method for rapidly constructing light formwork of reinforced-concrete-cast-in-place circular draining inspection well | |
JP2008127897A (en) | Mold holder, construction method of concrete structure using mold holder, and concrete structure constructed by the method | |
CN104047423B (en) | A kind of mould and construction method of wearing the accurate reserved opening of flooring plate | |
KR20070024959A (en) | Method of connecting manhole and water stopping pipe using water-swelled rubber ring | |
RU2657381C2 (en) | Method for production of concrete weight coated pipe with cable trunking | |
CN211344262U (en) | Air-defense embedded sleeve device for air-defense basement | |
JP2000096989A (en) | Air bleeder device in secondary lining of tunnel | |
RU2647257C2 (en) | Method for production of encased pipe with cable-conduit | |
JP2012036655A (en) | Method of reclaiming sewerage manhole and the manhole | |
JP5389432B2 (en) | Drainage equipment | |
CN113445488A (en) | Method for treating underground pipeline or karst cave | |
CN109653497B (en) | Die sinking installation method for embedded flexible sleeve of main body structure | |
EP2591184A1 (en) | Casting frame for sealing a conduit in a deck and use of same | |
CN110173113A (en) | A kind of Lin Qiang hangs hole constructing structure and method | |
CN219933207U (en) | Concrete pouring embedded sleeve | |
CN212983865U (en) | Grouting device for precast concrete inspection well | |
CN218643869U (en) | Can have enough to meet need formula electromechanical sleeve pipe | |
CN218890082U (en) | Fire-retardant ring mounting structure | |
KR970001412Y1 (en) | Joint structure for bulkheads in situ | |
CN114482125B (en) | Construction method of underground comprehensive pipe rack | |
CN203248855U (en) | Embedded casing pipe generally used by upper water pipe and lower water pipe of bathroom floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: MICROENTITY |
|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO MICRO (ORIGINAL EVENT CODE: MICR); ENTITY STATUS OF PATENT OWNER: MICROENTITY |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
|
FEPP | Fee payment procedure |
Free format text: PETITION RELATED TO MAINTENANCE FEES GRANTED (ORIGINAL EVENT CODE: PTGR); ENTITY STATUS OF PATENT OWNER: MICROENTITY |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: AWAITING TC RESP, ISSUE FEE PAYMENT VERIFIED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |