US20200331058A1 - Casting process - Google Patents
Casting process Download PDFInfo
- Publication number
- US20200331058A1 US20200331058A1 US16/897,803 US202016897803A US2020331058A1 US 20200331058 A1 US20200331058 A1 US 20200331058A1 US 202016897803 A US202016897803 A US 202016897803A US 2020331058 A1 US2020331058 A1 US 2020331058A1
- Authority
- US
- United States
- Prior art keywords
- mold
- casting
- inert gas
- fixture
- cavity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D17/00—Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
- B22D17/20—Accessories: Details
- B22D17/22—Dies; Die plates; Die supports; Cooling equipment for dies; Accessories for loosening and ejecting castings from dies
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D17/00—Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
- B22D17/20—Accessories: Details
- B22D17/30—Accessories for supplying molten metal, e.g. in rations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D17/00—Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
- B22D17/20—Accessories: Details
- B22D17/32—Controlling equipment
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D18/00—Pressure casting; Vacuum casting
- B22D18/04—Low pressure casting, i.e. making use of pressures up to a few bars to fill the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D27/00—Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting
- B22D27/003—Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting by using inert gases
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D39/00—Equipment for supplying molten metal in rations
- B22D39/02—Equipment for supplying molten metal in rations having means for controlling the amount of molten metal by volume
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
- C22F1/002—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working by rapid cooling or quenching; cooling agents used therefor
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
- C22F1/04—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of aluminium or alloys based thereon
Definitions
- the present disclosure contemplates a casting system and process employing high pressure die casting and/or low-pressure permanent mold casting process.
- a low-pressure furnace delivers premium quality molten lightweight material, such as aluminum, that is free from oxides and dissolved hydrogen gas into the mold cavity.
- a high-pressure metal delivery system in the die casting process utilizes a plunger that forced air out of the mold/die cavity via numerous strategically located air vents.
- an inert gas such as but not limited to helium gas (He)
- He helium gas
- a gas delivery and control system may work in connection with a CPU of a casting system to manage gas delivery.
- the inert gas is strategically introduced into the mold/die cavity through a gas piping system that is similar system to the air venting system and it is located particularly for the purpose of introducing helium gas.
- the cavity may be flushed with He prior to the metal being introduced into the cavity.
- Vent plugs may be deployed to help diffuse inert gas into the cavity of the mold. Because casting solidification is enhanced significantly due to the helium cooling effect, production cycle time is reduced accordingly and thus productivity output is enhanced measurably.
- the die cast mold and/or permanent mold construction provides for helium venting passages that are strategically located in casting cavity areas in order to enhance solidification properties.
- He gas because of its unique qualities of thermal conductivity [six times that of air], significantly improves the efficiency of the heat transfer of the molten metal, such as aluminum, that is in contact with mold cavity areas. Further, the He gas can be introduced into the mold via a targeted helium vent system that specifically targets the mold cavity for maximum effectiveness in order to achieve the desired mechanical and physical properties.
- This disclosure provides at least two improved hard mold tooling [iron and steel] configurations that take advantage of the He cooling gas environment. They are:
- An improved high pressure die casting (DC) process that is designed to provide a high productivity production casting process.
- a plunger metal delivery system forces air in the steel mold cavity out of the mold and fill cavity prior to full solidification. Because the air is a high density media, evacuation is not nearly as rapid as desired.
- helium or another inert gas is deployed to occupy the mold cavities. Helium gas facilitates rapid mold cavity air evacuation as well as enhanced rapid solidification resulting premium quality castings. As a result, entrapped air is forced out. The resulting heat transfer between molten aluminum and. the steel die surface is accelerated and thus results in sound porosity free aluminum castings that are produced at faster cycle rates.
- An improved permanent mold (PM) and semi-permanent mold (SPM) casting process is also disclosed to provide a high-volume production casting process.
- a distinction between the PM and SPM casting process and the DC process is the metal delivery system.
- DC the metal is delivered under high pressure via plunger as opposed to PM and SPM the metal delivery can be by gravity pouring into the mold and/or low-pressure counter gravity delivery into the mold cavity.
- helium gas is flushed through the mold cavity prior to the mold filling step and during the mold solidifying step which is part of the dendrite formation stage.
- the resulting castings have improved mechanical properties and the foundry process has improved mold cycle rates. Casting thin wall capabilities are further enhanced and are now made possible because the air evacuation issues are now mitigated by the introduction of an inert gas.
- FIG. 1 is a schematic diagram of a casting system for manufacturing metal castings, showing a mold being loaded in to a roll-over system;
- FIG. 2 is the schematic diagram of the casting system shown in FIG. 1 , showing a mold leaving the roll-over system after having been filled with molten material;
- FIGS. 3A-B are a flow diagram of the method of operating the casting system shown in FIGS. 1 and 2 ;
- FIG. 4 is an illustration of an alternative sand casting mold for making metal parts using a mold having a sealed compartment that can be injected with Helium;
- FIGS. 5A-5C are schematic representations of an alternative low-pressure casting system having a chamber environment deploying a mold placed in a chamber that is injected with Helium to form a part in an O2-free environment;
- FIG. 6 is a schematic diagram of an alternative metal casting system that uses a manifold system for delivering gas, such as Helium, into a lower portion of a mold during the casting process;
- gas such as Helium
- FIG. 7 are Helium [He] and Nitrogen [N2] gas cooling curves showing casting cooling times relative to temperature
- FIG. 8 is a schematic diagram of an alternative casting system, showing the foundry steps of die casting, including the step of a mold cavity being filled using inert gas;
- FIG. 9 is the die used in the casting system of FIG. 8 , showing the two sections of the die opened along with an inert gas supply and venting arrangement;
- FIG. 10 is a perspective view of the cast part that could be manufactured in a foundry using the die shown in FIG. 9 ;
- FIG. 11 is an enlarged side section cut of the cast part shown in FIG. 10 , taken from the perspective of line 10 - 10 , showing the construction of the part that is produced using the process shown in FIG. 8 ;
- FIG. 12A is an illustration of a vent plug made of powdered metal that can be used with the mold shown in FIG. 10 ;
- FIG. 12B is an illustration of an alternative vent plug
- FIG. 12C is an illustration of a machined vent plug
- FIG. 13 is a flow chart of the method of operating the foundry die casting system that is shown in FIG. 8 ;
- FIG. 14 is a schematic diagram of an alternative casting system, showing a permanent mold system that employs a low-pressure counter gravity fed permanent mold, illustrating the step of a mold cavity being filled while using an inert gas;
- FIG. 15 is a flow chart of the method of operating the low pressure counter gravity fed permanent mold casting system that is shown in FIG. 14 ;
- FIG. 16 is an alternative mold that is used in permanent mold casting system, showing a gravity fed permanent mold that has an inert gas supply and venting arrangement;
- FIG. 17 is a flow chart of the method of filling the gravity fed permanent mold die that is shown in FIG. 16 ;
- FIG. 18 is a graph showing the material properties of a casting, where percent of elongation is shown as a measure of tensile strength vs. Dendrite Arm Spacing (DAS);
- FIG. 19 is a comparison chart showing performance results of a sand mold aluminum casting trial where castings having been cooled by air (see columns 1 and 1 ) have been compared to castings having been cooled by an inert gas (see columns 3 and 4 ) such as Helium; and
- FIG. 20 is a chart showing performance results of a permanent mold casting trial that deployed water as a source to cool molds, wherein Dendrite Arm Spacing (DAS) is shown to positively influence the volume percent of porosity and thermal fatigue life of a casting.
- DAS Dendrite Arm Spacing
- a casting system 10 can be deployed in a foundry prototype or hi-production facility where sand casting, die casting, permanent mold and semi-permanent mold casting process very thin, lightweight sand cores for Core-Pack Molding can be used in the production of light metal castings such as, but not limited to, aluminum and magnesium.
- the lightweight sand cores are produced with conventional machines and core sand binder systems.
- One improvement is in the assembly of the lightweight core segments with shape specific geometries into a core pack, and subsequently shrink-wrapped, to form a seal of the core pack to keep the assembly intact dimensionally while being counter-gravity filled with molten aluminum.
- the improved lightweight core pack can also be supported within a fixture and then sealed via, shrink wrap, or some other method, to achieve a self-contained mold environment that can be flushed with an inert cooling gas, such as, but not limited to, Helium, to significantly improve the molten metal and mold heat transfer characteristics.
- an inert cooling gas such as, but not limited to, Helium
- the shrink wrap and/or other techniques create a self-contained environment that can be designed to allow for a vacuum attachment that will draw a vacuum on the mold cavity while being filled with molten metal. The slight vacuum will facilitate the removal of core gases as well as allow for the flushing of cooling gases and the removal of heat from the casting while it solidifies.
- Helium cooling gas is a preferred gas for the casting system because of its physical characteristics compared to air or any other inert gas.
- Helium is inert and has a density seven times lower than air, with thermal conductivity properties six times that of air.
- Helium has three properties which play roles in influencing the present aluminum casting system. Specifically, Helium gas is inert, it has a low density, and it has attractive thermal conductivity characteristics.
- an inert gas mold cavity environment allows for rapid mold filling without the risk of metal oxidation and resultant casting defects. Such performance can result in faster cycle times, which improves production output per hour.
- the low-density gas will be pushed out of the mold cavity through the mold air venting system while the metal enters the mold with far less resistance; thus, facilitating thin-wall capability when compared to air.
- the improved thermal conductivity will enhance the solidification process and significantly improve the efficiency of the metal mold wall because of significant heat transfer improvements drive directional metal solidification and improve aluminum metallurgy. This also results in faster cure times which translates in to increased production output per hour for a given casting station.
- the resulting system provides high production cycle rates due to the high metal fill rate. It also provides improved metal solidification rates resulting in improved microstructure characteristics, improved mechanical properties and thermal fatigue resistance.
- the present system is further flexible in that it can be used with commercial materials, such as aluminum alloys.
- An improved sand mold, hard casting mold/tooling cooling concept that leverages inert gas is operable to affect the metallurgical properties of aluminum.
- Such concepts may be applicable to sand casting, die casting, permanent and semi-permanent mold (hard mold tooling) aluminum casting process as well.
- the impact of a Helium cooling gas which is inert, has low density and is highly heat conductive, will yield similar results in hard mold tooling.
- the cooling gas may be introduced into the mold cavity and be targeted on specific areas of the resulting casting.
- Hard tooling is vented to allow core gases and expanding air in the mold cavity to escape—the same venting concept can be applied in reverse to introduce helium gas into the mold cavity.
- the cooling gas has a positive impact on the solidification characteristics of the aluminum thus achieving a metallurgical microstructure of very low secondary dendrite arm spacing higher strength and ductility. Productivity is also improved because of the solidification rate of the cast molten aluminum.
- the present disclosure may be applied to sand mold casting, die casting, permanent mold casting, and semi-permanent mold casting environments. For discussion purposes only, sand mold casting process, die casting, permanent and semi-permanent casting systems are presented. It will be appreciated that the disclosure may apply inert gas to a variety of metal casting processes.
- FIG. 1 in particular discloses a schematic diagram of one example of a sand molding casting system 10 for manufacturing metal castings 12 using a low-pressure casting environment deploying an anti-gravity fill system.
- the casting system 10 includes a transport system 14 , a fixture 16 loaded with mold segments 18 , a roll-over fill station 20 , an inert gas source system 22 , and a furnace 24 .
- the transport system 14 includes a first portion 26 and a second portion 28 that may also be considered a cooling conveyor. Chillers 30 may be deployed near and or around the perimeter of the second portion 28 of the transport system 14 to aid in the cooling of the mold fixture 16 once it has left the roll-over fill station 20 .
- the transport system 14 includes motors 32 , sensors 34 , and PLCs 36 for controlling the operation of the casting system 14 .
- the PLCs 36 may communicate with a main computer 38 located remotely in the foundry or elsewhere for controlling and overseeing the production environment at a given facility. It will be appreciated that the motors 32 , sensors 34 , and PLC 36 may be located at numerous locations within the casting system 10 and they may be operable to communicate with each other in series and/or in parallel in order to effectuate the desired performance and production output.
- the first portion 26 is operable to motivate a plurality of fixtures 16 from an assembly area (not shown), along a path 40 , and then deliver the fixture 16 to a receiving or inlet area 42 of the roll-over station 20 . The operation of each fixture 16 along the path 40 of the first portion 26 is controlled by the PLC 36 .
- the sensor 34 may sense when a fixture 16 has entered the inlet area 42 , thus allowing the next available fixture 16 to advance along the casting system 10 .
- the roll-over station 20 is the mold pouring station for the casting system 10 and includes the inlet area 42 , a base 44 , a head 46 with an indexing or rotating turret 48 that is connected to the base 44 , and a nozzle inlet portion 50 for communicating with a furnace nozzle 52 .
- the rotating turret 48 is operable to index axially in the direction of arrow 54 relative to the base 44 . This action allows the turret 48 to index relative to the furnace nozzle 52 during mold filling operations. For example, during mold fill operations, the turret 48 is extended. outwards towards the furnace nozzle 52 so as to allow flow of the molten material such as aluminum in to the sand mold segments 18 . Once the mold is full, metal flow is terminated, which then permits the rotating turret 48 to axially retract in the direction of arrow 54 so as to permit the furnace nozzle 52 to disconnect from the fixture 16 .
- the roll-over station 20 is operable to rotate in the direction of arrow 54 for the purpose of advancing the fixture 16 from an upright position 56 to an inverted position 58 .
- the fixture 16 enters the inlet 42 in the upright position 56 , is secured via clamping mechanism 60 , and then is inverted 180 degrees to the inverted position 58 as is shown in FIG. 1 .
- the rotating turret 48 then locks into place, which secures the fixture in the inverted position 58 during the He gas fill and the metal pour steps of the operation.
- the roll-over station 20 is operable to then advance the fixture in the direction of arrow 62 to the second portion 28 of the transport system 14 , where it is then cooled via coolers 30 . Once cooled, the fixture enters a shake-out station 62 where the formed cast part 12 is then removed from the fixture 16 . The fixture is then repurposed for later re-use.
- the second portion 28 of the transport system 14 includes rollers 68 , similar to the rollers 68 on the first portion 26 , for supporting and advancing the inverted fixture 16 ′.
- the second portion 28 includes motors 32 , sensors 34 , and a PLC 36 , which is in turn connected 70 via a communication link to the main computer 38 .
- the PLCs 36 could be connected using various telecommunication methods, for example blue tooth, near field proximity, or other type methods.
- One or more chillers 30 may be placed along the path of the second portion 28 so as to effectuate cooling characteristics of the metal in the mold segments 18 .
- FIGS. 3A and 3B disclose an exemplary casting flow diagram or process 90 illustrating one example of a method of manufacturing a casting 12 using the casting system 10 that is depicted in FIG. 1 .
- the method presented discusses employing He as the inert gas, other inert gasses such as N 2 , or others, are contemplated by this disclosure.
- the method 90 of operating the casting system 10 may include fewer or more of the following steps. This is but one example of how the method of operation could be contemplated.
- the method of casting 90 may begin with step 100 , which is providing mold segments and a support fixture for casting metal parts, may include the mold segments 18 being individual molds that are aligned in segments such that they can be encapsulated and held in place by the fixture 16 during the molding process. After the casting process is complete, the mold segments are destroyed during the shake-out process so as to separate the cast part 12 from the fixture 16 ′. The fixture in turn can be reused for another mold cycle by installing new mold segments 18 . It will be appreciated that based on the design of the casting part 12 to be manufactured, that a single segment 18 or segments aligned in different fashions may be employed.
- the next step 102 is loading mold segments 18 into the fixture 16 , and this step may include inserting a plurality of individual segments 18 which collectively form the mold 76 . This step can be performed off-line and in a staging area.
- the next step 106 is to load the fixture 16 into the roll-over station 20 which is shown in FIG. 1 as a first or upright position.
- the fixture enters the roll-over station 20 by rolling off the transport system 14 and into the inlet 50 of the roll-over station 20 . Once the fixture is advanced to this position, another fixture 16 on the transport system 14 is advanced so that it can be staged and ready to be processed at the next available pour cycle.
- the next step 108 is to secure the fixture 16 to the roll-over station 20 . This may be accomplished by using an automated locking system having clamps and sensors that communicate with the computer 38 . This securing step 108 holds the fixture in place when it is rotated 180 degrees before the fill cycle.
- the next step 110 is to connect the He source 22 to the mold segments 18 or mold 76 .
- This step provides the supply of inert gas, such as He, to the mold 76 so that a constant supply of He can be delivered at predetermined pressures and predetermined flow rates.
- the He source 22 can be controlled by the PLC 36 or computer 38 , and thus the He delivery process can be specifically controlled so as to yield a certain result within the mold 76 .
- the rate of gas delivery to the mold's cavity can be controlled so as to have the rate of infusion of the inert gas calculated to exhaust Oxygen from the cavity of the mold in the best possible way.
- the next step 112 is to inject He into the bottom of the mold segments. This step starts the process of removing O 2 particles from the base of the mold cavity.
- the next step 114 is to flush the mold segments 18 with He under a predetermined pressure and flow rate so as to create an environment of O 2 -free mold segments, along with any other particles that may be present in the cavity of the mold segments.
- This is the step where the inert gas source system 22 continuously works to flush the entire cavity with inert gas sufficient to evacuate all O 2 , and penetrate the porous walls of the mold to form a barrier layer of inert gas on the surface of the inner wall cavity.
- This barrier layer of inert gas helps the thermal cooling performance as it has high thermal conductivity.
- a goal of this step may be to provide total He gas saturation within the mold cavity 76 .
- Another goal is to provide targeted He gas delivery to specific sections within the mold cavity, and that can be accomplished by the inert gas source system 22 working in concert with, for example, a manifold delivery system. (See FIG. 6 .)
- the next step 116 is to rotate the fixture 16 using the mold roll-over station 20 to a second or inverted position 58 .
- This facilitates an anti-gravity molten metal fill process.
- Constant inert gas pressure may be applied during this roll-over process so that positive pressure is maintained within the cavity to aid in keeping O 2 for reentering the mold cavity. This process will help keep the mold cavity saturated with inert gas before and during the mold fill process.
- the next step 118 is to connect the fixture 16 to the low-pressure furnace 24 .
- This can be accomplished by the turret 48 indexing axially in a direction opposite of arrow 54 .
- the turret 48 indexes to the point where it fully connects to the nozzle 52 which extends outward from the body of the furnace 24 . Once the nozzle 52 is connected to the turret 48 , this becomes the metal pour fill position and such is maintained during the pour fill cycle.
- the next step 120 includes injecting into bottom 78 of fixture 16 molten metal 80 using a counter gravity filling process where molten metal 80 is delivered in an O 2 -free environment.
- the counter-gravity filling process results in introducing molten metal 80 in the bottom 78 of the sand mold using a low-pressure system furnace delivery system.
- the pressure range employed in this counter-gravity filling process could be in the range of 5 psi to 20 psi and the flow rate could be in the range of 5 to 25 pounds/second.
- the molten metal 80 will displace the He within the cavity as the pressurized molten metal traverses from the bottom of the cavity 78 and makes its way upward, against gravity, through the internal spaces 82 of the cavity. As the metal 80 continues to displace the He and travel upward against gravity, the He is exhausted out a degassing valve 222 near the top of the fixture 16 . (See FIG. 4 ) This process continues until a predetermined amount of metal 80 has been introduced in to cavity such that the cavity has been filled.
- the next step 122 is to continue injecting metal using low-pressure counter-gravity cycle to form a casting part 12 .
- This is improved by the deployment of He in the cavity which improves fluid flow.
- the He further reduces turbulent metal flow within the cavity which permits a more rapid fill rate because, in part, there is less push back because the air has been removed from the cavity.
- This step includes the low-pressure furnace 24 delivering molten metal 80 , aluminum for example, but other metals are contemplated by this disclosure, through the furnace nozzle 52 which in turn directs the metal 80 to the mold cavity 76 .
- FIG. 4 illustrates an example of a cross-section of one such mold cavity 76 , which is discussed further below.
- Metal 80 enters the bottom of the cavity and is forced up and through the cavity. This fill process continues for a predetermined period of time which may be controlled by the computer 38 , or a separate fill system having its own sensors, valves, and control logic.
- the next step 124 is to stop filling the mold with molten metal 80 when a mold full signal is generated by a mold fill sensor 84 .
- the sensor 84 may be situated near the top 86 of the mold. The sensor may communicate with the PLC 36 , the computer 38 , and/or a separate fill system.
- the fill sensor 84 may be on board the fixture 16 , as is shown in FIG. 1 , or inside the mold cavity 76 , or the sensor 84 may be positioned elsewhere relative to the casting system 10 . Stopping the flow of metal to the mold may be accomplished by other means, which are contemplated by this disclosure.
- the next step 126 of the casting process may include rolling the fixture 16 back to the first position 26 . This would be the same orientation as the fixture 16 had when it entered the roil-over station 20 at the beginning of the fill cycle. See FIG. 1 .
- this step may be avoided and the fixture with the newly molded casting part 12 may be kept inverted, as is shown in FIG. 2 , and then exited from the roll-over station 20 .
- the decision how to orient the fixture at this stage of the process 90 provides for a flexible method of operation.
- the next step 128 is to disconnect fixture 16 from furnace 24 . This can be accomplished by retracting the turret 48 in the direction of arrow 54 so as to cause the nozzle 52 to disengage the inlet 50 of the turret 48 . It will be appreciated that this step may be accomplished using a drive system 88 that may be on-board or external to the roll-over station 20 .
- the drive system 88 is operable to control the indexing of the turret 48 relative to the base 44 at predetermined periods of the metal pour cycle.
- the next step 130 is to disconnect the He from fixture 16 so as to no longer deliver pressurized He to the fixture 16 .
- This may be accomplished manually or by the system 10 being automated in this regard so long as the inert gas source system 22 is no longer delivering a supply of gas to the cavity.
- the inert gas system 22 may include a supply tank, lines, valves, sensors, gauges, and its own controller.
- the next step 132 is to remove the fixture 16 from roll-over station 20 .
- This may be accomplished in several ways, one of which could include actuators propelling the fixture 16 in a direction 62 away from the roll-over station 20 so as to advance the fixture 16 towards the second line 28 which could also be referenced as a cooling conveyor.
- the next step 134 is to advance the fixture 16 ′ to the cooling conveyor which embodies the second line 28 for the final processing of the fixture. Once the fixture 16 ′ is securely positioned on the cooling conveyor 28 , the roll-over station 20 is now free to accept another fixture 16 that in turn can be loaded, and thus a new mold fill process can begin once it is has been properly positioned.
- the next step 136 is to introduce chill cycle to the fixture 16 ′ and thus the part 12 that is now curing within the fixture 16 ′.
- the chill cycle may be accomplished by the use of chillers 30 that are shown in FIGS. 1 and 2 in schematic form where the chillers 30 may be placed in close proximity to the cooling conveyor 28 .
- One or more chillers 30 may be deployed in this casting system 10 .
- the chillers 30 may encapsulate the fixture 16 ′ as the fixture 16 ′ traverses along the conveyor, or they may be lesser configured as is shown in the FIGS.
- the chillers may be flexible and programmable so as to exert a predetermined amount of cooling capacity so as to meet the cooling preferences on any given fixture 16 ′ as it traverses the conveyor. For example, if a fixture 16 ′ is hosting a casting part 12 that has a large dimensional characteristic, then the chillers 30 may be programmed to deliver a high cooling capacity so as to cool the part 12 at a preferred rate of cooling. By contrast, if the fixture 16 ′ is hosting a smaller part 12 to be cast, then the chillers 30 may be programmed to deliver a lower cooling capacity.
- the next step 138 is to shake out the part 12 from the fixture 16 . This is done after the chillers 30 , if any, have completed their cooling cycle and thus the part 12 is ready to be broken away from the fixture and the sand molds therein.
- the shake out step 138 may be accomplished using conventional means in the industry. However, one variant here is that the fixture 16 ′ will be preserved and repurposed so as to be deployed again in another casting process 90 .
- the shake out process 138 contemplates a recovery system for the just used fixture 16 ′, a procedure for separating out the dirty sand, and for then advancing the new part 12 to a finishing station.
- the next step 140 is to repeat steps 100 - 138 to form another casting part 12 .
- This casting process 90 contemplates employing the casting system 10 over and over again so that a continuous mold line can operate at varying capacities.
- prototype mold casting runs can be envisioned with the present system because it is flexible in that fixtures 16 can be loaded on to the transport system 14 , all the while the parts 12 to be formed can be of different sizes and shapes.
- the computers 38 and PLCs 36 may permit selective programming for each fixture 16 , which in turn allows for the mold fill cycle to be uniquely controlled, and the chill cycle to be uniquely controlled, all based on the desired characteristics for a particular part 12 .
- the mold fill cycle can contemplate steps 102 - 132 , while the chill cycle can contemplate steps 134 - 136 .
- each fixture 16 may have its own mold parameters 140 , 142 , and so on.
- Each mold parameter may be a unique set of instructions, data sets, characteristics, and the like, that are particular to the part 12 that is to be cast.
- one mold parameter 140 could be specific instructions regarding the part to be manufactured, part size, target weight, inert gas type to be delivered to the cavity, rate of gas delivery, pressure rate of gas delivery, cycle time, mold fill cycle time target rates, metal type, chill cycle times, target part material properties, etc.
- mold parameter 140 , 142 Any bit of information that may be important, specific, and/or unique to the part 12 to be cast could be contemplated as a mold parameter 140 , 142 .
- the mold parameters 140 , 142 may be saved in a storage system that is connected with the computer 38 and/or housed in the cloud.
- the casting system 10 can be deployed where the identical part 12 can be cast for extended periods of time, such as days, weeks, months, even years. If a part changeover is later desired, then the mold parameters 142 for the next desired part can be set up and programmed, and because the system 10 is flexible, the production line can be easily transitioned to casting another part as desired.
- FIG. 4 discloses an illustration of but one sand casting mold 76 for making metal parts using the casting system 10 and casting method 90 set forth herein.
- the casting mold 76 may have a sealed mold compartment that can be injected with inert gas such as Helium as well as un-unsealed mold compartment.
- inert gas such as Helium
- the molds 76 used with the casting system 10 may have only one cavity, or more than one cavity, which is style illustrated.
- the cavity 76 may have a plurality of cavities, all of which could be sealed or unsealed.
- FIG. 4 shows both a sealed and an unsealed (full of air) cavity.
- the sand casting mold 76 includes cross-sections 200 with an exemplary mold cavity section 202 having a sealed configuration and a non-sealed 204 cavity configuration.
- the sealed cavity section 202 includes a seal 206 that creates a sealed environment for surrounding and segregating the permeable sand mold 208 from the rest of its environment.
- the seal 206 may be a bag, liner, or other device that is operable to withstand the internal operating characteristics that are present in the casting environment.
- the seal 206 encapsulates the sand mold 208 and is operable to keep air out while maintaining inert gas inside the liner during the mold pour cycle.
- the seal is capable of withstanding pressures in the range of 5 psi to 50 psi.
- Within the center of the sand mold is the cavity 210 which takes on the form of the cast part 12 that is to be formed in this foundry process.
- Inert gas 212 such as, but not limited to He, is introduced at an inlet 213 into a mold gate and it traverses along a path 214 to where an inlet valve 216 may control the flow of gas 212 .
- Gas 212 passes past the valve 216 through a seal member 218 that is positioned adjacent a lower portion of the liner 206 .
- Gas 212 then is forced in the direction of arrow 220 to where it permeates and saturates the cavity 210 .
- a degassing valve 222 is positioned at an opposite side of the sealed liner 206 . Within the sealed liner 206 is an internal environment 224 wherein gas particles 226 are forced up and out of the environment through the degassing valve 222 .
- the internal environment 224 Before the internal environment 224 is flushed with an inert gas, it contains atmospheric contaminates such as O 2 , and others, which can be flushed out with the aid of the pressurized inert gas system 22 .
- the gas 212 flow and pressure rates may be controlled by the system 22 so as to achieve a desired part performance.
- an air cavity section 204 is depicted that does not have a sealed liner 206 .
- This is considered an air mold that is operable to deploy other aspects of the inert gas infusion system disclosed herein.
- gas such as He
- the gas 212 continues to fill the sand mold 232 as long as the valve 216 remains open. As the gas 212 enters the sand mold 232 is forces particles 236 up and out of the sand mold 232 in many directions.
- the atmospheric pressure will permit O 2 particles to reenter the sand mold 232 if a positive pressure is not maintained via the inert gas supply system 22 .
- maintaining positive He pressure will aid in keeping impurities out of the sand mold 232 during the molding cycle.
- FIGS. 5A-5C disclose schematic representations of an alternative low-pressure casting system 300 using a mold placed into a chamber that is injected with Helium to form a part in an O 2 free environment.
- this alternative casting system 300 includes a mold transfer line 302 and a staging area 304 for preparing a mold 306 for casting a part.
- the mold 306 may be a permanent or semi-permanent type sand casting mold.
- the mold 306 may have a base or fixture 308 , a drag 310 , a cope 312 , and a pour cavity 314 .
- a cover 316 is provided and presented over the top of the mold 306 . It has an internal dimension D that is slightly larger than the outer dimension d of the fixture 306 so as to permit the cover 316 to be lowered and mated to the mold 306 whereby minimal gap is presented between these two structures.
- FIG. 5C illustrates the cover 316 having been completely positioned in place over the top of the mold 306 so as to form a sealed chamber 318 .
- the sealed chamber 318 creates an enclosed environment 320 for the mold 306 to reside, and for an inert gas to be inserted.
- the mold fixture 322 (the mold 306 and the cover 316 combined), is advanced in the direction of arrow 324 to a mold fill station where an inert gas is introduced to the sealed chamber via an inert gas source system 22 .
- an inert gas is introduced to the sealed chamber via an inert gas source system 22 .
- a degassing valve 324 from the sealed chamber 318 with an inert gas
- a low-pressure furnace 24 or other furnace system, begins to fill the mold 306 with molten material. It will be appreciated that aluminum castings, or other materials, may be used in this process.
- the piping system 404 includes a plurality of pipes 414 and elbows 416 , preferably made of metal, that are connected and progress through the recessed channel 408 .
- the pipes 414 include gas openings 418 that permit inert gas to be released out of the piping system 404 and directed towards the mold cavity. Inert gas flows in to the drag 402 in the direction of arrow 420 and is routed through the piping system.
- FIG. 7 discloses He and N 2 gas cooling curves 500 showing casting cooling times relative to pressure.
- graphs are depicted via curves showing furnace low-pressure injection rates of 5 psi, 10 psi, and 15 psi.
- the casting system 10 operates well within these pressure ranges.
- the Helium cooling affect also measurably reduces aluminum dendrite cell spacing [DCS], an equivalent technical term for commonly used secondary dendrite arm spacing [SDAS].
- the cooling curves 500 illustrate performance graphs that show He cools much faster than N 2 , the result of which is that faster production cycle times can be accomplished.
- the first test was to measure the cooling effects of Helium and Nitrogen gas in a close-to-open system where a preheated aluminum specimen was surrounded by the ceramic fibers.
- the highly permeable ceramic fibers generated virtually no back pressure in the system.
- the cooling curves of the preheated 6061 aluminum cylinder from 950F to 400F under different cooling gases and different gage pressures showed: [1] the mass flow rate of Helium is always higher than that of Nitrogen under any pressure applied, and [2] the cooling rate of the preheated metal increases with cooling medium mass flow rate. The results are consistent with the statistical thermodynamics gas theory.
- FIG. 8 represents a schematic diagram for an alternative foundry casting system using a die casting system 600 and method for making a part such as, but not limited to, an aluminum part for use in industries such as, for example, aerospace and automotive. It will be appreciated that this system 600 may be used to founder parts made of other metal types, with various sizes and geometries, and such system could also be deployed in low volume prototype and/or high volume production run type environments.
- the die casting system 600 may include a high pressure delivery system 602 , a metal pour system 604 , a die 606 , sensor monitoring system 608 , a machine 610 , a central processing unit 612 , and an inert gas delivery and control system 614 .
- the high pressure gas delivery system 602 includes an accumulator 620 that provides nitrogen to a cylinder 622 , which in turns drives a plunger 624 .
- the plunger 624 includes a piston 626 and at one opposing end it includes a ram 628 that is in turn received within a shot sleeve or channel 630 of the metal pour System 604 .
- the high pressure delivery system 602 provides constant controlled pressure on the molten metal 632 as the piston 626 traverses in the direction of arrow W.
- the high pressure system 602 may be secured to a support 634 which in turn can be mounted to a floor 636 of a factory.
- the metal pour system 604 may include a furnace (not shown) and a hot metal delivery system or device such as a ladle 640 for delivering molten metal 632 , such as aluminum or other metal, when in a liquid state to the shot sleeve 630 .
- a hot metal delivery system or device such as a ladle 640 for delivering molten metal 632 , such as aluminum or other metal, when in a liquid state to the shot sleeve 630 .
- molten metal 632 such as aluminum or other metal
- the metal 632 at this stage remains superheated and begins to flow towards a cavity 644 within the die 606 .
- various sensors as part of the sensor monitoring system 608 may be positioned relative to the metal pour system 604 for providing various feedback as to the status and performance of the system 600 .
- the sensor monitoring system 608 is connected 650 to the CPU 612 and provides automatic operational feedback regarding the various sensed conditions of the operation of the system 600 .
- sensor monitoring system 608 may include a plurality of separately located sensors that are disposed about the system 600 .
- the sensor monitoring system 608 may include sensor 652 that may provide data. regarding the condition of the metal pouring system 604 .
- a sensor 654 may provide data regarding conditions relative to the die 606 .
- a sensor 656 may provide data regarding the conditions that are relative to the inert gas delivery and control system 614 .
- a sensor 658 may provide data regarding the conditions that are relative to the high pressure system 602 .
- Collectively, or individually, these sensors may communicate, via hard wire and/or via telemetry, with the CPU 612 .
- the CPU 612 in turn processes said data to efficiently control operation of the casting system 600 .
- An inert gas control system is provided that contemplates delivery, maintenance, and discontinuance of an inert gas based on operating conditions that are communicate
- the machine 610 includes a clamp 660 , a platen 662 , a drive motor 664 , which collectively sit upon a base 666 .
- the die 606 is clamped and is held in place via the platen 662 during casting operation and is operable to move between an open position, and a closed position (which is shown in FIG. 8 ).
- the die 606 is vented 668 which provides for exhaust gases, including inert gases, to escape during the casting process.
- the CPU 612 may be connected to a network or its own stand-alone computer system.
- the CPU 612 communicates with the various systems of the die casting system 600 and controls them collectively to provide an efficient casting process.
- the CPU 612 may include controllers that facilitate operation of solenoids at various locations of the system to enhance effective operation of the system 600 .
- the inert gas delivery and control system 614 communicates with the CPU 612 and the sensors 654 that are within or in proximity to the die 606 .
- the inert gas system 614 includes a supply source 672 which may provide a supply of Helium, Argon, Nitrogen, or other inert gas.
- the gas system 614 may, either alone or in concert with the CPU 612 , control and monitor the flow of inert gas 670 from the supply source 672 as the gas travels to the die 606 .
- the inert gas system 614 may include a series of inert gas passageways 674 located within the die 606 for delivering gas 670 to various areas of the die 606 at predetermined time periods within a casting cycle.
- a communication device 676 may be placed with the high pressure system 602 , motor 664 , and elsewhere, and with the CPU 612 so as to provide communication within the system 600 .
- the communication device 676 may be wireless, blue tooth, near field, and/or other contactless methodology of transmitting data and/or signals about a system.
- the system 600 may be connected to the Internet of Things (IoT) to a remote system and/or network 678 .
- IoT Internet of Things
- FIG. 9 illustrates an exemplary die 606 that may be used in the casting system 600 that is shown in FIG. 8 .
- the die 606 includes a first member 606 A and a second member 606 B, the first member 606 A is shown schematically opened up so that the internal aspects of the die 600 can be depicted.
- the die 606 depicted is a single mold single cavity type for casting a single part each cycle. However, it will be appreciated that the die 606 could be a multi cavity die for making multiple castings per cycle.
- the die 606 includes a plurality of gas exit vents 680 that extend around the perimeter of the cavity 644 and they are configured to capture and hold exhaust gas as the metal 632 enters the cavity 644 and during the metal cooling and solidification process.
- the vents 680 may be spaced apart evenly and they also provide a volume of space for the inert gas 670 to escape into during the cooling and solidification process.
- the inert gas delivery flow path or passageway 674 is formed as a channel extending through one side 682 of the die 606 A.
- the passageway 674 is part of the inert gas delivery control system 614 and it is operable to provide a supply of inert gas 670 to the cavity 644 .
- a connector or coupler system 684 may be part of the inert gas delivery system 614 .
- the connector system 684 may be provided on the side 682 of the die 606 A to provide quick connection between the die 606 and the supply of inert gas.
- Alignment pins 686 and bores 688 may be provided around the perimeter of the die 606 so as to aid in closing die halves 606 A and 606 B.
- one or more sensors 654 may be provided within the cavity 644 and/or about the perimeter of the cavity 644 .
- the sensors 654 may be of the type that detects solidification, temperature, or other characteristics, of metal 632 during the cooling process.
- One aspect of this disclosure is that it delivers inert gas 670 at various predetermined times of the casting process.
- the sensors 654 aid to tell the CPU 612 and/or the inert gas delivery system 614 the cooling state of the molten metal 632 .
- inert gas 670 can be delivered to the cavity 644 before metal is delivered to the cavity so as to “flush” the cavity 644 and other areas of the die 606 . Such will aid in removing environmental contaminants from the die.
- gas 670 continues to be delivered to the die 606 during the metal pouring process.
- inert gas 670 continues to be delivered to the die 606 during the solidification process.
- the gas supply is turned off.
- the system may vary the rate of gas flow and pressure to the mold, and the system may automatically adjust said flow and pressure based on sensed conditions, material types, production demand, and/or other conditions.
- FIG. 10 is a perspective view of the part 690 that was cast using the die shown in FIG. 9 .
- FIG. 11 is an enlarged side section cut taken from line 692 of FIG. 10 , showing the construction of the part 690 that is produced using the process shown in FIG. 8 .
- the casting 690 has a wall 694 with a thickness that surrounds the cavity 644 .
- the wall 694 may include one or more vent plugs 696 that are disposed within the inert gas delivery path 674 . Alternatively, the vent plugs 696 may be disposed in the wall 694 outside of the path 674 .
- the plug 696 permits delivery of inert gas 670 so that it goes only one way, i.e., from the inert gas delivery and control system 614 into the cavity 644 .
- the plug 696 prevents gas 670 from reversing its flow and escaping the die 606 .
- Inert gas 670 is delivered to both side A and side B of the part during certain portions of the casting process.
- Side A reflects an inside surface of wall 694
- Side B reflects an outside surface of wall 694 .
- inert gas 670 impinges (as shown in the arrows) upon both sides A and B of the part 690 which aids enhancing the cooling and solidification rate of the part 690 .
- DAS Dendrite Arm Structure
- the metal does so under gas pressure which forces the inert gas onto and into surfaces A and B of the wall 694 . This enhances permeation of the gas into the wall 694 which further improves part characteristics.
- an improved casting 690 is provided that is cast using a method of applying pressurized inert gas to one or more surfaces of the inner and/or outer walls 694 of the casting 690 .
- the systems herein may apply inert gas pressure to just one side of the wall, or both sides of the wall, and that the system may also be modified to apply pressurized inert gas at different pressure levels to different surfaces (such as A and B). Further, a resulting casting may be produced deploying a process of impinging inert gas at different pressure levels to different sections of the part.
- the system may be designed to deliver inert gas, at certain delivery rates, to certain sections of the mold, so as to enhance the desired outcome of the resulting casting. This method and process is called direct casting feature enhancement.
- FIG. 12A is a top view of an exemplary vent plug 696 that has a porous surface 698 .
- the plug 696 may be a powder metal inert gas diffuser plug. The thickness of the plug may be equal or lesser than the thickness of the wall 694 .
- FIG. 12B shows an alternative plug 696 that operates as a gas diffuser and it may have a porous surface 698 that has varying characteristics so as to provide a greater flow of inert gas therethrough as compared to the plug 696 in FIG. 13A .
- FIG. 13C illustrates a top view of yet another alternative diffuser plug 696 , but this variant has a machined surface 700 with a series of offset form one another channels 702 extending in parallel relationship to one another. The machined surface 700 directs inert gas 670 to flow through the channels 702 . More or less channels 702 may be provided based on desired gas flow rates.
- the surface 700 may be flat or contoured.
- FIG. 13 is a flow chart of the method of operating 710 the foundry die casting system 600 that is shown in FIG. 8 .
- the method 710 may include more or less steps than that set forth herein. For exemplary purposes, helium gas is discussed but other inert gasses may be contemplated.
- the method of operating 710 includes starting 712 with the step of opening 714 the die 606 and preparing 716 the die for a casting process. Preparing the die 716 for the casting process may include bringing it to a desired temperature, cleaning it and then lubricating it to enhance part extraction. The next step is to close 718 the die halves to prepare them for the closure during the casting process. Closing the die halves and clamping them is performed using high pressure system of the machine 610 . A sensor senses when the die is closed 720 so that it can be sealed off for the metal pour process. This may be accomplished by using proximity sensors.
- the next step is to flush 722 the die cavity with an inert gas such as Helium.
- the flushing step is performed with a gas at a flow rate, for example, of about 10 liters/minute for about 10 seconds. This step forces air and other contaminants out from the cavity of the die 606 and replaces them with desired inert gas.
- the next process is to begin filling 724 the die cavity 644 with molten metal 632 .
- the inert gas at a lower feed rate is continuously delivered to the cavity 644 . This may be completed by transferring molten metal from the furnace into a ladle 640 .
- the ladle pours molten metal into the shot chamber 630 .
- the plunger 624 advances the molten metal which is in turn injected into the clamped cavity under high pressure. It will be appreciated that at the metal pouring step the inert gas continues to be delivered to the die cavity 644 but now at a slower feed rate of about liters/minute.
- an inert gas delivery system is provided that is variable and selective.
- the metal fill process 724 continues until a sensor senses when the cavity is full 726 . Once the cavity is full the fill process 724 stops and the solidification 728 of the casting begins. During the casting solidification process inert gas continues to be delivered to the cavity 644 . During the solidification step, a sensor senses 730 when solidification of the molten metal is complete. Once solidification has reached a predetermined state, the supply of inert gas is discontinued 732 to stop the flow of gas into the cavity 644 . The casting is now cooled sufficiently to be removed from the die 606 . This is accomplished by unclamping 734 the die halves 606 A and 606 B to permit ejecting 736 the part 690 from the die. Once the part 690 is ejected, the part is then trimmed 738 . The part is now complete and the process 710 has ended 740 .
- FIG. 14 is a schematic diagram of an alternative casting system, showing a permanent mold casting system 800 that employs a low-pressure counter gravity fed permanent mold 802 , illustrating the step of a mold cavity being filled using an inert gas.
- the permanent mold casting system 800 may include a first station 804 , a second station 806 , a third station 808 and a fourth station 810 .
- the first station 804 is a mold preparation stage where a mold is prepared for filling and an inert gas source is connected to the mold.
- the second station 804 is a low pressure counter gravity fed metal filling stage.
- the third station 806 is mold cooling stage where the inert gas source is disconnected from the mold.
- the fourth station 808 is where the part has solidified and is then ejected from the mold.
- the mold traverses on a conveyor system 812 that continuously indexes between said stations.
- An inert gas recovery and supply system 814 provides a method of delivering to a mold 802 inert gas 801 , and capturing inert gas, such as Helium, Argon and/or Nitrogen., that escapes from the mold 802 during the foundry process.
- the inert gas recovery and supply system 814 may include a supply source 816 , a gas delivery member 818 with a disconnect 846 for communicating the supply of inert gas 801 to a mold 802 .
- a reclaimer 819 captures inert gas 801 that escapes from the mold 802 during the foundry process as the mold 802 indexes from station 804 to station 808 .
- a captured gas return line 820 returns captured gas 803 from the reclaimer 819 to the gas supply source 816 .
- the gas supply source 816 may include a scrubber 822 for cleaning the returned supply of inert gas 803 before it enters the supply source 816 .
- the captured inert gas 803 may be kept separate or may be comingled with a clean supply of inert gas 801 .
- the inert gas recovery and supply system 814 may include a hood 824 that covers one more stations of the casting system 800 .
- the hood 824 is operable to capture from one or more stations the escaped inert gas 826 , direct the captured gas via line 828 to a supply source 816 .
- the casting system 800 may include a hood 824 or a single reclaimer 819 or a plurality of single reclaimers 819 disposed as various stations for aiding in recovering inert gas 801 that has escaped the foundry process. It will be appreciated that the escaped inert gas 826 may be recovered using other methods and hardware, all of which are contemplated by this disclosure.
- the system 814 may be deployed with the other casting systems 10 , 300 , 600 , that are set forth in this disclosure.
- the inert gas recovery and supply system 814 is operable to stay connected to the mold 802 as it indexes from station to station.
- the system may be provided with a disconnect 846 that communicates with the mold 802 .
- the disconnect 846 allows the supply of inert gas to be removed from the supply source 816 .
- the permanent mold casting system 800 further includes a molding machine 830 that is positioned at station 806 .
- the machine 830 includes a frame 832 , a clamp 834 , a slider 836 , push pins 838 , a ram 840 , and a platform 842 that the mold 802 rests upon.
- the ram 840 exerts pressure on the clamp 834 which in turn maintains pressure on the mold 802 to keep it closed which is the position shown in FIG. 14 .
- the casting system 800 further includes a high pressure source 850 for delivering a gas such as Nitrogen via a delivery tube 852 to an inlet 854 of a furnace 856 .
- the furnace 856 has a heater for maintaining molten metal 858 at a predetermined temperature.
- the furnace 856 includes a bottom wall 860 , side wall 862 , a furnace platform 864 , and a metal delivery tube 866 .
- the metal delivery tube 866 communicates with the mold 802 and provides a fluid flow of molten metal to a cavity 868 of the mold 802 .
- pressurized Nitrogen flows through delivery tube 852 to supply downward pressure 870 on the upper surface of a vat 872 that is filled with the molten metal 858 .
- the high pressure source 850 is operable to be controlled by a CPU 880 which in turn is connected to the inert gas supply source 816 , the machine 830 , the furnace 856 , and other systems of the casting system 800 .
- inert gas 801 continues to be delivered to the mold 802 to aid in part solidification and dendrite arm structure (DAS) formation.
- DAS dendrite arm structure
- the inert gas supply and recovery system 814 continues to monitor and deliver inert gas to the mold 802 during the solidification process.
- Sensors 882 may be deployed in and/or around the mold cavity 868 so as to aid in the determination of the solidification process of the new part 884 . It will be appreciated that the inert gas and recovery system 814 is operable to simultaneously deliver and maintain the proper supply of inert gas 801 to the various stations ( 804 , 806 and 808 ) while the casting system 800 is in operation.
- Inert gas 801 is delivered to the mold 802 similar to the method and system that was discussed in the system 600 , the discussion of which is hereby incorporated by reference. But generally, inert gas 801 is delivered to the cavity 868 via the gas delivery member 818 , to the mold 802 via a disconnect 820 , though a diffuser plug 696 (See FIGS. 12A-12 ), where a controlled supply of inert gas 801 can flush the cavity 868 and maintain a predetermined pressurized supply of gas to the mold 802 during the casting process.
- FIG. 15 is a flow chart of the method 900 of operating the low pressure counter gravity fed permanent mold casting system 800 that is shown in FIG. 14 .
- the first step starts 902 the casting process by preparing the mold 802 by preheating 904 is and lubricating it so as to enhance remove of the part once the casting process is completed. This is performed at the first station 804 .
- the next step is to inject 906 inert gas into the mold, 802 at a first flow rate until the mold is purged or flushed. It will be appreciated that the flow rate for flushing can be about 10 L/minute for a period of about 10 seconds.
- the mold 802 is flushed, the mold indexes to the fill station 806 .
- the supply of inert gas may be disconnected or maintained during this indexing step.
- the next step is to fill the mold by delivering 908 molten metal to the mold while delivering gas to the mold.
- the same gas flow rate or a different flow rate may be deployed during this mold fill step.
- Sensors may be deployed so as to monitor the level of inert gas within and/or around the cavity 868 so as to assure pressurized inert gas maintains the area within the cavity, and not contaminated environment gases. If the sensor senses contaminated environment gases, then the system 816 may increase pressure and force more inert gas within the cavity of the mold. Once the level inert gas within the cavity 868 is at a predetermined level, then the system 816 may automatically reduce the feed rate of inert gas. Mold fill sensor(s) 886 may be located within or about the cavity 868 so as to sense when the mold if full of molten metal. When this situation occurs, the mold is full and the pour process can be terminated.
- next step is to stop delivery 910 of metal to the mold.
- the Nitrogen supply source 850 stops applying pressure to Nitrogen supply line 866 so that the metal stops traversing upwardly in the metal delivery tube 866 .
- the mold 802 exits the machine 830 and indexes to the third station 808 where cooling of the part continues.
- the system continues 912 to deliver inert gas to the mold to aid in solidification.
- a solidification sensor 882 monitors the solidification status of the part 884 to determine 914 when the casting has solidified. Once the sensor 882 has determined with the casting has solidified, to a desired level, the system stops 916 delivering inert gas to the mold 802 .
- the final step is to index the mold 802 to the fourth station 810 and then separate 918 the part 884 from the mold.
- the process 900 in now ended 920 and the process can be repeated.
- FIG. 16 illustrates an alternative mold 1000 that may be used with a low-pressure gravity fed permanent mold system 1010 , wherein an inert gas supply 1012 , and venting system 1014 is provided to aid the solidification process of a part.
- the mold 1000 is used in a gravity fed system which is different than the counter gravity fed permanent mold system 800 that was discussed in FIGS. 8-15 .
- This gravity fed mold 1000 is used with mold system 1010 somewhat similar to the mold system 800 and has a furnace and other similar components which will not be repeated. A difference though is that the molten metal 858 is poured from the top 1016 of the mold 1000 .
- the mold 1000 has a first die or mold halve 1018 and a second die or mold halve 1020 .
- the two halves work in concert when they are closed using a machine 830 similar to that shown in FIG. 14 .
- a difference though is that the pouring system delivers molten metal 858 from the top 1016 of the mold instead of the bottom of the mold.
- the machine 830 is modified to accommodate delivery of molten metal to the top 1016 of the mold 1000 .
- the mold 1000 is connected to the supply of inert gas 1012 by a connector 1022 .
- a gas delivery passage 1024 extends within the mold halve 1020 or the mold halve 108 , or both, in order to deliver a supply of pressurized inert gas 801 to the lower portion of the mold cavity 1024 .
- This arrangement forces contaminants upward and out of the cavities 1026 via the venting system 1014 .
- the mold 1000 may have more than one cavity, and for exemplary purposes only, mold 1000 illustrates 3 cavities 1026 which allows the foundry to cast three parts per cycle.
- the casting system 1010 is operable to cast multiple parts per cycle while deploying the inert gas 801 process of flushing the cavities, filing the cavities 1026 with molten metal, and then solidifying the parts. This arrangement allows for a reduction in casting cycle times yet all the while producing castings that have improved Dendrite Arm Structures (DAS).
- DAS Dendrite Arm Structures
- the mold 1000 may also deploy vent plugs 696 (as shown in FIGS. 12A, 12B and 12C ) which aid in trapping inert gas 801 within the cavities 1026 and keeping out environmental contaminants.
- Sensors 882 may be placed about the mold 1000 to provide data on the performance of the molding performance, such as, but not limited to, if a cast part is solidified, cooled, molten, etc.
- a method of operating 1030 a low-pressure gravity fed permanent mold system 1010 of FIG. 16 is illustrated.
- the first step is to start 1032 the molding process.
- the next step is to prepare 1034 the mold by heating it and lubricating it so that the part can be easily removed.
- the next step is to close 1035 the mold halves 1018 and 1020 and activate the gas supply 1012 to flush 1036 the mold with an inert gas 801 .
- the inert gas 801 is continued to be fed to the cavities 1026 while the metal fill 1038 process begins.
- the metal filing process 1038 continues until a mold full indictor signal is sensed by a sensor 886 .
- the inert gas continues to be applied during this process and continues to permeate the walls of the cavities 1026 . At this point the mold is full of metal and the pouring process stops 1040 . During the fill process 1038 the venting system 1014 provides a path for gases to escape the cavities 1026 . This is aided by the continued positive pressure of inert gas 801 being exerted in the bottom of the mold 1000 . It will be appreciated that the inert gas supply and recovery system 814 discussed above may be deployed with the permanent mold system 1010 .
- the next step is the solidification process 1042 and during this process positive inert gas pressure continues to be deployed on the mold 1000 from supply 1012 .
- a metal solidification sensor 822 may be provided in a plurality of locations about the mold 1000 and once they indicate the casting has solidified to a certain state, then the gas supply 1012 is turned off and the part is then cooled sufficiently to then be removed from the mold.
- the next step is to eject 1044 the part 884 from the mold 1000 and the process can stop 1046 .
- the process 1030 can now be repeated and the mold 1000 can be reused to cast new parts.
- this method is intended to be used for high and low production volume permanent mold operations.
- FIG. 18 is a graph 1050 showing the material properties of a casting, where percent of elongation 1052 is shown as a measure of tensile strength 1054 vs. Dendrite Arm Spacing (DAS) 1056 . An inverse correlation exists between DAS 1056 and tensile strength 1054 . Likewise, an inverse correlation exists between DAS and elongation 1050 . Cast parts with lower DAS values are desirable as they have higher metallurgical properties. Cast parts using the inert gas systems and methods discussed herein have generally shown lower DAS values. DAS is a metallurgical characteristic that is dependent on molten metal cooling rates and influences the ductility [Elongation] of the aluminum most significantly as shown in FIG. 18 .
- FIG. 19 is a chart 1075 showing performance results of a sand mold aluminum casting trial where two castings having been cooled by conventional air have been compared to two castings having been cooled by an inert gas such as Helium.
- the graph represents improved Dendrite Arm Spacings, cooling rates, and percent of elongation of castings when Helium gas has been deployed during the foundry process.
- FIG. 20 is a chart 1080 showing performance results of a permanent mold casting trial using water cooled molds, wherein Dendrite Arm Spacing is shown to positively influence the volume percent of porosity of a casting compared to thermal fatigue life of a casting.
- the trial revealed that thermal fatigue life cycles of a casting increase measurably with the reduction of DAS and mico-porosity.
- DAS reduces, so does volume percent of porosity.
- the disclosed systems 10 , 600 , 800 , and 1000 employ an improved casting process that deploys inert gas during the casting process such that the resulting casting has improved DAS characteristics. Such casting processes can be deployed for prototype runs as well as high volume production operations.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Molds, Cores, And Manufacturing Methods Thereof (AREA)
Abstract
A foundry casting system and process employs an inert gas delivery and recovery system for casting parts which results in cast parts having improved metalurgical characteristics. The system may be employed in sand, die casting, semi-permanent and permanent casting environments. Pressurized inert gas may be diffused into the mold before, during and after the metal pouring step. The resulting casting is free from oxides and dissolved hydrogen gas as they are removed from the mold cavity. This results in higher quality castings as well as increased production output due to faster cooling cycles.
Description
- This application claims priority to U.S. patent application Ser. No. 15/976,305 filed May 10, 2018 and is hereby incorporated by reference in its entirety.
- The automotive and aerospace industries continue to drive innovation in a variety of technological fields, including that of the cast metals industry. Continual market pressure to significantly reduce cast component cost through productivity and weight reduction while increasing performance has highlighted the need for geometric design flexibility and the merging of value-added features into complex engineered castings. This focus gave birth to high volume precision sand casting (“PSC”) for aluminum engine blocks and cylinder heads. Dry sand molding combined with sand core technology for intricate internal casting features a practical and flexible approach for “Core-Pack Molding” in the production of aluminum castings. This technology is cost effective and complex-design friendly for a high-volume production foundry process. PSC technology is being utilized for the production of premium quality aluminum engine blocks in direct competition with die cast/permanent mold casting technology for the North American automotive industry.
- The automotive industry is continuously demanding reduction of vehicle weight, coupled with significant reduction in overall manufacturing product and process costs. There is a need to address this pressing demand for weight and cost reduction, for example, in engine block and powertrain components. Die casting (DC) and low-pressure permanent mold filling technologies could be enhanced by unique mold environment features to achieve cost reduction and premium quality aluminum metallurgy.
- The manufacturing industry is also demanding an improved casting process that can be used. in low to medium volume production facilities. For example, in the foundry environment, there is a demand to provide a casting system that is flexible for small production runs to generate prototype sample parts. There is also a demand to then utilize that same production process for larger scale production runs as well. Thus, a flexible casting process that is operable for prototype runs as well as production runs is in demand. Cost savings can result from such an improved casting system.
- The present disclosure contemplates a casting system and process employing high pressure die casting and/or low-pressure permanent mold casting process. Using a counter-gravity molten metal delivery system, a low-pressure furnace delivers premium quality molten lightweight material, such as aluminum, that is free from oxides and dissolved hydrogen gas into the mold cavity. A high-pressure metal delivery system in the die casting process utilizes a plunger that forced air out of the mold/die cavity via numerous strategically located air vents.
- To make the mold cavity free from oxides and provide a high heat transfer layer between the mold surface and the molten aluminum entering the mold cavity, an inert gas, such as but not limited to helium gas (He), is deployed which facilitates rapid solidification of the molten aluminum, thus influencing very fine metallurgical dendrite formation. A gas delivery and control system may work in connection with a CPU of a casting system to manage gas delivery. The inert gas is strategically introduced into the mold/die cavity through a gas piping system that is similar system to the air venting system and it is located particularly for the purpose of introducing helium gas. The cavity may be flushed with He prior to the metal being introduced into the cavity. The metallurgical impact on the aluminum is reflected in measurable [between 50% and 100%] mechanical property improvements. Vent plugs may be deployed to help diffuse inert gas into the cavity of the mold. Because casting solidification is enhanced significantly due to the helium cooling effect, production cycle time is reduced accordingly and thus productivity output is enhanced measurably.
- The die cast mold and/or permanent mold construction provides for helium venting passages that are strategically located in casting cavity areas in order to enhance solidification properties. He gas, because of its unique qualities of thermal conductivity [six times that of air], significantly improves the efficiency of the heat transfer of the molten metal, such as aluminum, that is in contact with mold cavity areas. Further, the He gas can be introduced into the mold via a targeted helium vent system that specifically targets the mold cavity for maximum effectiveness in order to achieve the desired mechanical and physical properties.
- This disclosure provides at least two improved hard mold tooling [iron and steel] configurations that take advantage of the He cooling gas environment. They are:
- 1. An improved high pressure die casting (DC) process that is designed to provide a high productivity production casting process. A plunger metal delivery system forces air in the steel mold cavity out of the mold and fill cavity prior to full solidification. Because the air is a high density media, evacuation is not nearly as rapid as desired. Thus, helium or another inert gas is deployed to occupy the mold cavities. Helium gas facilitates rapid mold cavity air evacuation as well as enhanced rapid solidification resulting premium quality castings. As a result, entrapped air is forced out. The resulting heat transfer between molten aluminum and. the steel die surface is accelerated and thus results in sound porosity free aluminum castings that are produced at faster cycle rates.
- 2. An improved permanent mold (PM) and semi-permanent mold (SPM) casting process is also disclosed to provide a high-volume production casting process. A distinction between the PM and SPM casting process and the DC process is the metal delivery system. In DC the metal is delivered under high pressure via plunger as opposed to PM and SPM the metal delivery can be by gravity pouring into the mold and/or low-pressure counter gravity delivery into the mold cavity. In either case, helium gas is flushed through the mold cavity prior to the mold filling step and during the mold solidifying step which is part of the dendrite formation stage. The resulting castings have improved mechanical properties and the foundry process has improved mold cycle rates. Casting thin wall capabilities are further enhanced and are now made possible because the air evacuation issues are now mitigated by the introduction of an inert gas.
-
FIG. 1 is a schematic diagram of a casting system for manufacturing metal castings, showing a mold being loaded in to a roll-over system; -
FIG. 2 is the schematic diagram of the casting system shown inFIG. 1 , showing a mold leaving the roll-over system after having been filled with molten material; -
FIGS. 3A-B are a flow diagram of the method of operating the casting system shown inFIGS. 1 and 2 ; -
FIG. 4 is an illustration of an alternative sand casting mold for making metal parts using a mold having a sealed compartment that can be injected with Helium; -
FIGS. 5A-5C are schematic representations of an alternative low-pressure casting system having a chamber environment deploying a mold placed in a chamber that is injected with Helium to form a part in an O2-free environment; -
FIG. 6 is a schematic diagram of an alternative metal casting system that uses a manifold system for delivering gas, such as Helium, into a lower portion of a mold during the casting process; -
FIG. 7 are Helium [He] and Nitrogen [N2] gas cooling curves showing casting cooling times relative to temperature; -
FIG. 8 is a schematic diagram of an alternative casting system, showing the foundry steps of die casting, including the step of a mold cavity being filled using inert gas; -
FIG. 9 is the die used in the casting system ofFIG. 8 , showing the two sections of the die opened along with an inert gas supply and venting arrangement; -
FIG. 10 is a perspective view of the cast part that could be manufactured in a foundry using the die shown inFIG. 9 ; -
FIG. 11 is an enlarged side section cut of the cast part shown inFIG. 10 , taken from the perspective of line 10-10, showing the construction of the part that is produced using the process shown inFIG. 8 ; -
FIG. 12A is an illustration of a vent plug made of powdered metal that can be used with the mold shown inFIG. 10 ; -
FIG. 12B is an illustration of an alternative vent plug; -
FIG. 12C is an illustration of a machined vent plug; -
FIG. 13 is a flow chart of the method of operating the foundry die casting system that is shown inFIG. 8 ; -
FIG. 14 is a schematic diagram of an alternative casting system, showing a permanent mold system that employs a low-pressure counter gravity fed permanent mold, illustrating the step of a mold cavity being filled while using an inert gas; -
FIG. 15 is a flow chart of the method of operating the low pressure counter gravity fed permanent mold casting system that is shown inFIG. 14 ; -
FIG. 16 is an alternative mold that is used in permanent mold casting system, showing a gravity fed permanent mold that has an inert gas supply and venting arrangement; -
FIG. 17 is a flow chart of the method of filling the gravity fed permanent mold die that is shown inFIG. 16 ; -
FIG. 18 is a graph showing the material properties of a casting, where percent of elongation is shown as a measure of tensile strength vs. Dendrite Arm Spacing (DAS); -
FIG. 19 is a comparison chart showing performance results of a sand mold aluminum casting trial where castings having been cooled by air (seecolumns 1 and 1) have been compared to castings having been cooled by an inert gas (seecolumns 3 and 4) such as Helium; and -
FIG. 20 is a chart showing performance results of a permanent mold casting trial that deployed water as a source to cool molds, wherein Dendrite Arm Spacing (DAS) is shown to positively influence the volume percent of porosity and thermal fatigue life of a casting. - A
casting system 10 can be deployed in a foundry prototype or hi-production facility where sand casting, die casting, permanent mold and semi-permanent mold casting process very thin, lightweight sand cores for Core-Pack Molding can be used in the production of light metal castings such as, but not limited to, aluminum and magnesium. The lightweight sand cores are produced with conventional machines and core sand binder systems. One improvement is in the assembly of the lightweight core segments with shape specific geometries into a core pack, and subsequently shrink-wrapped, to form a seal of the core pack to keep the assembly intact dimensionally while being counter-gravity filled with molten aluminum. The improved lightweight core pack can also be supported within a fixture and then sealed via, shrink wrap, or some other method, to achieve a self-contained mold environment that can be flushed with an inert cooling gas, such as, but not limited to, Helium, to significantly improve the molten metal and mold heat transfer characteristics. In addition to keeping the core pack assembly intact, the shrink wrap and/or other techniques create a self-contained environment that can be designed to allow for a vacuum attachment that will draw a vacuum on the mold cavity while being filled with molten metal. The slight vacuum will facilitate the removal of core gases as well as allow for the flushing of cooling gases and the removal of heat from the casting while it solidifies. - Helium cooling gas is a preferred gas for the casting system because of its physical characteristics compared to air or any other inert gas. Helium is inert and has a density seven times lower than air, with thermal conductivity properties six times that of air. Helium has three properties which play roles in influencing the present aluminum casting system. Specifically, Helium gas is inert, it has a low density, and it has attractive thermal conductivity characteristics. Taken individually, an inert gas mold cavity environment allows for rapid mold filling without the risk of metal oxidation and resultant casting defects. Such performance can result in faster cycle times, which improves production output per hour. The low-density gas will be pushed out of the mold cavity through the mold air venting system while the metal enters the mold with far less resistance; thus, facilitating thin-wall capability when compared to air. This results in smoother and quicker mold fill times, all while using thinner mold walls. And finally, the improved thermal conductivity will enhance the solidification process and significantly improve the efficiency of the metal mold wall because of significant heat transfer improvements drive directional metal solidification and improve aluminum metallurgy. This also results in faster cure times which translates in to increased production output per hour for a given casting station. The resulting system provides high production cycle rates due to the high metal fill rate. It also provides improved metal solidification rates resulting in improved microstructure characteristics, improved mechanical properties and thermal fatigue resistance. The present system is further flexible in that it can be used with commercial materials, such as aluminum alloys.
- An improved sand mold, hard casting mold/tooling cooling concept that leverages inert gas is operable to affect the metallurgical properties of aluminum. Such concepts may be applicable to sand casting, die casting, permanent and semi-permanent mold (hard mold tooling) aluminum casting process as well. The impact of a Helium cooling gas which is inert, has low density and is highly heat conductive, will yield similar results in hard mold tooling. The cooling gas may be introduced into the mold cavity and be targeted on specific areas of the resulting casting. Hard tooling is vented to allow core gases and expanding air in the mold cavity to escape—the same venting concept can be applied in reverse to introduce helium gas into the mold cavity. The cooling gas has a positive impact on the solidification characteristics of the aluminum thus achieving a metallurgical microstructure of very low secondary dendrite arm spacing higher strength and ductility. Productivity is also improved because of the solidification rate of the cast molten aluminum. Thus, the present disclosure may be applied to sand mold casting, die casting, permanent mold casting, and semi-permanent mold casting environments. For discussion purposes only, sand mold casting process, die casting, permanent and semi-permanent casting systems are presented. It will be appreciated that the disclosure may apply inert gas to a variety of metal casting processes.
- Referring now to
FIGS. 1-7 ,FIG. 1 in particular discloses a schematic diagram of one example of a sandmolding casting system 10 for manufacturingmetal castings 12 using a low-pressure casting environment deploying an anti-gravity fill system. Thecasting system 10 includes atransport system 14, afixture 16 loaded withmold segments 18, a roll-over fill station 20, an inertgas source system 22, and afurnace 24. Thetransport system 14 includes afirst portion 26 and a second portion 28 that may also be considered a cooling conveyor.Chillers 30 may be deployed near and or around the perimeter of the second portion 28 of thetransport system 14 to aid in the cooling of themold fixture 16 once it has left the roll-over fill station 20. - The
transport system 14 includesmotors 32,sensors 34, andPLCs 36 for controlling the operation of thecasting system 14. ThePLCs 36, in turn, may communicate with amain computer 38 located remotely in the foundry or elsewhere for controlling and overseeing the production environment at a given facility. It will be appreciated that themotors 32,sensors 34, andPLC 36 may be located at numerous locations within thecasting system 10 and they may be operable to communicate with each other in series and/or in parallel in order to effectuate the desired performance and production output. Thefirst portion 26 is operable to motivate a plurality offixtures 16 from an assembly area (not shown), along apath 40, and then deliver thefixture 16 to a receiving orinlet area 42 of the roll-over station 20. The operation of eachfixture 16 along thepath 40 of thefirst portion 26 is controlled by thePLC 36. For example, thesensor 34 may sense when afixture 16 has entered theinlet area 42, thus allowing the nextavailable fixture 16 to advance along thecasting system 10. - The roll-
over station 20 is the mold pouring station for thecasting system 10 and includes theinlet area 42, abase 44, ahead 46 with an indexing or rotating turret 48 that is connected to thebase 44, and anozzle inlet portion 50 for communicating with afurnace nozzle 52. The rotating turret 48 is operable to index axially in the direction ofarrow 54 relative to thebase 44. This action allows the turret 48 to index relative to thefurnace nozzle 52 during mold filling operations. For example, during mold fill operations, the turret 48 is extended. outwards towards thefurnace nozzle 52 so as to allow flow of the molten material such as aluminum in to thesand mold segments 18. Once the mold is full, metal flow is terminated, which then permits the rotating turret 48 to axially retract in the direction ofarrow 54 so as to permit thefurnace nozzle 52 to disconnect from thefixture 16. - The roll-
over station 20 is operable to rotate in the direction ofarrow 54 for the purpose of advancing thefixture 16 from anupright position 56 to aninverted position 58. Thefixture 16 enters theinlet 42 in theupright position 56, is secured via clampingmechanism 60, and then is inverted 180 degrees to theinverted position 58 as is shown inFIG. 1 . The rotating turret 48 then locks into place, which secures the fixture in theinverted position 58 during the He gas fill and the metal pour steps of the operation. The roll-over station 20 is operable to then advance the fixture in the direction ofarrow 62 to the second portion 28 of thetransport system 14, where it is then cooled viacoolers 30. Once cooled, the fixture enters a shake-out station 62 where the formed castpart 12 is then removed from thefixture 16. The fixture is then repurposed for later re-use. - The second portion 28 of the
transport system 14 includesrollers 68, similar to therollers 68 on thefirst portion 26, for supporting and advancing theinverted fixture 16′. The second portion 28 includesmotors 32,sensors 34, and aPLC 36, which is in turn connected 70 via a communication link to themain computer 38. It will be appreciated that thePLCs 36 could be connected using various telecommunication methods, for example blue tooth, near field proximity, or other type methods. One ormore chillers 30 may be placed along the path of the second portion 28 so as to effectuate cooling characteristics of the metal in themold segments 18. -
FIG. 2 discloses a schematic diagram of theCasting System 10 depicted inFIG. 1 , showing themold fixture 16′ exiting the roll-over station 20 after the mold fill step has been completed. A plurality ofmold fixtures 16 are stationed along thetransport system 14 in preparation to be introduced to the roll-over fill station 20. Here the roll-over station 20 has just completed a fill cycle and a cast part or casting 12 has been formed and is shown exiting 72, theoutlet 74 of the roll-over station 20. Thefixture 16′ advances towards thetransport system 14 and is shown inverted as that is the orientation of thefixture 16′ when it exits from the roil-over station 20. This permits the anti-gravity metal fill process to be accomplished. -
FIGS. 3A and 3B disclose an exemplary casting flow diagram orprocess 90 illustrating one example of a method of manufacturing a casting 12 using thecasting system 10 that is depicted inFIG. 1 . It will be appreciated that while the method presented discusses employing He as the inert gas, other inert gasses such as N2, or others, are contemplated by this disclosure. Further, themethod 90 of operating thecasting system 10 may include fewer or more of the following steps. This is but one example of how the method of operation could be contemplated. - 1. Providing mold segments and a support fixture for casting metal parts.
- 2. Loading the mold segments into the fixture.
- 3. Transferring fixture along a transport line to a mold roll-over station.
- 4. Loading fixture into the roll-over station (first position).
- 5. Securing fixture to the roll-over station.
- 6. Connecting He source to mold segments.
- 7. Injecting He into bottom of mold segments.
- 8. Hushing mold segments with He to create O2-free mold segments.
- 9. Rotating fixture via the roll-over station (second position).
- 10. Connecting fixture to a low pressure furnace.
- 11. Injecting molten metal into bottom of fixture for counter-gravity filling in an O2-free environment.
- 12. Continuing to inject metal using low-pressure, counter-gravity cycle to form a part.
- 13. Stopping fill of mold with metal when mold full signal is detected.
- 14. Rolling fixture back to the first position.
- 15. Disconnecting fixture from furnace.
- 16. Disconnecting He source from fixture.
- 17. Removing fixture from roll-over station.
- 18. Advancing fixture to cooling conveyor.
- 19. Introducing chill cycle to part.
- 20. Shaking out part from fixture.
- 21. Repeating steps to form another part.
- The method of casting 90 may begin with
step 100, which is providing mold segments and a support fixture for casting metal parts, may include themold segments 18 being individual molds that are aligned in segments such that they can be encapsulated and held in place by thefixture 16 during the molding process. After the casting process is complete, the mold segments are destroyed during the shake-out process so as to separate thecast part 12 from thefixture 16′. The fixture in turn can be reused for another mold cycle by installingnew mold segments 18. It will be appreciated that based on the design of the castingpart 12 to be manufactured, that asingle segment 18 or segments aligned in different fashions may be employed. - The
next step 102 is loadingmold segments 18 into thefixture 16, and this step may include inserting a plurality ofindividual segments 18 which collectively form themold 76. This step can be performed off-line and in a staging area. - The
next step 104 is to transfer thefixture 16 along atransport line 14 to a mold roll-over station 20, where molten material is introduced to themold 76. The fixture transfer process may be controlled by themain computer 38, which in turn my have human interface for selectively controlling the operations. - The
next step 106 is to load thefixture 16 into the roll-over station 20 which is shown inFIG. 1 as a first or upright position. The fixture enters the roll-over station 20 by rolling off thetransport system 14 and into theinlet 50 of the roll-over station 20. Once the fixture is advanced to this position, anotherfixture 16 on thetransport system 14 is advanced so that it can be staged and ready to be processed at the next available pour cycle. - The
next step 108 is to secure thefixture 16 to the roll-over station 20. This may be accomplished by using an automated locking system having clamps and sensors that communicate with thecomputer 38. This securingstep 108 holds the fixture in place when it is rotated 180 degrees before the fill cycle. - The
next step 110 is to connect theHe source 22 to themold segments 18 ormold 76. This step provides the supply of inert gas, such as He, to themold 76 so that a constant supply of He can be delivered at predetermined pressures and predetermined flow rates. This results in a controlled He infusion process which can be adjusted based on the mold's geometry. TheHe source 22 can be controlled by thePLC 36 orcomputer 38, and thus the He delivery process can be specifically controlled so as to yield a certain result within themold 76. For example, for amold 76 withmany mold segments 18, the rate of gas delivery to the mold's cavity can be controlled so as to have the rate of infusion of the inert gas calculated to exhaust Oxygen from the cavity of the mold in the best possible way. - The
next step 112 is to inject He into the bottom of the mold segments. This step starts the process of removing O2 particles from the base of the mold cavity. - The
next step 114 is to flush themold segments 18 with He under a predetermined pressure and flow rate so as to create an environment of O2-free mold segments, along with any other particles that may be present in the cavity of the mold segments. This is the step where the inertgas source system 22 continuously works to flush the entire cavity with inert gas sufficient to evacuate all O2, and penetrate the porous walls of the mold to form a barrier layer of inert gas on the surface of the inner wall cavity. This barrier layer of inert gas helps the thermal cooling performance as it has high thermal conductivity. A goal of this step may be to provide total He gas saturation within themold cavity 76. Another goal is to provide targeted He gas delivery to specific sections within the mold cavity, and that can be accomplished by the inertgas source system 22 working in concert with, for example, a manifold delivery system. (SeeFIG. 6 .) - The
next step 116 is to rotate thefixture 16 using the mold roll-over station 20 to a second orinverted position 58. By rotating the fixture 180 degrees, this facilitates an anti-gravity molten metal fill process. Constant inert gas pressure may be applied during this roll-over process so that positive pressure is maintained within the cavity to aid in keeping O2 for reentering the mold cavity. This process will help keep the mold cavity saturated with inert gas before and during the mold fill process. - The
next step 118 is to connect thefixture 16 to the low-pressure furnace 24. This can be accomplished by the turret 48 indexing axially in a direction opposite ofarrow 54. The turret 48 indexes to the point where it fully connects to thenozzle 52 which extends outward from the body of thefurnace 24. Once thenozzle 52 is connected to the turret 48, this becomes the metal pour fill position and such is maintained during the pour fill cycle. - The
next step 120 includes injecting intobottom 78 offixture 16molten metal 80 using a counter gravity filling process wheremolten metal 80 is delivered in an O2-free environment. The counter-gravity filling process results in introducingmolten metal 80 in the bottom 78 of the sand mold using a low-pressure system furnace delivery system. The pressure range employed in this counter-gravity filling process could be in the range of 5 psi to 20 psi and the flow rate could be in the range of 5 to 25 pounds/second. By introducing themolten metal 80 using this counter-gravity methodology, themolten metal 80 will displace the He within the cavity as the pressurized molten metal traverses from the bottom of thecavity 78 and makes its way upward, against gravity, through theinternal spaces 82 of the cavity. As themetal 80 continues to displace the He and travel upward against gravity, the He is exhausted out adegassing valve 222 near the top of thefixture 16. (SeeFIG. 4 ) This process continues until a predetermined amount ofmetal 80 has been introduced in to cavity such that the cavity has been filled. - The
next step 122 is to continue injecting metal using low-pressure counter-gravity cycle to form acasting part 12. This is improved by the deployment of He in the cavity which improves fluid flow. The He further reduces turbulent metal flow within the cavity which permits a more rapid fill rate because, in part, there is less push back because the air has been removed from the cavity. This step includes the low-pressure furnace 24 deliveringmolten metal 80, aluminum for example, but other metals are contemplated by this disclosure, through thefurnace nozzle 52 which in turn directs themetal 80 to themold cavity 76.FIG. 4 illustrates an example of a cross-section of onesuch mold cavity 76, which is discussed further below.Metal 80 enters the bottom of the cavity and is forced up and through the cavity. This fill process continues for a predetermined period of time which may be controlled by thecomputer 38, or a separate fill system having its own sensors, valves, and control logic. - The next step 124 is to stop filling the mold with
molten metal 80 when a mold full signal is generated by amold fill sensor 84. Thesensor 84 may be situated near the top 86 of the mold. The sensor may communicate with thePLC 36, thecomputer 38, and/or a separate fill system. Thefill sensor 84 may be on board thefixture 16, as is shown inFIG. 1 , or inside themold cavity 76, or thesensor 84 may be positioned elsewhere relative to thecasting system 10. Stopping the flow of metal to the mold may be accomplished by other means, which are contemplated by this disclosure. - The
next step 126 of the casting process may include rolling thefixture 16 back to thefirst position 26. This would be the same orientation as thefixture 16 had when it entered the roil-over station 20 at the beginning of the fill cycle. SeeFIG. 1 . By contrast, it will also be appreciated that this step may be avoided and the fixture with the newly molded castingpart 12 may be kept inverted, as is shown inFIG. 2 , and then exited from the roll-over station 20. The decision how to orient the fixture at this stage of theprocess 90 provides for a flexible method of operation. - The
next step 128 is to disconnectfixture 16 fromfurnace 24. This can be accomplished by retracting the turret 48 in the direction ofarrow 54 so as to cause thenozzle 52 to disengage theinlet 50 of the turret 48. It will be appreciated that this step may be accomplished using adrive system 88 that may be on-board or external to the roll-over station 20. Thedrive system 88 is operable to control the indexing of the turret 48 relative to the base 44 at predetermined periods of the metal pour cycle. - The
next step 130 is to disconnect the He fromfixture 16 so as to no longer deliver pressurized He to thefixture 16. This may be accomplished manually or by thesystem 10 being automated in this regard so long as the inertgas source system 22 is no longer delivering a supply of gas to the cavity. Theinert gas system 22 may include a supply tank, lines, valves, sensors, gauges, and its own controller. - The
next step 132 is to remove thefixture 16 from roll-over station 20. This may be accomplished in several ways, one of which could include actuators propelling thefixture 16 in adirection 62 away from the roll-over station 20 so as to advance thefixture 16 towards the second line 28 which could also be referenced as a cooling conveyor. - The
next step 134 is to advance thefixture 16′ to the cooling conveyor which embodies the second line 28 for the final processing of the fixture. Once thefixture 16′ is securely positioned on the cooling conveyor 28, the roll-over station 20 is now free to accept anotherfixture 16 that in turn can be loaded, and thus a new mold fill process can begin once it is has been properly positioned. - The
next step 136 is to introduce chill cycle to thefixture 16′ and thus thepart 12 that is now curing within thefixture 16′. By employing chillers at this stage, thepart 12 will begin cool quicker which results in improved part characteristics. The chill cycle may be accomplished by the use ofchillers 30 that are shown inFIGS. 1 and 2 in schematic form where thechillers 30 may be placed in close proximity to the cooling conveyor 28. One ormore chillers 30 may be deployed in thiscasting system 10. Thechillers 30 may encapsulate thefixture 16′ as thefixture 16′ traverses along the conveyor, or they may be lesser configured as is shown in the FIGS. The chillers may be flexible and programmable so as to exert a predetermined amount of cooling capacity so as to meet the cooling preferences on any givenfixture 16′ as it traverses the conveyor. For example, if afixture 16′ is hosting a castingpart 12 that has a large dimensional characteristic, then thechillers 30 may be programmed to deliver a high cooling capacity so as to cool thepart 12 at a preferred rate of cooling. By contrast, if thefixture 16′ is hosting asmaller part 12 to be cast, then thechillers 30 may be programmed to deliver a lower cooling capacity. - The
next step 138 is to shake out thepart 12 from thefixture 16. This is done after thechillers 30, if any, have completed their cooling cycle and thus thepart 12 is ready to be broken away from the fixture and the sand molds therein. The shake outstep 138 may be accomplished using conventional means in the industry. However, one variant here is that thefixture 16′ will be preserved and repurposed so as to be deployed again in anothercasting process 90. Thus, the shake outprocess 138 contemplates a recovery system for the just usedfixture 16′, a procedure for separating out the dirty sand, and for then advancing thenew part 12 to a finishing station. - The
next step 140 is to repeat steps 100-138 to form another castingpart 12. Thiscasting process 90 contemplates employing thecasting system 10 over and over again so that a continuous mold line can operate at varying capacities. For example, prototype mold casting runs can be envisioned with the present system because it is flexible in thatfixtures 16 can be loaded on to thetransport system 14, all the while theparts 12 to be formed can be of different sizes and shapes. Thecomputers 38 andPLCs 36 may permit selective programming for eachfixture 16, which in turn allows for the mold fill cycle to be uniquely controlled, and the chill cycle to be uniquely controlled, all based on the desired characteristics for aparticular part 12. The mold fill cycle can contemplate steps 102-132, while the chill cycle can contemplate steps 134-136. - Another example of the flexibility of the present system is that small prototype runs may be intermixed with large scale production runs. This can be accomplished because each
fixture 16 may have itsown mold parameters part 12 that is to be cast. For example, onemold parameter 140 could be specific instructions regarding the part to be manufactured, part size, target weight, inert gas type to be delivered to the cavity, rate of gas delivery, pressure rate of gas delivery, cycle time, mold fill cycle time target rates, metal type, chill cycle times, target part material properties, etc. Any bit of information that may be important, specific, and/or unique to thepart 12 to be cast could be contemplated as amold parameter mold parameters computer 38 and/or housed in the cloud. - It will also be appreciated that on large scale casting production runs, the
casting system 10 can be deployed where theidentical part 12 can be cast for extended periods of time, such as days, weeks, months, even years. If a part changeover is later desired, then themold parameters 142 for the next desired part can be set up and programmed, and because thesystem 10 is flexible, the production line can be easily transitioned to casting another part as desired. -
FIG. 4 discloses an illustration of but onesand casting mold 76 for making metal parts using thecasting system 10 andcasting method 90 set forth herein. The castingmold 76 may have a sealed mold compartment that can be injected with inert gas such as Helium as well as un-unsealed mold compartment. It will be appreciated that themolds 76 used with thecasting system 10 may have only one cavity, or more than one cavity, which is style illustrated. It will also be appreciated that thecavity 76 may have a plurality of cavities, all of which could be sealed or unsealed. For demonstrative purposes only,FIG. 4 shows both a sealed and an unsealed (full of air) cavity. - The
sand casting mold 76 includescross-sections 200 with an exemplarymold cavity section 202 having a sealed configuration and a non-sealed 204 cavity configuration. The sealedcavity section 202 includes aseal 206 that creates a sealed environment for surrounding and segregating the permeable sand mold 208 from the rest of its environment. Theseal 206 may be a bag, liner, or other device that is operable to withstand the internal operating characteristics that are present in the casting environment. Theseal 206 encapsulates the sand mold 208 and is operable to keep air out while maintaining inert gas inside the liner during the mold pour cycle. The seal is capable of withstanding pressures in the range of 5 psi to 50 psi. Within the center of the sand mold is thecavity 210 which takes on the form of thecast part 12 that is to be formed in this foundry process. -
Inert gas 212 such as, but not limited to He, is introduced at aninlet 213 into a mold gate and it traverses along apath 214 to where aninlet valve 216 may control the flow ofgas 212.Gas 212 passes past thevalve 216 through aseal member 218 that is positioned adjacent a lower portion of theliner 206.Gas 212 then is forced in the direction ofarrow 220 to where it permeates and saturates thecavity 210. Adegassing valve 222 is positioned at an opposite side of the sealedliner 206. Within the sealedliner 206 is aninternal environment 224 whereingas particles 226 are forced up and out of the environment through thedegassing valve 222. Before theinternal environment 224 is flushed with an inert gas, it contains atmospheric contaminates such as O2, and others, which can be flushed out with the aid of the pressurizedinert gas system 22. Thegas 212 flow and pressure rates may be controlled by thesystem 22 so as to achieve a desired part performance. - With continued reference to
FIG. 4 , anair cavity section 204 is depicted that does not have a sealedliner 206. This is considered an air mold that is operable to deploy other aspects of the inert gas infusion system disclosed herein. In particular, gas, such as He, traverses along apath 230 and through avalve 216 and onward up into thepermeable sand mold 232 and thecavity 234. Thegas 212 continues to fill thesand mold 232 as long as thevalve 216 remains open. As thegas 212 enters thesand mold 232 isforces particles 236 up and out of thesand mold 232 in many directions. Because noseal liner 206 is present in this embodiment, the atmospheric pressure will permit O2 particles to reenter thesand mold 232 if a positive pressure is not maintained via the inertgas supply system 22. Thus, maintaining positive He pressure will aid in keeping impurities out of thesand mold 232 during the molding cycle. -
FIGS. 5A-5C disclose schematic representations of an alternative low-pressure casting system 300 using a mold placed into a chamber that is injected with Helium to form a part in an O2 free environment. Referring toFIG. 5A , thisalternative casting system 300 includes amold transfer line 302 and astaging area 304 for preparing amold 306 for casting a part. Themold 306 may be a permanent or semi-permanent type sand casting mold. Themold 306 may have a base orfixture 308, adrag 310, a cope 312, and a pourcavity 314. - With reference to
FIG. 5B , acover 316 is provided and presented over the top of themold 306. It has an internal dimension D that is slightly larger than the outer dimension d of thefixture 306 so as to permit thecover 316 to be lowered and mated to themold 306 whereby minimal gap is presented between these two structures.FIG. 5C illustrates thecover 316 having been completely positioned in place over the top of themold 306 so as to form a sealedchamber 318. The sealedchamber 318 creates anenclosed environment 320 for themold 306 to reside, and for an inert gas to be inserted. Once thecover 316 is in place, the mold fixture 322 (themold 306 and thecover 316 combined), is advanced in the direction ofarrow 324 to a mold fill station where an inert gas is introduced to the sealed chamber via an inertgas source system 22. Once the O2 particles have been flushed via adegassing valve 324 from the sealedchamber 318 with an inert gas, a low-pressure furnace 24, or other furnace system, begins to fill themold 306 with molten material. It will be appreciated that aluminum castings, or other materials, may be used in this process. -
FIG. 6 discloses a schematic diagram of an alternative metal casting system that uses amanifold system 400 for delivering gas such as Helium in to a mold during the casting process. Themanifold system 400 may be deployed in thecasting system 300 that is shown inFIGS. 5A-5C . Themanifold system 400 includes asand mold drag 402 and apiping system 404. Thedrag 402 has abody 406, a recessedchannel 408, anentrance 410 and anexit 412. The recessed channel is deep enough to receive thepiping system 404. The recessedchannel 408 provides a void for also delivering inert gas to the cavity of the mold. - The
piping system 404 includes a plurality ofpipes 414 andelbows 416, preferably made of metal, that are connected and progress through the recessedchannel 408. Thepipes 414 include gas openings 418 that permit inert gas to be released out of thepiping system 404 and directed towards the mold cavity. Inert gas flows in to thedrag 402 in the direction ofarrow 420 and is routed through the piping system. -
FIG. 7 discloses He and N2 gas cooling curves 500 showing casting cooling times relative to pressure. In these figures graphs are depicted via curves showing furnace low-pressure injection rates of 5 psi, 10 psi, and 15 psi. Thecasting system 10 operates well within these pressure ranges. The Helium cooling affect also measurably reduces aluminum dendrite cell spacing [DCS], an equivalent technical term for commonly used secondary dendrite arm spacing [SDAS]. The cooling curves 500 illustrate performance graphs that show He cools much faster than N2, the result of which is that faster production cycle times can be accomplished. - The efficiency of Helium as a cooling gas and the impact on the aluminum metallurgy has been evaluated under two very distinct test environments: [1] measure the cooling rate of Helium and Nitrogen on a preheated slug of aluminum, and [2] measure the cooling rate of Helium and Nitrogen in an encapsulated sand mold environment when filled with molten aluminum.
- The first test was to measure the cooling effects of Helium and Nitrogen gas in a close-to-open system where a preheated aluminum specimen was surrounded by the ceramic fibers. The highly permeable ceramic fibers generated virtually no back pressure in the system. The cooling curves of the preheated 6061 aluminum cylinder from 950F to 400F under different cooling gases and different gage pressures showed: [1] the mass flow rate of Helium is always higher than that of Nitrogen under any pressure applied, and [2] the cooling rate of the preheated metal increases with cooling medium mass flow rate. The results are consistent with the statistical thermodynamics gas theory. The gas theory predicts that Helium molecules have a slightly lower heat capacity than Nitrogen [by ˜30%], but travel much faster [by ˜160%] than Nitrogen under any given temperature because of its lower molecular weight than Nitrogen (4 to 28). For a given gage pressure [≈ overall pressure differential] there are significantly more Helium molecules available to remove heat than Nitrogen. Consequently, this gas cooling efficiency test demonstrates very clearly the measurably higher cooling rates for Helium gas when compared to air.
- In the second test, Helium and Nitrogen gas was applied to a sealed sand mold before and during casting solidification, in addition, a mold was poured without any gas flow simulating a conventional sand mold filling environment. The cooling curves decidedly show the cooling effect of Helium gas compared to Nitrogen gas as well as a comparative cooling curve for a conventionally solidified mold environment. The thermal data strongly suggests that Helium cooling will cause a DCS reduction based on the well-known relationship between aluminum alloy DCS and local solidification time. This test data supports application of inert gas to the casting process for not only sand castings, but also die casting, permanent and semi-permanent casting operations.
-
FIG. 8 represents a schematic diagram for an alternative foundry casting system using adie casting system 600 and method for making a part such as, but not limited to, an aluminum part for use in industries such as, for example, aerospace and automotive. It will be appreciated that thissystem 600 may be used to founder parts made of other metal types, with various sizes and geometries, and such system could also be deployed in low volume prototype and/or high volume production run type environments. Thedie casting system 600 may include a highpressure delivery system 602, a metal poursystem 604, adie 606, sensor monitoring system 608, a machine 610, acentral processing unit 612, and an inert gas delivery andcontrol system 614. - The high pressure
gas delivery system 602 includes anaccumulator 620 that provides nitrogen to acylinder 622, which in turns drives aplunger 624. Theplunger 624 includes apiston 626 and at one opposing end it includes aram 628 that is in turn received within a shot sleeve or channel 630 of the metal pourSystem 604. The highpressure delivery system 602 provides constant controlled pressure on themolten metal 632 as thepiston 626 traverses in the direction of arrow W. Thehigh pressure system 602 may be secured to asupport 634 which in turn can be mounted to a floor 636 of a factory. - The metal pour
system 604 may include a furnace (not shown) and a hot metal delivery system or device such as a ladle 640 for deliveringmolten metal 632, such as aluminum or other metal, when in a liquid state to the shot sleeve 630. When themetal 632 is in the shot sleeve 630 it accumulates, becomes pressurized and starts to flow in the direction ofarrow 642 which provides a flow of metal to the inlet of thedie 606. Themetal 632 at this stage remains superheated and begins to flow towards acavity 644 within thedie 606. It will be appreciated that various sensors as part of the sensor monitoring system 608 may be positioned relative to the metal poursystem 604 for providing various feedback as to the status and performance of thesystem 600. - The sensor monitoring system 608 is connected 650 to the
CPU 612 and provides automatic operational feedback regarding the various sensed conditions of the operation of thesystem 600. For example, sensor monitoring system 608 may include a plurality of separately located sensors that are disposed about thesystem 600. Further, the sensor monitoring system 608 may include sensor 652 that may provide data. regarding the condition of themetal pouring system 604. Asensor 654 may provide data regarding conditions relative to thedie 606. Asensor 656 may provide data regarding the conditions that are relative to the inert gas delivery andcontrol system 614. Asensor 658 may provide data regarding the conditions that are relative to thehigh pressure system 602. Collectively, or individually, these sensors may communicate, via hard wire and/or via telemetry, with theCPU 612. TheCPU 612 in turn processes said data to efficiently control operation of thecasting system 600. An inert gas control system is provided that contemplates delivery, maintenance, and discontinuance of an inert gas based on operating conditions that are communicated by said sensors. - The machine 610 includes a
clamp 660, aplaten 662, adrive motor 664, which collectively sit upon abase 666. Thedie 606 is clamped and is held in place via theplaten 662 during casting operation and is operable to move between an open position, and a closed position (which is shown inFIG. 8 ). Thedie 606 is vented 668 which provides for exhaust gases, including inert gases, to escape during the casting process. - The
CPU 612 may be connected to a network or its own stand-alone computer system. TheCPU 612 communicates with the various systems of thedie casting system 600 and controls them collectively to provide an efficient casting process. TheCPU 612 may include controllers that facilitate operation of solenoids at various locations of the system to enhance effective operation of thesystem 600. - The inert gas delivery and
control system 614 communicates with theCPU 612 and thesensors 654 that are within or in proximity to thedie 606. Theinert gas system 614 includes asupply source 672 which may provide a supply of Helium, Argon, Nitrogen, or other inert gas. Thegas system 614, may, either alone or in concert with theCPU 612, control and monitor the flow ofinert gas 670 from thesupply source 672 as the gas travels to thedie 606. Theinert gas system 614 may include a series ofinert gas passageways 674 located within thedie 606 for deliveringgas 670 to various areas of the die 606 at predetermined time periods within a casting cycle. Acommunication device 676 may be placed with thehigh pressure system 602,motor 664, and elsewhere, and with theCPU 612 so as to provide communication within thesystem 600. Thecommunication device 676 may be wireless, blue tooth, near field, and/or other contactless methodology of transmitting data and/or signals about a system. Further, thesystem 600 may be connected to the Internet of Things (IoT) to a remote system and/ornetwork 678. -
FIG. 9 illustrates anexemplary die 606 that may be used in thecasting system 600 that is shown inFIG. 8 . Thedie 606 includes a first member 606A and a second member 606B, the first member 606A is shown schematically opened up so that the internal aspects of thedie 600 can be depicted. The die 606 depicted is a single mold single cavity type for casting a single part each cycle. However, it will be appreciated that thedie 606 could be a multi cavity die for making multiple castings per cycle. - The
die 606 includes a plurality of gas exit vents 680 that extend around the perimeter of thecavity 644 and they are configured to capture and hold exhaust gas as themetal 632 enters thecavity 644 and during the metal cooling and solidification process. Thevents 680 may be spaced apart evenly and they also provide a volume of space for theinert gas 670 to escape into during the cooling and solidification process. in one of the dies 606, for example in the female die shown at 606A, the inert gas delivery flow path orpassageway 674 is formed as a channel extending through oneside 682 of the die 606A. Thepassageway 674 is part of the inert gasdelivery control system 614 and it is operable to provide a supply ofinert gas 670 to thecavity 644. It will be appreciated that a connector orcoupler system 684 may be part of the inertgas delivery system 614. Theconnector system 684 may be provided on theside 682 of the die 606A to provide quick connection between the die 606 and the supply of inert gas. Alignment pins 686 and bores 688 may be provided around the perimeter of the die 606 so as to aid in closing die halves 606A and 606B. - With continued reference to
FIG. 9 , one ormore sensors 654 may be provided within thecavity 644 and/or about the perimeter of thecavity 644. Thesensors 654 may be of the type that detects solidification, temperature, or other characteristics, ofmetal 632 during the cooling process. One aspect of this disclosure is that it deliversinert gas 670 at various predetermined times of the casting process. Thus, thesensors 654 aid to tell theCPU 612 and/or the inertgas delivery system 614 the cooling state of themolten metal 632. For example,inert gas 670 can be delivered to thecavity 644 before metal is delivered to the cavity so as to “flush” thecavity 644 and other areas of thedie 606. Such will aid in removing environmental contaminants from the die. Once the die is “flushed”, thengas 670 continues to be delivered to thedie 606 during the metal pouring process. Once the pouring process is complete,inert gas 670 continues to be delivered to thedie 606 during the solidification process. Once thesensor 654 indicates a desired solidification state of a part, then the gas supply is turned off. Throughout the gas delivery process, the system may vary the rate of gas flow and pressure to the mold, and the system may automatically adjust said flow and pressure based on sensed conditions, material types, production demand, and/or other conditions. -
FIG. 10 is a perspective view of thepart 690 that was cast using the die shown inFIG. 9 .FIG. 11 is an enlarged side section cut taken fromline 692 ofFIG. 10 , showing the construction of thepart 690 that is produced using the process shown inFIG. 8 . The casting 690 has awall 694 with a thickness that surrounds thecavity 644. Thewall 694 may include one or more vent plugs 696 that are disposed within the inertgas delivery path 674. Alternatively, the vent plugs 696 may be disposed in thewall 694 outside of thepath 674. Theplug 696 permits delivery ofinert gas 670 so that it goes only one way, i.e., from the inert gas delivery andcontrol system 614 into thecavity 644. Theplug 696 preventsgas 670 from reversing its flow and escaping thedie 606. -
Inert gas 670 is delivered to both side A and side B of the part during certain portions of the casting process. Side A reflects an inside surface ofwall 694, while Side B reflects an outside surface ofwall 694. Thus,inert gas 670 impinges (as shown in the arrows) upon both sides A and B of thepart 690 which aids enhancing the cooling and solidification rate of thepart 690. Such action positively influences the Dendrite Arm Structure (DAS) of the resultingpart 690. See the tables herein. Further, as the metal solidifies, it does so under gas pressure which forces the inert gas onto and into surfaces A and B of thewall 694. This enhances permeation of the gas into thewall 694 which further improves part characteristics. Thus, animproved casting 690 is provided that is cast using a method of applying pressurized inert gas to one or more surfaces of the inner and/orouter walls 694 of the casting 690. - It will be appreciated that the systems herein may apply inert gas pressure to just one side of the wall, or both sides of the wall, and that the system may also be modified to apply pressurized inert gas at different pressure levels to different surfaces (such as A and B). Further, a resulting casting may be produced deploying a process of impinging inert gas at different pressure levels to different sections of the part. Thus, if it is desired to have a resulting part that has different performance characteristics at different sections of the casting, then the system may be designed to deliver inert gas, at certain delivery rates, to certain sections of the mold, so as to enhance the desired outcome of the resulting casting. This method and process is called direct casting feature enhancement.
-
FIG. 12A is a top view of anexemplary vent plug 696 that has aporous surface 698. Theplug 696 may be a powder metal inert gas diffuser plug. The thickness of the plug may be equal or lesser than the thickness of thewall 694.FIG. 12B shows analternative plug 696 that operates as a gas diffuser and it may have aporous surface 698 that has varying characteristics so as to provide a greater flow of inert gas therethrough as compared to theplug 696 inFIG. 13A .FIG. 13C illustrates a top view of yet anotheralternative diffuser plug 696, but this variant has a machinedsurface 700 with a series of offset form one anotherchannels 702 extending in parallel relationship to one another. Themachined surface 700 directsinert gas 670 to flow through thechannels 702. More orless channels 702 may be provided based on desired gas flow rates. Thesurface 700 may be flat or contoured. -
FIG. 13 is a flow chart of the method of operating 710 the foundrydie casting system 600 that is shown inFIG. 8 . Themethod 710 may include more or less steps than that set forth herein. For exemplary purposes, helium gas is discussed but other inert gasses may be contemplated. The method of operating 710 includes starting 712 with the step of opening 714 thedie 606 and preparing 716 the die for a casting process. Preparing thedie 716 for the casting process may include bringing it to a desired temperature, cleaning it and then lubricating it to enhance part extraction. The next step is to close 718 the die halves to prepare them for the closure during the casting process. Closing the die halves and clamping them is performed using high pressure system of the machine 610. A sensor senses when the die is closed 720 so that it can be sealed off for the metal pour process. This may be accomplished by using proximity sensors. - The next step is to flush 722 the die cavity with an inert gas such as Helium. The flushing step is performed with a gas at a flow rate, for example, of about 10 liters/minute for about 10 seconds. This step forces air and other contaminants out from the cavity of the
die 606 and replaces them with desired inert gas. - Once the die cavity is flushed with an inert gas, the next process is to begin filling 724 the
die cavity 644 withmolten metal 632. During this metal fill process, the inert gas at a lower feed rate is continuously delivered to thecavity 644. This may be completed by transferring molten metal from the furnace into a ladle 640. The ladle pours molten metal into the shot chamber 630. Theplunger 624 advances the molten metal which is in turn injected into the clamped cavity under high pressure. It will be appreciated that at the metal pouring step the inert gas continues to be delivered to thedie cavity 644 but now at a slower feed rate of about liters/minute. Thus, an inert gas delivery system is provided that is variable and selective. - The
metal fill process 724 continues until a sensor senses when the cavity is full 726. Once the cavity is full thefill process 724 stops and thesolidification 728 of the casting begins. During the casting solidification process inert gas continues to be delivered to thecavity 644. During the solidification step, a sensor senses 730 when solidification of the molten metal is complete. Once solidification has reached a predetermined state, the supply of inert gas is discontinued 732 to stop the flow of gas into thecavity 644. The casting is now cooled sufficiently to be removed from thedie 606. This is accomplished by unclamping 734 the die halves 606A and 606B to permit ejecting 736 thepart 690 from the die. Once thepart 690 is ejected, the part is then trimmed 738. The part is now complete and theprocess 710 has ended 740. -
FIG. 14 is a schematic diagram of an alternative casting system, showing a permanentmold casting system 800 that employs a low-pressure counter gravity fedpermanent mold 802, illustrating the step of a mold cavity being filled using an inert gas. The permanentmold casting system 800 may include afirst station 804, asecond station 806, athird station 808 and afourth station 810. Thefirst station 804 is a mold preparation stage where a mold is prepared for filling and an inert gas source is connected to the mold. Thesecond station 804 is a low pressure counter gravity fed metal filling stage. Thethird station 806 is mold cooling stage where the inert gas source is disconnected from the mold. Thefourth station 808 is where the part has solidified and is then ejected from the mold. The mold traverses on aconveyor system 812 that continuously indexes between said stations. - An inert gas recovery and
supply system 814 provides a method of delivering to amold 802inert gas 801, and capturing inert gas, such as Helium, Argon and/or Nitrogen., that escapes from themold 802 during the foundry process. The inert gas recovery andsupply system 814 may include asupply source 816, agas delivery member 818 with adisconnect 846 for communicating the supply ofinert gas 801 to amold 802. Areclaimer 819 capturesinert gas 801 that escapes from themold 802 during the foundry process as themold 802 indexes fromstation 804 tostation 808. A capturedgas return line 820 returns capturedgas 803 from thereclaimer 819 to thegas supply source 816. Thegas supply source 816 may include a scrubber 822 for cleaning the returned supply ofinert gas 803 before it enters thesupply source 816. The capturedinert gas 803 may be kept separate or may be comingled with a clean supply ofinert gas 801. - The inert gas recovery and
supply system 814 may include ahood 824 that covers one more stations of thecasting system 800. Thehood 824 is operable to capture from one or more stations the escapedinert gas 826, direct the captured gas via line 828 to asupply source 816. Thus, thecasting system 800 may include ahood 824 or asingle reclaimer 819 or a plurality ofsingle reclaimers 819 disposed as various stations for aiding in recoveringinert gas 801 that has escaped the foundry process. It will be appreciated that the escapedinert gas 826 may be recovered using other methods and hardware, all of which are contemplated by this disclosure. - The
system 814 may be deployed with theother casting systems supply system 814 is operable to stay connected to themold 802 as it indexes from station to station. The system may be provided with adisconnect 846 that communicates with themold 802. Thedisconnect 846 allows the supply of inert gas to be removed from thesupply source 816. - The permanent
mold casting system 800 further includes amolding machine 830 that is positioned atstation 806. Themachine 830 includes aframe 832, aclamp 834, aslider 836, push pins 838, aram 840, and aplatform 842 that themold 802 rests upon. Theram 840 exerts pressure on theclamp 834 which in turn maintains pressure on themold 802 to keep it closed which is the position shown inFIG. 14 . - The
casting system 800 further includes ahigh pressure source 850 for delivering a gas such as Nitrogen via adelivery tube 852 to aninlet 854 of afurnace 856. Thefurnace 856 has a heater for maintainingmolten metal 858 at a predetermined temperature. Thefurnace 856 includes abottom wall 860,side wall 862, afurnace platform 864, and ametal delivery tube 866. Themetal delivery tube 866 communicates with themold 802 and provides a fluid flow of molten metal to acavity 868 of themold 802. During operation, pressurized Nitrogen flows throughdelivery tube 852 to supplydownward pressure 870 on the upper surface of avat 872 that is filled with themolten metal 858. This pressure causes an upward movement of molten metal to traverse upwardly withinmetal delivery tube 866 and then in turn into thecavity 868 of themold 802. Thehigh pressure source 850 is operable to be controlled by aCPU 880 which in turn is connected to the inertgas supply source 816, themachine 830, thefurnace 856, and other systems of thecasting system 800. - With continued reference to
FIG. 14 , once a part has been cast, it is removed from themachine 830 and traverses on the conveyor to thenext station 808 where the solidification process continues. Atstation 808,inert gas 801 continues to be delivered to themold 802 to aid in part solidification and dendrite arm structure (DAS) formation. The inert gas supply andrecovery system 814 continues to monitor and deliver inert gas to themold 802 during the solidification process.Sensors 882 may be deployed in and/or around themold cavity 868 so as to aid in the determination of the solidification process of thenew part 884. It will be appreciated that the inert gas andrecovery system 814 is operable to simultaneously deliver and maintain the proper supply ofinert gas 801 to the various stations (804, 806 and 808) while thecasting system 800 is in operation. -
Inert gas 801 is delivered to themold 802 similar to the method and system that was discussed in thesystem 600, the discussion of which is hereby incorporated by reference. But generally,inert gas 801 is delivered to thecavity 868 via thegas delivery member 818, to themold 802 via adisconnect 820, though a diffuser plug 696 (SeeFIGS. 12A-12 ), where a controlled supply ofinert gas 801 can flush thecavity 868 and maintain a predetermined pressurized supply of gas to themold 802 during the casting process. -
FIG. 15 is a flow chart of themethod 900 of operating the low pressure counter gravity fed permanentmold casting system 800 that is shown inFIG. 14 . The first step starts 902 the casting process by preparing themold 802 by preheating 904 is and lubricating it so as to enhance remove of the part once the casting process is completed. This is performed at thefirst station 804. The next step is to inject 906 inert gas into the mold, 802 at a first flow rate until the mold is purged or flushed. It will be appreciated that the flow rate for flushing can be about 10 L/minute for a period of about 10 seconds. Once themold 802 is flushed, the mold indexes to thefill station 806. The supply of inert gas may be disconnected or maintained during this indexing step. - The next step is to fill the mold by delivering 908 molten metal to the mold while delivering gas to the mold. The same gas flow rate or a different flow rate may be deployed during this mold fill step. Sensors may be deployed so as to monitor the level of inert gas within and/or around the
cavity 868 so as to assure pressurized inert gas maintains the area within the cavity, and not contaminated environment gases. If the sensor senses contaminated environment gases, then thesystem 816 may increase pressure and force more inert gas within the cavity of the mold. Once the level inert gas within thecavity 868 is at a predetermined level, then thesystem 816 may automatically reduce the feed rate of inert gas. Mold fill sensor(s) 886 may be located within or about thecavity 868 so as to sense when the mold if full of molten metal. When this situation occurs, the mold is full and the pour process can be terminated. - Then next step is to stop
delivery 910 of metal to the mold. When this occurs, theNitrogen supply source 850 stops applying pressure toNitrogen supply line 866 so that the metal stops traversing upwardly in themetal delivery tube 866. Once the fill process stops, themold 802 exits themachine 830 and indexes to thethird station 808 where cooling of the part continues. During the cooling phase, the system continues 912 to deliver inert gas to the mold to aid in solidification. Asolidification sensor 882 monitors the solidification status of thepart 884 to determine 914 when the casting has solidified. Once thesensor 882 has determined with the casting has solidified, to a desired level, the system stops 916 delivering inert gas to themold 802. The final step is to index themold 802 to thefourth station 810 and then separate 918 thepart 884 from the mold. Theprocess 900 in now ended 920 and the process can be repeated. -
FIG. 16 illustrates analternative mold 1000 that may be used with a low-pressure gravity fedpermanent mold system 1010, wherein aninert gas supply 1012, andventing system 1014 is provided to aid the solidification process of a part. Themold 1000 is used in a gravity fed system which is different than the counter gravity fedpermanent mold system 800 that was discussed inFIGS. 8-15 . This gravity fedmold 1000 is used withmold system 1010 somewhat similar to themold system 800 and has a furnace and other similar components which will not be repeated. A difference though is that themolten metal 858 is poured from the top 1016 of themold 1000. Themold 1000 has a first die ormold halve 1018 and a second die ormold halve 1020. The two halves work in concert when they are closed using amachine 830 similar to that shown inFIG. 14 . A difference though is that the pouring system deliversmolten metal 858 from the top 1016 of the mold instead of the bottom of the mold. Thus themachine 830 is modified to accommodate delivery of molten metal to the top 1016 of themold 1000. - The
mold 1000 is connected to the supply ofinert gas 1012 by aconnector 1022. A gas delivery passage 1024 extends within themold halve 1020 or the mold halve 108, or both, in order to deliver a supply of pressurizedinert gas 801 to the lower portion of the mold cavity 1024. This arrangement forces contaminants upward and out of thecavities 1026 via theventing system 1014. Themold 1000 may have more than one cavity, and for exemplary purposes only,mold 1000 illustrates 3cavities 1026 which allows the foundry to cast three parts per cycle. Thus, thecasting system 1010 is operable to cast multiple parts per cycle while deploying theinert gas 801 process of flushing the cavities, filing thecavities 1026 with molten metal, and then solidifying the parts. This arrangement allows for a reduction in casting cycle times yet all the while producing castings that have improved Dendrite Arm Structures (DAS). - The
mold 1000 may also deploy vent plugs 696 (as shown inFIGS. 12A, 12B and 12C ) which aid in trappinginert gas 801 within thecavities 1026 and keeping out environmental contaminants.Sensors 882 may be placed about themold 1000 to provide data on the performance of the molding performance, such as, but not limited to, if a cast part is solidified, cooled, molten, etc. - With reference to
FIG. 17 , a method of operating 1030 a low-pressure gravity fedpermanent mold system 1010 ofFIG. 16 is illustrated. The first step is to start 1032 the molding process. The next step is to prepare 1034 the mold by heating it and lubricating it so that the part can be easily removed. The next step is to close 1035 themold halves gas supply 1012 to flush 1036 the mold with aninert gas 801. Once the mold cavity is flushed, theinert gas 801 is continued to be fed to thecavities 1026 while themetal fill 1038 process begins. Themetal filing process 1038 continues until a mold full indictor signal is sensed by asensor 886. The inert gas continues to be applied during this process and continues to permeate the walls of thecavities 1026. At this point the mold is full of metal and the pouring process stops 1040. During thefill process 1038 theventing system 1014 provides a path for gases to escape thecavities 1026. This is aided by the continued positive pressure ofinert gas 801 being exerted in the bottom of themold 1000. It will be appreciated that the inert gas supply andrecovery system 814 discussed above may be deployed with thepermanent mold system 1010. - The next step is the
solidification process 1042 and during this process positive inert gas pressure continues to be deployed on themold 1000 fromsupply 1012. A metal solidification sensor 822 may be provided in a plurality of locations about themold 1000 and once they indicate the casting has solidified to a certain state, then thegas supply 1012 is turned off and the part is then cooled sufficiently to then be removed from the mold. The next step is to eject 1044 thepart 884 from themold 1000 and the process can stop 1046. Theprocess 1030 can now be repeated and themold 1000 can be reused to cast new parts. Thus, this method is intended to be used for high and low production volume permanent mold operations. -
FIG. 18 is agraph 1050 showing the material properties of a casting, where percent ofelongation 1052 is shown as a measure oftensile strength 1054 vs. Dendrite Arm Spacing (DAS) 1056. An inverse correlation exists betweenDAS 1056 andtensile strength 1054. Likewise, an inverse correlation exists between DAS andelongation 1050. Cast parts with lower DAS values are desirable as they have higher metallurgical properties. Cast parts using the inert gas systems and methods discussed herein have generally shown lower DAS values. DAS is a metallurgical characteristic that is dependent on molten metal cooling rates and influences the ductility [Elongation] of the aluminum most significantly as shown inFIG. 18 . The data base for metal/material properties existing in handbooks up until now was entirely developed over the years under atmospheric conditions [Nitrogen & Oxygen] and thus influenced by their physical characteristics during solidification. However, Helium gas is an inert and very low density gas with extremely high conductivity operates to positively change the property characteristics that are influenced by cooling rates while solidifying. -
FIG. 19 is achart 1075 showing performance results of a sand mold aluminum casting trial where two castings having been cooled by conventional air have been compared to two castings having been cooled by an inert gas such as Helium. The graph represents improved Dendrite Arm Spacings, cooling rates, and percent of elongation of castings when Helium gas has been deployed during the foundry process. -
FIG. 20 is achart 1080 showing performance results of a permanent mold casting trial using water cooled molds, wherein Dendrite Arm Spacing is shown to positively influence the volume percent of porosity of a casting compared to thermal fatigue life of a casting. In general, the trial revealed that thermal fatigue life cycles of a casting increase measurably with the reduction of DAS and mico-porosity. Likewise, as DAS reduces, so does volume percent of porosity. The disclosedsystems - It will be appreciated that the aforementioned method and systems may be modified to have some components and steps removed, or may have additional components and steps added, all of which are deemed to be within the spirit of the present disclosure. Even though the present disclosure has been described in detail with reference to specific embodiments, it will be appreciated that the various modifications and changes can be made to these embodiments without departing from the scope of the present disclosure as set forth in the claims. The specification and the drawings are to be regarded as an illustrative thought instead of merely restrictive thought.
Claims (21)
1-20. (canceled)
21. A casting with a dendrite arm structure (DAS) which is less than 30 microns, prepared by a foundry casting process comprising the steps of:
providing at least one mold;
connecting an inert gas to the mold;
delivering inert gas to the mold;
flushing mold with inert gas;
delivering molten metal to the mold to form a casting;
stop delivering metal to the mold; and
removing casting from mold, the casting having an inner surface and an outer surface.
22. The casting as claimed in claim 21 , further comprising a step of continuously delivering inert gas to the mold during the delivering molten metal to the mold step.
23. The casting as claimed in claim 21 , further comprising a step of continuously delivering inert gas to the mold up until the step of removing casting from mold.
24. The casting as claimed in claim 21 , wherein the inert gas is one of helium, argon, or nitrogen.
25. The casting as claimed in claim 21 , Wherein the dendrite arm structure (DAS) of the casting is in the range of 16 microns to 25 microns.
26. The casting as claimed in claim 21 , wherein a percent of elongation of the casting is in a range of 10 to 14.
27. The casting as claimed in claim 21 , further comprising the step of applying pressurized inert gas to at least one surface of a casting.
28. The casting as claimed in claim 21 , further comprising the step of impinging inert gas at different pressure levels to different surfaces of the casting.
29. The casting as claimed in claim 21 , further comprising a dendrite arm structure (DAS) in one area of the casting that is different than another area of the casting.
30. The casting as claimed in claim 21 , wherein the flushing step provides inert gas at a rate of about 10 liters per minute for a period of about 10 seconds.
31. The casting as claimed in claim 21 , wherein the step of delivering inert gas includes varying a flow rate of inert gas during the casting process.
32. A foundry casting process of making a casting using inert gas to purge and aid in the solidification of a casting, the process comprising the steps of:
providing a mold for use with casting a metal part;
connecting an inert gas to the mold;
flushing the mold with inert gas to purge the mold of impurities and to create an O2-free area inside of the mold;
delivering molten metal into the O2-free area inside of the mold;
stopping the flow of molten metal;
continuing to deliver inert gas to the mold during solidification of the molten metal;
stopping the supply of inert gas to the mold; and
removing the metal part from the mold.
33. The product of the process of claim 32 .
34. The product of the process of chin herein the product has a property of a dendrite arm structure (DAS) of less than 30 microns.
35. The product of the process of claim 32 , wherein the product has a property of a percent of elongation in a range of 10 to 14.
36. The process of claim 32 , further comprising the step of sensing when the molten metal has solidified.
37. A foundry casting process for manufacture of a casting which comprises:
providing at least one mold and a fixture;
loading the mold into the fixture;
transferring the fixture to a mold station;
before or after the transferring step, flushing the mold with an inert gas to create an area within the mold that is O2-free;
injecting molten metal into the mold while continuously delivering inert gas to the mold;
stop filling mold when mold is full; and
removing fixture from mold station.
38. A casting manufactured by the process of claim 37 .
39. A casting manufactured by the process of claim 37 , wherein the casting has a dendrite arm structure (DAS) property that is the range of 16 microns to 25 microns.
40. A casting manufactured by the process of claim 37 , wherein the casting has a yield strength that is in the range of 89 Mpa to 92 Mpa.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/897,803 US20200331058A1 (en) | 2018-05-10 | 2020-06-10 | Casting process |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/976,305 US11148194B2 (en) | 2018-05-10 | 2018-05-10 | Casting system |
US16/456,201 US10933465B2 (en) | 2018-05-10 | 2019-06-28 | Casting system |
US16/897,803 US20200331058A1 (en) | 2018-05-10 | 2020-06-10 | Casting process |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/456,201 Division US10933465B2 (en) | 2018-05-10 | 2019-06-28 | Casting system |
Publications (1)
Publication Number | Publication Date |
---|---|
US20200331058A1 true US20200331058A1 (en) | 2020-10-22 |
Family
ID=68463868
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/456,201 Active US10933465B2 (en) | 2018-05-10 | 2019-06-28 | Casting system |
US16/897,803 Abandoned US20200331058A1 (en) | 2018-05-10 | 2020-06-10 | Casting process |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/456,201 Active US10933465B2 (en) | 2018-05-10 | 2019-06-28 | Casting system |
Country Status (1)
Country | Link |
---|---|
US (2) | US10933465B2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4104950A1 (en) * | 2021-06-18 | 2022-12-21 | Cevher Jant Sanayii A.S. | A low pressure casting method and a system thereof |
CN114346213A (en) * | 2022-01-11 | 2022-04-15 | 定州市四新工业有限公司 | Low-pressure casting die and low-pressure casting process suitable for same |
JP1737989S (en) * | 2022-01-18 | 2023-03-01 | casting machine (part of) | |
WO2023158747A1 (en) * | 2022-02-17 | 2023-08-24 | Pyrotek, Inc. | Method and apparatus for improving aluminum degassing efficiency |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE790179A (en) * | 1971-10-18 | 1973-02-15 | Soag Machinery Ltd | LOW PRESSURE SHELL MOLDING PROCESS AND APPARATUS FOR IMPLEMENTING THE PROCESS |
JPS61209761A (en) * | 1985-03-13 | 1986-09-18 | Toshiba Mach Co Ltd | Method for controlling casting with die casting machine and gas vent sensor to be used therein |
US4633930A (en) * | 1985-06-11 | 1987-01-06 | The Dow Chemical Company | Molten metal shot size and delivery mechanism for continuous casting operations |
KR910004219B1 (en) * | 1987-12-10 | 1991-06-24 | 도오시바 기까이 가부시기가이샤 | Method & device for the gas blow-out state in a mold |
US5163500A (en) * | 1991-12-13 | 1992-11-17 | Ford Motor Company | Rollover method for metal casting |
JP3370232B2 (en) | 1996-05-31 | 2003-01-27 | 碧海工機株式会社 | Mold moving type continuous gravity casting line equipment |
US6247521B1 (en) * | 1996-08-15 | 2001-06-19 | Toyota Jidosha Kabushiki Kaisha | Pressure difference control method for filling a cavity with melt |
JP3460560B2 (en) | 1998-01-06 | 2003-10-27 | トヨタ自動車株式会社 | Casting apparatus and casting method |
US20010002617A1 (en) * | 1998-12-23 | 2001-06-07 | United Technologies Corporation | Apparatus and methods for die casting |
EP1417063B2 (en) * | 2001-08-17 | 2012-08-08 | Cymat Technologies Ltd. | Method for low pressure casting metal foam |
DE10144945B4 (en) * | 2001-09-12 | 2005-05-04 | Alcan Bdw Gmbh & Co. Kg | A method of controlling a vacuum valve of a vacuum die casting apparatus and vacuum die casting apparatus |
US20030056929A1 (en) * | 2001-09-24 | 2003-03-27 | Staley James T. | Die casting of wrought aluminum alloys |
JP2006212697A (en) * | 2005-02-07 | 2006-08-17 | Honda Motor Co Ltd | Die for die casting |
US7896059B2 (en) * | 2006-01-03 | 2011-03-01 | Adolf Hetke | Metal casting system, engineered molds, process and articles made thereby |
JP2011192544A (en) | 2010-03-15 | 2011-09-29 | Idemitsu Kosan Co Ltd | Photoelectric conversion device |
WO2017085765A1 (en) | 2015-11-16 | 2017-05-26 | 新東工業株式会社 | Casting equipment and management method for mold fabrication data for mold and melt state data for melt in casting equipment |
JP2018065168A (en) | 2016-10-19 | 2018-04-26 | メタルエンジニアリング株式会社 | Pouring system |
-
2019
- 2019-06-28 US US16/456,201 patent/US10933465B2/en active Active
-
2020
- 2020-06-10 US US16/897,803 patent/US20200331058A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
US10933465B2 (en) | 2021-03-02 |
US20190344335A1 (en) | 2019-11-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10933465B2 (en) | Casting system | |
US6637497B2 (en) | Automotive and aerospace materials in a continuous, pressurized mold filling and casting machine | |
US4589466A (en) | Metal casting | |
AU614404B2 (en) | Countergravity casting method and apparatus | |
KR101810522B1 (en) | Inclined gravity casting device | |
JP2007075862A (en) | Casting method | |
US11148194B2 (en) | Casting system | |
JP2007075862A5 (en) | ||
JP2003528731A (en) | Downcast casting method to sand mold with controlled solidification of casting material | |
US4832105A (en) | Investment casting method and apparatus, and cast article produced thereby | |
AU2021100090A4 (en) | ICS- Counter Gravity Casting: Intelligent Centrifugal Counter Gravity Low- cost Casting System | |
BR112019021639B1 (en) | METHOD AND DEVICE FOR FILLING AN ANTIGRAVITY MOLD | |
US20170182552A1 (en) | Method for operating a vacuum die-casting machine | |
US4862945A (en) | Vacuum countergravity casting apparatus and method with backflow valve | |
JP2009214111A (en) | Vertical casting apparatus and vertical-type casting method | |
JP2009131888A (en) | Casting apparatus | |
HU221249B1 (en) | Process and apparatus and a mould for the production of a light metal casting | |
US5636680A (en) | Method and device for terminating the casting process after non-gravity casting of moulds, especially green-sand moulds, particularly with easily oxidable metals or metal alloys | |
WO2010078201A1 (en) | Low-pressure sand casting of aluminum alloy cylinder engine parts | |
JP3103345B2 (en) | Manufacturing method of nonferrous metal casting by green sand mold | |
CN212216999U (en) | Casting mould | |
JP2007190607A (en) | Die casting apparatus and die casting method | |
JP6183272B2 (en) | Casting apparatus and casting method | |
DE69924726T2 (en) | FEEDING USING A SEALABLE PRESSURE CAP | |
JPS60162553A (en) | Molding method in packed casting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |